Attachment 007 Operation and Maintenance Contract USDA-NCAUR, Peoria, IL
Craft Crew Size Estimated Labor Hours
HSKP
Equipment No. -
WO Type PM Multitask Yes
Expense Class In-service Task Yes
Task No. 3118-3120A-3120B-M Description THURSDAY 7AM- MONTHLY CLEANING OF 3118-3120A-3120B
Assigned To 2-017 Priority 3.00
Task Report (Full List)
12/14/2020 National Center Agricultural Utilization Research Page
Site NCAUR
Sub-location 1 3120A Schedule Type Duplicates Sub-location 2 3RD FLOOR Task Duration
No Tenant
Equipment No. - Equipment Description
Location BUILDING 001 Perform Every 8.00 Thursday
Sub-location 3 CENTER WING No. of Times Completed
Date Last Performed Down Time Next Due Date 1/21/2021 Must Be Down
Sub-location 1 3118 Schedule Type Duplicates Sub-location 2 3RD FLOOR Task Duration
Equipment Description
Location BUILDING 001 Perform Every 8.00 Thursday
Sub-location 3 CENTER WING No. of Times Completed
Date Last Performed Down Time Next Due Date 1/21/2021 Must Be Down
Sub-location 1 3120B Schedule Type Duplicates Sub-location 2 3RD FLOOR Task Duration
No Tenant
Equipment No. - Equipment Description
Location BUILDING 001 Perform Every 8.00 Thursday
Sub-location 3 CENTER WING No. of Times Completed
Date Last Performed Down Time Next Due Date 1/21/2021 Must Be Down
OFFICE
1. WIPE OFF GLASS IN DOOR (BOTH SIDES)
2. CLEAN DOOR JAM
3. WIPE OFF DOORS FRONT AND BACK SIDES
4. WIPE OFF WINDOW LEDGES
5. DUST OFFICE WHERE POSSIBLE (NO DESKS) - DO NOT REMOVE ANYTHING TO DUST
6.TILE FLOOR: SWEEP AND MOP FLOOR INCLUDING CORNERS AND EDGES. LIFT CORNER OF CHAIR MATS AND
SWEEP 2-3 INCHES UNDER MATS THEN SWEEP AND MOP MATS.
7. CARPET FLOOR: SWEEP OFF MAT AND HEPA VACUUM CARPET.
LAB
1. WIPE OFF GLASS IN DOOR (BOTH SIDES)
2. CLEAN DOOR JAM
3. WIPE OFF DOORS FRONT AND BACK SIDES
4. WIPE OFF WINDOW LEDGES
5. LIFE CORNERS OF CHAIR MATS AND SWEEP 2-3 INCHES UNDER MATS
6. SWEEP AND MOP MATS
No Tenant
Meter Name Last Performed At
Task Instructions
Instruction Code HK-LAB/OFF Date Last Edited 7/30/2020
ELEC 1.00 12.00
PIPE 2.00 12.00
Expense Class In-service Task Yes
Craft Crew Size Estimated Labor Hours
Assigned To Priority 3.00
WO Type PM Multitask No
Site NCAUR Task No. 5 YR INSPECTION
Description 5 YR INSPECTION/TEST ITEMS
Task Report (Full List)
12/14/2020 National Center Agricultural Utilization Research Page
7. SWEEP AND MOP FLOOR
Tenant
Equipment No. FIRE-SPRINK-SPRINKLER PIPING Equipment Description INTERNAL INSPECTION OF FIRE SPRINKLER SYSTEMS PIPI
Location BUILDING 001 Perform Every 5.00
1.00
Date Last Performed 1/15/2018 Down Time Next Due Date 9/20/2022 Must Be Down No
Sub-location 2 - Task Duration
Sub-location 3 - No. of Times Completed
Location BUILDING 001 Perform Every 5.00 Year(s) Sub-location 1 - Schedule Type Duplicates
SUB 32.00
Equipment No. FIRE-SPRINK-CHECK VALVE Equipment Description INTERMAL INSPECTION OF SYSTEM CHECK VALVE
Year(s) Sub-location 1 - Schedule Type Duplicates Sub-location 2 - Task Duration
Tenant
Equipment No. FIRE-SPRINK-STANDPIPE Equipment Description STANDPIPE TEST ON INSTALLED WET STANDPIPES
Location BUILDING 001 Perform Every 5.00
Sub-location 3 - No. of Times Completed
Date Last Performed Down Time Next Due Date Must Be Down No
Year(s) Sub-location 1 - Schedule Type Duplicates Sub-location 2 - Task Duration
Sub-location 3 - No. of Times Completed
Date Last Performed Down Time
Year(s) Sub-location 1 - Schedule Type Duplicates Sub-location 2 - Task Duration
Tenant
Equipment No. FIRE-SPRINK-SYS GAUGE Equipment Description SYSTEM GAUGE(S) REPLACEMENT
Location BUILDING 001 Perform Every 5.00
Sub-location 3 - No. of Times Completed
Date Last Performed Down Time Next Due Date Must Be Down No
Next Due Date Must Be Down No
Craft Crew Size Estimated Labor Hours
HVAC 1.00 0.32
WO Type PM Multitask No
Expense Class In-service Task No
12/14/2020 National Center Agricultural Utilization Research Page
Description 5 YR INSPECTION/TEST ITEMS
Assigned To 1-168 Priority 3.00
3/11/2013
Site NCAUR Task No. AC-COMP-BLD10-C-Q
Task Report (Full List)
Tenant
Meter Name Last Performed At
Task Instructions
Instruction Code 5 YR Date Last Edited
Tenant
Equipment No. F Equipment Description AC COMPRESSOR
Location BUILDING 001 Perform Every 3.00
Sub-location 3 CENTER WING No. of Times Completed
Date Last Performed Down Time Next Due Date Must Be Down No
Month(s) Sub-location 1 - Schedule Type Duplicates Sub-location 2 - Task Duration 15.00
Equipment No. AC-COMP-C-01 Equipment Description
Location BUILDING 001 Perform Every 3.00
Month(s) Sub-location 1 ATTIC Schedule Type Duplicates Sub-location 2 CENTER WING Task Duration 7.00
Equipment Description AC COMPRESSOR
Location BUILDING 001 Perform Every 3.00
Next Due Date 3/6/2019 Must Be Down Yes Tenant
Equipment No. fASU
Sub-location 3 BAY KK-LL No. of Times Completed 68.00
Date Last Performed 1/9/2020 Down Time 15.00
Month(s) Sub-location 1 ATTIC Schedule Type Duplicates Sub-location 2 ADMIN WING Task Duration 23.00
