Questions and Answers 19 Dec 2022.xlsx

XLSX spreadsheet 73 KB Posted

Attached to
Base Operations Support (BOS) - Tyndall AFB
Solicitation number
FA481922R0014
Issued by

View the file

Other files

File Type Posted
Solicitation Amendment FA481922R00140005 SF 30.pdf PDF
Attachment 19 CBA Memorandum of Agreement.pdf PDF
Solicitation Amendment FA481922R00140004 SF 30.pdf PDF
CBA Memorandum of Agreement 14 Jun 2022.docx.pdf PDF
Attachment 1A - Historical Workload 30 Dec 2022.xlsx XLSX spreadsheet
Questions and Answers 30 Dec 2022.xlsx XLSX spreadsheet
Attachment 1Q - Historical Real Property Asset Inventory Data 14 Dec 2022.pdf PDF
Attachment 1A - Historical Workload 14 Dec 2022.xlsx XLSX spreadsheet
Attachment 1R - Asbestos Management and Operation Plan.pdf PDF
Attachment 7 - Proposal Volume II Quick View Revision 1 14 Dec 2022.pdf PDF
Attachment 1S - 325 CES Pest Management Plan.docx DOCX document
Solicitation Amendment FA481922R00140003 SF 30.pdf PDF
Attachment 1C - Air Force Preventative Maintenance Task List Data 14 Dec 2022.xlsx XLSX spreadsheet
Attachment 5 - Addendum to FAR 52.212-1 14 Dec 2022.docx DOCX document
Attachment 1B - Real Property and Facility Inventory 14 Dec 2022.xlsx XLSX spreadsheet
Attachment 1U - Tyndall Hazardous Waste Management Plan.pdf PDF
Attachment 10 - PPI Worksheet 14 Dec 2022.docx DOCX document
Attachment 1 - Performance Work Statement 14 Dec 2022.docx DOCX document
Attachment 1D - Licenses and Certifications 14 Dec 2022.xlsx XLSX spreadsheet
Attachment 9 - Manpower Matrix Worksheet 14 Dec 2022.xlsx XLSX spreadsheet
Attachment 6 - Addendum to FAR 52.212-2 14 Dec 2022.docx DOCX document
Attachment 1T - Hazardous Material Emergency Planning and Response Plan.pdf PDF
Solicitation Amendment FA481922R00140002.pdf PDF
Solicitation Amendment FA481922R00140001.pdf PDF
Pre-Proposal Site Visit.pdf PDF
Site Visit Attendee List.xlsx XLSX spreadsheet
Attachment 12 - Sample Subcontractor Letter of Consent 20 July 2022.docx DOCX document
Attachment 1H - Govt-Furnished ADPE 20 July 2022.pdf PDF
Attachment 1C - Air Force Preventative Maintenance Task List Data 20 July 2022.xlsx XLSX spreadsheet
Attachment 1A - Historical Workload 20 July 2022.xlsx XLSX spreadsheet
Attachment 1P - Cranes_Trolley_Rail Systems_Lifts_Hoists 20 July 2022.xlsx XLSX spreadsheet
Attachment 1G - Govt-Furnished Equip (Non- EAID) 20 July 2022.pdf PDF
Attachment 13 - Sample Client Authorization Letter 20 July 2022.docx DOCX document
Attachment 10 - PPI Worksheet 20 July 2022.docx DOCX document
Attachment 6 - Addendum to FAR 52.212-2 20 July 2022.pdf PDF
Attachment 8 - Pricing Matrix Worksheet 20 July 2022.xlsx XLSX spreadsheet
Attachment 1M - Definitions 20 July 2022.pdf PDF
Attachment 3 - SCLS WD 2015-4559 Rev 21 28 July 2022.pdf PDF
Attachment 2 - CBA 2021 01 Mar 2021.pdf PDF
Attachment 16 - Question Worksheet 20 July 2022.xlsx XLSX spreadsheet
Attachment 4 - DD254 20 July 2022.pdf PDF
Attachment 14 - Financial Responsibility Questionnaire 20 July 2022.pdf PDF
Attachment 15 - Base Access Request EAL 20 July 2022.xlsx XLSX spreadsheet
Attachment 5 - Addendum to FAR 52.212-1 20 July 2022.pdf PDF
Attachment 9 - Manpower Matrix Worksheet 20 July 2022.xlsx XLSX spreadsheet
Attachment 1K--Publications and Forms 20 July 2022.pdf PDF
Attachment 1 - PWS 20 July 2022.pdf PDF
Attachment 1L - Local Plans 20 July 2022.pdf PDF
Attachment 11 - Past Performance Questionnaire 20 July 2022.docx DOCX document
Attachment 1E - Maps and Work Area Layouts 20 July 2022.pdf PDF
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question Worksheet Question Worksheet, Attachment 16, FA481922R0014

NOTE: State question clearly, giving as much information as possible. If an answer may generate a follow-on question, try to anticipate that so the entire subject can be addressed at the same time.
#PWS Paragraph
Reference (If Applicable)Reference Document (If Applicable)QUESTIONRESPONSE (RESERVED FOR GOVERNMENT)
1Attachment 1A- Historical Workload 20 July 2022Annual DSW Count TabThe numbers in Column C do not match up to the total number in Columns D thru T for lines 3 thru 17. Will this be corrected as if you added the numbers from Column C thru T the totals are way higher something is very wrong with this Tab?Attachment 1A has been revised to correct this issue.
2Attachment 1A- Historical Workload 20 July 2022Craftsman Manpower TabWhy does Line 17 and 24 Column B have PM (RWP) and rest of the PM lines do not? Please clarifyThe labels associated with the change in verbiage coincide with the transition from ACES/IWIMS to TRIRIGA, as well as the standardization in terminology associated with the Air Force standardization of the PMTL. Both Preventative Maintenance and Recurring Work Program represent the same type of work.
3Attachment 1C- Air Force Preventative Maintenance Task List Data 20 July 2022Main TabPlease confirm the numbers in Column F are complete PM List for Tyndall?Confirmed that they are the current complete PM list for Tyndall AFB
4Attachment 1C- Air Force Preventative Maintenance Task List Data 20 July 2022Main TabThe following items from the main tab( lines 29,53,73,75,91,101,146,159 and 175) have their PMTL LINK tab blank, will the government update Attachment 1C and provide the PMTL data for each of these: D30952201950

