Attachment 007-MP2 Task Report.pdf

PDF 3 MB Posted

Attached to
Operations and Maintenance Services Federal contract opportunity
Solicitation number
12505B21R0003
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Midwest Area

View the file

Other files for this federal contract opportunity

Other files attached to Operations and Maintenance Services, newest first.
File Type Posted
Past Performance Questionnaire.pdf PDF
SF-30 Amendment 03.pdf PDF
SF-30 Amendment 02.pdf PDF
Sign In Sheets.pdf PDF
Attachment 016-Work Order Summary-A.xlsx XLSX spreadsheet
Attachment 016-Work Order Summary-B.xlsx XLSX spreadsheet
Listing of Fire Alarm System Devices.pdf PDF
02 - Schedule B Addendum.xls XLS spreadsheet
RFIs.pdf PDF
Attachment 004-Documents by Reference-rev 07-08-2021.pdf PDF
Attachment 016-Work Order Summary-B.pdf PDF
Attachment 016-Work Order Summary-A.pdf PDF
Attachment 16 - Work Order Summary.xlsx XLSX spreadsheet
Schedule B Addendum.xls XLS spreadsheet
SF-30.pdf PDF
Attachment 05 - MP2 Equipment Report-Simple.xlsx XLSX spreadsheet
Schedule B Addendum.xls XLS spreadsheet
SF-33 with Sections B-M.pdf PDF
Attachment 002-Work Order Types.pdf PDF
Attachment 003-Work Order Statistics.pdf PDF
Attachment 004-Documents Incorporated by Reference.pdf PDF
Attachment 008-Inventory of Goverment Vehicles.pdf PDF
Attachment 011-Housekeeping Matrix.pdf PDF
Attachment 013-Elevators and Lifting Devices.pdf PDF
Attachment 015-Pest Treatment Matrix.pdf PDF
Attachment 016-Work Order Summary.pdf PDF
Attachment 019-Government Furnished Equipment.pdf PDF
Exhibit 006-Wage Determination (Construction).pdf PDF
Exhibit 007-Wage Determination (Services).pdf PDF
Attachment 020-Stock Level Summary.pdf PDF
Attachment 022-Supplemental Work Items.pdf PDF
Exhibit 004-Quality Assurance Surveillance Plan.pdf PDF
Exhibit 001-Performance Work Statement.pdf PDF
Attachment 012-Flooring Surfaces.pdf PDF
Attachment 014-Supplies Services-Government Furnished.pdf PDF
Attachment 021-Space Temperature and Humidity Requirements.pdf PDF
Attachment 001-Craft Codes.pdf PDF
Attachment 005-MP2 Equipment Report-Simple.pdf PDF
Attachment 006-MP2 Task Instruction List.pdf PDF
Attachment 009-Contractor Space.pdf PDF
Attachment 010-Facility Drawings.pdf PDF
Attachment 017-Personal Identify Information (PII) Sheet.pdf PDF
Attachment 018-Ozone Depleting Substances (ODS) Management Program-rev01-20-2021.pdf PDF
Exhibit 002-NCAUR BSHEM Manual v2020-11.pdf PDF
Exhibit 003-NCAUR Bldg Standards.pdf PDF
Exhibit 005-SCA Directory of Occupations.pdf PDF
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 007 Operation and Maintenance Contract USDA-NCAUR, Peoria, IL

Craft Crew Size Estimated Labor Hours

HSKP

Equipment No. -

WO Type PM Multitask Yes

Expense Class In-service Task Yes

Task No. 3118-3120A-3120B-M Description THURSDAY 7AM- MONTHLY CLEANING OF 3118-3120A-3120B

Assigned To 2-017 Priority 3.00

Task Report (Full List)

12/14/2020 National Center Agricultural Utilization Research Page

Site NCAUR

Sub-location 1 3120A Schedule Type Duplicates Sub-location 2 3RD FLOOR Task Duration

No Tenant

Equipment No. - Equipment Description

Location BUILDING 001 Perform Every 8.00 Thursday

Sub-location 3 CENTER WING No. of Times Completed

Date Last Performed Down Time Next Due Date 1/21/2021 Must Be Down

Sub-location 1 3118 Schedule Type Duplicates Sub-location 2 3RD FLOOR Task Duration

Equipment Description

Location BUILDING 001 Perform Every 8.00 Thursday

Sub-location 3 CENTER WING No. of Times Completed

Date Last Performed Down Time Next Due Date 1/21/2021 Must Be Down

Sub-location 1 3120B Schedule Type Duplicates Sub-location 2 3RD FLOOR Task Duration

No Tenant

Equipment No. - Equipment Description

Location BUILDING 001 Perform Every 8.00 Thursday

Sub-location 3 CENTER WING No. of Times Completed

Date Last Performed Down Time Next Due Date 1/21/2021 Must Be Down

OFFICE

1. WIPE OFF GLASS IN DOOR (BOTH SIDES)

2. CLEAN DOOR JAM

3. WIPE OFF DOORS FRONT AND BACK SIDES

4. WIPE OFF WINDOW LEDGES

5. DUST OFFICE WHERE POSSIBLE (NO DESKS) - DO NOT REMOVE ANYTHING TO DUST

6.TILE FLOOR: SWEEP AND MOP FLOOR INCLUDING CORNERS AND EDGES. LIFT CORNER OF CHAIR MATS AND

SWEEP 2-3 INCHES UNDER MATS THEN SWEEP AND MOP MATS.

7. CARPET FLOOR: SWEEP OFF MAT AND HEPA VACUUM CARPET.

LAB

1. WIPE OFF GLASS IN DOOR (BOTH SIDES)

2. CLEAN DOOR JAM

3. WIPE OFF DOORS FRONT AND BACK SIDES

4. WIPE OFF WINDOW LEDGES

5. LIFE CORNERS OF CHAIR MATS AND SWEEP 2-3 INCHES UNDER MATS

6. SWEEP AND MOP MATS

No Tenant

Meter Name Last Performed At

Task Instructions

Instruction Code HK-LAB/OFF Date Last Edited 7/30/2020

ELEC 1.00 12.00

PIPE 2.00 12.00

Expense Class In-service Task Yes

Craft Crew Size Estimated Labor Hours

Assigned To Priority 3.00

WO Type PM Multitask No

Site NCAUR Task No. 5 YR INSPECTION

Description 5 YR INSPECTION/TEST ITEMS

Task Report (Full List)

12/14/2020 National Center Agricultural Utilization Research Page

7. SWEEP AND MOP FLOOR

Tenant

Equipment No. FIRE-SPRINK-SPRINKLER PIPING Equipment Description INTERNAL INSPECTION OF FIRE SPRINKLER SYSTEMS PIPI

Location BUILDING 001 Perform Every 5.00

1.00

Date Last Performed 1/15/2018 Down Time Next Due Date 9/20/2022 Must Be Down No

Sub-location 2 - Task Duration

Sub-location 3 - No. of Times Completed

Location BUILDING 001 Perform Every 5.00 Year(s) Sub-location 1 - Schedule Type Duplicates

SUB 32.00

Equipment No. FIRE-SPRINK-CHECK VALVE Equipment Description INTERMAL INSPECTION OF SYSTEM CHECK VALVE

Year(s) Sub-location 1 - Schedule Type Duplicates Sub-location 2 - Task Duration

Tenant

Equipment No. FIRE-SPRINK-STANDPIPE Equipment Description STANDPIPE TEST ON INSTALLED WET STANDPIPES

Location BUILDING 001 Perform Every 5.00

Sub-location 3 - No. of Times Completed

Date Last Performed Down Time Next Due Date Must Be Down No

Year(s) Sub-location 1 - Schedule Type Duplicates Sub-location 2 - Task Duration

Sub-location 3 - No. of Times Completed

Date Last Performed Down Time

Year(s) Sub-location 1 - Schedule Type Duplicates Sub-location 2 - Task Duration

Tenant

Equipment No. FIRE-SPRINK-SYS GAUGE Equipment Description SYSTEM GAUGE(S) REPLACEMENT

Location BUILDING 001 Perform Every 5.00

Sub-location 3 - No. of Times Completed

Date Last Performed Down Time Next Due Date Must Be Down No

Next Due Date Must Be Down No

Craft Crew Size Estimated Labor Hours

HVAC 1.00 0.32

WO Type PM Multitask No

Expense Class In-service Task No

12/14/2020 National Center Agricultural Utilization Research Page

Description 5 YR INSPECTION/TEST ITEMS

Assigned To 1-168 Priority 3.00

3/11/2013

Site NCAUR Task No. AC-COMP-BLD10-C-Q

Task Report (Full List)

Tenant

Meter Name Last Performed At

Task Instructions

Instruction Code 5 YR Date Last Edited

Tenant

Equipment No. F Equipment Description AC COMPRESSOR

Location BUILDING 001 Perform Every 3.00

Sub-location 3 CENTER WING No. of Times Completed

Date Last Performed Down Time Next Due Date Must Be Down No

Month(s) Sub-location 1 - Schedule Type Duplicates Sub-location 2 - Task Duration 15.00

Equipment No. AC-COMP-C-01 Equipment Description

Location BUILDING 001 Perform Every 3.00

Month(s) Sub-location 1 ATTIC Schedule Type Duplicates Sub-location 2 CENTER WING Task Duration 7.00

Equipment Description AC COMPRESSOR

Location BUILDING 001 Perform Every 3.00

Next Due Date 3/6/2019 Must Be Down Yes Tenant

Equipment No. fASU

Sub-location 3 BAY KK-LL No. of Times Completed 68.00

Date Last Performed 1/9/2020 Down Time 15.00

Month(s) Sub-location 1 ATTIC Schedule Type Duplicates Sub-location 2 ADMIN WING Task Duration 23.00

