Attachment 1C - Air Force Preventative Maintenance Task List Data 20 July 2022.xlsx
XLSX spreadsheet 4 MB Posted
- Attached to
- Base Operations Support (BOS) - Tyndall AFB
- Solicitation number
- FA481922R0014
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Main
| PMTL ITEMS | ||||||
| PMTL | PMTL Link | Discipline | PMTL Description | UOM | QTY | |
| B3015225195001 | B3015225195001 | Structures | Roof, Low Sloped, Small (< 5000 sf, min 2 person task) | Each | 32 | |
| B3015225195002 | B3015225195002 | Structures | Roof, Low Sloped, Medium ( 5K - 10K Sf , min 2 person task) | Each | 4 | |
| B3015225195003 | B3015225195003 | Structures | Roof, Low Sloped, Large (up to 15k sf, min 2 person task) | Each | 16 | |
| B3015225195004 | B3015225195004 | Structures | Roof, Steep Slope, Small ( <5k sf, min 2 person task) | Each | 163 | |
| B3015225195005 | B3015225195005 | Structures | Roof, Steep Slope, Medium (5k sf - 10k sf, min 2 person task) | Each | 40 | |
| B3015225195006 | B3015225195006 | Structures | Roof, Steep Slope, Lg (up to 15k sf, min 2 person task) | Each | 32 | |
| B2035225195007 | B2035225195007 | Structures | Ladders, Fixed | Each | 6 | |
| B20354001950 | B20354001950 | Structures | Door, overhead, manual, up to 24' high x 25' wide | Each | 56 | |
| B20354101950 | B20354101950 | Structures | Door, overhead, electric, roll up, to 24' high x 25' wide | Each | 43 | |
| B2035450195001 | B2035450195001 | Structures | Doors, Igloo/Blast, Hinged/Sliding (2 person task) | Each | 2 | |
| B2035450195004 | B2035450195004 | Structures | Fabric Folding Door | Each | 6 | |
| C10251101950 | C10251101950 | Structures | Fire doors, swinging | Each | 1 | |
| D20252601950 | D20252601950 | Water Fuels Systems | Water heater, gas, to 120 gal. | Each | 35 | |
| D2025260395001 | D2025260395001 | Water Fuels Systems | Heater, Water, Electric | Each | 2 | |
| D20252603950 | D20252603950 | Water Fuels Systems | Water heater,steam coil, to 2500 gallon | Each | 3 | |
| D2025260395001 | D2025260395001 | Water Fuels Systems | Heater,Water,Electric | Each | 53 | |
| D3025210195002 | D3025210195002 | HVAC | Expansion Tank | Each | 24 | |
| D30451201950 | D30451201950 | HVAC | Fan coil unit | Each | 66 | |
| D30451601950 | D30451601950 | HVAC | VAV Boxes | Each | 2 | |
| D3045160195001 | D3045160195001 | HVAC | VAV Boxes, Reheat and/or Fan Powered | Each | 4 | |
| D3045600195002 | D3045600195002 | HVAC | Heat Exchanger, Shell & Tube, Non-Steam | Each | 1 | |
| D30551101950 | D30551101950 | HVAC | Unit heater, gas radiant | Each | 9 | |
| D30551102950 | D30551102950 | HVAC | Unit heater, gas infrared | Each | 24 | |
| D30551103950 | D30551103950 | HVAC | Unit heater, steam | Each | 32 | |
| D3065100195001 | D3065100195001 | Energy Mgmt Control Sys | Frequency Drive Controllers | Each | 87 | |
| D3065100195003 | D3065100195003 | Energy Mgmt Control Sys | CO/CO2/NO2/LEL SENSOR CALIBRATION | Each | 1 | |
| D30952201950 | D30952201950 | HVAC | Dehumidifier, desiccant wheel | Each | 9 | |
| D4065100195011 | D4065100195011 | Energy Mgmt Control Sys | DDC Cabinet, Primary/Secondary Controller | Each | 113 | |
| D4095100195001 | D4095100195001 | Alarms | Carbon Dioxide Systems | Each | 1 | |
| D5015234195001 | D5015234195001 | Electrical | Automatic Transfer Switch (ATS) | Each | 15 | |
| D50152801950 | D50152801950 | Electrical | Motor control center, over 400 A | Each | 11 | |
| D50952501950 | D50952501950 | Electrical | Light, emergency, hardwired system | Each | 28 | |
| D50952502950 | D50952502950 | Electrical | Light, emergency, dry cell | Each | 1 | |
| D50952503950 | D50952503950 | Electrical | Light, emergency, wet cell | Each | 18 | |
| D5095250395002 | D5095250395002 | Electrical | Perform Grounding Checks AF System Facility -Per Facility | Each | 15 | |
| D5095250395003 | D5095250395003 | Electrical | Perform Grounding Checks Ammo Facility | Each | 12 | |
| D5095250395004 | D5095250395004 | Electrical | Perform Grounding Checks Comm Facility | Each | 19 | |
| E1035100195001 | E1035100195001 | Pavements | Tire Shredder, Manual | Each | 12 | |
| G20451501950 | G20451501950 | Structures | Manual swing gate | Each | 4 | |
| G2045150195006 | G2045150195006 | Pavements | Airfield Pavement (per 10K SY) | Each | 144 | |
| G2045150195009 | G2045150195009 | Pavements | Bridge | Each | 2 | |
| G3015118195006 | G3015118195006 | Pavements | Outfall | Each | 50 | |
| G3015612195002 | G3015612195002 | Entomology | Termite Inspections | Each | 582 | |
| D3035160295002 | D3035160295002 | Structures | Boiler-CHW Closed Loop Water Treatment | Each | 95 | |
| D30454101950 | D30454101950 | HVAC | Centrifugal, over 1 HP | Each | 126 | |
| D5015280195011 | D5015280195011 | Power Pro | Aircraft Arresting System UHMW Poly Panels | Each | 5 | |
| G3025544195002 | G3025544195002 | Water Fuels Systems | Flush and Inspect Manhole and Sewer | Each | 450 | |
| D5035710195001 | D5035710195001 | Alarms | FACP 301 or More Heat Devices | Each | 95 | |
| G3025420195001 | G3025420195001 | Water Fuels Systems | Lift Station, Dry Well | Each | 34 | |
| D3035160295005 | D3035160295005 | HVAC | Chiller, Scroll, Air Cooled 30 to 130 Ton | Each | 27 | |
| C10201025800 | C10201025800 | Structures | Roll up grille, aluminum, manual, 10' x 10' high, mill finish | Each | 16 | |
| D30551221950 | D30551221950 | HVAC | Forced air heater, oil or gas fired, up to 120 MBH | Each | 21 | |
| D5095250195011 | D5095250195011 | Electrical | Inspect Lightning Protection System (Per Node) | Each | 585 | |
| D3035160295001 | D3035160295001 | HVAC | Air Cooled Screw Chiller >100 TN | Each | 9 | |
| G3065310195054 | G3065310195054 | Water Fuels Systems | Valve, Non-Lubricated Plug, above 2" | Each | 55 | |
| D5095210295001 | D5095210295001 | Power Pro | Diesel Generator, >500 KW | Each | 6 | |
| D30351602950 | D30351602950 | HVAC | Chiller, screw, water cooled, over 100 tons | Each | 5 | |
| D30552301950 | D30552301950 | HVAC | Package unit, computer room | Each | 40 | |
| G3065310195022 | G3065310195022 | Water Fuels Systems | Tank, Aboveground Fuel Storage (AST) | Each | 18 | |
| D5035710195003 | D5035710195003 | Alarms | FACP 50 or Less Heat Devices | Each | 213 | |
| D5035710195006 | D5035710195006 | Alarms | FACP 50 or Less Smoke Devices | Each | 258 | |
| G3065310195018 | G3065310195018 | Water Fuels Systems | Pipe, all metal, above 3" (per 1000 LF) | Each | 12 | |
| D30452101950 | D30452101950 | HVAC | Fan, axial, up to 5,000 CFM | Each | 160 | |
| D5095250195003 | D5095250195003 | Electrical | Inspect A/F Signs (distance/barrier/taxiway) | Each | 99 | |
| D30552502950 | D30552502950 | HVAC | Air conditioning,split system,DX air cooled,over 10 tons | Each | 36 | |
| G3025536195001 | G3025536195001 | Water Fuels Systems | Inspect/Clean Grease Traps | Each | 9 | |
| D5095250195002 | D5095250195002 | Electrical | Inspect A/F (runway, taxiway, & threshold) | Each | 2 | |
| D30552102950 | D30552102950 | HVAC | Package unit, air cooled, 25 thru 50 ton | Each | 33 | |
| G3065310195014 | G3065310195014 | Water Fuels Systems | Meters, Flow, Positive Displacement - Issue and Receipt | Each | 28 | |
| D5035710195004 | D5035710195004 | Alarms | FACP 51 to 100 Heat Devices | Each | 26 | |