C10201025800 D30251304950 D40204103650 D30251302950 D30251303950 G30302106300 G30653101950 D30251301950 D30952201950 - RS Means Attached C10201025800 - Removed (Not Required) D30251304950 - RS Means Attached D40204103650 - AFPMTL Attached D30251302950 - RS Means Attached D30251303950 - RS Means Attached G30302106300 - Removed (Not Required) G30653101950 - RS Means Attached D30251301950 - RS Means Attached 5 Attachment 1C- Air Force Preventative Maintenance Task List Data 20 July 2022 Main Tab The following items from the main tab( lines 176, 207 and 208) their PMTL LINK do not work, will the government update Attachment 1C and provide the PMTL data for each of these: D3045220295 MFR. Specs MFR. Specs 1 Line 176 - Link Fixed Line 207 - Maintenance Attached Line 208 - Maintenance Attached D3045220295 - RS Means Attached MFR. Specs - Maintenance Attached MFR. Specs 1 - Maintenance Attached 6 Attachment 1C- Air Force Preventative Maintenance Task List Data 20 July 2022 Main Tab The following items from the main tab( lines 3-9, 12,13,18,19,22,23,27,28,30-32,37-40, 42-46, 48-52, 55-58, 61-64,66,68,69,71,72,76,78-80, 86,90,92-94,96,99,100,102-107, 109-112, 114-119, 122,123,125,126,129,131-133,135-138,141-145 147-150, 152-154, 157, 161, 163-174 ,177-184, 186-190, 193-204 and 206) their PMTL LINK have no hours assigned to them like the others, will the government update Attachment 1C and provide the PMTL data for each of these: B3015225195001 B3015225195002 B3015225195003 B3015225195004 B3015225195005 B3015225195006 B2035225195007 B2035450195001 B2035450195004 D2025260395001 D3025210195002 D3045160195001 D3045600195002 D3065100195001 D3065100195003 D4065100195011 D4095100195001 D5015234195001 D5095250395002 D5095250395003 D5095250395004 E1035100195001 G2045150195006 G2045150195009 G3015118195006 G3015612195002 D3035160295002 D5015280195011 G3025544195002 D5035710195001 G3025420195001 D3035160295005 D5095250195011 D3035160295001 G3065310195054 D5095210295001 G3065310195022 D5035710195003 D5035710195006 G3065310195018 D5095250195003 G3025536195001 D5095250195002 G3065310195014 D5035710195004 D50952501950010 D2025410195001 D5095250195004 D2095910195001

STREET SWEEPING

G3065310195009 D4015150195002 D5035710195005 G3025536195002 D2025410295001 D5095250195001 D4015310195001 G3065310195002 D5095250195009 D4095400195001 D5095210295007 G3065310195005 G3065310195055 D5015280195010 D5095250195005 D5095250195006 G3065310195010 D5095210295002 B20351102950 D4095210195001 D5095250195007 D5095210295004 G3065310195011 D3035160195001 G3065310195056 D4015210195001 G3065310195004 D5035710195008 G3015612195006 D5095210295003 G3065310195013 G3065310195024 D5035710195007 G3065310195015 D4015180195002 G3065310195048 G3065310195021 G3025536195003 G3065310195008 G3065310195040 B2035450195003 G3065310195030 G3065310195006 G3065310195007 G3065310195028 G3065310195035 D5035710195002 G3065310195020 G3065310195053 D5015210195001 D5015210195002 D5015210195003 D5015260195001 D5015260195002 D5035710195010 D5095250195011 B2035300195001 D3095122195001 D4095210195002 D5095250195008 G2045150495001 D5015280195007 D5095210295011 D5015280195001 G2045150195010 G3015612195003 G3015612195008 D4015180195001 D3035110195001 D5015280195005 D50952102955002 G3035070195002 E10351001950031 E1035100195003 E1035100195002 B2035450195002 G40955110195001 D5095210295006 B2035110295001 D3025210195001 D2025410295001 G3015612195010 G3015612195009 D5015280195004 G3015612195001 G3015612195005 G2045150395002

