Attachment 8 - Pricing Matrix Worksheet 20 July 2022.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- Base Operations Support (BOS) - Tyndall AFB
- Solicitation number
- FA481922R0014
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| CLIN | Description | Quantity | Unit of Measure | Unit Price | Total Amount |
| 0001 | Operations Management. The contractor shall perform all activities and functions related to leading, managing, training, and directing resources as required, to satisfactorily fulfill all operations and maintenance (O&M) requirements for RP and RPIE in accordance with PWS paragraph 1.2. | 6 | Months | $ - 0 | |
| 0002 | Requirements and Optimization. The contractor shall be responsible for proactive systems performance analysis, resource optimization, life-cycle requirements, and customer interface for facility and infrastructure maintenance and repair requirements IAW PWS paragraph 1.3. | 6 | Months | $ - 0 | |
| 0003 | Materiel Control. The contractor shall manage the civil engineer materiel supply IAW PWS paragraph 1.5. | 6 | Months | $ - 0 | |
| 0004 | Facility Systems - Electrical. The contractor shall be responsible for inspection, maintenance, and repair of secondary electrical service for all real property and temporary structures listed in Attachment 1B in accordance with PWS paragraph 1.6.2. | 6 | Months | $ - 0 | |
| 0005 | Facility Systems - Alarms. The contractor shall inspect, test, and maintain fire alarm systems, water-based systems, special hazard suppression systems, and the mass notification systems IAW PWS paragraph 1.6.1. | 6 | Months | $ - 0 | |
| 0006 | Facility Systems - Power Production. The contractor shall be responsible for inspection, maintenance, and repair of emergency power systems, fire deluge pumps, and airfield arresting systems (AAS) IAW PWS paragraph 1.6.3. | 6 | Months | $ - 0 | |
| 0007 | Heavy Repair - Structures. The contractor shall inspect, maintain, and repair all structures, to include roofing, temporary roofing, locksmith services, and signs IAW PWS paragraph 1.7 and 1.7.1. | 6 | Months | $ - 0 | |
| 0008 | Heavy Repair - Pavements, Grounds and Equipment. The contractor shall inspect, maintain, and repair pavements, grounds and equipment, to include Recreational paths, paved roads, unpaved roads, storm drainage, storm water ponds, containment, driveways, parking lots, and storage areas, fences, barriers, airfields, sweeping operations, cranes, trolley rail systems, lifts, and hoists, IAW PWS paragraph 1.7 and 1.7.2. | 6 | Months | $ - 0 | |
| 0009 | Infrastructure Systems - Energy Management Control Systems. The contractor shall manage, operate, and maintain a fully optimized EMCS to control HVAC equipment in accordance with PWS paragraph 1.8.1. | 6 | Months | $ - 0 | |
| 0010 | Infrastructure Systems - Entomology and Pest Management. The contractor shall perform all entomology and pest management requirements in accordance with PWS paragraph 1.8.3. | 6 | Months | $ - 0 | |
| 0011 | Infrastructure Systems - Water and Fuels Maintenance. The contractor shall inspect, maintain, repair, and modify fire suppression systems, liquid fuel systems, natural gas and liquid petroleum systems, wastewater, and secondary water distributions IAW PWS paragraph 1.8.2. | 6 | Months | $ - 0 | |
| 0012 | Infrastructure Systems - HVAC. The contractor shall inspect, troubleshoot, maintain, repair, replace, and modify HVAC system chillers, steam/condensate units, air handlers, heating units, air conditioners, coils, condensers, boilers/furnaces, compressed air, piping, and valves control systems IAW PWS paragraph 1.8.4. | 6 | Months | $ - 0 | |