| D30251304950 | D30251304950 | HVAC | Boiler, hot water, oil, gas, or comb. fired, over 1000 MBH | Each | 24 | |
| D30351402950 | D30351402950 | HVAC | Chiller, centrif., water cooled, over 100 tons | Each | 1 | |
| D40204103650 | D40204103650 | Alarms | Detectors with brackets, fixed temperature heat detector | Each | 99 | |
| D50952501950010 | D50952501950010 | Electrical | Inspect Static Grounding System - POL, (LOX) Storage | Each | 103 | |
| D30553101950 | D30553101950 | HVAC | Heat Pump, air cooled, up to 5 tons | Each | 59 | |
| D2025410195001 | D2025410195001 | Water Fuels Systems | Backflow Prevention Device DCVA (Double check valve assembly) Class I or II | Each | 120 | |
| D5095250195004 | D5095250195004 | Electrical | Inspect Approach Lights | Each | 2 | |
| D2095910195001 | D2095910195001 | Water Fuels Systems | Water (Sound Tape Wells) | Each | 10 | |
| D30452501950 | D30452501950 | HVAC | Hood and blower | Each | 20 | |
| D30352201950 | D30352201950 | HVAC | Condensing unit, air cooled, 3 tons to 25 tons | Each | 172 | |
| D30951182950 | D30951182950 | HVAC | Air compressor, reciprocating, 5 to 40 H.P. | Each | 4 | |
| D30352602950 | D30352602950 | HVAC | Compressor, DX refrigeration, 25 to 100 tons | Each | 1 | |
| D30351302950 | D30351302950 | HVAC | Chiller, recip., air cooled, over 25 tons | Each | 3 | |
| STREET SWEEPING | STREET SWEEPING | Pavements | STREET SWEEPING (per 10K SY) | Each | 346 | |
| E10953203950 | E10953203950 | Electrical | FAT FRYER | Each | 8 | |
| D30351301950 | D30351301950 | HVAC | Chiller, recip., air cooled, up to 25 tons | Each | 4 | |
| D30951141950 | D30951141950 | HVAC | Air compressor, centrifugal, to 40 H.P. | Each | 50 | |
| G3065310195009 | G3065310195009 | Water Fuels Systems | Fuel systems, All Areas | Each | 7 | |
| D30251302950 | D30251302950 | HVAC | Boiler, hot water, oil, gas, or comb. fired, 120 TO 500 MBH | Each | 17 | |
| D4015150195002 | D4015150195002 | Water Fuels Systems | Wet Pipe Sprinkler System | Each | 79 | |
| D5035710195005 | D5035710195005 | Alarms | Unmonitored FACP (Monthly) | Each | 30 | |
| G3025536195002 | G3025536195002 | Water Fuels Systems | Oil Water Separators (sewer) | Each | 15 | |
| D30553202950 | D30553202950 | HVAC | Heat pump, water cooled, over 5 ton | Each | 22 | |
| D2025410295001 | D2025410295001 | Water Fuels Systems | BackFlow Prevention (BFP) Device RPZ High Hazzard | Each | 74 | |
| D40151002950 | D40151002950 | Water Fuels Systems | Backflow prevention device, over 4" | Each | 7 | |
| D30552101950 | D30552101950 | HVAC | Package unit, air cooled, 3 thru 24 ton | Each | 15 | |
| D5095250195001 | D5095250195001 | Electrical | Conduct Insulation Resistance Testing - A/F Lighting Circuits | Each | 12 | |
| D4015310195001 | D4015310195001 | Water Fuels Systems | Dry Pipe Automatic Sprinkler System | Each | 6 | |
| D30251303950 | D30251303950 | HVAC | Boiler, hot water, oil, gas, or comb. fired, 500 to 1000 MBH | Each | 12 | |
| G3065310195002 | G3065310195002 | Water Fuels Systems | Control Panels, Master Control/Pump Control | Each | 4 | |
| D5095250195009 | D5095250195009 | Electrical | Inspect Wind Cones | Each | 8 | |
| D4095400195001 | D4095400195001 | Water Fuels Systems | Dry & Wet Chemical Systems | Each | 8 | |
| D5095210295007 | D5095210295007 | Power Pro | POL Fuels Generator | Each | 2 | |
| G3065310195005 | G3065310195005 | Water Fuels Systems | Fuel Pump, API 610, Electric Motor Driven | Each | 30 | |
| G3065310195055 | G3065310195055 | Water Fuels Systems | Valve, Pressure (Safety) Relief, All | Each | 30 | |
| D30552202950 | D30552202950 | HVAC | Package unit, water cooled, 25 thru 50 ton | Each | 8 | |
| D5015280195010 | D5015280195010 | Power Pro | AAS Doughnut Loader | Each | 2 | |
| D5095250195005 | D5095250195005 | Electrical | Inspect Obstruction Lights - No Special Equipment (Per 25 lights) | Each | 5 | |
| D5095250195006 | D5095250195006 | Electrical | Inspect Obstruction Lights - Special Equipment (Per 10 lights) | Each | 7 | |
| G3065310195010 | G3065310195010 | Water Fuels Systems | Gauge, Pressure/Vacuum | Each | 25 | |
| D30552501950 | D30552501950 | HVAC | Air conditioning,split system,DX air cooled,to 10 tons | Each | 7 | |
| D5095210295002 | D5095210295002 | Power Pro | Diesel Generator, 5-25 KW | Each | 7 | |
| B20351102950 | B20351102950 | Structures | Hanger doors, sliding | Each | 4 | |
| D4095210195001 | D4095210195001 | Water Fuels Systems | Low-Expansion Foam Systems for Flammable Liquid Tanks | Each | 9 | |
| D5095250195007 | D5095250195007 | Electrical | Inspect PAPI Lights | Per approach | 4 | |
| D5095210295004 | D5095210295004 | Power Pro | Diesel Generator, 26 - 249 KW | Each | 18 | |
| G3065310195011 | G3065310195011 | Water Fuels Systems | Hoses, Receipt, Hard Semi-hard, above 1.5 inches | Each | 6 | |
| D30251101950 | D30251101950 | HVAC | Boiler, electric, to 1500 gal. | Each | 32 | |
| D30351601950 | D30351601950 | HVAC | Chiller, screw, water cooled, up to 100 tons | Each | 1 | |
| D3035160195001 | D3035160195001 | HVAC | Air Cooled Screw Chiller 26-100 Tons | Each | 1 | |
| G3065310195056 | G3065310195056 | Water Fuels Systems | Valve, Thermal Relief, All | Each | 20 | |
| D30552201950 | D30552201950 | HVAC | Package unit, water cooled, 3 tons through 24 tons | Each | 7 | |
| D4015210195001 | D4015210195001 | Water Fuels Systems | Fire System (Electric Motor Pump) | Each | 13 | |
| G3065310195004 | G3065310195004 | Water Fuels Systems | Filter Separator | Each | 12 | |
| D30351102950 | D30351102950 | HVAC | Water cooling tower, 50 thru 500 tons | Each | 7 | |
| D30351352950 | D30351352950 | HVAC | Chiller, recip., water cooled, over 50 tons | Each | 1 | |
| D5035710195008 | D5035710195008 | Alarms | FACP 101 to 300 Smoke Devices | Each | 9 | |
| D30451101950 | D30451101950 | HVAC | Air handling unit, 3 thru 24 tons | Each | 173 | |
| G3015612195006 | G3015612195006 | Entomology | Food Facility Surveillance - Per Facility | Each | 12 | |
| D5095210295003 | D5095210295003 | Power Pro | Diesel Generator, 250 - 499 KW | Each | 8 | |
| G3065310195013 | G3065310195013 | Water Fuels Systems | Level Alarms, High, High-High/Low, Low-Low | Each | 8 | |
| D30452103950 | D30452103950 | HVAC | Fan, axial, over 10,000 CFM | Each | 12 | |
| G3065310195024 | G3065310195024 | Water Fuels Systems | Tank, Underground Storage Tank (UST) | Each | 3 | |
| D5035710195007 | D5035710195007 | Alarms | FACP 51 to 100 Smoke Devices | Each | 12 | |
| G3065310195015 | G3065310195015 | Water Fuels Systems | Motors, All hp | Each | 22 | |
| D4015180195002 | D4015180195002 | Water Fuels Systems | Pre-Action Automatic Sprinkler System | Each | 7 | |
| D30553201950 | D30553201950 | HVAC | Heat pump, water cooled, up to 5 ton | Each | 3 | |
| D30451103950 | D30451103950 | HVAC | Air handling unit, over 50 tons | Each | 44 | |
| G3065310195048 | G3065310195048 | Water Fuels Systems | Valve, Automatic, above 4", Product Recovery Tank OV (2129AF) | Each | 10 | |
| G3065310195021 | G3065310195021 | Water Fuels Systems | Switch, Flow | Each | 9 | |
| G3025536195003 | G3025536195003 | Water Fuels Systems | Septic Tank Inspection | Each | 10 | |
| G3065310195008 | G3065310195008 | Water Fuels Systems | Fuel pump, Split Case, Electric Motor Driven | Each | 4 | |