Instruction Code C-1 Date Last Edited 10/2/2019
Task Instructions
Instruction Code 069 Date Last Edited 7/26/2011
A. INSPECT UNIT FOR LOOSE COMPONENTS, CORROSION, ETC.
B. CHECK ELECTRICAL CONNECTIONS FOR TIGHTNESS
C. CLEAN DRAINS
D. CHANGE THE REFRIDGERANT DRIER CORE AS REQUIRED
Next Due Date Must Be Down No Tenant
Meter Name Last Performed At
Sub-location 3 BAY M-N No. of Times Completed 31.00
Date Last Performed 7/16/2009 Down Time
Task No. AC-COMP-BLD10-Q Description QUARTERLY ON BLD #10C AC COMPRESSOR
Assigned To 1-168 Priority 3.00
12/14/2020 National Center Agricultural Utilization Research Page
___ ELECTRICAL [ ] BOTH
___ HYDRAULIC
___ PNEUMATIC HAND PROTECTION
___ STEAM [ ] CHEMICAL GLOVES
___ OTHER: [ ] STANDARD WORK GLOVES
[ ] OVERHEAD HAZARDS [ ] GAUNTLETS
[ ] WELDING/BURNING/HOT WORK [ ] OTHER:
[ ] OTHER:
ITEMS NEEDING PERFORMED
PERMITS [ ] COMPELTED WALKDOWN
[ ] CONFINED SPACE ENTRY [ ] COMPLETE HAZARD ANALYSIS
[ ] LOCKOUT/TAGOUT [ ] ENGINEERING ASSESSMENT
[ ] WELDING/BURNING/HOT WORK
[ ] OTHER: RESPIRATORY PROTECTION
[ ] DUST MASK
ASBESTOS [ ] HALF-FACE RESPIRATOR
[ ] SUSPECT ASBESTOS [ ] FULL-FACE RESPIRATOR
[ ] SAMPLES TO BE TAKEN [ ] SUPPLIES AIR
[ ] ASBESTOS ABATEMENT [ ] SCBA
[ ] ASBESTOS HOUSEKEEPING
FULL-BODY PROTECTION
[ ] CHEMICAL RESISTANT APRONS
[ ] SLEEVES/GAUNTLETS
[ ] HEAT/FLAME RESISTANT CLOTHING
[X ] SAFETY SHOES
[ ] OTHER
Site NCAUR
CHEMICAL HAZARDS TYPE OF LOCKOUT/TAGOUT
[ ] ASBESTOS [ ] PERMIT-REQUIRED
[ ] CARCINOGEN [ ] SINGLE-SOURCE
[ ] CORROSIVES [X ] "SEE LOTO BOOK FOR COMPLETE LOTO PROCEDURES"
[ ] INCOMPATIBLE CHEMICALS
[ ] LEAD EYE/FACE PROTECTION
[ ] MANMADE MINERAL FIBERS [X ] SAFETY GLASSES
[ ] CHEMICAL GOOGLES
PHYSICAL HAZARDS [ ] FACE SHIELD (CHEMICAL RESISTANT)
[ ] COMPRESSED CYLINDERS [ ] FACE SHIELD (GRINDING)
[ ] CONFINED SPACE [ ] UV/WELDER SHIELD
[ ] MANUAL LIFTING
[ ] MECHANICAL/MOVING PARTS HEARING PROTECTION
[ ] NOISE [ ] EARPLUGS
[ ] HAZARDOUS ENERGY: [ ] EARMUFFS
Task Report (Full List)
Sub-location 3 - No. of Times Completed 61.00
Date Last Performed 2/13/2019 Down Time
Month(s) Sub-location 1 C Schedule Type Duplicates Sub-location 2 - Task Duration 14.00
Equipment No. AC-COMP-BLD10 Equipment Description AC COMPRESSOR CONDENSING UNIT & BLOWER
Location BUILDING 10 Perform Every 3.00
Craft Crew Size Estimated Labor Hours
HVAC 1.00 2.00
WO Type PM Multitask Yes
Expense Class In-service Task Yes
Next Due Date 4/22/2019 Must Be Down No
Site NCAUR Task No. AC-UNIT-BLDG10B-Q
Description QUARTERLY ON AC UNIT BUILDING 10B
CHEMICAL HAZARDS TYPE OF LOCKOUT/TAGOUT
[ ] ASBESTOS [ ] PERMIT-REQUIRED
[ ] CARCINOGEN [ ] SINGLE-SOURCE
[ ] CORROSIVES [X ] "SEE LOTO BOOK FOR COMPLETE LOTO PROCEDURES"
Task Report (Full List)
12/14/2020 National Center Agricultural Utilization Research Page
[ ] INCOMPATIBLE CHEMICALS
[ ] LEAD EYE/FACE PROTECTION
[ ] MANMADE MINERAL FIBERS [X ] SAFETY GLASSES
[ ] CHEMICAL GOOGLES
PHYSICAL HAZARDS [ ] FACE SHIELD (CHEMICAL RESISTANT)
[ ] COMPRESSED CYLINDERS [ ] FACE SHIELD (GRINDING)
[ ] CONFINED SPACE [ ] UV/WELDER SHIELD
[ ] MANUAL LIFTING
[ ] MECHANICAL/MOVING PARTS HEARING PROTECTION
[ ] NOISE [ ] EARPLUGS
[ ] HAZARDOUS ENERGY: [ ] EARMUFFS
___ ELECTRICAL [ ] BOTH
___ HYDRAULIC
___ PNEUMATIC HAND PROTECTION
___ STEAM [ ] CHEMICAL GLOVES
___ OTHER: [ ] STANDARD WORK GLOVES
[ ] OVERHEAD HAZARDS [ ] GAUNTLETS
[ ] WELDING/BURNING/HOT WORK [ ] OTHER:
[ ] OTHER:
ITEMS NEEDING PERFORMED
PERMITS [ ] COMPELTED WALKDOWN
[ ] CONFINED SPACE ENTRY [ ] COMPLETE HAZARD ANALYSIS
[ ] LOCKOUT/TAGOUT [ ] ENGINEERING ASSESSMENT
[ ] WELDING/BURNING/HOT WORK
[ ] OTHER: RESPIRATORY PROTECTION
[ ] DUST MASK
ASBESTOS [ ] HALF-FACE RESPIRATOR
[ ] SUSPECT ASBESTOS [ ] FULL-FACE RESPIRATOR
[ ] SAMPLES TO BE TAKEN [ ] SUPPLIES AIR
[ ] ASBESTOS ABATEMENT [ ] SCBA
[ ] ASBESTOS HOUSEKEEPING
FULL-BODY PROTECTION
[ ] CHEMICAL RESISTANT APRONS
[ ] SLEEVES/GAUNTLETS
[ ] HEAT/FLAME RESISTANT CLOTHING
[X ] SAFETY SHOES
Instruction Code BLDG 10 Date Last Edited 3/30/2010
WARNING -
FIRE DETECTORS MUST BE DISABLED BEFORE ANY FLAME OR ARC WELDING WORK
Instruction Code C-1 Date Last Edited 10/2/2019
Task Instructions
Instruction Code 069 Date Last Edited 7/26/2011
A. INSPECT UNIT FOR LOOSE COMPONENTS, CORROSION, ETC.
B. CHECK ELECTRICAL CONNECTIONS FOR TIGHTNESS
C. CLEAN DRAINS
D. CHANGE THE REFRIDGERANT DRIER CORE AS REQUIRED
Tenant
Meter Name Last Performed At
Assigned To 1-168 Priority 3.00
WO Type PM Multitask Yes
Sub-location 2 - Task Duration 7.00
Sub-location 3 - No. of Times Completed 75.00
Location BUILDING 010 Perform Every 3.00 Month(s) Sub-location 1 B Schedule Type Duplicates
HVAC 1.00 0.75
Equipment No. AC-UNIT-BLDG10B Equipment Description AC FAN EVAPORATOR UNIT
Expense Class In-service Task Yes
Craft Crew Size Estimated Labor Hours
Site NCAUR Task No. AC-UNIT-EVAP-Q
Description QUARTERLY ON AC UNIT BUILDING 10B
C. CHECK FOR MOLD GROWTH IN DRAIN PAN
IF EVIDENCE IS FOUND OF MICROBIAL (MOLD) GROWTH, CLEAN ALL SURFACES PER STEP 1-8 BEFORE
GOING ON TO THE NEXT UNIT
D. GENERATE A CM WORK ORDER AFTER CLEANING TO RECORD ADDITIONAL LABOR HOURS
STEP #1
DISCONNECT ALL ELECTRICAL POWER TO THE UNIT
STEP #2
DON THE APPROPIATE PERSONAL PROTECTIVE EQUIPMENT (PPE)
STEP #3
REMOVE ALL STANDING WATER
STEP #4
USE A SCRAPER OR OTHER TOOLS TO REMOVE ANY SOLID MATTER. REMOVE SOLID MATTER WITH A VACUUM DEVICE THAT UTILIZES HIGH EFFICIENCY PARTICULATE ARRESTANCE (HEPA) FILTERS WITH A MINIMUM
EFFICIENCY OF 99.97% AT 0.3 MICRON PARTICLE SIZE
STEP #5
THROUGHLY CLEAN THE CONTAMINATED AREA(S) WITH A MILD BLEACH & WATER SOLUTION OR AN EPA-APPROVED SANITIZER SPECIFICALLY DESIGNED FOR HVAC USE. CAREFULLY FOLLOW THE SANITIZER MANUFACTURE'S
INSTRUCTIONS REGARDING THE USE OF THE PRODUCT
STEP #6
IMMEDIATLY RINSE THE DRAIN PAN THROUGHLY WITH FRESH WATER TO PREVENT POTENTIAL CORROSIONS
FROM THE CLEANING SOLUTION OF THE PAN & DRAIN LINE COMPONENTS
STEP #7
ALLOW THE UNIT TO DRY THROUGHLY BEFORE PUTTING THE SYSTEM BACK INTO SERVICE
STEP #8
DETERMINE & CORRECT THE CAUSE OF THE MICROBIAL (MOLD) CONTAMINATION
Instruction Code BLDG 10 Date Last Edited 3/30/2010
WARNING -
FIRE DETECTORS MUST BE DISABLED BEFORE ANY FLAME OR ARC WELDING WORK
8/8/2011
QUARTERLY PM OF WATER SOURCE HEAT PUMP OR EVAPORATION UNIT
A. SHUT DOWN ELECTRICAL SOURCE & LOCK OUT
B. INSPECT CONDENSATE DRAIN PAN FOR PROPER DRAINAGE
IF EVIDENCE OF STANDING WATER OR CONDENSATE OVERFLOW EXISTS GENERATE CM WORK ORDER FOR
CORRECTIVE MEASURES
Task Report (Full List)
12/14/2020 National Center Agricultural Utilization Research Page
Tenant
Meter Name Last Performed At
Task Instructions
Instruction Code 067 Date Last Edited