Instruction Code C-1 Date Last Edited 10/2/2019

Task Instructions

Instruction Code 069 Date Last Edited 7/26/2011

A. INSPECT UNIT FOR LOOSE COMPONENTS, CORROSION, ETC.

B. CHECK ELECTRICAL CONNECTIONS FOR TIGHTNESS

C. CLEAN DRAINS

D. CHANGE THE REFRIDGERANT DRIER CORE AS REQUIRED

Next Due Date Must Be Down No Tenant

Meter Name Last Performed At

Sub-location 3 BAY M-N No. of Times Completed 31.00

Date Last Performed 7/16/2009 Down Time

Task No. AC-COMP-BLD10-Q Description QUARTERLY ON BLD #10C AC COMPRESSOR

Assigned To 1-168 Priority 3.00

12/14/2020 National Center Agricultural Utilization Research Page

___ ELECTRICAL [ ] BOTH

___ HYDRAULIC

___ PNEUMATIC HAND PROTECTION

___ STEAM [ ] CHEMICAL GLOVES

___ OTHER: [ ] STANDARD WORK GLOVES

[ ] OVERHEAD HAZARDS [ ] GAUNTLETS

[ ] WELDING/BURNING/HOT WORK [ ] OTHER:

[ ] OTHER:

ITEMS NEEDING PERFORMED

PERMITS [ ] COMPELTED WALKDOWN

[ ] CONFINED SPACE ENTRY [ ] COMPLETE HAZARD ANALYSIS

[ ] LOCKOUT/TAGOUT [ ] ENGINEERING ASSESSMENT

[ ] WELDING/BURNING/HOT WORK

[ ] OTHER: RESPIRATORY PROTECTION

[ ] DUST MASK

ASBESTOS [ ] HALF-FACE RESPIRATOR

[ ] SUSPECT ASBESTOS [ ] FULL-FACE RESPIRATOR

[ ] SAMPLES TO BE TAKEN [ ] SUPPLIES AIR

[ ] ASBESTOS ABATEMENT [ ] SCBA

[ ] ASBESTOS HOUSEKEEPING

FULL-BODY PROTECTION

[ ] CHEMICAL RESISTANT APRONS

[ ] SLEEVES/GAUNTLETS

[ ] HEAT/FLAME RESISTANT CLOTHING

[X ] SAFETY SHOES

[ ] OTHER

Site NCAUR

CHEMICAL HAZARDS TYPE OF LOCKOUT/TAGOUT

[ ] ASBESTOS [ ] PERMIT-REQUIRED

[ ] CARCINOGEN [ ] SINGLE-SOURCE

[ ] CORROSIVES [X ] "SEE LOTO BOOK FOR COMPLETE LOTO PROCEDURES"

[ ] INCOMPATIBLE CHEMICALS

[ ] LEAD EYE/FACE PROTECTION

[ ] MANMADE MINERAL FIBERS [X ] SAFETY GLASSES

[ ] CHEMICAL GOOGLES

PHYSICAL HAZARDS [ ] FACE SHIELD (CHEMICAL RESISTANT)

[ ] COMPRESSED CYLINDERS [ ] FACE SHIELD (GRINDING)

[ ] CONFINED SPACE [ ] UV/WELDER SHIELD

[ ] MANUAL LIFTING

[ ] MECHANICAL/MOVING PARTS HEARING PROTECTION

[ ] NOISE [ ] EARPLUGS

[ ] HAZARDOUS ENERGY: [ ] EARMUFFS

Task Report (Full List)

Sub-location 3 - No. of Times Completed 61.00

Date Last Performed 2/13/2019 Down Time

Month(s) Sub-location 1 C Schedule Type Duplicates Sub-location 2 - Task Duration 14.00

Equipment No. AC-COMP-BLD10 Equipment Description AC COMPRESSOR CONDENSING UNIT & BLOWER

Location BUILDING 10 Perform Every 3.00

Craft Crew Size Estimated Labor Hours

HVAC 1.00 2.00

WO Type PM Multitask Yes

Expense Class In-service Task Yes

Next Due Date 4/22/2019 Must Be Down No

Site NCAUR Task No. AC-UNIT-BLDG10B-Q

Description QUARTERLY ON AC UNIT BUILDING 10B

CHEMICAL HAZARDS TYPE OF LOCKOUT/TAGOUT

[ ] ASBESTOS [ ] PERMIT-REQUIRED

[ ] CARCINOGEN [ ] SINGLE-SOURCE

[ ] CORROSIVES [X ] "SEE LOTO BOOK FOR COMPLETE LOTO PROCEDURES"

Task Report (Full List)

12/14/2020 National Center Agricultural Utilization Research Page

[ ] INCOMPATIBLE CHEMICALS

[ ] LEAD EYE/FACE PROTECTION

[ ] MANMADE MINERAL FIBERS [X ] SAFETY GLASSES

[ ] CHEMICAL GOOGLES

PHYSICAL HAZARDS [ ] FACE SHIELD (CHEMICAL RESISTANT)

[ ] COMPRESSED CYLINDERS [ ] FACE SHIELD (GRINDING)

[ ] CONFINED SPACE [ ] UV/WELDER SHIELD

[ ] MANUAL LIFTING

[ ] MECHANICAL/MOVING PARTS HEARING PROTECTION

[ ] NOISE [ ] EARPLUGS

[ ] HAZARDOUS ENERGY: [ ] EARMUFFS

___ ELECTRICAL [ ] BOTH

___ HYDRAULIC

___ PNEUMATIC HAND PROTECTION

___ STEAM [ ] CHEMICAL GLOVES

___ OTHER: [ ] STANDARD WORK GLOVES

[ ] OVERHEAD HAZARDS [ ] GAUNTLETS

[ ] WELDING/BURNING/HOT WORK [ ] OTHER:

[ ] OTHER:

ITEMS NEEDING PERFORMED

PERMITS [ ] COMPELTED WALKDOWN

[ ] CONFINED SPACE ENTRY [ ] COMPLETE HAZARD ANALYSIS

[ ] LOCKOUT/TAGOUT [ ] ENGINEERING ASSESSMENT

[ ] WELDING/BURNING/HOT WORK

[ ] OTHER: RESPIRATORY PROTECTION

[ ] DUST MASK

ASBESTOS [ ] HALF-FACE RESPIRATOR

[ ] SUSPECT ASBESTOS [ ] FULL-FACE RESPIRATOR

[ ] SAMPLES TO BE TAKEN [ ] SUPPLIES AIR

[ ] ASBESTOS ABATEMENT [ ] SCBA

[ ] ASBESTOS HOUSEKEEPING

FULL-BODY PROTECTION

[ ] CHEMICAL RESISTANT APRONS

[ ] SLEEVES/GAUNTLETS

[ ] HEAT/FLAME RESISTANT CLOTHING

[X ] SAFETY SHOES

Instruction Code BLDG 10 Date Last Edited 3/30/2010

WARNING -

FIRE DETECTORS MUST BE DISABLED BEFORE ANY FLAME OR ARC WELDING WORK

Instruction Code C-1 Date Last Edited 10/2/2019

Task Instructions

Instruction Code 069 Date Last Edited 7/26/2011

A. INSPECT UNIT FOR LOOSE COMPONENTS, CORROSION, ETC.

B. CHECK ELECTRICAL CONNECTIONS FOR TIGHTNESS

C. CLEAN DRAINS

D. CHANGE THE REFRIDGERANT DRIER CORE AS REQUIRED

Tenant

Meter Name Last Performed At

Assigned To 1-168 Priority 3.00

WO Type PM Multitask Yes

Sub-location 2 - Task Duration 7.00

Sub-location 3 - No. of Times Completed 75.00

Location BUILDING 010 Perform Every 3.00 Month(s) Sub-location 1 B Schedule Type Duplicates

HVAC 1.00 0.75

Equipment No. AC-UNIT-BLDG10B Equipment Description AC FAN EVAPORATOR UNIT

Expense Class In-service Task Yes

Craft Crew Size Estimated Labor Hours

Site NCAUR Task No. AC-UNIT-EVAP-Q

Description QUARTERLY ON AC UNIT BUILDING 10B

C. CHECK FOR MOLD GROWTH IN DRAIN PAN

IF EVIDENCE IS FOUND OF MICROBIAL (MOLD) GROWTH, CLEAN ALL SURFACES PER STEP 1-8 BEFORE

GOING ON TO THE NEXT UNIT

D. GENERATE A CM WORK ORDER AFTER CLEANING TO RECORD ADDITIONAL LABOR HOURS

STEP #1

DISCONNECT ALL ELECTRICAL POWER TO THE UNIT

STEP #2

DON THE APPROPIATE PERSONAL PROTECTIVE EQUIPMENT (PPE)

STEP #3

REMOVE ALL STANDING WATER

STEP #4

USE A SCRAPER OR OTHER TOOLS TO REMOVE ANY SOLID MATTER. REMOVE SOLID MATTER WITH A VACUUM DEVICE THAT UTILIZES HIGH EFFICIENCY PARTICULATE ARRESTANCE (HEPA) FILTERS WITH A MINIMUM

EFFICIENCY OF 99.97% AT 0.3 MICRON PARTICLE SIZE

STEP #5

THROUGHLY CLEAN THE CONTAMINATED AREA(S) WITH A MILD BLEACH & WATER SOLUTION OR AN EPA-APPROVED SANITIZER SPECIFICALLY DESIGNED FOR HVAC USE. CAREFULLY FOLLOW THE SANITIZER MANUFACTURE'S