Some PMTL list requires RS Means, which may provide recommended hours. For the PMTL items without hours, the Government doesn’t provide hours, only detailed requirements. It is the offerors responsibility to estimate the associated hours based on their research and resources.
7Attachment 8 - Pricing Matrix WorksheetCLIN x0013 Temporary Facility MaintenanceWill the Government provide a breakout in Attachment 1A by shop for the Temporary Facilities? If not can government provide a percentage by shop of what is provided that would be done at the temporary facilities? If not will the Government provide a plug number as only incumbent know the current level of effort for the temporary facilities?The Government does not currently track the number of work tasks that have occured for each of the temporary facilities. When TAFB transitioned from ACES/IWIMS to TRIRIGA, the historical workloads associated with each individual facility was lost. We have spoken with AFCEC and the data appears to be unrecoverable. For the purposes of proposal, all contractors should assume that temporary facilities constitute 5% of the work load across all shops. The only support provided to temporary facilities that are leased are pest management, signs, and locks. The Government owned temporary facilities are maintained by the BOS Contractor, but the summation of all temp facility work constitues approximately 5% of total work by craft.
8Attachment 1 PWSPara 1.3.1.7Please confirm that are only 8 bridges that require inspection?Confirmed, there are only 8 bridges that require inspection by BOS Contract Personnel, largest is 81 Square Yards.
9Attachment 1 PWSPara 1.3.4How many building on Tyndall have Asbestos and what has been the historical workload for Asbestos Abatement?There have been 0 hours attributed to Asbestos Abatement at TAFB by BOS-I contract personnel. The transference of responsibility from Installation Management Flight (CEI) to Operations Flight (CEO) was a recent occurence. The requirement isnt for the BOS contractor to perform abatement, but they are required to inspect and run the abatement program (i.e. working through hiring abatement contractors, etc)
10Attachment 1 PWSPara 1.5Will the Government provide the workload for Material control operations for the past 4 years like it did for the Maintenance shops?The material control personnel historical workload is 9360 labor hours per year. This includes the admin, material procurement, and U-FIX-IT. This annual amount has been consistent for total length of current contract.
11Attachment 1 PWSPara 1.5.2Please confirm the Government required a body to be in U-Fix-It function from 0700 to 1500 Mon thru Fri except federal holidaysThe government will not direct the contractor how to man the U-Fix-It function. The requirement is for it to be open for customer service from 0700 to 1500 Mon through Friday except Federal holidays.
12Attachment 1A- Historical Workload 20 July 2022Craftsman Manpower TabLines (3, 10, 17 , 24, 31 and 38) are called PM, if this is true PM workload why is there hours in Column G, H, I & J since there are titled Services Call? Please clarify why hours are assigned to Service Calls for PMsThis is a nomenclature issue that relates to the shop types that previously existed. We left the data in this format because it is the way that came out of ACES/IWIMS. These are different shops. Historically there was a shop dedicated to purely service calls. However, based on available manpower, they also accomplished PM tasks when required.
13Attachment 1A- Historical Workload 20 July 2022Craftsman Manpower TabWhere is the workload for the Electrical shop as only showing workload for High Voltage?The Column for 452-2B Service Call Electrical is interior electrical work. It is Column H
14Attachment 1A- Historical Workload 20 July 2022Craftsman Manpower TabWhat is the breakout for 452-2B Service Call Electrical for Interior and High Voltage Electrical Work? Or do we assume it is all Interior?The Column for 452-2B Service Call Electrical is interior electrical work. The Column for High Voltage Electrical Work is exterior.
15Attachment 1 PWSPara 1.7.1.2What is the workload for Locksmith services as it is not provided in Attachment 1A?Locksmith hours are captured under Vertical 451-IA
16Attachment 1 PWSPara 1.8.2.6 thru 1.8.2.14Will the Government provide the workload for all these areas as there is none currently provided in Attachment 1A and contractor is required to perform these functions and currently only the incumbent has this knowledge?The workload associated with Paragraph 1.8.2.6-1.8.2.14 are all found within the Plumbing shop.
17Attachment 1 PWSPara 1.9.13What is the historical workload for the past 3 years for UH Room Turnover as it is not broken out in Attachment 1A as only the incumbent has this knowledge?Dorm managers submit Work Tasks as rooms become unoccupied. Historical data is mixed in with total hours
18Attachment 1 PWSPara 1.9.13What CLIN is the UH Room Turnover charged too? Will the Government add a CLIN for this work?There is no specific CLIN this is charged to. It is charged to the craftsman labor and material in the same way that any other work order would be accomplished. There is no UH CLIN.
19Attachment 1 PWSPara 1.9.4.2What CLIN does the Government want the FOCUS workload be staffed and priced against? To shops or will a CLIN be added?There is no specific CLIN this is charged to. It is charged to the craftsman labor and material in the same way that any other work order would be accomplished. There is no FOCUS CLIN.
20Attachment 1 PWSPara 1.5.1Is MAXIMO a government provided program with the contractor paying for the annual subscription renewal only?Because TRIRIGA/NEXGEN-IT does not currently allow BOS Contract Personnel to utilize the material acqusition portion, the Government Purchased MAXIMO for use. The annual renewal/annual licensing is paid for by the BOS Contractor.
21Attachment 1 PWSPara 1.5.1Does the contractor have to use MAXIMO if it has an accepted system being utilized on another USAF CE contract for material acquisition system?MAXIMO is required for use by the BOS Contractor
22Attachment 1 PWSPara 1.7.2.1The PWS paragraph references boardwalk gazebos but none can be found in Attachment 1B, Will the Government remove Gazebos from PWS or update Attachment 1B?Yes. Once new construction completes, the RP records will reflect the new pavillions (gazebos)
23Attachment 1 PWS; Attachment 1DPara 1.3.1.1States the following: "The R&O Lead shall be a licensed Professional Engineer (PE) in any of the 50 United States or U.S. Territories" but Attachment 1D, Line 3 says only FL for R&O Lead. Will this conflict be resolved by changing either the PWS or Attachment 1D so they match up?The R&O Lead can be registered in any US State or Territory. Appendix 1D will be updated to reflect.
24Attachment 1 PWS and Attachment 1APara 1.9.4.2; Craftsperson Manpower Tab, FOCUS WL HoursPWS Para 1.9.4.2 says contractor will do minimum of 10,000 hour annually but for FY 18 and FY19 they are both way under that number, can the government explain why contractor didn’t meet the 10,000 hours for FY 18 and FY 19?Differences in workload can be mostly attributed to Hurricane Michael, which devistated Tyndall AFB in FY19 (October 2018). The immediate recovery period dramatically reduced FOCUS Hours, as work priorities shifted to recover and operate the base.
