Attachment-30 COLS Grounds Maintenance.pdf
PDF 100 KB Posted
- Solicitation number
- FA7060-23-R-0010
About this file
This document outlines requirements for grounds maintenance services at four Air Force bases. It specifies that 100% of grounds at base 1 should be maintained according to standards for improved grounds, with 2-4 inch mowing and trimming of all areas. Base 2 requires 75% of grounds to meet improved grounds standards, while bases 3 and 4 require 50% and 15% respectively. Services include mowing, edging, irrigation, fertilization, debris and pest removal, pruning, and ditch maintenance. Additional requirements vary by base but may include tree trimming, removal and replanting, bed maintenance, and special event support.
View the file
Other files
Show 40 more
Latest 50 of 83 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AFCOLS
FY20 AF COLS Function: Grounds Maintenance Level: 3 PEC: XXX
Working Group: AF COLS EEIC: XXX ACP POCs
Responsibility Organization Name Email
PEM
Program Lead Program Lead Program Lead
RESOURCES
The Grounds Maintenance mission is to provide Air Force bases with landscaping activities, vegetation management and control, and mowing services for improved and semi-improved, unimproved, and airfield grounds in order to maintain the aesthetic and natural environment of the base and to comply with Federal and Air Force mandates regarding safety and the environment.
Manpower (Civ) Contract (CME) Manpower (Mil) Non-manpower
Mission Area Description:
AF COLS 1: Classified 100% as Improved Grounds in FY17 is also classified as Improved Grounds in current FY, Maintained 100% Improved Grounds at 2"-4" per the 2008 LoS Baseline, Trimmed and edged 100% to present a neat and professional appearance per the 2008 LoS Baseline, Irrigated and received 100 % irrigation maintenance to maintain a healthy state and keep an operational and efficient system per the 2008 LoS Baseline, Fertilized 100% "as needed" per the 2008 LoS Baseline, Kept 100% clear of debris, trash, and other foreign objects to present a neat and professional appearance per the 2008 LoS Baseline, Received 100% leaf removal per the 2008 LoS Baseline (NTE 6x per year), Received 100% pest and weed control to maintain professional appearance per the 2008 LoS Baseline, Pruned or trimmed 100% of shrubs, hedges, and similar vegetation as required for safety and security and to promote natural growth, Maintained 100% grounds at 4"-10" per the 2008 LoS Baseline, Trimmed 100% of grounds to present a neat and professional appearance per the 2008 LoS Baseline, Maintained 100% grounds in accordance with AFI 91-202, Maintained 100% grounds per 2008 LoS Baseline (typically once per year at 10"-14"), Maintained 100% ditches to control erosion and ensure continuous free flow of water per the 2008 LoS Baseline, Number of Other Requirements provided from the list below:
1. Prune & Trim Trees
2. Remove Trees & Stumps
3. Special Cuts
4. Maintain Vegetative Inert, Flower Beds, & Related
5. Plant Trees, Shrubs, Vegetative, Inert, & Flower Beds
AF COLS 2: Classified 100% as Improved Grounds in FY17 is also classified as Improved Grounds in current FY, Maintained 75% Improved Grounds at 2"-4" per the 2008 LoS Baseline, Trimmed and edged 75% to present a neat and professional appearance per the 2008 LoS Baseline, Irrigated and received 75% irrigation maintenance to maintain a healthy state and keep an operational and efficient system per the 2008 LoS Baseline, Fertilized 75% "as needed" per the 2008 LoS Baseline, Kept 75% clear of debris, trash, and other foreign objects to present a neat and professional appearance per the 2008 LoS Baseline, Received 75% leaf removal per the 2008 LoS Baseline
Description: Provide landscaping services for land occupied by buildings and other permanent structures, as well as lawns and landscape plantings on which personnel annually plan and perform intensive maintenance activities, including the cantonment area, parade grounds, drill fields, athletic areas, green-belt along major roadways, installation entry points (primary and high use gates), picnic grounds within the cantonment area, memorials, and cemeteries, and landscaping services on land where periodic maintenance is performed
