Attachment 1O - Utility Privatization PODs 20 July 2022.docx

DOCX document 1 MB Posted

Attached to
Base Operations Support (BOS) - Tyndall AFB
Solicitation number
FA481922R0014
Issued by

View the file

Other files

File Type Posted
Attachment 19 CBA Memorandum of Agreement.pdf PDF
Questions and Answers 30 Dec 2022.xlsx XLSX spreadsheet
Attachment 1T - Hazardous Material Emergency Planning and Response Plan.pdf PDF
Attachment 6 - Addendum to FAR 52.212-2 14 Dec 2022.docx DOCX document
Questions and Answers 19 Dec 2022.xlsx XLSX spreadsheet
Attachment 1 - Performance Work Statement 14 Dec 2022.docx DOCX document
Attachment 1A - Historical Workload 14 Dec 2022.xlsx XLSX spreadsheet
Attachment 1R - Asbestos Management and Operation Plan.pdf PDF
Attachment 10 - PPI Worksheet 14 Dec 2022.docx DOCX document
Attachment 1B - Real Property and Facility Inventory 14 Dec 2022.xlsx XLSX spreadsheet
Attachment 9 - Manpower Matrix Worksheet 14 Dec 2022.xlsx XLSX spreadsheet
Solicitation Amendment FA481922R00140003 SF 30.pdf PDF
Attachment 1C - Air Force Preventative Maintenance Task List Data 14 Dec 2022.xlsx XLSX spreadsheet
Solicitation Amendment FA481922R00140002.pdf PDF
Solicitation Amendment FA481922R00140001.pdf PDF
Pre-Proposal Site Visit.pdf PDF
Site Visit Attendee List.xlsx XLSX spreadsheet
Solicitation - FA481922R0014.pdf PDF
Attachment 1B - Real Property and Facility Inventory 20 July 2022.xlsx XLSX spreadsheet
Attachment 1D - Licenses and Certifications 20 July 2022.xlsx XLSX spreadsheet
Attachment 1F - Govt-Furnished Equip (EAID) 20 July 2022.pdf PDF
Attachment 1H - Govt-Furnished ADPE 20 July 2022.pdf PDF
Attachment 1I - Govt-Furnished Radios 20 July 2022.pdf PDF
Attachment 1J - Govt-Furnished Training 20 July 2022.pdf PDF
Attachment 1N - CE PLAYBOOKS 20 July 2022.docx DOCX document
Attachment 7 - Proposal Volume II Quick View 20 July 2022.pdf PDF
Attachment 17 - Contract Data Requirement List (CDRLs) A500 - A519 12 Sep 2022.pdf PDF
Attachment 1A - Historical Workload 20 July 2022.xlsx XLSX spreadsheet
Attachment 1P - Cranes_Trolley_Rail Systems_Lifts_Hoists 20 July 2022.xlsx XLSX spreadsheet
Attachment 5 - Addendum to FAR 52.212-1 20 July 2022.pdf PDF
Attachment 6 - Addendum to FAR 52.212-2 20 July 2022.pdf PDF
Attachment 9 - Manpower Matrix Worksheet 20 July 2022.xlsx XLSX spreadsheet
Attachment 10 - PPI Worksheet 20 July 2022.docx DOCX document
Attachment 1E - Maps and Work Area Layouts 20 July 2022.pdf PDF
Attachment 1G - Govt-Furnished Equip (Non- EAID) 20 July 2022.pdf PDF
Attachment 1L - Local Plans 20 July 2022.pdf PDF
Attachment 1M - Definitions 20 July 2022.pdf PDF
Attachment 3 - SCLS WD 2015-4559 Rev 21 28 July 2022.pdf PDF
Attachment 4 - DD254 20 July 2022.pdf PDF
Attachment 8 - Pricing Matrix Worksheet 20 July 2022.xlsx XLSX spreadsheet
Attachment 11 - Past Performance Questionnaire 20 July 2022.docx DOCX document
Attachment 13 - Sample Client Authorization Letter 20 July 2022.docx DOCX document
Attachment 14 - Financial Responsibility Questionnaire 20 July 2022.pdf PDF
Attachment 16 - Question Worksheet 20 July 2022.xlsx XLSX spreadsheet
Attachment 1 - PWS 20 July 2022.pdf PDF
Attachment 1C - Air Force Preventative Maintenance Task List Data 20 July 2022.xlsx XLSX spreadsheet
Attachment 1K--Publications and Forms 20 July 2022.pdf PDF
Attachment 2 - CBA 2021 01 Mar 2021.pdf PDF
Attachment 12 - Sample Subcontractor Letter of Consent 20 July 2022.docx DOCX document
Attachment 15 - Base Access Request EAL 20 July 2022.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1O — UTILITY PRIVATIZATION POD’S

Click each link below.

image1.emf

UP POD's Electrical_Redacted.pdf image2.emf

UP POD's WATER_Redacted.pdf image3.emf

UP POD's Natural Gas_Redacted.pdf

Point of Demarcation

(POD)

Applicable Scenario Sketch

POD is the downstream side of the closest shutoff valve to the exterior of the building.

No meter or regulator is connected to the service line feeding the structure.

B1.3. Unique Points of Demarcation Table 10 lists anomalous points of demarcation that do not fit any of the above scenarios.

TABLE 10

Unique POD Natural Gas Distribution System Tyndall AFB

Building No. Point of Demarcation (POD) Description

Primary Natural Gas service East of Bldg 5013

Outlet side of 6” natural gas pipe valve (G-1) downstream side of the utility owned regulator station east of Bldg 5013

Primary Feed Felix Lake MFH Supply end of 4” NG pipe 20 feet northwest of Intersection of Prime Beef Rd and Sabre Drive (Proposed location of future gas meter related to housing privatization contractor)

Primary Feed Wood Manor

MFH

Supply end of 4” NG pipe 20 feet northwest of Intersection of Prime Beef Rd and Sabre Drive (Proposed location of future gas meter related to housing privatization contractor)

3137 (TLF MFH) Supply side of Tee on 2” line East of Quarters 3137

3175 (TLF MFH) Supply side of Tee on 2” line East of Quarters 3175

3173 (TLF MFH) Supply side of Tee on 2” line East of Quarters 3173

3163 (TLF MFH) Supply side of Tee on 2” line East of Quarters 3163

3164 (TLF MFH) Supply side of 2” Valve Southwest of Quarters 3164 – line 1

3164 (TLF MFH) Supply side of 2” Valve Southwest of Quarters 3164 – line 2

3136 (TLF MFH) Supply side of Tee on 2” line East of North of Quarters 3136

TLF MFH Supply side of 4” Valve along Sabre Dr.

3223 (Youth Center) Supply side of 2” Valve Southwest of Facility 3223 (Youth Center)

Structure

Service Line

Point of Demarcation

Distr bution Line

Distr bution Line Shutoff Valve

File details come from the government source that posted it. Updated .