25Attachment 1 PWS and Attachment 1APara 1.9.4.2; Craftsperson Manpower Tab, FOCUS WL HoursPWS Para 1.9.4.2 says contractor will do maximum of 15,000 hour annually but for FY 20 and FY21 they are both way over that number, can the government explain why contractor didn’t meet the 10,000 hours for FY 20 and FY 21?Hurricane Michael dramatically changd the landscape of Tyndall AFB, which led to numerous projects being under estimated manhour wise. For example, pouring large concrete pads historically took fewer manhours, but the increased height of the water table now requires well-pointing, pumping, and stabilization. Projects that the current BOS planner estimated took longer (than anticipated) across the board. The governments position is that the BOS contractor shall plan their work NTE that hour threshold.
26Attachment 1 PWS and Attachment 1APara 1.8.1.2; Craftsperson Manpower Tab, LUC 19 WL Hours for EMCS Column TPWS Para states we must monitor 24/7 356 days year but Attachment 1A LUC workload in Column T only has an average of 409 hours for the 4 yrs. provided. Are the hours correct and if so, has the PWS requirement changed from pervious contract? If it hasn’t, how is this requirement currently being met?EMCS logs part of their hours against the HVAC shop and part with EMCS (based upon the specific task they are working). The BOS Contractor MUST have 24/7/365 coverage of EMCS
27Attachment 1A- Historical Workload 20 July 2022Craftsperson Manpower Tab, LUC 19 WL HoursWhy is FY 21 hours so much higher than the total hours for FY 18, 19 and 20 as they are double over FY 18 and 19 and close to double for FY 20? Please validate the hours are correct for all yearsThe LUC 19 line item is a historic designator from ACES/IWIMS. When the data was pulled it had forecast the work requirement rather than ending when it was suppossed to. Attachment 1A has been revised to reflect this.
28Attachment 1A- Historical Workload 20 July 2022Craftsperson Manpower Tab, DSW EmergencyWill the government explain why the DSW Emergency hours goes from average of 241 for FY 18,19 and 20 to over 36,600 for FY 21? Are these numbers correct? IF so why such a dramatic uptic in Emergency hours in FY 21?The emergency and urgent line items had been swapped. Attachment 1A has beenrevised to reflect this.
29Attachment 1A- Historical Workload 20 July 2022Craftsperson Manpower TabWhy is the Data the same for FY 20 DSW Emergency and FY 21 DSW Urgent? Will this be corrected and a new Attachment 1A be issued?Attachment 1A revised to correct this issue.
30Attachment 1A- Historical Workload 20 July 2022Craftsperson Manpower TabIt appears the Workload for FY 21 DSW Emergency and FY 21 DSW Urgent were put n wrong lines, please confirm? IF so will the data be updated and new Attachment 1A be issued?Attachment 1A revised to correct this issue.
31Attachment 1A- Historical Workload 20 July 2022Craftsperson Manpower TabWhy are DSW Urgent so much higher than DSW Routines for FY 18, 19 and 20 as normally DSW Routines are the highest numbers? Please confirm the hours are correct.Tyndall AFB was devestated by Hurricane Michael on 10 Oct 2018. The routine work orders became far fewer as the recovery actions (mostly urgent and emergency) were occuring. Under normal conditions, PM/Routine are generally the most common type of work, which is not reflective of FY18-20 at Tyndall AFB.
32Attachment 1A- Historical Workload 20 July 2022Craftsperson Manpower TabColumn F is titled 451-IA Vertical but there is no reference in the PWS, Attachment 1. Will Government delete this workload or update the PWS to include Vertical? If not will Government define what crafts and PWS sections would be doing this work listed und Column F, 451-IA Vertical? Please advise how and where this should be handled and used.The titles for the various shops came from ACES/IWIMS, which has since been replaced by NEXGEN. The verical shop and carpenters shop are one shop, but were broken down in ACES/IWIMS based on type of work. The PWS paragraphs that relate to both shops are: 1.7.1 and all its sub sections (Structures, roofs, locks, signs, etc)
33Attachment 1A- Historical Workload 20 July 2022Annual DSW Count TabColumn F is titled 451-IA Vertical but there is no reference in the PWS, Attachment 1. Will Government delete this workload or update the PWS to include Vertical? If not will Government define what crafts and PWS sections would be doing this work listed und Column F, 451-IA Vertical? Please advise how and where this should be handled and used.The titles for the various shops came from ACES/IWIMS, which has since been replaced by NEXGEN. The verical shop and carpenters shop are truly one shop, but were broken down in ACES/IWIMS based on type of work. The PWS paragraphs that relate to both shops are: 1.7.1 and all its sub sections (Structures, roofs, locks, signs, etc)
34Attachment 1A- Historical Workload 20 July 2022Annual DSW Count Tab, Column MWhy is shop 454-4B Wastewater blank for FY 18,19 and20? Will this be populated and if so will government provided updated Attachment 1A?The work for wastewater is handled by the Plumbing Shop. For the purpose of streamlining, TRIRIGA and ACES/IWIMS data is combined. The nomenclature between the two systems isn't identical. Under ACES/IWIMS, there was no Wastewater Shop, but under TRIRIGA there is. That is why the FY which represents the advent of TRIRIGA at TAFB has tasks associated, but FY18-20 do not.
35Attachment 1A- Historical Workload 20 July 2022Craftsperson Manpower TabFY 20 DSW Urgent & FY 21 DSW Routine have same hours for Columns I, J and T ( Service Call HVAC, Service Call Plumber and EMCS) which seems very strange. Will Government validate theses entries and all entries in Craftsperson Manpower Tab and reissue an updated Attachment 1A?Attachment 1A revised to correct this issue.
36Attachment 8 - Pricing Matrix WorksheetWill the Government add a CLIN for the vehicles as Lot with Not to exceed price? If not what CLIN do you want cost priced against?No. Any costs associated with the offerors proposed vehicles as required to fulfill PWS objectives may be allocated to the other priced FFP CLINs.
37Attachment 1A- Historical Workload 20 July 2022Craftsperson Manpower TabWill the Government provide what the PM's are for Column D, 441WA Sweepers as there is over 2200 hours and expected to see more hours for actual sweeping vs PMs? Please ClarifyAll Air Force PMTLs that are applicable to Tyndall AFB under its current state have been attached to the soliciation. The vast majority (95%) of these hours and tasks are associated with PMTL work. There are VERY few/rare occurrences which have regular work tasks assigned to the sweepers
38Attachment 1A- Historical Workload 20 July 2022Craftsperson Manpower TabColumns G, H, I, J have Service Calls in title for Carpenter, Electrician, HVAC and Plumbers so you would not expect to see time in PM, FOCUS or LUC 19 line. Since these seem to be Service Call, why are there workload in the PM, FOCUS and LUC 19 lines? Shouldn't those three lines be blank? IF not why not? Please clarifyThese are shop names from ACES/IWIMS. Based on manning and mission requirements, they also accomplished the other types of work (i.e. FOCUS/PM/etc).
39Attachment 1A- Historical Workload 20 July 2022Craftsperson Manpower Tab and Annual DSW Count Tab, Wastewater Column MThe Annual DSW Count Tab has counts for FY 21 but the Craftsperson Manpower Tab has no Hours for FY 21. Will this be corrected to put hours in Craftsperson Manpower or removed the Counts in Annual DSW count Tab? Please ClarifyThe wastewater line was a hold over from the ACES/IWIMS & TRIRIGA transition. The work is all accomplished by the Plumbers, and the wastewater line has now been combined with the plumber line. Attachment 1A revised accordingly.
40Attachment 1A- Historical Workload 20 July 2022Annual DSW Count Tab, Column MSince there is only one year of data for Wastewater, why is it divided by 4 yrs. as that does not seem to be correct unless the Government can provide data for FY 18, 19 and 20? Please clarifyAttachment 1A revised to correct this issue.
