Attachment 06a - Drawings 523A4-20-205 - Part1.pdf
PDF 16 MB Posted
- Attached to
- Y1DA--VISN 1 Construction MATOC Federal contract opportunity
- Solicitation number
- 36C77624R0098
About this file
This document is a comprehensive set of architectural and engineering construction drawings for the expansion of the Emergency Department at the VA Boston Healthcare System's West Roxbury location. The project, designated as VA Project #523A4-20-205, involves renovating and upgrading multiple exam rooms across eight distinct construction phases. The renovation encompasses 16 exam rooms and associated corridors, with specific focus on modernizing spaces, upgrading finishes, installing new mechanical and electrical systems, and implementing ligature-resistant design elements, particularly in mental health spaces.
The drawings detail extensive modifications including replacement of door hardware, installation of new wall protection and flooring, repainting, upgrading ceiling systems, and installing new HVAC and piping infrastructure. The project includes a new exterior roof access stair and will be implemented in carefully sequenced phases to minimize disruption to hospital operations. The design team includes William Pevear Architects, Alares Engineering, and Hastings Consulting, with construction documents dated January 31, 2024. The renovation will be fully sprinklered and follows VA infection control and safety guidelines, with specific attention to maintaining hospital functionality during construction.
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
Phase
ARCHITECT STAMPCONSULTANTS 523A4-20-205
VAMC WEST ROXBURY
EXPAND EMERGENCY
DEPARTMENT
William Pevear Architects, Inc.
872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139
T: 617.335.5186
Alares Engineering
248 Copeland Street, 2nd Floor Quincy, MA 02169
T: 617.481.6390
MEP/FP ENGINEER
Drawing Scale
321 4 5 6 7 8
A
B
C
D
E
321 4 5 6 7 8
1400 VFW PARKWAY, WEST ROXBURY, MA 02132
01/31/2024
CODE CONSULTANT
Hastings Consulting
142 Hanlon Road Holliston, MA 01746
T: 508.397.8417
N
C U s e rs \M ir ia m \D o c u m e n ts
\1
-V
A W
R E
D E x p a n s io n m ir ia m
X L
H .r v t
/3
/2
:0
:2
A
M
GI000
COVER
DEPARTMENT OF VETERANS AFFAIRS
BOSTON HEALTHCARE SYSTEM - WEST ROXBURY
EXPAND EMERGENCY DEPARTMENT
1400 VFW PARKWAY, WEST ROXBURY, MA 02132
VA Project # 523A4-20-205
WPA Project # 1643
CONSTRUCTION DOCUMENTS
January 31, 2024
ARCHITECT
William Pevear Architects, Inc.
872 Massachusetts Avenue, Suite 2-9 Cambridge, MA 02139 T: 617.335.5186
MEP/FP ENGINEER
Alares Engineering
248 Copeland Street, 2nd Floor Quincy, MA 02169 T: 617.481.6390
CODE CONSULTANT
Hastings Consulting
142 Hanlon Road Holliston, MA 01746 T: 508.397.8417
V F
W P
A R
K W
A Y
SPRIN
G S
T
PROJECT LOCATION
N
VAMC WEST ROXBURY
BLDG 3
Revision: Date:
EMERGENCY DEPARTMENT
AMBULATORY ENTRY
EMERGENCY
DEPARTMENT
AMBULANCE
ENTRY
CONNECTION
TO PHARMACY
CONNECTION TO
RADIOLOGY
CONNECTION TO MAIN
HOSPITAL ENTRY
EXAM ROOMS -
IN SCOPE
MENTAL HEALTH EXAM
ROOM - IN SCOPE
BOUNDARY OF EMERGENCY
DEPARTMENT
EMERGENCY
DEPARTMENT
wpevear Text Box
Miriam Image
Miriam Image wpevear Text Box May 23, 2024 wpevear Text Box Pre-bid revision 01 wpevear Text Box May 23, 2024
& AND
L ANGLE
@ AT
CENTERLINE
Ø DIAMETER
# POUND
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
ALUM ALUMINUM
ALT ALTERNATE
AV AUDIOVISUAL
BO BOTTOM OF
BOT BOTTOM
BOS BOTTOM OF STEEL
B/T BENCH TOP
CC CONTRACTOR FURNISHED, CONTRACTOR INSTALLED
CG CORNER GUARD
CH CEILING HEIGHT
CJ CONTROL JOINT
CLG CEILING
CMU CONCRETE MASONRY UNIT
CO CASED OPENING
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
COORD COORDINATE
CPT CARPET
CT CERAMIC TILE
CUH CABINET UNIT HEATER
DF DRINKING FOUNTAIN
DIA DIAMETER
DN DOWN
DWG DRAWING
E EAST
EIFS EXTERIOR INSULATION & FINISH SYSTEM
EJ EXPANSION JOINT
EMER SHR EMERGENCY SHOWER
EP ELECTRICAL PANEL
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXIST EXISTING
F/F FACE TO FACE
FACP FIRE ALARM CONTROL PANEL
FCO FLOOR CLEANOUT
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDV FIRE DEPARTMENT VALVE
FEC FIRE EXTINGUISHER CABINET
FE FIRE EXTINGUISHER
FF FINISH FACE
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FHR FIRE HOSE RACK
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FTR FINNED TUBE RADIATION
G GAS
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GFRC GLASS FIBER REINFORCED CONCRETE
GFRG GLASS FIBER REINFORCED GYPSUM
GWB GYPSUM WALL BOARD
HB HOSE BIBB
HPT HIGH POINT
HR HOUR
HVAC HEATING, VENTILATION, AIR CONDITIONING
HW HOT WATER
ID INSIDE DIAMETER
IF INSIDE FACE
IG INSULATED GLASS
INT INTERIOR
L LEFT
LAB LABORATORY
LPT LOW POINT
MAX MAXIMUM
MECH MECHANICAL
MH MANHOLE
MIN MINIMUM
MO MASONRY OPENING
N NORTH
NIC NOT IN CONTRACT
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
OF/CI OWNER FURNISHED/CONTRACTOR INSTALLED
OFD OVERFLOW DRAIN
OPH OPPOSITE HAND
O OXYGEN
PA PANIC ALARM
QT QUARRY TILE
R RISER
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REF REFRIGERATOR
RO ROUGH OPENING
RWL RAIN WATER LEADER
ABBREVIATIONS
BUILDING / SECTOR ---
BUILDING / SECTOR ---
LINETYPES
MATCH LINE
OVERHEAD
(OVERCOUNTER AND SOFFITS)
REFERENCE (COLUMN LINES
AND MATCHLINES)
BELOW AND BEYOND
(UNDERCOUNTER AND FOOTINGS)
BREAK LINE
DOCUMENT REVISION 01
DEDUCT ALTERNATE
TYPICAL DOOR;
90 DEGREE OPEN DOOR
180 DEGREE OPEN DOOR
DOORS
EXISTING DOOR
GENERAL DEMOLITION NOTES
S SOUTH
SHR SHOWER
SHRD SHOWER DRAIN
SIM SIMILAR
SST STAINLESS STEEL
STC SOUND TRANSMISSION CLASS
S/T SHELF (EQUIPMENT PLACEMENT)
TD TRENCH DRAIN
TO TOP OF
TOC TOP OF CONCRETE SLAB
TOS TOP OF STEEL
TOW TOP OF WALL
TYP TYPICAL
UL UNDERWRITERS LABORATORIES
UON UNLESS OTHERWISE NOTED
U/C UNDER COUNTER
VAC VACUUM
VC VA FURNISHED, CONTRACTOR INSTALLED
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VV VA FURNISHED, VA INSTALLED
W WEST
WH WALL HYDRANT
ABBREVIATIONS SYMBOLS
SECTION IDENTIFICATION
SHEET NUMBER
DETAIL
GENERAL NOTES
1.DIMENSIONS TO LOCATE PARTITIONS ARE GIVEN TYPICALLY TO THE FINISHED FACE. PARTITIONS THAT GRAPHICALLY CENTER ON A GRID OR WINDOW MULLION ARE TO BE CENTERED AS SHOWN UNLESS OTHERWISE NOTED. NEW PARTITIONS AND SURFACES THAT ARE SHOWN TO ALIGN WITH EXISTING SURFACES ARE TO BE
ALIGNED AND FINISHED SMOOTH AND FLUSH.
2. CONTRACT LIMIT LINES SHALL BE WHERE INDICATED ON THE DRAWINGS. HOWEVER, IN ORDER TO COMPLETE OR FACILITATE INDICATED WORK, CONTRACTOR MAY BE REQUIRED TO CARRY OUT WORK ADJACENT TO OR NEARBY, BUT OUTSIDE INDICATED LIMITS.
3. CONTRACTOR SHALL VIF ALL EXISTING DIMENSIONS PRIOR TO START OF CONSTRUCTION AND NOTIFY VA OF ANY
DISCREPANCIES.
4. PROVIDE FIRE BLOCKING AT ALL PENETRATIONS AT RATED WALLS.
5. PROVIDE ACOUSTIC SEALANT AT ALL PENETRATIONS AT UNRATED WALLS.
6. EGRESS TO BE MAINTAINED THROUGHOUT ENTIRETY OF CONSTRUCTION, PROVIDE TEMPORARY SIGNAGE AS
REQ'D.
1. DEMOLITION PLANS ARE NOT COMPREHENSIVE. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY AND ADDRESS EXISTING CONDITIONS AS REQUIRED TO ACCOMPLISH THE NEW WORK SHOWN OR REASONABLY IMPLIED. IN GENERAL, THE INTENT OF DEMOLITION IS INDICATED WITH DASHED LINES ON THE DRAWINGS, BUT THIS SCOPE IS DIAGRAMMATIC IN NATURE AND IS COMPLIMENTED BY THE COMPLETE SET OF
CONTRACT DOCUMENTS.
2. THE CONTRACTOR SHALL EXERCISE CARE SO THAT ONLY THE CONSTRUCTION INDICATED OR REASONABLY IMPLIED TO BE REMOVED SHALL BE DEMOLISHED. THE EXISTING CONSTRUCTION TO REMAIN SHALL BE LEFT INTACT AND UNDAMAGED. IN AREAS WHERE ARCHITECTURAL CONSTRUCTION IS TO BE REMOVED, STRUCTURAL, MEP, AND OTHER BUILDING SYSTEM ELEMENTS ARE TO BE PRESERVED.
3. PROVIDE TEMPORARY PARTITIONS AND SYSTEMS AS REQUIRED TO MEET SPECIFIC ROOM/ BUILDING ICRA CLASS PRECAUTION DURING CONSTRUCTION AND UPON COMPLETION OF EACH FLOOR/ BUILDING. SEE ROOM DESIGNATIONS FOR ICRA CLASS. ALL TEMPORARY PARITION LAYOUTS TO BE APPROVED BY VA PRIOR TO INSALLATION, 4'-0" CLEAR WIDTH MINIMUM TO BE MAINTAINED AT CORRIDORS THROUGHOUT CONSTRUCTION.