| G3065310195040 | G3065310195040 | Water Fuels Systems | Valve, Automatic, above 4", High-Level Shut-Off Valve (129AF) | Each | 8 | |
| G30302106300 | G30302106300 | Water Fuels Systems | Manhole/catch basin, concrete, precast, 6' ID riser, 14' deep | Each | 2 | |
| B2035450195003 | B2035450195003 | Structures | Electronic Locks | Each | 4 | |
| G3065310195030 | G3065310195030 | Water Fuels Systems | Valve, Automatic, above 4", Non-Surge/Check Valve (81AF/81AF-8) | Each | 13 | |
| G3065310195006 | G3065310195006 | Water Fuels Systems | Fuel pump, Deep Well Turbine, electric motor driven | Each | 3 | |
| G3065310195007 | G3065310195007 | Water Fuels Systems | Fuel pump, Self-priming Electric Motor Driven | Each | 3 | |
| D30451102950 | D30451102950 | HVAC | Air handling unit, 25 thru 50 tons | Each | 37 | |
| G3065310195028 | G3065310195028 | Water Fuels Systems | Valve, Automatic, above 4", Fuel Shut-off Control Valve (41AF-2C) | Each | 10 | |
| G3065310195035 | G3065310195035 | Water Fuels Systems | Valve, Automatic, above 4", Fill Stand Control Valve (90AF-4A-3) | Each | 4 | |
| D5035710195002 | D5035710195002 | Alarms | FACP 101 to 300 Heat Devices | Each | 2 | |
| D30553102950 | D30553102950 | HVAC | Heat Pump, air cooled, over 5 tons | Each | 1 | |
| D30452102950 | D30452102950 | HVAC | Fan, axial, 5,000 to 10,000 CFM | Each | 2 | |
| G3065310195020 | G3065310195020 | Water Fuels Systems | Suppressor, Surge | Each | 2 | |
| D30452203950 | D30452203950 | HVAC | Fan, centrifugal, over 10,000 CFM | Each | 1 | |
| G30653101950 | G30653101950 | Water Fuels Systems | FUEL OIL STORAGE TANK, ABOVE GROUND | Each | 1 | |
| D30452201950 | D30452201950 | HVAC | Fan, centrifugal, up to 5,000 CFM | Each | 1 | |
| G3065310195053 | G3065310195053 | Water Fuels Systems | Valve, Manual Ball, above 2" | Each | 54 | |
| D40151001950 | D40151001950 | Water Fuels Systems | Backflow prevention device, up to 4" | Each | 8 | |
| D5015210195001 | D5015210195001 | Electrical | Inspect Distribution Panel - 1201 to 2000 Amps | Each | 56 | |
| D5015210195002 | D5015210195002 | Electrical | Inspect Distribution Panel - >2001 Amps | Each | 3 | |
| D5015210195003 | D5015210195003 | Electrical | Inspect Distribution Panel - 601 to 1200 Amps | Each | 4 | |
| D5015260195001 | D5015260195001 | Electrical | Inspect Sub Panel - 225 Amps and Smaller | Each | 697 | |
| D5015260195002 | D5015260195002 | Electrical | Inspect Sub Panel - 226 Amps and Larger | Each | 146 | |
| D5035710195010 | D5035710195010 | Electrical | Inspect Mass Notification System (MNS) Per Bldg | Each | 1 | |
| D5095250195011 | D5095250195011 | Electrical | Inspect Lightning Protection System | Each | 47 | |
| B2035300195001 | B2035300195001 | Structures | Aircraft Blast Shields | Each | 1 | |
| D3095122195001 | D3095122195001 | HVAC | AIR COMPRESSOR 40HP OR LESS ROTARY SCREW | Each | 1 | |
| D4095210195002 | D4095210195002 | Water Fuels Systems | FOAM SPRAY SPRINKLER SYSTEM | Each | 1 | |
| D5095250195008 | D5095250195008 | Electrical | Inspect Rotating | |||
| Beacon | Each | 1 | ||||
| G2045150495001 | G2045150495001 | Structures | Tilt-A-Way vertical pivot gate, chainlink | Each | 1 | |
| D30251301950 | D30251301950 | HVAC | BOILER LESS THAN 120 MBH | Each | 2 | |
| D3045220295 | D3045220295 | HVAC | FAN CENTRIFUGAL 5K TO 10K CFM | Each | 2 | |
| D5015280195007 | D5015280195007 | Power Pro | BAK-15 |
Aircraft Arresting
| System | Each | 2 | ||
| D5095210295011 | D5095210295011 | Power Pro | Load Bank | |
| Inspection | Each | 2 | ||
| D5015280195001 | D5015280195001 | Power Pro | E-5 |
Runway Overrun
| Barrier | Each | 4 | ||||
| G2045150195010 | G2045150195010 | Pavements | Inspect Retaining Walls (per 300 square yards, per person) over 4' high | Each | 4 | |
| G3015612195003 | G3015612195003 | Entomology | BASH SURVEILLANCE (Per Sector) | Each | 4 | |
| G3015612195008 | G3015612195008 | Entomology | AIRFIELD WEED SURVEILLANCE (Per Sector) | Each | 4 | |
| D4015180195001 | D4015180195001 | Water Fuels Systems | DELUGE SPRINKLER SYSTEM | Each | 9 | |
| D3035110195001 | D3035110195001 | HVAC | COOLING TOWER LEGIONELLA | Each | 6 | |
| D30551222950 | D30551222950 | HVAC | FURNACE OVER 120 MBH | Each | 6 | |
| D5015280195005 | D5015280195005 | Power Pro | BAK-12 |
Aircraft arresting
| system | Each | 8 | ||||
| D50952102955002 | D50952102955002 | Power Pro | Diesel Generator 5 - 25 KW | Each | 8 | |
| G3035070195002 | G3035070195002 | Pavements | Retention Pond Per pond | Each | 10 | |
| E10351001950031 | E10351001950031 | Electrical | Traffic Pop-Up Hydraulic Per Row | Each | 12 | |
| E1035100195003 | E1035100195003 | Electrical | Traffic Control |
Barriers Pop-Up Electric
| Per Row | Each | 13 | ||||
| D30352601950 | D30352601950 | HVAC | DX REFRIGERATION | Each | 14 | |
| G20451504950 | G20451504950 | Electrical | ELECTRIC SLIDE GATE | Each | 14 | |
| E1035100195002 | E1035100195002 | Structures | Drop Arms | |||
| Each | Each | 15 | ||||
| B2035450195002 | B2035450195002 | Structures | Doors, Vault | Each | 17 | |
| G40955110195001 | G40955110195001 | Electrical | Cathodic Protection (60 Day and Annual) | Each | 27 | |
| D5095210295006 | D5095210295006 | Power Pro | EAID Generators | Each | 34 | |
| B2035110295001 | B2035110295001 | Structures | Hangar Doors, Sliding, Large | Each | 40 | |
| D3025210195001 | D3025210195001 | HVAC | AIR SEPERATOR | Each | 46 | |
| D2025410295001 | D2025410295001 | Water Fuels Systems | Back Flow Prevention (BFP) Device RPZ High Hazard Class III | Each | 161 | |
| G3015612195010 | G3015612195010 | Entomology | RODENT SURVEILLANCE - PER FACILITY | Each | 236 | |
| G3015612195009 | G3015612195009 | Entomology | WEED SURVEILLANCE - PER ACRE | Each | 22 | |
| D5015280195004 | D5015280195004 | Power Pro | MB 60.9.9.C |
Textile Brake
| Arresting System | Each | 4 | ||||
| G3015612195001 | G3015612195001 | Entomology | ADULT MOSQUITO SURVEILLANCE | Each | N/A | |
| G3015612195005 | G3015612195005 | Entomology | LARVAL MOSQUITO SURVEILLANCE | Each | N/A | |
| D30451701950 | D30451701950 | HVAC | FIRE DAMPERS | Each | 194 | |
| G2045150395002 | G2045150395002 | Structures | EOD Range | Each | 1 | |
| MFR. Specs | MFR. Specs | Electrical | Final Denial Barriers Electric | Each | 2 | |
| MFR. Specs 1 | MFR. Specs 1 | Electrical | Final Denial Barriers Hydraulic | Each | 7 |
E10351001950031
| Equipment Component | As Of: 12/21/2020 | |||
| Equipment Type: | E1035100195003 | |||
| Component: | Vehicle Barriers, Pop-Up | |||
| Notes: | Ref: AFI 32-1001 | |||
| Step | PM Components (Task Description) | Q | S | A |
| Ref: AFI 32-1001 | x | x | x | |
| 1 | Check with Facility Manager for deficiencies | x | x | x |
| 2 | Coordinate inspection with Security Forces | x | x | x |
| 3 | Close lanes and change traffic flow | x | x | x |
| 4 | Check for proper operation, binding or misalignment and adjust as necessary | x | x | x |
| 5 | Inspect all indicator lights and traffic lights for proper operation, replace bulbs as necessary | x | x | x |
| 6 | Gain access to maintenance control panel | x | x | x |
| 7 | Cycle barrier to road closed position | x | x | x |
| 8 | Install safety bars | x | x | x |
| 9 | Bleed off all hydraulic pressure and lock and tag out power | x | x | x |
| 10 | Remove access panel that covers actuators | x | x | x |
