Solicitation Amendment FA481922R00140003 SF 30.pdf
PDF 941 KB Posted
- Attached to
- Base Operations Support (BOS) - Tyndall AFB
- Solicitation number
- FA481922R0014
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
List of Attachments
Miscellaneous text in this section has been modified to:
Attachment Number Description Date
1 Performance Work Statement 14 Dec 2022
1A Historical Workload 14 Dec 2022
1B Real Property Facility Inventory 14 Dec 2022
1C Air Force Preventive Maintenance Task List Data 14 Dec 2022
1D Licenses and Certifications 14 Dec 2014
1E Maps and Work Area Layouts 20 Jul 2022
1F Government Furnished Equipment EAID 20 Jul 2022
1G Government Furnished Equipment Non EAID 20 Jul 2022
1H Government Furnished ADPE 20 Jul 2022
1I Government Furnished Radios 20 Jul 2022
1J Government Furnished Training 20 Jul 2022
1K Publications and Forms 20 Jul 2022
1L RESERVED
1M Definitions 20 Jul 2022
1N 325 CES Playbooks 20 Jul 2022
1O Utility Privatization Points of Demarcation 20 Jul 2022
1P Cranes, Trollies, Rail Systems, Lifts, Hoists 20 Jul 2022
1Q Historical Real Property Asset Inventory Data 14 Dec 2022
1R Asbestos Management and Operation Plan 15 Jan 2003
1S 325 CES Pest Management Plan FY18
FA481922R00140003
1T Hazardous Material Emergency Planning and Response Plan 30 Oct 2018
1U Tyndall Hazardous Waste Management Plan July 2013
2 Collective Bargaining Agreement 1 Mar 2021
3 SCLS WD 2015-5449 Rev 21 28 Jul 2022
4 DD 254 Contract Security Classification Specification 20 Jul 2022
5 Addendum to FAR 52.212-1 14 Dec 2022
6 Addendum to FAR 52.212-2 14 Dec 2022
7 Proposal Volume II Quick View 14 Dec 2022
8 Pricing Matrix Worksheet 20 Jul 2022
9 Manpower Matrix Worksheet 14 Dec 2022
10 Past Performance Information Worksheet 14 Dec 2022
11 Past Performance Questionnaire 20 Jul 2022
12 Sample Subcontractor Letter of Consent 20 Jul 2022
13 Sample Client Authorization Letter 20 Jul 2022
14 Financial Responsibility Questionnaire 20 Jul 2022
15 Base Access Request EAL 20 Jul 2022
16 Question Worksheet 20 Jul 2022
17 Contract Data Requirement List 12 Sep 2022
Instructions, Conditions, & Notices to Offerors or Quoters
Miscellaneous text in this section has been modified to:
The purpose of Amendment 0003 is to incorporate the following changes:
1. Change "Attachment 1L - Local Plans" in PWS List of Attachments to "Attachment 1L - RESERVED".
2. Incorporate Attachment 1Q - Historical Real Property Asset Inventory Data and add Attachment 1Q - Historical Real Property Asset Inventory Data to the List of Attachments section of the PWS.
3. Revise PWS paragraph 1.1.1. to clarify scope of contractor support required for the 24 leased temporary facilities.
4. Revise PWS paragraph 1.3.1.4, bullet item number 10, to change "Future Year Defense Program (FYDP) +2 plan" to "FYDP+3 plan".
5. Revise PWS paragraph 1.3.2.2. to change the previously referenced CE Playbook to Facility Manager Playbook, Chapter 5.
6. Revise PWS paragraph 1.7.1. to change the the paragraph reference for FOCUS projects to paragraph 1.9.6.2.
7. Revise PWS paragraph 1.7.1.2 Locksmith Services to specify the required security clearance level requirements for personnel fulfilling locksmith requirements as Secret.
8. Revise PWS paragraph 1.7.2.11 to clarify the performance objectives and scope of sweeping operations for both airfield and non-airfield areas.
9. Revise the Table in PWS paragraph 4.2 to add Materiel Control requirements as a mission essential function.
10. Revise PWS paragraph 4.24.2.1 to identify the most current URL for the required EMS training.
11. Revise PWS paragraph 4.27.1.1.2 to properly cite CDRL A500.
12. Revise PWS paragraph 4.27.1.1.4 to add Locksmith to the Secret/Tier 3 security clearance requirements pertaining to contractor activity during transition.
13. Revise Attachment 5, paragraph 3.5, to change the required proposal file naming convention requirements.
14. Revise Attachment 5, Section II, Table 1, to change the page limitations for Volume III Past Performance from 30 pages to 36 pages to reflect the additional pages authorized for Past Performance Information Worksheets submitted by offerors.
15. Revise Attachment 5, Section II, paragraph 1.1.1. to change the required proposal file naming convention requirements.
16. Revise Attachment 5, Section II, paragraph 1.1.2. to revise the page size and formatting requirements for offeror proposals.
17. Add paragraph 1.1.2.1 to Section II, Attachment 5, to specify font type and size restrictions for offeror proposals
18. Revise Attachment 5, Section II, paragraph 1.1.3 to revise page limitation requirements
19. Revise Attachment 5, Section II, paragraphs 3.2.2.1 to add Locksmith to the security clearance requirements during transition activity
20. Revise Attachment 5, Section II, paragraph 3.2.3.1 o change the FYDP requirements for 7-year FYDP+2 to 8-year FYDP+3
21. Revise Attachment 5, Section II, paragraphs 3.2.3.2(2) to change FYDP+2 to FYDP+3
22. Revise Attachment 5, Section II, paragraph 3.2.4.1 to specify that Attachment 9 Manpower Matrix is excluded from the 70 page count limitation for Proposal Volume II.
23. Revise Attachment 5, Section II, paragraph 4.1 to update the General information for Volume III Past Performance Proposal.
24. Add paragraph 4.1.1 Key Personnel, to Attachment 5, Section II, to provide clarification on Key Personnel for past performance evaluation
25. Revise Attachment 5, Section II, paragraph 4.2.3 to increase the page limitation for each PPI reference by 2 total pages from 5 total pages to 7 total pages and clarify offeror formatting requirements.
26. Revise Attachment 5, Section II, paragraph 4.2.3.2 to change the page count limitation from 30 pages to 36 pages
27. Revise Attachment 5, Section II, paragraph 4.2.4 to clarify that subcontractor letters of consent and client authorization letters are excluded from the Volume III page count limitation.
28. Revise Attachment 6, paragraph 1.0 Basis for Contract Award
29. Revise Attachment 6, paragraph 4.1.1.1 to add Locksmith to the security clearance requirements during contractor transition activity
30. Revise Attachment 6, paragraph 4.1.2.1 to change 7-year FYDP+2 to 8-year FYDP+3
31. Revise Attachment 6, paragraph 4.1.2.1(2) to change FYDP+2 to FYDP+3
32. Revise Attachment 6, paragraph 4.2.1 Past Performance
33. Revise Attachment 6 , paragraph 4.2.2 to change the past performance recency criteria
34. Add paragraph 4.2.7 Key Personnel to Attachment 6
35. Revise Attachment 9 - Manpower Matrix Worksheet to rectify the PWS paragraph references for each applicable functional area of contract performance
36. Revise Attachment 10 - PPI Worksheet sections B.6. and B.7.
37. Revise Attachment 1D - Licenses and Certifications, column C, Row 3, to specify the professional engineer licensure requirements
38. Revise Attachment 7 Proposal Volume II Quick View to realign the paragraph numbering to match the paragraph numbering of the addenda to FAR 52.212-1 and FAR 52.212-2.
39. Revise Attachment 7 Proposal Volume II Quick View to add Locksmith to the cross-reference between paragraph 3.2.2.1 of Attachment 5 and paragraph 4.1.1.1 of Attachment 6
40. Revise Attachment 7 Proposal Volume II Quick View to change paragraphs 3.2.3.1, 4.1.2.1 from 7-year FYDP+2 to 8-year FYDP+3
41. Revise Attachment 7 Proposal Volume II Quick View to change paragraphs 3.2.3.2 and 4.1.2.2(2) from FYDP+2 to FYDP+3
42. Revise Attachment 1A Historical Workload to remedy Historical Workload Data errors
43. Revise Attachment 1B Real Property and Facility Inventory to remove the Future Facility tab, and incorporate a new CATCODE tab, and incorporate a new Mission Dependency Index (MDI) tab
44. Revise Attachment 1C Air Force PMTLs to remedy data errors
45. Revise PWS paragraphs 4.18, 1.3.3, 3.28, and 3.1 to incorporate Contracting Officer approval processes for expenses incurred against their respective CLINs
46. Revise PWS paragraph 1.2.1 to change "funds" to "expenses"
47. Revise PWS paragraph 1.2.1.1 to change "shall expend funds" to "shall incur expenses"
48. Change "Effort submitted for proposed..." to "Efforts submitted for proposed..." in Attachment 5, Section 4.1.
49. Incorporate Attachment 1R - Asbestos Management and Operation Plan and add Attachment 1R - Asbestos Management and Operation Plan to the List of Attachments section of the PWS.
50. Incorporate Attachment 1S - 325 CES Pest Management Plan and add Attachment 1S - 325 CES Pest Management Plan to the List of Attachments section of the PWS.
51. Incorporate Attachment 1T - Hazardous Material Emergency Planning and Response Plan and add Attachment 1T - Hazardous Material Emergency Planning and Response Plan to the List of Attachments section of the PWS
52. Incorporate Attachment 1U - Tyndall Hazardous Waste Management Plan and add Attachment 1U - Tyndall Hazardous Waste Management Plan to the List of Attachments section of the PWS
| IDCode: |
| Page: 1 |
| Pages: 5 |
| AmendNo: 0003 |
| EffDate: 19 Dec 2022 |
| ReqNo: |
| ProjNo: |
| IssCode: FA4819 |
| AdmCode: |
| IssuedBy: FA4819 325 CONS PKP |
BLDG 36235 CP 850-283-8643
105 MISSISSIPPI RD
TYNDALL AFB, FL 32403-5521
UNITED STATES
Karl Deffert, Email: karl.deffert@us.af.mil Telephone: 523-8688
| AdminBy: |
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: FA481922R0014 |
| SolDate: 12 Sep 2022 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: 1 |
| Copies: 1 |
| Descript: The purpose of this modification is to incorporate the following changes: |
1. Revise the terms and conditions of the solicitation as specified in the Summary of Changes listed below.
| ContNameTitle: |
| CoNameTitle: Matthew Lahr, Contracting Officer |
| ContDate: |
| CODate: 19 Dec 2022 |
File details come from the government source that posted it. Updated .