4. ALL DEBRIS SHALL BE THE PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED AND DISPOSED OF IN A SAFE AND LAWFUL MANNER. ALL SALVAGE SHALL BE THE PROPERTY OF THE OWNER AND REUSED ON THE PROJECT AS INDICATED. CONTRACTOR SHALL TAKE RESPONSIBILITY FOR THE TEMPORARY STORAGE OF SALVAGE TO BE REUSED. THE CONTRACTOR SHALL REMOVE ALL SALVAGE SO AS NOT TO DAMAGE AND SHALL
BE RESPONSIBLE FOR REPLACEMENT OF DAMAGED SALVAGE.
5. WHEN REMOVING PORTIONS OF WALL OR CEILINGS TAKE ALL PRECAUTIONS TO PREVENT STRUCTURAL AND
BUILDING INFRASTRUCTURE DAMAGE.
6. SEE MEP/FP DRAWINGS FOR SYSTEM DEMOLITION. TAKE ALL PRECAUTIONS TO PREVENT DAMAGE. REMOVE, REPLACE, OR CAP AS REQUIRED TO PRESERVE SERVICE TO BE MAINTAINED. IN THE EVENT DAMAGE OCCURS, PATCH AND REPAIR ALL SURFACES DISTURBED BY DEMOLITION, AND REFINISH FOR A CLEAN AND UNIFORM
APPEARANCE.
7. CONTRACTOR TO COORDINATE WITH COR (3) WEEKS IN ADVANCE FOR ANY REQUIRED MEP/FP SYSTEM SHUT DOWNS AND START-UPS RELEVANT TO DEMOLITION. CAP OR RECONNECT MEP/FP SYSTEMS SERVING OCCUPIED AREAS OUTSIDE OF PROJECT SCOPE. INTERRUPTION TO HOSPITAL OPERATIONS WILL LIKELY BE REQUIRED TO
TAKE PLACE DURING OFF-HOURS.
8. MAIN CORRIDORS TO REMAIN CLEAR AND FUNCTIONAL THROUGHOUT DEMOLITION AND CONSTRUCTION.
9. PROTECT, PATCH AND REPAIR ALL FINISHES ADJACENT TO THE DEMOLITION AREA.
10. ALL SALVAGED ITEMS NOT TO BE REUSED ON THIS PROJECT TO BE RETURNED TO OWNER.
11. MAINTAIN CONNECTION AND FUNCTION OF ALL SYSTEMS SERVING FLOORS ABOVE AND BELOW DURING
CONSTRUCTION.
12. CONSTRUCTION AND (RE)LOCATION OF UTILITIES MAY REQUIRE SELECTIVE DEMOLITION AND PATCHING AT WALLS ABOVE CEILING. CONTRACTOR SHALL PATCH AND MATCH WALL SYSTEMS, INCLUDING BUT NOT LIMITED
TO RATING AND ACOUSTIC INTEGRITY.
13. ROOF DEMO NOTE: DO NOT VOID EXISTING ROOFING WARRANTY. CONTRACTOR SHALL COORDINATE WITH
THE GARLAND COMPANY, INC. AND PRIOR TO ANY WORK SHALL WALK THE ROOF WITH GARLAND
REPRESENTATIVE TO INSPECT EXISTING SYSTEM. CONTRACTOR SHALL MODIFY EXISTING ROOF FOR NEW SYSTEMS ONLY AS APPROVED BY THE GARLAND COMPANY, INC. AND THE CONTRACTOR SHALL INSPECT FINAL MODIFICATION OF ROOF SYSTEMS WITH THE GARLAND REPRESENTATIVE. THE GARLAND COMPANY, INC.
REPRESENTATIVE FOR VAMC WEST ROXBURY IS; BRIAN KENDER (617) 755-4655
Room name
1-101
ROOM TAG ROOM NAME
ROOM NUMBER
ROOM IDENTIFICATION
DETAIL
DEDUCT ALT SYMBOL DA #X
XX
DETAIL
DETAIL NAME
SCALE 1/8" = 1'-0"
SPRINKLER
SMOKE DETECTOR S
TROFFER LIGHT
SUPPLY GRILL DIFFUSER
RECESSED CEILING LIGHT/
WALL MOUNTED LIGHT
RETURN GRILL
MAT1
MAT2
MATERIAL
TRANSITION TAG
FIRE ALARM PULL STATION
(KEY ACTIVATION)
FIRE ALARM COMBINATION
AUDIO/VISUAL INDICATOR
NOTE:
MEP&FP AND IT/TEL-DATA SYMBOLS MAY DIFFER, SEE
MEP&FP SYMBOL SHEETS FOR MORE INFORMATION
F
BUILDING NUMBER
SYMBOLS
COLUMN LINE
DOOR SYMBOL XXX
X.X
X.X
PAINT COLOR DESIGNATION
PARTITION TYPE SYMBOL B
DETAIL IDENTIFICATION
SHEET NUMBER
DETAIL CALLOUT
9'-0"CH
TYPE
CEILING SYMBOL
CEILING TYPE
CEILING HEIGHT
XXX
GYPSUM BOARD CEILING
ACOUSTICAL CEILING TILE
MATERIAL INDICATIONS
TYPICAL MOUNTING HEIGHTS
SIGNAGE SYMBOL S1
1 HOUR FIRE RESISTANCE RATED PARTITION (TOP:
NEW; BOTTOM: ETR)
UNRATED NEW PARTITION
EXISTING PARTITION TO REMAIN
EXISTING PARTITION TO BE DEMOLISHED
WALL INDICATIONS
ED SPACES NOT IN SCOPE (MAY BE
IMPACTED BY TEMP. ICRA
PARTITIONS, SEE DEMO PLANS)
IMPACTED BY RENOVATIONS FOR
CEILING/UTILITY CONNECTION
WORK ONLY
IN SCOPE
ROOM INFILL
FINISH SCHEDULE
P1 PAINT - BM WHITE DOWN
GWB PAINTED GYPSUM WALL
BOARD CEILING
P2 PAINT - SW KOI POND
P3 PAINT - SW BREEZY
WP1 WALL PROTECTION - INPRO
PALLADIUM RIGID SHEET W/ RICOCHET
TOP CAP - ANTIQUE WHITE
WSF1 SHEET VINYL - MANNINGTON PARADIGM II FLOW - EXEMPLAR
RB1 RESILIENT BASE - MANNINGTON IDEAL BASE - GRAY BEIGE
Room name
XXXX
XXXX
XXXX
XXXX
101ROOM
NUMBER
ROOM NAME
BASE
FLOOR
CEILING
WALL
FINISHES
ALL FINISHES IN TAG ARE FIELD
FINISHES, ACCENTS NOTED ON PLANS
TEMPORARY PARTITION*
*PROVIDE TEMPORARY PARTITIONS AND SYSTEMS AS REQUIRED TO MEET ICRA
PRECAUTIONS DURING CONSTRUCTION AND UPON COMPLETION OF EACH
PHASE. SEE ROOM SCHED. FOR PRECAUTION LEVEL. ALL TEMPORARY
PARTITION LAYOUTS TO BE APPROVED BY VA PRIOR TO INSTALLATION, 4'-0"
CLEAR WIDTH MINIMUM TO BE MAINTAINED AT PATIENT AREA CORRIDORS
THROUGHOUT CONSTRUCTION, 3'-0" TO BE MAINTAINED AT OTHER AREAS.
NOT IN SCOPE
CG1 CORNER GUARD - ACROVYN SM-10
#100 EGGSHELL - VIF HEIGHT FROM
TOP OF BASE TO CEILING
(ALL PRODUCTS LISTED BELOW ARE B.O.D.)
P4 PAINT - BM WILD MULBERRY
CORNER GUARD (CG)HANDRAIL
V A
R
IE
S
6"
CORNER GUARD
HANDRAIL
T Y
P
WAINSCOT WALL
PROTECTION
T Y
P
BUMPER
BUMPER
0' - 6"
NOTE: MINIMUM LENGTH FOR HANDRAIL/BUMPER TO BE 12".
PROVIDE AT ALL CORRIDOR LOCATIONS WITH WALL LENGTH
GREATER THAN 24". HANDRAIL AND BUMPER TO TERMINATE
6" FROM DOOR FRAME, TYP.
6"
PATIENT ROOM
SIGNAGE
EXIT
WALL MOUNTED EXIT SIGN
(@ DOOR) U.O.N
LIGHT SWITCH ELECTRICAL
OUTLET
CARD
READER
(CR)
3' -1
0"
1' -6
DOOR
OPERATOR
(DO)
3' -1
0"
NURSE CALL
DEVICE
(NC)
3' -0
ELECTRICAL
OUTLET
ABOVE DESK
3' -0
3' -1
0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
Phase
ARCHITECT STAMPCONSULTANTS 523A4-20-205
VAMC WEST ROXBURY
EXPAND EMERGENCY
DEPARTMENT
William Pevear Architects, Inc.