Date Last Performed 10/20/2020 Down Time 20.00 Next Due Date 1/22/2021 Must Be Down Yes
HVAC 1.00 1.44
Equipment No. AC-UNIT-C-01-3115
Expense Class In-service Task Yes
Craft Crew Size Estimated Labor Hours
WO Type PM Multitask No
Sub-location 2 3RD FLOOR Task Duration 7.00
Sub-location 3 CENTER WING No. of Times Completed 34.00
Location BUILDING 001 Perform Every 3.00 Month(s) Sub-location 1 3115 Schedule Type Duplicates
Equipment Description AC UNIT CEILING MOUNTED EVAPORATOR
Next Due Date Must Be Down No Tenant
Equipment No. AC-UNIT-C-03-0120A
Sub-location 3 CENTER WING No. of Times Completed 24.00
Date Last Performed 7/27/2010 Down Time
Month(s) Sub-location 1 1109 Schedule Type Duplicates Sub-location 2 1ST FLOOR Task Duration 7.00
Tenant
Equipment No. AC-UNIT-C-02-1109 Equipment Description HANGING AC EVAPORATOR UNIT
Location BUILDING 001 Perform Every 3.00
Date Last Performed 7/27/2010 Down Time 15.00 Next Due Date Must Be Down No
Next Due Date 3/18/2021 Must Be Down No Tenant
Equipment No. AC-UNIT-S-01-0317
Sub-location 3 CENTER WING No. of Times Completed 33.00
Date Last Performed 9/24/2020 Down Time
12/14/2020 National Center Agricultural Utilization Research Page
Sub-location 2 BASEMENT Task Duration 7.00
Month(s) Sub-location 1 0120A Schedule Type Duplicates
Task Report (Full List)
Equipment Description SPLIT SYSTEM AIR COND-EVAP UNIT
Location BUILDING 001 Perform Every 3.00
Equipment Description HANGING AC EVAPORATOR UNIT
Location BUILDING 001 Perform Every 3.00
Next Due Date 3/18/2021 Must Be Down No Tenant
Equipment No. AC-UNIT-S-02-0319
Sub-location 3 SOUTH WING No. of Times Completed 76.00
Date Last Performed 9/24/2020 Down Time
Month(s) Sub-location 1 0317 Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration 7.00
Equipment Description HANGING AC EVAPORATOR UNIT
Location BUILDING 001 Perform Every 3.00
Task Instructions
Instruction Code 067 Date Last Edited 8/8/2011
Next Due Date 3/18/2021 Must Be Down No Tenant
Meter Name Last Performed At
Sub-location 3 SOUTH WING No. of Times Completed 76.00
Date Last Performed 9/24/2020 Down Time
Month(s) Sub-location 1 0319 Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration 7.00
Instruction Code C-1 Date Last Edited 10/2/2019
CHEMICAL HAZARDS TYPE OF LOCKOUT/TAGOUT
[ ] ASBESTOS [ ] PERMIT-REQUIRED
[ ] CARCINOGEN [ ] SINGLE-SOURCE
[ ] CORROSIVES [X ] "SEE LOTO BOOK FOR COMPLETE LOTO PROCEDURES"
Task Report (Full List)
QUARTERLY PM OF WATER SOURCE HEAT PUMP OR EVAPORATION UNIT
A. SHUT DOWN ELECTRICAL SOURCE & LOCK OUT
B. INSPECT CONDENSATE DRAIN PAN FOR PROPER DRAINAGE
IF EVIDENCE OF STANDING WATER OR CONDENSATE OVERFLOW EXISTS GENERATE CM WORK ORDER FOR
CORRECTIVE MEASURES
C. CHECK FOR MOLD GROWTH IN DRAIN PAN
IF EVIDENCE IS FOUND OF MICROBIAL (MOLD) GROWTH, CLEAN ALL SURFACES PER STEP 1-8 BEFORE
GOING ON TO THE NEXT UNIT
D. GENERATE A CM WORK ORDER AFTER CLEANING TO RECORD ADDITIONAL LABOR HOURS
STEP #1
DISCONNECT ALL ELECTRICAL POWER TO THE UNIT
STEP #2
DON THE APPROPIATE PERSONAL PROTECTIVE EQUIPMENT (PPE)
STEP #3
REMOVE ALL STANDING WATER
STEP #4
USE A SCRAPER OR OTHER TOOLS TO REMOVE ANY SOLID MATTER. REMOVE SOLID MATTER WITH A VACUUM DEVICE THAT UTILIZES HIGH EFFICIENCY PARTICULATE ARRESTANCE (HEPA) FILTERS WITH A MINIMUM
EFFICIENCY OF 99.97% AT 0.3 MICRON PARTICLE SIZE
STEP #5
THROUGHLY CLEAN THE CONTAMINATED AREA(S) WITH A MILD BLEACH & WATER SOLUTION OR AN EPA-APPROVED SANITIZER SPECIFICALLY DESIGNED FOR HVAC USE. CAREFULLY FOLLOW THE SANITIZER MANUFACTURE'S
INSTRUCTIONS REGARDING THE USE OF THE PRODUCT
STEP #6
IMMEDIATLY RINSE THE DRAIN PAN THROUGHLY WITH FRESH WATER TO PREVENT POTENTIAL CORROSIONS
FROM THE CLEANING SOLUTION OF THE PAN & DRAIN LINE COMPONENTS
STEP #7
ALLOW THE UNIT TO DRY THROUGHLY BEFORE PUTTING THE SYSTEM BACK INTO SERVICE
STEP #8
DETERMINE & CORRECT THE CAUSE OF THE MICROBIAL (MOLD) CONTAMINATION
12/14/2020 National Center Agricultural Utilization Research Page
[ ] INCOMPATIBLE CHEMICALS
[ ] LEAD EYE/FACE PROTECTION
[ ] MANMADE MINERAL FIBERS [X ] SAFETY GLASSES
[ ] CHEMICAL GOOGLES
PHYSICAL HAZARDS [ ] FACE SHIELD (CHEMICAL RESISTANT)
[ ] COMPRESSED CYLINDERS [ ] FACE SHIELD (GRINDING)
[ ] CONFINED SPACE [ ] UV/WELDER SHIELD
[ ] MANUAL LIFTING
[ ] MECHANICAL/MOVING PARTS HEARING PROTECTION
[ ] NOISE [ ] EARPLUGS
[ ] HAZARDOUS ENERGY: [ ] EARMUFFS
Equipment No. AC-UNIT-N-02-3205 Equipment Description HANGING AC EVAPORATOR UNIT WEST
Location BUILDING 001 Perform Every 1.00
Craft Crew Size Estimated Labor Hours
HVAC 1.00 0.47
WO Type PM Multitask No
Expense Class In-service Task Yes
Task No. AC-UNIT-N-M Description QUARTERLY ON EVAPORATOR AC UNITS
Assigned To 1-168 Priority 3.00
___ ELECTRICAL [ ] BOTH
___ HYDRAULIC
___ PNEUMATIC HAND PROTECTION
___ STEAM [ ] CHEMICAL GLOVES
___ OTHER: [ ] STANDARD WORK GLOVES
[ ] OVERHEAD HAZARDS [ ] GAUNTLETS
[ ] WELDING/BURNING/HOT WORK [ ] OTHER:
[ ] OTHER:
ITEMS NEEDING PERFORMED
PERMITS [ ] COMPELTED WALKDOWN
[ ] CONFINED SPACE ENTRY [ ] COMPLETE HAZARD ANALYSIS
[ ] LOCKOUT/TAGOUT [ ] ENGINEERING ASSESSMENT
[ ] WELDING/BURNING/HOT WORK
[ ] OTHER: RESPIRATORY PROTECTION
[ ] DUST MASK
ASBESTOS [ ] HALF-FACE RESPIRATOR
[ ] SUSPECT ASBESTOS [ ] FULL-FACE RESPIRATOR
[ ] SAMPLES TO BE TAKEN [ ] SUPPLIES AIR
[ ] ASBESTOS ABATEMENT [ ] SCBA
[ ] ASBESTOS HOUSEKEEPING
FULL-BODY PROTECTION
[ ] CHEMICAL RESISTANT APRONS
[ ] SLEEVES/GAUNTLETS
[ ] HEAT/FLAME RESISTANT CLOTHING
[X ] SAFETY SHOES
Site NCAUR
Month(s) Sub-location 1 2205 Schedule Type Duplicates Sub-location 2 2ND FLOOR Task Duration 7.00
Equipment Description HANGING AC EVAPORATOR UNIT WEST
Location BUILDING 001 Perform Every 1.00
Next Due Date 12/30/2020 Must Be Down No Tenant
Equipment No. AC-UNIT-N-04-2205
Sub-location 3 NORTH WING No. of Times Completed 229.00
Date Last Performed 11/13/2020 Down Time
Month(s) Sub-location 1 3205 Schedule Type Duplicates Sub-location 2 3RD FLOOR Task Duration 7.00
Sub-location 2 2ND FLOOR Task Duration 7.00
Sub-location 3 NORTH WING No. of Times Completed 229.00
Location BUILDING 001 Perform Every 1.00 Month(s) Sub-location 1 2205 Schedule Type Duplicates
12/14/2020 National Center Agricultural Utilization Research Page
Equipment No. EVAPORATOR UNIT EAS Equipment Description HANGING AC EVAPORATOR UNIT EAST
Next Due Date 12/30/2020 Must Be Down No Tenant
Task Report (Full List)
Sub-location 3 NORTH WING No. of Times Completed 229.00
Date Last Performed 11/13/2020 Down Time
Location BUILDING 001 Perform Every 1.00 Month(s)
No Tenant
Equipment No. EVAPORATOR UNIT EAST Equipment Description HANGING AC EVAPORATOR UNIT EAST
Date Last Performed 11/13/2020 Down Time Next Due Date 12/30/2020 Must Be Down