| 0013 | Temporary Facility Maintenance. The contractor shall service the Government owned temporary facilities listed in Attachment 1B in the same manner as all other real property assets IAW with the PWS. The contractor shall also perform locksmith services, signage, and pest management services for 24 each leased temporary administrative modular facilities (36000 Series building numbers) IAW PWS paragraphs 1.7.1.2, 1.7.1.3, and 1.8.3 respectively. | 6 | Months | $ - 0 | |
| 0014 | Travel/Training in accordance with PWS paragraph 4.18. |
| NOT TO EXCEED (NTE) $15,000.00 | 1 | Lot | $ 15,000.00 | $ 15,000.00 |
| 0015 | Minor Services. Non-recurring services within the general scope of the contract, but outside of the contractors' capabilities, may be subcontracted by the contractor subject to the approval of Contracting Officer (CO) IAW PWS paragraph 1.3.3. |
| NOT TO EXCEED (NTE) $25,000.00 | 1 | Lot | $ 25,000.00 | $ 25,000.00 |
| 0016 | Work Order Supplies/Materials. Supplies and materials necessary for work within the scope of the contract IAW PWS paragraph 3.2.8. |
| NOT TO EXCEED (NTE) $1,250,000.00 | 1 | Lot | $ 1,250,000.00 | $ 1,250,000.00 |
| 0017 | Government Furnished Property. Repair, replace, service or purchase newly added Government furnished property subject to Contracting Officer approval IAW PWS paragraph 3.1. |
| NOT TO EXCEED (NTE) $10,000.00 | 1 | Lot | $ 10,000.00 | $ 10,000.00 | |
| 0018 | Transition Period. All duties required to effectively accomplish mobilization and changeover IAW PWS paragraph 4.27. The transition period shall not exceed 45 days. | 1 | Lot | $ - 0 | |
| Base Year Total | $ 1,300,000.00 | ||||
| 1001 | Operations Management. The contractor shall perform all activities and functions related to leading, managing, training, and directing resources as required, to satisfactorily fulfill all operations and maintenance (O&M) requirements for RP and RPIE in accordance with PWS paragraph 1.2. | 12 | Months | $ - 0 | |
| 1002 | Requirements and Optimization. The contractor shall be responsible for proactive systems performance analysis, resource optimization, life-cycle requirements, and customer interface for facility and infrastructure maintenance and repair requirements IAW PWS paragraph 1.3. | 12 | Months | $ - 0 | |
| 1003 | Materiel Control. The contractor shall manage the civil engineer materiel supply IAW PWS paragraph 1.5. | 12 | Months | $ - 0 | |
| 1004 | Facility Systems - Electrical. The contractor shall be responsible for inspection, maintenance, and repair of secondary electrical service for all real property and temporary structures listed in Attachment 1B in accordance with PWS paragraph 1.6.2. | 12 | Months | $ - 0 | |
| 1005 | Facility Systems - Alarms. The contractor shall inspect, test, and maintain fire alarm systems, water-based systems, special hazard suppression systems, and the mass notification systems IAW PWS paragraph 1.6.1. | 12 | Months | $ - 0 | |
| 1006 | Facility Systems - Power Production. The contractor shall be responsible for inspection, maintenance, and repair of emergency power systems, fire deluge pumps, and airfield arresting systems (AAS) IAW PWS paragraph 1.6.3. | 12 | Months | $ - 0 | |
| 1007 | Heavy Repair - Structures. The contractor shall inspect, maintain, and repair all structures, to include roofing, temporary roofing, locksmith services, and signs IAW PWS paragraph 1.7 and 1.7.1. | 12 | Months | $ - 0 | |
| 1008 | Heavy Repair - Pavements, Grounds and Equipment. The contractor shall inspect, maintain, and repair pavements, grounds and equipment, to include Recreational paths, paved roads, unpaved roads, storm drainage, storm water ponds, containment, driveways, parking lots, and storage areas, fences, barriers, airfields, sweeping operations, cranes, trolley rail systems, lifts, and hoists, IAW PWS paragraph 1.7 and 1.7.2. | 12 | Months | $ - 0 | |
| 1009 | Infrastructure Systems - Energy Management Control Systems. The contractor shall manage, operate, and maintain a fully optimized EMCS to control HVAC equipment in accordance with PWS paragraph 1.8.1. | 12 | Months | $ - 0 | |
| 1010 | Infrastructure Systems - Entomology and Pest Management. The contractor shall perform all entomology and pest management requirements in accordance with PWS paragraph 1.8.3. | 12 | Months | $ - 0 | |
| 1011 | Infrastructure Systems - Water and Fuels Maintenance. The contractor shall inspect, maintain, repair, and modify fire suppression systems, liquid fuel systems, natural gas and liquid petroleum systems, wastewater, and secondary water distributions IAW PWS paragraph 1.8.2. | 12 | Months | $ - 0 | |
| 1012 | Infrastructure Systems - HVAC. The contractor shall inspect, troubleshoot, maintain, repair, replace, and modify HVAC system chillers, steam/condensate units, air handlers, heating units, air conditioners, coils, condensers, boilers/furnaces, compressed air, piping, and valves control systems IAW PWS paragraph 1.8.4. | 12 | Months | $ - 0 | |
| 1013 | Temporary Facility Maintenance. The contractor shall service the Government owned temporary facilities listed in Attachment 1B in the same manner as all other real property assets IAW with the PWS. The contractor shall also perform locksmith services, signage, and pest management services for 24 each leased temporary administrative modular facilities (36000 Series building numbers) IAW PWS paragraphs 1.7.1.2, 1.7.1.3, and 1.8.3 respectively. | 12 | Months | $ - 0 | |
| 1014 | Travel/Training in accordance with PWS paragraph 4.18. |
| NOT TO EXCEED (NTE) $15,000.00 | 1 | Lot | $ 15,000.00 | $ 15,000.00 |
| 1015 | Minor Services. Non-recurring services within the general scope of the contract, but outside of the contractors' capabilities, may be subcontracted by the contractor subject to the approval of Contracting Officer (CO) IAW PWS paragraph 1.3.3. |
| NOT TO EXCEED (NTE) $50,000.00 | 1 | Lot | $ 50,000.00 | $ 50,000.00 |
| 1016 | Work Order Supplies/Materials. Supplies and materials necessary for work within the scope of the contract IAW PWS paragraph 3.2.8. |
| NOT TO EXCEED (NTE) $2,500,000.00 | 1 | Lot | $ 2,500,000.00 | $ 2,500,000.00 |
| 1017 | Government Furnished Property. Repair, replace, service or purchase newly added Government furnished property subject to Contracting Officer approval IAW PWS paragraph 3.1. |
| NOT TO EXCEED (NTE) $20,000.00 | 1 | Lot | $ 20,000.00 | $ 20,000.00 | |
| Option Year 1 Total | $ 2,585,000.00 | ||||
| 2001 | Operations Management. The contractor shall perform all activities and functions related to leading, managing, training, and directing resources as required, to satisfactorily fulfill all operations and maintenance (O&M) requirements for RP and RPIE in accordance with PWS paragraph 1.2. | 12 | Months | $ - 0 | |
| 2002 | Requirements and Optimization. The contractor shall be responsible for proactive systems performance analysis, resource optimization, life-cycle requirements, and customer interface for facility and infrastructure maintenance and repair requirements IAW PWS paragraph 1.3. | 12 | Months | $ - 0 | |
| 2003 | Materiel Control. The contractor shall manage the civil engineer materiel supply IAW PWS paragraph 1.5. | 12 | Months | $ - 0 | |
| 2004 | Facility Systems - Electrical. The contractor shall be responsible for inspection, maintenance, and repair of secondary electrical service for all real property and temporary structures listed in Attachment 1B in accordance with PWS paragraph 1.6.2. | 12 | Months | $ - 0 | |
| 2005 | Facility Systems - Alarms. The contractor shall inspect, test, and maintain fire alarm systems, water-based systems, special hazard suppression systems, and the mass notification systems IAW PWS paragraph 1.6.1. | 12 | Months | $ - 0 | |
| 2006 | Facility Systems - Power Production. The contractor shall be responsible for inspection, maintenance, and repair of emergency power systems, fire deluge pumps, and airfield arresting systems (AAS) IAW PWS paragraph 1.6.3. | 12 | Months | $ - 0 | |
| 2007 | Heavy Repair - Structures. The contractor shall inspect, maintain, and repair all structures, to include roofing, temporary roofing, locksmith services, and signs IAW PWS paragraph 1.7 and 1.7.1. | 12 | Months | $ - 0 | |
| 2008 | Heavy Repair - Pavements, Grounds and Equipment. The contractor shall inspect, maintain, and repair pavements, grounds and equipment, to include Recreational paths, paved roads, unpaved roads, storm drainage, storm water ponds, containment, driveways, parking lots, and storage areas, fences, barriers, airfields, sweeping operations, cranes, trolley rail systems, lifts, and hoists, IAW PWS paragraph 1.7 and 1.7.2. | 12 | Months | $ - 0 | |
| 2009 | Infrastructure Systems - Energy Management Control Systems. The contractor shall manage, operate, and maintain a fully optimized EMCS to control HVAC equipment in accordance with PWS paragraph 1.8.1. | 12 | Months | $ - 0 | |
| 2010 | Infrastructure Systems - Entomology and Pest Management. The contractor shall perform all entomology and pest management requirements in accordance with PWS paragraph 1.8.3. | 12 | Months | $ - 0 | |
| 2011 | Infrastructure Systems - Water and Fuels Maintenance. The contractor shall inspect, maintain, repair, and modify fire suppression systems, liquid fuel systems, natural gas and liquid petroleum systems, wastewater, and secondary water distributions IAW PWS paragraph 1.8.2. | 12 | Months | $ - 0 | |
| 2012 | Infrastructure Systems - HVAC. The contractor shall inspect, troubleshoot, maintain, repair, replace, and modify HVAC system chillers, steam/condensate units, air handlers, heating units, air conditioners, coils, condensers, boilers/furnaces, compressed air, piping, and valves control systems IAW PWS paragraph 1.8.4. | 12 | Months | $ - 0 | |
| 2013 | Temporary Facility Maintenance. The contractor shall service the Government owned temporary facilities listed in Attachment 1B in the same manner as all other real property assets IAW with the PWS. The contractor shall also perform locksmith services, signage, and pest management services for 24 each leased temporary administrative modular facilities (36000 Series building numbers) IAW PWS paragraphs 1.7.1.2, 1.7.1.3, and 1.8.3 respectively. | 12 | Months | $ - 0 | |
| 2014 | Travel/Training in accordance with PWS paragraph 4.18. |
| NOT TO EXCEED (NTE) $15,000.00 | 1 | Lot | $ 15,000.00 | $ 15,000.00 |
| 2015 | Minor Services. Non-recurring services within the general scope of the contract, but outside of the contractors' capabilities, may be subcontracted by the contractor subject to the approval of Contracting Officer (CO) IAW PWS paragraph 1.3.3. |
| NOT TO EXCEED (NTE) $50,000.00 | 1 | Lot | $ 50,000.00 | $ 50,000.00 |
| 2016 | Work Order Supplies/Materials. Supplies and materials necessary for work within the scope of the contract IAW PWS paragraph 3.2.8. |
| NOT TO EXCEED (NTE) $2,500,000.00 | 1 | Lot | $ 2,500,000.00 | $ 2,500,000.00 |
| 2017 | Government Furnished Property. Repair, replace, service or purchase newly added Government furnished property subject to Contracting Officer approval IAW PWS paragraph 3.1. |
| NOT TO EXCEED (NTE) $20,000.00 | 1 | Lot | $ 20,000.00 | $ 20,000.00 | |
| Option Year 2 Total | $ 2,585,000.00 | ||||
| 3001 | Operations Management. The contractor shall perform all activities and functions related to leading, managing, training, and directing resources as required, to satisfactorily fulfill all operations and maintenance (O&M) requirements for RP and RPIE in accordance with PWS paragraph 1.2. | 12 | Months | $ - 0 | |
| 3002 | Requirements and Optimization. The contractor shall be responsible for proactive systems performance analysis, resource optimization, life-cycle requirements, and customer interface for facility and infrastructure maintenance and repair requirements IAW PWS paragraph 1.3. | 12 | Months | $ - 0 | |
| 3003 | Materiel Control. The contractor shall manage the civil engineer materiel supply IAW PWS paragraph 1.5. | 12 | Months | $ - 0 | |
| 3004 | Facility Systems - Electrical. The contractor shall be responsible for inspection, maintenance, and repair of secondary electrical service for all real property and temporary structures listed in Attachment 1B in accordance with PWS paragraph 1.6.2. | 12 | Months | $ - 0 | |
| 3005 | Facility Systems - Alarms. The contractor shall inspect, test, and maintain fire alarm systems, water-based systems, special hazard suppression systems, and the mass notification systems IAW PWS paragraph 1.6.1. | 12 | Months | $ - 0 | |
| 3006 | Facility Systems - Power Production. The contractor shall be responsible for inspection, maintenance, and repair of emergency power systems, fire deluge pumps, and airfield arresting systems (AAS) IAW PWS paragraph 1.6.3. | 12 | Months | $ - 0 | |
| 3007 | Heavy Repair - Structures. The contractor shall inspect, maintain, and repair all structures, to include roofing, temporary roofing, locksmith services, and signs IAW PWS paragraph 1.7 and 1.7.1. | 12 | Months | $ - 0 | |
| 3008 | Heavy Repair - Pavements, Grounds and Equipment. The contractor shall inspect, maintain, and repair pavements, grounds and equipment, to include Recreational paths, paved roads, unpaved roads, storm drainage, storm water ponds, containment, driveways, parking lots, and storage areas, fences, barriers, airfields, sweeping operations, cranes, trolley rail systems, lifts, and hoists, IAW PWS paragraph 1.7 and 1.7.2. | 12 | Months | $ - 0 | |
| 3009 | Infrastructure Systems - Energy Management Control Systems. The contractor shall manage, operate, and maintain a fully optimized EMCS to control HVAC equipment in accordance with PWS paragraph 1.8.1. | 12 | Months | $ - 0 | |
| 3010 | Infrastructure Systems - Entomology and Pest Management. The contractor shall perform all entomology and pest management requirements in accordance with PWS paragraph 1.8.3. | 12 | Months | $ - 0 | |
| 3011 | Infrastructure Systems - Water and Fuels Maintenance. The contractor shall inspect, maintain, repair, and modify fire suppression systems, liquid fuel systems, natural gas and liquid petroleum systems, wastewater, and secondary water distributions IAW PWS paragraph 1.8.2. | 12 | Months | $ - 0 | |
| 3012 | Infrastructure Systems - HVAC. The contractor shall inspect, troubleshoot, maintain, repair, replace, and modify HVAC system chillers, steam/condensate units, air handlers, heating units, air conditioners, coils, condensers, boilers/furnaces, compressed air, piping, and valves control systems IAW PWS paragraph 1.8.4. | 12 | Months | $ - 0 | |
| 3013 | Temporary Facility Maintenance. The contractor shall service the Government owned temporary facilities listed in Attachment 1B in the same manner as all other real property assets IAW with the PWS. The contractor shall also perform locksmith services, signage, and pest management services for 24 each leased temporary administrative modular facilities (36000 Series building numbers) IAW PWS paragraphs 1.7.1.2, 1.7.1.3, and 1.8.3 respectively. | 12 | Months | $ - 0 | |
| 3014 | Travel/Training in accordance with PWS paragraph 4.18. |
| NOT TO EXCEED (NTE) $15,000.00 | 1 | Lot | $ 15,000.00 | $ 15,000.00 |
| 3015 | Minor Services. Non-recurring services within the general scope of the contract, but outside of the contractors' capabilities, may be subcontracted by the contractor subject to the approval of Contracting Officer (CO) IAW PWS paragraph 1.3.3. |
| NOT TO EXCEED (NTE) $50,000.00 | 1 | Lot | $ 50,000.00 | $ 50,000.00 |
| 3016 | Work Order Supplies/Materials. Supplies and materials necessary for work within the scope of the contract IAW PWS paragraph 3.2.8. |
| NOT TO EXCEED (NTE) $2,500,000.00 | 1 | Lot | $ 2,500,000.00 | $ 2,500,000.00 |
| 3017 | Government Furnished Property. Repair, replace, service or purchase newly added Government furnished property subject to Contracting Officer approval IAW PWS paragraph 3.1. |
| NOT TO EXCEED (NTE) $20,000.00 | 1 | Lot | $ 20,000.00 | $ 20,000.00 | |
| Option Year 3 Total | $ 2,585,000.00 | ||||
| 4001 | Operations Management. The contractor shall perform all activities and functions related to leading, managing, training, and directing resources as required, to satisfactorily fulfill all operations and maintenance (O&M) requirements for RP and RPIE in accordance with PWS paragraph 1.2. | 12 | Months | $ - 0 | |
| 4002 | Requirements and Optimization. The contractor shall be responsible for proactive systems performance analysis, resource optimization, life-cycle requirements, and customer interface for facility and infrastructure maintenance and repair requirements IAW PWS paragraph 1.3. | 12 | Months | $ - 0 | |
| 4003 | Materiel Control. The contractor shall manage the civil engineer materiel supply IAW PWS paragraph 1.5. | 12 | Months | $ - 0 | |
| 4004 | Facility Systems - Electrical. The contractor shall be responsible for inspection, maintenance, and repair of secondary electrical service for all real property and temporary structures listed in Attachment 1B in accordance with PWS paragraph 1.6.2. | 12 | Months | $ - 0 | |
| 4005 | Facility Systems - Alarms. The contractor shall inspect, test, and maintain fire alarm systems, water-based systems, special hazard suppression systems, and the mass notification systems IAW PWS paragraph 1.6.1. | 12 | Months | $ - 0 | |
| 4006 | Facility Systems - Power Production. The contractor shall be responsible for inspection, maintenance, and repair of emergency power systems, fire deluge pumps, and airfield arresting systems (AAS) IAW PWS paragraph 1.6.3. | 12 | Months | $ - 0 | |
| 4007 | Heavy Repair - Structures. The contractor shall inspect, maintain, and repair all structures, to include roofing, temporary roofing, locksmith services, and signs IAW PWS paragraph 1.7 and 1.7.1. | 12 | Months | $ - 0 | |
| 4008 | Heavy Repair - Pavements, Grounds and Equipment. The contractor shall inspect, maintain, and repair pavements, grounds and equipment, to include Recreational paths, paved roads, unpaved roads, storm drainage, storm water ponds, containment, driveways, parking lots, and storage areas, fences, barriers, airfields, sweeping operations, cranes, trolley rail systems, lifts, and hoists, IAW PWS paragraph 1.7 and 1.7.2. | 12 | Months | $ - 0 | |
| 4009 | Infrastructure Systems - Energy Management Control Systems. The contractor shall manage, operate, and maintain a fully optimized EMCS to control HVAC equipment in accordance with PWS paragraph 1.8.1. | 12 | Months | $ - 0 | |
| 4010 | Infrastructure Systems - Entomology and Pest Management. The contractor shall perform all entomology and pest management requirements in accordance with PWS paragraph 1.8.3. | 12 | Months | $ - 0 | |
| 4011 | Infrastructure Systems - Water and Fuels Maintenance. The contractor shall inspect, maintain, repair, and modify fire suppression systems, liquid fuel systems, natural gas and liquid petroleum systems, wastewater, and secondary water distributions IAW PWS paragraph 1.8.2. | 12 | Months | $ - 0 | |
| 4012 | Infrastructure Systems - HVAC. The contractor shall inspect, troubleshoot, maintain, repair, replace, and modify HVAC system chillers, steam/condensate units, air handlers, heating units, air conditioners, coils, condensers, boilers/furnaces, compressed air, piping, and valves control systems IAW PWS paragraph 1.8.4. | 12 | Months | $ - 0 | |
| 4013 | Temporary Facility Maintenance. The contractor shall service the Government owned temporary facilities listed in Attachment 1B in the same manner as all other real property assets IAW with the PWS. The contractor shall also perform locksmith services, signage, and pest management services for 24 each leased temporary administrative modular facilities (36000 Series building numbers) IAW PWS paragraphs 1.7.1.2, 1.7.1.3, and 1.8.3 respectively. | 12 | Months | $ - 0 | |
| 4014 | Travel/Training in accordance with PWS paragraph 4.18. |
| NOT TO EXCEED (NTE) $15,000.00 | 1 | Lot | $ 15,000.00 | $ 15,000.00 |
| 4015 | Minor Services. Non-recurring services within the general scope of the contract, but outside of the contractors' capabilities, may be subcontracted by the contractor subject to the approval of Contracting Officer (CO) IAW PWS paragraph 1.3.3. |
| NOT TO EXCEED (NTE) $50,000.00 | 1 | Lot | $ 50,000.00 | $ 50,000.00 |
| 4016 | Work Order Supplies/Materials. Supplies and materials necessary for work within the scope of the contract IAW PWS paragraph 3.2.8. |
| NOT TO EXCEED (NTE) $2,500,000.00 | 1 | Lot | $ 2,500,000.00 | $ 2,500,000.00 |
| 4017 | Government Furnished Property. Repair, replace, service or purchase newly added Government furnished property subject to Contracting Officer approval IAW PWS paragraph 3.1. |
| NOT TO EXCEED (NTE) $20,000.00 | 1 | Lot | $ 20,000.00 | $ 20,000.00 | |
| Option Year 4 Total | $ 2,585,000.00 | ||||
| 5001 | Operations Management. The contractor shall perform all activities and functions related to leading, managing, training, and directing resources as required, to satisfactorily fulfill all operations and maintenance (O&M) requirements for RP and RPIE in accordance with PWS paragraph 1.2. | 4.5 | Months | $ - 0 | |
| 5002 | Requirements and Optimization. The contractor shall be responsible for proactive systems performance analysis, resource optimization, life-cycle requirements, and customer interface for facility and infrastructure maintenance and repair requirements IAW PWS paragraph 1.3. | 4.5 | Months | $ - 0 | |
| 5003 | Materiel Control. The contractor shall manage the civil engineer materiel supply IAW PWS paragraph 1.5. | 4.5 | Months | $ - 0 | |
| 5004 | Facility Systems - Electrical. The contractor shall be responsible for inspection, maintenance, and repair of secondary electrical service for all real property and temporary structures listed in Attachment 1B in accordance with PWS paragraph 1.6.2. | 4.5 | Months | $ - 0 | |
| 5005 | Facility Systems - Alarms. The contractor shall inspect, test, and maintain fire alarm systems, water-based systems, special hazard suppression systems, and the mass notification systems IAW PWS paragraph 1.6.1. | 4.5 | Months | $ - 0 | |
| 5006 | Facility Systems - Power Production. The contractor shall be responsible for inspection, maintenance, and repair of emergency power systems, fire deluge pumps, and airfield arresting systems (AAS) IAW PWS paragraph 1.6.3. | 4.5 | Months | $ - 0 | |
| 5007 | Heavy Repair - Structures. The contractor shall inspect, maintain, and repair all structures, to include roofing, temporary roofing, locksmith services, and signs IAW PWS paragraph 1.7 and 1.7.1. | 4.5 | Months | $ - 0 | |
| 5008 | Heavy Repair - Pavements, Grounds and Equipment. The contractor shall inspect, maintain, and repair pavements, grounds and equipment, to include Recreational paths, paved roads, unpaved roads, storm drainage, storm water ponds, containment, driveways, parking lots, and storage areas, fences, barriers, airfields, sweeping operations, cranes, trolley rail systems, lifts, and hoists, IAW PWS paragraph 1.7 and 1.7.2. | 4.5 | Months | $ - 0 | |
| 5009 | Infrastructure Systems - Energy Management Control Systems. The contractor shall manage, operate, and maintain a fully optimized EMCS to control HVAC equipment in accordance with PWS paragraph 1.8.1. | 4.5 | Months | $ - 0 | |
| 5010 | Infrastructure Systems - Entomology and Pest Management. The contractor shall perform all entomology and pest management requirements in accordance with PWS paragraph 1.8.3. | 4.5 | Months | $ - 0 | |
| 5011 | Infrastructure Systems - Water and Fuels Maintenance. The contractor shall inspect, maintain, repair, and modify fire suppression systems, liquid fuel systems, natural gas and liquid petroleum systems, wastewater, and secondary water distributions IAW PWS paragraph 1.8.2. | 4.5 | Months | $ - 0 | |
| 5012 | Infrastructure Systems - HVAC. The contractor shall inspect, troubleshoot, maintain, repair, replace, and modify HVAC system chillers, steam/condensate units, air handlers, heating units, air conditioners, coils, condensers, boilers/furnaces, compressed air, piping, and valves control systems IAW PWS paragraph 1.8.4. | 4.5 | Months | $ - 0 | |
| 5013 | Temporary Facility Maintenance. The contractor shall service the Government owned temporary facilities listed in Attachment 1B in the same manner as all other real property assets IAW with the PWS. The contractor shall also perform locksmith services, signage, and pest management services for 24 each leased temporary administrative modular facilities (36000 Series building numbers) IAW PWS paragraphs 1.7.1.2, 1.7.1.3, and 1.8.3 respectively. | 4.5 | Months | $ - 0 | |
| 5014 | Travel/Training in accordance with PWS paragraph 4.18. |
| NOT TO EXCEED (NTE) $15,000.00 | 1 | Lot | $ 7,500.00 | $ 7,500.00 |
| 5015 | Minor Services. Non-recurring services within the general scope of the contract, but outside of the contractors' capabilities, may be subcontracted by the contractor subject to the approval of Contracting Officer (CO) IAW PWS paragraph 1.3.3. |
| NOT TO EXCEED (NTE) $25,000.00 | 1 | Lot | $ 25,000.00 | $ 25,000.00 |
| 5016 | Work Order Supplies/Materials. Supplies and materials necessary for work within the scope of the contract IAW PWS paragraph 3.2.8. |
| NOT TO EXCEED (NTE) $1,250,000.00 | 1 | Lot | $ 1,250,000.00 | $ 1,250,000.00 |
| 5017 | Government Furnished Property. Repair, replace, service or purchase newly added Government furnished property subject to Contracting Officer approval IAW PWS paragraph 3.1. |
| NOT TO EXCEED (NTE) $10,000.00 | 1 | Lot | $ 10,000.00 | $ 10,000.00 | |
| Option Year 5 Total | $ 1,292,500.00 | ||||
| Total Contract Value | $ 12,932,500.00 | ||||
| Total Evaluated Price | $ - 0 |
File details come from the government source that posted it. Updated .