872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139
T: 617.335.5186
Alares Engineering
248 Copeland Street, 2nd Floor Quincy, MA 02169
T: 617.481.6390
MEP/FP ENGINEER
Drawing Scale
321 4 5 6 7 8
A
B
C
D
E
321 4 5 6 7 8
1400 VFW PARKWAY, WEST ROXBURY, MA 02132
01/31/2024
CODE CONSULTANT
Hastings Consulting
142 Hanlon Road Holliston, MA 01746
T: 508.397.8417
N
C U s e rs \M ir ia m \D o c u m e n ts
\1
-V
A W
R E
D E x p a n s io n m ir ia m
X L
H .r v t
/3
/2
:0
:3
A
M
As indicated
GI002
SHEET LIST, GENERAL NOTES,
ABBREVIATIONS, & GRAPHIC
STANDARDS
Sheet List
Sheet Number Sheet Name
00_GENERAL INFORMATION
GI000 COVER
GI002 SHEET LIST, GENERAL NOTES, ABBREVIATIONS, & GRAPHIC
STANDARDS
GI103 LIFE SAFETY PLAN
GI120 PHASING OVERVIEW
01_STRUCTURAL
S100 EXTERIOR STAIR REINFORCED CONRETE LANDING PAD
02_ARCHITECTURAL
AS401 PHASE 1 - EXAM 11 (GA-187) & EXAM 16 (GA-146) - DEMOLITION &
NEW DRAWINGS
AS401B PHASE 1 - ROOF PLAN
AS402 PHASE 2 - EXAMS 12 (GA-186) & EXAM 13 (GA-184) - DEMOLITION &
NEW DRAWINGS
AS403 PHASE 3 - EXAM 1 (GA-169), EXAM 2 (GA-170), & CORRIDOR -
DEMOLITION & NEW DRAWINGS
AS404 PHASE 4 - EXAM 3 (GA-171) & EXAM 4 (GA-172) - DEMOLITION &
NEW DRAWINGS
AS405 PHASE 5 - EXAM 5 (GA-173) & EXAM 6 (GA178) - DEMOLITION &
NEW DRAWINGS
AS406 PHASE 6 - EXAM 7 (GA-179), EXAM 8 (GA-180) & CORRIDOR -
DEMOLITION & NEW DRAWINGS
AS407 PHASE 7 - EXAM 9 (GA-180) & EXAM 10 (GA-182) - DEMOLITION &
NEW DRAWINGS
AS408 PHASE 8 - EXAM 14 (GA-147) & EXAM 15 (GA145) - DEMOLITION &
NEW DRAWINGS
AS501 PARTITION DETAILS, DOOR SCHEDULE & DETAILS, INTERIOR
DETAILS
AS701 EXTERIOR STAIR ENLARGED PLAN AND SECTIONS
AS702 EXTERIOR STAIR DETAILS
AS801 ROOF DETAILS
03_FIRE PROTECTION
FX001 GENERAL FIRE PROTECTION NOTES
FX100 GROUND FLOOR FIRE PROTECTION PLANS
FX500 GENERAL FIRE PROTECTION DETAILS
05_MECHANICAL
MG001 HVAC GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS
MG002 HVAC GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS
MD002 LOW ROOF - DEMOLITION
MH001 GROUND LEVEL - NEW WORK - DUCTWORK
MH002 LOW ROOF - NEW WORK
MP001 GROUND LEVEL - NEW WORK - PIPING
MI100 HVAC DETAILS
MI101 HVAC DETAILS
MI102 HVAC DETAILS
MI200 HVAC SCHEDULE
MI300 HVAC CONTROLS
06_ELECTRICAL
E001 ELECTRICAL SYMBOLS & NOTES
E002 ELECTRICAL ABBREVIATIONS
ED100 BUILDING 3 EXISTING CONDITIONS / DEMOLITION ELECTRICAL
PLAN
ED101 BUILDING 3 EXISTING CONDITIONS / DEMOLITION ELECTRICAL
REFLECTED CEILING PLAN
ED102 BUILDING 3 ROOF EXISTING CONDITIONS / DEMOLITION
ELECTRICAL PLAN
E100 BUILDING 3 GROUND FLOOR NEW WORK ELECTRICAL PLAN
E101 BLDG 3 ONE-LINE DIAGRAM & ROOM GC-100 ELECTRICAL NEW
WORK PLAN
E102 BUILDING 3 GROUND FLOOR NEW WORK LIGHTING PLAN
E103 BUILDING 3 ROOF NEW WORK ELECTRICAL PLANS
E104 BUILDING 3 GROUND FLOOR SPECIAL SYSTEMS PLAN
E500 ELECTRICAL DETAILS
Grand total: 43
Revision: Date:
Miriam Image
Miriam Image
UP B
C
D
G
A
0.2
3 4 6 72
PHASE 8
PHASE 2
PHASE 3
PHASE 1
PHASE 5
PHASE 6
PHASE 1
PHASE 7
PHASE 4
CEILING WORK IN CORRIDOR
TO BE DONE OFF-HOURS
CEILING WORK IN CORRIDOR
TO BE DONE OFF-HOURS
REPLACE CARD READER
TRIAGE ROOM WORKFLOW TO
BE TEMPORARILY REDIRECTED
DURING CEILING WORK
EXAM 16
GA-146
CORRIDOR
CG-20MECHANICAL
ROOM
GA-157
OFFICE
GA-148
CORRIDOR
CG-20
EXAM 11
GA-187
EXAM 12
GA-186
EXAM 13
GA-184
CORRIDOR
CG-21B
EXAM 14
GA-147
EXAM 15
GA-145
EXAM 10
GA-182
EXAM 9
GA-181
EXAM 8 MH
GA-180
CORRIDOR
CG-25
EXAM 7
ISOLATION
GA-179
EXAM 6
ISOLATION
GA-178
CORRIDOR
CG-26
PHASE 5
EXAM 1
GA-169
EXAM 2
GA-170
EXAM 3
GA-171
EXAM 4
GA-172
EXAM 5
GA-173
REPLACE CARD READER
REPLACE CARD
READER
F.5
0.5
PHASE 6
CG-26
CG-25
CG-20
WORKSTATION TO REMAIN
IN USE DURING
CONSTRUCTION
WORKSTATION TO REMAIN
IN USE DURING
CONSTRUCTION
B
C
A
1 3 4 112
N
NEW AHU
PHASE 1 & 2 PHASE 1
NEW CORES FOR PIPE LOCATIONS
EXISTING
TO REMAIN
AHU
PHASE 1 - REPLACE FINISHES AT GA-187 (EXAM 11) & GA-146 (EXAM 16);
BEGIN ROOFTOP WORK FOR AHU INSTALLATION; INSTALL NEW HVAC
PIPING ABOVE ROOMS CG-20, GA-146 (EXAM 16), GA-148, GA-187 (EXAM
11); CORRIDOR DOOR CARD READER REPLACEMENT; INSTALL
EXTERIOR ROOF ACCESS STAIR.
EMERGENCY DEPT. BOUNDARY
PHASE 2 - REPLACE FINISHES AT GA-186 (EXAM 12) & GA-184 (EXAM 13);
COMPLETE ROOF TOP WORK; COMPLETE INSTALLATION OF NEW HVAC
PIPING ABOVE ROOMS GA-186, GA-184, CG-21B.
* INFILL AREA INDICATES SPACE COMPLETE AT PHASE, TEMPORARY WORK MAY
OCCUR AT PHASES BEFORE PHASE COMPLETE FOR ENABLING WORK, SEE PHASE-
BY-PHASE PLANS FOR SPECIFICS
GENERAL PHASING NOTES:
1. MAINTAIN EGRESS THROUGHOUT CONSTRUCTION. LIMIT OBSTRUCTION OF
CORRIDOR TO MAINTAIN OPERATION OF ED DURING CONSTRUCTION.
2. PRIOR TO EACH SUBSEQUENT PHASE, THE CONTRACTOR SHALL COMPLETE THE
CURRENT PHASE INCLUDING: A) REMOVE TEMPORARY PARTITION(S), ICRA BARRIERS,
AND CONTROLS NOT REQUIRED FOR NEXT PHASE, B) VA SHALL APPROVE
COMPLETION, MOVE EQUIPMENT/FURNISHINGS, AND TRANSFER HOSPITAL
OPERATIONS TO NEW SPACES, C) UPON SUCCESSFUL COMPLETION OF TRANSFER OF
HOSPITAL OPERATIONS, THE VA SHALL REMOVE ALL EQUIPMENT, FURNISHINGS, AND
VA PROPERTY TO BE RETAINED FROM AREAS OF NEXT PHASE, D) CONTRACTOR
SHALL MODIFY TEMPORARY WORK AREAS AND INSTALL NEXT PHASE TEMPORARY
PARTITIONS, ICRA BARRIERS AND CONTROL SYSTEMS AND OBTAIN VA COR
APPROVAL TO BEGIN NEXT PHASE.
3. *PROVIDE TEMPORARY PARTITIONS AND SYSTEMS AS REQUIRED TO MEET ICRA
PRECAUTIONS DURING CONSTRUCTION AND UPON COMPLETION OF EACH PHASE.
SEE ROOM SCHEDULE FOR PRECAUTION LEVEL. ALL TEMPORARY PARITION LAYOUTS
TO BE APPROVED BY VA PRIOR TO INSTALLATION, 4'-0" CLEAR WIDTH MINIMUM TO BE
MAINTAINED AT PATIENT AREA CORRIDORS THROUGHOUT CONSTRUCTION, 3'-0" TO
BE MAINTAINED AT AREAS WHERE PATIENT BED ACCESS IS NOT REQUIRED.
PHASING GRAPHIC KEY*
PHASE 3 - REPLACE FINISHES AT GA-169 (EXAM 1) & GA-170 (EXAM 2)
PHASE 4 - REPLACE FINISHES AT GA-171 (EXAM 3) & GA-172 (EXAM 4)
PHASE 5 - REPLACE FINISHES AT GA-173 (EXAM 5) & GA-178 (EXAM 6)
PHASE 6 - ROOM GA-180 (EXAM 8) REPLACE FINISHES, REPLACE
FIXTURES AND HARDWARE WITH APPROVED LIGATURE-RESISTANT
PRODUCTS. ROOM GA-179 (EXAM 7) REPLACE FINISHES; REPLACE
DOOR LEAVES AND HARDWARE AT DOOR CG-25.
PHASE 7 - REPLACE FINISHES AT GA-181 (EXAM 9) & GA-182 (EXAM 10)
PHASE 8 - REPLACE FINISHES AT GA-147 (EXAM 14) & GA-145 (EXAM 15)
NOT IN SCOPE
WALL REMARKS
W1. REMOVE WALL MOUNTED MOVABLE FURNISHINGS, TAPE OFF & PROTECT FIXED
DEVICES CONNECTED TO MEPFP DURING RENOVATION.
W2. REPAIR AND PATCH GWB DAMAGE.
W3. NEW PAINT THROUGHOUT.
W4. NEW WALL PROTECTION WAINSCOT ALL WALLS.
W5. PICK RESISTANT SEALANT AT ALL JOINT AND MATERIAL INTERFACES.
FLOORING/BASE REMARKS
F1. REMOVE EXISTING FLOORING & BASE.
F2. INSTALL NEW WSF1 FLOORING & INTEGRAL BASE, INSTALL TRANSITION WITH
ADJACENT FLOORING AT DOOR.
CEILING REMARKS
C1. REMOVE CEILING AS REQUIRED TO INSTALL NEW HVAC PIPING, REINSTALL
EXISTING CEILING AFTER HVAC INSTALLATION COMPLETE.
C2. CLEAN AND REPLACE DAMAGED CEILING TILES & EXISTING DEVICES, MINIMAL
REPLACEMENT EXPECTED.
C3. DEMOLISH PORTIONS OF EXISTING CEILING AS REQUIRED TO INSTALL LIGATURE-
RESISTANT FIXTURES. PATCH AND REPAIR GWB AS REQUIRED TO CREATE EVEN
SURFACE AND PAINT.
C4. RELOCATE (1) LIGHT FIXTURE.
DOOR REMARKS
D1. REPLACE DOOR LEAF WITHIN EXISTING FRAME, REUSE EXISTING HARDWARE.
D2. REPLACE CARD READER AT EXISTING DOOR.
D3. NEW LIGATURE RESISTANT DOOR AND HARDWARE.
WINDOW REMARKS
G1. PAINT FRAME P1.
HVAC REMARKS
H1. ABOVE CEILING PIPING WORK, TEMPORARY REMOVAL OF CEILING.
H2. NEW LIGATURE-RESISTANT CEILING DEVICES.
H3. NEW ROOFTOP EQUIPMENT.
ELECTRICAL REMARKS
E1. NEW CARD READER.
E2. TEMPORARY REMOVAL OF CEILING FOR ABOVE CEILING WORK, DISCONNECT
ELECTRICAL DEVICES ARE REQUIRED.
E3. CONNECTIONS TO NEW ROOFTOP EQUIPMENT.