41Attachment 2 - CBA 2021 01 Mar 2021Article 19 on Page 34The list of Job Titles has Grounds, Lawn and Tree Trimmers but the PWS does NOT have any Ground Maintenance. Is grounds maintenance part of this contract or not? IF so will the PWS be updated and provided ASAP to the bidders?Grounds maintenance is NOT part of this contract.
42Attachment 1P Cranes Trolley Rail System Lifts Hoists 20 July 2022Are these items listed in this Attachment accounted for in Attachment 1A Historical Workload 20 July 2022 or are these in addition to Attachment 1A? Please clarifyThese activities have historically been fulfilled by by Contractor Safety, which is not an actual shop. The BOS Contractor Management Hours are not captured in the historical workload.
43Attachment 1C- Air Force Preventative Maintenance Task List Data 20 July 2022Are these items listed in this Attachment accounted for in Attachment 1A Historical Workload 20 July 2022 or are these in addition to Attachment 1A? Please clarifyThese are accounted for in the historical workload. The PMTL list was published in FY21, with some transition in FY20. Prior to this, there were Tyndall AFB specific requirements. The PMTL mandate requirements from the AF.
44Attachment 1A- Historical Workload 20 July 2022Please provide the square footage of faculties for the FY 18, 19, 20 and 21 that make is up the workload that is provided in Attachment 1A. With Hurricane Michael hitting in Oct 2018, we expected to a lot less work but this does not seem to be the case.The real property record for FY18-20 is now attached. The information for FY21 is already provided. When combined, this represents the totality of the information we have on these assets.
45Attachment 1 PWSPara 1.7.2.8Is the workload for the 10 historical cemetery fences accounted for in Attachment 1A or is this in addition to Attachment 1A? Please adviseThe historical workload for the cemetery fences is included in Attachment 1A
46Attachment 1 PWSPara 1.8.2.12When was the last 5 year survey completed for backflow/cross connection?Backflow/cross connection surveys are accomplished on a 5 year rotating schedule, similar to BUILDER inspections. The BOS Contractor shall establish a schedule for the work. Backflow inspections are commonly done at the same time as the weekly PM on those assets. Cross connection surveys are conducted by an independent contractor hired by the government.
47Attachment 1 PWSPara 1.7.1.1.1Will the Government provide list of buildings with Temporary Roof (Materials) that required Inspection/Repair and Minor Roof Refurbishments? What has been the historical workload for this requirement since the hurricane? Or has this workload been accounted for in Attachment 1A?The current facilities that have temporary roofs are B256, B295, and B290. These roofs require minimal upkeep by the BOS Contractor. The historical workload is already accounted for in Attachment 1A
48Will you be releasing Sections L & M shortly or can I find the Instructions to Offerors in another Attachment?Please reference FAR Provisions 52.212-1 and 52.212-2, to include their addenda in attachments 5 and 6, respectively.
49My company is looking to bid on the subject opportunity and there are controlled documents on the solicitation. Can you please tell me what you need in order to provide the controlled documents for our company?PWS has been updated to remove controlled documents from Attachment 1L. Attachments 1R - Asbestos Management and Operation Plan, 1S - 325 CES Pest Management Plan, 1T- Hazardous Material Emergency Planning and Response Plan, and 1U - Tyndall Hazardous Waste Management Plan have been incorporated via amendment.
50n/aAtt. 6Section 5.2.2 states that: "Recency is defined as at least 12 months of the effort’s period of performance must have been performed during the past four (3) years from the date of issuance of this solicitation." Can the government please clarify whether performance must have been performed during the past four years or the past three years from the date of issuance of the solicitation?Recency is defined as at least 12 months of the effort's period of perfomance must have been performed during the past five years from the date of issuance of the solicitation. Attachment 6 has been amended accordingly.
51n/aAtt. 5Section II.3.2.4.1 requires offerors to complete the Attachment 9 Manpower Matrix as part of Volume II Technical, Subfactor 3 Staffing Approach. Can the government please confirm that the completed Attachment 9 should be provided as a separate, stand-alone document?Attachment 9 shall be provided as a separate, stand alone document included with the offerors Volume II
52n/aAtt. 5Section II.3.2.4.1 requires offerors to complete the Attachment 9 Manpower Matrix as part of Volume II Technical, Subfactor 3 Staffing Approach. Can the government please confirm that the completed Attachment 9 will not count towards the 70-page limit for Volume II Technical?Attachment 9 shall not count toward the 70-page limit for Volume II Technical. Attachment 5 amended accordingly.
53n/aAtt. 5Section 3.2.4.2 requires offerors to submit "rationale for how the proposed manpower in Attachment 9 will be utilized to fulfill all requirements in the PWS." Can the Government be more specific with regards to "rationale?" Is the Government looking for a summary or a full Basis of Estimate (BOE)? If the government would like a comprehensive BOE, we recommend that this piece of the response be outside the 70-page limit for Volume II, as a comprehensive BOE can run to more than 50 pages.The Government requires the offeror to provide sound rationale for how the proposed manpower in the Manpower Matrix (Attachment 9) will be utilized to fulfill all requirements in the PWS. A comprehensive Basis of Estimate is not required.
54n/aAtt. 5Section 3.2.4.2 requires offerors to submit "rationale for how the proposed manpower in Attachment 9 will be utilized to fulfill all requirements in the PWS." Can the Government be more specific with regards to "rationale?" Is the Government looking for a summary or a full Basis of Estimate (BOE)? If the government wants a summary, can you please provide clearer instructions for what this should contain?The Government requires the offeror to provide sound rationale for how the proposed manpower in the Manpower Matrix (Attachment 9) will be utilized to fulfill all requirements in the PWS. A comprehensive Basis of Estimate is not required.
55n/aAtt. 5Section 1.1.2 provides the font requirements. We request that the government allows 10-point font in any graphics, tables, diagrams, supporting illustrations, and spreadsheets, as well as in document headers and footers.10-point font is authorized for any text in graphics, tables, diagrams, supporting illustrations, spreadsheets, and document headers and footers. Attachment 5 is amended accordingly.
56n/aAtt. 5Section 1.1.2 provides the font requirements. We request that the government does not enforce a font requirement in cases of screenshots.Section 1.1.2. of Attachment 5 has been amended accordingly.
57n/aAtt. 5Section 1.1.3 includes a Notional Organization Structure in the list of items excluded from page limitations. A Notional Organization Structure is not required in any of the Volume II instructions in section 3.0. Can the government please clarify whether a Notional Organization Structure is required, and if so, where in an offeror's proposal should it be provided?A notional organizational structure is not required
584.27.1.1.2Att. 1Can the Government please confirm that the CDRL required in this paragraph is, in fact, CDRL A500 (Transition-in Status Reports) and not CDRL A501 (Quality Control Plan)?Yes, that is correct (CDRL A500), PWS updated accordingly.
