Attachment 1B - 25_0418-523A4-19-205.A01.pdf
PDF 515 KB Posted
- Attached to
- Y1DA--VISN 1 Construction MATOC
- Solicitation number
- 36C77624R0098
About this file
This document is an Addendum #1 for the U.S. Department of Veterans Affairs Boston Healthcare System's West Roxbury Emergency Department Expansion project (VA Project No. 523A4-20-205). The addendum includes updated specifications and drawings for temporary environmental controls, specifically Section 01 57 19, which details the contractor's responsibilities for managing environmental pollution and damage.
The environmental controls specification covers a comprehensive range of requirements, including protecting air, water, and land resources, managing visual aesthetics, noise, solid waste, and controlling pollutants. Key provisions include controlling particulate emissions, minimizing noise levels (with specific decibel limitations), managing construction waste, protecting existing landscape features, controlling soil erosion, and ensuring proper disposal of chemical and solid waste. The document mandates the contractor develop and submit an Environmental Protection Plan that outlines personnel responsibilities, waste management procedures, and compliance with federal, state, and local environmental regulations.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of Veterans Affairs Boston Healthcare System – West Roxbury
523A4-20-205 VAMC West Roxbury Expand Emergency Department
Addendum #1 April 18, 2025
Revision List:
Specifications:
015719 – Temporary Environmental Controls (new)
Drawings:
AS407 – PHASE 7 - EXAM 9 (GA-180) & EXAM 10 (GA-
182) – DEMOLITION & NEW DRAWINGS
AS501 – PARTITION DETAILS, DOOR SCHEDULE &
DETAILS, INTERIOR DETAILS
AS701 – EXTERIOR STAIR ENLARGED PLAN AND
SECTIONS
AS702 – EXTERIOR STAIR DETAILS
Expand Emergency Department 04-18-2025 Department of Veterans Affairs Construction Documents Boston Healthcare System - West Roxbury Addendum #1 VA Project No. 523A4-20-205
01 57 19 -1
SECTION 01 57 19
TEMPORARY ENVIRONMENTAL CONTROLS
PART 1 - GENERAL
1.1 DESCRIPTION
This section specifies the control of environmental pollution and damage that the Contractor must consider for air, water, and land resources. It includes management of visual aesthetics, noise, solid waste, radiant energy, and radioactive materials, as well as other pollutants and resources encountered or generated by the Contractor.
The Contractor is obligated to consider specified control measures with the costs included within the various contract items of work.
Environmental pollution and damage is defined as the presence of chemical, physical, or biological elements or agents which:
1. Adversely effect human health or welfare,
2. Unfavorably alter ecological balances of importance to human life,
3. Effect other species of importance to humankind, or;
4. Degrade the utility of the environment for aesthetic, cultural, and historical purposes.
Definitions of Pollutants:
1. Chemical Waste: Petroleum products, bituminous materials, salts, acids, alkalis, herbicides, pesticides, organic chemicals, and inorganic wastes.
2. Debris: Combustible and noncombustible wastes, such as leaves, tree trimmings, ashes, and waste materials resulting from construction or maintenance and repair work.
3. Sediment: Soil and other debris that has been eroded and transported by runoff water.
4. Solid Waste: Rubbish, debris, garbage, and other discarded solid materials resulting from industrial, commercial, and agricultural operations and from community activities.
5. Surface Discharge: The term "Surface Discharge" implies that the water is discharged with possible sheeting action and subsequent soil erosion may occur. Waters that are surface discharged may terminate in drainage ditches, storm sewers, creeks, and/or "water of the United States" and would require a permit to discharge water from the governing agency.
01 57 19 -2
6. Rubbish: Combustible and noncombustible wastes such as paper, boxes, glass and crockery, metal and lumber scrap, tin cans, and bones.
7. Sanitary Wastes:
a. Sewage: Domestic sanitary sewage and human and animal waste.
b. Garbage: Refuse and scraps resulting from preparation, cooking, dispensing, and consumption of food.
1.2 QUALITY CONTROL
Establish and maintain quality control for the environmental protection of all items set forth herein.
Record on daily reports any problems in complying with laws, regulations, and ordinances. Note any corrective action taken.
1.3 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
U.S. National Archives and Records Administration (NARA):
33 CFR 328....................Definitions
1.4 SUBMITTALS
In accordance with Section, 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES, furnish the following:
1. Environmental Protection Plan: After the contract is awarded and prior to the commencement of the work, the Contractor shall meet with the Contracting Officer’s Representative (COR) to discuss the proposed Environmental Protection Plan and to develop mutual understanding relative to details of environmental protection. Not more than 20 days after the meeting, the Contractor shall prepare and submit to the Contracting Officer’s Representative (COR)for approval, a written and/or graphic Environmental Protection Plan including, but not limited to, the following:
a. Name(s) of person(s) within the Contractor's organization who is (are) responsible for ensuring adherence to the Environmental
Protection Plan.
b. Name(s) and qualifications of person(s) responsible for manifesting hazardous waste to be removed from the site.
c. Name(s) and qualifications of person(s) responsible for training the Contractor's environmental protection personnel.
01 57 19 -3
d. Description of the Contractor's environmental protection personnel training program.
e. A list of Federal, State, and local laws, regulations, and permits concerning environmental protection, pollution control, noise control and abatement that are applicable to the
Contractor's proposed operations and the requirements imposed by those laws, regulations, and permits.
f. Methods for protection of features to be preserved within authorized work areas including trees, shrubs, vines, grasses, ground cover, landscape features, air and water quality, fish and wildlife, soil, historical, and archeological and cultural resources.
g. Procedures to provide the environmental protection that comply with the applicable laws and regulations. Describe the procedures to correct pollution of the environment due to accident, natural causes, or failure to follow the procedures as described in the
Environmental Protection Plan.
h. Permits, licenses, and the location of the solid waste disposal area.
i. Drawings showing locations of any proposed material storage areas, structures, sanitary facilities, and stockpiles of excess or spoil materials. Include as part of an Erosion Control Plan approved by the District Office of the U.S. Soil Conservation
Service and the Department of Veterans Affairs.
j. Environmental Monitoring Plans for the job site including land, water, air, and noise.
k. Work Area Plan showing the proposed activity in each portion of the area and identifying the areas of limited use or nonuse. Plan should include measures for marking the limits of use areas. This plan may be incorporated within the Erosion Control Plan.
l. Inclusion of “best management practices” and methodologies.
Approval of the Contractor's Environmental Protection Plan will not relieve the Contractor of responsibility for adequate and continued control of pollutants and other environmental protection measures.
1.5 PROTECTION OF ENVIRONMENTAL RESOURCES
Protect environmental resources within the project boundaries and those affected outside the limits of permanent work during the entire period
01 57 19 -4 of this contract. Confine activities to areas defined by the specifications and drawings.
Protection of Land Resources: Prior to construction, identify all land resources to be preserved within the work area. Do not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, grasses, topsoil, and landforms without permission from the COR.
Do not fasten or attach ropes, cables, or guys to trees for anchorage unless specifically authorized, or where special emergency use is permitted. Provide erosion control plans, in phases where required.
1. Work Area Limits: Prior to any construction, mark the areas that require work to be performed under this contract. Mark or fence isolated areas within the general work area that are to be saved and protected. Protect monuments, works of art, and markers before construction operations begin. Convey to all personnel the purpose of marking and protecting all necessary objects.
2. Protection of Landscape: Protect trees, shrubs, vines, grasses, land forms, and other landscape features shown on the drawings to be preserved by marking, fencing, or using any other approved techniques.
a. Box and protect from damage existing trees and shrubs to remain on the construction site.
b. Immediately repair all damage to existing trees and shrubs by trimming, cleaning, and painting with antiseptic tree paint.
c. Do not store building materials or perform construction activities closer to existing trees or shrubs than the farthest extension of their limbs.
3. Reduction of Exposure of Unprotected Erodible Soils: Plan and conduct earthwork to minimize the duration of exposure of unprotected soils. Clear areas in reasonably sized increments only as needed to use. Form earthwork to final grade as shown.
Immediately protect side slopes and back slopes upon completion of rough grading.
4. Temporary Protection of Disturbed Areas: Construct diversion ditches, benches, and berms to retard and divert runoff from the construction site to protected drainage areas approved under paragraph 208 of the Clean Water Act.
01 57 19 -5
a. Sediment Basins: Trap sediment from construction areas in temporary or permanent sediment basins that accommodate the runoff of a local two year (design year) storm. After each storm, pump the basins dry and remove the accumulated sediment. Control overflow/drainage with paved weirs or by vertical overflow pipes, draining from the surface.
b. Reuse or conserve the collected topsoil sediment as directed by the COR.
c. Institute effluent quality monitoring programs as required by Federal, State, and local environmental agencies.
5. Erosion and Sedimentation Control Devices: The erosion and sediment controls selected and maintained by the Contractor shall be such that water quality standards are not violated as a result of the
Contractor's activities. Construct or install all temporary and permanent erosion and sedimentation control features shown. Maintain temporary erosion and sediment control measures such as berms, dikes, drains, sedimentation basins, grassing, and mulching, until permanent drainage and erosion control facilities are completed and operative.
6. Manage borrow areas on Government property to minimize erosion and to prevent sediment from entering nearby water courses or lakes.
7. Manage and control spoil areas on Government property to limit spoil to areas shown and prevent erosion of soil or sediment from entering nearby water courses or lakes.
8. Protect adjacent areas from despoilment by temporary excavations and embankments.
9. Handle and dispose of solid wastes in such a manner that will prevent contamination of the environment. Place solid wastes
(excluding clearing debris) in containers that are emptied on a regular schedule. Transport all solid waste off Government property and dispose of waste in compliance with Federal, State, and local requirements.
10. Store chemical waste away from the work areas in corrosion resistant containers and dispose of waste in accordance with Federal, State, and local regulations.
11. Handle discarded materials other than those included in the solid waste category as directed by the COR.
01 57 19 -6
Protection of Water Resources: Keep construction activities under surveillance, management, and control to avoid pollution of surface and ground waters and sewer systems. Implement management techniques to control water pollution by the listed construction activities that are included in this contract.
1. Washing and Curing Water: Do not allow wastewater directly derived from construction activities to enter water areas. Collect and place wastewater in retention ponds allowing the suspended material to settle, the pollutants to separate, or the water to evaporate.
2. Control movement of materials and equipment at stream crossings during construction to prevent violation of water pollution control standards of the Federal, State, or local government.
3. Monitor water areas affected by construction.
Protection of Fish and Wildlife Resources: Keep construction activities under surveillance, management, and control to minimize interference with, disturbance of, or damage to fish and wildlife. Prior to beginning construction operations, list species that require specific attention along with measures for their protection.
Protection of Air Resources: Keep construction activities under surveillance, management, and control to minimize pollution of air resources. Burning is not permitted on the job site. Keep activities, equipment, processes, and work operated or performed, in strict accordance with the Commonwealth of Massachusetts State Air Pollution
Statue, Rule, or Regulation and Federal emission and performance laws and standards. Maintain ambient air quality standards set by the
Environmental Protection Agency, for those construction operations and activities specified.
1. Particulates: Control dust particles, aerosols, and gaseous by-products from all construction activities, processing, and preparation of materials (such as from asphaltic batch plants) at all times, including weekends, holidays, and hours when work is not in progress.
2. Particulates Control: Maintain all excavations, stockpiles, haul roads, permanent and temporary access roads, plant sites, spoil areas, borrow areas, and all other work areas within or outside the project boundaries free from particulates which would cause a hazard
01 57 19 -7 or a nuisance. Sprinklering, chemical treatment of an approved type, light bituminous treatment, baghouse, scrubbers, electrostatic precipitators, or other methods are permitted to control particulates in the work area.
3. Hydrocarbons and Carbon Monoxide: Control monoxide emissions from equipment to Federal and State allowable limits.
4. Odors: Control odors of construction activities and prevent obnoxious odors from occurring.
Reduction of Noise: Minimize noise using every action possible. Perform noise-producing work in less sensitive hours of the day or week as directed by the COR. Maintain noise-produced work at or below the decibel levels and within the time periods specified.
1. Perform construction activities involving repetitive, high-level impact noise only between 8:00 a.m. and 6:00 p.m unless otherwise permitted by local ordinance or the COR. Repetitive impact noise on the property shall not exceed the following dB limitations:
Time Duration of Impact Noise Sound Level in dB
More than 12 minutes in any hour 70
Less than 30 seconds of any hour 85
Less than three minutes of any hour 80
Less than 12 minutes of any hour 75
2. Provide sound-deadening devices on equipment and take noise abatement measures that are necessary to comply with the requirements of this contract, consisting of, but not limited to, the following:
a. Maintain maximum permissible construction equipment noise levels at 15 meter (50 feet) (dBA):
EARTHMOVING MATERIALS HANDLING
FRONT LOADERS 75 CONCRETE MIXERS 75
BACKHOES 75 CONCRETE PUMPS 75
DOZERS 75 CRANES 75
TRACTORS 75 DERRICKS IMPACT 75
SCAPERS 80 PILE DRIVERS 95
GRADERS 75 JACK HAMMERS 75
01 57 19 -8
TRUCKS 75 ROCK DRILLS 80
PAVERS, STATIONARY 80 PNEUMATIC TOOLS 80
PUMPS 75
GENERATORS 75 SAWS 75
COMPRESSORS 75 VIBRATORS 75
b. Use shields or other physical barriers to restrict noise transmission.
c. Provide soundproof housings or enclosures for noise-producing machinery.
d. Use efficient silencers on equipment air intakes.
e. Use efficient intake and exhaust mufflers on internal combustion engines that are maintained so equipment performs below noise levels specified.
f. Line hoppers and storage bins with sound deadening material.
g. Conduct truck loading, unloading, and hauling operations so that noise is kept to a minimum.
3. Measure sound level for noise exposure due to the construction at least once every five successive working days while work is being performed above 55 dB(A) noise level. Measure noise exposure at the property line or 15 m (50 feet) from the noise source, whichever is greater. Measure the sound levels on the A weighing network of a
General Purpose sound level meter at slow response. To minimize the effect of reflective sound waves at buildings, take measurements at
900 to 1800 mm (three to six feet) in front of any building face.
Submit the recorded information to the COR noting any problems and the alternatives for mitigating actions.
Restoration of Damaged Property: If any direct or indirect damage is done to public or private property resulting from any act, omission, neglect, or misconduct, the Contractor shall restore the damaged property to a condition equal to that existing before the damage at no additional cost to the Government. Repair, rebuild, or restore property as directed or make good such damage in an acceptable manner.
Final Clean-up: On completion of project and after removal of all debris, rubbish, and temporary construction, Contractor shall leave the construction area in a clean condition satisfactory to the COR.
Cleaning shall include off the station disposal of all items and
01 57 19 -9 materials not required to be salvaged, as well as all debris and rubbish resulting from demolition and new work operations.
- - - E N D - - -
EXAM 9
WSF1
RB1
P1,WP1
ETR
GA-181
AS40708
AS407
EXAM 10
WSF1
RB1
P1,WP1
ETR
GA-182
P2
P3
GA-182 GA-181
± 9' - 11" VIF ± 9' - 9 1/2" VIF
" V
IF
EXAM 10
GA-182
EXAM 9
GA-181
CEILING & ALL CEILING
DEVICES & EQUIPMENT
EXISTING TO REMAIN,
PROTECT IN PLACE
DURING RENOVATION
CEILING & ALL CEILING
DEVICES & EQUIPMENT
EXISTING TO REMAIN,
PROTECT IN PLACE
DURING RENOVATION
EXAM 9
GA-181
EXAM 10
GA-182
TEMPORARY PARTITION3'
-0
" M
IN
3'
5"
PATIENT CIRCULATION TO BE RE-ROUTING AROUND
CENTRAL WORK STATION DURING THIS PHASE - TEMP
SIGNAGE TO BE PROVIDED
T
WALL PROTECTION
WAINSCOT, AS
SCHEDULED
BASE AS SCHEDULED
P1
EXISTING
HEADWALL TO
REMAIN, PROTECT
IN PLACE DURING
CONSTRUCTION
WALL PROTECTION
WAINSCOT, AS
SCHEDULED
BASE AS SCHEDULED
P2
WALL PROTECTION
WAINSCOT, AS
SCHEDULED
BASE AS SCHEDULED
P1
GA-181
EXISTING FRAME TO
REMAIN, LEAF TO BE
REPLACED, REUSE
EXISTING HARDWARE; PAINT
FRAME P1
WALL PROTECTION
WAINSCOT, AS
SCHEDULED
BASE AS SCHEDULED
P1
EXISTING SINK TO REMAIN
3'
0" 6"
3'
6"
AS501
TYP
WALL PROTECTION
WAINSCOT, AS
SCHEDULED
BASE AS SCHEDULED
P1
EXISTING
HEADWALL TO
REMAIN, PROTECT
IN PLACE DURING
CONSTRUCTION
WALL PROTECTION
WAINSCOT, AS
SCHEDULED
BASE AS SCHEDULED
P1
EXISTING SINK TO REMAIN
WALL PROTECTION
WAINSCOT, AS
SCHEDULED
BASE AS SCHEDULED
P1
GA-182
EXISTING FRAME TO
REMAIN, LEAF TO BE
REPLACED, REUSE
EXISTING HARDWARE; PAINT
FRAME P1
WALL PROTECTION
WAINSCOT, AS
SCHEDULED
BASE AS SCHEDULED
P3
3'
0" 6"
3'
6"
AS501
TYP
WALL REMARKS
W1. REMOVE WALL MOUNTED MOVABLE FURNISHINGS, TAPE OFF & PROTECT FIXED
DEVICES CONNECTED TO MEPFP DURING RENOVATION.
W2. REPAIR AND PATCH GWB DAMAGE.
W3. NEW PAINT THROUGHOUT.
W4. NEW WALL PROTECTION WAINSCOT ALL WALLS.
W5. PICK RESISTANT SEALANT AT ALL JOINT AND MATERIAL INTERFACES.
FLOORING/BASE REMARKS
F1. REMOVE EXISTING FLOORING & BASE.
F2. INSTALL NEW WSF1 FLOORING & INTEGRAL BASE, INSTALL TRANSITION WITH
ADJACENT FLOORING AT DOOR.
CEILING REMARKS
C1. REMOVE CEILING AS REQUIRED TO INSTALL NEW HVAC PIPING, REINSTALL
EXISTING CEILING AFTER HVAC INSTALLATION COMPLETE.
C2. CLEAN AND REPLACE DAMAGED CEILING TILES & EXISTING DEVICES, MINIMAL
REPLACEMENT EXPECTED.
C3. DEMOLISH PORTIONS OF EXISTING CEILING AS REQUIRED TO INSTALL LIGATURE-
RESISTANT FIXTURES. PATCH AND REPAIR GWB AS REQUIRED TO CREATE EVEN
SURFACE AND PAINT.
C4. RELOCATE (1) LIGHT FIXTURE.
DOOR REMARKS
D1. REPLACE DOOR LEAF WITHIN EXISTING FRAME, REUSE EXISTING HARDWARE.
D2. REPLACE CARD READER AT EXISTING DOOR.
D3. NEW LIGATURE RESISTANT DOOR AND HARDWARE.
WINDOW REMARKS
G1. PAINT FRAME P1.
HVAC REMARKS
H1. ABOVE CEILING PIPING WORK, TEMPORARY REMOVAL OF CEILING.
H2. NEW LIGATURE-RESISTANT CEILING DEVICES.
H3. NEW ROOFTOP EQUIPMENT.
ELECTRICAL REMARKS
E1. NEW CARD READER.
E2. TEMPORARY REMOVAL OF CEILING FOR ABOVE CEILING WORK, DISCONNECT
ELECTRICAL DEVICES ARE REQUIRED.
E3. CONNECTIONS TO NEW ROOFTOP EQUIPMENT.
E4. RELOCATE (1) LIGHT FIXTURE.
E5. NEW LIGATURE-RESISTANT CEILING & WALL DEVICES.
FIRE PROTECTION REMARKS
FP1. NEW LIGATURE-RESISTANT SPRINKLER(S) PER FP DRAWINGS.
ICRA LEVEL OF PRECAUTION: REFER TO SPECIFICATIONS FOR FULL REQUIREMENTS
BY LEVEL OF ICRA PRECAUTIONS REQUIRED.
RENOVATION SCOPE REMARKS
1 HOUR FIRE RESISTANCE RATED PARTITION (TOP:
NEW; BOTTOM: ETR)
UNRATED NEW PARTITION
EXISTING PARTITION TO REMAIN
EXISTING PARTITION TO BE DEMOLISHED
WALL INDICATIONS
ED SPACES NOT IN SCOPE (MAY BE
IMPACTED BY TEMP. ICRA
PARTITIONS, SEE DEMO PLANS)
IMPACTED BY RENOVATIONS FOR
CEILING/UTILITY CONNECTION
WORK ONLY
IN SCOPE
ROOM INFILL
FINISH SCHEDULE
P1 PAINT - BM WHITE DOWN
GWB PAINTED GYPSUM WALL
BOARD CEILING
P2 PAINT - SW KOI POND
P3 PAINT - SW BREEZY
WP1 WALL PROTECTION - INPRO
PALLADIUM RIGID SHEET W/ RICOCHET
TOP CAP - ANTIQUE WHITE
WSF1 SHEET VINYL - MANNINGTON PARADIGM II FLOW - EXEMPLAR
RB1 RESILIENT BASE - MANNINGTON IDEAL BASE - GRAY BEIGE
Room name
XXXX
XXXX
XXXX
XXXX
101ROOM
NUMBER
ROOM NAME
BASE
FLOOR
CEILING
WALL
FINISHES
ALL FINISHES IN TAG ARE FIELD
FINISHES, ACCENTS NOTED ON PLANS
TEMPORARY PARTITION*
*PROVIDE TEMPORARY PARTITIONS AND SYSTEMS AS REQUIRED TO MEET ICRA
PRECAUTIONS DURING CONSTRUCTION AND UPON COMPLETION OF EACH
PHASE. SEE ROOM SCHED. FOR PRECAUTION LEVEL. ALL TEMPORARY
PARTITION LAYOUTS TO BE APPROVED BY VA PRIOR TO INSTALLATION, 4'-0"
CLEAR WIDTH MINIMUM TO BE MAINTAINED AT PATIENT AREA CORRIDORS
THROUGHOUT CONSTRUCTION, 3'-0" TO BE MAINTAINED AT OTHER AREAS.
NOT IN SCOPE
CG1 CORNER GUARD - ACROVYN SM-10
#100 EGGSHELL - VIF HEIGHT FROM
TOP OF BASE TO CEILING
(ALL PRODUCTS LISTED BELOW ARE B.O.D.)
P4 PAINT - BM WILD MULBERRY
DEMOLITION KEY NOTES*
REMOVE DOOR LEAF, FRAME TO REMAIN IN PLACE, RETAIN EXISTING HARDWARE
FOR REUSE AT DOOR.
REMOVE FURNISHINGS, EQUIPMENT, CUBICLE CURTAIN, AND SIGNAGE THAT ARE
NOT CONNECTED TO BUILDINGS SERVICES FROM THROUGHOUT ROOM
TEMPORARILY.
TAPE-OFF AND PROTECT HARD-WIRED DEVICES AND EQUIPMENT INCLUDING AT
CEILINGS AND HEADWALL DURING CONSTRUCTION
DEMO PORTIONS OF CEILING FOR INSTALLATION OF NEW DEVICES.
TEMPORARILY REMOVE PORTIONS OF CEILING FOR ABOVE CEILING MEPFP WORK
FLOORING, BASE, AND WALL PROTECTION TO BE REMOVED
*REFER TO SHEET GI002 FOR GENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E PhaseARCHITECT STAMPCONSULTANTS 523A4-20-205
VAMC WEST ROXBURY
EXPAND EMERGENCY
DEPARTMENT
William Pevear Architects, Inc.
872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139
T: 617.335.5186
Alares Engineering
248 Copeland Street, 2nd Floor Quincy, MA 02169
T: 617.481.6390
MEP/FP ENGINEER
Drawing Scale
321 4 5 6 7 8
A
B
C
D
E
321 4 5 6 7 8
1400 VFW PARKWAY, WEST ROXBURY, MA 02132
01/31/2024
CODE CONSULTANT
Hastings Consulting
142 Hanlon Road Holliston, MA 01746
T: 508.397.8417
N
C :\U se rs
\a do rn \D oc um en ts
\1
3-
VA
W R
E D
E xp an si on -re st or ed _a do rn w illi am pe ve ar .c om .rv t 4/
/2
4:
:3
PM
1/4" = 1'-0"
AS407
PHASE 7 - EXAM 9 (GA-180) &
EXAM 10 (GA-182) - DEMOLITION
& NEW DRAWINGS
SCALE: 1/4" = 1'-0"
PHASE 7 - NEW - ENLARGED PLAN - EXAM 9 (GA-180) & EXAM 10
(GA-182)
SCALE: 1/4" = 1'-0"
03 PHASE 7 - ENLARGED RCP - EXAM 9 (GA-180) & EXAM 10 (GA-182)
SCALE: 1/4" = 1'-0"
PHASE 7 - DEMO - ENLARGED PLAN - GA-181 (EXAM 9) & GA-182
(EXAM 10)
SCALE: 1/4" = 1'-0"
07 GA-181 (EXAM 9) - 4
SCALE: 1/4" = 1'-0"
06 GA-181 (EXAM 9) - 3
SCALE: 1/4" = 1'-0"
05 GA-181 (EXAM 9) - 2
SCALE: 1/4" = 1'-0"
04 GA-181 (EXAM 9) - 1
SCALE: 1/4" = 1'-0"
11 GA-182 (EXAM 10) - 4
SCALE: 1/4" = 1'-0"
10 GA-182 (EXAM 10) - 3
SCALE: 1/4" = 1'-0"
09 GA-182 (EXAM 10) - 2
SCALE: 1/4" = 1'-0"
08 GA-182 (EXAM 10) - 1
Room Schedule - Scope Summary - Phase 7
ROOM INFO ARCHITECTURAL
HVAC ELECTRICAL PLUMBING
FIRE
PROTECTION
ICRA LEVEL OF
PRECAUTION OTHER NOTESNUMBER NAME AREA (±) PHASE WALLS
FLOORING &
BASE CEILING DOOR WINDOW
GA-181 EXAM 9 111 SF 7 W1, W2, W3, W4 F1, F2 C2 D1 N/A N/A N/A N/A N/A IV
GA-182 EXAM 10 112 SF 7 W1, W2, W3, W4 F1, F2 C2 D1 N/A N/A N/A N/A N/A IV
PHASE 7
Revision: Date:
Addendum #1 04/18/2025
PANEL TYPE FRAME TYPE
2" 2"
2"
VARIES
F0HG
6"6"
3'- 6"
3'- 0"
FG
6" 6"
6" 1'-
0"
ARMOR PLATE & EDGE
GUARD AT BOTH SIDES, TYP.
2'- 8"
STRETCHER PLATE, KICK PLATE &
EDGE GUARD AT BOTH SIDES, TYP.
6"
KICK PLATE
STRETCHER
PLATE
EDGE
GUARD
ARMOR
PLATE
3'
6"
EDGE
GUARD
OR ETR
PARTITION AS SCHEDULED
SEALANT
0'
- 2
0' - 0 1/2"0' - 0 1/2"
0' - 1 15/16"VARIES0' - 1 15/16"
PARTITION THICKNESS + 1-1/8"
DOOR AS
SCHEDULED
0'
- 0
5/ 8"
JOINT SEALANT
AND BACKING BOTH
SIDES
NOTE: PICK
RESISTANT
SEALANT AT MH
ROOM SIDE
JAMB ANCHOR
REFER TO DOOR
SCHEDULE FOR
FRAME PROFILE
DOOR AS
SCHEDULED
SCHEDULED/EXISTING PARTITION
SC
HE
DU
LE
D/
EX
IS
TI
NG
P
AR
TI
TI
ON
4" T
YP
T TEMPORARY PARTITION
TEMPORARY PARTITIONS GENERAL NOTES:
1. TEMPORARY PARTITIONS SHALL BE LGMF WITH 1/2"
GWB OR 5/8" TYPE X GWB FOR FIRE RATING, SEALED.
PLASTIC FILMS SHALL NOT BE ACCEPTED.
2. PREENGINEERED SYSTEMS, STARC OR EQUAL IN LIEU
OF LGMF ARE ACCEPTABLE.
3. PROVIDE ACOUSTIC INSULATION FOR ALL TEMPORARY
PARTITIONS.
4. PROVIDE RATED TEMPORARY PARTITIONS FOR RATED
SPACES.
5. DOOR OPENINGS WITHIN CONSTRUCTION AREA SHALL
BE SEALED. TEMPORARILY REMOVE AND STORE DOOR
LEAF FOR REUSE IF OPENING IS REQUIRED TO ALLOW
FOR CONTRACTOR ACCESS.
6. IN LOCATIONS WHERE WORK ABOVE CEILINGS SHALL
BE DONE PARTITION SYSTEMS SHALL EXTEND TO U/S OF
STRUCTURE.
CONCRETE SLAB
VINYL FLOORING
INTEGRAL VINYL BASE
6"
WAINSCOT AS SCHEDULED
TOP CAP AS SCHEDULED
5/ 8"
FILLET STRIP
JOINT SEALANT
INTEGRAL BASE TOE
2"
3' -6
" T
YP
PICK RESISTANT
SEALANT AT MENTAL
HEALTH SPACES
CONCRETE SLAB
FLOORING SEAMVINYL FLOORING
0'
- 0
1/ 8"
CONCRETE SLAB
ACCESSIBLE FLOOR
TRANSITION STRIPVINYL FLOORING
0'
- 0
1/ 8"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E PhaseARCHITECT STAMPCONSULTANTS 523A4-20-205
VAMC WEST ROXBURY
EXPAND EMERGENCY
DEPARTMENT
William Pevear Architects, Inc.
872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139
T: 617.335.5186
Alares Engineering
248 Copeland Street, 2nd Floor Quincy, MA 02169
T: 617.481.6390
MEP/FP ENGINEER
Drawing Scale
321 4 5 6 7 8
A
B
C
D
E
321 4 5 6 7 8
1400 VFW PARKWAY, WEST ROXBURY, MA 02132
01/31/2024
CODE CONSULTANT
Hastings Consulting
142 Hanlon Road Holliston, MA 01746
T: 508.397.8417
N
C :\U se rs
\a do rn \D oc um en ts
\1
3-
VA
W R
E D
E xp an si on -re st or ed _a do rn w illi am pe ve ar .c om .rv t 4/
/2
4:
:3
PM
As indicated
AS501
PARTITION DETAILS, DOOR
SCHEDULE & DETAILS, INTERIOR
DETAILS
Door Schedule - New Work
DOOR FRAME
FIRE
RTG
HW
SET Comments
WIDTH
(VIF)
WIDTH BY
PANEL
HEIGHT
PANEL
TYPE MATERIAL
GLASS TYPE
MATE
RIALP1 P2 P1 P 2 P1 P2
CG-20 7' - 0" 3' - 6" 3' - 6" 7' - 0" ETR ETR ETR ETR ETR ETR ETR HW-4 REPLACE CARD READER, TIE-IN TO DOOR OPERATOR TO ACTUATE CG-25 7' - 0" 3' - 6" 3' - 6" 7' - 0" ETR ETR ETR ETR ETR ETR ETR HW-4 REPLACE CARD READER, TIE-IN TO DOOR OPERATOR TO ACTUATE
CG-26 6' - 10 1/4" 7' - 0" ETR ETR ETR ETR ETR ETR HW-4
ES-1 4' - 0" 4' - 0" 7' - 10" G EG -- G EG -- HW-2 NEW EXTERIOR GATE
GA-145 3' - 0" 3' - 0" 7' - 0" FG SCW G-1 ETR ETR -- HW-3 NEW LEAF AND DOOR PROTECTION ONLY GA-146 3' - 0" 3' - 0" 7' - 0" FG SCW G-1 ETR ETR -- HW-3 NEW LEAF AND DOOR PROTECTION ONLY GA-147 3' - 0" 3' - 0" 7' - 0" FG SCW G-1 ETR ETR -- HW-3 NEW LEAF AND DOOR PROTECTION ONLY GA-169 4' - 0" 4' - 0" 7' - 0" FG SCW G-1 ETR ETR -- HW-3 NEW LEAF AND DOOR PROTECTION ONLY GA-170 4' - 0" 4' - 0" 7' - 0" FG SCW G-1 ETR ETR -- HW-3 NEW LEAF AND DOOR PROTECTION ONLY GA-171 4' - 0" 4' - 0" 7' - 0" FG SCW G-1 ETR ETR -- HW-3 NEW LEAF AND DOOR PROTECTION ONLY GA-172 4' - 0" 4' - 0" 7' - 0" FG SCW G-1 ETR ETR -- HW-3 NEW LEAF AND DOOR PROTECTION ONLY GA-173 4' - 0" 4' - 0" 7' - 0" FG SCW G-1 ETR ETR -- HW-3 NEW LEAF AND DOOR PROTECTION ONLY GA-178 4' - 0" 4' - 0" 7' - 0" FG SCW G-1 ETR ETR -- HW-3 NEW LEAF AND DOOR PROTECTION ONLY GA-179 4' - 0" 4' - 0" 7' - 0" FG SCW G-1 ETR ETR -- HW-3 NEW LEAF AND DOOR PROTECTION ONLY GA-180 4' - 0" 4' - 0" 7' - 0" HG SWD G-2 F0 HM -- HW-1 NEW LIGATURE-RESISTANT DOOR, FRAME, & HARDWARE (P1
MATERIAL REV. ADDENDUM #1)
GA-181 4' - 0" 4' - 0" 7' - 0" FG SCW G-1 ETR ETR -- HW-3 NEW LEAF AND DOOR PROTECTION ONLY GA-182 4' - 0" 4' - 0" 7' - 0" FG SCW G-1 ETR ETR -- HW-3 NEW LEAF AND DOOR PROTECTION ONLY GA-184 4' - 0" 4' - 0" 7' - 0" FG SCW G-1 ETR ETR -- HW-3 NEW LEAF AND DOOR PROTECTION ONLY GA-186 4' - 0" 4' - 0" 7' - 0" FG SCW G-1 ETR ETR -- HW-3 NEW LEAF AND DOOR PROTECTION ONLY GA-187 4' - 0" 4' - 0" 7' - 0" FG SCW G-1 ETR ETR -- HW-3 NEW LEAF AND DOOR PROTECTION ONLY
KEY DOOR CONSTRUCTION DESCRIPTION
EG EXTERIOR GATE
ETR EXISTING TO REMAIN
SCW SOLID CORE WOOD
SWD SECURITY WOOD DOOR (WOOD VENEER METAL DOOR,
BOD AMBICO SECURITY WOOD DOOR)
KEY FIRE RATING DESCRIPTION
-- NONE
45 45 MIN
90 90 MIN
ETR EXISTING TO REMAIN - NOT MODIFIED
KEY GLASS TYPE DESCRIPTION
-- NO GLASS REQUIRED
ETR EXISTING TO REMAIN GLASS
G-1 LAMINATED SAFETY GLASS (080000 GL0-1) (ADDENDUM #1)
G-2 SECURITY GLASS (080000 GL-2) (ADDENDUM #1)
KEY FRAME CONSTRUCTION DESCRIPTION
EG EXTERIOR GATE
ETR Existing to Remain HM Frame - Repaint
HM HOLLOW METAL
SCALE: 6" = 1'-0"
11 TYP. HOLLOW METAL DOOR FRAME HEAD/JAMB DETAIL
SCALE: 6" = 1'-0"
12 TYP. FRAME LOCATION AT PERPENDICULAR PARTITION
SCALE: 1 1/2" = 1'-0"
13 TYPE "T" - TEMPORARY PARTITION
SCALE: 6" = 1'-0"
TYP. WALL BASE DETAIL INTEGRAL BASE WITH WAINSCOT AT
SHEET VINYL FLOORING
SCALE: 6" = 1'-0"
15 TYP. FLOOR TRANSITION VINYL TO VINYL
REPLACE CARD READER, TIE-IN TO DOOR OPERATOR TO ACTUATE
KEY HARDWARE TYPE DESCRIPTION
HW-1 MH EXAM DOOR HW - BEST LIGATURE RESISTANT LEVER
SET SPSL SERIES (LISL/LISE (MORTISE) WITH PRIVACY
LOCK; TYPICAL BUTT HINGES AT CORRIDOR SIDE; TYPICAL
DOOR STOP AT EXTERIOR; TYPICAL CLOSER AT CORRIDOR
SIDE
HW-2 (ADDENDUM #1) EXTERIOR GATE HARDWARE:HINGES: 180
DEGREE GATE HINGES PER LEAF; POSITIVE LOCKING GATE
LATCH PERMITTING OPERATION FROM BOTH SIDE OF GATE,
WITH PROVISIONS FOR PADLOCKING ACCESSIBLE FROM
BOTH SIDES OF GATE; PADLOCKS: BY VA; PROVIDE TYPICAL
CHAIN LINK FENCE SPRING LOADED CLOSER.
HW-3 (ADDENDUM #1) REUSE EXISTING HW AT NEW DOOR LEAF;
PROVIDE NEW EDGE GUARD, KICK PLATE & STRETCHER
PLATE BOTH SIDES.
HW-4 (ADDENDUM #1) HW ETR - REPLACE CARD READER, TIE-IN
NEW CARD READER TO DOOR OPERATOR ACTUATION
GENERAL DOOR NOTES:
1. REFER TO SHEET GI120 FOR TAGGED CORRIDOR DOOR LOCATIONS FOR CARD READER REPLACEMENT
2. VERIFY DOOR DIMENSIONS IN FIELD FOR EXACT DOOR LEAF REPLACEMENT SIZE.
3. DOOR HARDWARE STANDARDS TO BE VERIFIED WITH CURRENT VA STANDARDS PRIOR TO INSTALLATION.
DOOR PROTECTION: ARMOR PLATES, KICK PLATES, STRETCHER PLATES AND DOOR EDGING
1. CONFORM TO ANSI STANDARD A156.6.
2. KICK PLATES, STRETCHER AND ARMOR PLATES OF METAL, TYPE J100 SERIES.
3. PROVIDE KICK PLATES AND MOP PLATES WHERE SPECIFIED. KICK PLATES SHALL (12 INCHES) HIGH. KICK, ARMOR AND STRETCHER PLATES SHALL BE MINIMUM 1.58 MM (0.062 INCHES) THICK, BEVELED ON ALL 4 EDGES (B4E). ON PUSH SIDE OF DOORS WHERE JAMB STOP EXTENDS TO FLOOR, MAKE KICK PLATES 38 MM (1-1/2 INCHES) LESS THAN WIDTH OF DOOR. EXTEND ALL OTHER KICK AND MOP PLATES TO WITHIN 6 MM (1/4 INCH) OF
EACH EDGE OF DOORS.
4. ARMOR PLATES SHALL BE MINIMUM 1.58 MM (0.062 INCHES) THICK, 1066 MM (42 INCHES) HIGH AND 38 MM (1-1/2 INCHES) LESS THAN WIDTH OF DOORS. PROVIDE ARMOR PLATES BEVELED ON ALL 4 EDGES (B4E). WHERE TOP OF INTERMEDIATE RAIL OF DOOR IS LESS THAN 1066 MM (42 INCHES) FROM DOOR BOTTOM, EXTEND ARMOR
PLATES TO WITHIN 13 MM (1/2 INCH) OF TOP OF INTERMEDIATE RAIL.
5. PROVIDE SURFACE TYPE STAINLESS STEEL EDGE GUARDS, EQUAL TO BURNS MFG. 302 SERIES AT ALL WOOD DOORS. PROVIDE EDGE GUARDS OF BEVEL AND THICKNESS TO MATCH WOOD DOOR. PROVIDE EDGE GUARDS WITH FACTORY CUT-OUTS FOR DOOR HARDWARE THAT MUST BE INSTALLED THROUGH OR EXTEND THROUGH THE EDGE GUARD. PROVIDE FULL-HEIGHT EDGE GUARDS. FORWARD EDGE GUARDS TO WOOD DOOR
MANUFACTURER FOR FACTORY INSTALLATION ON DOORS.
23 DOOR SCHEDULE, LEGENDS, & NOTES
Revision: Date:
Addendum #1 04/18/2025
1 ADDENDUM #1 NOTE:
1. PROVIDE FACTORY FINISH. PROVIDE VENEER AND FINISH PER
090600: SLICED WHITE MAPLE VENEER, CLEAR FINISH
2. ALL REPLACEMENT DOOR LEAVES/DOORS TO MATCH EXISTING
RATING; BASED ON EXISTING AS BUILT DRAWINGS PROVIDED BY VA,
ALL DOORS IN SCOPE ASSUMED UNRATED WITH EXCEPTION OF
CORRIDOR DOORS WHICH ARE EXISTING TO REMAIN.
DN
AS70116
SECURITY FENCE WITH ACCESS GATE.
PROVIDE GATE HARDWARE W/ POSITIVE
GATE LATCH WITH PROVISIONS FOR
PADLOCKING FROM BOTH SIDES OF GATE
AS701
EXISTING PARAPET
TO REMAIN
AS701
NEW REINFORCED
CONCRETE LANDING
PAD AT BASE OF STAIR
STAIR SUPPORT
COLUMNS BY MANUF.
SWITCHBACK PREFAB ALUMINUM ACCESS STAIR;
OSHA COMPLIANT. 36" WIDE, OPEN RISER SKID
RESISTANT BAR GRATE TREADS. PROVIDE CONCRETE
MOUNTING PAD AT LANDING AND CONCRETE
SUPPORT PIERS AS REQUIRED. PROVIDE NEOPRENE
SUPPORT PADS FOR ROOFTOP LANDING CROSS
OVER. 1 1/2" DIAMETER PIPE HANDRAILS.
AS701
2'-4" CLEAR
4 1/2"10"
EQ EQ
EQ EQ
OVERALL
± 7' - 11"
EXISTING EXTERIOR WALL TO FAR EDGE OF
STAIR. OVERALL WIDTH TO BE VERIFIED WITH
DELEGATED DESIGN STAIR SYSTEM
LANDING CLEAR WIDTH
TO MATCH CLEAR
WIDTH AT STAIR RUNS
Ground Level 0' - 0"
Level 1 13' - 10"
0"
VI
F
3'
0"
EXISTING PARAPET
TO REMAIN
AS701
SECURITY FENCE
WITH ACCESS GATE
MAINTAIN 6" MIN. CLEARANCE FOR
ACCESS TO EXISTING EXTERIOR DOOR
STAIR SUPPORTS,
CONNECT AT STRINGER
AND BRACE AS REQ'D BY
DELEGATED DESIGNER
CONCRETE FENCE POST
FOOTING, 42"X12"
AS701
8'
0"
6" MIN.
10' - 0" 4' - 4" 4' - 4"
AS702
TYP
EXISTING PARAPET
TO REMAIN
AS701
AS702
TYP
SECURITY FENCE
WITH ACCESS GATE
STAIR SUPPORTS,
CONNECT AT STRINGER
AND BRACE AS REQ'D BY
DELEGATED DESIGNER
AS701
/2
3'
1/
2"
AS702
TYP
AS702
TYP
AS702
TYP
AS702
AS702
TYP
HAUNCHED SLAB AT
STAIR SUPPORTS
SET SLAB
ELEVATION AT 1"
ABOVE HIGHEST
GRADE AT STAIR
FOOTPRINT
1" M
IN
7"
9"
8" CONCRETE BELOW GRADE MIN.
EXISTING LOW ROOF VI
F
3'
0"
EXISTING PARAPET TO REMAIN
BRIDGE OVER PARAPET
NON-PENETRATING
ROOF MOUNTING PAD
STAIR SUPPORTS, CONNECT
AT STRINGER AND BRACE
AS REQ'D BY DELEGATED
DESIGNER
AS702
TYP
± 7' - 11"± 2' - 2"
AS701
3'
1/
2" 6'
9' - 0" 9' - 6"
SECURITY FENCE WITH
ACCESS GATE. PROVIDE
GATE HARDWARE W/
POSITIVE GATE LATCH WITH
PROVISIONS FOR
PADLOCKING FROM BOTH
SIDES OF GATE
NEW REINFORCED
CONCRETE LANDING
PAD AT BASE OF
STAIR. DO NOT TIE
NEW CONCRETE PAD
FOR STAIR TO
EXISTING BUILDING.
AS702
TYP
STAIR SUPPORTS,
CONNECT AT STRINGER
AND BRACE AS REQ'D BY
DELEGATED DESIGNER
EXISTING EXTERIOR WALL
PROVIDE ±1/2”
EXPANSION JOINT
WITH JOINT FILLER
AT INTERSECTION
WITH EXTERIOR
WALL OF EXISTING
BUILDING.
AS70116
AS701
AS701
AS701
SECURITY FENCE WITH ACCESS GATE.
PROVIDE GATE WITH HARDWARE FOR PAD
LOCK.
EXISTING BUILDING
NEW REINFORCED
CONCRETE LANDING
PAD AT BASE OF STAIR
SWITCHBACK PREFAB ALUMINUM ACCESS STAIR;
OSHA COMPLIANT. 36" WIDE, OPEN RISER SKID
RESISTANT BAR GRATE TREADS. PROVIDE CONCRETE
MOUNTING PAD AT LANDING AND CONCRETE
SUPPORT PIERS AS REQUIRED. PROVIDE NEOPRENE
SUPPORT PADS FOR ROOFTOP LANDING CROSS
OVER. 1 1/2" DIAMETER PIPE HANDRAILS.
9' - 6"
NOTE: PREFAB STAIR AND RELATED
FOUNDATION SYSTEMS, SECURITY GATE,
AND SECURITY ENCLOSURE SHALL BE
DELEGATED DESIGN. CONTRACTOR TO
PROVIDE STAMPED AND SIGNED
ENGINEERING DRAWINGS. CONTRACTOR
SHALL PROVIDE TOPOGRAPHIC SURVEY OR
CONDUCT ON SITE FIELD INVESTIGATIONS
AS REQUIRED AND PROVIDE GROUND
PENETRATING RADAR SCANS IN IMPACTED
AREAS TO COORDINATE BELOW GRADE
WORK WITH EXISTING CONDITIONS.
NOTE: CONTRACTOR TO PROVIDE SURVEY
OF AREA AND DELEGATED DESIGN FOR
STAIR CONNECTION AT GROUND AND
PREFABRICATED STAIR
BASIS OF DESIGN: UPSIDE INNOVATIONS
OSHA COMPLIANT ALUMINUM STAIR TOWER
6' - 10" O.C.
3'
0" O
.C
3'
0" O
.C
2'-4" CLEAR
3' - 0"
STAIR SUPPORTS,
CONNECT AT STRINGER
AND BRACE AS REQ'D BY
DELEGATED DESIGNER
4 1/2"
10"
MAINTAIN 6" CLEARANCE
FOR ACCESS TO EXISTING
EXTERIOR DOOR
4'
4"
4' -0
" G
AT
E
4'
4"
8' - 6"
NOTE: ROOF MAINTENANCE ACCESS STAIR
TO MEET OSHA REQUIREMENTS. NO
ACCESS BY GENERAL PUBLIC.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E PhaseARCHITECT STAMPCONSULTANTS 523A4-20-205
VAMC WEST ROXBURY
EXPAND EMERGENCY
DEPARTMENT
William Pevear Architects, Inc.
872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139
T: 617.335.5186
Alares Engineering
248 Copeland Street, 2nd Floor Quincy, MA 02169
T: 617.481.6390
MEP/FP ENGINEER
Drawing Scale
321 4 5 6 7 8
A
B
C
D
E
321 4 5 6 7 8
1400 VFW PARKWAY, WEST ROXBURY, MA 02132
01/31/2024
CODE CONSULTANT
Hastings Consulting
142 Hanlon Road Holliston, MA 01746
T: 508.397.8417
N
C :\U se rs
\a do rn \D oc um en ts
\1
3-
VA
W R
E D
E xp an si on -re st or ed _a do rn w illi am pe ve ar .c om .rv t 4/
/2
4:
:3
PM
As indicated
AS701
EXTERIOR STAIR ENLARGED
PLAN AND SECTIONS
SCALE: 1/4" = 1'-0"
14 EXTERIOR STAIR ENLARGED ROOF PLAN
SCALE: 1/4" = 1'-0"
16 EXTERIOR STAIR ELEVATION
SCALE: 1/4" = 1'-0"
23 EXTERIOR STAIR SECTION 1
SCALE: 1/2" = 1'-0"
22 EXTERIOR STAIR PARAPET SECTION
SCALE: 1/4" = 1'-0"
21 EXTERIOR STAIR SECTION 2
SCALE: 1/4" = 1'-0"
12 EXTERIOR STAIR ENLARGED LEVEL 1 PLAN
Revision: Date:
STRUCTURAL ALUMINUM
STRINGER
OPEN RISER SKID RESISTANT
BAR GRATE TREADS
7"
11"
STRUCTURAL ALUMINUM
STRINGER
OPEN RISER SKID RESISTANT
BAR GRATE TREADS
FOOTPLATE ANCHORED
TO SLAB AS REQ'D BY
DELEGATED DESIGNER
STRUCTURAL ALUMINUM STRINGER
OPEN RISER SKID RESISTANT
BAR GRATE TREADS
SKID RESISTANT BAR GRATE
LANDING
LANDING SUPPORT AS REQ'D
BY DELEGATED DESIGNER.
STRUCTURAL ALUMINUM
STRINGER
OPEN RISER SKID
RESISTANT BAR GRATE
TREADS
SKID RESISTANT BAR
GRATE LANDING
LANDING SUPPORT AS REQ'D
BY DELEGATED DESIGNER.
END VIEW ELEVATION
TOP VIEW
STRINGER W/ GUARDRAIL ON TOP
4 1/2"
HANDRAIL BRACKET
TO POST
2" TYP. STRINGER
ALUMINUM HANDRAIL
ALUMINUM GUARDRAIL
3'
0"3'
6"
2" TYP. STRINGER
2 1/2" TYP.
ALUMINUM HANDRAIL
ALUMINUM GUARDRAIL
ALUMINUM
HANDRAIL
ALUMINUM
GUARDRAIL
COLUMN FOOTPLATE
ANCHORED TO SLAB AS REQ.
BY DELEGATED DESIGNER
PREFAB ALUMINUM STAIR POST
AND ATTACHMENT DETAIL AS
PER MANUFACTURER
NOTE: SEE STRUCTURAL DETAIL FOR
CONCRETE AND ANCHOR PLATE INFORMATION
HAUNCH/ REINFORCE PAD
AT STAIR COLUMNS AS
REQ. BY MANUFACTURER
NON-PENETRATING ROOF
MOUNTING PAD
EXISTING ROOF
MOUNTING PLATE BY
DELEGATED DESIGNER
ROOF AGGREGATE
3'- 0"
3'- 6"
STRUCTURAL ALUMINUM
STRINGER
OPEN RISER SKID
RESISTANT BAR GRATE
TREADS
ALUMINUM HANDRAIL
ALUMINUM GUARDRAIL
CONCRETE SLAB
TYPICAL CORNER
POST FOOTING
TYPICAL LINE
POST FOOTING
SEE PLAN
8'
0"
SECURITY FENCE AND
ACCESS GATE BY
DELEGATED DESIGNER
CONCRETE FOOTING, SEE
STRUCTURAL FOR ADDITIONAL
INFORMATION
GALVANIZED STEEL
CHAIN LINK
FENCING, TYP.
GALVANIZED STEEL
FENCE POST, TYP.
PAD ELEVATION ±4" ABOVE GRADE
MIN., W/ 1/8" PER 1'-0" CROSS SLOPE.
THE EXISTING GRADE SLOPE VARIES,
SET NEW PAD TO MIN. 6" STEP AT
GATE ACCESS.
CONCRETE PAD TO BE POURED
OVER CONCRETE FENCE FOOTINGS
BE
LO
W G
R
AD
E
4' -0
" M
IN
1' - 0" TYP.
POSITIVE GATE
LATCH WITH
PROVISIONS FOR
PADLOCKING
FROM BOTH
SIDES OF GATE
8"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E PhaseARCHITECT STAMPCONSULTANTS 523A4-20-205
VAMC WEST ROXBURY
EXPAND EMERGENCY
DEPARTMENT
William Pevear Architects, Inc.
872 Massachusetts Ave. Suite 2-9 Cambridge, MA 02139
T: 617.335.5186
Alares Engineering
248 Copeland Street, 2nd Floor Quincy, MA 02169
T: 617.481.6390
MEP/FP ENGINEER
Drawing Scale
321 4 5 6 7 8
A
B
C
D
E
321 4 5 6 7 8
1400 VFW PARKWAY, WEST ROXBURY, MA 02132
01/31/2024
CODE CONSULTANT
Hastings Consulting
142 Hanlon Road Holliston, MA 01746
T: 508.397.8417
N
C :\U se rs
\a do rn \D oc um en ts
\1
3-
VA
W R
E D
E xp an si on -re st or ed _a do rn w illi am pe ve ar .c om .rv t 4/
/2
4:
:3
PM
As indicated
AS702
EXTERIOR STAIR DETAILS
SCALE: 1 1/2" = 1'-0"
12 TYP. STAIR DETAIL - TYPICAL TREAD
SCALE: 1 1/2" = 1'-0"
11 TYP. STAIR DETAIL - BOTTOM CONNECTION TO SLAB
SCALE: 1 1/2" = 1'-0"
13 TYP. STAIR DETAIL - TOP CONNECTION TO LANDING
SCALE: 1 1/2" = 1'-0"
14 TYP. STAIR DETAIL - BOTTOM CONNECTION TO LANDING
SCALE: 1" = 1'-0"
22 TYP. STAIR DETAIL - GUARDRAIL AT LANDING
SCALE: 1 1/2" = 1'-0"
16 TYPICAL STAIR SUPPORT COLUMN FOOTING
SCALE: 1 1/2" = 1'-0"
15 TYP. STAIR DETAIL - BOTTOM CONNECTION TO EXISTING ROOF
SCALE: 1" = 1'-0"
23 TYP. STAIR DETAIL - GUARDRAIL TERMINATION
SCALE: 1/2" = 1'-0"
25 CHAIN LINK FENCE DETAIL
NOTE: ROOF MAINTENANCE
ACCESS STAIR TO MEET OSHA
REQUIREMENTS. NO ACCESS BY
GENERAL PUBLIC.
Revision: Date:
File details come from the government source that posted it. Updated .