, , g j p p pp p , p
(NTE 6x per year), Received 75% pest and weed control to maintain professional appearance per the 2008 LoS Baseline, Pruned or trimmed 75% of shrubs, hedges, and similar vegetation as required for safety and security and to promote natural growth, Maintained 75% grounds at 4"-10" per the 2008 LoS Baseline, Trimmed 75% of grounds to present a neat and professional appearance per the 2008 LoS Baseline, Maintained 100% grounds in accordance with AFI 91-202, Maintained 100% grounds per 2008 LoS Baseline (typically once per year at 10"-14"), Maintained 100% ditches to control erosion and ensure continuous free flow of water per the 2008 LoS Baseline, Number of Other Requirements provided from the list below:
1. Emergency Only Prune & Trim Trees
2. Emergency Only Remove Trees & Stumps
3. Special Cuts: Emergency & Special Events only (No Distinguished Visitor cuts)
4. Maintain Vegetative, Inert, Flower Beds, & Related
AF COLS 3: Classified 100% as Improved Grounds in FY17 is also classified as Improved Grounds in current FY, Maintained 50% Improved Grounds at 2"-4" per the 2008 LoS Baseline, Trimmed and edged 50% to present a neat and professional appearance per the 2008 LoS Baseline, Irrigated and received 50% irrigation maintenance to maintain a healthy state and keep an operational and efficient system per the 2008 LoS Baseline, Fertilized 50% "as needed" per the 2008 LoS Baseline, Kept 50% clear of debris, trash, and other foreign objects to present a neat and professional appearance per the 2008 LoS Baseline, Received 50% leaf removal per the 2008 LoS Baseline (NTE 6x per year), Received 50% pest and weed control to maintain professional appearance per the 2008 LoS Baseline, Pruned or trimmed 50% of shrubs, hedges, and similar vegetation as required for safety and security and to promote natural growth, Maintained 50% grounds at 4"-10" per the 2008 LoS Baseline, Trimmed 50% of grounds to present a neat and professional appearance per the 2008 LoS Baseline, Maintained 100% grounds in accordance with AFI 91-202, Maintained 100% grounds per 2008 LoS Baseline (typically once per year at 10"-14"), Maintained 100% ditches to control erosion and ensure continuous free flow of water per the 2008 LoS Baseline, Number of Other Requirements provided from the list below:
1. Emergency Only Prune & Trim Trees
2. Emergency Only Remove Trees & Stumps
3. Special Cuts: Emergency & Special Events only (No Distinguished Visitor cuts)
4. Maintain Vegetative, Inert, Flower Beds, & Related
AF COLS 4: Classified 75% as Improved Grounds in FY17 is also classified as Improved Grounds in current FY, Maintained 50% Improved Grounds at 2"-4" per the 2008 LoS Baseline, Trimmed and edged 50% to present a neat and professional appearance per the 2008 LoS Baseline, Irrigated and received 50% irrigation maintenance to maintain a healthy state and keep an operational and efficient system per the 2008 LoS Baseline, Fertilized 50% "as needed" per the 2008 LoS Baseline, Kept 50% clear of debris, trash, and other foreign objects to present a neat and professional appearance per the 2008 LoS Baseline, Received 50% leaf removal per the 2008 LoS Baseline (NTE 6x per year), Received 50% pest and weed control to maintain professional appearance per the 2008 LoS Baseline, Pruned or trimmed 50% of shrubs, hedges, and similar vegetation as required for safety and security and to promote natural growth, Maintained 15% grounds at 4"-10" per the 2008 LoS Baseline, Trimmed 15% of grounds to present a neat and professional appearance per the 2008 LoS Baseline, Maintained 100% grounds in accordance with AFI 91-202, Maintained 100% grounds per 2008 LoS Baseline (typically once per year at 10"-14"), Maintained 100% ditches to control erosion and ensure continuous free flow of water per the 2008 LoS Baseline, No Other Requirements provided
Sub Mission Area: Improved Grounds
(p y g g ), p g , , , p g p p primarily for operational and aesthetic reasons (such as erosion and dust control, bird control, and visual clear zones for safety and/or security)
Sheet1
File details come from the government source that posted it. Updated .