INSTRUCTIONS REGARDING THE USE OF THE PRODUCT

STEP #6

IMMEDIATLY RINSE THE DRAIN PAN THROUGHLY WITH FRESH WATER TO PREVENT POTENTIAL CORROSIONS

FROM THE CLEANING SOLUTION OF THE PAN & DRAIN LINE COMPONENTS

STEP #7

ALLOW THE UNIT TO DRY THROUGHLY BEFORE PUTTING THE SYSTEM BACK INTO SERVICE

STEP #8

DETERMINE & CORRECT THE CAUSE OF THE MICROBIAL (MOLD) CONTAMINATION

Instruction Code BLDG 10 Date Last Edited 3/30/2010

WARNING -

FIRE DETECTORS MUST BE DISABLED BEFORE ANY FLAME OR ARC WELDING WORK

8/8/2011

QUARTERLY PM OF WATER SOURCE HEAT PUMP OR EVAPORATION UNIT

A. SHUT DOWN ELECTRICAL SOURCE & LOCK OUT

B. INSPECT CONDENSATE DRAIN PAN FOR PROPER DRAINAGE

IF EVIDENCE OF STANDING WATER OR CONDENSATE OVERFLOW EXISTS GENERATE CM WORK ORDER FOR

CORRECTIVE MEASURES

Task Report (Full List)

12/14/2020 National Center Agricultural Utilization Research Page

Tenant

Meter Name Last Performed At

Task Instructions

Instruction Code 067 Date Last Edited

Date Last Performed 10/20/2020 Down Time 20.00 Next Due Date 1/22/2021 Must Be Down Yes

HVAC 1.00 1.44

Equipment No. AC-UNIT-C-01-3115

Expense Class In-service Task Yes

Craft Crew Size Estimated Labor Hours

WO Type PM Multitask No

Sub-location 2 3RD FLOOR Task Duration 7.00

Sub-location 3 CENTER WING No. of Times Completed 34.00

Location BUILDING 001 Perform Every 3.00 Month(s) Sub-location 1 3115 Schedule Type Duplicates

Equipment Description AC UNIT CEILING MOUNTED EVAPORATOR

Next Due Date Must Be Down No Tenant

Equipment No. AC-UNIT-C-03-0120A

Sub-location 3 CENTER WING No. of Times Completed 24.00

Date Last Performed 7/27/2010 Down Time

Month(s) Sub-location 1 1109 Schedule Type Duplicates Sub-location 2 1ST FLOOR Task Duration 7.00

Tenant

Equipment No. AC-UNIT-C-02-1109 Equipment Description HANGING AC EVAPORATOR UNIT

Location BUILDING 001 Perform Every 3.00

Date Last Performed 7/27/2010 Down Time 15.00 Next Due Date Must Be Down No

Next Due Date 3/18/2021 Must Be Down No Tenant

Equipment No. AC-UNIT-S-01-0317

Sub-location 3 CENTER WING No. of Times Completed 33.00

Date Last Performed 9/24/2020 Down Time

12/14/2020 National Center Agricultural Utilization Research Page

Sub-location 2 BASEMENT Task Duration 7.00

Month(s) Sub-location 1 0120A Schedule Type Duplicates

Task Report (Full List)

Equipment Description SPLIT SYSTEM AIR COND-EVAP UNIT

Location BUILDING 001 Perform Every 3.00

Equipment Description HANGING AC EVAPORATOR UNIT

Location BUILDING 001 Perform Every 3.00

Next Due Date 3/18/2021 Must Be Down No Tenant

Equipment No. AC-UNIT-S-02-0319

Sub-location 3 SOUTH WING No. of Times Completed 76.00

Date Last Performed 9/24/2020 Down Time

Month(s) Sub-location 1 0317 Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration 7.00

Equipment Description HANGING AC EVAPORATOR UNIT

Location BUILDING 001 Perform Every 3.00

Task Instructions

Instruction Code 067 Date Last Edited 8/8/2011

Next Due Date 3/18/2021 Must Be Down No Tenant

Meter Name Last Performed At

Sub-location 3 SOUTH WING No. of Times Completed 76.00

Date Last Performed 9/24/2020 Down Time

Month(s) Sub-location 1 0319 Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration 7.00

Instruction Code C-1 Date Last Edited 10/2/2019

CHEMICAL HAZARDS TYPE OF LOCKOUT/TAGOUT

[ ] ASBESTOS [ ] PERMIT-REQUIRED

[ ] CARCINOGEN [ ] SINGLE-SOURCE

[ ] CORROSIVES [X ] "SEE LOTO BOOK FOR COMPLETE LOTO PROCEDURES"

Task Report (Full List)

QUARTERLY PM OF WATER SOURCE HEAT PUMP OR EVAPORATION UNIT

A. SHUT DOWN ELECTRICAL SOURCE & LOCK OUT

B. INSPECT CONDENSATE DRAIN PAN FOR PROPER DRAINAGE

IF EVIDENCE OF STANDING WATER OR CONDENSATE OVERFLOW EXISTS GENERATE CM WORK ORDER FOR

CORRECTIVE MEASURES

C. CHECK FOR MOLD GROWTH IN DRAIN PAN

IF EVIDENCE IS FOUND OF MICROBIAL (MOLD) GROWTH, CLEAN ALL SURFACES PER STEP 1-8 BEFORE

GOING ON TO THE NEXT UNIT

D. GENERATE A CM WORK ORDER AFTER CLEANING TO RECORD ADDITIONAL LABOR HOURS

STEP #1

DISCONNECT ALL ELECTRICAL POWER TO THE UNIT

STEP #2

DON THE APPROPIATE PERSONAL PROTECTIVE EQUIPMENT (PPE)

STEP #3

REMOVE ALL STANDING WATER

STEP #4

USE A SCRAPER OR OTHER TOOLS TO REMOVE ANY SOLID MATTER. REMOVE SOLID MATTER WITH A VACUUM DEVICE THAT UTILIZES HIGH EFFICIENCY PARTICULATE ARRESTANCE (HEPA) FILTERS WITH A MINIMUM

EFFICIENCY OF 99.97% AT 0.3 MICRON PARTICLE SIZE

STEP #5

THROUGHLY CLEAN THE CONTAMINATED AREA(S) WITH A MILD BLEACH & WATER SOLUTION OR AN EPA-APPROVED SANITIZER SPECIFICALLY DESIGNED FOR HVAC USE. CAREFULLY FOLLOW THE SANITIZER MANUFACTURE'S

INSTRUCTIONS REGARDING THE USE OF THE PRODUCT

STEP #6

IMMEDIATLY RINSE THE DRAIN PAN THROUGHLY WITH FRESH WATER TO PREVENT POTENTIAL CORROSIONS

FROM THE CLEANING SOLUTION OF THE PAN & DRAIN LINE COMPONENTS

STEP #7

ALLOW THE UNIT TO DRY THROUGHLY BEFORE PUTTING THE SYSTEM BACK INTO SERVICE

STEP #8

DETERMINE & CORRECT THE CAUSE OF THE MICROBIAL (MOLD) CONTAMINATION

12/14/2020 National Center Agricultural Utilization Research Page

[ ] INCOMPATIBLE CHEMICALS

[ ] LEAD EYE/FACE PROTECTION

[ ] MANMADE MINERAL FIBERS [X ] SAFETY GLASSES

[ ] CHEMICAL GOOGLES

PHYSICAL HAZARDS [ ] FACE SHIELD (CHEMICAL RESISTANT)

[ ] COMPRESSED CYLINDERS [ ] FACE SHIELD (GRINDING)

[ ] CONFINED SPACE [ ] UV/WELDER SHIELD

[ ] MANUAL LIFTING

[ ] MECHANICAL/MOVING PARTS HEARING PROTECTION

[ ] NOISE [ ] EARPLUGS

[ ] HAZARDOUS ENERGY: [ ] EARMUFFS

Equipment No. AC-UNIT-N-02-3205 Equipment Description HANGING AC EVAPORATOR UNIT WEST

Location BUILDING 001 Perform Every 1.00

Craft Crew Size Estimated Labor Hours

HVAC 1.00 0.47

WO Type PM Multitask No

Expense Class In-service Task Yes

Task No. AC-UNIT-N-M Description QUARTERLY ON EVAPORATOR AC UNITS

Assigned To 1-168 Priority 3.00

___ ELECTRICAL [ ] BOTH

___ HYDRAULIC

___ PNEUMATIC HAND PROTECTION

___ STEAM [ ] CHEMICAL GLOVES

___ OTHER: [ ] STANDARD WORK GLOVES

[ ] OVERHEAD HAZARDS [ ] GAUNTLETS

[ ] WELDING/BURNING/HOT WORK [ ] OTHER:

[ ] OTHER:

ITEMS NEEDING PERFORMED

PERMITS [ ] COMPELTED WALKDOWN

[ ] CONFINED SPACE ENTRY [ ] COMPLETE HAZARD ANALYSIS

[ ] LOCKOUT/TAGOUT [ ] ENGINEERING ASSESSMENT

[ ] WELDING/BURNING/HOT WORK

[ ] OTHER: RESPIRATORY PROTECTION

[ ] DUST MASK

ASBESTOS [ ] HALF-FACE RESPIRATOR

[ ] SUSPECT ASBESTOS [ ] FULL-FACE RESPIRATOR

[ ] SAMPLES TO BE TAKEN [ ] SUPPLIES AIR

[ ] ASBESTOS ABATEMENT [ ] SCBA

[ ] ASBESTOS HOUSEKEEPING

FULL-BODY PROTECTION

[ ] CHEMICAL RESISTANT APRONS

[ ] SLEEVES/GAUNTLETS

[ ] HEAT/FLAME RESISTANT CLOTHING

[X ] SAFETY SHOES

Site NCAUR

Month(s) Sub-location 1 2205 Schedule Type Duplicates Sub-location 2 2ND FLOOR Task Duration 7.00

