Attachment 06a - Drawings 523A4-20-205 - Part1.pdf

PDF 16 MB Posted

Attached to
Y1DA--VISN 1 Construction MATOC Federal contract opportunity
Solicitation number
36C77624R0098
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document is a comprehensive set of architectural and engineering construction drawings for the expansion of the Emergency Department at the VA Boston Healthcare System's West Roxbury location. The project, designated as VA Project #523A4-20-205, involves renovating and upgrading multiple exam rooms across eight distinct construction phases. The renovation encompasses 16 exam rooms and associated corridors, with specific focus on modernizing spaces, upgrading finishes, installing new mechanical and electrical systems, and implementing ligature-resistant design elements, particularly in mental health spaces.

The drawings detail extensive modifications including replacement of door hardware, installation of new wall protection and flooring, repainting, upgrading ceiling systems, and installing new HVAC and piping infrastructure. The project includes a new exterior roof access stair and will be implemented in carefully sequenced phases to minimize disruption to hospital operations. The design team includes William Pevear Architects, Alares Engineering, and Hastings Consulting, with construction documents dated January 31, 2024. The renovation will be fully sprinklered and follows VA infection control and safety guidelines, with specific attention to maintaining hospital functionality during construction.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--VISN 1 Construction MATOC, newest first.
File Type Posted
36C77624R0098 0003.docx DOCX document
Attachment 1 - RFP 36C77624R0098 Tech Questions - dated 5-2-25.docx DOCX document
Attachment 1B - 25_0418-523A4-19-205.A01.pdf PDF
Attachment 1 - RFP 36C77624R0098 Tech Questions - dated 4-22-25.docx DOCX document
36C77624R0098 0002.docx DOCX document
Attachment 3 - Attachment 06g - Wage Det - MA20250001 Rev5 4-4-25.pdf PDF
Attachment 1F - 108_3-S21_First and Second Floor Sections.pdf PDF
Attachment 1D - 690-035 3-85 bldg 3 OREA Ground North Color Accent 1991.pdf PDF
Attachment 1C - 056_3-1_New Addition - Part Ground Floor Plan - North.pdf PDF
Attachment 2 - Attachment 06 - 523A4-20-205 Seed Project Notice of Task Order Request for Proposal - Updated 4-17-25.docx DOCX document
Attachment 1E - 090_3-S3_First Floor Framing Plan North.pdf PDF
Attachment 1A - 21_0521 523A4-20-205 RBM Report.pdf PDF
Attachment 1 - Sign-In Sheet - VISN 1 MATOC 4-2-25.pdf PDF
Attachment 2 - 36C77624R0098_0001.docx DOCX document
36C77624R0098 0001.docx DOCX document
Attachment 06h - Brand Name J_A - 523A4-20-205 Redacted.pdf PDF
Attachment 06f - Infection Control Risk Assessment - VISN 1 MATOC Seed Project.pdf PDF
Attachment 02 - Limitations on Subcontracting.docx DOCX document
Attachment 06g - Wage Det - MA20250001 Rev2 3-14-25.pdf PDF
Attachment 06c - Base Offer Cost Breakdown.xlsx XLSX spreadsheet
Attachment 06a - Specifications 523A4-20-205.pdf PDF
Attachment 06d - Site Visit Instructions - Seed Project VISN 1 MATOC.docx DOCX document
Attachment 05 - Past Performance Questionnaire.docx DOCX document
Attachment 06b - Seed Project Price Schedule Sheet.docx DOCX document
Attachment 04 - Subcontractor Information and Consent Form.docx DOCX document
Attachment 06 - 523A4-20-205 Seed Project Notice of Task Order Request for Proposal.docx DOCX document
Attachment 06a - Drawings 523A4-20-205 - Part2.pdf PDF
Attachment 06e - Pre-Construction Risk Assessment - VISN 1 MATOC Seed Project.pdf PDF
Attachment 03 - Project Information Sheet for Contractors.docx DOCX document
Attachment 01 - Technical Question Form - VISN 1 MATOC.xlsx XLSX spreadsheet
36C77624R0098.docx DOCX document
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

Phase

ARCHITECT STAMPCONSULTANTS 523A4-20-205

VAMC WEST ROXBURY

EXPAND EMERGENCY

DEPARTMENT

William Pevear Architects, Inc.

872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139

T: 617.335.5186

Alares Engineering

248 Copeland Street, 2nd Floor Quincy, MA 02169

T: 617.481.6390

MEP/FP ENGINEER

Drawing Scale

321 4 5 6 7 8

A

B

C

D

E

321 4 5 6 7 8

1400 VFW PARKWAY, WEST ROXBURY, MA 02132

01/31/2024

CODE CONSULTANT

Hastings Consulting

142 Hanlon Road Holliston, MA 01746

T: 508.397.8417

N

C U s e rs \M ir ia m \D o c u m e n ts

\1

-V

A W

R E

D E x p a n s io n m ir ia m

X L

H .r v t

/3

/2

:0

:2

A

M

GI000

COVER

DEPARTMENT OF VETERANS AFFAIRS

BOSTON HEALTHCARE SYSTEM - WEST ROXBURY

EXPAND EMERGENCY DEPARTMENT

1400 VFW PARKWAY, WEST ROXBURY, MA 02132

VA Project # 523A4-20-205

WPA Project # 1643

CONSTRUCTION DOCUMENTS

January 31, 2024

ARCHITECT

William Pevear Architects, Inc.

872 Massachusetts Avenue, Suite 2-9 Cambridge, MA 02139 T: 617.335.5186

MEP/FP ENGINEER

Alares Engineering

248 Copeland Street, 2nd Floor Quincy, MA 02169 T: 617.481.6390

CODE CONSULTANT

Hastings Consulting

142 Hanlon Road Holliston, MA 01746 T: 508.397.8417

V F

W P

A R

K W

A Y

SPRIN

G S

T

PROJECT LOCATION

N

VAMC WEST ROXBURY

BLDG 3

Revision: Date:

EMERGENCY DEPARTMENT

AMBULATORY ENTRY

EMERGENCY

DEPARTMENT

AMBULANCE

ENTRY

CONNECTION

TO PHARMACY

CONNECTION TO

RADIOLOGY

CONNECTION TO MAIN

HOSPITAL ENTRY

EXAM ROOMS -

IN SCOPE

MENTAL HEALTH EXAM

ROOM - IN SCOPE

BOUNDARY OF EMERGENCY

DEPARTMENT

EMERGENCY

DEPARTMENT

wpevear Text Box

Miriam Image

Miriam Image wpevear Text Box May 23, 2024 wpevear Text Box Pre-bid revision 01 wpevear Text Box May 23, 2024

& AND

L ANGLE

@ AT

CENTERLINE

Ø DIAMETER

# POUND

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADJ ADJUSTABLE

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

ALUM ALUMINUM

ALT ALTERNATE

AV AUDIOVISUAL

BO BOTTOM OF

BOT BOTTOM

BOS BOTTOM OF STEEL

B/T BENCH TOP

CC CONTRACTOR FURNISHED, CONTRACTOR INSTALLED

CG CORNER GUARD

CH CEILING HEIGHT

CJ CONTROL JOINT

CLG CEILING

CMU CONCRETE MASONRY UNIT

CO CASED OPENING

COL COLUMN

CONC CONCRETE

CONT CONTINUOUS

COORD COORDINATE

CPT CARPET

CT CERAMIC TILE

CUH CABINET UNIT HEATER

DF DRINKING FOUNTAIN

DIA DIAMETER

DN DOWN

DWG DRAWING

E EAST

EIFS EXTERIOR INSULATION & FINISH SYSTEM

EJ EXPANSION JOINT

EMER SHR EMERGENCY SHOWER

EP ELECTRICAL PANEL

EQ EQUAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EWS EYE WASH STATION

EXIST EXISTING

F/F FACE TO FACE

FACP FIRE ALARM CONTROL PANEL

FCO FLOOR CLEANOUT

FCU FAN COIL UNIT

FD FLOOR DRAIN

FDC FIRE DEPARTMENT CONNECTION

FDV FIRE DEPARTMENT VALVE

FEC FIRE EXTINGUISHER CABINET

FE FIRE EXTINGUISHER

FF FINISH FACE

FH FIRE HYDRANT

FHC FIRE HOSE CABINET

FHR FIRE HOSE RACK

FOC FACE OF CONCRETE

FOF FACE OF FINISH

FTR FINNED TUBE RADIATION

G GAS

GFCI GROUND FAULT CIRCUIT INTERRUPTER

GFRC GLASS FIBER REINFORCED CONCRETE

GFRG GLASS FIBER REINFORCED GYPSUM

GWB GYPSUM WALL BOARD

HB HOSE BIBB

HPT HIGH POINT

HR HOUR

HVAC HEATING, VENTILATION, AIR CONDITIONING

HW HOT WATER

ID INSIDE DIAMETER

IF INSIDE FACE

IG INSULATED GLASS

INT INTERIOR

L LEFT

LAB LABORATORY

LPT LOW POINT

MAX MAXIMUM

MECH MECHANICAL

MH MANHOLE

MIN MINIMUM

MO MASONRY OPENING

N NORTH

NIC NOT IN CONTRACT

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER

OF OUTSIDE FACE

OF/CI OWNER FURNISHED/CONTRACTOR INSTALLED

OFD OVERFLOW DRAIN

OPH OPPOSITE HAND

O OXYGEN

PA PANIC ALARM

QT QUARRY TILE

R RISER

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

REF REFRIGERATOR

RO ROUGH OPENING

RWL RAIN WATER LEADER

ABBREVIATIONS

BUILDING / SECTOR ---

BUILDING / SECTOR ---

LINETYPES

MATCH LINE

OVERHEAD

(OVERCOUNTER AND SOFFITS)

REFERENCE (COLUMN LINES

AND MATCHLINES)

BELOW AND BEYOND

(UNDERCOUNTER AND FOOTINGS)

BREAK LINE

DOCUMENT REVISION 01

DEDUCT ALTERNATE

TYPICAL DOOR;

90 DEGREE OPEN DOOR

180 DEGREE OPEN DOOR

DOORS

EXISTING DOOR

GENERAL DEMOLITION NOTES

S SOUTH

SHR SHOWER

SHRD SHOWER DRAIN

SIM SIMILAR

SST STAINLESS STEEL

STC SOUND TRANSMISSION CLASS

S/T SHELF (EQUIPMENT PLACEMENT)

TD TRENCH DRAIN

TO TOP OF

TOC TOP OF CONCRETE SLAB

TOS TOP OF STEEL

TOW TOP OF WALL

TYP TYPICAL

UL UNDERWRITERS LABORATORIES

UON UNLESS OTHERWISE NOTED

U/C UNDER COUNTER

VAC VACUUM

VC VA FURNISHED, CONTRACTOR INSTALLED

VCT VINYL COMPOSITION TILE

VIF VERIFY IN FIELD

VV VA FURNISHED, VA INSTALLED

W WEST

WH WALL HYDRANT

ABBREVIATIONS SYMBOLS

SECTION IDENTIFICATION

SHEET NUMBER

DETAIL

GENERAL NOTES

1.DIMENSIONS TO LOCATE PARTITIONS ARE GIVEN TYPICALLY TO THE FINISHED FACE. PARTITIONS THAT GRAPHICALLY CENTER ON A GRID OR WINDOW MULLION ARE TO BE CENTERED AS SHOWN UNLESS OTHERWISE NOTED. NEW PARTITIONS AND SURFACES THAT ARE SHOWN TO ALIGN WITH EXISTING SURFACES ARE TO BE

ALIGNED AND FINISHED SMOOTH AND FLUSH.