| 11 | Clean barrier pits of debris and inspect drainage | x | x | x |
| 12 | Repair, tighten, or replace bolts or parts | x | x | x |
| 13 | Inspect hoses and wiring for wear and damage, repair as needed | x | x | x |
| 14 | Grease fittings on actuators | x | x | x |
| 15 | Reinstall actuator access panel | x | x | x |
| 16 | Perform remaining manufacturer's recommended maint. | x | x | x |
| 17 | Inspect outside plates for damage | x | x | x |
| 18 | Inspect barrier for corrosion and paint coating condition repair as needed | x | x | x |
| 19 | Remove tag out and restore power and hydraulic pressure | x | x | x |
| 20 | Remove safety bars | x | x | x |
| 21 | Test barrier and safety systems for proper operation | x | x | x |
| 22 | Cycle barrier to road open position | x | x | x |
| 23 | Reopen lane and return traffic flow to normal | x | x | x |
| 24 | Compile list of discrepancies and open corrective maintenance work task(s) to make repair(s) | x | x | x |
D50952501950010
| Equipment Type: | D5095250195010 | |||
| Component: | Inspect Static Grounding System - POL, MUNS, LOX Storage - Per Facility | |||
| Step | PM Components (Task Description) | Q | S | A |
| 1 | Collect maps, communication equipment, tools, safety equipment | x | ||
| 2 | Check for current meter calibration date if required | x | ||
| 3 | Coordinate inspection with facility manager | x | x | x |
| 4 | Obtain approval to enter secured area from guard if required | x | ||
| 5 | Perform visual inspection of static ground conductor | x | x | x |
| 6 | Don safety gear if required | x | ||
| 7 | Check to see if grounding system within the facility are bonded together at ground level or below | x | ||
| 8 | Check to see if flashover protection is installed on insulated fittings on underground metallic pipeline entering the facility (if accessable) | x | ||
| 9 | Inspect cable and ground rods for corrosion | x | ||
| 10 | Inspect/tighten ground connections as required | x | ||
| 11 | Locate test point | x | ||
| 12 | Drive reference pins and attach cables | x | ||
| 13 | Check ground reading | x | ||
| 14 | Check resistance across all connections | x | ||
| 15 | Record results | x | ||
| 16 | Disconnect cables, remove reference pins and clean up area | x | ||
| 17 | Compile list of discrepancies and open corrective maintenance job order(s) to make the repair(s) | x | x | x |
D30451701950
B2035110295001
| Equipment Component | As Of: 08/06/2019 | |
| Equipment Type: | B2035110295001 | |
| Component: | Hangar Doors, Sliding, Large | |
| Notes: | Initial Aug 17 Updated Aug 19. Changed AFI 91-203 to AFMAN 91-203. | |
| Step | PM Components (Task Description) | A |
| 1 | Dated Aug 2017 Frequency determined by asset condition, mission dependency, and ROI Ref: AFMAN 91-203 para 24.14 | x |
| 2 | Collect maps, tools, communication equipment, and safety equipment | x |
| 3 | Check with Facility Manager for deficiencies | x |
| 4 | Remove debris from door track | x |
| 5 | Operate door | x |
| 6 | Check alignment of hanger door, door guide and lubricate | x |
| 7 | Inspect and lubricate wheel drive chain | x |
| 8 | Adjust brake shoes and check for wear | |
| 9 | Inspect and lubricate drive wheels, guides, stops and rollers | x |
| 10 | Inspect door for general condition, paint, functionality, warning and caution signage | x |
| 11 | Inspect bumpers, springs and stops blocks for wear | x |
| 12 | Check and lubricate door guides, pulleys, hinges, and latching mechanisms | x |
| 13 | Inspect and lubricate motor gearbox, drive chain (or belt), and motor where applicable; adjust as necessary | x |
| 14 | Check operation of door controls, limit switch, alarms, warning lights, adjust as necessary | x |
| 15 | Coordinate with Electrical work center to inspect electrical switches, limit switches, wiring, alarms, warning lights, electrical connections, and contacts; adjust as necessary | x |
| 16 | Repair loose hardware and identify missing hardware | x |
| 17 | Replace motor gear box oil | x |
| 18 | Compile list of discrepancies and open corrective maintenance work task(s) to make the repair(s) | x |
G40955110195001
| Equipment Component | As Of: 02/27/2015 | ||
| Equipment Type: | G4095110195001 | ||
| Component: | Cathodic Protection (60 day and Annual | ||
| Notes: | Per AFI 32-1001 and UFC 3-570-06 | ||
| Step | PM Components (Task Description) | BM | A |
| 1 | Inspect exterior of rectifier cabinet, all exposed connecting conduit, and fittings for corrosion, deteriorated paint, mechanical integrity and cleanliness, make minor repairs and clean/touch-up paint as required. All steps Per AFI 32-1001 and UFC 3-570-06 | x | x |
| 2 | Open and inspect interior of rectifier cabinet, inspect wiring for fraying, signs of overheating, deterioration mechanical damage, and loose connections; make adjustments as required | x | x |
| 3 | Check electrical contacts for overheating and pitting; make adjustments | x | x |
| 4 | Clean interior of rectifier cabinet | x | x |
| 5 | Check panel voltmeter and ampmeter with standard test instruments | x | x |
| 6 | Read and record panel meter voltage and current values on AF IMT Form 491 | x | x |
| 7 | Measure and record rectifier voltage and current with portable instrument | x | x |
| 8 | Perform Impressed Current Anode Bed Survey and annotate findings on AF IMT Form 1688 | x | |
| 9 | Perform Resistance Bond Check/Check potential at cathode locations; tighten loose connections | x | x |
| 10 | Perform Galvanic Anode Check and annotate findings on AF IMT Form 1686 | x | |
| 11 | Conduct Water Tank Callibration and annotate findings on AF IMT Form 1689 | x | |
| 12 | Compile list of discrepancies and open corrective maintenance job order(s) to make the repair(s) | x | x |
G20451504950
D30352601950
D50952102955002
| Equipment Component | As Of: 12/23/2020 | ||||||
| Equipment Type: | D5095210295002 | ||||||
| Component: | Diesel Generator, >5 - 25 KW | ||||||
| Notes: | Ref: AFMAN 32-1062 and UFC 3-540-07 | ||||||
| Step | PM Components (Task Description) | Labor-hrs | J | M | S | A | 2yr |
| Ref: AFMAN 32-1062 and UFC 3-540-07 | x | x | x | x | x | ||
| 1 | Collect maps, communication equipment, tools, safety equipment. Conduct tailgate safety briefing. Don all required PPE. Notify Facility Manager/facility occupants | x | x | x | x | x | |
| 2 | Inspect Batteries and DC Charging System | x | x | x | x | x | |
| 3 | Complete inspection Report (Compile list of discrepancies and open corrective maintenance work task(s) to make repair(s) | x | x | x | x | x | |
| 4 | Inspect Cooling System, coolant hoses and Louvers | x | x | x | x | ||
| 5 | Test Coolant | x | x | x | x | ||
| 6 | Ensure Belt Proper Tension | x | x | x | x | ||
| 7 | Check Fuel System for Leaks | x | x | x | x | ||
| 8 | Inspect Day Tank and Test Aux Pump | x | x | x | x | ||
| 9 | Inspect Unit Grounding and Wires | x | x | x | x | ||
| 10 | Inspect Controls/Gauges Condition | x | x | x | x | ||
| 11 | Exhaust Gas temperature reading | x | x | x | x | ||
| 12 | Operate Generator Under Load (Monthly) | x | |||||
| 13 | Drain Water from Fuel System | x | x | x | x | ||
| 14 | Disconnect Power From Main | x | x | x | |||