Date Last Performed 11/13/2020 Down Time 10.00 Next Due Date 12/30/2020 Must Be Down No
Sub-location 2 3RD FLOOR Task Duration 7.00
Sub-location 3 NORTH WING No. of Times Completed 229.00
Sub-location 1 3205 Schedule Type Duplicates
CHEMICAL HAZARDS TYPE OF LOCKOUT/TAGOUT
[ ] ASBESTOS [ ] PERMIT-REQUIRED
[ ] CARCINOGEN [ ] SINGLE-SOURCE
[ ] CORROSIVES [X ] "SEE LOTO BOOK FOR COMPLETE LOTO PROCEDURES"
[ ] INCOMPATIBLE CHEMICALS
[ ] LEAD EYE/FACE PROTECTION
[ ] MANMADE MINERAL FIBERS [X ] SAFETY GLASSES
[ ] CHEMICAL GOOGLES
PHYSICAL HAZARDS [ ] FACE SHIELD (CHEMICAL RESISTANT)
[ ] COMPRESSED CYLINDERS [ ] FACE SHIELD (GRINDING)
[ ] CONFINED SPACE [ ] UV/WELDER SHIELD
[ ] MANUAL LIFTING
[ ] MECHANICAL/MOVING PARTS HEARING PROTECTION
[ ] NOISE [ ] EARPLUGS
[ ] HAZARDOUS ENERGY: [ ] EARMUFFS
___ ELECTRICAL [ ] BOTH
___ HYDRAULIC
___ PNEUMATIC HAND PROTECTION
___ STEAM [ ] CHEMICAL GLOVES
___ OTHER: [ ] STANDARD WORK GLOVES
[ ] OVERHEAD HAZARDS [ ] GAUNTLETS
[ ] WELDING/BURNING/HOT WORK [ ] OTHER:
[ ] OTHER:
ITEMS NEEDING PERFORMED
PERMITS [ ] COMPELTED WALKDOWN
[ ] CONFINED SPACE ENTRY [ ] COMPLETE HAZARD ANALYSIS
[ ] LOCKOUT/TAGOUT [ ] ENGINEERING ASSESSMENT
[ ] WELDING/BURNING/HOT WORK
[ ] OTHER: RESPIRATORY PROTECTION
[ ] DUST MASK
ASBESTOS [ ] HALF-FACE RESPIRATOR
[ ] SUSPECT ASBESTOS [ ] FULL-FACE RESPIRATOR
[ ] SAMPLES TO BE TAKEN [ ] SUPPLIES AIR
[ ] ASBESTOS ABATEMENT [ ] SCBA
[ ] ASBESTOS HOUSEKEEPING
2/28/2012
CHECK:
FILTERS AND DATE
DRAIN PAN
EVAPORATOR COIL
MOTOR
BLOWER ASSEMBLY
MOUNTING BRACKETS
Instruction Code C-1 Date Last Edited 10/2/2019
Tenant
Meter Name Last Performed At
Instruction Code AC UNITS Date Last Edited
WO Type PM Multitask Yes
Site NCAUR Task No. AC-UNIT-N-SA
Description SEMI-ANNUAL ON EVAPORATOR AC UNITS
Task Report (Full List)
12/14/2020 National Center Agricultural Utilization Research Page
FULL-BODY PROTECTION
[ ] CHEMICAL RESISTANT APRONS
[ ] SLEEVES/GAUNTLETS
[ ] HEAT/FLAME RESISTANT CLOTHING
[X ] SAFETY SHOES
[ ] OTHER:
Sub-location 3 NORTH WING No. of Times Completed 40.00
Date Last Performed 11/23/2020 Down Time
Month(s) Sub-location 1 3205 Schedule Type Duplicates Sub-location 2 3RD FLOOR Task Duration 7.00
Equipment No. AC-UNIT-N-02-3205 Equipment Description HANGING AC EVAPORATOR UNIT WEST
Location BUILDING 001 Perform Every 6.00
ELEC 1.00 1.00
HVAC 1.00 1.00
Expense Class In-service Task Yes
Craft Crew Size Estimated Labor Hours
Next Due Date 5/13/2021 Must Be Down No Tenant
Equipment No. EVAPORATOR UNIT EAS
Sub-location 3 NORTH WING No. of Times Completed 40.00
Date Last Performed 11/23/2020 Down Time
Month(s) Sub-location 1 2205 Schedule Type Duplicates Sub-location 2 2ND FLOOR Task Duration 7.00
Equipment Description HANGING AC EVAPORATOR UNIT WEST
Location BUILDING 001 Perform Every 6.00
Next Due Date 5/13/2021 Must Be Down No Tenant
Equipment No. AC-UNIT-N-04-2205
Equipment Description HANGING AC EVAPORATOR UNIT EAST
Location BUILDING 001 Perform Every 6.00
Next Due Date 5/13/2021 Must Be Down No Tenant
Equipment No. EVAPORATOR UNIT EAST
Sub-location 3 NORTH WING No. of Times Completed 40.00
Date Last Performed 11/23/2020 Down Time
Month(s) Sub-location 1 2205 Schedule Type Duplicates Sub-location 2 2ND FLOOR Task Duration 7.00
Equipment Description HANGING AC EVAPORATOR UNIT EAST
Location BUILDING 001 Perform Every 6.00
Sub-location 3 NORTH WING No. of Times Completed 40.00
Date Last Performed 11/23/2020 Down Time 10.00
Month(s) Sub-location 1 3205 Schedule Type Duplicates Sub-location 2 3RD FLOOR Task Duration 7.00
CHECK:
FILTERS AND DATE
DRAIN PAN
EVAPORATOR COIL
MOTOR
BLOWER ASSEMBLY
MOUNTING BRACKETS
Instruction Code C-1 Date Last Edited 10/2/2019
CHEMICAL HAZARDS TYPE OF LOCKOUT/TAGOUT
[ ] ASBESTOS [ ] PERMIT-REQUIRED
[ ] CARCINOGEN [ ] SINGLE-SOURCE
[ ] CORROSIVES [X ] "SEE LOTO BOOK FOR COMPLETE LOTO PROCEDURES"
[ ] INCOMPATIBLE CHEMICALS
[ ] LEAD EYE/FACE PROTECTION
[ ] MANMADE MINERAL FIBERS [X ] SAFETY GLASSES
[ ] CHEMICAL GOOGLES
PHYSICAL HAZARDS [ ] FACE SHIELD (CHEMICAL RESISTANT)
[ ] COMPRESSED CYLINDERS [ ] FACE SHIELD (GRINDING)
[ ] CONFINED SPACE [ ] UV/WELDER SHIELD
[ ] MANUAL LIFTING
[ ] MECHANICAL/MOVING PARTS HEARING PROTECTION
[ ] NOISE [ ] EARPLUGS
[ ] HAZARDOUS ENERGY: [ ] EARMUFFS
___ ELECTRICAL [ ] BOTH
___ HYDRAULIC
___ PNEUMATIC HAND PROTECTION
___ STEAM [ ] CHEMICAL GLOVES
___ OTHER: [ ] STANDARD WORK GLOVES
[ ] OVERHEAD HAZARDS [ ] GAUNTLETS
[ ] WELDING/BURNING/HOT WORK [ ] OTHER:
[ ] OTHER:
ITEMS NEEDING PERFORMED
PERMITS [ ] COMPELTED WALKDOWN
[ ] CONFINED SPACE ENTRY [ ] COMPLETE HAZARD ANALYSIS
[ ] LOCKOUT/TAGOUT [ ] ENGINEERING ASSESSMENT
[ ] WELDING/BURNING/HOT WORK
[ ] OTHER: RESPIRATORY PROTECTION
[ ] DUST MASK
ASBESTOS [ ] HALF-FACE RESPIRATOR
[ ] SUSPECT ASBESTOS [ ] FULL-FACE RESPIRATOR
[ ] SAMPLES TO BE TAKEN [ ] SUPPLIES AIR
[ ] ASBESTOS ABATEMENT [ ] SCBA
[ ] ASBESTOS HOUSEKEEPING
FULL-BODY PROTECTION
Task Instructions
Task Report (Full List)
12/14/2020 National Center Agricultural Utilization Research Page
Instruction Code AC UNITS Date Last Edited 2/28/2012
Next Due Date 5/13/2021 Must Be Down Yes Tenant
Meter Name Last Performed At
Location BUILDING 002 Perform Every 3.00 Month(s) Sub-location 1 - Schedule Type Duplicates
HVAC 1.00 0.50
Equipment No. AC-WINDOW-04 Equipment Description WINDOW AIR CONDITIONER
Expense Class In-service Task Yes
Craft Crew Size Estimated Labor Hours
Assigned To 1-168 Priority 3.00
WO Type PM Multitask No
Site NCAUR Task No. AC-WINDOW-1-4-Q
Description SEMI-ANNUAL ON EVAPORATOR AC UNITS
Task Instructions
Instruction Code 065 Date Last Edited 2/24/2004
Next Due Date 1/26/2021 Must Be Down No Tenant
Meter Name Last Performed At
Task Report (Full List)
12/14/2020 National Center Agricultural Utilization Research Page
Date Last Performed 11/3/2020 Down Time
Sub-location 2 - Task Duration 7.00
Sub-location 3 - No. of Times Completed 77.00
SPRING MAINTENANCE (PRIOR TO START UP)
A. REMOVE ANY PLASTIC OR CLOTH COVERS & STORE THEM FOR FUTURE USE
B. UNPLUG ELECTRICAL CORD FOR SAFETY
C. VISUALLY CHECK UNIT FOR:
1. SECURE MOUNTING
2. CONDITION OF ELECTRICAL CORD
3. PHYSICAL APPEARENCE
4. TIGHT AIRSEAL AROUND UNIT
5. MISSING HARDWARE
6. CLEANLINESS OF DRIP PAN
D. INSPECT AIR FILTER & CLAEN IF REQUIRED
E. INSPECT EVAPORATOR COIL FINS FOR DAMAGE & CLEANLINESS, CORRECT ANY DISCREPANCIES F. VERIFY EVAPORATOR & CONDENSER FANS ROTATE FREELY, LUBRICATE FAN MOTOR BEARINGS IF APPLICABLE
G. VERIFY CONDENSATE DRAIN LINE IS UNOBSTRUCTED
H. PLUG IN POWER CORD & TURN ON FAN ONLY-VERIFY QUIET OPERATION & NORMAL AIR FLOW
I. TURN CONTROLS TO COOLING & VERIFY COMPRESSOR STARTS & UNIT BEGINS TO COOL