2. CONTRACT LIMIT LINES SHALL BE WHERE INDICATED ON THE DRAWINGS. HOWEVER, IN ORDER TO COMPLETE OR FACILITATE INDICATED WORK, CONTRACTOR MAY BE REQUIRED TO CARRY OUT WORK ADJACENT TO OR NEARBY, BUT OUTSIDE INDICATED LIMITS.

3. CONTRACTOR SHALL VIF ALL EXISTING DIMENSIONS PRIOR TO START OF CONSTRUCTION AND NOTIFY VA OF ANY

DISCREPANCIES.

4. PROVIDE FIRE BLOCKING AT ALL PENETRATIONS AT RATED WALLS.

5. PROVIDE ACOUSTIC SEALANT AT ALL PENETRATIONS AT UNRATED WALLS.

6. EGRESS TO BE MAINTAINED THROUGHOUT ENTIRETY OF CONSTRUCTION, PROVIDE TEMPORARY SIGNAGE AS

REQ'D.

1. DEMOLITION PLANS ARE NOT COMPREHENSIVE. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY AND ADDRESS EXISTING CONDITIONS AS REQUIRED TO ACCOMPLISH THE NEW WORK SHOWN OR REASONABLY IMPLIED. IN GENERAL, THE INTENT OF DEMOLITION IS INDICATED WITH DASHED LINES ON THE DRAWINGS, BUT THIS SCOPE IS DIAGRAMMATIC IN NATURE AND IS COMPLIMENTED BY THE COMPLETE SET OF

CONTRACT DOCUMENTS.

2. THE CONTRACTOR SHALL EXERCISE CARE SO THAT ONLY THE CONSTRUCTION INDICATED OR REASONABLY IMPLIED TO BE REMOVED SHALL BE DEMOLISHED. THE EXISTING CONSTRUCTION TO REMAIN SHALL BE LEFT INTACT AND UNDAMAGED. IN AREAS WHERE ARCHITECTURAL CONSTRUCTION IS TO BE REMOVED, STRUCTURAL, MEP, AND OTHER BUILDING SYSTEM ELEMENTS ARE TO BE PRESERVED.

3. PROVIDE TEMPORARY PARTITIONS AND SYSTEMS AS REQUIRED TO MEET SPECIFIC ROOM/ BUILDING ICRA CLASS PRECAUTION DURING CONSTRUCTION AND UPON COMPLETION OF EACH FLOOR/ BUILDING. SEE ROOM DESIGNATIONS FOR ICRA CLASS. ALL TEMPORARY PARITION LAYOUTS TO BE APPROVED BY VA PRIOR TO INSALLATION, 4'-0" CLEAR WIDTH MINIMUM TO BE MAINTAINED AT CORRIDORS THROUGHOUT CONSTRUCTION.

4. ALL DEBRIS SHALL BE THE PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED AND DISPOSED OF IN A SAFE AND LAWFUL MANNER. ALL SALVAGE SHALL BE THE PROPERTY OF THE OWNER AND REUSED ON THE PROJECT AS INDICATED. CONTRACTOR SHALL TAKE RESPONSIBILITY FOR THE TEMPORARY STORAGE OF SALVAGE TO BE REUSED. THE CONTRACTOR SHALL REMOVE ALL SALVAGE SO AS NOT TO DAMAGE AND SHALL

BE RESPONSIBLE FOR REPLACEMENT OF DAMAGED SALVAGE.

5. WHEN REMOVING PORTIONS OF WALL OR CEILINGS TAKE ALL PRECAUTIONS TO PREVENT STRUCTURAL AND

BUILDING INFRASTRUCTURE DAMAGE.

6. SEE MEP/FP DRAWINGS FOR SYSTEM DEMOLITION. TAKE ALL PRECAUTIONS TO PREVENT DAMAGE. REMOVE, REPLACE, OR CAP AS REQUIRED TO PRESERVE SERVICE TO BE MAINTAINED. IN THE EVENT DAMAGE OCCURS, PATCH AND REPAIR ALL SURFACES DISTURBED BY DEMOLITION, AND REFINISH FOR A CLEAN AND UNIFORM

APPEARANCE.

7. CONTRACTOR TO COORDINATE WITH COR (3) WEEKS IN ADVANCE FOR ANY REQUIRED MEP/FP SYSTEM SHUT DOWNS AND START-UPS RELEVANT TO DEMOLITION. CAP OR RECONNECT MEP/FP SYSTEMS SERVING OCCUPIED AREAS OUTSIDE OF PROJECT SCOPE. INTERRUPTION TO HOSPITAL OPERATIONS WILL LIKELY BE REQUIRED TO

TAKE PLACE DURING OFF-HOURS.

8. MAIN CORRIDORS TO REMAIN CLEAR AND FUNCTIONAL THROUGHOUT DEMOLITION AND CONSTRUCTION.

9. PROTECT, PATCH AND REPAIR ALL FINISHES ADJACENT TO THE DEMOLITION AREA.

10. ALL SALVAGED ITEMS NOT TO BE REUSED ON THIS PROJECT TO BE RETURNED TO OWNER.

11. MAINTAIN CONNECTION AND FUNCTION OF ALL SYSTEMS SERVING FLOORS ABOVE AND BELOW DURING

CONSTRUCTION.

12. CONSTRUCTION AND (RE)LOCATION OF UTILITIES MAY REQUIRE SELECTIVE DEMOLITION AND PATCHING AT WALLS ABOVE CEILING. CONTRACTOR SHALL PATCH AND MATCH WALL SYSTEMS, INCLUDING BUT NOT LIMITED

TO RATING AND ACOUSTIC INTEGRITY.

13. ROOF DEMO NOTE: DO NOT VOID EXISTING ROOFING WARRANTY. CONTRACTOR SHALL COORDINATE WITH

THE GARLAND COMPANY, INC. AND PRIOR TO ANY WORK SHALL WALK THE ROOF WITH GARLAND

REPRESENTATIVE TO INSPECT EXISTING SYSTEM. CONTRACTOR SHALL MODIFY EXISTING ROOF FOR NEW SYSTEMS ONLY AS APPROVED BY THE GARLAND COMPANY, INC. AND THE CONTRACTOR SHALL INSPECT FINAL MODIFICATION OF ROOF SYSTEMS WITH THE GARLAND REPRESENTATIVE. THE GARLAND COMPANY, INC.

REPRESENTATIVE FOR VAMC WEST ROXBURY IS; BRIAN KENDER (617) 755-4655

Room name

1-101

ROOM TAG ROOM NAME

ROOM NUMBER

ROOM IDENTIFICATION

DETAIL

DEDUCT ALT SYMBOL DA #X

XX

DETAIL

DETAIL NAME

SCALE 1/8" = 1'-0"

SPRINKLER

SMOKE DETECTOR S

TROFFER LIGHT

SUPPLY GRILL DIFFUSER

RECESSED CEILING LIGHT/

WALL MOUNTED LIGHT

RETURN GRILL

MAT1

MAT2

MATERIAL

TRANSITION TAG

FIRE ALARM PULL STATION

(KEY ACTIVATION)

FIRE ALARM COMBINATION

AUDIO/VISUAL INDICATOR

NOTE:

MEP&FP AND IT/TEL-DATA SYMBOLS MAY DIFFER, SEE

MEP&FP SYMBOL SHEETS FOR MORE INFORMATION

F

BUILDING NUMBER

SYMBOLS

COLUMN LINE

DOOR SYMBOL XXX

X.X

X.X

PAINT COLOR DESIGNATION

PARTITION TYPE SYMBOL B

DETAIL IDENTIFICATION

SHEET NUMBER

DETAIL CALLOUT

9'-0"CH

TYPE

CEILING SYMBOL

CEILING TYPE

CEILING HEIGHT

XXX

GYPSUM BOARD CEILING

ACOUSTICAL CEILING TILE

MATERIAL INDICATIONS

TYPICAL MOUNTING HEIGHTS

SIGNAGE SYMBOL S1

1 HOUR FIRE RESISTANCE RATED PARTITION (TOP:

NEW; BOTTOM: ETR)

UNRATED NEW PARTITION

EXISTING PARTITION TO REMAIN

EXISTING PARTITION TO BE DEMOLISHED

WALL INDICATIONS

ED SPACES NOT IN SCOPE (MAY BE

IMPACTED BY TEMP. ICRA

PARTITIONS, SEE DEMO PLANS)

IMPACTED BY RENOVATIONS FOR

CEILING/UTILITY CONNECTION

WORK ONLY

IN SCOPE

ROOM INFILL

FINISH SCHEDULE

P1 PAINT - BM WHITE DOWN

GWB PAINTED GYPSUM WALL

BOARD CEILING

P2 PAINT - SW KOI POND

P3 PAINT - SW BREEZY

WP1 WALL PROTECTION - INPRO

PALLADIUM RIGID SHEET W/ RICOCHET

TOP CAP - ANTIQUE WHITE

WSF1 SHEET VINYL - MANNINGTON PARADIGM II FLOW - EXEMPLAR

RB1 RESILIENT BASE - MANNINGTON IDEAL BASE - GRAY BEIGE

Room name

XXXX

XXXX

XXXX

XXXX

101ROOM

NUMBER

ROOM NAME

BASE

FLOOR

CEILING

WALL

FINISHES

ALL FINISHES IN TAG ARE FIELD

FINISHES, ACCENTS NOTED ON PLANS

TEMPORARY PARTITION*

*PROVIDE TEMPORARY PARTITIONS AND SYSTEMS AS REQUIRED TO MEET ICRA

PRECAUTIONS DURING CONSTRUCTION AND UPON COMPLETION OF EACH

PHASE. SEE ROOM SCHED. FOR PRECAUTION LEVEL. ALL TEMPORARY

PARTITION LAYOUTS TO BE APPROVED BY VA PRIOR TO INSTALLATION, 4'-0"

CLEAR WIDTH MINIMUM TO BE MAINTAINED AT PATIENT AREA CORRIDORS

THROUGHOUT CONSTRUCTION, 3'-0" TO BE MAINTAINED AT OTHER AREAS.

NOT IN SCOPE

CG1 CORNER GUARD - ACROVYN SM-10

#100 EGGSHELL - VIF HEIGHT FROM

TOP OF BASE TO CEILING

(ALL PRODUCTS LISTED BELOW ARE B.O.D.)

P4 PAINT - BM WILD MULBERRY

CORNER GUARD (CG)HANDRAIL

V A

R

IE

S

6"

CORNER GUARD

HANDRAIL

T Y

P

WAINSCOT WALL

PROTECTION

T Y

P

BUMPER

BUMPER

0' - 6"

NOTE: MINIMUM LENGTH FOR HANDRAIL/BUMPER TO BE 12".

PROVIDE AT ALL CORRIDOR LOCATIONS WITH WALL LENGTH

GREATER THAN 24". HANDRAIL AND BUMPER TO TERMINATE

6" FROM DOOR FRAME, TYP.