59n/aAtt. 9The Manpower Matrix is missing PWS 1.4 (Preventive and Corrective Maintenance Programs). The numbering of the subsequent sections (Material Control, Facility Systems, Heavy Repair, Infrastructure Systems, Processes and Requirements) do not match the PWS. Can the government please provide a corrected Attachment 9 Manpower Matrix?PWS 1.4 Preventive and Corrective Maintenance is intentionally excluded from the Manpower Matrix as these responsibilities are fulfilled by the other sections included in the Manpower Matrix. The sections in the Manpower Matrix have been renumbered to align with the PWS.
60n/aAtt. 5Section 3.2.3 states that offeror shall provide a HVAC AMP. Does the Government require a complete AMP for Tyndall BOS, or just a description of how the AMP will address the requirements of 3.2.3.1 - 3.2.3.4? AMPs can be more than 50 pages long, which would leave only 20 pages to provide comprehensive responses to the rest of the Technical Subfactor 1-3 requirements. Given this, we recommend that either the AMP Plan be outside the Volume II 70-page limit, or that the 70 page limit be increased to 100 pages.The Government does not want a full AMP, but we are looking for a description of data acquisition, what would be included in the AMP/Sub-AMP submission, and a fabricated example detailing a few assets. The purpose of this is to explain the process that will be used and provide a visual example of what we can expect in terms of level of detail. For the actual execution of the AMPs, post-award, a full AMP/Sub-AMP plan will be created an become an on-going process.
61n/aAtt. 5The RFP states that ”Print shall be no smaller than a font size of 12.” Will the Government allow text in tables, figures/graphics, callout boxes, and quote boxes to be not smaller than 10 point font?Yes, please refer to the answer to question #55.
62n/aAtt. 5The RFP states that ”Print shall be no smaller than a font size of 12.” Will the government allow logos to be exempt from the font limitations so they may be submitted in their native font?Yes
63n/aAtt. 5The RFP states that ”Print shall be no smaller than a font size of 12.” Will the Government allow text in headers/footers to be not smaller than 9 point font?The Government will allow no smaller than 10 point font for headers and footers. Attachment 5 amended accordingly.
64n/aAtt. 5The RFP states that ”Print shall be no smaller than a font size of 12.” Will the government exclude screenshots from this font requirement so they may be submitted in their native screen capture font?Yes, please refer to the answer to question #56
65n/aAtt. 5The RFP states that ”Print shall be no smaller than a font size of 12.” Will the Government confirm that all Excel files submitted as past of the Cost Volume are excluded from these font requirements and may be submitted in their native fonts or Excel default fonts?Yes. All excel files submitted as part of the cost volume may be submitted in their native fonts or excel default fonts.
66n/aAtt. 5The RFP states that “each page within a volume shall be numbered consecutively.” Will the government allow pages outside of a volume’s page limitations (e.g., Table of contents, glossary, appendices, etc.) to be numbered with roman numerials (i, ii, etc.) or appendix indicators (A-1, B-1, etc.)?Yes
67n/aAtt. 5Given that teams may have several subcontractors/clients, therefore using multiple pages for this requirement, will the Government allow Subcontractor Letters of Consent and Client Authorization Letters to be excluded from the page count for Volume III?Yes, Attachment 5 amended accordingly.
68Section L and
Section MSection M assigns factor numbers to the Technical Proposal (Factor 1), the Past Performance Proposal (Factor 2), and the Price Proposal (Factor 3), however, Section L does not assign factors. Please advise how the Government wants these volumes labeled.Offerors shall label the volumes in accordance with the volume number and titles identified in Attachment 5
69Section M.5.2.2The RFP States, "Recency is defined as at least 12 months of the effort’s period of performance must have been performed during the past four (3) years from the date of issuance of this solicitation. The entire contract will be evaluated if there are 12-months of performance within the three year recency window." Please clarify if contracts must have been performed during the past four years or the past three years.Please refer to the answer to question #50.
70Section L.1.1.2Please clarify if 11X17 pages count as one page or two pages.reference to 11x17 pages have been removed from Attachment 5 as amended.
71Section L.1.1.2Is font size less than 12 pt. acceptable for tables/graphics? For example, Manpower Matrix (Attachment 9) is 11 pt. font. Is a font other than Times New Roman acceptable for graphics?Yes, please refer to the answers to questions 55 and 56
72Section L.3.2.4.1Does the Government want the Manpower Matrix (Attachment 9) converted to a Word document and inserted into Tab 4 - Subfactor 3: Staffing Approach of the Technical Volume? If the answer is yes, does the Government also want offerors to include the Excel file?No, please submit the completed Manpower Matrix as a separate excel file with Volume II, this document is excluded from the page limitation for Volume II
73Section L.1.1.3The RFP states, "Each page shall be counted except the following: the transmittal letter, cover pages, tab-divider pages, title pages, table of contents, cross-reference matrix, lists of tables and drawings, glossary or acronyms, or Notional Organization Structure." This section contains the only mention of lists of tables and drawings. Please clarify if the Government wants offerors to include a list of tables and drawings for each volume. If so, should they be included as part of the table of contents and is a master list required in Volume I?Yes, Yes, and Yes
74Section M.5.2.1The RFP states that the Government will take into account past performance information regarding key personnel. Please advise how the Government wants offerors to present past performance citations for key personnel. Is a resume acceptable?Offerors shall ensure past performance information complies with all instructions set forth in Attachment 5.
75Section L 1.1, 2.0, & 3.2Offerors are directed to submit via the PIEE portal, but the solicitation is not accessible (i.e. "File not found") Could the Government please enable the solicitation to be found and tracked prior to submittal?Solicitation is now accessible in the Solicitation Module in PIEE.
76Section L.1.1.3Please exclude Subcontractor/Teaming Partner Consent Letters and Client Authorization Letters from the page count.Yes, please refer to the answer to question #67
77PWS 1.3.2 Demand Maintenance/Customer ServiceIs the contractor required to staff the customer request center 24/7?The customer service function must be avaliable 24/7/365 for emergency calls and coordinating response. During Duty Hours, this has historically been accomplished by the Customer Service Unit, whereas EMCS normally handles it after hours. The contractor can staff anyway they see fit as required to meet objectives.
78PWS 1.3.2.2 Facility Manager ProgramThe PWS directs contractors to administer the Facility Manager Program IAW the Facility Manager Playbook. We could not locate a copy of this playbook in Attachment 1N. Please provide a copy.Facility Manager Program is located in the Facilities Management Playbook, Chapter 5 . PWS updated accordingly.
794.6.2, 1.8.1.1PWS, Attachment 5The Performance Work Statement Section 4.6.2 includes Security Requirements for the contract as being a Facility Clearance Level of Secret. Specifically, this requirement is required for any personnel requiring administrative rights to DoD network in support of EMCS, PWS Section 1.8.1.1.