J. VERIFY PROPER OPERATION AT ALL CONTROL PANELS
K. MEASURE CURRENT USING CLAMP-ON AMPERE METER, COMPARE WITH NAME PLATE DATA
L. VERIFY THERMOSTAT IS FUNCTIONING PROPERLY
M. SET CONTROLS FOR NORMAL OPERATION & SHUT OFF UNIT
FALL MAINTENANCE (WHEN SECURING UNIT FOR WINTER)
A. OPERATE UNIT TO VERIFY IT IS OPERATIONAL
B. SHUT OFF UNIT & UNPLUG IT
C. CLEAN EVAPORATOR COIL AS REQUIRED
D. VISUALLY INSPECT UNIT FOR:
1. CONDITION OF POWER CORD
2. TIGHT AIR SEAL AROUND UNIT
3. MISSING HARDWARE
4. GENERAL PHYSICAL CONDITION
5. INSTALL WINTERIZING COVERS IF PROVIDED
CHEMICAL HAZARDS TYPE OF LOCKOUT/TAGOUT
[ ] ASBESTOS [ ] PERMIT-REQUIRED
[ ] CARCINOGEN [ ] SINGLE-SOURCE
[ ] CORROSIVES [X ] "SEE LOTO BOOK FOR COMPLETE LOTO PROCEDURES"
[ ] INCOMPATIBLE CHEMICALS
[ ] LEAD EYE/FACE PROTECTION
[ ] MANMADE MINERAL FIBERS [X ] SAFETY GLASSES
[ ] CHEMICAL GOOGLES
PHYSICAL HAZARDS [ ] FACE SHIELD (CHEMICAL RESISTANT)
[ ] COMPRESSED CYLINDERS [ ] FACE SHIELD (GRINDING)
[ ] CONFINED SPACE [ ] UV/WELDER SHIELD
[ ] MANUAL LIFTING
[ ] MECHANICAL/MOVING PARTS HEARING PROTECTION
[ ] NOISE [ ] EARPLUGS
[ ] HAZARDOUS ENERGY: [ ] EARMUFFS
___ ELECTRICAL [ ] BOTH
___ HYDRAULIC
___ PNEUMATIC HAND PROTECTION
___ STEAM [ ] CHEMICAL GLOVES
___ OTHER: [ ] STANDARD WORK GLOVES
[ ] OVERHEAD HAZARDS [ ] GAUNTLETS
[ ] WELDING/BURNING/HOT WORK [ ] OTHER:
[ ] OTHER:
ITEMS NEEDING PERFORMED
PERMITS [ ] COMPELTED WALKDOWN
[ ] CONFINED SPACE ENTRY [ ] COMPLETE HAZARD ANALYSIS
[ ] LOCKOUT/TAGOUT [ ] ENGINEERING ASSESSMENT
[ ] WELDING/BURNING/HOT WORK
[ ] OTHER: RESPIRATORY PROTECTION
[ ] DUST MASK
Task Report (Full List)
WO Type PM Multitask Yes
Expense Class In-service Task Yes
Task No. AC-WINDOW-2-4-A Description SEMI-ANNUAL ON EVAPORATOR AC UNITS
Assigned To 1-168 Priority 3.00
12/14/2020 National Center Agricultural Utilization Research Page
ASBESTOS [ ] HALF-FACE RESPIRATOR
[ ] SUSPECT ASBESTOS [ ] FULL-FACE RESPIRATOR
[ ] SAMPLES TO BE TAKEN [ ] SUPPLIES AIR
[ ] ASBESTOS ABATEMENT [ ] SCBA
[ ] ASBESTOS HOUSEKEEPING
FULL-BODY PROTECTION
[ ] CHEMICAL RESISTANT APRONS
[ ] SLEEVES/GAUNTLETS
[ ] HEAT/FLAME RESISTANT CLOTHING
[X ] SAFETY SHOES
[ ] OTHER:
Equipment No. AC-WINDOW-02 Equipment Description WINDOW AIR CONDITIONER
Location BUILDING 011 Perform Every 12.00
Craft Crew Size Estimated Labor Hours
HVAC 1.00 1.30
Month(s) Sub-location 1 A Schedule Type Duplicates Sub-location 2 NORTHWALL Task Duration 7.00
Equipment Description WINDOW AIR CONDITIONER
Location BUILDING 011 Perform Every 12.00
Next Due Date 5/17/2021 Must Be Down No Tenant
Equipment No. AC-WINDOW-03
Sub-location 3 - No. of Times Completed 18.00
Date Last Performed 5/21/2020 Down Time 5.00
Month(s) Sub-location 1 B Schedule Type Duplicates Sub-location 2 - Task Duration 3.00
Sub-location 3 - No. of Times Completed 21.00
Date Last Performed 5/21/2020 Down Time
Month(s) Sub-location 1 - Schedule Type Duplicates Sub-location 2 - Task Duration 7.00
Equipment Description WINDOW AIR CONDITIONER
Location BUILDING 002 Perform Every 12.00
Next Due Date 5/17/2021 Must Be Down No Tenant
Equipment No. AC-WINDOW-04
Sub-location 3 - No. of Times Completed 20.00
Date Last Performed 5/21/2020 Down Time
SPRING MAINTENANCE (PRIOR TO START UP)
A. REMOVE ANY PLASTIC OR CLOTH COVERS & STORE THEM FOR FUTURE USE
B. UNPLUG ELECTRICAL CORD FOR SAFETY
C. VISUALLY CHECK UNIT FOR:
1. SECURE MOUNTING
2. CONDITION OF ELECTRICAL CORD
3. PHYSICAL APPEARENCE
4. TIGHT AIRSEAL AROUND UNIT
5. MISSING HARDWARE
6. CLEANLINESS OF DRIP PAN
D. INSPECT AIR FILTER & CLAEN IF REQUIRED
E. INSPECT EVAPORATOR COIL FINS FOR DAMAGE & CLEANLINESS, CORRECT ANY DISCREPANCIES F. VERIFY EVAPORATOR & CONDENSER FANS ROTATE FREELY, LUBRICATE FAN MOTOR BEARINGS IF APPLICABLE
G. VERIFY CONDENSATE DRAIN LINE IS UNOBSTRUCTED
H. PLUG IN POWER CORD & TURN ON FAN ONLY-VERIFY QUIET OPERATION & NORMAL AIR FLOW
I. TURN CONTROLS TO COOLING & VERIFY COMPRESSOR STARTS & UNIT BEGINS TO COOL
J. VERIFY PROPER OPERATION AT ALL CONTROL PANELS
K. MEASURE CURRENT USING CLAMP-ON AMPERE METER, COMPARE WITH NAME PLATE DATA
L. VERIFY THERMOSTAT IS FUNCTIONING PROPERLY
M. SET CONTROLS FOR NORMAL OPERATION & SHUT OFF UNIT
FALL MAINTENANCE (WHEN SECURING UNIT FOR WINTER)
Instruction Code 065 Date Last Edited 2/24/2004
Task Report (Full List)
12/14/2020 National Center Agricultural Utilization Research Page
Task Instructions
Instruction Code 064 Date Last Edited 11/6/2001 A. OBSERVE UNIT IN OPERATION & VERIFY IT IS COOLING PROPERLY & OPERATING SATISFACTORILY
B. SHUT OFF UNIT & INSPECT AIR FILTER, CLEAN IF REQUIRED
C. VERIFY CONDENSATE IS DRAINING PROPERLY
D. RESTART UNIT & VERIFY THERMOSTAT FUNCTIONS PROPERLY
E. VISUALLY CHECK PHYSICAL CONDITION OF UNIT & CONDITION OF AIR SEAL AROUND UNIT
F. LUBRICATE UNIT AS REQUIRED
Next Due Date 5/17/2021 Must Be Down No
FALL MAINTENANCE (WHEN SECURING UNIT FOR WINTER)
A. OPERATE UNIT TO VERIFY IT IS OPERATIONAL
B. SHUT OFF UNIT & UNPLUG IT
C. CLEAN EVAPORATOR COIL AS REQUIRED
D. VISUALLY INSPECT UNIT FOR:
1. CONDITION OF POWER CORD
2. TIGHT AIR SEAL AROUND UNIT
3. MISSING HARDWARE
4. GENERAL PHYSICAL CONDITION
5. INSTALL WINTERIZING COVERS IF PROVIDED
Instruction Code C-1 Date Last Edited 10/2/2019
CHEMICAL HAZARDS TYPE OF LOCKOUT/TAGOUT
[ ] ASBESTOS [ ] PERMIT-REQUIRED
[ ] CARCINOGEN [ ] SINGLE-SOURCE
[ ] CORROSIVES [X ] "SEE LOTO BOOK FOR COMPLETE LOTO PROCEDURES"
[ ] INCOMPATIBLE CHEMICALS
[ ] LEAD EYE/FACE PROTECTION
[ ] MANMADE MINERAL FIBERS [X ] SAFETY GLASSES
[ ] CHEMICAL GOOGLES
PHYSICAL HAZARDS [ ] FACE SHIELD (CHEMICAL RESISTANT)
[ ] COMPRESSED CYLINDERS [ ] FACE SHIELD (GRINDING)
[ ] CONFINED SPACE [ ] UV/WELDER SHIELD
[ ] MANUAL LIFTING
[ ] MECHANICAL/MOVING PARTS HEARING PROTECTION
[ ] NOISE [ ] EARPLUGS
[ ] HAZARDOUS ENERGY: [ ] EARMUFFS
___ ELECTRICAL [ ] BOTH
___ HYDRAULIC
___ PNEUMATIC HAND PROTECTION
___ STEAM [ ] CHEMICAL GLOVES
___ OTHER: [ ] STANDARD WORK GLOVES
[ ] OVERHEAD HAZARDS [ ] GAUNTLETS
[ ] WELDING/BURNING/HOT WORK [ ] OTHER:
[ ] OTHER:
ITEMS NEEDING PERFORMED
PERMITS [ ] COMPELTED WALKDOWN
[ ] CONFINED SPACE ENTRY [ ] COMPLETE HAZARD ANALYSIS
[ ] LOCKOUT/TAGOUT [ ] ENGINEERING ASSESSMENT
[ ] WELDING/BURNING/HOT WORK
[ ] OTHER: RESPIRATORY PROTECTION
[ ] DUST MASK
ASBESTOS [ ] HALF-FACE RESPIRATOR
[ ] SUSPECT ASBESTOS [ ] FULL-FACE RESPIRATOR
[ ] SAMPLES TO BE TAKEN [ ] SUPPLIES AIR
[ ] ASBESTOS ABATEMENT [ ] SCBA
[ ] ASBESTOS HOUSEKEEPING
FULL-BODY PROTECTION
Task Report (Full List)
12/14/2020 National Center Agricultural Utilization Research Page
[ ] OTHER:
Site NCAUR
Month(s) Sub-location 1 - Schedule Type Duplicates Sub-location 2 - Task Duration 3.00