6"

PATIENT ROOM

SIGNAGE

EXIT

WALL MOUNTED EXIT SIGN

(@ DOOR) U.O.N

LIGHT SWITCH ELECTRICAL

OUTLET

CARD

READER

(CR)

3' -1

0"

1' -6

DOOR

OPERATOR

(DO)

3' -1

0"

NURSE CALL

DEVICE

(NC)

3' -0

ELECTRICAL

OUTLET

ABOVE DESK

3' -0

3' -1

0"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

Phase

ARCHITECT STAMPCONSULTANTS 523A4-20-205

VAMC WEST ROXBURY

EXPAND EMERGENCY

DEPARTMENT

William Pevear Architects, Inc.

872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139

T: 617.335.5186

Alares Engineering

248 Copeland Street, 2nd Floor Quincy, MA 02169

T: 617.481.6390

MEP/FP ENGINEER

Drawing Scale

321 4 5 6 7 8

A

B

C

D

E

321 4 5 6 7 8

1400 VFW PARKWAY, WEST ROXBURY, MA 02132

01/31/2024

CODE CONSULTANT

Hastings Consulting

142 Hanlon Road Holliston, MA 01746

T: 508.397.8417

N

C U s e rs \M ir ia m \D o c u m e n ts

\1

-V

A W

R E

D E x p a n s io n m ir ia m

X L

H .r v t

/3

/2

:0

:3

A

M

As indicated

GI002

SHEET LIST, GENERAL NOTES,

ABBREVIATIONS, & GRAPHIC

STANDARDS

Sheet List

Sheet Number Sheet Name

00_GENERAL INFORMATION

GI000 COVER

GI002 SHEET LIST, GENERAL NOTES, ABBREVIATIONS, & GRAPHIC

STANDARDS

GI103 LIFE SAFETY PLAN

GI120 PHASING OVERVIEW

01_STRUCTURAL

S100 EXTERIOR STAIR REINFORCED CONRETE LANDING PAD

02_ARCHITECTURAL

AS401 PHASE 1 - EXAM 11 (GA-187) & EXAM 16 (GA-146) - DEMOLITION &

NEW DRAWINGS

AS401B PHASE 1 - ROOF PLAN

AS402 PHASE 2 - EXAMS 12 (GA-186) & EXAM 13 (GA-184) - DEMOLITION &

NEW DRAWINGS

AS403 PHASE 3 - EXAM 1 (GA-169), EXAM 2 (GA-170), & CORRIDOR -

DEMOLITION & NEW DRAWINGS

AS404 PHASE 4 - EXAM 3 (GA-171) & EXAM 4 (GA-172) - DEMOLITION &

NEW DRAWINGS

AS405 PHASE 5 - EXAM 5 (GA-173) & EXAM 6 (GA178) - DEMOLITION &

NEW DRAWINGS

AS406 PHASE 6 - EXAM 7 (GA-179), EXAM 8 (GA-180) & CORRIDOR -

DEMOLITION & NEW DRAWINGS

AS407 PHASE 7 - EXAM 9 (GA-180) & EXAM 10 (GA-182) - DEMOLITION &

NEW DRAWINGS

AS408 PHASE 8 - EXAM 14 (GA-147) & EXAM 15 (GA145) - DEMOLITION &

NEW DRAWINGS

AS501 PARTITION DETAILS, DOOR SCHEDULE & DETAILS, INTERIOR

DETAILS

AS701 EXTERIOR STAIR ENLARGED PLAN AND SECTIONS

AS702 EXTERIOR STAIR DETAILS

AS801 ROOF DETAILS

03_FIRE PROTECTION

FX001 GENERAL FIRE PROTECTION NOTES

FX100 GROUND FLOOR FIRE PROTECTION PLANS

FX500 GENERAL FIRE PROTECTION DETAILS

05_MECHANICAL

MG001 HVAC GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS

MG002 HVAC GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS

MD002 LOW ROOF - DEMOLITION

MH001 GROUND LEVEL - NEW WORK - DUCTWORK

MH002 LOW ROOF - NEW WORK

MP001 GROUND LEVEL - NEW WORK - PIPING

MI100 HVAC DETAILS

MI101 HVAC DETAILS

MI102 HVAC DETAILS

MI200 HVAC SCHEDULE

MI300 HVAC CONTROLS

06_ELECTRICAL

E001 ELECTRICAL SYMBOLS & NOTES

E002 ELECTRICAL ABBREVIATIONS

ED100 BUILDING 3 EXISTING CONDITIONS / DEMOLITION ELECTRICAL

PLAN

ED101 BUILDING 3 EXISTING CONDITIONS / DEMOLITION ELECTRICAL

REFLECTED CEILING PLAN

ED102 BUILDING 3 ROOF EXISTING CONDITIONS / DEMOLITION

ELECTRICAL PLAN

E100 BUILDING 3 GROUND FLOOR NEW WORK ELECTRICAL PLAN

E101 BLDG 3 ONE-LINE DIAGRAM & ROOM GC-100 ELECTRICAL NEW

WORK PLAN

E102 BUILDING 3 GROUND FLOOR NEW WORK LIGHTING PLAN

E103 BUILDING 3 ROOF NEW WORK ELECTRICAL PLANS

E104 BUILDING 3 GROUND FLOOR SPECIAL SYSTEMS PLAN

E500 ELECTRICAL DETAILS

Grand total: 43

Revision: Date:

Miriam Image

Miriam Image

UP B

C

D

G

A

0.2

3 4 6 72

PHASE 8

PHASE 2

PHASE 3

PHASE 1

PHASE 5

PHASE 6

PHASE 1

PHASE 7

PHASE 4

CEILING WORK IN CORRIDOR

TO BE DONE OFF-HOURS

CEILING WORK IN CORRIDOR

TO BE DONE OFF-HOURS

REPLACE CARD READER

TRIAGE ROOM WORKFLOW TO

BE TEMPORARILY REDIRECTED

DURING CEILING WORK

EXAM 16

GA-146

CORRIDOR

CG-20MECHANICAL

ROOM

GA-157

OFFICE

GA-148

CORRIDOR

CG-20

EXAM 11

GA-187

EXAM 12

GA-186

EXAM 13

GA-184

CORRIDOR

CG-21B

EXAM 14

GA-147

EXAM 15

GA-145

EXAM 10

GA-182

EXAM 9

GA-181

EXAM 8 MH

GA-180

CORRIDOR

CG-25

EXAM 7

ISOLATION

GA-179

EXAM 6

ISOLATION

GA-178

CORRIDOR

CG-26

PHASE 5

EXAM 1

GA-169

EXAM 2

GA-170

EXAM 3

GA-171

EXAM 4

GA-172

EXAM 5

GA-173

REPLACE CARD READER

REPLACE CARD

READER

F.5

0.5

PHASE 6

CG-26

CG-25

CG-20

WORKSTATION TO REMAIN

IN USE DURING

CONSTRUCTION

WORKSTATION TO REMAIN

IN USE DURING

CONSTRUCTION

B

C

A

1 3 4 112

N

NEW AHU

PHASE 1 & 2 PHASE 1

NEW CORES FOR PIPE LOCATIONS

EXISTING

TO REMAIN

AHU

PHASE 1 - REPLACE FINISHES AT GA-187 (EXAM 11) & GA-146 (EXAM 16);

BEGIN ROOFTOP WORK FOR AHU INSTALLATION; INSTALL NEW HVAC

PIPING ABOVE ROOMS CG-20, GA-146 (EXAM 16), GA-148, GA-187 (EXAM

11); CORRIDOR DOOR CARD READER REPLACEMENT; INSTALL

EXTERIOR ROOF ACCESS STAIR.

EMERGENCY DEPT. BOUNDARY

PHASE 2 - REPLACE FINISHES AT GA-186 (EXAM 12) & GA-184 (EXAM 13);

COMPLETE ROOF TOP WORK; COMPLETE INSTALLATION OF NEW HVAC

PIPING ABOVE ROOMS GA-186, GA-184, CG-21B.

* INFILL AREA INDICATES SPACE COMPLETE AT PHASE, TEMPORARY WORK MAY

OCCUR AT PHASES BEFORE PHASE COMPLETE FOR ENABLING WORK, SEE PHASE-

BY-PHASE PLANS FOR SPECIFICS

GENERAL PHASING NOTES:

1. MAINTAIN EGRESS THROUGHOUT CONSTRUCTION. LIMIT OBSTRUCTION OF

CORRIDOR TO MAINTAIN OPERATION OF ED DURING CONSTRUCTION.

2. PRIOR TO EACH SUBSEQUENT PHASE, THE CONTRACTOR SHALL COMPLETE THE

CURRENT PHASE INCLUDING: A) REMOVE TEMPORARY PARTITION(S), ICRA BARRIERS,

AND CONTROLS NOT REQUIRED FOR NEXT PHASE, B) VA SHALL APPROVE

COMPLETION, MOVE EQUIPMENT/FURNISHINGS, AND TRANSFER HOSPITAL

OPERATIONS TO NEW SPACES, C) UPON SUCCESSFUL COMPLETION OF TRANSFER OF

HOSPITAL OPERATIONS, THE VA SHALL REMOVE ALL EQUIPMENT, FURNISHINGS, AND

VA PROPERTY TO BE RETAINED FROM AREAS OF NEXT PHASE, D) CONTRACTOR

SHALL MODIFY TEMPORARY WORK AREAS AND INSTALL NEXT PHASE TEMPORARY

PARTITIONS, ICRA BARRIERS AND CONTROL SYSTEMS AND OBTAIN VA COR

APPROVAL TO BEGIN NEXT PHASE.

3. *PROVIDE TEMPORARY PARTITIONS AND SYSTEMS AS REQUIRED TO MEET ICRA

PRECAUTIONS DURING CONSTRUCTION AND UPON COMPLETION OF EACH PHASE.

SEE ROOM SCHEDULE FOR PRECAUTION LEVEL. ALL TEMPORARY PARITION LAYOUTS

TO BE APPROVED BY VA PRIOR TO INSTALLATION, 4'-0" CLEAR WIDTH MINIMUM TO BE

MAINTAINED AT PATIENT AREA CORRIDORS THROUGHOUT CONSTRUCTION, 3'-0" TO

BE MAINTAINED AT AREAS WHERE PATIENT BED ACCESS IS NOT REQUIRED.

PHASING GRAPHIC KEY*

PHASE 3 - REPLACE FINISHES AT GA-169 (EXAM 1) & GA-170 (EXAM 2)

PHASE 4 - REPLACE FINISHES AT GA-171 (EXAM 3) & GA-172 (EXAM 4)

PHASE 5 - REPLACE FINISHES AT GA-173 (EXAM 5) & GA-178 (EXAM 6)

PHASE 6 - ROOM GA-180 (EXAM 8) REPLACE FINISHES, REPLACE

FIXTURES AND HARDWARE WITH APPROVED LIGATURE-RESISTANT

PRODUCTS. ROOM GA-179 (EXAM 7) REPLACE FINISHES; REPLACE

DOOR LEAVES AND HARDWARE AT DOOR CG-25.

PHASE 7 - REPLACE FINISHES AT GA-181 (EXAM 9) & GA-182 (EXAM 10)

PHASE 8 - REPLACE FINISHES AT GA-147 (EXAM 14) & GA-145 (EXAM 15)

NOT IN SCOPE

WALL REMARKS

W1. REMOVE WALL MOUNTED MOVABLE FURNISHINGS, TAPE OFF & PROTECT FIXED

DEVICES CONNECTED TO MEPFP DURING RENOVATION.

W2. REPAIR AND PATCH GWB DAMAGE.