Equipment Description HANGING AC EVAPORATOR UNIT WEST

Location BUILDING 001 Perform Every 1.00

Next Due Date 12/30/2020 Must Be Down No Tenant

Equipment No. AC-UNIT-N-04-2205

Sub-location 3 NORTH WING No. of Times Completed 229.00

Date Last Performed 11/13/2020 Down Time

Month(s) Sub-location 1 3205 Schedule Type Duplicates Sub-location 2 3RD FLOOR Task Duration 7.00

Sub-location 2 2ND FLOOR Task Duration 7.00

Sub-location 3 NORTH WING No. of Times Completed 229.00

Location BUILDING 001 Perform Every 1.00 Month(s) Sub-location 1 2205 Schedule Type Duplicates

12/14/2020 National Center Agricultural Utilization Research Page

Equipment No. EVAPORATOR UNIT EAS Equipment Description HANGING AC EVAPORATOR UNIT EAST

Next Due Date 12/30/2020 Must Be Down No Tenant

Task Report (Full List)

Sub-location 3 NORTH WING No. of Times Completed 229.00

Date Last Performed 11/13/2020 Down Time

Location BUILDING 001 Perform Every 1.00 Month(s)

No Tenant

Equipment No. EVAPORATOR UNIT EAST Equipment Description HANGING AC EVAPORATOR UNIT EAST

Date Last Performed 11/13/2020 Down Time Next Due Date 12/30/2020 Must Be Down

Date Last Performed 11/13/2020 Down Time 10.00 Next Due Date 12/30/2020 Must Be Down No

Sub-location 2 3RD FLOOR Task Duration 7.00

Sub-location 3 NORTH WING No. of Times Completed 229.00

Sub-location 1 3205 Schedule Type Duplicates

CHEMICAL HAZARDS TYPE OF LOCKOUT/TAGOUT

[ ] ASBESTOS [ ] PERMIT-REQUIRED

[ ] CARCINOGEN [ ] SINGLE-SOURCE

[ ] CORROSIVES [X ] "SEE LOTO BOOK FOR COMPLETE LOTO PROCEDURES"

[ ] INCOMPATIBLE CHEMICALS

[ ] LEAD EYE/FACE PROTECTION

[ ] MANMADE MINERAL FIBERS [X ] SAFETY GLASSES

[ ] CHEMICAL GOOGLES

PHYSICAL HAZARDS [ ] FACE SHIELD (CHEMICAL RESISTANT)

[ ] COMPRESSED CYLINDERS [ ] FACE SHIELD (GRINDING)

[ ] CONFINED SPACE [ ] UV/WELDER SHIELD

[ ] MANUAL LIFTING

[ ] MECHANICAL/MOVING PARTS HEARING PROTECTION

[ ] NOISE [ ] EARPLUGS

[ ] HAZARDOUS ENERGY: [ ] EARMUFFS

___ ELECTRICAL [ ] BOTH

___ HYDRAULIC

___ PNEUMATIC HAND PROTECTION

___ STEAM [ ] CHEMICAL GLOVES

___ OTHER: [ ] STANDARD WORK GLOVES

[ ] OVERHEAD HAZARDS [ ] GAUNTLETS

[ ] WELDING/BURNING/HOT WORK [ ] OTHER:

[ ] OTHER:

ITEMS NEEDING PERFORMED

PERMITS [ ] COMPELTED WALKDOWN

[ ] CONFINED SPACE ENTRY [ ] COMPLETE HAZARD ANALYSIS

[ ] LOCKOUT/TAGOUT [ ] ENGINEERING ASSESSMENT

[ ] WELDING/BURNING/HOT WORK

[ ] OTHER: RESPIRATORY PROTECTION

[ ] DUST MASK

ASBESTOS [ ] HALF-FACE RESPIRATOR

[ ] SUSPECT ASBESTOS [ ] FULL-FACE RESPIRATOR

[ ] SAMPLES TO BE TAKEN [ ] SUPPLIES AIR

[ ] ASBESTOS ABATEMENT [ ] SCBA

[ ] ASBESTOS HOUSEKEEPING

2/28/2012

CHECK:

FILTERS AND DATE

DRAIN PAN

EVAPORATOR COIL

MOTOR

BLOWER ASSEMBLY

MOUNTING BRACKETS

Instruction Code C-1 Date Last Edited 10/2/2019

Tenant

Meter Name Last Performed At

Instruction Code AC UNITS Date Last Edited

WO Type PM Multitask Yes

Site NCAUR Task No. AC-UNIT-N-SA

Description SEMI-ANNUAL ON EVAPORATOR AC UNITS

Task Report (Full List)

12/14/2020 National Center Agricultural Utilization Research Page

FULL-BODY PROTECTION

[ ] CHEMICAL RESISTANT APRONS

[ ] SLEEVES/GAUNTLETS

[ ] HEAT/FLAME RESISTANT CLOTHING

[X ] SAFETY SHOES

[ ] OTHER:

Sub-location 3 NORTH WING No. of Times Completed 40.00

Date Last Performed 11/23/2020 Down Time

Month(s) Sub-location 1 3205 Schedule Type Duplicates Sub-location 2 3RD FLOOR Task Duration 7.00

Equipment No. AC-UNIT-N-02-3205 Equipment Description HANGING AC EVAPORATOR UNIT WEST

Location BUILDING 001 Perform Every 6.00

ELEC 1.00 1.00

HVAC 1.00 1.00

Expense Class In-service Task Yes

Craft Crew Size Estimated Labor Hours

Next Due Date 5/13/2021 Must Be Down No Tenant

Equipment No. EVAPORATOR UNIT EAS

Sub-location 3 NORTH WING No. of Times Completed 40.00

Date Last Performed 11/23/2020 Down Time

Month(s) Sub-location 1 2205 Schedule Type Duplicates Sub-location 2 2ND FLOOR Task Duration 7.00

Equipment Description HANGING AC EVAPORATOR UNIT WEST

Location BUILDING 001 Perform Every 6.00

Next Due Date 5/13/2021 Must Be Down No Tenant

Equipment No. AC-UNIT-N-04-2205

Equipment Description HANGING AC EVAPORATOR UNIT EAST

Location BUILDING 001 Perform Every 6.00

Next Due Date 5/13/2021 Must Be Down No Tenant

Equipment No. EVAPORATOR UNIT EAST

Sub-location 3 NORTH WING No. of Times Completed 40.00

Date Last Performed 11/23/2020 Down Time

Month(s) Sub-location 1 2205 Schedule Type Duplicates Sub-location 2 2ND FLOOR Task Duration 7.00

Equipment Description HANGING AC EVAPORATOR UNIT EAST

Location BUILDING 001 Perform Every 6.00

Sub-location 3 NORTH WING No. of Times Completed 40.00

Date Last Performed 11/23/2020 Down Time 10.00

Month(s) Sub-location 1 3205 Schedule Type Duplicates Sub-location 2 3RD FLOOR Task Duration 7.00

CHECK:

FILTERS AND DATE

DRAIN PAN

EVAPORATOR COIL

MOTOR

BLOWER ASSEMBLY

MOUNTING BRACKETS

Instruction Code C-1 Date Last Edited 10/2/2019

CHEMICAL HAZARDS TYPE OF LOCKOUT/TAGOUT

[ ] ASBESTOS [ ] PERMIT-REQUIRED

[ ] CARCINOGEN [ ] SINGLE-SOURCE

[ ] CORROSIVES [X ] "SEE LOTO BOOK FOR COMPLETE LOTO PROCEDURES"

[ ] INCOMPATIBLE CHEMICALS

[ ] LEAD EYE/FACE PROTECTION

[ ] MANMADE MINERAL FIBERS [X ] SAFETY GLASSES

[ ] CHEMICAL GOOGLES

PHYSICAL HAZARDS [ ] FACE SHIELD (CHEMICAL RESISTANT)

[ ] COMPRESSED CYLINDERS [ ] FACE SHIELD (GRINDING)

[ ] CONFINED SPACE [ ] UV/WELDER SHIELD

[ ] MANUAL LIFTING

[ ] MECHANICAL/MOVING PARTS HEARING PROTECTION

[ ] NOISE [ ] EARPLUGS

[ ] HAZARDOUS ENERGY: [ ] EARMUFFS

___ ELECTRICAL [ ] BOTH

___ HYDRAULIC

___ PNEUMATIC HAND PROTECTION

___ STEAM [ ] CHEMICAL GLOVES

___ OTHER: [ ] STANDARD WORK GLOVES

[ ] OVERHEAD HAZARDS [ ] GAUNTLETS

[ ] WELDING/BURNING/HOT WORK [ ] OTHER:

[ ] OTHER:

ITEMS NEEDING PERFORMED

PERMITS [ ] COMPELTED WALKDOWN

[ ] CONFINED SPACE ENTRY [ ] COMPLETE HAZARD ANALYSIS

[ ] LOCKOUT/TAGOUT [ ] ENGINEERING ASSESSMENT

[ ] WELDING/BURNING/HOT WORK

[ ] OTHER: RESPIRATORY PROTECTION

[ ] DUST MASK

ASBESTOS [ ] HALF-FACE RESPIRATOR

[ ] SUSPECT ASBESTOS [ ] FULL-FACE RESPIRATOR

[ ] SAMPLES TO BE TAKEN [ ] SUPPLIES AIR

[ ] ASBESTOS ABATEMENT [ ] SCBA

[ ] ASBESTOS HOUSEKEEPING

FULL-BODY PROTECTION

Task Instructions

Task Report (Full List)