| 15 | Perform semiannual inspections and full system tests (generator, ATS, and full emergency facility loads; check integral load bank maintenance) | x | x | x | |||
| 16 | Change Oil and Lube Filters. (oil change deferment only permitted IAW UFC 3-540-07) | x | x | ||||
| 17 | Change Fuel Filters. (follow manufacturer guidance on frequencies) | x | x | x | |||
| 18 | Clean Airbox and Change Air Filter. (follow manufacturer guidance on frequencies) | x | x | x | |||
| 19 | Change Coolant and Filter; Flush Radiator every 2 years | x |
D30551222950
D30251301950
D40151001950
D30452201950
G30653101950
D30452203950
D30452102950
D30553102950
D30451102950
G30302106300
D30451103950
D30553201950
D30452103950
D30451101950
D30351352950
D30351102950
D30552201950
D30351601950
D30251101950
D30552501950
D30552202950
D30251303950
D30552101950
D40151002950
D30553202950
D30251302950
D30951141950
D30351301950
E10953203950
D30351302950
D30352602950
D30951182950
D30352201950
D30452501950
D30553101950
D40204103650
D30351402950
D30251304950
D30552102950
D30552502950
D30452101950
D30552301950
D30351602950
D30551221950
C10201025800
D30454101950
G20451501950
D50952503950
D50952502950
D50952501950
D50152801950
D30952201950
D30551103950
D30551102950
D30551101950
D30451601950
D30451201950
D20252601950
C10251101950
B20354101950
B20354001950
STREET SWEEPING
| Equipment Type: | N/A | ||||||||||||||||||||||
| Component: | Paved Roads | ||||||||||||||||||||||
| PM Components (Task Description) | Daily | Weekly | Semi-Monthly | Monthly | Bi-Monthly | Quarterly | Semi-Annually | Annually | 20mo | 21mo | 2yrs | 3yr | 40mo | 4yr | 5yr | 6yr | 10yr | 20yr | 50yr | Frequency | Total Hours | ||
| 1 | Sweep Airfield | x | Daily | 0 | |||||||||||||||||||
| 2 | Sweep paved roads | x | Weekly | 0 | |||||||||||||||||||
| 3 | Semi-Monthly | 0 | |||||||||||||||||||||
| 4 | Monthly | 0 | |||||||||||||||||||||
| 5 | Bi-Monthly | 0 | |||||||||||||||||||||
| Quarterly | 0 | ||||||||||||||||||||||
| Semi-Annually | 0 | ||||||||||||||||||||||
| Annually | 0 | ||||||||||||||||||||||
| 20mo | 0 | ||||||||||||||||||||||
| 21mo | 0 | ||||||||||||||||||||||
| 2yrs | 0 | ||||||||||||||||||||||
| 3yr | 0 | ||||||||||||||||||||||
| 40mo | 0 | ||||||||||||||||||||||
| 4yr | 0 | ||||||||||||||||||||||
| 5yr | 0 | ||||||||||||||||||||||
| 6yr | 0 | ||||||||||||||||||||||
| 10yr | 0 | ||||||||||||||||||||||
| 20yr | 0 | ||||||||||||||||||||||
| 50yr | 0 |
B20351102950
| Equipment Type: | B20351102950 | ||||||||||||||||||||||
| Component: | Hangar Doors, Sliding, Large | ||||||||||||||||||||||
| PM Components (Task Description) | Daily | Weekly | Semi-Monthly | Monthly | Bi-Monthly | Quarterly | Semi-Annually | Annually | 20mo | 21mo | 2yrs | 3yr | 40mo | 4yr | 5yr | 6yr | 10yr | 20yr | 50yr | Frequency | Total Hours | ||
| 1 | Dated Aug 2017 Frequency determined by asset condition, mission dependency, and ROI Ref: AFMAN 91-203 para 24.14 | x | Daily | 0 | |||||||||||||||||||
| 2 | Collect maps, tools, communication equipment, and safety equipment | x | Weekly | 0 | |||||||||||||||||||
| 3 | Check with Facility Manager for deficiencies | x | Semi-Monthly | 0 | |||||||||||||||||||
| 4 | Remove debris from door track | x | Monthly | 0 | |||||||||||||||||||
| 5 | Operate door | x | Bi-Monthly | 0 | |||||||||||||||||||
| 6 | Check alignment of hanger door, door guide and lubricate | x | Quarterly | 0 | |||||||||||||||||||
| 7 | Inspect and lubricate wheel drive chain | x | Semi-Annually | 0 | |||||||||||||||||||
| 8 | Adjust brake shoes and check for wear | Annually | 0 | ||||||||||||||||||||
| 9 | Inspect and lubricate drive wheels, guides, stops and rollers | x | 20mo | 0 | |||||||||||||||||||
| 10 | Inspect door for general condition, paint, functionality, warning and caution signage | x | 21mo | 0 | |||||||||||||||||||
| 11 | Inspect bumpers, springs and stops blocks for wear | x | 2yrs | 0 | |||||||||||||||||||
| 12 | Check and lubricate door guides, pulleys, hinges, and latching mechanisms | x | 3yr | 0 | |||||||||||||||||||
| 13 | Inspect and lubricate motor gearbox, drive chain (or belt), and motor where applicable; adjust as necessary | x | 40mo | 0 | |||||||||||||||||||
| 14 | Check operation of door controls, limit switch, alarms, warning lights, adjust as necessary | x | 4yr | 0 | |||||||||||||||||||
| 15 | Coordinate with Electrical work center to inspect electrical switches, limit switches, wiring, alarms, warning lights, electrical connections, and contacts; adjust as necessary | x | 5yr | 0 | |||||||||||||||||||
| 16 | Repair loose hardware and identify missing hardware | x | 6yr | 0 | |||||||||||||||||||
| 17 | Replace motor gear box oil | x | 10yr | 0 | |||||||||||||||||||
| 18 | Compile list of discrepancies and open corrective maintenance work task(s) to make the repair(s) | x | 20yr | 0 | |||||||||||||||||||
| Total | 50yr | 0 |
B2035225195007
| Equipment Type: | B2035225195007 | ||||||||||||||||||||||
| Component: | Ladders, Fixed | ||||||||||||||||||||||
| PM Components (Task Description) | Daily | Weekly | Semi-Monthly | Monthly | Bi-Monthly | Quarterly | Semi-Annually | Annually | 20mo | 21mo | 2yrs | 3yr | 40mo | 4yr | 5yr | 6yr | 10yr | 20yr | 50yr | Frequency | Total Hours | ||
| 0 | Ref: AFMAN 91-203 para 7.3.2 | x | Daily | 0 | |||||||||||||||||||
| 1 | Check with Facility Manager for deficiencies | x | Weekly | 0 | |||||||||||||||||||
| 2 | Inspect for loose, worn, or damaged rungs/side rails | x | Semi-Monthly | 0 | |||||||||||||||||||
| 3 | Inspect for damaged or corroded handrails/brackets on platforms | x | Monthly | 0 | |||||||||||||||||||
| 4 | Inspect for deteriorating masonry or siding where fixed ladder anchorages are secured to the structure | x | Bi-Monthly | 0 | |||||||||||||||||||
| 5 | Inspect for lose or damaged carrier rails or cables | x | Quarterly | 0 | |||||||||||||||||||
| 6 | Inspect for cracked, rusted, or damaged welds | x | Semi-Annually | 0 | |||||||||||||||||||
| 7 | Inspect for any surface rust | x | Annually | 0 | |||||||||||||||||||
| 8 | Tighten or replace loose, damaged, or missing bolts, rivet heads, hardware | x | 20mo | 0 | |||||||||||||||||||
| 9 | Document and/or Update BE Asset Record and SMS data to capture ladder type, safety climbing device installed (note if none), open corrective maintenance work task for any deficiencies. | x | 21mo | 0 | |||||||||||||||||||
| 2yrs | 0 | ||||||||||||||||||||||
| 3yr | 0 | ||||||||||||||||||||||
| 40mo | 0 | ||||||||||||||||||||||
| 4yr | 0 | ||||||||||||||||||||||
| 5yr | 0 | ||||||||||||||||||||||
| 6yr | 0 | ||||||||||||||||||||||
| 10yr | 0 | ||||||||||||||||||||||
| 20yr | 0 | ||||||||||||||||||||||
| 50yr | 0 |
B2035225195008
| Equipment Type: | B2035225195008 | ||||||||||||||||||||||
| Component: | Hangar doors, Tilt-up | ||||||||||||||||||||||
| PM Components (Task Description) | Daily | Weekly | Semi-Monthly | Monthly | Bi-Monthly | Quarterly | Semi-Annually | Annually | 20mo | 21mo | 2yrs | 3yr | 40mo | 4yr | 5yr | 6yr | 10yr | 20yr | 50yr | Frequency | Total Hours | ||
| 0 | Dated Aug 2017 Frequency determined by asset condition, mission dependency, and ROI Ref: AFMAN 91-203 para 24.14 | x | Daily | 0 | |||||||||||||||||||
| 1 | Collect maps, tools, communication equipment, and safety equipment. Check with Facility Manager for deficiencies | x | Weekly | 0 | |||||||||||||||||||
| 2 | Remove debris from door track. | x | Semi-Monthly | 0 | |||||||||||||||||||
| 3 | Operate door. | x | Monthly | 0 | |||||||||||||||||||
| 4 | Check alignment of hanger door, door guides and lubricate. | x | Bi-Monthly | 0 | |||||||||||||||||||
| 5 | Inspect and lubricate wheel drive chain. | x | Quarterly | 0 | |||||||||||||||||||
| 6 | Adjust brake shoes and check for wear. | x | Semi-Annually | 0 | |||||||||||||||||||
| 7 | Inspect and lubricate drive wheels, guides, stops and rollers. | x | Annually | 0 | |||||||||||||||||||
| 8 | Compile list of discrepancies and open corrective maintenance work task(s) to make the repair(s) | x | 20mo | 0 | |||||||||||||||||||
| 21mo | 0 | ||||||||||||||||||||||
| 2yrs | 0 | ||||||||||||||||||||||
| 3yr | 0 | ||||||||||||||||||||||
| 40mo | 0 | ||||||||||||||||||||||
| 4yr | 0 | ||||||||||||||||||||||
| 5yr | 0 | ||||||||||||||||||||||
| 6yr | 0 | ||||||||||||||||||||||
| 10yr | 0 | ||||||||||||||||||||||
| 20yr | 0 | ||||||||||||||||||||||
| 50yr | 0 |
B2035300195001
| Equipment Type: | B2035300195001 | ||||||||||||||||||||||
| Component: | Aircraft Blast Shields | ||||||||||||||||||||||
| PM Components (Task Description) | Daily | Weekly | Semi-Monthly | Monthly | Bi-Monthly | Quarterly | Semi-Annually | Annually | 20mo | 21mo | 2yrs | 3yr | 40mo | 4yr | 5yr | 6yr | 10yr | 20yr | 50yr | Frequency | Total Hours | ||
| 1 | Check with Facility Manager for deficiencies | x | Daily | 0 | |||||||||||||||||||
| 2 | Inspect for damaged or deteriorating structural members | x | Weekly | 0 | |||||||||||||||||||
| 3 | Inspect fastners and hardware for proper tightness and installation | x | Semi-Monthly | 0 | |||||||||||||||||||
| 4 | Tighten or replace loose/missing hardware | x | Monthly | 0 | |||||||||||||||||||
| 5 | Fill out maintenance checklist and report deficiencies | x | Bi-Monthly | 0 | |||||||||||||||||||
| Quarterly | 0 | ||||||||||||||||||||||
| Semi-Annually | 0 | ||||||||||||||||||||||
| Annually | 0 | ||||||||||||||||||||||
| 20mo | 0 | ||||||||||||||||||||||
| 21mo | 0 | ||||||||||||||||||||||
| 2yrs | 0 | ||||||||||||||||||||||
| 3yr | 0 | ||||||||||||||||||||||
| 40mo | 0 | ||||||||||||||||||||||
| 4yr | 0 | ||||||||||||||||||||||
| 5yr | 0 | ||||||||||||||||||||||
| 6yr | 0 | ||||||||||||||||||||||
| 10yr | 0 | ||||||||||||||||||||||
| 20yr | 0 | ||||||||||||||||||||||
| 50yr | 0 |
B2035450195001
| Equipment Type: | B2035450195001 | ||||||||||||||||||||||
| Component: | Hangar Doors, Igloo/Blast, Hinged/Sliding (2 person task) | ||||||||||||||||||||||
| PM Components (Task Description) | Daily | Weekly | Semi-Monthly | Monthly | Bi-Monthly | Quarterly | Semi-Annually | Annually | 20mo | 21mo | 2yrs | 3yr | 40mo | 4yr | 5yr | 6yr | 10yr | 20yr | 50yr | Frequency | Total Hours | ||
| 0 | Frequency determined by asset condition, mission dependency, and ROI Ref: AFMAN 91-203 para 24.14 | x | Daily | 0 | |||||||||||||||||||
| 1 | Check with Facility Manager for deficiencies | x | Weekly | 0 | |||||||||||||||||||
| 2 | Inspect door for general condition/functionality | x | Semi-Monthly | 0 | |||||||||||||||||||
| 3 | Check for proper operation, binding or misalignment and adjust as necessary | x | Monthly | 0 | |||||||||||||||||||
| 4 | Check and lubricate door guides, pulleys, hinges, and latching mechanisms | x | Bi-Monthly | 0 | |||||||||||||||||||
| 5 | Inspect and lubricate motor gearbox, drive chain (or belt), and motor where applicable; adjust as necessary | x | Quarterly | 0 | |||||||||||||||||||
| 6 | Check operation of limit switch, adjust as necessary | x | Semi-Annually | 0 | |||||||||||||||||||
| 7 | Check electrical operator, wiring, connections, and contacts; adjust as necessary | x | Annually | 0 | |||||||||||||||||||
| 8 | Repair or replace loose or missing hardware | x | 20mo | 0 | |||||||||||||||||||
| 9 | Clean area around door | x | 21mo | 0 | |||||||||||||||||||
| 10 | Compile list of discrepancies and open corrective maintenance work task(s) to make the repair(s) | x | 2yrs | 0 | |||||||||||||||||||
| 3yr | 0 | ||||||||||||||||||||||
| 40mo | 0 | ||||||||||||||||||||||
| 4yr | 0 | ||||||||||||||||||||||
| 5yr | 0 | ||||||||||||||||||||||
| 6yr | 0 | ||||||||||||||||||||||
| 10yr | 0 | ||||||||||||||||||||||
| 20yr | 0 | ||||||||||||||||||||||
| 50yr | 0 |
B2035450195002
| Equipment Type: | B2035450195002 | ||||||||||||||||||||||
| Component: | Doors, Vault | ||||||||||||||||||||||
| PM Components (Task Description) | Daily | Weekly | Semi-Monthly | Monthly | Bi-Monthly | Quarterly | Semi-Annually | Annually | 20mo | 21mo | 2yrs | 3yr | 40mo | 4yr | 5yr | 6yr | 10yr | 20yr | 50yr | Frequency | Total Hours | ||
| 1 | Collect maps, communication equipment, tools, safety equipment | x | Daily | 0 | |||||||||||||||||||
| 2 | Check with Facility Manager and or vault manager for deficiencies | x | Weekly | 0 | |||||||||||||||||||
| 3 | Perform operational inspection per AFI 16-1404 Table A6.1. Ref: AFI 16-1404, Air Force Information Security Program, para 5.2.4.1. | x | Semi-Monthly | 0 | |||||||||||||||||||
| 4 | Compile list of discrepancies and open corrective maintenance work task(s) to make the repair(s). | x | Monthly | 0 | |||||||||||||||||||
| Bi-Monthly | 0 | ||||||||||||||||||||||
| Quarterly | 0 | ||||||||||||||||||||||
| Semi-Annually | 0 | ||||||||||||||||||||||
| Annually | 0 | ||||||||||||||||||||||
| 20mo | 0 | ||||||||||||||||||||||
| 21mo | 0 | ||||||||||||||||||||||
| 2yrs | 0 | ||||||||||||||||||||||
| 3yr | 0 | ||||||||||||||||||||||
| 40mo | 0 | ||||||||||||||||||||||
| 4yr | 0 | ||||||||||||||||||||||
| 5yr | 0 | ||||||||||||||||||||||
| 6yr | 0 | ||||||||||||||||||||||
| 10yr | 0 | ||||||||||||||||||||||
| 20yr | 0 | ||||||||||||||||||||||
| 50yr | 0 |
D20252603950
B2035450195003
| Equipment Type: | B2035450195003 | ||||||||||||||||||||||
| Component: | Electronic Locks | ||||||||||||||||||||||
| PM Components (Task Description) | Daily | Weekly | Semi-Monthly | Monthly | Bi-Monthly | Quarterly | Semi-Annually | Annually | 20mo | 21mo | 2yrs | 3yr | 40mo | 4yr | 5yr | 6yr | 10yr | 20yr | 50yr | Frequency | Total Hours | ||
| 1 | Check with Facility Manager for deficiencies | x | x | Daily | 0 | ||||||||||||||||||
| 2 | Remove Housing | x | Weekly | 0 | |||||||||||||||||||
| 3 | Replace Battery | x | Semi-Monthly | 0 | |||||||||||||||||||
| 4 | Replace Housing | x | Monthly | 0 | |||||||||||||||||||
| 5 | Clean Electronic Locks with Swipe Card | x | x | Bi-Monthly | 0 | ||||||||||||||||||
| 6 | Fill out maintenance checklist and report deficiencies | x | x | Quarterly | 0 | ||||||||||||||||||
| Semi-Annually | 0 | ||||||||||||||||||||||
| Annually | 0 | ||||||||||||||||||||||
| 20mo | 0 | ||||||||||||||||||||||
| 21mo | 0 | ||||||||||||||||||||||
| 2yrs | 0 | ||||||||||||||||||||||
| 3yr | 0 | ||||||||||||||||||||||
| 40mo | 0 | ||||||||||||||||||||||
| 4yr | 0 | ||||||||||||||||||||||
| 5yr | 0 | ||||||||||||||||||||||
| 6yr | 0 | ||||||||||||||||||||||
| 10yr | 0 | ||||||||||||||||||||||
| 20yr | 0 | ||||||||||||||||||||||
| 50yr | 0 |
B2035450195004
| Equipment Type: | B2035450195004 | ||||||||||||||||||||||
| Component: | Fabric Folding Door | ||||||||||||||||||||||
| PM Components (Task Description) | Daily | Weekly | Semi-Monthly | Monthly | Bi-Monthly | Quarterly | Semi-Annually | Annually | 20mo | 21mo | 2yrs | 3yr | 40mo | 4yr | 5yr | 6yr | 10yr | 20yr | 50yr | Frequency | Total Hours | ||
| 1 | Collect maps, communications equipment, tools, safety equipment | x | x | x | Daily | 0 | |||||||||||||||||
| 2 | Perform manual test on brake; release brake and make sure door stops in the desired position | x | x | x | Weekly | 0 | |||||||||||||||||
| 3 | Inspect chain for wear; tighten or replace as required. Lubricate | x | x | Semi-Monthly | 0 | ||||||||||||||||||
| 4 | Clean and check all controls and wiring connections | x | x | Monthly | 0 | ||||||||||||||||||
| 5 | Make sure sideframe and header covers are installed | x | x | Bi-Monthly | 0 | ||||||||||||||||||
| 6 | Clean Curtain with Isopropyl alcohol or warm soapy water. DO NOT use abrasive cleaner. Inspect for wear, damage and tears. Make sure curtain is tracking straight | x | x | x | Quarterly | 0 | |||||||||||||||||
| 7 | Check gearbox for unusual noise. Check fluid level | x | x | Semi-Annually | 0 | ||||||||||||||||||
| 8 | Check header mounting hardware connections. Blow dust and debris from the header | x | x | Annually | 0 | ||||||||||||||||||
| 9 | Check the limit switch open and close positions, check to ensure chain is tight | x | x | x | 20mo | 0 | |||||||||||||||||
| 10 | Check motor for normal operation, check connections | x | x | 21mo | 0 | ||||||||||||||||||
| 11 | Check photoeyes alignment, adjust as required. Check all connections. Wipe lens or reflectors clean | x | x | x | 2yrs | 0 | |||||||||||||||||
| 12 | Check door seals for wear and tear. Make sure seals are sealing at the header and sideframe locations | x | x | x | 3yr | 0 | |||||||||||||||||
| 13 | Inspect sideframe for damage. Check all mounting hardware | x | x | 40mo | 0 | ||||||||||||||||||
| 14 | Inspect stabilizing bars for damage; straighten or replace as required | x | x | 4yr | 0 | ||||||||||||||||||
| 15 | Inspect lifting straps for wear and tear, replace as required. Make sure straps and tension pin nuts are tight | x | x | x | 5yr | 0 | |||||||||||||||||
| 16 | Make sure strap clamps are tight and curtain is sealing at the floor | x | x | 6yr | 0 | ||||||||||||||||||
| 17 | Compile list of discrepancies and open corrective maintenance job order(s) to make repair(s) | x | x | x | 10yr | 0 | |||||||||||||||||
| 20yr | 0 | ||||||||||||||||||||||
| 50yr | 0 |
B2035450195005
| Equipment Type: | B2035450195005 | ||||||||||||||||||||||
| Component: | Fabric Roll-Up Door | ||||||||||||||||||||||
| PM Components (Task Description) | Daily | Weekly | Semi-Monthly | Monthly | Bi-Monthly | Quarterly | Semi-Annually | Annually | 20mo | 21mo | 2yrs | 3yr | 40mo | 4yr | 5yr | 6yr | 10yr | 20yr | 50yr | Frequency | Total Hours | ||
| 1 | Collect maps, communications equipment, tools, safety | x | x | x | Daily | 0 | |||||||||||||||||
| 2 | Operate all devices to verify proper operation | x | x | x | Weekly | 0 | |||||||||||||||||
| 3 | Verify auto re-feed is operational | x | x | x | Semi-Monthly | 0 | |||||||||||||||||
| 4 | Verify that the brake stops the door at open and closed positions as well as when stopped in the middle of travel. To move the curtain manually, turn the brake release handle to the disengaged position. The curtain should be able to be moved manually. If | x | x | x | Monthly | 0 | |||||||||||||||||
| 5 | Clean, check all connections with disconnect off. Make sure all wires are free from moving parts | x | Bi-Monthly | 0 | |||||||||||||||||||
| 6 | Inspect curtain for wear or damage, patch immediately to prevent condensation or frost buildup. Clean with warm soapy water. Check drive spheres, if missing or damaged, replaced. Check top roller for proper operation | x | x | x | Quarterly | 0 | |||||||||||||||||
| 7 | Perform visual inspection for damage. Tighten all hardware. Replace any worn labels. Use air hose to remove dust and debris | x | Semi-Annually | 0 | |||||||||||||||||||
| 8 | Operate door and make sure all operations are functioning properly | x | Annually | 0 | |||||||||||||||||||
| 9 | Verify drive tube gear is centered over track groove. Make sure bearing set screws and mounting bolts are tight | x | 20mo | 0 | |||||||||||||||||||
| 10 | Check gearbox fluid level, fill with Mobil - SHC 624 or Phillips 66 - Syncon 32 if low. Check lock collar set screws for tightness | x | 21mo | 0 | |||||||||||||||||||
| 11 | Verify Encoder chain and sprocket set screws are tight. Verify lock collar on encoder is tight. Check open and close positions, adjust as required | x | 2yrs | 0 | |||||||||||||||||||
| 12 | Verify lintel seal is sealing wall properly | x | 3yr | 0 | |||||||||||||||||||
| 13 | Check motor. Inspect junction box and plug connections | x | 40mo | 0 | |||||||||||||||||||
| 14 | With power off, verify chain hoist opens door. Lubricate chain, sprockets and check alignment | x | 4yr | 0 | |||||||||||||||||||
| 15 | Verify both photoeyes reverse the curtain. LED’s on receiver should go on/off. Clean emitter and receiver lens | x | x | x | 5yr | 0 | |||||||||||||||||
| 16 | Perform visual inspection of tracks. Lubricate radials and tracks with food grade synthetic grease. (It may be required to remove the existing grease prior to adding new.) Verify proper width and tighten all hardware. Check foam seal if present. | x | x | x | 6yr | 0 | |||||||||||||||||
| 17 | Inspect track retention strips, replace if cracked | x | 10yr | 0 | |||||||||||||||||||
| 18 | Compile list of discrepancies and open corrective maintenance job order(s) to make repair(s) | x | x | x | 20yr | 0 | |||||||||||||||||
| 50yr | 0 |
B3015225195001
| Equipment Type: | B3015225195001 | ||||||||||||||||||||||
| Component: | Roof, Low Sloped, Small (< 5000sf, min 2 person task) | ||||||||||||||||||||||
| PM Components (Task Description) | Daily | Weekly | Semi-Monthly | Monthly | Bi-Monthly | Quarterly | Semi-Annually | Annually | 20mo | 21mo | 2yrs | 3yr | 40mo | 4yr | 5yr | 6yr | 10yr | 20yr | 50yr | Frequency | Total Hours | ||
| 0 | Ref: AFI 32-1001 and UFC 3-110-03 | x | Daily | 0 | |||||||||||||||||||
| 1 | Check with Facility Manager for deficiencies. Ensure All Safety Equipment Is In Place Before Starting Job | x | Weekly | 0 | |||||||||||||||||||
| 2 | Inspect surface for wear and UV protection deterioration | x | Semi-Monthly | 0 | |||||||||||||||||||
| 3 | Inspect membrane for holes or damage | x | Monthly | 0 | |||||||||||||||||||
| 4 | Parapet Membrane Flashing: Inspect for damage/holes/deterioration; Inspect for open seams/end laps; Inspect for open upper edge; Validate membrane is properly secured and counter flashing is in place | x | Bi-Monthly | 0 | |||||||||||||||||||
| 5 | Parapet Counter Flashing: Inspect metal counterflashing; Inspect fasteners; Inspect end/lap joints in metal | x | Quarterly | 0 | |||||||||||||||||||
| 6 | Wall Membrane Flashing: Inspect membrane flashing for holes or damage; Inspect the flashing seams; Inspect the metal counterflashings for damage/holes and proper attachment | x | Semi-Annually | 0 | |||||||||||||||||||
| 7 | Wall Counter Flashing: Inspect membrane flashing for holes or damage; Inspect the flashing seams; Inspect the metal counterflashings for damage/holes and proper attachment | x | Annually | 0 | |||||||||||||||||||