W3. NEW PAINT THROUGHOUT.

W4. NEW WALL PROTECTION WAINSCOT ALL WALLS.

W5. PICK RESISTANT SEALANT AT ALL JOINT AND MATERIAL INTERFACES.

FLOORING/BASE REMARKS

F1. REMOVE EXISTING FLOORING & BASE.

F2. INSTALL NEW WSF1 FLOORING & INTEGRAL BASE, INSTALL TRANSITION WITH

ADJACENT FLOORING AT DOOR.

CEILING REMARKS

C1. REMOVE CEILING AS REQUIRED TO INSTALL NEW HVAC PIPING, REINSTALL

EXISTING CEILING AFTER HVAC INSTALLATION COMPLETE.

C2. CLEAN AND REPLACE DAMAGED CEILING TILES & EXISTING DEVICES, MINIMAL

REPLACEMENT EXPECTED.

C3. DEMOLISH PORTIONS OF EXISTING CEILING AS REQUIRED TO INSTALL LIGATURE-

RESISTANT FIXTURES. PATCH AND REPAIR GWB AS REQUIRED TO CREATE EVEN

SURFACE AND PAINT.

C4. RELOCATE (1) LIGHT FIXTURE.

DOOR REMARKS

D1. REPLACE DOOR LEAF WITHIN EXISTING FRAME, REUSE EXISTING HARDWARE.

D2. REPLACE CARD READER AT EXISTING DOOR.

D3. NEW LIGATURE RESISTANT DOOR AND HARDWARE.

WINDOW REMARKS

G1. PAINT FRAME P1.

HVAC REMARKS

H1. ABOVE CEILING PIPING WORK, TEMPORARY REMOVAL OF CEILING.

H2. NEW LIGATURE-RESISTANT CEILING DEVICES.

H3. NEW ROOFTOP EQUIPMENT.

ELECTRICAL REMARKS

E1. NEW CARD READER.

E2. TEMPORARY REMOVAL OF CEILING FOR ABOVE CEILING WORK, DISCONNECT

ELECTRICAL DEVICES ARE REQUIRED.

E3. CONNECTIONS TO NEW ROOFTOP EQUIPMENT.

E4. RELOCATE (1) LIGHT FIXTURE.

E5. NEW LIGATURE-RESISTANT CEILING & WALL DEVICES.

FIRE PROTECTION REMARKS

FP1. NEW LIGATURE-RESISTANT SPRINKLER(S) PER FP DRAWINGS.

ICRA LEVEL OF PRECAUTION: REFER TO SPECIFICATIONS FOR FULL REQUIREMENTS

BY LEVEL OF ICRA PRECAUTIONS REQUIRED.

RENOVATION SCOPE REMARKS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

Phase

ARCHITECT STAMPCONSULTANTS 523A4-20-205

VAMC WEST ROXBURY

EXPAND EMERGENCY

DEPARTMENT

William Pevear Architects, Inc.

872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139

T: 617.335.5186

Alares Engineering

248 Copeland Street, 2nd Floor Quincy, MA 02169

T: 617.481.6390

MEP/FP ENGINEER

Drawing Scale

321 4 5 6 7 8

A

B

C

D

E

321 4 5 6 7 8

1400 VFW PARKWAY, WEST ROXBURY, MA 02132

01/31/2024

CODE CONSULTANT

Hastings Consulting

142 Hanlon Road Holliston, MA 01746

T: 508.397.8417

N

C U s e rs \M ir ia m \D o c u m e n ts

\1

-V

A W

R E

D E x p a n s io n m ir ia m

X L

H .r v t

/3

/2

:0

:4

A

M

As indicated

GI120

PHASING OVERVIEW

SCALE: 3/32" = 1'-0"

1 PHASING OVERVIEW - LEVEL AG

SCALE: 3/32" = 1'-0"

2 PHASING OVERVIEW - ROOF

Room Schedule - Scope Summary

ROOM INFO ARCHITECTURAL

HVAC ELECTRICAL PLUMBING

FIRE

PROTECTION

ICRA LEVEL OF

PRECAUTION OTHER NOTESNUMBER NAME AREA (±) PHASE WALLS

FLOORING &

BASE CEILING DOOR WINDOW

CG-20 CORRIDOR 353 SF 1 N/A N/A C1, C4 D2 N/A H1 E1, E4 N/A N/A IV WORK TO BE DONE OFF-HOURS AS DETERMINED BY VA, AREA TO REMAIN OPEN DURING DAY

CG-26 CORRIDOR 492 SF 1 N/A N/A N/A D2 N/A N/A E1 N/A N/A IV WORK TO BE DONE OFF-HOURS AS DETERMINED BY VA, AREA TO REMAIN OPEN DURING DAY

GA-146 EXAM 16 97 SF 1 W2, W3, W4, W5 F1, F2 C1, C2 D1 N/A H1 E2 N/A N/A IV

GA-148 OFFICE 54 SF 1 N/A N/A C1 N/A N/A H1 E2 N/A N/A IV WORK TO BE DONE OFF-HOURS AS DETERMINED BY VA, AREA TO REMAIN OPEN DURING DAY

GA-187 EXAM 11 120 SF 1 W2, W3, W4, W5 F1, F2 C1, C2 D1 G1 H1 E2 N/A N/A IV

ROOF ROOF 2554 SF 1 N/A N/A N/A N/A N/A H3 E3 N/A N/A IV ROOFTOP WORK TO SPAN MULTIPLE PHASES AS NEEDED

CG-21B CORRIDOR 65 SF 2 N/A N/A C1 N/A N/A H1 E2 N/A N/A IV WORK TO BE DONE OFF-HOURS AS DETERMINED BY VA, AREA TO REMAIN OPEN DURING DAY

GA-184 EXAM 13 126 SF 2 W1, W2, W3, W4 F1, F2 C1, C2 D1 G1 H1 E2 N/A N/A IV

GA-186 EXAM 12 113 SF 2 W1, W2, W3, W4 F1, F2 C1, C2 D1 G1 H1 E2 N/A N/A IV

GA-169 EXAM 1 117 SF 3 W1, W2, W3, W4 F1, F2 C2 D1 N/A N/A N/A N/A N/A IV

GA-170 EXAM 2 131 SF 3 W1, W2, W3, W4 F1, F2 C2 D1 G1 N/A N/A N/A N/A IV

GA-171 EXAM 3 129 SF 4 W1, W2, W3, W4 F1, F2 C2 D1 G1 N/A N/A N/A N/A IV

GA-172 EXAM 4 124 SF 4 W1, W2, W3, W4 F1, F2 C2 D1 N/A N/A N/A N/A N/A IV

GA-173 EXAM 5 129 SF 5 W1, W2, W3, W4 F1, F2 C2 D1 G1 N/A N/A N/A N/A IV

GA-178 EXAM 6 ISOLATION 121 SF 5 W1, W2, W3, W4 F1, F2 C2 D1 G1 N/A N/A N/A N/A IV

CG-25 CORRIDOR 382 SF 6 N/A N/A N/A D2 N/A N/A E1 N/A N/A IV WORK TO BE DONE OFF-HOURS AS DETERMINED BY VA, AREA TO REMAIN OPEN DURING DAY

GA-179 EXAM 7 ISOLATION 112 SF 6 W1, W2, W3, W4 F1, F2 C2 D1 G1 N/A N/A N/A N/A IV

GA-180 EXAM 8 MH 112 SF 6 W1, W2, W3, W4,

W5

F1, F2 C3 D3 N/A H2 E5 1 FP1 IV ALL FINISHES & DEVICES AT ROOM INTERIOR TO BE SUITABLE FOR MH SECURE SETTING, GA-181 EXAM 9 111 SF 7 W1, W2, W3, W4 F1, F2 C2 D1 N/A N/A N/A N/A N/A IV

GA-182 EXAM 10 112 SF 7 W1, W2, W3, W4 F1, F2 C2 D1 N/A N/A N/A N/A FP1 IV

GA-145 EXAM 15 104 SF 8 W1, W2, W3, W4 F1, F2 C2 D1 N/A N/A N/A N/A N/A IV

GA-147 EXAM 14 103 SF 8 W1, W2, W3, W4 F1, F2 C2 D1 N/A N/A N/A N/A N/A IV

Revision: Date:

Miriam Image

UP

9' - 6"

S-100

1% SLOPE

#4 @ 12" O.C EACH WAY

1" ABOVE GRADE

12" MIN COMPACTED CRUSHED STONE

8" CONCRETE SLAB

SECTION VIEW

19' - 6"

4' - 6"

HAUNCHED SLAB AT STAIR SUPPORTS.

REFER TO ARCHITECTURAL FOR EXACT

DIMENSIONS OF STAIR SUPPORTS. (TYP.)

8"

GRADE

GRADE

7" +/- ABOVE GRADE (V.I.F)

8" MIN

Project NumberProject NumberProject NumberProject Number

Building NumberBuilding NumberBuilding NumberBuilding Number

Drawing NumberDrawing NumberDrawing NumberDrawing Number

Project TitleProject TitleProject TitleProject Title

LocationLocationLocationLocation

Issue DateIssue DateIssue DateIssue Date CheckedCheckedCheckedChecked DrawnDrawnDrawnDrawn

Drawing TitleDrawing TitleDrawing TitleDrawing Title

Approved:Approved:Approved:Approved:

VA FORM 08 - 6231

AAAA

CONSTRUCTION

DOCUMENTS

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

BBBB

CCCC

DDDD

EEEE

PhasePhasePhasePhase

ARCHITECT STAMPSTAMPSTAMPSTAMPCONSULTANTS 523A4-20-205

VAMC WEST ROXBURY

EXPAND EMERGENCY

DEPARTMENT

William Pevear Architects, Inc.

872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139

T: 617.335.5186

Alares Engineering

248 Copeland Street, 2nd Floor Quincy, MA 02169

T: 617.481.6390

MEP/FP ENGINEER

Drawing ScaleDrawing ScaleDrawing ScaleDrawing Scale

333322221111 4444 5555 6666 7777 8888

AAAA

BBBB

CCCC

DDDD

EEEE

333322221111 4444 5555 6666 7777 8888

1400 VFW PARKWAY, WEST ROXBURY, MA 02132

01/31/2024

CODE CONSULTANT

Hastings Consulting

142 Hanlon Road Holliston, MA 01746

T: 508.397.8417

N

C U s e rs \Q n g u y e n

\D o c u m e n ts

\W R

-E D

M e c h

S ta m p e d b g o ld s te in R

C

Y M

.r v t

/2

/2

:3 :2

P

M

3/8" = 1'-0"

S-100

EXTERIOR STAIR REINFORCED

CONCRETE LANDING PAD

QSQSQSQS QNQNQNQN

3/8" = 1'-0"

Exterior Stair Reinforced Concrete Landing Pad

GENERAL NOTES:

1. THE STRUCTURAL DRAWING SHALL BE USED IN CONJECTION WITH ALL OTHER CONTRACT DRAWINGS AND SPECIFICATIONS. REFER TO ARCHITECTURAL FOR MORE DETAILS.

2. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING, COORDINATING AND VERIFYING ALL DIMENSIONS IN THE FIELD PRIOR TO COMMENCING WORK. THE CONTRACTOR SHALL IMMEDIATELY REPORT ANY DISCREPANCY TO THE ARCHITECT AND ENGINEER AS A REQUEST FOR INFORMATION (RFI).

3. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING IN THE FIELD THE EXISTENCE AND LOCATION OF BURIED AND/OR EMBEDDED UTILITIES AFFECTED BY THE WORK OF THIS CONTRACT.

4. IN ACCORDANCE WITH SPECIFICATION, TESTING AND INSPECTION OF STRUCTURAL WORK SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THE COST FOR TESTING AND INSPECTIONS WILL BE

PAID BY THE CONTRACTOR.

5. CARE SHALL BE TAKEN BY THE CONTRACTOR TO PROTECT EXISTING SYSTEMS AND SURFACES INDATED TO REMAIN. ALL DAMAGE RESULTING FROM THE CONTRACTOR'S OPERATIONS SHALL BE REPAIRED AS APPROVED BY THE CONTRACTING OFFICER AT NO ADDITIONAL COST TO THE GOVERNMENT.

6. THE CONTRACTOR SHALL PROVIDE BARRICADES AT ALL WORK AREAS TO PREVENT PERSONNEL FROM ENTERING AREAS OF WORK, UNO.

7. THE CONTRACTOR SHALL COORDINATE THE TIMING AND SEQUENCE OF WORK WITH THE CONTRACTING OFFICER, AND BUILDING TENANTS.

3/8" = 1'-0"

REINFORCED CONCRETE LANDING PAD

DETAILS

NOTES:

1. THE CONCRETE REINFORCEMENT SHALL BE #4 AT 12" ON THE CENTER EACH WAY AND CENTERED IN THE SLAB.

2. THE MINIMUM CONCRETE COMPRESSIVE STRENGTH SHALL BE 5000 PSI AND MINIMUM 6% AIR ENTRAINED.

3. THE EDGE OF THE SLAB SHALL BE 3/4" CHAMFERED AND THE SURFACE OF THE CONCRETE SHALL BE BROOM FINISH.

4. MAXIMUM SPACING FOR CONTROL JOINT IS 10-FT.

5. ADD CONCRETE CORROSION INHIBITOR (SIKA CNI OR APPROVED EQUAL) PER MANUFACTURER RECOMMENDATION.

6. INSTALL CONBCRETE PAD FLAT AND LEVELED. ENSURE MINIMUM HAUNCH DEPTH IS ACHIEVED.

Revision:Revision:Revision:Revision: Date:Date:Date:Date:

EXAM 11

WSF1

RB1

P1,WP1

ETR

GA-187

AS40104

GA-187

P2

± 11' - 0" VIF

V

IF

EXAM 11

GA-187

CEILING & ALL CEILING

DEVICES & EQUIPMENT

EXISTING TO REMAIN,

PROTECT IN PLACE

DURING RENOVATION

EXAM 16

WSF1

RB1

P1,WP1

ETR

GA-146

AS401

P4

GA-146

/2

V

IF

± 10' - 8" VIF

CG1

EXAM 16

GA-146

CEILING & ALL CEILING

DEVICES & EQUIPMENT

EXISTING TO REMAIN,

PROTECT IN PLACE

DURING RENOVATION

EXAM 16

GA-146

TEMPORARY

PARTITION

4'-0" MIN

±4'-6"

T

EXAM 11

GA-187

TEMPORARY

PARTITION

4'-0" MIN

±4'-6"

T

WALL PROTECTION

WAINSCOT AS

SCHEDULED

BASE AS SCHEDULED

P1

EXISTING

HEADWALL TO

REMAIN, PROTECT

IN PLACE DURING

CONSTRUCTION

WALL PROTECTION

WAINSCOT AS

SCHEDULED

BASE AS SCHEDULED

P214

AS501

TYP

WALL PROTECTION

WAINSCOT, AS SCHEDULED

BASE AS SCHEDULED

EXISTING WINDOW

TO REMAIN, PAINT

FRAME P1 P1

EXISTING SINK TO REMAIN

GA-187

EXISTING FRAME TO

REMAIN, LEAF TO BE

REPLACED, REUSE

EXISTING HARDWARE; PAINT

FRAME P1

WALL PROTECTION

WAINSCOT, AS

SCHEDULED

BASE AS SCHEDULED

P1

WALL PROTECTION

WAINSCOT, AS

SCHEDULED

BASE AS SCHEDULED

P1

AS501

TYP

CG1

WALL PROTECTION

WAINSCOT, AS

SCHEDULED

BASE AS SCHEDULED

P4

WALL PROTECTION WAINSCOT,

AS SCHEDULED

BASE AS SCHEDULED

P1

EXISTING SINK TO REMAIN

GA-146

EXISTING FRAME TO

REMAIN, LEAF TO BE

REPLACED, REUSE

EXISTING HARDWARE; PAINT

FRAME P1

WALL PROTECTION

WAINSCOT, AS

SCHEDULED

BASE AS SCHEDULED

P1

WALL REMARKS

W1. REMOVE WALL MOUNTED MOVABLE FURNISHINGS, TAPE OFF & PROTECT FIXED

DEVICES CONNECTED TO MEPFP DURING RENOVATION.

W2. REPAIR AND PATCH GWB DAMAGE.

W3. NEW PAINT THROUGHOUT.

W4. NEW WALL PROTECTION WAINSCOT ALL WALLS.

W5. PICK RESISTANT SEALANT AT ALL JOINT AND MATERIAL INTERFACES.

FLOORING/BASE REMARKS

F1. REMOVE EXISTING FLOORING & BASE.

F2. INSTALL NEW WSF1 FLOORING & INTEGRAL BASE, INSTALL TRANSITION WITH

ADJACENT FLOORING AT DOOR.

CEILING REMARKS

C1. REMOVE CEILING AS REQUIRED TO INSTALL NEW HVAC PIPING, REINSTALL

EXISTING CEILING AFTER HVAC INSTALLATION COMPLETE.

C2. CLEAN AND REPLACE DAMAGED CEILING TILES & EXISTING DEVICES, MINIMAL

REPLACEMENT EXPECTED.

C3. DEMOLISH PORTIONS OF EXISTING CEILING AS REQUIRED TO INSTALL LIGATURE-

RESISTANT FIXTURES. PATCH AND REPAIR GWB AS REQUIRED TO CREATE EVEN

SURFACE AND PAINT.

C4. RELOCATE (1) LIGHT FIXTURE.

DOOR REMARKS

D1. REPLACE DOOR LEAF WITHIN EXISTING FRAME, REUSE EXISTING HARDWARE.

D2. REPLACE CARD READER AT EXISTING DOOR.

D3. NEW LIGATURE RESISTANT DOOR AND HARDWARE.

WINDOW REMARKS

G1. PAINT FRAME P1.

HVAC REMARKS

H1. ABOVE CEILING PIPING WORK, TEMPORARY REMOVAL OF CEILING.

H2. NEW LIGATURE-RESISTANT CEILING DEVICES.

H3. NEW ROOFTOP EQUIPMENT.

ELECTRICAL REMARKS

E1. NEW CARD READER.

E2. TEMPORARY REMOVAL OF CEILING FOR ABOVE CEILING WORK, DISCONNECT

ELECTRICAL DEVICES ARE REQUIRED.

E3. CONNECTIONS TO NEW ROOFTOP EQUIPMENT.

E4. RELOCATE (1) LIGHT FIXTURE.

E5. NEW LIGATURE-RESISTANT CEILING & WALL DEVICES.

FIRE PROTECTION REMARKS

FP1. NEW LIGATURE-RESISTANT SPRINKLER(S) PER FP DRAWINGS.

ICRA LEVEL OF PRECAUTION: REFER TO SPECIFICATIONS FOR FULL REQUIREMENTS

BY LEVEL OF ICRA PRECAUTIONS REQUIRED.

RENOVATION SCOPE REMARKS

1 HOUR FIRE RESISTANCE RATED PARTITION (TOP:

NEW; BOTTOM: ETR)

UNRATED NEW PARTITION

EXISTING PARTITION TO REMAIN

EXISTING PARTITION TO BE DEMOLISHED

WALL INDICATIONS

ED SPACES NOT IN SCOPE (MAY BE

IMPACTED BY TEMP. ICRA

PARTITIONS, SEE DEMO PLANS)

IMPACTED BY RENOVATIONS FOR

CEILING/UTILITY CONNECTION

WORK ONLY

IN SCOPE

ROOM INFILL

FINISH SCHEDULE

P1 PAINT - BM WHITE DOWN

GWB PAINTED GYPSUM WALL

BOARD CEILING

P2 PAINT - SW KOI POND

P3 PAINT - SW BREEZY

WP1 WALL PROTECTION - INPRO

PALLADIUM RIGID SHEET W/ RICOCHET

TOP CAP - ANTIQUE WHITE

WSF1 SHEET VINYL - MANNINGTON PARADIGM II FLOW - EXEMPLAR

RB1 RESILIENT BASE - MANNINGTON IDEAL BASE - GRAY BEIGE

Room name

XXXX

XXXX

XXXX

XXXX

101ROOM

NUMBER

ROOM NAME

BASE

FLOOR

CEILING

WALL

FINISHES

ALL FINISHES IN TAG ARE FIELD

FINISHES, ACCENTS NOTED ON PLANS

TEMPORARY PARTITION*

*PROVIDE TEMPORARY PARTITIONS AND SYSTEMS AS REQUIRED TO MEET ICRA

PRECAUTIONS DURING CONSTRUCTION AND UPON COMPLETION OF EACH

PHASE. SEE ROOM SCHED. FOR PRECAUTION LEVEL. ALL TEMPORARY

PARTITION LAYOUTS TO BE APPROVED BY VA PRIOR TO INSTALLATION, 4'-0"

CLEAR WIDTH MINIMUM TO BE MAINTAINED AT PATIENT AREA CORRIDORS

THROUGHOUT CONSTRUCTION, 3'-0" TO BE MAINTAINED AT OTHER AREAS.

NOT IN SCOPE

CG1 CORNER GUARD - ACROVYN SM-10

#100 EGGSHELL - VIF HEIGHT FROM

TOP OF BASE TO CEILING

(ALL PRODUCTS LISTED BELOW ARE B.O.D.)

P4 PAINT - BM WILD MULBERRY

DEMOLITION KEY NOTES*

REMOVE DOOR LEAF, FRAME TO REMAIN IN PLACE, RETAIN EXISTING HARDWARE

FOR REUSE AT DOOR.

REMOVE FURNISHINGS, EQUIPMENT, CUBICLE CURTAIN, AND SIGNAGE THAT ARE

NOT CONNECTED TO BUILDINGS SERVICES FROM THROUGHOUT ROOM

TEMPORARILY.

TAPE-OFF AND PROTECT HARD-WIRED DEVICES AND EQUIPMENT INCLUDING AT

CEILINGS AND HEADWALL DURING CONSTRUCTION

DEMO PORTIONS OF CEILING FOR INSTALLATION OF NEW DEVICES.

TEMPORARILY REMOVE PORTIONS OF CEILING FOR ABOVE CEILING MEPFP WORK

FLOORING, BASE, AND WALL PROTECTION TO BE REMOVED

*REFER TO SHEET GI002 FOR GENERAL NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

Phase

ARCHITECT STAMPCONSULTANTS 523A4-20-205

VAMC WEST ROXBURY

EXPAND EMERGENCY

DEPARTMENT

William Pevear Architects, Inc.

872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139

T: 617.335.5186

Alares Engineering

248 Copeland Street, 2nd Floor Quincy, MA 02169

T: 617.481.6390

MEP/FP ENGINEER

Drawing Scale

321 4 5 6 7 8

A

B

C

D

E

321 4 5 6 7 8

1400 VFW PARKWAY, WEST ROXBURY, MA 02132

01/31/2024

CODE CONSULTANT

Hastings Consulting

142 Hanlon Road Holliston, MA 01746

T: 508.397.8417

N

C U s e rs \M ir ia m \D o c u m e n ts

\1

-V

A W

R E

D E x p a n s io n m ir ia m

X L

H .r v t

/3

/2

:0

:0

A

M

1/4" = 1'-0"

AS401

PHASE 1 - EXAM 11 (GA-187) &

EXAM 16 (GA-146) - DEMOLITION

& NEW DRAWINGS

SCALE: 1/4" = 1'-0"

02 PHASE 1 - NEW - ENLARGED PLAN - GA-187 (EXAM 11)

SCALE: 1/4" = 1'-0"

03 PHASE 1 - ENLARGED RCP - GA-187 (EXAM 11)

SCALE: 1/4" = 1'-0"

09 PHASE 1 - NEW - ENLARGED PLAN - GA-146 (EXAM 16)

SCALE: 1/4" = 1'-0"

10 PHASE 1 - ENLARGED RCP - GA-146 (EXAM 16)

SCALE: 1/4" = 1'-0"

08 PHASE 1 - DEMO - ENLARGED PLAN - GA-146 (EXAM 16)

SCALE: 1/4" = 1'-0"

01 PHASE 1 - DEMO - ENLARGED PLAN - GA-187 (EXAM 11)

SCALE: 1/4" = 1'-0"

04 GA-187 (EXAM 11) - 1

SCALE: 1/4" = 1'-0"

05 GA-187 (EXAM 11) - 2

SCALE: 1/4" = 1'-0"

06 GA-187 (EXAM 11) - 3

SCALE: 1/4" = 1'-0"

07 GA-187 (EXAM 11) - 4

SCALE: 1/4" = 1'-0"

11 GA-146 (EXAM 16) - 1

SCALE: 1/4" = 1'-0"

12 GA-146 (EXAM 16) - 2

SCALE: 1/4" = 1'-0"

13 GA-146 (EXAM 16) - 3

SCALE: 1/4" = 1'-0"

14 GA-146 (EXAM 16) - 4

TYPICAL EXAM ROOM EXISTING PHOTOS - SIMILAR SCOPE FOR ROOMS:

EXAM 1 (GA-169), EXAM 2 (GA-170), EXAM 3 (GA-171), EXAM 4 (GA-172), EXAM 5 (GA-173), EXAM 6 (GA-178), EXAM 7 (GA-179), EXAM 9 (GA-181), EXAM 10 (GA-182), EXAM 11 (GA-187), EXAM 12 (GA-186), EXAM 13 (GA-184), EXAM 14

(GA-147), EXAM 15 (GA-145), EXAM 16 (GA-146)

VIEW OF SIDE WALL OF EXAM ROOM

SCHEDULED FOR FINISH UPGRADES:

-CONTRACTOR TO REMOVE

FURNISHINGS, EQUIPMENT, AND

SIGNAGE THAT ARE NOT CONNECTED

TO BUILDINGS SERVICES FROM

THROUGHOUT ROOM TEMPORARILY.

SALVAGE FOR REUSE ALL MOUNTED

EQUIPMENT AND SIGNAGE.

-TAPE-OFF AND PROTECT HARD-

WIRED DEVICES AND EQUIPMENT

THROUGHOUT.

-WALL PROTECTION, BASE, AND

FLOORING TO BE REPLACED.

-ROOM TO BE REPAINTED

VIEW OF HEAD WALL OF EXAM ROOM

SCHEDULED FOR FINISH UPGRADES:

-HEAD WALL & ALL CEILING

EQUIPMENT/DEVICES TO BE

PROTECTED IN PLACE DURING

CONSTRUCTION.

VIEW OF SIDE WALL OF EXAM ROOM

SCHEDULED FOR FINISH UPGRADES:

-CONTRACTOR TO REMOVE PRIVACY

CURTAIN TEMPORARILY DURING

CONSTRUCTION, SALVAGE FOR REUSE.

VIEW OF FOOT WALL OF EXAM ROOM

SCHEDULED FOR FINISH UPGRADES:

-DAMAGED DOOR LEAF TO BE

REPLACED WITHIN EXISTING DOOR

FRAME, EXISTING HARDWARE TO BE

REUSED.

-HOLLOW METAL DOOR FRAME AND

WINDOW FRAME TO BE PAINTED P1.

Room Schedule - Scope Summary - Phase 1

ROOM INFO ARCHITECTURAL

HVAC ELECTRICAL PLUMBING

FIRE

PROTECTION

ICRA LEVEL OF

PRECAUTION OTHER NOTESNUMBER NAME AREA (±) PHASE WALLS

FLOORING &

BASE CEILING DOOR WINDOW

CG-20 CORRIDOR 353 SF 1 N/A N/A C1, C4 D2 N/A H1 E1, E4 N/A N/A IV WORK TO BE DONE OFF-HOURS AS DETERMINED BY VA, AREA TO REMAIN OPEN DURING DAY

CG-26 CORRIDOR 492 SF 1 N/A N/A N/A D2 N/A N/A E1 N/A N/A IV WORK TO BE DONE OFF-HOURS AS DETERMINED BY VA, AREA TO REMAIN OPEN DURING DAY

GA-146 EXAM 16 97 SF 1 W2, W3, W4, W5 F1, F2 C1, C2 D1 N/A H1 E2 N/A N/A IV

GA-148 OFFICE 54 SF 1 N/A N/A C1 N/A N/A H1 E2 N/A N/A IV WORK TO BE DONE OFF-HOURS AS DETERMINED BY VA, AREA TO REMAIN OPEN DURING DAY

GA-187 EXAM 11 120 SF 1 W2, W3, W4, W5 F1, F2 C1, C2 D1 G1 H1 E2 N/A N/A IV

ROOF ROOF 2554 SF 1 N/A N/A N/A N/A N/A H3 E3 N/A N/A IV ROOFTOP WORK TO SPAN MULTIPLE PHASES AS NEEDED

EXTERIOR WALL - NEW LOCATION FOR ROOF ACCESS STAIR

VIEW OF EXISTING EXTERIOR WALL AND ROOF

ACCESS LADDER:

-ROOF ACCESS LADDER TO BE DEMOLISHED.

-NEW ROOF ACCESS STAIR TO BE INSTALLED

IN SAME AREA. NEW CONCRETE PAD FOR

STAIR SUPPORT TO BE INSTALLED ADJACENT

TO BUILDING.

-EXISTING EXTERIOR WALL TO REMAIN. NEW

SURFACE MOUNTED LIGHT TO BE INSTALLED

AT EXTERIOR WALL.

PHASE 1

Revision: Date:

Miriam Image

B

C

A

1 10 11

NEW ROOFTOP

EQUIPMENT TO TIE INTO

EXISTING DUCT

PENETRATIONS

NEW CURBS TO BE

PROVIDED FOR NEW AHU

NEW AHU

TIE-IN AT EXISTING

DUCTWORK, USING EXISTING

PENETRATIONS, SEE HVAC

AT NEW/MODIFIED ROOF

PENETRATIONS, PATCH

AND MATCH EXISTING

ROOF SYSTEM

NEW EXHAUST FAN ON

EXISTING RAISED CURB

EXISTING AHU

TO REMAIN

TIE-IN AT EXISTING

DUCTWORK, USING

EXISTING PENETRATIONS,

SEE HVAC

PATCH ROOF AT NEW

DUCT SUPPORTS,

SEE HVAC FOR

LOCATIONS

NEW ROOF CURB,

COORDINATE FINAL

SIZE WITH SELECTED AHU

AS801

AS701

PENETRATIONS TO BE

LOCATED ABOVE CEILING

IN ROOM GA-184 BELOW

ROOF MOUNTING PADS

AS801

CUT OPENING IN EXISTING RAISED CURB AND

PROVIDE SUPPORT FRAMING AS REQ. TO

SUPPORT NEW EQUIPMENT; REMOVE EXISTING

CURB FLASHING AND PROVIDE NEW SLOPED

METAL FLASHING HIP ROOF AND FRAMING OVER

EXISTING CURB.

AS801

AS801

GENERAL NOTE:

DO NOT VOID EXISTING ROOFING WARRANTY. CONTRACTOR

SHALL COORDINATE WITH THE GARLAND COMPANY, INC. AND

PRIOR TO ANY WORK SHALL WALK THE ROOF WITH GARLAND

REPRESENTATIVE TO INSPECT EXISTING SYSTEM.

CONTRACTOR SHALL MODIFY EXISTING ROOF FOR NEW

SYSTEMS ONLY AS APPROVED BY THE GARLAND COMPANY,

INC. AND CONTRACTOR SHALL INSPECT FINAL MODIFICATION

OF ROOF SYSTEMS WITH GARLAND REPRESENTATIVE.

THE GARLAND COMPANY, INC. REPRESENTATIVE FOR VAMC

WEST ROXBURY IS: BRIAN KENDER, (617) 755-4655

CONTRACTOR OPTION TO USE

PITCH POCKET FOR MULTIPLE

PIPE PENETRATIONS

AS801

WALL REMARKS

W1. REMOVE WALL MOUNTED MOVABLE FURNISHINGS, TAPE OFF & PROTECT FIXED

DEVICES CONNECTED TO MEPFP DURING RENOVATION.

W2. REPAIR AND PATCH GWB DAMAGE.

W3. NEW PAINT THROUGHOUT.

W4. NEW WALL PROTECTION WAINSCOT ALL WALLS.

W5. PICK RESISTANT SEALANT AT ALL JOINT AND MATERIAL INTERFACES.

FLOORING/BASE REMARKS

F1. REMOVE EXISTING FLOORING & BASE.

F2. INSTALL NEW WSF1 FLOORING & INTEGRAL BASE, INSTALL TRANSITION WITH

ADJACENT FLOORING AT DOOR.

CEILING REMARKS

C1. REMOVE CEILING AS REQUIRED TO INSTALL NEW HVAC PIPING, REINSTALL

EXISTING CEILING AFTER HVAC INSTALLATION COMPLETE.

C2. CLEAN AND REPLACE DAMAGED CEILING TILES & EXISTING DEVICES, MINIMAL

REPLACEMENT EXPECTED.

C3. DEMOLISH PORTIONS OF EXISTING CEILING AS REQUIRED TO INSTALL LIGATURE-

RESISTANT FIXTURES. PATCH AND REPAIR GWB AS REQUIRED TO CREATE EVEN

SURFACE AND PAINT.

C4. RELOCATE (1) LIGHT FIXTURE.

DOOR REMARKS

D1. REPLACE DOOR LEAF WITHIN EXISTING FRAME, REUSE EXISTING HARDWARE.

D2. REPLACE CARD READER AT EXISTING DOOR.

D3. NEW LIGATURE RESISTANT DOOR AND HARDWARE.

WINDOW REMARKS

G1. PAINT FRAME P1.

HVAC REMARKS

H1. ABOVE CEILING PIPING WORK, TEMPORARY REMOVAL OF CEILING.

H2. NEW LIGATURE-RESISTANT CEILING DEVICES.

H3. NEW ROOFTOP EQUIPMENT.

ELECTRICAL REMARKS

E1. NEW CARD READER.

E2. TEMPORARY REMOVAL OF CEILING FOR ABOVE CEILING WORK, DISCONNECT

ELECTRICAL DEVICES ARE REQUIRED.

E3. CONNECTIONS TO NEW ROOFTOP EQUIPMENT.

E4. RELOCATE (1) LIGHT FIXTURE.

E5. NEW LIGATURE-RESISTANT CEILING & WALL DEVICES.

FIRE PROTECTION REMARKS

FP1. NEW LIGATURE-RESISTANT SPRINKLER(S) PER FP DRAWINGS.

ICRA LEVEL OF PRECAUTION: REFER TO SPECIFICATIONS FOR FULL REQUIREMENTS

BY LEVEL OF ICRA PRECAUTIONS REQUIRED.

RENOVATION SCOPE REMARKS

1 HOUR FIRE RESISTANCE RATED PARTITION (TOP:

NEW; BOTTOM: ETR)

UNRATED NEW PARTITION

EXISTING PARTITION TO REMAIN

EXISTING PARTITION TO BE DEMOLISHED

WALL INDICATIONS

ED SPACES NOT IN SCOPE (MAY BE

IMPACTED BY TEMP. ICRA

PARTITIONS, SEE DEMO PLANS)

IMPACTED BY RENOVATIONS FOR

CEILING/UTILITY CONNECTION

WORK ONLY

IN SCOPE

ROOM INFILL

FINISH SCHEDULE

P1 PAINT - BM WHITE DOWN

GWB PAINTED GYPSUM WALL

BOARD CEILING

P2 PAINT - SW KOI POND

P3 PAINT - SW BREEZY

WP1 WALL PROTECTION - INPRO

PALLADIUM RIGID SHEET W/ RICOCHET

TOP CAP - ANTIQUE WHITE

WSF1 SHEET VINYL - MANNINGTON PARADIGM II FLOW - EXEMPLAR

RB1 RESILIENT BASE - MANNINGTON IDEAL BASE - GRAY BEIGE

Room name

XXXX

XXXX

XXXX

XXXX

101ROOM

NUMBER

ROOM NAME

BASE

FLOOR

CEILING

WALL

FINISHES

ALL FINISHES IN TAG ARE FIELD

FINISHES, ACCENTS NOTED ON PLANS

TEMPORARY PARTITION*

*PROVIDE TEMPORARY PARTITIONS AND SYSTEMS AS REQUIRED TO MEET ICRA

PRECAUTIONS DURING CONSTRUCTION AND UPON COMPLETION OF EACH

PHASE. SEE ROOM SCHED. FOR PRECAUTION LEVEL. ALL TEMPORARY

PARTITION LAYOUTS TO BE APPROVED BY VA PRIOR TO INSTALLATION, 4'-0"

CLEAR WIDTH MINIMUM TO BE MAINTAINED AT PATIENT AREA CORRIDORS

THROUGHOUT CONSTRUCTION, 3'-0" TO BE MAINTAINED AT OTHER AREAS.

NOT IN SCOPE

CG1 CORNER GUARD - ACROVYN SM-10

#100 EGGSHELL - VIF HEIGHT FROM

TOP OF BASE TO CEILING

(ALL PRODUCTS LISTED BELOW ARE B.O.D.)

P4 PAINT - BM WILD MULBERRY

DEMOLITION KEY NOTES*

REMOVE DOOR LEAF, FRAME TO REMAIN IN PLACE, RETAIN EXISTING HARDWARE

FOR REUSE AT DOOR.

REMOVE FURNISHINGS, EQUIPMENT, CUBICLE CURTAIN, AND SIGNAGE THAT ARE

NOT CONNECTED TO BUILDINGS SERVICES FROM THROUGHOUT ROOM

TEMPORARILY.

TAPE-OFF AND PROTECT HARD-WIRED DEVICES AND EQUIPMENT INCLUDING AT

CEILINGS AND HEADWALL DURING CONSTRUCTION

DEMO PORTIONS OF CEILING FOR INSTALLATION OF NEW DEVICES.

TEMPORARILY REMOVE PORTIONS OF CEILING FOR ABOVE CEILING MEPFP WORK

FLOORING, BASE, AND WALL PROTECTION TO BE REMOVED

*REFER TO SHEET GI002 FOR GENERAL NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

Phase

ARCHITECT STAMPCONSULTANTS 523A4-20-205

VAMC WEST ROXBURY

EXPAND EMERGENCY

DEPARTMENT

William Pevear Architects, Inc.

872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139

T: 617.335.5186

Alares Engineering

248 Copeland Street, 2nd Floor Quincy, MA 02169

T: 617.481.6390

MEP/FP ENGINEER

Drawing Scale

321 4 5 6 7 8

A

B

C

D

E

321 4 5 6 7 8

1400 VFW PARKWAY, WEST ROXBURY, MA 02132

01/31/2024

CODE CONSULTANT

Hastings Consulting

142 Hanlon Road Holliston, MA 01746

T: 508.397.8417

N

C U s e rs \M ir ia m \D o c u m e n ts

\1

-V

A W

R E

D E x p a n s io n m ir ia m

X L

H .r v t

/3

/2

:0

:0

A

M

1/4" = 1'-0"

AS401B

PHASE 1 - ROOF PLAN

Room Schedule - Scope Summary - Phase 1

ROOM INFO ARCHITECTURAL

HVAC ELECTRICAL PLUMBING

FIRE

PROTECTION

ICRA LEVEL OF

PRECAUTION OTHER NOTESNUMBER NAME AREA (±) PHASE WALLS

FLOORING &

BASE CEILING DOOR WINDOW

CG-20 CORRIDOR 353 SF 1 N/A N/A C1, C4 D2 N/A H1 E1, E4 N/A N/A IV WORK TO BE DONE OFF-HOURS AS DETERMINED BY VA, AREA TO REMAIN OPEN DURING DAY

CG-26 CORRIDOR 492 SF 1 N/A N/A N/A D2 N/A N/A E1 N/A N/A IV WORK TO BE DONE OFF-HOURS AS DETERMINED BY VA, AREA TO REMAIN OPEN DURING DAY

GA-146 EXAM 16 97 SF 1 W2, W3, W4, W5 F1, F2 C1, C2 D1 N/A H1 E2 N/A N/A IV

GA-148 OFFICE 54 SF 1 N/A N/A C1 N/A N/A H1 E2 N/A N/A IV WORK TO BE DONE OFF-HOURS AS DETERMINED BY VA, AREA TO REMAIN OPEN DURING DAY

GA-187 EXAM 11 120 SF 1 W2, W3, W4, W5 F1, F2 C1, C2 D1 G1 H1 E2 N/A N/A IV

ROOF ROOF 2554 SF 1 N/A N/A N/A N/A N/A H3 E3 N/A N/A IV ROOFTOP WORK TO SPAN MULTIPLE PHASES AS NEEDED

PHASE 1

Revision: Date:

Miriam Image

AS402

AS402

AS401

EXAM 13

WSF1

RB1

P1,WP1

ETR

GA-184

EXAM 12

WSF1

RB1

P1,WP1

ETR

GA-186

CORRIDOR

CG-21B

P2

P3

GA-186

GA-184

/2

V

IF

± 11' - 0" VIF

/2

V

IF

CG1

EXAM 13

GA-184

EXAM 12

GA-186

9' - 0"CH

ETR

9' - 0"CH

ETR

9' - 0"CH

ETR

8' - 6"CH

ETR

CORRIDOR

CG-21B

CEILING & ALL CEILING

DEVICES & EQUIPMENT

EXISTING TO REMAIN,

PROTECT IN PLACE DURING

RENOVATION

CEILING & ALL CEILING

DEVICES & EQUIPMENT

EXISTING TO REMAIN,

PROTECT IN PLACE DURING

RENOVATION

EXAM 13

GA-184

EXAM 12

GA-186

CEILING WORK IN CORRIDOR

TO BE DONE OFF-HOURS

5'-0" MIN

±6'-0"

T

T

02 03

05 06

02 03

05 06

WALL PROTECTION

WAINSCOT, AS

SCHEDULED

BASE AS SCHEDULED

P1

EXISTING

HEADWALL TO

REMAIN, PROTECT

IN PLACE DURING

CONSTRUCTION

WALL PROTECTION

WAINSCOT, AS

SCHEDULED

BASE AS SCHEDULED

P114

AS501

TYP

WALL PROTECTION WAINSCOT,

AS SCHEDULED

BASE AS SCHEDULED

P1

EXISTING SINK TO REMAIN

GA-186

EXISTING WINDOW

TO REMAIN, PAINT

FRAME P1

EXISTING FRAME TO

REMAIN, LEAF TO BE

REPLACED, REUSE

EXISTING HARDWARE; PAINT

FRAME P1

WALL PROTECTION

WAINSCOT, AS

SCHEDULED

BASE AS SCHEDULED

P3

CG1

WALL PROTECTION

WAINSCOT, AS

SCHEDULED

BASE AS SCHEDULED

P1

EXISTING

HEADWALL TO

REMAIN, PROTECT

IN PLACE DURING

CONSTRUCTION

WALL PROTECTION

WAINSCOT, AS

SCHEDULED

BASE AS SCHEDULED

P2

AS501

TYP

WALL PROTECTION WAINSCOT,

AS SCHEDULED

BASE AS SCHEDULED

P1

EXISTING SINK TO REMAIN

GA-184

EXISTING WINDOW

TO REMAIN, PAINT

FRAME P1

EXISTING FRAME TO

REMAIN, LEAF TO BE

REPLACED, REUSE

EXISTING HARDWARE; PAINT

FRAME P1

WALL PROTECTION

WAINSCOT, AS

SCHEDULED

BASE AS SCHEDULED

P1

WALL REMARKS

W1. REMOVE WALL MOUNTED MOVABLE FURNISHINGS, TAPE OFF & PROTECT FIXED

DEVICES CONNECTED TO MEPFP DURING RENOVATION.

W2. REPAIR AND PATCH GWB DAMAGE.

W3. NEW PAINT THROUGHOUT.

W4. NEW WALL PROTECTION WAINSCOT ALL WALLS.

W5. PICK RESISTANT SEALANT AT ALL JOINT AND MATERIAL INTERFACES.

FLOORING/BASE REMARKS

F1. REMOVE EXISTING FLOORING & BASE.

F2. INSTALL NEW WSF1 FLOORING & INTEGRAL BASE, INSTALL TRANSITION WITH

ADJACENT FLOORING AT DOOR.

CEILING REMARKS

C1. REMOVE CEILING AS REQUIRED TO INSTALL NEW HVAC PIPING, REINSTALL

EXISTING CEILING AFTER HVAC INSTALLATION COMPLETE.

C2. CLEAN AND REPLACE DAMAGED CEILING TILES & EXISTING DEVICES, MINIMAL

REPLACEMENT EXPECTED.

C3. DEMOLISH PORTIONS OF EXISTING CEILING AS REQUIRED TO INSTALL LIGATURE-

RESISTANT FIXTURES. PATCH AND REPAIR GWB AS REQUIRED TO CREATE EVEN

SURFACE AND PAINT.

C4. RELOCATE (1) LIGHT FIXTURE.

DOOR REMARKS

D1. REPLACE DOOR LEAF WITHIN EXISTING FRAME, REUSE EXISTING HARDWARE.

D2. REPLACE CARD READER AT EXISTING DOOR.

D3. NEW LIGATURE RESISTANT DOOR AND HARDWARE.

WINDOW REMARKS

G1. PAINT FRAME P1.

HVAC REMARKS

H1. ABOVE CEILING PIPING WORK, TEMPORARY REMOVAL OF CEILING.

H2. NEW LIGATURE-RESISTANT CEILING DEVICES.

H3. NEW ROOFTOP EQUIPMENT.

ELECTRICAL REMARKS

E1. NEW CARD READER.

E2. TEMPORARY REMOVAL OF CEILING FOR ABOVE CEILING WORK, DISCONNECT

ELECTRICAL DEVICES ARE REQUIRED.

E3. CONNECTIONS TO NEW ROOFTOP EQUIPMENT.

E4. RELOCATE (1) LIGHT FIXTURE.

E5. NEW LIGATURE-RESISTANT CEILING & WALL DEVICES.

FIRE PROTECTION REMARKS

FP1. NEW LIGATURE-RESISTANT SPRINKLER(S) PER FP DRAWINGS.

ICRA LEVEL OF PRECAUTION: REFER TO SPECIFICATIONS FOR FULL REQUIREMENTS

BY LEVEL OF ICRA PRECAUTIONS REQUIRED.

RENOVATION SCOPE REMARKS

1 HOUR FIRE RESISTANCE RATED PARTITION (TOP:

NEW; BOTTOM: ETR)

UNRATED NEW PARTITION

EXISTING PARTITION TO REMAIN

EXISTING PARTITION TO BE DEMOLISHED

WALL INDICATIONS

ED SPACES NOT IN SCOPE (MAY BE

IMPACTED BY TEMP. ICRA

PARTITIONS, SEE DEMO PLANS)

IMPACTED BY RENOVATIONS FOR

CEILING/UTILITY CONNECTION

WORK ONLY

IN SCOPE

ROOM INFILL

FINISH SCHEDULE

P1 PAINT - BM WHITE DOWN

GWB PAINTED GYPSUM WALL

BOARD CEILING

P2 PAINT - SW KOI POND

P3 PAINT - SW BREEZY

WP1 WALL PROTECTION - INPRO

PALLADIUM RIGID SHEET W/ RICOCHET

TOP CAP - ANTIQUE WHITE

WSF1 SHEET VINYL - MANNINGTON PARADIGM II FLOW - EXEMPLAR

RB1 RESILIENT BASE - MANNINGTON IDEAL BASE - GRAY BEIGE

Room name

XXXX

XXXX

XXXX

XXXX

101ROOM

NUMBER

ROOM NAME

BASE

FLOOR

CEILING

WALL

FINISHES

ALL FINISHES IN TAG ARE FIELD

FINISHES, ACCENTS NOTED ON PLANS

TEMPORARY PARTITION*

*PROVIDE TEMPORARY PARTITIONS AND SYSTEMS AS REQUIRED TO MEET ICRA

PRECAUTIONS DURING CONSTRUCTION AND UPON COMPLETION OF EACH

PHASE. SEE ROOM SCHED. FOR PRECAUTION LEVEL. ALL TEMPORARY

PARTITION LAYOUTS TO BE APPROVED BY VA PRIOR TO INSTALLATION, 4'-0"

CLEAR WIDTH MINIMUM TO BE MAINTAINED AT PATIENT AREA CORRIDORS

THROUGHOUT CONSTRUCTION, 3'-0" TO BE MAINTAINED AT OTHER AREAS.

NOT IN SCOPE

CG1 CORNER GUARD - ACROVYN SM-10

#100 EGGSHELL - VIF HEIGHT FROM

TOP OF BASE TO CEILING

(ALL PRODUCTS LISTED BELOW ARE B.O.D.)

P4 PAINT - BM WILD MULBERRY

DEMOLITION KEY NOTES*

REMOVE DOOR LEAF, FRAME TO REMAIN IN PLACE, RETAIN EXISTING HARDWARE

FOR REUSE AT DOOR.

REMOVE FURNISHINGS, EQUIPMENT, CUBICLE CURTAIN, AND SIGNAGE THAT ARE

NOT CONNECTED TO BUILDINGS SERVICES FROM THROUGHOUT ROOM

TEMPORARILY.

TAPE-OFF AND PROTECT HARD-WIRED DEVICES AND EQUIPMENT INCLUDING AT

CEILINGS AND HEADWALL DURING CONSTRUCTION

DEMO PORTIONS OF CEILING FOR INSTALLATION OF NEW DEVICES.

TEMPORARILY REMOVE PORTIONS OF CEILING FOR ABOVE CEILING MEPFP WORK

FLOORING, BASE, AND WALL PROTECTION TO BE REMOVED

*REFER TO SHEET GI002 FOR GENERAL NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

Phase

ARCHITECT STAMPCONSULTANTS 523A4-20-205

VAMC WEST ROXBURY

EXPAND EMERGENCY

DEPARTMENT

William Pevear Architects, Inc.

872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139

T: 617.335.5186

Alares Engineering

248 Copeland Street, 2nd Floor Quincy, MA 02169

T: 617.481.6390

MEP/FP ENGINEER

Drawing Scale

321 4 5 6 7 8

A

B

C

D

E

321 4 5 6 7 8

1400 VFW PARKWAY, WEST ROXBURY, MA 02132

01/31/2024

CODE CONSULTANT

Hastings Consulting

142 Hanlon Road Holliston, MA 01746

T: 508.397.8417

N

C U s e rs \M ir ia m \D o c u m e n ts

\1

-V

A W

R E

D E x p a n s io n m ir ia m

X L

H .r v t

/3

/2

:0

:1

A

M

1/4" = 1'-0"

AS402

PHASE 2 - EXAMS 12 (GA-186) &

EXAM 13 (GA-184) - DEMOLITION

& NEW DRAWINGS

SCALE: 1/4" = 1'-0"

PHASE 2 - NEW- ENLARGED PLAN - GA-184 (EXAM 13) & GA-186

(EXAM 12)

SCALE: 1/4" = 1'-0"

03 PHASE 2 - ENLARGED RCP- GA-184 (EXAM 13) & GA-186 (EXAM 12)

SCALE: 1/4" = 1'-0"

PHASE 2 - DEMO - ENLARGED PLAN - GA-184 (EXAM 13) & GA-186

(EXAM 12)

SCALE: 1/4" = 1'-0"

04 GA-186 (EXAM 12) - 1

SCALE: 1/4" = 1'-0"

05 GA-186 (EXAM 12) - 2

SCALE: 1/4" = 1'-0"

06 GA-186 (EXAM 12) - 3

SCALE: 1/4" = 1'-0"

07 GA-186 (EXAM 12) - 4

SCALE: 1/4" = 1'-0"

08 GA-184 (EXAM 13) - 1

SCALE: 1/4" = 1'-0"

09 GA-184 (EXAM 13) - 2

SCALE: 1/4" = 1'-0"

10 GA-184 (EXAM 13) - 3

SCALE: 1/4" = 1'-0"

11 GA-184 (EXAM 13) - 4

Room Schedule - Scope Summary - Phase 2

ROOM INFO ARCHITECTURAL

HVAC ELECTRICAL PLUMBING

FIRE

PROTECTION

ICRA LEVEL OF

PRECAUTION OTHER NOTESNUMBER NAME AREA (±) PHASE WALLS

FLOORING &

BASE CEILING DOOR WINDOW

CG-21B CORRIDOR 65 SF 2 N/A N/A C1 N/A N/A H1 E2 N/A N/A IV WORK TO BE DONE OFF-HOURS AS DETERMINED BY VA, AREA TO REMAIN OPEN DURING DAY

GA-184 EXAM 13 126 SF 2 W1, W2, W3, W4 F1, F2 C1, C2 D1 G1 H1 E2 N/A N/A IV

GA-186 EXAM 12 113 SF 2 W1, W2, W3, W4 F1, F2 C1, C2 D1 G1 H1 E2 N/A N/A IV

PHASE 2

Revision: Date:

Miriam Image

AS40304

EXAM 1

WSF1

RB1

P1,WP1

ETR

GA-169

EXAM 2

WSF1

RB1

P1,WP1

ETR

GA-170

CORRIDOR

CG-23

AS40308

AS402

P2 P3

GA-169 GA-170

V

IF

± 8' - 11 1/2" VIF ± 9' - 3" VIF

V

IF

CG1

EXAM 1

GA-169

EXAM 2

GA-170

CORRIDOR

CG-23

CEILING & ALL CEILING

DEVICES & EQUIPMENT

EXISTING TO REMAIN,

PROTECT IN PLACE

DURING RENOVATION

CEILING & ALL CEILING

DEVICES & EQUIPMENT

EXISTING TO REMAIN,

PROTECT IN PLACE

DURING RENOVATION

EXAM 1

GA-169

EXAM 2

GA-170

CORRIDOR

CG-23

TEMPORARY

PARTITION

M

IN

T

01 01

WALL PROTECTION

WAINSCOT, AS

SCHEDULED

BASE AS SCHEDULED

P1

AS501

TYP

CG1

P1

WALL PROTECTION WAINSCOT,

AS SCHEDULED

BASE AS SCHEDULED

EXISTING HEADWALL TO

REMAIN, PROTECT IN

PLACE DURING

CONSTRUCTION

P3

WALL PROTECTION

WAINSCOT, AS

SCHEDULED

BASE AS SCHEDULED

WALL PROTECTION WAINSCOT,

AS SCHEDULED

BASE AS SCHEDULED

EXISTING SINK TO REMAIN

P1

GA-169

EXISTING FRAME TO

REMAIN, LEAF TO BE

REPLACED, REUSE

EXISTING HARDWARE; PAINT

FRAME P1

WALL PROTECTION

WAINSCOT, AS

SCHEDULED

P2

BASE AS SCHEDULED

AS501

TYP

P1

WALL PROTECTION

WAINSCOT, AS

SCHEDULED

BASE AS SCHEDULED

EXISTING WINDOW

TO REMAIN, PAINT

FRAME P1

EXISTING HEADWALL TO

REMAIN, PROTECT IN

PLACE DURING

CONSTRUCTION

P1

WALL PROTECTION

WAINSCOT, AS

SCHEDULED

BASE AS SCHEDULED

EXISTING WINDOW

TO REMAIN

WALL PROTECTION

WAINSCOT, AS SCHEDULED

BASE AS SCHEDULED

P1

GA-170

EXISTING WINDOW

TO REMAIN, PAINT

FRAME P1

EXISTING FRAME TO

REMAIN, LEAF TO BE

REPLACED, REUSE

EXISTING HARDWARE; PAINT

FRAME P1

WALL REMARKS

W1. REMOVE WALL MOUNTED MOVABLE FURNISHINGS, TAPE OFF & PROTECT FIXED

DEVICES CONNECTED TO MEPFP DURING RENOVATION.

W2. REPAIR AND PATCH GWB DAMAGE.

W3. NEW PAINT THROUGHOUT.

W4. NEW WALL PROTECTION WAINSCOT ALL WALLS.

W5. PICK RESISTANT SEALANT AT ALL JOINT AND MATERIAL INTERFACES.

FLOORING/BASE REMARKS

F1. REMOVE EXISTING FLOORING & BASE.

F2. INSTALL NEW WSF1 FLOORING & INTEGRAL BASE, INSTALL TRANSITION…