Equipment No. ACS-MAIN Equipment Description NORTHERN ACCESS CONTROL GATE PANEL
Location BUILDING 001 Perform Every 1.00
Craft Crew Size Estimated Labor Hours
GRD 1.00 1.00
WO Type PM Multitask No
Expense Class In-service Task Yes
Task No. ACC-CONT-COMP-M Description MONTHLY ON ACCESS CONTROL SYSTEM
Assigned To 3-011 Priority 3.00
Assigned To 1-134 Priority 3.00
WO Type PM Multitask Yes
Site NCAUR Task No. ACC-CONT-COMP-Q
Description QUARTERLY ON ACCESS CONTROL SYSTEM
Task Instructions
Instruction Code 143 Date Last Edited 12/21/2015
MONTHLY ON ACCESS CONTROL COMPUTER SYSTEM PWS 6.3
BACKUP IS NOW DONE BY I.T. 4/3/06
CLEAN COMPUTER, MONITOR
Next Due Date 12/30/2020 Must Be Down No Tenant
Meter Name Last Performed At
Sub-location 3 GUARD OFFICE No. of Times Completed 195.00
Date Last Performed 12/2/2020 Down Time
42.00
Date Last Performed 12/10/2020 Down Time Next Due Date 3/11/2021 Must Be Down No
Sub-location 2 BASEMENT Task Duration
Sub-location 3 NORTH WING No. of Times Completed
Location BUILDING 001 Perform Every 3.00 Month(s) Sub-location 1 0225 Schedule Type Duplicates
ELEC 1.00 6.00
Equipment No. ACC-CONT-PNL-01-0225 Equipment Description NORTHERN ACCESS CONTROL PANEL-2 DOOR
Expense Class In-service Task Yes
Craft Crew Size Estimated Labor Hours
Equipment Description NORTHERN ACCESS CONTROL PANEL-4DOOR
Next Due Date 3/11/2021 Must Be Down No Tenant
Equipment No. ACC-CONT-PNL-03-0016
Sub-location 3 NORTH WING No. of Times Completed 42.00
Date Last Performed 12/10/2020 Down Time
Month(s) Sub-location 1 0212 Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration
Tenant
Equipment No. ACC-CONT-PNL-02-0212 Equipment Description NORTHERN ACCESS CONTROL PANEL-4 DOOR
Location BUILDING 001 Perform Every 3.00
Task Report (Full List)
12/14/2020 National Center Agricultural Utilization Research Page
Month(s) Sub-location 1 3135 Schedule Type Duplicates Sub-location 2 3RD FLOOR Task Duration
Tenant
Equipment No. ACC-CONT-PNL-04-3135 Equipment Description NORTHERN ACCESS CONTROL PANEL-4 DOOR
Location BUILDING 001 Perform Every 3.00
42.00
Date Last Performed 12/10/2020 Down Time Next Due Date 3/11/2021 Must Be Down No
Sub-location 2 BASEMENT Task Duration
Sub-location 3 ADMIN WING No. of Times Completed
Location BUILDING 001 Perform Every 3.00 Month(s) Sub-location 1 - Schedule Type Duplicates
Sub-location 3 ADMIN WING No. of Times Completed 42.00
Date Last Performed 12/10/2020 Down Time
Month(s) Sub-location 1 0041 Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration
Equipment Description NORTHERN ACCESS CONTROL PANEL-4 DOOR
Location BUILDING 001 Perform Every 3.00
Next Due Date 3/11/2021 Must Be Down No Tenant
Equipment No. ACC-CONT-PNL-05-0041
Sub-location 3 CENTER WING No. of Times Completed 42.00
Date Last Performed 12/10/2020 Down Time
Next Due Date 3/11/2021 Must Be Down No Tenant
Equipment No. ACC-CONT-PNL-07-BLDG002
Sub-location 3 WEST No. of Times Completed 42.00
Date Last Performed 12/10/2020 Down Time
Month(s) Sub-location 1 BASEMENT Schedule Type Duplicates Sub-location 2 SOUTH WING Task Duration
Equipment Description NORTHERN ACCESS CONTROL PANEL-4 DOOR
Location BUILDING 001 Perform Every 3.00
Next Due Date 3/11/2021 Must Be Down No Tenant
Equipment No. ACC-CONT-PNL-06-0328 OUTSIDE
Equipment Description NORTHERN ACCESS CONTROL PANEL-4 DOOR
Location BUILDING 001 Perform Every 3.00
Next Due Date 3/11/2021 Must Be Down No Tenant
Equipment No. ACC-CONT-PNL-08-0314
Sub-location 3 SOUTH No. of Times Completed 42.00
Date Last Performed 12/10/2020 Down Time
Month(s) Sub-location 1 - Schedule Type Duplicates Sub-location 2 - Task Duration
Equipment Description NORTHERN ACCESS CONTROL PANEL-4 DOOR
Location BUILDING 002 Perform Every 3.00
12/14/2020 National Center Agricultural Utilization Research Page
Month(s) Sub-location 1 0315 Schedule Type Duplicates
Task Report (Full List)
Equipment Description NORTHERN ACCESS CONTROL PANEL-4 DOOR
Location BUILDING 001 Perform Every 3.00
Next Due Date 3/11/2021 Must Be Down No Tenant
Equipment No. ACC-CONT-PNL-09-0315
Sub-location 3 SOUTH WING No. of Times Completed 42.00
Date Last Performed 12/10/2020 Down Time
Month(s) Sub-location 1 0314 Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration
Sub-location 2 BASEMENT Task Duration
Sub-location 3 - No. of Times Completed 42.00
Date Last Performed 12/10/2020 Down Time
Month(s) Sub-location 1 ATTIC Schedule Type Duplicates Sub-location 2 ADMIN WING Task Duration
Equipment Description NORTHERN ACCESS CONTROL PANEL-4 DOOR
Location BUILDING 001 Perform Every 3.00
Next Due Date 3/11/2021 Must Be Down No Tenant
Equipment No. ACC-CONT-PNL-10-ATTIC
Sub-location 3 SOUTH WING No. of Times Completed 42.00
Date Last Performed 12/10/2020 Down Time
Next Due Date 3/11/2021 Must Be Down No Tenant
Equipment No. ACC-CONT-PNL-12-ATTIC
Sub-location 3 - No. of Times Completed 42.00
Date Last Performed 12/10/2020 Down Time
Month(s) Sub-location 1 ATTIC Schedule Type Duplicates Sub-location 2 ADMIN WING Task Duration
Equipment Description NORTHERN ACCESS CONTROL PANEL-4 DOOR
Location BUILDING 001 Perform Every 3.00
Next Due Date 3/11/2021 Must Be Down No Tenant
Equipment No. ACC-CONT-PNL-11-ATTIC
Equipment Description NORTHERN ACCESS CONTROL PANEL-4 DOOR
Location BUILDING 001 Perform Every 3.00
Next Due Date 3/11/2021 Must Be Down No Tenant
Equipment No. ACC-CONT-PNL-13-0032
Sub-location 3 - No. of Times Completed 42.00
Date Last Performed 12/10/2020 Down Time
Month(s) Sub-location 1 ATTIC Schedule Type Duplicates Sub-location 2 ADMIN WING Task Duration
Equipment Description NORTHERN ACCESS CONTROL PANEL-4 DOOR
Location BUILDING 001 Perform Every 3.00
Month(s) Sub-location 1 0019 Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration
Equipment Description NORTHERN ACCESS CONTROL PANEL-4 DOOR
Location BUILDING 001 Perform Every 3.00
Next Due Date 3/11/2021 Must Be Down No Tenant
Equipment No. ACC-CONT-PNL-14-0019
Sub-location 3 ADMIN WING No. of Times Completed 42.00
Date Last Performed 12/10/2020 Down Time
Month(s) Sub-location 1 - Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration
Sub-location 3 CENTER WING No. of Times Completed 42.00
Date Last Performed 12/10/2020 Down Time
Month(s) Sub-location 1 0120A Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration
Equipment Description NORTHERN ACCESS CONTROL PANEL-4 DOOR
Location BUILDING 001 Perform Every 3.00
Next Due Date 3/11/2021 Must Be Down No Tenant
Equipment No. ACC-CONT-PNL-15-0120A
Sub-location 3 ADMIN WING No. of Times Completed 42.00
Date Last Performed 12/10/2020 Down Time
Task Report (Full List)
12/14/2020 National Center Agricultural Utilization Research Page
Next Due Date 3/11/2021 Must Be Down No
Next Due Date 3/11/2021 Must Be Down No Tenant
Equipment No. ACC-CONT-PWR-SUP-01-0225
Sub-location 3 CENTER WING No. of Times Completed 42.00
Date Last Performed 12/10/2020 Down Time
Month(s) Sub-location 1 3135 Schedule Type Duplicates Sub-location 2 3RD FLOOR Task Duration
Tenant
Equipment No. ACC-CONT-PNL-16-3135 Equipment Description NORTHERN ACCESS CONTROL PANEL-4 DOOR
Location BUILDING 001 Perform Every 3.00
Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY
Location BUILDING 001 Perform Every 3.00
Next Due Date 3/11/2021 Must Be Down No Tenant
Equipment No. ACC-CONT-PWR-SUP-02-0212
Sub-location 3 NORTH WING No. of Times Completed 42.00
Date Last Performed 12/10/2020 Down Time
Month(s) Sub-location 1 0225 Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration
Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY
Location BUILDING 001 Perform Every 3.00
Month(s) Sub-location 1 - Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration
Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY
Location BUILDING 001 Perform Every 3.00
Next Due Date 3/11/2021 Must Be Down No Tenant
Equipment No. ACC-CONT-PWR-SUP-03-0016
Sub-location 3 NORTH WING No. of Times Completed 42.00
Date Last Performed 12/10/2020 Down Time
Month(s) Sub-location 1 0212 Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration
Sub-location 3 CENTER WING No. of Times Completed 42.00
Date Last Performed 12/10/2020 Down Time
Month(s) Sub-location 1 0120A Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration
Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY
Location BUILDING 001 Perform Every 3.00
Next Due Date 3/11/2021 Must Be Down No Tenant
Equipment No. ACC-CONT-PWR-SUP-04-0120A
Sub-location 3 ADMIN WING No. of Times Completed 42.00
Date Last Performed 12/10/2020 Down Time
Next Due Date 3/11/2021 Must Be Down No Tenant
Equipment No. ACC-CONT-PWR-SUP-06
Sub-location 3 ADMIN WING No. of Times Completed 42.00
Date Last Performed 12/10/2020 Down Time
Month(s) Sub-location 1 0041 Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration
Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY
Location BUILDING 001 Perform Every 3.00
Next Due Date 3/11/2021 Must Be Down No Tenant
Equipment No. ACC-CONT-PWR-SUP-05-0041
Location BUILDING 001 Perform Every 3.00 Month(s)
Task Report (Full List)
Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY
Equipment No. ACC-CONT-PWR-SUP-07-BLDG02 Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY
Location BUILDING 002 Perform Every 3.00
42.00
Date Last Performed 12/10/2020 Down Time Next Due Date 3/11/2021 Must Be Down No
Sub-location 2 SOUTH WING Task Duration
Sub-location 3 WEST No. of Times Completed
Sub-location 1 BASEMENT Schedule Type Duplicates
Month(s) Sub-location 1 0314 Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration
Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY
Location BUILDING 001 Perform Every 3.00
Next Due Date 3/11/2021 Must Be Down No Tenant
Equipment No. ACC-CONT-PWR-SUP-08-0314
Sub-location 3 SOUTH No. of Times Completed 42.00
Date Last Performed 12/10/2020 Down Time
Month(s) Sub-location 1 - Schedule Type Duplicates Sub-location 2 - Task Duration
Sub-location 3 SOUTH WING No. of Times Completed 42.00
Date Last Performed 12/10/2020 Down Time
Month(s) Sub-location 1 0315 Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration
Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY
Location BUILDING 001 Perform Every 3.00
Next Due Date 3/11/2021 Must Be Down No Tenant
Equipment No. ACC-CONT-PWR-SUP-09-0315
Sub-location 3 SOUTH WING No. of Times Completed 42.00
Date Last Performed 12/10/2020 Down Time
Next Due Date 3/11/2021 Must Be Down No Tenant
Equipment No. ACC-CONT-PWR-SUP-11-ATTIC
Sub-location 3 - No. of Times Completed 42.00
Date Last Performed 12/10/2020 Down Time
Month(s) Sub-location 1 ATTIC Schedule Type Duplicates Sub-location 2 ADMIN WING Task Duration
Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY
Location BUILDING 001 Perform Every 3.00
Next Due Date 3/11/2021 Must Be Down No Tenant
Equipment No. ACC-CONT-PWR-SUP-10-ATTIC
Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY
Location BUILDING 001 Perform Every 3.00
Next Due Date 3/11/2021 Must Be Down No Tenant
Equipment No. ACC-CONT-PWR-SUP-12-ATTIC
Sub-location 3 - No. of Times Completed 42.00
Date Last Performed 12/10/2020 Down Time
Month(s) Sub-location 1 ATTIC Schedule Type Duplicates Sub-location 2 ADMIN WING Task Duration
Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY
Location BUILDING 001 Perform Every 3.00
42.00
Date Last Performed 12/10/2020 Down Time
Sub-location 2 ADMIN WING Task Duration
Sub-location 3 - No. of Times Completed
Month(s)
Task Report (Full List)
Sub-location 1 ATTIC Schedule Type Duplicates
Month(s) Sub-location 1 - Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration
Tenant
Equipment No. ACC-CONT-PWR-SUP-13-0032 Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY
Location BUILDING 001 Perform Every 3.00
Next Due Date 3/11/2021 Must Be Down No
Sub-location 3 ADMIN WING No. of Times Completed 42.00
Date Last Performed 12/10/2020 Down Time
Month(s) Sub-location 1 0019 Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration
Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY
Location BUILDING 001 Perform Every 3.00
Next Due Date 3/11/2021 Must Be Down No Tenant
Equipment No. ACC-CONT-PWR-SUP-14-0019
Sub-location 3 ADMIN WING No. of Times Completed 42.00
Date Last Performed 12/10/2020 Down Time
Next Due Date 3/11/2021 Must Be Down No Tenant
Equipment No. ACC-CONT-PWR-SUP-16-3135
Sub-location 3 CENTER WING No. of Times Completed 42.00
Date Last Performed 12/10/2020 Down Time
Month(s) Sub-location 1 0120A Schedule Type Duplicates Sub-location 2 BASEMENT Task Duration
Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY
Location BUILDING 001 Perform Every 3.00
Next Due Date 3/11/2021 Must Be Down No Tenant
Equipment No. ACC-CONT-PWR-SUP-15-0120A
Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY
Location BUILDING 010 Perform Every 3.00
Next Due Date 3/11/2021 Must Be Down No Tenant
Equipment No. ACC-CONT-PWR-SUP-17-BLDG10C
Sub-location 3 CENTER WING No. of Times Completed 42.00
Date Last Performed 12/10/2020 Down Time
Month(s) Sub-location 1 3135 Schedule Type Duplicates Sub-location 2 3RD FLOOR Task Duration
Equipment Description NORTHERN ACCESS CONTROL POWER SUPPLY
Location BUILDING 001 Perform Every 3.00
Task Report (Full List)
12/14/2020 National Center Agricultural Utilization Research Page
GATE.