If the Offeror submitting a proposal for this solicitation is an unpopulated SBA approved 8(a) Joint Venture in which one of the members of the JV has a Top Secret Facility Clearance, would the Government accept the member’s Facility Clearance Level for the purposes of fulfilling this requirement on behalf of the JV, provided that the member company of the JV with the required FCL will employ all personnel requiring administrative rights to DoD network in support of the EMCS portion of the PWS?Yes
804.6.2, 2.9PWS, Attachment 5The Performance Work Statement Section 4.6.2 includes Security Requirements for the contract as being a Facility Clearance Level of Secret.
If the Offeror submitting a proposal for this solicitation is an unpopulated SBA approved 8(a) Joint Venture in which one of the members of the JV has a Top Secret Facility Clearance, would it be acceptable to the Government if the clear JV member sponsor the JV entity post award and submit their DD254 in the proposal submission?At a minimum, the member to the JV that is actually fulfilling the performance objectives which include clearance requirements must possess an adequate FCL.
81n/aAtt. 5, Att. 11, and Att. 10Section 4.2.3.2 Past Performance Questionnaire stated "The Offeror shall send out and track the completion of the Past Performance Questionnaires (Attachment 1) to each of the Points of Contact (POCs) identified in each Past Performance Information Worksheet sumbitted in accordance with paragraph 4.2.3 above. In addition, the section further states that "the offeror shall use best efforts to ensure that at least one POC per relevant contract submit a PPQ." However, The Past Performance Worksheet contains only one POC (the Contracting Officer). Question: Please confirm that the PPQ should be sent to only one POC, the Contracting Officer.At a minimum, the offeror shall send the PPQ to the cognizant Contracting Officer or commercial equivalent
82n/aAtt. 5 and Att. 10Section 4.2.3 restricts each PPI Worksheet to 5 pages. Because the contract information takes at least 1 page, would the Government increase the page count for each PPI to no more than 7 pages (and thereby increasing the total page count for the Past Performance volume to 36 pages - 1 page summary and 7 pages for each citation) so Offerors can provide a more comprehensive description of how the contract is relevant to the Tyndall PWS?Yes, Section 4.2.3 has been amended accordingly
83n/aAtt. 5 and Att. 10Are offerors allowed to make minor formatting adjustments to Attachment 10, when completing the the Past Performance Information Worksheet?Yes, as long as offerors comply with all page limitations and formatting requirements as outlined in the Addendum to FAR 52.212-1. Paragraph 4.2.3 of Attachment 5 revised accordingly.
84n/aAre there any other contracts that are performing CE Operations types services at Tyndall AFB? For example, is there a Grounds Maintenance contract or a Job Order Contract?There are other contractors performing: Grounds Maintenance, Elevator Maintenance, Municiple Solid Waste (Refuse), Custodial, Oil/Water Seperator/Grease Traps (skimming/cleaning) ONLY, Hood and Duct cleaning @ food service locations ONLY.
85Temporary Facilities TabAttachment 1B - Real Property and Facility InventoryAre the Temporary Facilities staying throughout the life of contract or not? If not will Government add a column with date they will be removed?It should be assumed that Temporary Facilities will remain throughout the life of the contract.
86Temporary Facilities TabAttachment 1B - Real Property and Facility InventoryIs the 304,980 Sq. Ft for temporary facilities figured into the Base Yr., OY1 thru OY4 Total Sq. feet at bottom of each tab or not?The square footage for the temporary facilities is not included in the square footage at the bottom of each tab
87Base Year, OY1, OY2 and OY3 Tabs; Projected Demolition AreasAttachment 1B - Real Property and Facility InventoryWill the Government updated Column D (Projected Demo) for the building to be demolition with month and year vs just month?Only the year was provided for the projected demolition activity due to uncertainties in the MILCON/FSRM/DEMO program scheduling.
88Base Year, OY1, OY2 and OY3 TabsAttachment 1B - Real Property and Facility InventoryAre the buildingmarked for demolition already decommissioned yet? If not will a column be added with decommissioned date?The buildings marked for demolition are in multiple years, with many still being used until the demolition is awarded/scheduled. With that being the case, we do not have decommissioning dates on the occupied and unawarded demo contracts.
891.1.1. ScopeAttachment 1 PWSIs power washing/cleaning of the exterior of structures, roofs, and sidewallks considered part of the scope to fulfill life-cycle operations and maintenance requirements for all facilities, non-privatized infrastructure, real property (RP),Government-owned temporary facilities, and real property installed equipment (RPIE) identified in Attachment 1B at Tyndall AFB, FL and three geographically separated locations (Carrabelle, St. George Island, Sumatra) in accordance with this PWS?Power Washing Supplies are available at the U-FIX-IT Store for Facilitiy Managers to check out and use. There have been very few/very rare occurances of BOS Contractor personnel performing this type of work. It should be assumed for the sake of this contract that Power Washing is not included in the scope
901.3.1.6. Warranty ManagementAttachment 1 PWSIs power washing/cleaning of newly installed metal siding, metal roofing, storefront systems, newly applied paint., etc included in warranty management if current and newly installed siding, roofing, storefront systems, paint., etc require pressure cleaning/washing as part of their warranty?Power Washing Supplies are available at the U-FIX-IT Store for Facilitiy Managers to check out and use. There have been very few/very rare occurances of BOS Contractor personnel performing this type of work. It should be assumed for the sake of this contract that Power Washing is not included in the scope, even if a warranty requires it
91Attachment 5, II/1.0/Table 1Are the Glossaries Tab 10 (Vol I), Tab 5 (Vol II) and Tab 5 (Vol III) all subject to the page limitation established for each respective volume?Glossaries are not counted towards page limitations in accordance with section 1.1.3 of Attachment 5 - Addendum to FAR 52.212-1.
92Attachment 6, para. 5.2.25.2.2.states "Recency is defined as at least 12 months of the effort’s period of performance must have been performed during the past four (3) years from the date of issuance of this solicitation. The entire contract will be evaluated if there are 12-months of performance within the three year recency window."
Question: Can the Goverment please clarify that the recency window is 3 years?please see question 50 above
931.5.1PWSPWS states in part "The Government requires the contractor to assume all required licenses and access rights to ensure continuity."
Question: In order to properly price this requirement, we respectfully request that the Government specify how many Maximo licenses and access rights the contractor is responsible for?The number of licenses required for MAXIMO is based on the contractor's proposed manning for those offices. We cannot dictate a required number of licenses, as it would influence the contractor's proposed manning. It should be assumed by the Contractor that the number of personnel required to perform this function is the same as if they were using any other material acqusition & control system.
941.5.1PWSMaximo is presented in the PWS as specific to "Material Acquisition System."

Question 1: Are there other Maximo applications deployed at TAFB that augment the IWIMS/ACES-IWIMS, SMS, Tririga data management, work order execution, workload balancing, procurement, preventive maintenance, Predictive Maintenance operations?

Question 2: How is data management integrated/synchronized between Maximo and IWIMS/ACES-IWIMS, SMS and Tririga?1. MAXIMO is only used for Material Control/Acquisiton and does not interface with other systems. MAXIMO was procured because the Government did not allow the BOS Contractor to use the Material Control/Acqusition portions of NEXGEN-IT/TRIRIGA. There are no other MAXIMO applications at TAFB for BOS 2. There is no direct communication between these systems. Any required data entry between the systems is performed manually by Material Control and/or Customer Service Personnel
951.5.1,
3.2.8PWSPWS 1.5.1 discusses the Maximo Materiel Acquisition System. PWS 3.2.8 states "Contractor shall use Materiel Acquisition System for supply management, materiel acquisition, and tracking."
Question: Are these two references one in the same? If not, please define them.They are the same
962Service SummarySS-17 Service Summary requires a monthly Quality Control Schedule.
Question: Would the Government clarify/amplify the construct of the monthly Quality Control Schedule?The contractor shall ensure all Service Summary Items identified in paragraph 2.0 are included in their monthly schedule. (SS-1 thru SS-18). Also, include for inspection all programs, plans, TO Accounts, Inventories and any other item which could be inspected by the COR or other government agency. The Quality Control Team of the contractor shall have a copy of the PWS and throughly review entire contents for any required oversight.
97Attachment 1GQuestion: Are the 4 chillers and 2 package units in the Facility Maintenance Shop trailer-mounted (Portable)?
Same question for the 3 generators in the Power Pro Shop.The 4 Chillers and 2 Package Units in the FM Shop are trailer mounted (portable). The 3 Generators in the Power Pro Shop are trailer mounted (portable)
98Attachment 1F, Page 1 (first set of items)Page 1 shows an item described as "Dummy Load" with a price of $9,940.
Question: Is this item a load bank? If not, please describe.This is a load bank
99Attachment 1F, Pages 1-2 (second set of items)These pages list 23 air conditioners, all identically priced at over $10,000 each.
Question: Are these portable, trailer-mounted units? If not, please provide more detail as to their application.These are portable, but not on trailers. They can be picked up and moved to locations where facility units have failed and used as backup.
100NumerousThere are numerous references to NexGen-IT System.
Question: Has Tririga been implemented yet at Tyndall? If not, what is the anticipated roll-out date? If Tririga is not in use yet, what system is currently being used and expected to be in place when the contract begins?TRIRIGA/NexGen-IT has been in use at Tyndall since May 2021. Tyndall was the first AF Base to recieve approval to use.
101Attachment 1I - Gov't Furnished RadiosThis attachment lists 108 portable radios but does not show a base station.
Question: Will the Government provide a base station?No base station provided.
102PWS 4.22Attachment 1L - Local PlansSince compliance with the reference plans is mandatory, will the Government provide the listed plans for review?PWS has been revised to remove Attachment 1L. Attachments 1R - Asbestos Management and Operation Plan, 1S - 325 CES Pest Management Plan, 1T- Hazardous Material Emergency Planning and Response Plan, and 1U - Tyndall Hazardous Waste Management Plan have been incorporated via amendment.
103Attachment 2 - CBAAppendix A, Job Descriptions, is blank.
Question: Will the Government please provide the missing Appendix?Job descriptions are identified on page 33 of Attachment 2 - CBA.
104Attachment 1B, Tab OY1In the MILCON table at upper left, line 8, Tyndall AFB Gates Complexes - Commercial Gate shows 297,643 SF. Line 23, Tyndall AFB Gates Complexes - Airey and Tyndall Gates also shows 297,643 SF.

Question 1: Is it coincidental that both lines have the exact same square footage?

Question 2: Will the Government please reconcile these square footages, if incorrect, and also reconcile the TOTAL MILCON ADD sum of 1,313,779 SF on line 19?1. The square footages assigned to both are not by coincidence, they are used as a planning factor. The designs for the gates are not complete, but these square footages came from the programming documents. 2. The square footages are remaining the same the MILCON total remains as 1,313,779
105Attachment 1C - PMTLsTabs G30653101950, G30302106300, C10201025800 and D40204103650 contain no information.

Question: Will the Government please provide the missing data? G30653101950 - RS Means Attached G30302106300 - Removed (Not Required) C10201025800 - Removed (Not Required) D40204103650 - RS Means Attached 106 1.7.2.11 Attachment 1C - PMTLs PWS states in part "Airfields include main airfield, drone runway, all associated taxiways and parking aprons. All sweeping operations shall be performed daily in order to keep the surface areas clear of debris. All airfield sweeping operations shall commence no later than 0600L." However, Attachment 1C, Tab Sweep Airfield, specifies that the airfield is to be swept weekly.

This is the start of the file's text. The full file is on GovTribe.