E4. RELOCATE (1) LIGHT FIXTURE.
E5. NEW LIGATURE-RESISTANT CEILING & WALL DEVICES.
FIRE PROTECTION REMARKS
FP1. NEW LIGATURE-RESISTANT SPRINKLER(S) PER FP DRAWINGS.
ICRA LEVEL OF PRECAUTION: REFER TO SPECIFICATIONS FOR FULL REQUIREMENTS
BY LEVEL OF ICRA PRECAUTIONS REQUIRED.
RENOVATION SCOPE REMARKS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
Phase
ARCHITECT STAMPCONSULTANTS 523A4-20-205
VAMC WEST ROXBURY
EXPAND EMERGENCY
DEPARTMENT
William Pevear Architects, Inc.
872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139
T: 617.335.5186
Alares Engineering
248 Copeland Street, 2nd Floor Quincy, MA 02169
T: 617.481.6390
MEP/FP ENGINEER
Drawing Scale
321 4 5 6 7 8
A
B
C
D
E
321 4 5 6 7 8
1400 VFW PARKWAY, WEST ROXBURY, MA 02132
01/31/2024
CODE CONSULTANT
Hastings Consulting
142 Hanlon Road Holliston, MA 01746
T: 508.397.8417
N
C U s e rs \M ir ia m \D o c u m e n ts
\1
-V
A W
R E
D E x p a n s io n m ir ia m
X L
H .r v t
/3
/2
:0
:4
A
M
As indicated
GI120
PHASING OVERVIEW
SCALE: 3/32" = 1'-0"
1 PHASING OVERVIEW - LEVEL AG
SCALE: 3/32" = 1'-0"
2 PHASING OVERVIEW - ROOF
Room Schedule - Scope Summary
ROOM INFO ARCHITECTURAL
HVAC ELECTRICAL PLUMBING
FIRE
PROTECTION
ICRA LEVEL OF
PRECAUTION OTHER NOTESNUMBER NAME AREA (±) PHASE WALLS
FLOORING &
BASE CEILING DOOR WINDOW
CG-20 CORRIDOR 353 SF 1 N/A N/A C1, C4 D2 N/A H1 E1, E4 N/A N/A IV WORK TO BE DONE OFF-HOURS AS DETERMINED BY VA, AREA TO REMAIN OPEN DURING DAY
CG-26 CORRIDOR 492 SF 1 N/A N/A N/A D2 N/A N/A E1 N/A N/A IV WORK TO BE DONE OFF-HOURS AS DETERMINED BY VA, AREA TO REMAIN OPEN DURING DAY
GA-146 EXAM 16 97 SF 1 W2, W3, W4, W5 F1, F2 C1, C2 D1 N/A H1 E2 N/A N/A IV
GA-148 OFFICE 54 SF 1 N/A N/A C1 N/A N/A H1 E2 N/A N/A IV WORK TO BE DONE OFF-HOURS AS DETERMINED BY VA, AREA TO REMAIN OPEN DURING DAY
GA-187 EXAM 11 120 SF 1 W2, W3, W4, W5 F1, F2 C1, C2 D1 G1 H1 E2 N/A N/A IV
ROOF ROOF 2554 SF 1 N/A N/A N/A N/A N/A H3 E3 N/A N/A IV ROOFTOP WORK TO SPAN MULTIPLE PHASES AS NEEDED
CG-21B CORRIDOR 65 SF 2 N/A N/A C1 N/A N/A H1 E2 N/A N/A IV WORK TO BE DONE OFF-HOURS AS DETERMINED BY VA, AREA TO REMAIN OPEN DURING DAY
GA-184 EXAM 13 126 SF 2 W1, W2, W3, W4 F1, F2 C1, C2 D1 G1 H1 E2 N/A N/A IV
GA-186 EXAM 12 113 SF 2 W1, W2, W3, W4 F1, F2 C1, C2 D1 G1 H1 E2 N/A N/A IV
GA-169 EXAM 1 117 SF 3 W1, W2, W3, W4 F1, F2 C2 D1 N/A N/A N/A N/A N/A IV
GA-170 EXAM 2 131 SF 3 W1, W2, W3, W4 F1, F2 C2 D1 G1 N/A N/A N/A N/A IV
GA-171 EXAM 3 129 SF 4 W1, W2, W3, W4 F1, F2 C2 D1 G1 N/A N/A N/A N/A IV
GA-172 EXAM 4 124 SF 4 W1, W2, W3, W4 F1, F2 C2 D1 N/A N/A N/A N/A N/A IV
GA-173 EXAM 5 129 SF 5 W1, W2, W3, W4 F1, F2 C2 D1 G1 N/A N/A N/A N/A IV
GA-178 EXAM 6 ISOLATION 121 SF 5 W1, W2, W3, W4 F1, F2 C2 D1 G1 N/A N/A N/A N/A IV
CG-25 CORRIDOR 382 SF 6 N/A N/A N/A D2 N/A N/A E1 N/A N/A IV WORK TO BE DONE OFF-HOURS AS DETERMINED BY VA, AREA TO REMAIN OPEN DURING DAY
GA-179 EXAM 7 ISOLATION 112 SF 6 W1, W2, W3, W4 F1, F2 C2 D1 G1 N/A N/A N/A N/A IV
GA-180 EXAM 8 MH 112 SF 6 W1, W2, W3, W4,
W5
F1, F2 C3 D3 N/A H2 E5 1 FP1 IV ALL FINISHES & DEVICES AT ROOM INTERIOR TO BE SUITABLE FOR MH SECURE SETTING, GA-181 EXAM 9 111 SF 7 W1, W2, W3, W4 F1, F2 C2 D1 N/A N/A N/A N/A N/A IV
GA-182 EXAM 10 112 SF 7 W1, W2, W3, W4 F1, F2 C2 D1 N/A N/A N/A N/A FP1 IV
GA-145 EXAM 15 104 SF 8 W1, W2, W3, W4 F1, F2 C2 D1 N/A N/A N/A N/A N/A IV
GA-147 EXAM 14 103 SF 8 W1, W2, W3, W4 F1, F2 C2 D1 N/A N/A N/A N/A N/A IV
Revision: Date:
Miriam Image
UP
9' - 6"
S-100
1% SLOPE
#4 @ 12" O.C EACH WAY
1" ABOVE GRADE
12" MIN COMPACTED CRUSHED STONE
8" CONCRETE SLAB
SECTION VIEW
19' - 6"
4' - 6"
HAUNCHED SLAB AT STAIR SUPPORTS.
REFER TO ARCHITECTURAL FOR EXACT
DIMENSIONS OF STAIR SUPPORTS. (TYP.)
8"
GRADE
GRADE
7" +/- ABOVE GRADE (V.I.F)
8" MIN
Project NumberProject NumberProject NumberProject Number
Building NumberBuilding NumberBuilding NumberBuilding Number
Drawing NumberDrawing NumberDrawing NumberDrawing Number
Project TitleProject TitleProject TitleProject Title
LocationLocationLocationLocation
Issue DateIssue DateIssue DateIssue Date CheckedCheckedCheckedChecked DrawnDrawnDrawnDrawn
Drawing TitleDrawing TitleDrawing TitleDrawing Title
Approved:Approved:Approved:Approved:
VA FORM 08 - 6231
AAAA
CONSTRUCTION
DOCUMENTS
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
BBBB
CCCC
DDDD
EEEE
PhasePhasePhasePhase
ARCHITECT STAMPSTAMPSTAMPSTAMPCONSULTANTS 523A4-20-205
VAMC WEST ROXBURY
EXPAND EMERGENCY
DEPARTMENT
William Pevear Architects, Inc.
872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139
T: 617.335.5186
Alares Engineering
248 Copeland Street, 2nd Floor Quincy, MA 02169
T: 617.481.6390
MEP/FP ENGINEER
Drawing ScaleDrawing ScaleDrawing ScaleDrawing Scale
333322221111 4444 5555 6666 7777 8888
AAAA
BBBB
CCCC
DDDD
EEEE
333322221111 4444 5555 6666 7777 8888
1400 VFW PARKWAY, WEST ROXBURY, MA 02132
01/31/2024
CODE CONSULTANT
Hastings Consulting
142 Hanlon Road Holliston, MA 01746
T: 508.397.8417
N
C U s e rs \Q n g u y e n
\D o c u m e n ts
\W R
-E D
M e c h
S ta m p e d b g o ld s te in R
C
Y M
.r v t
/2
/2
:3 :2
P
M
3/8" = 1'-0"
S-100
EXTERIOR STAIR REINFORCED
CONCRETE LANDING PAD
QSQSQSQS QNQNQNQN
3/8" = 1'-0"
Exterior Stair Reinforced Concrete Landing Pad
GENERAL NOTES:
1. THE STRUCTURAL DRAWING SHALL BE USED IN CONJECTION WITH ALL OTHER CONTRACT DRAWINGS AND SPECIFICATIONS. REFER TO ARCHITECTURAL FOR MORE DETAILS.
2. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING, COORDINATING AND VERIFYING ALL DIMENSIONS IN THE FIELD PRIOR TO COMMENCING WORK. THE CONTRACTOR SHALL IMMEDIATELY REPORT ANY DISCREPANCY TO THE ARCHITECT AND ENGINEER AS A REQUEST FOR INFORMATION (RFI).
3. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING IN THE FIELD THE EXISTENCE AND LOCATION OF BURIED AND/OR EMBEDDED UTILITIES AFFECTED BY THE WORK OF THIS CONTRACT.
4. IN ACCORDANCE WITH SPECIFICATION, TESTING AND INSPECTION OF STRUCTURAL WORK SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THE COST FOR TESTING AND INSPECTIONS WILL BE
PAID BY THE CONTRACTOR.
5. CARE SHALL BE TAKEN BY THE CONTRACTOR TO PROTECT EXISTING SYSTEMS AND SURFACES INDATED TO REMAIN. ALL DAMAGE RESULTING FROM THE CONTRACTOR'S OPERATIONS SHALL BE REPAIRED AS APPROVED BY THE CONTRACTING OFFICER AT NO ADDITIONAL COST TO THE GOVERNMENT.
6. THE CONTRACTOR SHALL PROVIDE BARRICADES AT ALL WORK AREAS TO PREVENT PERSONNEL FROM ENTERING AREAS OF WORK, UNO.
7. THE CONTRACTOR SHALL COORDINATE THE TIMING AND SEQUENCE OF WORK WITH THE CONTRACTING OFFICER, AND BUILDING TENANTS.
3/8" = 1'-0"
REINFORCED CONCRETE LANDING PAD
DETAILS
NOTES:
1. THE CONCRETE REINFORCEMENT SHALL BE #4 AT 12" ON THE CENTER EACH WAY AND CENTERED IN THE SLAB.
2. THE MINIMUM CONCRETE COMPRESSIVE STRENGTH SHALL BE 5000 PSI AND MINIMUM 6% AIR ENTRAINED.
3. THE EDGE OF THE SLAB SHALL BE 3/4" CHAMFERED AND THE SURFACE OF THE CONCRETE SHALL BE BROOM FINISH.
4. MAXIMUM SPACING FOR CONTROL JOINT IS 10-FT.
5. ADD CONCRETE CORROSION INHIBITOR (SIKA CNI OR APPROVED EQUAL) PER MANUFACTURER RECOMMENDATION.
6. INSTALL CONBCRETE PAD FLAT AND LEVELED. ENSURE MINIMUM HAUNCH DEPTH IS ACHIEVED.
Revision:Revision:Revision:Revision: Date:Date:Date:Date:
EXAM 11
WSF1
RB1
P1,WP1
ETR
GA-187
AS40104
GA-187
P2
± 11' - 0" VIF
V
IF
EXAM 11
GA-187
CEILING & ALL CEILING
DEVICES & EQUIPMENT
EXISTING TO REMAIN,
PROTECT IN PLACE
DURING RENOVATION
EXAM 16
WSF1
RB1
P1,WP1
ETR
GA-146
AS401
P4
GA-146
/2
V
IF
± 10' - 8" VIF
CG1
EXAM 16
GA-146
CEILING & ALL CEILING
DEVICES & EQUIPMENT
EXISTING TO REMAIN,
PROTECT IN PLACE
DURING RENOVATION
EXAM 16
GA-146
TEMPORARY
PARTITION
4'-0" MIN
±4'-6"
T
EXAM 11
GA-187
TEMPORARY
PARTITION
4'-0" MIN
±4'-6"
T
WALL PROTECTION
WAINSCOT AS
SCHEDULED
BASE AS SCHEDULED
P1
EXISTING
HEADWALL TO
REMAIN, PROTECT
IN PLACE DURING
CONSTRUCTION
WALL PROTECTION
WAINSCOT AS
SCHEDULED
BASE AS SCHEDULED
P214
AS501
TYP
WALL PROTECTION
WAINSCOT, AS SCHEDULED
BASE AS SCHEDULED
EXISTING WINDOW
TO REMAIN, PAINT
FRAME P1 P1
EXISTING SINK TO REMAIN
GA-187
EXISTING FRAME TO
REMAIN, LEAF TO BE
REPLACED, REUSE
EXISTING HARDWARE; PAINT
FRAME P1
WALL PROTECTION
WAINSCOT, AS
SCHEDULED
BASE AS SCHEDULED
P1
WALL PROTECTION
WAINSCOT, AS
SCHEDULED
BASE AS SCHEDULED
P1
AS501
TYP
CG1
WALL PROTECTION
WAINSCOT, AS
SCHEDULED
BASE AS SCHEDULED
P4
WALL PROTECTION WAINSCOT,
AS SCHEDULED
BASE AS SCHEDULED
P1
EXISTING SINK TO REMAIN
GA-146
EXISTING FRAME TO
REMAIN, LEAF TO BE
REPLACED, REUSE
EXISTING HARDWARE; PAINT
FRAME P1
WALL PROTECTION
WAINSCOT, AS
SCHEDULED
BASE AS SCHEDULED
P1
WALL REMARKS
W1. REMOVE WALL MOUNTED MOVABLE FURNISHINGS, TAPE OFF & PROTECT FIXED
DEVICES CONNECTED TO MEPFP DURING RENOVATION.
W2. REPAIR AND PATCH GWB DAMAGE.
W3. NEW PAINT THROUGHOUT.
W4. NEW WALL PROTECTION WAINSCOT ALL WALLS.
W5. PICK RESISTANT SEALANT AT ALL JOINT AND MATERIAL INTERFACES.
FLOORING/BASE REMARKS
F1. REMOVE EXISTING FLOORING & BASE.
F2. INSTALL NEW WSF1 FLOORING & INTEGRAL BASE, INSTALL TRANSITION WITH
ADJACENT FLOORING AT DOOR.
CEILING REMARKS
C1. REMOVE CEILING AS REQUIRED TO INSTALL NEW HVAC PIPING, REINSTALL
EXISTING CEILING AFTER HVAC INSTALLATION COMPLETE.
C2. CLEAN AND REPLACE DAMAGED CEILING TILES & EXISTING DEVICES, MINIMAL
REPLACEMENT EXPECTED.
C3. DEMOLISH PORTIONS OF EXISTING CEILING AS REQUIRED TO INSTALL LIGATURE-
RESISTANT FIXTURES. PATCH AND REPAIR GWB AS REQUIRED TO CREATE EVEN
SURFACE AND PAINT.
C4. RELOCATE (1) LIGHT FIXTURE.
DOOR REMARKS
D1. REPLACE DOOR LEAF WITHIN EXISTING FRAME, REUSE EXISTING HARDWARE.
D2. REPLACE CARD READER AT EXISTING DOOR.
D3. NEW LIGATURE RESISTANT DOOR AND HARDWARE.
WINDOW REMARKS
G1. PAINT FRAME P1.
HVAC REMARKS
H1. ABOVE CEILING PIPING WORK, TEMPORARY REMOVAL OF CEILING.
H2. NEW LIGATURE-RESISTANT CEILING DEVICES.
H3. NEW ROOFTOP EQUIPMENT.
ELECTRICAL REMARKS
E1. NEW CARD READER.
E2. TEMPORARY REMOVAL OF CEILING FOR ABOVE CEILING WORK, DISCONNECT
ELECTRICAL DEVICES ARE REQUIRED.
E3. CONNECTIONS TO NEW ROOFTOP EQUIPMENT.
E4. RELOCATE (1) LIGHT FIXTURE.
E5. NEW LIGATURE-RESISTANT CEILING & WALL DEVICES.
FIRE PROTECTION REMARKS
FP1. NEW LIGATURE-RESISTANT SPRINKLER(S) PER FP DRAWINGS.
ICRA LEVEL OF PRECAUTION: REFER TO SPECIFICATIONS FOR FULL REQUIREMENTS
BY LEVEL OF ICRA PRECAUTIONS REQUIRED.
RENOVATION SCOPE REMARKS
1 HOUR FIRE RESISTANCE RATED PARTITION (TOP:
NEW; BOTTOM: ETR)
UNRATED NEW PARTITION
EXISTING PARTITION TO REMAIN
EXISTING PARTITION TO BE DEMOLISHED
WALL INDICATIONS
ED SPACES NOT IN SCOPE (MAY BE
IMPACTED BY TEMP. ICRA
PARTITIONS, SEE DEMO PLANS)
IMPACTED BY RENOVATIONS FOR
CEILING/UTILITY CONNECTION
WORK ONLY
IN SCOPE
ROOM INFILL
FINISH SCHEDULE
P1 PAINT - BM WHITE DOWN
GWB PAINTED GYPSUM WALL
BOARD CEILING
P2 PAINT - SW KOI POND
P3 PAINT - SW BREEZY
WP1 WALL PROTECTION - INPRO
PALLADIUM RIGID SHEET W/ RICOCHET
TOP CAP - ANTIQUE WHITE
WSF1 SHEET VINYL - MANNINGTON PARADIGM II FLOW - EXEMPLAR
RB1 RESILIENT BASE - MANNINGTON IDEAL BASE - GRAY BEIGE
Room name
XXXX
XXXX
XXXX
XXXX
101ROOM
NUMBER
ROOM NAME
BASE
FLOOR
CEILING
WALL
FINISHES
ALL FINISHES IN TAG ARE FIELD
FINISHES, ACCENTS NOTED ON PLANS
TEMPORARY PARTITION*
*PROVIDE TEMPORARY PARTITIONS AND SYSTEMS AS REQUIRED TO MEET ICRA
PRECAUTIONS DURING CONSTRUCTION AND UPON COMPLETION OF EACH
PHASE. SEE ROOM SCHED. FOR PRECAUTION LEVEL. ALL TEMPORARY
PARTITION LAYOUTS TO BE APPROVED BY VA PRIOR TO INSTALLATION, 4'-0"
CLEAR WIDTH MINIMUM TO BE MAINTAINED AT PATIENT AREA CORRIDORS
THROUGHOUT CONSTRUCTION, 3'-0" TO BE MAINTAINED AT OTHER AREAS.
NOT IN SCOPE
CG1 CORNER GUARD - ACROVYN SM-10
#100 EGGSHELL - VIF HEIGHT FROM
TOP OF BASE TO CEILING
(ALL PRODUCTS LISTED BELOW ARE B.O.D.)
P4 PAINT - BM WILD MULBERRY
DEMOLITION KEY NOTES*
REMOVE DOOR LEAF, FRAME TO REMAIN IN PLACE, RETAIN EXISTING HARDWARE
FOR REUSE AT DOOR.
REMOVE FURNISHINGS, EQUIPMENT, CUBICLE CURTAIN, AND SIGNAGE THAT ARE
NOT CONNECTED TO BUILDINGS SERVICES FROM THROUGHOUT ROOM
TEMPORARILY.
TAPE-OFF AND PROTECT HARD-WIRED DEVICES AND EQUIPMENT INCLUDING AT
CEILINGS AND HEADWALL DURING CONSTRUCTION
DEMO PORTIONS OF CEILING FOR INSTALLATION OF NEW DEVICES.
TEMPORARILY REMOVE PORTIONS OF CEILING FOR ABOVE CEILING MEPFP WORK
FLOORING, BASE, AND WALL PROTECTION TO BE REMOVED
*REFER TO SHEET GI002 FOR GENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
Phase
ARCHITECT STAMPCONSULTANTS 523A4-20-205
VAMC WEST ROXBURY
EXPAND EMERGENCY
DEPARTMENT
William Pevear Architects, Inc.
872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139
T: 617.335.5186
Alares Engineering
248 Copeland Street, 2nd Floor Quincy, MA 02169
T: 617.481.6390
MEP/FP ENGINEER
Drawing Scale
321 4 5 6 7 8
A
B
C
D
E
321 4 5 6 7 8
1400 VFW PARKWAY, WEST ROXBURY, MA 02132
01/31/2024
CODE CONSULTANT
Hastings Consulting
142 Hanlon Road Holliston, MA 01746
T: 508.397.8417
N
C U s e rs \M ir ia m \D o c u m e n ts
\1
-V
A W
R E
D E x p a n s io n m ir ia m
X L
H .r v t
/3
/2
:0
:0
A
M
1/4" = 1'-0"
AS401
PHASE 1 - EXAM 11 (GA-187) &
EXAM 16 (GA-146) - DEMOLITION
& NEW DRAWINGS
SCALE: 1/4" = 1'-0"
02 PHASE 1 - NEW - ENLARGED PLAN - GA-187 (EXAM 11)
SCALE: 1/4" = 1'-0"
03 PHASE 1 - ENLARGED RCP - GA-187 (EXAM 11)
SCALE: 1/4" = 1'-0"
09 PHASE 1 - NEW - ENLARGED PLAN - GA-146 (EXAM 16)
SCALE: 1/4" = 1'-0"
10 PHASE 1 - ENLARGED RCP - GA-146 (EXAM 16)
SCALE: 1/4" = 1'-0"
08 PHASE 1 - DEMO - ENLARGED PLAN - GA-146 (EXAM 16)
SCALE: 1/4" = 1'-0"
01 PHASE 1 - DEMO - ENLARGED PLAN - GA-187 (EXAM 11)
SCALE: 1/4" = 1'-0"
04 GA-187 (EXAM 11) - 1
SCALE: 1/4" = 1'-0"
05 GA-187 (EXAM 11) - 2
SCALE: 1/4" = 1'-0"
06 GA-187 (EXAM 11) - 3
SCALE: 1/4" = 1'-0"
07 GA-187 (EXAM 11) - 4
SCALE: 1/4" = 1'-0"
11 GA-146 (EXAM 16) - 1
SCALE: 1/4" = 1'-0"
12 GA-146 (EXAM 16) - 2
SCALE: 1/4" = 1'-0"
13 GA-146 (EXAM 16) - 3
SCALE: 1/4" = 1'-0"
14 GA-146 (EXAM 16) - 4
TYPICAL EXAM ROOM EXISTING PHOTOS - SIMILAR SCOPE FOR ROOMS:
EXAM 1 (GA-169), EXAM 2 (GA-170), EXAM 3 (GA-171), EXAM 4 (GA-172), EXAM 5 (GA-173), EXAM 6 (GA-178), EXAM 7 (GA-179), EXAM 9 (GA-181), EXAM 10 (GA-182), EXAM 11 (GA-187), EXAM 12 (GA-186), EXAM 13 (GA-184), EXAM 14
(GA-147), EXAM 15 (GA-145), EXAM 16 (GA-146)
VIEW OF SIDE WALL OF EXAM ROOM
SCHEDULED FOR FINISH UPGRADES:
-CONTRACTOR TO REMOVE
FURNISHINGS, EQUIPMENT, AND
SIGNAGE THAT ARE NOT CONNECTED
TO BUILDINGS SERVICES FROM
THROUGHOUT ROOM TEMPORARILY.
SALVAGE FOR REUSE ALL MOUNTED
EQUIPMENT AND SIGNAGE.
-TAPE-OFF AND PROTECT HARD-
WIRED DEVICES AND EQUIPMENT
THROUGHOUT.
-WALL PROTECTION, BASE, AND
FLOORING TO BE REPLACED.
-ROOM TO BE REPAINTED
VIEW OF HEAD WALL OF EXAM ROOM
SCHEDULED FOR FINISH UPGRADES:
-HEAD WALL & ALL CEILING
EQUIPMENT/DEVICES TO BE
PROTECTED IN PLACE DURING
CONSTRUCTION.
VIEW OF SIDE WALL OF EXAM ROOM
SCHEDULED FOR FINISH UPGRADES:
-CONTRACTOR TO REMOVE PRIVACY
CURTAIN TEMPORARILY DURING
CONSTRUCTION, SALVAGE FOR REUSE.
VIEW OF FOOT WALL OF EXAM ROOM
SCHEDULED FOR FINISH UPGRADES:
-DAMAGED DOOR LEAF TO BE
REPLACED WITHIN EXISTING DOOR
FRAME, EXISTING HARDWARE TO BE
REUSED.
-HOLLOW METAL DOOR FRAME AND
WINDOW FRAME TO BE PAINTED P1.
Room Schedule - Scope Summary - Phase 1
ROOM INFO ARCHITECTURAL
HVAC ELECTRICAL PLUMBING
FIRE
PROTECTION
ICRA LEVEL OF
PRECAUTION OTHER NOTESNUMBER NAME AREA (±) PHASE WALLS
FLOORING &
BASE CEILING DOOR WINDOW
CG-20 CORRIDOR 353 SF 1 N/A N/A C1, C4 D2 N/A H1 E1, E4 N/A N/A IV WORK TO BE DONE OFF-HOURS AS DETERMINED BY VA, AREA TO REMAIN OPEN DURING DAY
CG-26 CORRIDOR 492 SF 1 N/A N/A N/A D2 N/A N/A E1 N/A N/A IV WORK TO BE DONE OFF-HOURS AS DETERMINED BY VA, AREA TO REMAIN OPEN DURING DAY
GA-146 EXAM 16 97 SF 1 W2, W3, W4, W5 F1, F2 C1, C2 D1 N/A H1 E2 N/A N/A IV
GA-148 OFFICE 54 SF 1 N/A N/A C1 N/A N/A H1 E2 N/A N/A IV WORK TO BE DONE OFF-HOURS AS DETERMINED BY VA, AREA TO REMAIN OPEN DURING DAY
GA-187 EXAM 11 120 SF 1 W2, W3, W4, W5 F1, F2 C1, C2 D1 G1 H1 E2 N/A N/A IV
ROOF ROOF 2554 SF 1 N/A N/A N/A N/A N/A H3 E3 N/A N/A IV ROOFTOP WORK TO SPAN MULTIPLE PHASES AS NEEDED
EXTERIOR WALL - NEW LOCATION FOR ROOF ACCESS STAIR
VIEW OF EXISTING EXTERIOR WALL AND ROOF
ACCESS LADDER:
-ROOF ACCESS LADDER TO BE DEMOLISHED.
-NEW ROOF ACCESS STAIR TO BE INSTALLED
IN SAME AREA. NEW CONCRETE PAD FOR
STAIR SUPPORT TO BE INSTALLED ADJACENT
TO BUILDING.
-EXISTING EXTERIOR WALL TO REMAIN. NEW
SURFACE MOUNTED LIGHT TO BE INSTALLED
AT EXTERIOR WALL.
PHASE 1
Revision: Date:
Miriam Image
B
C
A
1 10 11
NEW ROOFTOP
EQUIPMENT TO TIE INTO
EXISTING DUCT
PENETRATIONS
NEW CURBS TO BE
PROVIDED FOR NEW AHU
NEW AHU
TIE-IN AT EXISTING
DUCTWORK, USING EXISTING
PENETRATIONS, SEE HVAC
AT NEW/MODIFIED ROOF
PENETRATIONS, PATCH
AND MATCH EXISTING
ROOF SYSTEM
NEW EXHAUST FAN ON
EXISTING RAISED CURB
EXISTING AHU
TO REMAIN
TIE-IN AT EXISTING
DUCTWORK, USING
EXISTING PENETRATIONS,
SEE HVAC
PATCH ROOF AT NEW
DUCT SUPPORTS,
SEE HVAC FOR
LOCATIONS
NEW ROOF CURB,
COORDINATE FINAL
SIZE WITH SELECTED AHU
AS801
AS701
PENETRATIONS TO BE
LOCATED ABOVE CEILING
IN ROOM GA-184 BELOW
ROOF MOUNTING PADS
AS801
CUT OPENING IN EXISTING RAISED CURB AND
PROVIDE SUPPORT FRAMING AS REQ. TO
SUPPORT NEW EQUIPMENT; REMOVE EXISTING
CURB FLASHING AND PROVIDE NEW SLOPED
METAL FLASHING HIP ROOF AND FRAMING OVER
EXISTING CURB.
AS801
AS801
GENERAL NOTE:
DO NOT VOID EXISTING ROOFING WARRANTY. CONTRACTOR
SHALL COORDINATE WITH THE GARLAND COMPANY, INC. AND
PRIOR TO ANY WORK SHALL WALK THE ROOF WITH GARLAND
REPRESENTATIVE TO INSPECT EXISTING SYSTEM.
CONTRACTOR SHALL MODIFY EXISTING ROOF FOR NEW
SYSTEMS ONLY AS APPROVED BY THE GARLAND COMPANY,
INC. AND CONTRACTOR SHALL INSPECT FINAL MODIFICATION
OF ROOF SYSTEMS WITH GARLAND REPRESENTATIVE.
THE GARLAND COMPANY, INC. REPRESENTATIVE FOR VAMC
WEST ROXBURY IS: BRIAN KENDER, (617) 755-4655
CONTRACTOR OPTION TO USE
PITCH POCKET FOR MULTIPLE
PIPE PENETRATIONS
AS801
WALL REMARKS
W1. REMOVE WALL MOUNTED MOVABLE FURNISHINGS, TAPE OFF & PROTECT FIXED
DEVICES CONNECTED TO MEPFP DURING RENOVATION.
W2. REPAIR AND PATCH GWB DAMAGE.
W3. NEW PAINT THROUGHOUT.
W4. NEW WALL PROTECTION WAINSCOT ALL WALLS.
W5. PICK RESISTANT SEALANT AT ALL JOINT AND MATERIAL INTERFACES.
FLOORING/BASE REMARKS
F1. REMOVE EXISTING FLOORING & BASE.
F2. INSTALL NEW WSF1 FLOORING & INTEGRAL BASE, INSTALL TRANSITION WITH
ADJACENT FLOORING AT DOOR.
CEILING REMARKS
C1. REMOVE CEILING AS REQUIRED TO INSTALL NEW HVAC PIPING, REINSTALL
EXISTING CEILING AFTER HVAC INSTALLATION COMPLETE.
C2. CLEAN AND REPLACE DAMAGED CEILING TILES & EXISTING DEVICES, MINIMAL
REPLACEMENT EXPECTED.
C3. DEMOLISH PORTIONS OF EXISTING CEILING AS REQUIRED TO INSTALL LIGATURE-
RESISTANT FIXTURES. PATCH AND REPAIR GWB AS REQUIRED TO CREATE EVEN
SURFACE AND PAINT.
C4. RELOCATE (1) LIGHT FIXTURE.
DOOR REMARKS
D1. REPLACE DOOR LEAF WITHIN EXISTING FRAME, REUSE EXISTING HARDWARE.
D2. REPLACE CARD READER AT EXISTING DOOR.
D3. NEW LIGATURE RESISTANT DOOR AND HARDWARE.
WINDOW REMARKS
G1. PAINT FRAME P1.
HVAC REMARKS
H1. ABOVE CEILING PIPING WORK, TEMPORARY REMOVAL OF CEILING.
H2. NEW LIGATURE-RESISTANT CEILING DEVICES.
H3. NEW ROOFTOP EQUIPMENT.
ELECTRICAL REMARKS
E1. NEW CARD READER.
E2. TEMPORARY REMOVAL OF CEILING FOR ABOVE CEILING WORK, DISCONNECT
ELECTRICAL DEVICES ARE REQUIRED.
E3. CONNECTIONS TO NEW ROOFTOP EQUIPMENT.
E4. RELOCATE (1) LIGHT FIXTURE.
E5. NEW LIGATURE-RESISTANT CEILING & WALL DEVICES.
FIRE PROTECTION REMARKS
FP1. NEW LIGATURE-RESISTANT SPRINKLER(S) PER FP DRAWINGS.
ICRA LEVEL OF PRECAUTION: REFER TO SPECIFICATIONS FOR FULL REQUIREMENTS
BY LEVEL OF ICRA PRECAUTIONS REQUIRED.
RENOVATION SCOPE REMARKS
1 HOUR FIRE RESISTANCE RATED PARTITION (TOP:
NEW; BOTTOM: ETR)
UNRATED NEW PARTITION
EXISTING PARTITION TO REMAIN
EXISTING PARTITION TO BE DEMOLISHED
WALL INDICATIONS
ED SPACES NOT IN SCOPE (MAY BE
IMPACTED BY TEMP. ICRA
PARTITIONS, SEE DEMO PLANS)
IMPACTED BY RENOVATIONS FOR
CEILING/UTILITY CONNECTION
WORK ONLY
IN SCOPE
ROOM INFILL
FINISH SCHEDULE
P1 PAINT - BM WHITE DOWN
GWB PAINTED GYPSUM WALL
BOARD CEILING
P2 PAINT - SW KOI POND
P3 PAINT - SW BREEZY
WP1 WALL PROTECTION - INPRO
PALLADIUM RIGID SHEET W/ RICOCHET
TOP CAP - ANTIQUE WHITE
WSF1 SHEET VINYL - MANNINGTON PARADIGM II FLOW - EXEMPLAR
RB1 RESILIENT BASE - MANNINGTON IDEAL BASE - GRAY BEIGE
Room name
XXXX
XXXX
XXXX
XXXX
101ROOM
NUMBER
ROOM NAME
BASE
FLOOR
CEILING
WALL
FINISHES
ALL FINISHES IN TAG ARE FIELD
FINISHES, ACCENTS NOTED ON PLANS
TEMPORARY PARTITION*
*PROVIDE TEMPORARY PARTITIONS AND SYSTEMS AS REQUIRED TO MEET ICRA
PRECAUTIONS DURING CONSTRUCTION AND UPON COMPLETION OF EACH
PHASE. SEE ROOM SCHED. FOR PRECAUTION LEVEL. ALL TEMPORARY
PARTITION LAYOUTS TO BE APPROVED BY VA PRIOR TO INSTALLATION, 4'-0"
CLEAR WIDTH MINIMUM TO BE MAINTAINED AT PATIENT AREA CORRIDORS
THROUGHOUT CONSTRUCTION, 3'-0" TO BE MAINTAINED AT OTHER AREAS.
NOT IN SCOPE
CG1 CORNER GUARD - ACROVYN SM-10
#100 EGGSHELL - VIF HEIGHT FROM
TOP OF BASE TO CEILING
(ALL PRODUCTS LISTED BELOW ARE B.O.D.)
P4 PAINT - BM WILD MULBERRY
DEMOLITION KEY NOTES*
REMOVE DOOR LEAF, FRAME TO REMAIN IN PLACE, RETAIN EXISTING HARDWARE
FOR REUSE AT DOOR.
REMOVE FURNISHINGS, EQUIPMENT, CUBICLE CURTAIN, AND SIGNAGE THAT ARE
NOT CONNECTED TO BUILDINGS SERVICES FROM THROUGHOUT ROOM
TEMPORARILY.
TAPE-OFF AND PROTECT HARD-WIRED DEVICES AND EQUIPMENT INCLUDING AT
CEILINGS AND HEADWALL DURING CONSTRUCTION
DEMO PORTIONS OF CEILING FOR INSTALLATION OF NEW DEVICES.
TEMPORARILY REMOVE PORTIONS OF CEILING FOR ABOVE CEILING MEPFP WORK
FLOORING, BASE, AND WALL PROTECTION TO BE REMOVED
*REFER TO SHEET GI002 FOR GENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
Phase
ARCHITECT STAMPCONSULTANTS 523A4-20-205
VAMC WEST ROXBURY
EXPAND EMERGENCY
DEPARTMENT
William Pevear Architects, Inc.
872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139
T: 617.335.5186
Alares Engineering
248 Copeland Street, 2nd Floor Quincy, MA 02169
T: 617.481.6390
MEP/FP ENGINEER
Drawing Scale
321 4 5 6 7 8
A
B
C
D
E
321 4 5 6 7 8
1400 VFW PARKWAY, WEST ROXBURY, MA 02132
01/31/2024
CODE CONSULTANT
Hastings Consulting
142 Hanlon Road Holliston, MA 01746
T: 508.397.8417
N
C U s e rs \M ir ia m \D o c u m e n ts
\1
-V
A W
R E
D E x p a n s io n m ir ia m
X L
H .r v t
/3
/2
:0
:0
A
M
1/4" = 1'-0"
AS401B
PHASE 1 - ROOF PLAN
Room Schedule - Scope Summary - Phase 1
ROOM INFO ARCHITECTURAL
HVAC ELECTRICAL PLUMBING
FIRE
PROTECTION
ICRA LEVEL OF
PRECAUTION OTHER NOTESNUMBER NAME AREA (±) PHASE WALLS
FLOORING &
BASE CEILING DOOR WINDOW
CG-20 CORRIDOR 353 SF 1 N/A N/A C1, C4 D2 N/A H1 E1, E4 N/A N/A IV WORK TO BE DONE OFF-HOURS AS DETERMINED BY VA, AREA TO REMAIN OPEN DURING DAY
CG-26 CORRIDOR 492 SF 1 N/A N/A N/A D2 N/A N/A E1 N/A N/A IV WORK TO BE DONE OFF-HOURS AS DETERMINED BY VA, AREA TO REMAIN OPEN DURING DAY
GA-146 EXAM 16 97 SF 1 W2, W3, W4, W5 F1, F2 C1, C2 D1 N/A H1 E2 N/A N/A IV
GA-148 OFFICE 54 SF 1 N/A N/A C1 N/A N/A H1 E2 N/A N/A IV WORK TO BE DONE OFF-HOURS AS DETERMINED BY VA, AREA TO REMAIN OPEN DURING DAY
GA-187 EXAM 11 120 SF 1 W2, W3, W4, W5 F1, F2 C1, C2 D1 G1 H1 E2 N/A N/A IV
ROOF ROOF 2554 SF 1 N/A N/A N/A N/A N/A H3 E3 N/A N/A IV ROOFTOP WORK TO SPAN MULTIPLE PHASES AS NEEDED
PHASE 1
Revision: Date:
Miriam Image
AS402
AS402
AS401
EXAM 13
WSF1
RB1
P1,WP1
ETR
GA-184
EXAM 12
WSF1
RB1
P1,WP1
ETR
GA-186
CORRIDOR
CG-21B
P2
P3
GA-186
GA-184
/2
V
IF
± 11' - 0" VIF
/2
V
IF
CG1
EXAM 13
GA-184
EXAM 12
GA-186
9' - 0"CH
ETR
9' - 0"CH
ETR
9' - 0"CH
ETR
8' - 6"CH
ETR
CORRIDOR
CG-21B
CEILING & ALL CEILING
DEVICES & EQUIPMENT
EXISTING TO REMAIN,
PROTECT IN PLACE DURING
RENOVATION
CEILING & ALL CEILING
DEVICES & EQUIPMENT
EXISTING TO REMAIN,
PROTECT IN PLACE DURING
RENOVATION
EXAM 13
GA-184
EXAM 12
GA-186
CEILING WORK IN CORRIDOR
TO BE DONE OFF-HOURS
5'-0" MIN
±6'-0"
T
T
02 03
05 06
02 03
05 06
WALL PROTECTION
WAINSCOT, AS
SCHEDULED
BASE AS SCHEDULED
P1
EXISTING
HEADWALL TO
REMAIN, PROTECT
IN PLACE DURING
CONSTRUCTION
WALL PROTECTION
WAINSCOT, AS
SCHEDULED
BASE AS SCHEDULED
P114
AS501
TYP
WALL PROTECTION WAINSCOT,
AS SCHEDULED
BASE AS SCHEDULED
P1
EXISTING SINK TO REMAIN
GA-186
EXISTING WINDOW
TO REMAIN, PAINT
FRAME P1
EXISTING FRAME TO
REMAIN, LEAF TO BE
REPLACED, REUSE
EXISTING HARDWARE; PAINT
FRAME P1
WALL PROTECTION
WAINSCOT, AS
SCHEDULED
BASE AS SCHEDULED
P3
CG1
WALL PROTECTION
WAINSCOT, AS
SCHEDULED
BASE AS SCHEDULED
P1
EXISTING
HEADWALL TO
REMAIN, PROTECT
IN PLACE DURING
CONSTRUCTION
WALL PROTECTION
WAINSCOT, AS
SCHEDULED
BASE AS SCHEDULED
P2
AS501
TYP
WALL PROTECTION WAINSCOT,
AS SCHEDULED
BASE AS SCHEDULED
P1
EXISTING SINK TO REMAIN
GA-184
EXISTING WINDOW
TO REMAIN, PAINT
FRAME P1
EXISTING FRAME TO
REMAIN, LEAF TO BE
REPLACED, REUSE
EXISTING HARDWARE; PAINT
FRAME P1
WALL PROTECTION
WAINSCOT, AS
SCHEDULED
BASE AS SCHEDULED
P1
WALL REMARKS
W1. REMOVE WALL MOUNTED MOVABLE FURNISHINGS, TAPE OFF & PROTECT FIXED
DEVICES CONNECTED TO MEPFP DURING RENOVATION.
W2. REPAIR AND PATCH GWB DAMAGE.
W3. NEW PAINT THROUGHOUT.
W4. NEW WALL PROTECTION WAINSCOT ALL WALLS.
W5. PICK RESISTANT SEALANT AT ALL JOINT AND MATERIAL INTERFACES.
FLOORING/BASE REMARKS
F1. REMOVE EXISTING FLOORING & BASE.
F2. INSTALL NEW WSF1 FLOORING & INTEGRAL BASE, INSTALL TRANSITION WITH
ADJACENT FLOORING AT DOOR.
CEILING REMARKS
C1. REMOVE CEILING AS REQUIRED TO INSTALL NEW HVAC PIPING, REINSTALL
EXISTING CEILING AFTER HVAC INSTALLATION COMPLETE.
C2. CLEAN AND REPLACE DAMAGED CEILING TILES & EXISTING DEVICES, MINIMAL
REPLACEMENT EXPECTED.
C3. DEMOLISH PORTIONS OF EXISTING CEILING AS REQUIRED TO INSTALL LIGATURE-
RESISTANT FIXTURES. PATCH AND REPAIR GWB AS REQUIRED TO CREATE EVEN
SURFACE AND PAINT.
C4. RELOCATE (1) LIGHT FIXTURE.
DOOR REMARKS
D1. REPLACE DOOR LEAF WITHIN EXISTING FRAME, REUSE EXISTING HARDWARE.
D2. REPLACE CARD READER AT EXISTING DOOR.
D3. NEW LIGATURE RESISTANT DOOR AND HARDWARE.
WINDOW REMARKS
G1. PAINT FRAME P1.
HVAC REMARKS
H1. ABOVE CEILING PIPING WORK, TEMPORARY REMOVAL OF CEILING.
H2. NEW LIGATURE-RESISTANT CEILING DEVICES.
H3. NEW ROOFTOP EQUIPMENT.
ELECTRICAL REMARKS
E1. NEW CARD READER.
E2. TEMPORARY REMOVAL OF CEILING FOR ABOVE CEILING WORK, DISCONNECT
ELECTRICAL DEVICES ARE REQUIRED.
E3. CONNECTIONS TO NEW ROOFTOP EQUIPMENT.
E4. RELOCATE (1) LIGHT FIXTURE.
E5. NEW LIGATURE-RESISTANT CEILING & WALL DEVICES.
FIRE PROTECTION REMARKS
FP1. NEW LIGATURE-RESISTANT SPRINKLER(S) PER FP DRAWINGS.
ICRA LEVEL OF PRECAUTION: REFER TO SPECIFICATIONS FOR FULL REQUIREMENTS
BY LEVEL OF ICRA PRECAUTIONS REQUIRED.
RENOVATION SCOPE REMARKS
1 HOUR FIRE RESISTANCE RATED PARTITION (TOP:
NEW; BOTTOM: ETR)
UNRATED NEW PARTITION
EXISTING PARTITION TO REMAIN
EXISTING PARTITION TO BE DEMOLISHED
WALL INDICATIONS
ED SPACES NOT IN SCOPE (MAY BE
IMPACTED BY TEMP. ICRA
PARTITIONS, SEE DEMO PLANS)
IMPACTED BY RENOVATIONS FOR
CEILING/UTILITY CONNECTION
WORK ONLY
IN SCOPE
ROOM INFILL
FINISH SCHEDULE
P1 PAINT - BM WHITE DOWN
GWB PAINTED GYPSUM WALL
BOARD CEILING
P2 PAINT - SW KOI POND
P3 PAINT - SW BREEZY
WP1 WALL PROTECTION - INPRO
PALLADIUM RIGID SHEET W/ RICOCHET
TOP CAP - ANTIQUE WHITE
WSF1 SHEET VINYL - MANNINGTON PARADIGM II FLOW - EXEMPLAR
RB1 RESILIENT BASE - MANNINGTON IDEAL BASE - GRAY BEIGE
Room name
XXXX
XXXX
XXXX
XXXX
101ROOM
NUMBER
ROOM NAME
BASE
FLOOR
CEILING
WALL
FINISHES
ALL FINISHES IN TAG ARE FIELD
FINISHES, ACCENTS NOTED ON PLANS
TEMPORARY PARTITION*
*PROVIDE TEMPORARY PARTITIONS AND SYSTEMS AS REQUIRED TO MEET ICRA
PRECAUTIONS DURING CONSTRUCTION AND UPON COMPLETION OF EACH
PHASE. SEE ROOM SCHED. FOR PRECAUTION LEVEL. ALL TEMPORARY
PARTITION LAYOUTS TO BE APPROVED BY VA PRIOR TO INSTALLATION, 4'-0"
CLEAR WIDTH MINIMUM TO BE MAINTAINED AT PATIENT AREA CORRIDORS
THROUGHOUT CONSTRUCTION, 3'-0" TO BE MAINTAINED AT OTHER AREAS.
NOT IN SCOPE
CG1 CORNER GUARD - ACROVYN SM-10
#100 EGGSHELL - VIF HEIGHT FROM
TOP OF BASE TO CEILING
(ALL PRODUCTS LISTED BELOW ARE B.O.D.)
P4 PAINT - BM WILD MULBERRY
DEMOLITION KEY NOTES*
REMOVE DOOR LEAF, FRAME TO REMAIN IN PLACE, RETAIN EXISTING HARDWARE
FOR REUSE AT DOOR.
REMOVE FURNISHINGS, EQUIPMENT, CUBICLE CURTAIN, AND SIGNAGE THAT ARE
NOT CONNECTED TO BUILDINGS SERVICES FROM THROUGHOUT ROOM
TEMPORARILY.
TAPE-OFF AND PROTECT HARD-WIRED DEVICES AND EQUIPMENT INCLUDING AT
CEILINGS AND HEADWALL DURING CONSTRUCTION
DEMO PORTIONS OF CEILING FOR INSTALLATION OF NEW DEVICES.
TEMPORARILY REMOVE PORTIONS OF CEILING FOR ABOVE CEILING MEPFP WORK
FLOORING, BASE, AND WALL PROTECTION TO BE REMOVED
*REFER TO SHEET GI002 FOR GENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
Phase
ARCHITECT STAMPCONSULTANTS 523A4-20-205
VAMC WEST ROXBURY
EXPAND EMERGENCY
DEPARTMENT
William Pevear Architects, Inc.
872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139
T: 617.335.5186
Alares Engineering
248 Copeland Street, 2nd Floor Quincy, MA 02169
T: 617.481.6390
MEP/FP ENGINEER
Drawing Scale
321 4 5 6 7 8
A
B
C
D
E
321 4 5 6 7 8
1400 VFW PARKWAY, WEST ROXBURY, MA 02132
01/31/2024
CODE CONSULTANT
Hastings Consulting
142 Hanlon Road Holliston, MA 01746
T: 508.397.8417
N
C U s e rs \M ir ia m \D o c u m e n ts
\1
-V
A W
R E
D E x p a n s io n m ir ia m
X L
H .r v t
/3
/2
:0
:1
A
M
1/4" = 1'-0"
AS402
PHASE 2 - EXAMS 12 (GA-186) &
EXAM 13 (GA-184) - DEMOLITION
& NEW DRAWINGS
SCALE: 1/4" = 1'-0"
PHASE 2 - NEW- ENLARGED PLAN - GA-184 (EXAM 13) & GA-186
(EXAM 12)
SCALE: 1/4" = 1'-0"
03 PHASE 2 - ENLARGED RCP- GA-184 (EXAM 13) & GA-186 (EXAM 12)
SCALE: 1/4" = 1'-0"
PHASE 2 - DEMO - ENLARGED PLAN - GA-184 (EXAM 13) & GA-186
(EXAM 12)
SCALE: 1/4" = 1'-0"
04 GA-186 (EXAM 12) - 1
SCALE: 1/4" = 1'-0"
05 GA-186 (EXAM 12) - 2
SCALE: 1/4" = 1'-0"
06 GA-186 (EXAM 12) - 3
SCALE: 1/4" = 1'-0"
07 GA-186 (EXAM 12) - 4
SCALE: 1/4" = 1'-0"
08 GA-184 (EXAM 13) - 1
SCALE: 1/4" = 1'-0"
09 GA-184 (EXAM 13) - 2
SCALE: 1/4" = 1'-0"
10 GA-184 (EXAM 13) - 3
SCALE: 1/4" = 1'-0"
11 GA-184 (EXAM 13) - 4
Room Schedule - Scope Summary - Phase 2
ROOM INFO ARCHITECTURAL
HVAC ELECTRICAL PLUMBING
FIRE
PROTECTION
ICRA LEVEL OF
PRECAUTION OTHER NOTESNUMBER NAME AREA (±) PHASE WALLS
FLOORING &
BASE CEILING DOOR WINDOW
CG-21B CORRIDOR 65 SF 2 N/A N/A C1 N/A N/A H1 E2 N/A N/A IV WORK TO BE DONE OFF-HOURS AS DETERMINED BY VA, AREA TO REMAIN OPEN DURING DAY
GA-184 EXAM 13 126 SF 2 W1, W2, W3, W4 F1, F2 C1, C2 D1 G1 H1 E2 N/A N/A IV
GA-186 EXAM 12 113 SF 2 W1, W2, W3, W4 F1, F2 C1, C2 D1 G1 H1 E2 N/A N/A IV
PHASE 2
Revision: Date:
Miriam Image
AS40304
EXAM 1
WSF1
RB1
P1,WP1
ETR
GA-169
EXAM 2
WSF1
RB1
P1,WP1
ETR
GA-170
CORRIDOR
CG-23
AS40308
AS402
P2 P3
GA-169 GA-170
V
IF
± 8' - 11 1/2" VIF ± 9' - 3" VIF
V
IF
CG1
EXAM 1
GA-169
EXAM 2
GA-170
CORRIDOR
CG-23
CEILING & ALL CEILING
DEVICES & EQUIPMENT
EXISTING TO REMAIN,
PROTECT IN PLACE
DURING RENOVATION
CEILING & ALL CEILING
DEVICES & EQUIPMENT
EXISTING TO REMAIN,
PROTECT IN PLACE
DURING RENOVATION
EXAM 1
GA-169
EXAM 2
GA-170
CORRIDOR
CG-23
TEMPORARY
PARTITION
M
IN
T
01 01
WALL PROTECTION
WAINSCOT, AS
SCHEDULED
BASE AS SCHEDULED
P1
AS501
TYP
CG1
P1
WALL PROTECTION WAINSCOT,
AS SCHEDULED
BASE AS SCHEDULED
EXISTING HEADWALL TO
REMAIN, PROTECT IN
PLACE DURING
CONSTRUCTION
P3
WALL PROTECTION
WAINSCOT, AS
SCHEDULED
BASE AS SCHEDULED
WALL PROTECTION WAINSCOT,
AS SCHEDULED
BASE AS SCHEDULED
EXISTING SINK TO REMAIN
P1
GA-169
EXISTING FRAME TO
REMAIN, LEAF TO BE
REPLACED, REUSE
EXISTING HARDWARE; PAINT
FRAME P1
WALL PROTECTION
WAINSCOT, AS
SCHEDULED
P2
BASE AS SCHEDULED
AS501
TYP
P1
WALL PROTECTION
WAINSCOT, AS
SCHEDULED
BASE AS SCHEDULED
EXISTING WINDOW
TO REMAIN, PAINT
FRAME P1
EXISTING HEADWALL TO
REMAIN, PROTECT IN
PLACE DURING
CONSTRUCTION
P1
WALL PROTECTION
WAINSCOT, AS
SCHEDULED
BASE AS SCHEDULED
EXISTING WINDOW
TO REMAIN
WALL PROTECTION
WAINSCOT, AS SCHEDULED
BASE AS SCHEDULED
P1
GA-170
EXISTING WINDOW
TO REMAIN, PAINT
FRAME P1
EXISTING FRAME TO
REMAIN, LEAF TO BE
REPLACED, REUSE
EXISTING HARDWARE; PAINT
FRAME P1
WALL REMARKS
W1. REMOVE WALL MOUNTED MOVABLE FURNISHINGS, TAPE OFF & PROTECT FIXED
DEVICES CONNECTED TO MEPFP DURING RENOVATION.
W2. REPAIR AND PATCH GWB DAMAGE.
W3. NEW PAINT THROUGHOUT.
W4. NEW WALL PROTECTION WAINSCOT ALL WALLS.
W5. PICK RESISTANT SEALANT AT ALL JOINT AND MATERIAL INTERFACES.
FLOORING/BASE REMARKS
F1. REMOVE EXISTING FLOORING & BASE.
F2. INSTALL NEW WSF1 FLOORING & INTEGRAL BASE, INSTALL TRANSITION…
This is the start of the file's text. The full file is on GovTribe.