12/14/2020 National Center Agricultural Utilization Research Page

Instruction Code AC UNITS Date Last Edited 2/28/2012

Next Due Date 5/13/2021 Must Be Down Yes Tenant

Meter Name Last Performed At

Location BUILDING 002 Perform Every 3.00 Month(s) Sub-location 1 - Schedule Type Duplicates

HVAC 1.00 0.50

Equipment No. AC-WINDOW-04 Equipment Description WINDOW AIR CONDITIONER

Expense Class In-service Task Yes

Craft Crew Size Estimated Labor Hours

Assigned To 1-168 Priority 3.00

WO Type PM Multitask No

Site NCAUR Task No. AC-WINDOW-1-4-Q

Description SEMI-ANNUAL ON EVAPORATOR AC UNITS

Task Instructions

Instruction Code 065 Date Last Edited 2/24/2004

Next Due Date 1/26/2021 Must Be Down No Tenant

Meter Name Last Performed At

Task Report (Full List)

12/14/2020 National Center Agricultural Utilization Research Page

Date Last Performed 11/3/2020 Down Time

Sub-location 2 - Task Duration 7.00

Sub-location 3 - No. of Times Completed 77.00

SPRING MAINTENANCE (PRIOR TO START UP)

A. REMOVE ANY PLASTIC OR CLOTH COVERS & STORE THEM FOR FUTURE USE

B. UNPLUG ELECTRICAL CORD FOR SAFETY

C. VISUALLY CHECK UNIT FOR:

1. SECURE MOUNTING

2. CONDITION OF ELECTRICAL CORD

3. PHYSICAL APPEARENCE

4. TIGHT AIRSEAL AROUND UNIT

5. MISSING HARDWARE

6. CLEANLINESS OF DRIP PAN

D. INSPECT AIR FILTER & CLAEN IF REQUIRED

E. INSPECT EVAPORATOR COIL FINS FOR DAMAGE & CLEANLINESS, CORRECT ANY DISCREPANCIES F. VERIFY EVAPORATOR & CONDENSER FANS ROTATE FREELY, LUBRICATE FAN MOTOR BEARINGS IF APPLICABLE

G. VERIFY CONDENSATE DRAIN LINE IS UNOBSTRUCTED

H. PLUG IN POWER CORD & TURN ON FAN ONLY-VERIFY QUIET OPERATION & NORMAL AIR FLOW

I. TURN CONTROLS TO COOLING & VERIFY COMPRESSOR STARTS & UNIT BEGINS TO COOL

J. VERIFY PROPER OPERATION AT ALL CONTROL PANELS

K. MEASURE CURRENT USING CLAMP-ON AMPERE METER, COMPARE WITH NAME PLATE DATA

L. VERIFY THERMOSTAT IS FUNCTIONING PROPERLY

M. SET CONTROLS FOR NORMAL OPERATION & SHUT OFF UNIT

FALL MAINTENANCE (WHEN SECURING UNIT FOR WINTER)

A. OPERATE UNIT TO VERIFY IT IS OPERATIONAL

B. SHUT OFF UNIT & UNPLUG IT

C. CLEAN EVAPORATOR COIL AS REQUIRED

D. VISUALLY INSPECT UNIT FOR:

1. CONDITION OF POWER CORD

2. TIGHT AIR SEAL AROUND UNIT

3. MISSING HARDWARE

4. GENERAL PHYSICAL CONDITION

5. INSTALL WINTERIZING COVERS IF PROVIDED

CHEMICAL HAZARDS TYPE OF LOCKOUT/TAGOUT

[ ] ASBESTOS [ ] PERMIT-REQUIRED

[ ] CARCINOGEN [ ] SINGLE-SOURCE

[ ] CORROSIVES [X ] "SEE LOTO BOOK FOR COMPLETE LOTO PROCEDURES"

[ ] INCOMPATIBLE CHEMICALS

[ ] LEAD EYE/FACE PROTECTION

[ ] MANMADE MINERAL FIBERS [X ] SAFETY GLASSES

[ ] CHEMICAL GOOGLES

PHYSICAL HAZARDS [ ] FACE SHIELD (CHEMICAL RESISTANT)

[ ] COMPRESSED CYLINDERS [ ] FACE SHIELD (GRINDING)

[ ] CONFINED SPACE [ ] UV/WELDER SHIELD

[ ] MANUAL LIFTING

[ ] MECHANICAL/MOVING PARTS HEARING PROTECTION

[ ] NOISE [ ] EARPLUGS

[ ] HAZARDOUS ENERGY: [ ] EARMUFFS

___ ELECTRICAL [ ] BOTH

___ HYDRAULIC

___ PNEUMATIC HAND PROTECTION

___ STEAM [ ] CHEMICAL GLOVES

___ OTHER: [ ] STANDARD WORK GLOVES

[ ] OVERHEAD HAZARDS [ ] GAUNTLETS

[ ] WELDING/BURNING/HOT WORK [ ] OTHER:

[ ] OTHER:

ITEMS NEEDING PERFORMED

PERMITS [ ] COMPELTED WALKDOWN

[ ] CONFINED SPACE ENTRY [ ] COMPLETE HAZARD ANALYSIS

[ ] LOCKOUT/TAGOUT [ ] ENGINEERING ASSESSMENT

[ ] WELDING/BURNING/HOT WORK

[ ] OTHER: RESPIRATORY PROTECTION

[ ] DUST MASK

Task Report (Full List)

WO Type PM Multitask Yes

Expense Class In-service Task Yes

Task No. AC-WINDOW-2-4-A Description SEMI-ANNUAL ON EVAPORATOR AC UNITS

Assigned To 1-168 Priority 3.00

12/14/2020 National Center Agricultural Utilization Research Page

ASBESTOS [ ] HALF-FACE RESPIRATOR

[ ] SUSPECT ASBESTOS [ ] FULL-FACE RESPIRATOR

[ ] SAMPLES TO BE TAKEN [ ] SUPPLIES AIR

[ ] ASBESTOS ABATEMENT [ ] SCBA

[ ] ASBESTOS HOUSEKEEPING

FULL-BODY PROTECTION

[ ] CHEMICAL RESISTANT APRONS

[ ] SLEEVES/GAUNTLETS

[ ] HEAT/FLAME RESISTANT CLOTHING

[X ] SAFETY SHOES

[ ] OTHER:

Equipment No. AC-WINDOW-02 Equipment Description WINDOW AIR CONDITIONER

Location BUILDING 011 Perform Every 12.00

Craft Crew Size Estimated Labor Hours

HVAC 1.00 1.30

Month(s) Sub-location 1 A Schedule Type Duplicates Sub-location 2 NORTHWALL Task Duration 7.00

Equipment Description WINDOW AIR CONDITIONER

Location BUILDING 011 Perform Every 12.00

Next Due Date 5/17/2021 Must Be Down No Tenant

Equipment No. AC-WINDOW-03

Sub-location 3 - No. of Times Completed 18.00

Date Last Performed 5/21/2020 Down Time 5.00

Month(s) Sub-location 1 B Schedule Type Duplicates Sub-location 2 - Task Duration 3.00

Sub-location 3 - No. of Times Completed 21.00

Date Last Performed 5/21/2020 Down Time

Month(s) Sub-location 1 - Schedule Type Duplicates Sub-location 2 - Task Duration 7.00

Equipment Description WINDOW AIR CONDITIONER

Location BUILDING 002 Perform Every 12.00

Next Due Date 5/17/2021 Must Be Down No Tenant

Equipment No. AC-WINDOW-04

Sub-location 3 - No. of Times Completed 20.00

Date Last Performed 5/21/2020 Down Time

SPRING MAINTENANCE (PRIOR TO START UP)

A. REMOVE ANY PLASTIC OR CLOTH COVERS & STORE THEM FOR FUTURE USE

B. UNPLUG ELECTRICAL CORD FOR SAFETY

C. VISUALLY CHECK UNIT FOR:

1. SECURE MOUNTING

2. CONDITION OF ELECTRICAL CORD

3. PHYSICAL APPEARENCE

4. TIGHT AIRSEAL AROUND UNIT

5. MISSING HARDWARE

6. CLEANLINESS OF DRIP PAN

D. INSPECT AIR FILTER & CLAEN IF REQUIRED

E. INSPECT EVAPORATOR COIL FINS FOR DAMAGE & CLEANLINESS, CORRECT ANY DISCREPANCIES F. VERIFY EVAPORATOR & CONDENSER FANS ROTATE FREELY, LUBRICATE FAN MOTOR BEARINGS IF APPLICABLE

G. VERIFY CONDENSATE DRAIN LINE IS UNOBSTRUCTED

H. PLUG IN POWER CORD & TURN ON FAN ONLY-VERIFY QUIET OPERATION & NORMAL AIR FLOW

I. TURN CONTROLS TO COOLING & VERIFY COMPRESSOR STARTS & UNIT BEGINS TO COOL

J. VERIFY PROPER OPERATION AT ALL CONTROL PANELS

K. MEASURE CURRENT USING CLAMP-ON AMPERE METER, COMPARE WITH NAME PLATE DATA

L. VERIFY THERMOSTAT IS FUNCTIONING PROPERLY

M. SET CONTROLS FOR NORMAL OPERATION & SHUT OFF UNIT

FALL MAINTENANCE (WHEN SECURING UNIT FOR WINTER)