| 8 | Surface, Membrane, Flashing: Apply mastic and fabric. Tighten/install fasteners. Apply caulk/sealant to open metal joints to prevent moisture intrusion | x | 20mo | 0 | |||||||||||||||||||
| 9 | Pipe vent: Inspect for corrosion; Inspect pipe flashing for damage/leaks; Inspect for proper air flow | x | 21mo | 0 | |||||||||||||||||||
| 10 | Roof Hatch: Inspect base flashing; Inspect metal counterflashing; Inspect fasteners; Inspect end/lap joints in metal; Inspect the gasket in hatch hood for damage/holes; Inspect hatch door mechanism to ensure proper closeage/ locking | x | 2yrs | 0 | |||||||||||||||||||
| 11 | Mech Equip/Exhaust Fan/Vent: Inspect exhaust vent equipment for corrosion, missing/damaged panels, ensure equipment is running properly. Ensure drain lines properly piped and supported. Ensure the equipment properly supported/flashed. Ensure metal flash | x | 3yr | 0 | |||||||||||||||||||
| 12 | Other Equip (Satelite Dish, etc): Inspect for damage; Inspect for proper support and proper membrane protection; Inspect for proper securement to support members | x | 40mo | 0 | |||||||||||||||||||
| 13 | Field Drain: Inspect flashing around drain; Inspect clamping ring for damage; Inspect bolts in clamping ring; Inspect strainer for damage; ensure drain flows freely | x | 4yr | 0 | |||||||||||||||||||
| 14 | Overflow Scupper: Inspect flashing around drain; Inspect strainer for damage; ensure drain flows freely; Inspect for proper connection to scupper box/downspout; | x | 5yr | 0 | |||||||||||||||||||
| 15 | Drains/Scuppers: Tighten/install bolts. Clear debris. | x | 6yr | 0 | |||||||||||||||||||
| 16 | Pitch Pan: Inspect for flashing around pitch pan; Inspect pitch pan edges for damage/holes/corrosion; Inspect for integrity of filler material; Fill with pitch as necessary | x | 10yr | 0 | |||||||||||||||||||
| 17 | Coping Cap: Inspect base flashing; Inspect metal cap end/lap joints; Inspect fasteners; Inspect for rust on metal | x | 20yr | 0 | |||||||||||||||||||
| 18 | Gutters/Downspouts: Inspect. Clear debris | x | 50yr | 0 | |||||||||||||||||||
| 19 | Fill out maintenance checklist and report defeficiencies. Note: If re-coating is required, ensure a corrective maintenance task is opened. | x |
B3015225195002
| Equipment Type: | B3015225195002 | ||||||||||||||||||||||
| Component: | Roof, Low Sloped - Medium (5k sf - 10k sf, min 2 person task) | ||||||||||||||||||||||
| PM Components (Task Description) | Daily | Weekly | Semi-Monthly | Monthly | Bi-Monthly | Quarterly | Semi-Annually | Annually | 20mo | 21mo | 2yrs | 3yr | 40mo | 4yr | 5yr | 6yr | 10yr | 20yr | 50yr | Frequency | Total Hours | ||
| 0 | Ref: AFI 32-1001 and UFC 3-110-03 | x | Daily | 0 | |||||||||||||||||||
| 1 | Check with Facility Manager for deficiencies. Ensure All Safety Equipment Is In Place Before Starting Job | x | Weekly | 0 | |||||||||||||||||||
| 2 | Inspect surface for wear and UV protection deterioration | x | Semi-Monthly | 0 | |||||||||||||||||||
| 3 | Inspect membrane for holes or damage | x | Monthly | 0 | |||||||||||||||||||
| 4 | Parapet Membrane Flashing: Inspect for damage/holes/deterioration; Inspect for open seams/end laps; Inspect for open upper edge; Validate membrane is properly secured and counter flashing is inplace | x | Bi-Monthly | 0 | |||||||||||||||||||
| 5 | Parapet Counter Flashing: Inspect metal counterflashing; Inspect fasteners; Inspect end/lap joints in metal | x | Quarterly | 0 | |||||||||||||||||||
| 6 | Wall Membrane Flashing: Inspect membrane flashing for holes or damage; Inspect the flashing seams; Inspect the metal counter flashings for damage/holes and proper attachment | x | Semi-Annually | 0 | |||||||||||||||||||
| 7 | Wall Counter Flashing: Inspect membrane flashing for holes or damage; Inspect the flashing seams; Inspect the metal counter flashings for damage/holes and proper attachment | x | Annually | 0 | |||||||||||||||||||
| 8 | Surface, Membrane, Flashing: Apply mastic and fabric. Tighten/install fasteners. Apply caulk/sealant to open metal joints to prevent moisture intrusion | x | 20mo | 0 | |||||||||||||||||||
| 9 | Pipe vent: Inspect for corrosion; Inspect pipe flashing for damage/leaks; Inspect for proper air flow | x | 21mo | 0 | |||||||||||||||||||
| 10 | Roof Hatch: Inspect base flashing; Inspect metal counter flashing; Inspect fasteners; Inspect end/lap joints in metal; Inspect the gasket in hatch hood for damage/holes; Inspect hatch door mechanism to ensure proper closeage/locking | x | 2yrs | 0 | |||||||||||||||||||
| 11 | Mech Equip/Exhaust Fan/Vent: Inspect exhaust vent equipment for corrosion, missing/damaged panels, ensure equipment is running properly. Ensure drain lines properly piped and supported. Ensure the equipment properly supported/flashed. Ensure metal flash | x | 3yr | 0 | |||||||||||||||||||
| 12 | Other Equip (Satelite Dish, etc): Inspect for damage; Inspect for proper support and proper membrane protection; Inspect for proper securement to support members | x | 40mo | 0 | |||||||||||||||||||
| 13 | Field Drain: Inspect flashing around drain; Inspect clamping ring for damage; Inspect bolts in clamping ring; Inspect strainer for damage; ensure drain flows freely | x | 4yr | 0 | |||||||||||||||||||
| 14 | Overflow Scupper: Inspect flashing around drain; Inspect strainer for damage; ensure drain flows freely; Inspect for proper connection to scupper box/downspout; | x | 5yr | 0 | |||||||||||||||||||
| 15 | Drains/Scuppers: Tighten/install bolts. Clear debris. | x | 6yr | 0 | |||||||||||||||||||
| 16 | Pitch Pan: Inspect for flashing around pitch pan; Inspect pitch pan edges for damage/holes/corrosion; Inspect for integrity of filler material; Fill with pitch as necessary | x | 10yr | 0 | |||||||||||||||||||
| 17 | Coping Cap: Inspect base flashing; Inspect metal cap end/lap joints; Inspect fasteners; Inspect for rust on metal | x | 20yr | 0 | |||||||||||||||||||
| 18 | Gutters/Downspouts: Inspect. Clear debris | x | 50yr | 0 | |||||||||||||||||||
| 19 | Fill out maintenance checklist and report defeficiencies | x |
B3015225195003
| Equipment Type: | B3015225195003 | ||||||||||||||||||||||
| Component: | Roof, Low Sloped, Large (up to 15k sf, min 2 person task) | ||||||||||||||||||||||
| PM Components (Task Description) | Daily | Weekly | Semi-Monthly | Monthly | Bi-Monthly | Quarterly | Semi-Annually | Annually | 20mo | 21mo | 2yrs | 3yr | 40mo | 4yr | 5yr | 6yr | 10yr | 20yr | 50yr | Frequency | Total Hours | ||
| 0 | Ref: AFI 32-1001 and UFC 3-110-03 | x | Daily | 0 | |||||||||||||||||||
| 1 | Check with Facility Manager for deficiencies. Ensure All Safety Equipment Is In Place Before Starting Job. Note: Roofs should be managed in sections corresponding with appropriate PMTL sizing | x | Weekly | 0 | |||||||||||||||||||
| 2 | Inspect surface for wear and UV protection deterioration | x | Semi-Monthly | 0 | |||||||||||||||||||
| 3 | Inspect membrane for holes or damage | x | Monthly | 0 | |||||||||||||||||||
| 4 | Parapet Membrane Flashing: Inspect for damage/holes/deterioration; Inspect for open seams/end laps; Inspect for open upper edge; Validate membrane is properly secured and counter flashing is inplace | x | Bi-Monthly | 0 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .