Attachment 26 Electrical Lines.pdf

PDF 374 KB Posted

Attached to
Construct Honor Guard Facility
Solicitation number
FA481922R0032
Issued by

View the file

Other files

File Type Posted
Solicitation Amendment FA481922R00320004 SF 30.pdf PDF
Attachment 27 - Appendix S - Location of Primary Transformer.pdf PDF
Solicitation Amendment - FA481922R00320003.pdf PDF
Attachment 1- APPA Honor Guard XLWU 21-8120 - Sep 2022 - Rev D.pdf PDF
Solicitation Amendment FA481922R00320003 SF 30.pdf PDF
Attachment 21-XLWU 21-8120 Honor Questions and Answers Rev C - 30 Aug 2022.xlsx XLSX spreadsheet
Solicitation Amendment FA481922R00320002 SF 30.pdf PDF
Attachment 25 - FRCS Guide 22 Sept 2021.pdf PDF
Attachment 22 - APPA Honor Guard XLWU 21-8120 - Aug 2022 - Rev C.docx DOCX document
Attachment 23 -XLWU 21-8120 Site Utilities.pdf PDF
Attachment 24- 2022_0630_TAFBHonorGuard_ExEquip.pdf PDF
Attachment 1 - SOW Honor Guard XLWU 21-8120 Sept 2022 - Rev C.docx DOCX document
Solicitation Amendment - FA481922R00320002.pdf PDF
Attachment 19 Section L and M v2.pdf PDF
Solicitation Amendment - FA481922R00320001.pdf PDF
Solicitation - FA481922R0032.pdf PDF
Attachment 11 AF Form 3000.pdf PDF
Attachment 17 AF Form 813 Honor Guard Facility.pdf PDF
Attachment 7- SITE PLAN A Rev A.pdf PDF
Attachment 2 - Floor Plan 813 Construct Honor Guard Facility Rev A.pdf PDF
Attachment 4 - Conceptual A Construct Honor Guard Facility Rev A.pdf PDF
Attachment 15 Base Access Request EAL.xlsx XLSX spreadsheet
Attachment 14 Sample RFI.PDF PDF
Attachment 5 - Conceptual B Construct Honor Guard Facility Rev A.pdf PDF
Attachment 10 AF Form 66.xlsx XLSX spreadsheet
Attachment 20 Wage Determinations.pdf PDF
Attachment 1 SOW Honor Guard XLWU 21-8120 - Jun 2022 - Rev A.pdf PDF
Attachment 3 - COAs 813 Construct Honor Guard Facility Rev A.pdf PDF
Attachment 16 Proof of Financial Responsibility.pdf PDF
Attachment 19 Section L and M 21.pdf PDF
Attachment 13 AF3065.pdf PDF
Attachment 6 - HG Topo Area Rev A.pdf PDF
Attachment 18 Division Cost Estimate Worksheet.xlsx XLSX spreadsheet
Attachment 12 AF 3064.pdf PDF
Attachment 9 - Other Contract Requirements.pdf PDF
Attachment 8 - SITE PLAN B Rev A.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HH-407

MH-406

MH-405

BD Can T-1723

FO-120. 1-144

DBS-1134

SPL-1141

DBS-1136

BD Can T-1137

DBS-1701

DBS-1726

BD CAN T-1707

144L8.3F

FO-120 [11660-36285], 25-36

FO-120 [11660-1134], 37-48

FO-120 [11660-1136], 49-60

FO-120 [11660-HH409], 61-72

FO-120 [11660-36276], 73-84

FO-224 [11660-1701], 1-12

FO-224 [11660-1723], 13-24

FO-215 [11660-1136], 13-24

FO-215 [11660-MH406], 97-144

P1-24PF

CA-04, 801-850

A, 51-100

DUCTBANK 109.4 M (358.7 Ft.)

DUCT, 4 IN, PVC - IN_SERVICE

DUCT, 4 IN, PVC - IN_SERVICE

Scale: 1:1588

1 0 0 f t

1028307833C Callout Point of origin for fiber is MH-406. Splice into last 36 strands of existing 144 fiber splice. Splice case type will need to be verified to determine capability to accept new fiber and to ensure proper sealing can be obtained

1028307833C Callout Verify 2 each 4" conduits exist between MH-406 and HH-407; if verified, extend 2 each 4" conduits with 2'X3' HH's spaced no more than 500' intervals.

1028307833C Rectangle

1028307833C Rectangle

1028307833C Polygonal Line

1028307833C Callout Existing 12 strand fiber and 100 pair copper cable

1028307833C Rectangle Proposed Honor Gaurd

1028307833C Typewritten Text Proposed Honor Guard

1028307833C Callout Existing direct buried copper splice. 25 pair can be picked up from there

File details come from the government source that posted it. Updated .