Instruction Code 065 Date Last Edited 2/24/2004

Task Report (Full List)

12/14/2020 National Center Agricultural Utilization Research Page

Task Instructions

Instruction Code 064 Date Last Edited 11/6/2001 A. OBSERVE UNIT IN OPERATION & VERIFY IT IS COOLING PROPERLY & OPERATING SATISFACTORILY

B. SHUT OFF UNIT & INSPECT AIR FILTER, CLEAN IF REQUIRED

C. VERIFY CONDENSATE IS DRAINING PROPERLY

D. RESTART UNIT & VERIFY THERMOSTAT FUNCTIONS PROPERLY

E. VISUALLY CHECK PHYSICAL CONDITION OF UNIT & CONDITION OF AIR SEAL AROUND UNIT

F. LUBRICATE UNIT AS REQUIRED

Next Due Date 5/17/2021 Must Be Down No

FALL MAINTENANCE (WHEN SECURING UNIT FOR WINTER)

A. OPERATE UNIT TO VERIFY IT IS OPERATIONAL

B. SHUT OFF UNIT & UNPLUG IT

C. CLEAN EVAPORATOR COIL AS REQUIRED

D. VISUALLY INSPECT UNIT FOR:

1. CONDITION OF POWER CORD

2. TIGHT AIR SEAL AROUND UNIT

3. MISSING HARDWARE

4. GENERAL PHYSICAL CONDITION

5. INSTALL WINTERIZING COVERS IF PROVIDED

Instruction Code C-1 Date Last Edited 10/2/2019

CHEMICAL HAZARDS TYPE OF LOCKOUT/TAGOUT

[ ] ASBESTOS [ ] PERMIT-REQUIRED

[ ] CARCINOGEN [ ] SINGLE-SOURCE

[ ] CORROSIVES [X ] "SEE LOTO BOOK FOR COMPLETE LOTO PROCEDURES"

[ ] INCOMPATIBLE CHEMICALS

[ ] LEAD EYE/FACE PROTECTION

[ ] MANMADE MINERAL FIBERS [X ] SAFETY GLASSES

[ ] CHEMICAL GOOGLES

PHYSICAL HAZARDS [ ] FACE SHIELD (CHEMICAL RESISTANT)

[ ] COMPRESSED CYLINDERS [ ] FACE SHIELD (GRINDING)

[ ] CONFINED SPACE [ ] UV/WELDER SHIELD

[ ] MANUAL LIFTING

[ ] MECHANICAL/MOVING PARTS HEARING PROTECTION

[ ] NOISE [ ] EARPLUGS

[ ] HAZARDOUS ENERGY: [ ] EARMUFFS

___ ELECTRICAL [ ] BOTH

___ HYDRAULIC

___ PNEUMATIC HAND PROTECTION

___ STEAM [ ] CHEMICAL GLOVES

___ OTHER: [ ] STANDARD WORK GLOVES

[ ] OVERHEAD HAZARDS [ ] GAUNTLETS

[ ] WELDING/BURNING/HOT WORK [ ] OTHER:

[ ] OTHER:

ITEMS NEEDING PERFORMED

PERMITS [ ] COMPELTED WALKDOWN

[ ] CONFINED SPACE ENTRY [ ] COMPLETE HAZARD ANALYSIS

[ ] LOCKOUT/TAGOUT [ ] ENGINEERING ASSESSMENT

[ ] WELDING/BURNING/HOT WORK

[ ] OTHER: RESPIRATORY PROTECTION

[ ] DUST MASK

ASBESTOS [ ] HALF-FACE RESPIRATOR

[ ] SUSPECT ASBESTOS [ ] FULL-FACE RESPIRATOR

[ ] SAMPLES TO BE TAKEN [ ] SUPPLIES AIR

[ ] ASBESTOS ABATEMENT [ ] SCBA

[ ] ASBESTOS HOUSEKEEPING

FULL-BODY PROTECTION

Task Report (Full List)

12/14/2020 National Center Agricultural Utilization Research Page

[ ] OTHER:

Site NCAUR

Month(s) Sub-location 1 - Schedule Type Duplicates Sub-location 2 - Task Duration 3.00

Equipment No. ACS-MAIN Equipment Description NORTHERN ACCESS CONTROL GATE PANEL

Location BUILDING 001 Perform Every 1.00

Craft Crew Size Estimated Labor Hours

GRD 1.00 1.00

WO Type PM Multitask No

Expense Class In-service Task Yes

Task No. ACC-CONT-COMP-M Description MONTHLY ON ACCESS CONTROL SYSTEM

Assigned To 3-011 Priority 3.00

Assigned To 1-134 Priority 3.00

WO Type PM Multitask Yes

Site NCAUR Task No. ACC-CONT-COMP-Q

Description QUARTERLY ON ACCESS CONTROL SYSTEM

Task Instructions

Instruction Code 143 Date Last Edited 12/21/2015

MONTHLY ON ACCESS CONTROL COMPUTER SYSTEM PWS 6.3

BACKUP IS NOW DONE BY I.T. 4/3/06

CLEAN COMPUTER, MONITOR

Next Due Date 12/30/2020 Must Be Down No Tenant

Meter Name Last Performed At

Sub-location 3 GUARD OFFICE No. of Times Completed 195.00

Date Last Performed 12/2/2020 Down Time

42.00

Date Last Performed 12/10/2020 Down Time Next Due Date 3/11/2021 Must Be Down No

Sub-location 2 BASEMENT Task Duration

Sub-location 3 NORTH WING No. of Times Completed

Location BUILDING 001 Perform Every 3.00 Month(s) Sub-location 1 0225 Schedule Type Duplicates

ELEC 1.00 6.00

Equipment No. ACC-CONT-PNL-01-0225 Equipment Description NORTHERN ACCESS CONTROL PANEL-2 DOOR

Expense Class In-service Task Yes

Craft Crew Size Estimated Labor Hours

Equipment Description NORTHERN ACCESS CONTROL PANEL-4DOOR

Next Due Date 3/11/2021 Must Be Down No Tenant

Equipment No. ACC-CONT-PNL-03-0016

Sub-location 3 NORTH WING No. of Times Completed 42.00

Date Last Performed 12/10/2020 Down Time

Month(s) Sub-location 1 0212 Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration

Tenant

Equipment No. ACC-CONT-PNL-02-0212 Equipment Description NORTHERN ACCESS CONTROL PANEL-4 DOOR

Location BUILDING 001 Perform Every 3.00

Task Report (Full List)

12/14/2020 National Center Agricultural Utilization Research Page

Month(s) Sub-location 1 3135 Schedule Type Duplicates Sub-location 2 3RD FLOOR Task Duration

Tenant

Equipment No. ACC-CONT-PNL-04-3135 Equipment Description NORTHERN ACCESS CONTROL PANEL-4 DOOR

Location BUILDING 001 Perform Every 3.00

42.00

Date Last Performed 12/10/2020 Down Time Next Due Date 3/11/2021 Must Be Down No

Sub-location 2 BASEMENT Task Duration

Sub-location 3 ADMIN WING No. of Times Completed

Location BUILDING 001 Perform Every 3.00 Month(s) Sub-location 1 - Schedule Type Duplicates

Sub-location 3 ADMIN WING No. of Times Completed 42.00

Date Last Performed 12/10/2020 Down Time

Month(s) Sub-location 1 0041 Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration

Equipment Description NORTHERN ACCESS CONTROL PANEL-4 DOOR

Location BUILDING 001 Perform Every 3.00

Next Due Date 3/11/2021 Must Be Down No Tenant

Equipment No. ACC-CONT-PNL-05-0041

Sub-location 3 CENTER WING No. of Times Completed 42.00

Date Last Performed 12/10/2020 Down Time

Next Due Date 3/11/2021 Must Be Down No Tenant

Equipment No. ACC-CONT-PNL-07-BLDG002

Sub-location 3 WEST No. of Times Completed 42.00

Date Last Performed 12/10/2020 Down Time

Month(s) Sub-location 1 BASEMENT Schedule Type Duplicates Sub-location 2 SOUTH WING Task Duration

Equipment Description NORTHERN ACCESS CONTROL PANEL-4 DOOR

Location BUILDING 001 Perform Every 3.00

Next Due Date 3/11/2021 Must Be Down No Tenant

Equipment No. ACC-CONT-PNL-06-0328 OUTSIDE

Equipment Description NORTHERN ACCESS CONTROL PANEL-4 DOOR

Location BUILDING 001 Perform Every 3.00

Next Due Date 3/11/2021 Must Be Down No Tenant

Equipment No. ACC-CONT-PNL-08-0314

Sub-location 3 SOUTH No. of Times Completed 42.00

Date Last Performed 12/10/2020 Down Time

Month(s) Sub-location 1 - Schedule Type Duplicates Sub-location 2 - Task Duration

Equipment Description NORTHERN ACCESS CONTROL PANEL-4 DOOR

Location BUILDING 002 Perform Every 3.00

12/14/2020 National Center Agricultural Utilization Research Page

Month(s) Sub-location 1 0315 Schedule Type Duplicates

Task Report (Full List)

Equipment Description NORTHERN ACCESS CONTROL PANEL-4 DOOR

Location BUILDING 001 Perform Every 3.00

Next Due Date 3/11/2021 Must Be Down No Tenant

Equipment No. ACC-CONT-PNL-09-0315

Sub-location 3 SOUTH WING No. of Times Completed 42.00

Date Last Performed 12/10/2020 Down Time

Month(s) Sub-location 1 0314 Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration

Sub-location 2 BASEMENT Task Duration

Sub-location 3 - No. of Times Completed 42.00

Date Last Performed 12/10/2020 Down Time

Month(s) Sub-location 1 ATTIC Schedule Type Duplicates Sub-location 2 ADMIN WING Task Duration

Equipment Description NORTHERN ACCESS CONTROL PANEL-4 DOOR

Location BUILDING 001 Perform Every 3.00

Next Due Date 3/11/2021 Must Be Down No Tenant

Equipment No. ACC-CONT-PNL-10-ATTIC

Sub-location 3 SOUTH WING No. of Times Completed 42.00

Date Last Performed 12/10/2020 Down Time

Next Due Date 3/11/2021 Must Be Down No Tenant

Equipment No. ACC-CONT-PNL-12-ATTIC

Sub-location 3 - No. of Times Completed 42.00

Date Last Performed 12/10/2020 Down Time

Month(s) Sub-location 1 ATTIC Schedule Type Duplicates Sub-location 2 ADMIN WING Task Duration

Equipment Description NORTHERN ACCESS CONTROL PANEL-4 DOOR

Location BUILDING 001 Perform Every 3.00

Next Due Date 3/11/2021 Must Be Down No Tenant

Equipment No. ACC-CONT-PNL-11-ATTIC

Equipment Description NORTHERN ACCESS CONTROL PANEL-4 DOOR

Location BUILDING 001 Perform Every 3.00

Next Due Date 3/11/2021 Must Be Down No Tenant

Equipment No. ACC-CONT-PNL-13-0032

Sub-location 3 - No. of Times Completed 42.00

Date Last Performed 12/10/2020 Down Time

Month(s) Sub-location 1 ATTIC Schedule Type Duplicates Sub-location 2 ADMIN WING Task Duration

Equipment Description NORTHERN ACCESS CONTROL PANEL-4 DOOR

Location BUILDING 001 Perform Every 3.00

Month(s) Sub-location 1 0019 Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration

Equipment Description NORTHERN ACCESS CONTROL PANEL-4 DOOR

Location BUILDING 001 Perform Every 3.00

Next Due Date 3/11/2021 Must Be Down No Tenant

Equipment No. ACC-CONT-PNL-14-0019

Sub-location 3 ADMIN WING No. of Times Completed 42.00

Date Last Performed 12/10/2020 Down Time

Month(s) Sub-location 1 - Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration

Sub-location 3 CENTER WING No. of Times Completed 42.00

Date Last Performed 12/10/2020 Down Time

Month(s) Sub-location 1 0120A Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration

Equipment Description NORTHERN ACCESS CONTROL PANEL-4 DOOR

Location BUILDING 001 Perform Every 3.00

Next Due Date 3/11/2021 Must Be Down No Tenant

Equipment No. ACC-CONT-PNL-15-0120A

Sub-location 3 ADMIN WING No. of Times Completed 42.00

Date Last Performed 12/10/2020 Down Time

Task Report (Full List)

12/14/2020 National Center Agricultural Utilization Research Page

Next Due Date 3/11/2021 Must Be Down No

Next Due Date 3/11/2021 Must Be Down No Tenant

Equipment No. ACC-CONT-PWR-SUP-01-0225

Sub-location 3 CENTER WING No. of Times Completed 42.00

Date Last Performed 12/10/2020 Down Time

Month(s) Sub-location 1 3135 Schedule Type Duplicates Sub-location 2 3RD FLOOR Task Duration

Tenant

Equipment No. ACC-CONT-PNL-16-3135 Equipment Description NORTHERN ACCESS CONTROL PANEL-4 DOOR

Location BUILDING 001 Perform Every 3.00

Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY

Location BUILDING 001 Perform Every 3.00

Next Due Date 3/11/2021 Must Be Down No Tenant

Equipment No. ACC-CONT-PWR-SUP-02-0212

Sub-location 3 NORTH WING No. of Times Completed 42.00

Date Last Performed 12/10/2020 Down Time

Month(s) Sub-location 1 0225 Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration

Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY

Location BUILDING 001 Perform Every 3.00

Month(s) Sub-location 1 - Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration

Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY

Location BUILDING 001 Perform Every 3.00

Next Due Date 3/11/2021 Must Be Down No Tenant

Equipment No. ACC-CONT-PWR-SUP-03-0016

Sub-location 3 NORTH WING No. of Times Completed 42.00

Date Last Performed 12/10/2020 Down Time

Month(s) Sub-location 1 0212 Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration

Sub-location 3 CENTER WING No. of Times Completed 42.00

Date Last Performed 12/10/2020 Down Time

Month(s) Sub-location 1 0120A Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration

Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY

Location BUILDING 001 Perform Every 3.00

Next Due Date 3/11/2021 Must Be Down No Tenant

Equipment No. ACC-CONT-PWR-SUP-04-0120A

Sub-location 3 ADMIN WING No. of Times Completed 42.00

Date Last Performed 12/10/2020 Down Time

Next Due Date 3/11/2021 Must Be Down No Tenant

Equipment No. ACC-CONT-PWR-SUP-06

Sub-location 3 ADMIN WING No. of Times Completed 42.00

Date Last Performed 12/10/2020 Down Time

Month(s) Sub-location 1 0041 Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration

Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY

Location BUILDING 001 Perform Every 3.00

Next Due Date 3/11/2021 Must Be Down No Tenant

Equipment No. ACC-CONT-PWR-SUP-05-0041

Location BUILDING 001 Perform Every 3.00 Month(s)

Task Report (Full List)

Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY

Equipment No. ACC-CONT-PWR-SUP-07-BLDG02 Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY

Location BUILDING 002 Perform Every 3.00

42.00

Date Last Performed 12/10/2020 Down Time Next Due Date 3/11/2021 Must Be Down No

Sub-location 2 SOUTH WING Task Duration

Sub-location 3 WEST No. of Times Completed

Sub-location 1 BASEMENT Schedule Type Duplicates

Month(s) Sub-location 1 0314 Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration

Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY

Location BUILDING 001 Perform Every 3.00

Next Due Date 3/11/2021 Must Be Down No Tenant

Equipment No. ACC-CONT-PWR-SUP-08-0314

Sub-location 3 SOUTH No. of Times Completed 42.00

Date Last Performed 12/10/2020 Down Time

Month(s) Sub-location 1 - Schedule Type Duplicates Sub-location 2 - Task Duration

Sub-location 3 SOUTH WING No. of Times Completed 42.00

Date Last Performed 12/10/2020 Down Time

Month(s) Sub-location 1 0315 Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration

Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY

Location BUILDING 001 Perform Every 3.00

Next Due Date 3/11/2021 Must Be Down No Tenant

Equipment No. ACC-CONT-PWR-SUP-09-0315

Sub-location 3 SOUTH WING No. of Times Completed 42.00

Date Last Performed 12/10/2020 Down Time

Next Due Date 3/11/2021 Must Be Down No Tenant

Equipment No. ACC-CONT-PWR-SUP-11-ATTIC

Sub-location 3 - No. of Times Completed 42.00

Date Last Performed 12/10/2020 Down Time

Month(s) Sub-location 1 ATTIC Schedule Type Duplicates Sub-location 2 ADMIN WING Task Duration

Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY

Location BUILDING 001 Perform Every 3.00

Next Due Date 3/11/2021 Must Be Down No Tenant

Equipment No. ACC-CONT-PWR-SUP-10-ATTIC

Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY

Location BUILDING 001 Perform Every 3.00

Next Due Date 3/11/2021 Must Be Down No Tenant

Equipment No. ACC-CONT-PWR-SUP-12-ATTIC

Sub-location 3 - No. of Times Completed 42.00

Date Last Performed 12/10/2020 Down Time

Month(s) Sub-location 1 ATTIC Schedule Type Duplicates Sub-location 2 ADMIN WING Task Duration

Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY

Location BUILDING 001 Perform Every 3.00

42.00

Date Last Performed 12/10/2020 Down Time

Sub-location 2 ADMIN WING Task Duration

Sub-location 3 - No. of Times Completed

Month(s)

Task Report (Full List)

Sub-location 1 ATTIC Schedule Type Duplicates

Month(s) Sub-location 1 - Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration

Tenant

Equipment No. ACC-CONT-PWR-SUP-13-0032 Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY

Location BUILDING 001 Perform Every 3.00

Next Due Date 3/11/2021 Must Be Down No

Sub-location 3 ADMIN WING No. of Times Completed 42.00

Date Last Performed 12/10/2020 Down Time

Month(s) Sub-location 1 0019 Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration

Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY

Location BUILDING 001 Perform Every 3.00

Next Due Date 3/11/2021 Must Be Down No Tenant

Equipment No. ACC-CONT-PWR-SUP-14-0019

Sub-location 3 ADMIN WING No. of Times Completed 42.00

Date Last Performed 12/10/2020 Down Time

Next Due Date 3/11/2021 Must Be Down No Tenant

Equipment No. ACC-CONT-PWR-SUP-16-3135

Sub-location 3 CENTER WING No. of Times Completed 42.00

Date Last Performed 12/10/2020 Down Time

Month(s) Sub-location 1 0120A Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration

Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY

Location BUILDING 001 Perform Every 3.00

Next Due Date 3/11/2021 Must Be Down No Tenant

Equipment No. ACC-CONT-PWR-SUP-15-0120A

Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY

Location BUILDING 010 Perform Every 3.00

Next Due Date 3/11/2021 Must Be Down No Tenant

Equipment No. ACC-CONT-PWR-SUP-17-BLDG10C

Sub-location 3 CENTER WING No. of Times Completed 42.00

Date Last Performed 12/10/2020 Down Time

Month(s) Sub-location 1 3135 Schedule Type Duplicates Sub-location 2 3RD FLOOR Task Duration

Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY

Location BUILDING 001 Perform Every 3.00

Task Report (Full List)

12/14/2020 National Center Agricultural Utilization Research Page

GATE.