________12 VOLT DC
________24 VOLT AC
________24 VOLT DC
________120 VOLT AC
Task Instructions
Instruction Code 142 Date Last Edited 3/25/2011
PWS 6.3
1. CHECK WIRE TERMINATIONS AND VOLTAGES IN ACCESS PANEL IN SERVICE BUILDING FOR REMOTE
Next Due Date 3/11/2021 Must Be Down No Tenant
Meter Name Last Performed At
Sub-location 3 - No. of Times Completed 42.00
Date Last Performed 12/10/2020 Down Time
Month(s) Sub-location 1 C Schedule Type Duplicates Sub-location 2 - Task Duration
2. CHECK CIRCUIT BOARDS, WIRE TERMINATIONS AND VOLTAGES IN ACCESS PANELS ACC-CONT-PNL-01 THRU -16
LOCATED THROUGHOUT THE BUILDING.
ACC-CONT-GATE-PNL-01-BLDG10C
________12 VOLT DC
________12 VOLT AC
________24 VOLT DC
________24 VOLT AC
ACC-CONT-PNL-01 ACC-CONT-PNL-02
________12 VOLT DC ________12 VOLT DC
________24 VOLT AC ________24 VOLT AC
________24 VOLT DC ________24 VOLT DC
ACC-CONT-PNL-03 ACC-CONT-PNL-04
________12 VOLT DC ________12 VOLT DC
________24 VOLT AC ________24 VOLT AC
________24 VOLT DC ________24 VOLT DC
________120 VOLT AC ________120 VOLT AC
ACC-CONT-PNL-05 ACC-CONT-PNL-06
________12 VOLT DC ________12 VOLT DC
________24 VOLT AC ________24 VOLT AC
________24 VOLT DC ________24 VOLT DC
________120 VOLT AC ________120 VOLT AC
ACC-CONT-PNL-07 ACC-CONT-PNL-08
________12 VOLT DC ________12 VOLT DC
________24 VOLT AC ________24 VOLT AC
________24 VOLT DC ________24 VOLT DC
________120 VOLT AC ________120 VOLT AC
ACC-CONT-PNL-09 ACC-CONT-PNL-10
________12 VOLT DC ________12 VOLT DC
________24 VOLT AC ________24 VOLT AC
________24 VOLT DC ________24 VOLT DC
________120 VOLT AC ________120 VOLT AC
ACC-CONT-PNL-11 ACC-CONT-PNL-12
________12 VOLT DC ________12 VOLT DC
________24 VOLT AC ________24 VOLT AC
________24 VOLT DC ________24 VOLT DC
________120 VOLT AC ________120 VOLT AC
ACC-CONT-PNL-13 ACC-CONT-PNL-14
________12 VOLT DC ________12 VOLT DC
________24 VOLT AC ________24 VOLT AC
________24 VOLT DC ________24 VOLT DC
________120 VOLT AC ________120 VOLT AC
ACC-CONT-PNL-15 ACC-CONT-PNL-16
________12 VOLT DC ________12 VOLT DC
________24 VOLT AC ________24 VOLT AC
________24 VOLT DC ________24 VOLT DC
________120 VOLT AC ________120 VOLT AC
3. CHECK WIRE TERMINATIONS AND VOLTAGES IN ACCESS CONTROL POWER SUPPLIES ACC-CONT-PWR SUP-01
THRU -17
ACC-CONT-PWR-SUP-01 ACC-CONT-PWR-SUP-02
________12 VOLT DC ________12 VOLT DC
________24 VOLT AC ________24 VOLT AC
________24 VOLT DC ________24 VOLT DC
Task Report (Full List)
12/14/2020 National Center Agricultural Utilization Research Page
ACC-CONT-PWR-SUP-03 ACC-CONT-PWR-SUP-04
________12 VOLT DC ________12 VOLT DC
________24 VOLT AC ________24 VOLT AC
________24 VOLT DC ________24 VOLT DC
________120 VOLT AC ________120 VOLT AC
ACC-CONT-PWR-SUP-05 ACC-CONT-PWR-SUP-06
________12 VOLT DC ________12 VOLT DC
________24 VOLT AC ________24 VOLT AC
________24 VOLT DC ________24 VOLT DC
________120 VOLT AC ________120 VOLT AC
ACC-CONT-PWR-SUP-07 ACC-CONT-PWR-SUP-08
________12 VOLT DC ________12 VOLT DC
24 VOLT AC 24 VOLT AC
Task No. ADMIN STCS CLEAN-NW Description ADMIN STAIRCASE CLEANING BI-WEEKLY (NORTH WING)
Task Report (Full List)
12/14/2020 National Center Agricultural Utilization Research Page
Craft Crew Size Estimated Labor Hours
Meter Name Last Performed At
Site NCAUR
WO Type AW Multitask No
Expense Class In-service Task Yes
Task No. ADDITIONAL WORK Description ADDITIONAL WORK
Assigned To Priority 3.00
________24 VOLT AC ________24 VOLT AC
________24 VOLT DC ________24 VOLT DC
________120 VOLT AC ________120 VOLT AC
ACC-CONT-PWR-SUP-09 ACC-CONT-PWR-SUP-10
________12 VOLT DC ________12 VOLT DC
________24 VOLT AC ________24 VOLT AC
________24 VOLT DC ________24 VOLT DC
________120 VOLT AC ________120 VOLT AC
ACC-CONT-PWR-SUP-11 ACC-CONT-PWR-SUP-12
________12 VOLT DC ________12 VOLT DC
________24 VOLT AC ________24 VOLT AC
________24 VOLT DC ________24 VOLT DC
________120 VOLT AC ________120 VOLT AC
ACC-CONT-PWR-SUP-13 ACC-CONT-PWR-SUP-14
________12 VOLT DC ________12 VOLT DC
________24 VOLT AC ________24 VOLT AC
________24 VOLT DC ________24 VOLT DC
________120 VOLT AC ________120 VOLT AC
ACC-CONT-PWR-SUP-15 ACC-CONT-PWR-SUP-16
________12 VOLT DC ________12 VOLT DC
________24 VOLT AC ________24 VOLT AC
________24 VOLT DC ________24 VOLT DC
________120 VOLT AC ________120 VOLT AC
ACC-CONT-PWR-SUP-17
________12 VOLT DC
________24 VOLT AC
________24 VOLT DC
________120 VOLT AC
WARNING -
Sub-location 3 NORTH WING No. of Times Completed 40.00
Date Last Performed 12/27/2020 Down Time
Week(s) Sub-location 1 - Schedule Type Duplicates Sub-location 2 - Task Duration
HSKP
Equipment No. - Equipment Description
Location BUILDING 001 Perform Every 2.00
Expense Class In-service Task Yes
Craft Crew Size Estimated Labor Hours
Assigned To 2-113 Priority 3.00
WO Type PM Multitask No
Task Instructions
Next Due Date 12/21/2020 Must Be Down No
Craft Crew Size Estimated Labor Hours
Assigned To 2-115 Priority 3.00
WO Type PM Multitask Yes
Site NCAUR Task No. ADMIN STCS-CLEAN-CW
Description ADMIN STAIRCASE CLEANING BI-WEEKLY (CENTER WING)
Instruction Code HK-STCS Date Last Edited 10/18/2019
STAIRCASES:
SWEEP STAIRS AND LANDINGS (WITH BROOM, NOT A DUST MOP)
WET MOP STAIRS AND LANDINGS
DUST AND WIPE DOWN WINDOW LEDGES
DUST AND WIPE DOWN RAILINGS, DISPLAY CASES, ETC.
CLEAN DOOR JAMS
WIPE DOWN FRONT AND BACK OF DOORS (CLEANING THE GLASS)
DISINFECT DOOR HANDLES AND REMOVE AND BUILD UP
No Tenant
Meter Name Last Performed At
Task Instructions
Instruction Code HK-STCS Date Last Edited 10/18/2019
Sub-location 3 CENTER WING No. of Times Completed
Date Last Performed Down Time Next Due Date 12/21/2020 Must Be Down
Week(s) Sub-location 1 - Schedule Type Duplicates Sub-location 2 - Task Duration
HSKP
Equipment No. - Equipment Description
Location BUILDING 001 Perform Every 2.00
HSKP
Expense Class In-service Task Yes
Craft Crew Size Estimated Labor Hours
Assigned To 2-111 Priority 3.00
WO Type PM Multitask No
Site NCAUR Task No. ADMIN STCS-CLEAN-SW
Description ADMIN STAIRCASE CLEANING BI-WEEKLY (SOUTH WING)
STAIRCASES:
SWEEP STAIRS AND LANDINGS (WITH BROOM, NOT A DUST MOP)
WET MOP STAIRS AND LANDINGS
DUST AND WIPE DOWN WINDOW LEDGES
DUST AND WIPE DOWN RAILINGS, DISPLAY CASES, ETC.
CLEAN DOOR JAMS
WIPE DOWN FRONT AND BACK OF DOORS (CLEANING THE GLASS)
Task Report (Full List)
DISINFECT DOOR HANDLES AND REMOVE AND BUILD UP
Equipment No. - Equipment Description
Location BLDG 001 Perform Every 2.00
Site NCAUR Task No. AIR-COMP-01-02-Q
Description QUARTERLY ON AIR COMPRESSORS
Task…