Attachment 1 - RFP 36C77624R0098 Tech Questions - dated 5-2-25.docx

DOCX document 39 KB Posted

Attached to
Y1DA--VISN 1 Construction MATOC Federal contract opportunity
Solicitation number
36C77624R0098
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document is a Technical Questions and VA Response Tracking Sheet for Solicitation #36C77624R0098, a VISN 1 Construction Multiple Award Task Order Contract (MATOC) issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The tracking sheet contains 15 technical questions and corresponding government responses covering diverse topics such as proposal submission requirements, project documentation, specification clarifications, and contract administration details. Key clarifications include requirements to complete all pricing attachment tabs, confirmation of owner's project manager definition, flooring base specifications, submission of past performance questionnaires, and confirmation that the contract is firm fixed-price with no tariff allowances. The solicitation appears to involve construction services with specific technical and documentation requirements, and allows multiple email submissions to meet the 5MB file size limitation for proposal responses.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--VISN 1 Construction MATOC, newest first.
File Type Posted
36C77624R0098 0003.docx DOCX document
Attachment 3 - Attachment 06g - Wage Det - MA20250001 Rev5 4-4-25.pdf PDF
Attachment 1F - 108_3-S21_First and Second Floor Sections.pdf PDF
Attachment 1D - 690-035 3-85 bldg 3 OREA Ground North Color Accent 1991.pdf PDF
Attachment 2 - Attachment 06 - 523A4-20-205 Seed Project Notice of Task Order Request for Proposal - Updated 4-17-25.docx DOCX document
Attachment 1E - 090_3-S3_First Floor Framing Plan North.pdf PDF
Attachment 1A - 21_0521 523A4-20-205 RBM Report.pdf PDF
Attachment 1C - 056_3-1_New Addition - Part Ground Floor Plan - North.pdf PDF
Attachment 1B - 25_0418-523A4-19-205.A01.pdf PDF
Attachment 1 - RFP 36C77624R0098 Tech Questions - dated 4-22-25.docx DOCX document
36C77624R0098 0002.docx DOCX document
Attachment 1 - Sign-In Sheet - VISN 1 MATOC 4-2-25.pdf PDF
Attachment 2 - 36C77624R0098_0001.docx DOCX document
36C77624R0098 0001.docx DOCX document
Attachment 06a - Drawings 523A4-20-205 - Part1.pdf PDF
Attachment 06g - Wage Det - MA20250001 Rev2 3-14-25.pdf PDF
Attachment 06c - Base Offer Cost Breakdown.xlsx XLSX spreadsheet
Attachment 06a - Drawings 523A4-20-205 - Part2.pdf PDF
Attachment 06e - Pre-Construction Risk Assessment - VISN 1 MATOC Seed Project.pdf PDF
Attachment 03 - Project Information Sheet for Contractors.docx DOCX document
Attachment 01 - Technical Question Form - VISN 1 MATOC.xlsx XLSX spreadsheet
Attachment 06a - Specifications 523A4-20-205.pdf PDF
Attachment 06d - Site Visit Instructions - Seed Project VISN 1 MATOC.docx DOCX document
Attachment 05 - Past Performance Questionnaire.docx DOCX document
Attachment 06b - Seed Project Price Schedule Sheet.docx DOCX document
Attachment 04 - Subcontractor Information and Consent Form.docx DOCX document
Attachment 06 - 523A4-20-205 Seed Project Notice of Task Order Request for Proposal.docx DOCX document
Attachment 06h - Brand Name J_A - 523A4-20-205 Redacted.pdf PDF
Attachment 06f - Infection Control Risk Assessment - VISN 1 MATOC Seed Project.pdf PDF
Attachment 02 - Limitations on Subcontracting.docx DOCX document
36C77624R0098.docx DOCX document
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION #: 36C77624R0098

PROJECT NAME: VISN 1 Construction MATOC

TECHNICAL QUESTIONS AND VA RESPONSE TRACKING SHEET

Item No.
MATOC
SEED PROJECT
QUESTION
GOVERNMENT RESPONSE
X
Please clarify RFI question 201. We want to make sure we sufficiently meet the solicitation requirements. Please confirm only the Base Offer breakdown tab showing labor & material on attachment 06C needs to be filled out.
No, that is not confirmed. You are required to complete all tabs so we can evaluate your breakdown for the seed project. This solicitation requires you to complete Attachments 6b and 06c, and that means in their entirety.

Offerors are required to submit BOTH Attachments 06b & 06c. Refer to Section “Instructions, Conditions, and Other Statements to Offerors”.

217
X
On the Project Information Sheet for Contractors (Attachment 03), there is a space for Contracting Officer name and contact information. Then below that there is a space for "Owners's Project Manager/POC" name and contact information. Can you please clarify who is the "Owner"? Would this be the POC/COR of our client, or is this our (the Offeror's) project manager?
Owner’s Project Manager/POC is the client’s project manager or POC – who you completed the project for. If you were a sub on the project, the Owner’s POC/PM is still the project owner/client, and not the Prime you were a sub for.
X
GI002 Finish Schedule shows WSF-1 sheet vinyl flooring with RB1 resilient base. Similarly, Specification section 09 06 00 sections 2.5.B. and C. show WSF1 Mannington Paradigm II Flow resilient sheet flooring and RB1 6” Rubber base, respectively. However, specification section 09 65 16 para 2.4.D mention fillet strip and cap strip for base, indicating an integral, self-cove base. Similarly, AS501 detail 14 shows an integral vinyl base. During our jobwalk, we've observed the existing base as a self-coved/integral base. Please clarify if the new floor base will be a 6" rubber base per spec section 09 06 00 or an integral base per detail 14 on AS501.
Refer to RFI-50 response.

090600 Basis of Design products listed are the welded sheet flooring and prefabricated welded integral flash cove base. The basis of design product for RB1 is a prefabricated integral base that is welded to the WSF1 flooring.

096516-2.4D: The cap and fillet strip shall be provided as required by the selected integral base manufacturer’s installation instructions. RB1 product listed in 090600 is basis of design, manufacturer requirements for submitted product may vary.

Detail 14/AS501 shows a welded integral base with a 2” toe similar to the basis of design product listed in 090600 that can also be created using a “flash cove” type field installed integral welded base.

219
X
X
If we are to include additional breakouts with our pricing this could max out our size limitations. Solicitation Section 2.9.2 states that proposals must not exceed 5MB total.
Send multiple emails if required, we will confirm each one.
220
X
Please advise on how to obtain PPQs that have been previously submitted for past projects.
Refer to #215. They are not stored somewhere. You will need to re-ask your clients to send them in for the new submission. Please refer to section 2.11 Information to be Submitted Volume 1: Factor 1, Past Performance.
X
RFI #127 response indicate the CM will be hiring the commissioning agent. Spec section 23 08 00 Commissioning of HVAC Systems 1.1-B states that commissioning agent will be appointed by VA, and 01 90 00-1.8-C-1 is even more explicit, stating “The VA with engage the CxA under a separate contract.”

1. Please confirm if the CM will be the one hiring the commissioning agent for the complete Cx scope.

2. If the CM is to hire a commissioning agent for this project, please provide a job-specific list of systems to be commissioned to properly price the scope for the Cx agent. 01 91 00 General Commissioning Requirements - 1.7 looks to be a more generic sublist as it is including scope not applicable to this project. It seems as most of the items listed out might not apply to this project Commissioning agent not required for project. Contractor responsible for typical factory startup and testing requirements for all equipment/ systems per individual specification sections.

222
X
How many contracts are expected to be awarded under this solicitation?
We cannot predict that.
223
X
Box 11 of the amendments says they can be acknowledged through one of three methods. Does acknowledging receipt of the amendments on Form 1442 meet option (b) of the available methods "By acknowledging receipt of the amendment on each copy of the offer submitted"?
Yes.
X
Spec 09 60 00 -Schedule for Finishes shows a glass type G-3 in the glazing schedule. Please confirm where glass type G-3 is found and provide a specification if applicable.
G-3 is not applicable, disregard.
225
X
Please clarify the required submission of 52.219-28 - POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION. It appears a submission is not required if the contractor completes or updates its representations and certifications on SAM. Is this correct?
Correct.
X
GI-120: Can the table summary be updated to reflect Addendum changes? It’s still showing FP in GA-182 which was confirmed it’s not applicable anymore.
Upon award, summary table will be updated.
X
As referenced in previous bid question 105, 106, 193, related to the exterior stair. Please clarify that the costs for any design of the site, Grading profiles etc, is the responsibility of the contractor and will not be designed by the VA engineers of record?
Confirmed, these are responsibility of contractor. Per note in drawing 12/AS701: NOTE: PREFAB STAIR AND RELATED FOUNDATION SYSTEMS, SECURITY GATE, AND SECURITY ENCLOSURE SHALL BE DELEGATED DESIGN. CONTRACTOR TO PROVIDE STAMPED AND SIGNED

ENGINEERING DRAWINGS. CONTRACTOR SHALL PROVIDE TOPOGRAPHIC SURVEY OR CONDUCT ON SITE FIELD INVESTIGATIONS AS REQUIRED AND PROVIDE GROUND PENETRATING RADAR SCANS IN IMPACTED AREAS TO COORDINATE BELOW GRADE

WORK WITH EXISTING CONDITIONS.

228
X
As referenced in previous bid question 107, 211. To maintain the 5MB limit are we allowed to submit multiple e-mails for each proposal volume i.e. it may require 2 or 3 emails for just one Volume? If acceptable, what email subject would you prefer the separate e-mails to be titled as Volume 1a, 1b Etc?
That’s acceptable.
229
X
As referenced in previous bid question 114 Can you clarify that professional photos are required only for final photos of completed work and the construction photos can be taken by the contactor?
No exception taken for photos taken by contractor for progress construction photos.
X
Due to unpredictable circumstances regarding tariffs, manufacturers may seek price increases after bidding. Bidders may make assumptions to cover potential tariffs which could result in a wide range for the allowance. To make bidding more competitive and comparable, it is recommended the government determine an allowance for potential tariffs. Please advise.
This will not be allowed as this is a firm fixed price contract.

File details come from the government source that posted it. Updated .