________12 VOLT DC

________24 VOLT AC

________24 VOLT DC

________120 VOLT AC

Task Instructions

Instruction Code 142 Date Last Edited 3/25/2011

PWS 6.3

1. CHECK WIRE TERMINATIONS AND VOLTAGES IN ACCESS PANEL IN SERVICE BUILDING FOR REMOTE

Next Due Date 3/11/2021 Must Be Down No Tenant

Meter Name Last Performed At

Sub-location 3 - No. of Times Completed 42.00

Date Last Performed 12/10/2020 Down Time

Month(s) Sub-location 1 C Schedule Type Duplicates Sub-location 2 - Task Duration

2. CHECK CIRCUIT BOARDS, WIRE TERMINATIONS AND VOLTAGES IN ACCESS PANELS ACC-CONT-PNL-01 THRU -16

LOCATED THROUGHOUT THE BUILDING.

ACC-CONT-GATE-PNL-01-BLDG10C

________12 VOLT DC

________12 VOLT AC

________24 VOLT DC

________24 VOLT AC

ACC-CONT-PNL-01 ACC-CONT-PNL-02

________12 VOLT DC ________12 VOLT DC

________24 VOLT AC ________24 VOLT AC

________24 VOLT DC ________24 VOLT DC

ACC-CONT-PNL-03 ACC-CONT-PNL-04

________12 VOLT DC ________12 VOLT DC

________24 VOLT AC ________24 VOLT AC

________24 VOLT DC ________24 VOLT DC

________120 VOLT AC ________120 VOLT AC

ACC-CONT-PNL-05 ACC-CONT-PNL-06

________12 VOLT DC ________12 VOLT DC

________24 VOLT AC ________24 VOLT AC

________24 VOLT DC ________24 VOLT DC

________120 VOLT AC ________120 VOLT AC

ACC-CONT-PNL-07 ACC-CONT-PNL-08

________12 VOLT DC ________12 VOLT DC

________24 VOLT AC ________24 VOLT AC

________24 VOLT DC ________24 VOLT DC

________120 VOLT AC ________120 VOLT AC

ACC-CONT-PNL-09 ACC-CONT-PNL-10

________12 VOLT DC ________12 VOLT DC

________24 VOLT AC ________24 VOLT AC

________24 VOLT DC ________24 VOLT DC

________120 VOLT AC ________120 VOLT AC

ACC-CONT-PNL-11 ACC-CONT-PNL-12

________12 VOLT DC ________12 VOLT DC

________24 VOLT AC ________24 VOLT AC

________24 VOLT DC ________24 VOLT DC

________120 VOLT AC ________120 VOLT AC

ACC-CONT-PNL-13 ACC-CONT-PNL-14

________12 VOLT DC ________12 VOLT DC

________24 VOLT AC ________24 VOLT AC

________24 VOLT DC ________24 VOLT DC

________120 VOLT AC ________120 VOLT AC

ACC-CONT-PNL-15 ACC-CONT-PNL-16

________12 VOLT DC ________12 VOLT DC

________24 VOLT AC ________24 VOLT AC

________24 VOLT DC ________24 VOLT DC

________120 VOLT AC ________120 VOLT AC

3. CHECK WIRE TERMINATIONS AND VOLTAGES IN ACCESS CONTROL POWER SUPPLIES ACC-CONT-PWR SUP-01

THRU -17

ACC-CONT-PWR-SUP-01 ACC-CONT-PWR-SUP-02

________12 VOLT DC ________12 VOLT DC

________24 VOLT AC ________24 VOLT AC

________24 VOLT DC ________24 VOLT DC

Task Report (Full List)

12/14/2020 National Center Agricultural Utilization Research Page

ACC-CONT-PWR-SUP-03 ACC-CONT-PWR-SUP-04

________12 VOLT DC ________12 VOLT DC

________24 VOLT AC ________24 VOLT AC

________24 VOLT DC ________24 VOLT DC

________120 VOLT AC ________120 VOLT AC

ACC-CONT-PWR-SUP-05 ACC-CONT-PWR-SUP-06

________12 VOLT DC ________12 VOLT DC

________24 VOLT AC ________24 VOLT AC

________24 VOLT DC ________24 VOLT DC

________120 VOLT AC ________120 VOLT AC

ACC-CONT-PWR-SUP-07 ACC-CONT-PWR-SUP-08

________12 VOLT DC ________12 VOLT DC

24 VOLT AC 24 VOLT AC

Task No. ADMIN STCS CLEAN-NW Description ADMIN STAIRCASE CLEANING BI-WEEKLY (NORTH WING)

Task Report (Full List)

12/14/2020 National Center Agricultural Utilization Research Page

Craft Crew Size Estimated Labor Hours

Meter Name Last Performed At

Site NCAUR

WO Type AW Multitask No

Expense Class In-service Task Yes

Task No. ADDITIONAL WORK Description ADDITIONAL WORK

Assigned To Priority 3.00

________24 VOLT AC ________24 VOLT AC

________24 VOLT DC ________24 VOLT DC

________120 VOLT AC ________120 VOLT AC

ACC-CONT-PWR-SUP-09 ACC-CONT-PWR-SUP-10

________12 VOLT DC ________12 VOLT DC

________24 VOLT AC ________24 VOLT AC

________24 VOLT DC ________24 VOLT DC

________120 VOLT AC ________120 VOLT AC

ACC-CONT-PWR-SUP-11 ACC-CONT-PWR-SUP-12

________12 VOLT DC ________12 VOLT DC

________24 VOLT AC ________24 VOLT AC

________24 VOLT DC ________24 VOLT DC

________120 VOLT AC ________120 VOLT AC

ACC-CONT-PWR-SUP-13 ACC-CONT-PWR-SUP-14

________12 VOLT DC ________12 VOLT DC

________24 VOLT AC ________24 VOLT AC

________24 VOLT DC ________24 VOLT DC

________120 VOLT AC ________120 VOLT AC

ACC-CONT-PWR-SUP-15 ACC-CONT-PWR-SUP-16

________12 VOLT DC ________12 VOLT DC

________24 VOLT AC ________24 VOLT AC

________24 VOLT DC ________24 VOLT DC

________120 VOLT AC ________120 VOLT AC

ACC-CONT-PWR-SUP-17

________12 VOLT DC

________24 VOLT AC

________24 VOLT DC

________120 VOLT AC

WARNING -

Sub-location 3 NORTH WING No. of Times Completed 40.00

Date Last Performed 12/27/2020 Down Time

Week(s) Sub-location 1 - Schedule Type Duplicates Sub-location 2 - Task Duration

HSKP

Equipment No. - Equipment Description

Location BUILDING 001 Perform Every 2.00

Expense Class In-service Task Yes

Craft Crew Size Estimated Labor Hours

Assigned To 2-113 Priority 3.00

WO Type PM Multitask No

Task Instructions

Next Due Date 12/21/2020 Must Be Down No

Craft Crew Size Estimated Labor Hours

Assigned To 2-115 Priority 3.00

WO Type PM Multitask Yes

Site NCAUR Task No. ADMIN STCS-CLEAN-CW

Description ADMIN STAIRCASE CLEANING BI-WEEKLY (CENTER WING)

Instruction Code HK-STCS Date Last Edited 10/18/2019

STAIRCASES:

SWEEP STAIRS AND LANDINGS (WITH BROOM, NOT A DUST MOP)

WET MOP STAIRS AND LANDINGS

DUST AND WIPE DOWN WINDOW LEDGES

DUST AND WIPE DOWN RAILINGS, DISPLAY CASES, ETC.

CLEAN DOOR JAMS

WIPE DOWN FRONT AND BACK OF DOORS (CLEANING THE GLASS)

DISINFECT DOOR HANDLES AND REMOVE AND BUILD UP

No Tenant

Meter Name Last Performed At

Task Instructions

Instruction Code HK-STCS Date Last Edited 10/18/2019

Sub-location 3 CENTER WING No. of Times Completed

Date Last Performed Down Time Next Due Date 12/21/2020 Must Be Down

Week(s) Sub-location 1 - Schedule Type Duplicates Sub-location 2 - Task Duration

HSKP

Equipment No. - Equipment Description

Location BUILDING 001 Perform Every 2.00

HSKP

Expense Class In-service Task Yes

Craft Crew Size Estimated Labor Hours

Assigned To 2-111 Priority 3.00

WO Type PM Multitask No

Site NCAUR Task No. ADMIN STCS-CLEAN-SW

Description ADMIN STAIRCASE CLEANING BI-WEEKLY (SOUTH WING)

STAIRCASES:

SWEEP STAIRS AND LANDINGS (WITH BROOM, NOT A DUST MOP)

WET MOP STAIRS AND LANDINGS

DUST AND WIPE DOWN WINDOW LEDGES

DUST AND WIPE DOWN RAILINGS, DISPLAY CASES, ETC.

CLEAN DOOR JAMS

WIPE DOWN FRONT AND BACK OF DOORS (CLEANING THE GLASS)

Task Report (Full List)

DISINFECT DOOR HANDLES AND REMOVE AND BUILD UP

Equipment No. - Equipment Description

Location BLDG 001 Perform Every 2.00

Site NCAUR Task No. AIR-COMP-01-02-Q

Description QUARTERLY ON AIR COMPRESSORS

Task…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .