Attachment 16 - Work Order Summary.xlsx

XLSX spreadsheet 1 MB Posted

Attached to
Operations and Maintenance Services Federal contract opportunity
Solicitation number
12505B21R0003
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Midwest Area

View the file

Other files for this federal contract opportunity

Other files attached to Operations and Maintenance Services, newest first.
File Type Posted
Past Performance Questionnaire.pdf PDF
SF-30 Amendment 03.pdf PDF
SF-30 Amendment 02.pdf PDF
Sign In Sheets.pdf PDF
Attachment 016-Work Order Summary-A.xlsx XLSX spreadsheet
Attachment 016-Work Order Summary-B.xlsx XLSX spreadsheet
Listing of Fire Alarm System Devices.pdf PDF
02 - Schedule B Addendum.xls XLS spreadsheet
RFIs.pdf PDF
Attachment 004-Documents by Reference-rev 07-08-2021.pdf PDF
Attachment 016-Work Order Summary-B.pdf PDF
Attachment 016-Work Order Summary-A.pdf PDF
Schedule B Addendum.xls XLS spreadsheet
SF-30.pdf PDF
Attachment 05 - MP2 Equipment Report-Simple.xlsx XLSX spreadsheet
Schedule B Addendum.xls XLS spreadsheet
SF-33 with Sections B-M.pdf PDF
Attachment 002-Work Order Types.pdf PDF
Attachment 003-Work Order Statistics.pdf PDF
Attachment 004-Documents Incorporated by Reference.pdf PDF
Attachment 008-Inventory of Goverment Vehicles.pdf PDF
Attachment 011-Housekeeping Matrix.pdf PDF
Attachment 013-Elevators and Lifting Devices.pdf PDF
Attachment 015-Pest Treatment Matrix.pdf PDF
Attachment 016-Work Order Summary.pdf PDF
Attachment 019-Government Furnished Equipment.pdf PDF
Exhibit 006-Wage Determination (Construction).pdf PDF
Exhibit 007-Wage Determination (Services).pdf PDF
Attachment 007-MP2 Task Report.pdf PDF
Attachment 020-Stock Level Summary.pdf PDF
Attachment 022-Supplemental Work Items.pdf PDF
Exhibit 004-Quality Assurance Surveillance Plan.pdf PDF
Exhibit 001-Performance Work Statement.pdf PDF
Attachment 012-Flooring Surfaces.pdf PDF
Attachment 014-Supplies Services-Government Furnished.pdf PDF
Attachment 021-Space Temperature and Humidity Requirements.pdf PDF
Attachment 001-Craft Codes.pdf PDF
Attachment 005-MP2 Equipment Report-Simple.pdf PDF
Attachment 006-MP2 Task Instruction List.pdf PDF
Attachment 009-Contractor Space.pdf PDF
Attachment 010-Facility Drawings.pdf PDF
Attachment 017-Personal Identify Information (PII) Sheet.pdf PDF
Attachment 018-Ozone Depleting Substances (ODS) Management Program-rev01-20-2021.pdf PDF
Exhibit 002-NCAUR BSHEM Manual v2020-11.pdf PDF
Exhibit 003-NCAUR Bldg Standards.pdf PDF
Exhibit 005-SCA Directory of Occupations.pdf PDF
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Work Order Summary

Attachment 16
Operation and Maintenance Contract
USDA-NCAUR, Peoria, IL
WORK ORDER SUMMARY
SiteWO No.Close DateTask No.DescriptionAssigned ToWO TypeStatusScheduled Start DateScheduled Finish DatePriorityWork PriorityEquipment No.CraftEstimated Labor Hours
NCAUR2016031124/1/2016FIRE-SPRNK-VLVE-Q-SFQUARTERLY ON FIRE SPRINKLER CONTROL VALVES-PIPCO1-134PMC3/16/20163/26/201634.26FIRE-SPRINK-VALVE-12ELEC0.01
NCAUR2016031124/1/2016FIRE-SPRNK-VLVE-Q-SFQUARTERLY ON FIRE SPRINKLER CONTROL VALVES-PIPCO1-134PMC3/16/20163/26/201634.26FIRE-SPRINK-VALVE-13ELEC0.01
NCAUR2016031124/1/2016FIRE-SPRNK-VLVE-Q-SFQUARTERLY ON FIRE SPRINKLER CONTROL VALVES-PIPCO1-134PMC3/16/20163/26/201634.26FIRE-SPRINK-VALVE-14ELEC0.01
NCAUR2016031124/1/2016FIRE-SPRNK-VLVE-Q-SFQUARTERLY ON FIRE SPRINKLER CONTROL VALVES-PIPCO1-134PMC3/16/20163/26/201634.26FIRE-SPRINK-VALVE-15ELEC0.01
NCAUR2016031124/1/2016FIRE-SPRNK-VLVE-Q-SFQUARTERLY ON FIRE SPRINKLER CONTROL VALVES-PIPCO1-134PMC3/16/20163/26/201634.26FIRE-SPRINK-VALVE-16ELEC0.01
NCAUR2016031124/1/2016FIRE-SPRNK-VLVE-Q-SFQUARTERLY ON FIRE SPRINKLER CONTROL VALVES-PIPCO1-134PMC3/16/20163/26/201634.26FIRE-SPRINK-VALVE-17ELEC0.01
NCAUR2016031124/1/2016FIRE-SPRNK-VLVE-Q-SFQUARTERLY ON FIRE SPRINKLER CONTROL VALVES-PIPCO1-134PMC3/16/20163/26/201634.26FIRE-SPRINK-VALVE-18ELEC0.01
NCAUR2016031124/1/2016FIRE-SPRNK-VLVE-Q-SFQUARTERLY ON FIRE SPRINKLER CONTROL VALVES-PIPCO1-134PMC3/16/20163/26/201634.26FIRE-SPRINK-VALVE-19ELEC0.01
NCAUR2016031124/1/2016FIRE-SPRNK-VLVE-Q-SFQUARTERLY ON FIRE SPRINKLER CONTROL VALVES-PIPCO1-134PMC3/16/20163/26/201634.26FIRE-SPRINK-VALVE-20ELEC0.01
NCAUR2016031124/1/2016FIRE-SPRNK-VLVE-Q-SFQUARTERLY ON FIRE SPRINKLER CONTROL VALVES-PIPCO1-134PMC3/16/20163/26/201634.26FIRE-SPRINK-VALVE-21ELEC0.01
NCAUR2016031133/14/2016FUEL-OIL-TANK-W-SFWEEKLY FUEL OIL LEVEL CHECK1-136PMC3/15/20163/22/201633.8FUEL-OIL-TANK-02STEN0.25
NCAUR2016031133/14/2016FUEL-OIL-TANK-W-SFWEEKLY FUEL OIL LEVEL CHECK1-136PMC3/15/20163/22/201633.8FUEL-OIL-TANK-03STEN0.25
NCAUR2016031144/1/2016GOV-VEH-BWBI-WEEKLY INSPECTION OF GOVERNMENT VEHICLES1-167PMC3/18/20164/2/201639.17GOV-VEH-016GEMAW0.09
NCAUR2016031144/1/2016GOV-VEH-BWBI-WEEKLY INSPECTION OF GOVERNMENT VEHICLES1-167PMC3/18/20164/2/201639.17GOV-VEH-025GEMAW0.09
NCAUR2016031144/1/2016GOV-VEH-BWBI-WEEKLY INSPECTION OF GOVERNMENT VEHICLES1-167PMC3/18/20164/2/201639.17GOV-VEH-215GEMAW0.09
NCAUR2009038944/6/2009CARPET-CLEAN-WWEEKLY CLEANING OF BUILDING CARPETSCTC4/2/20094/9/200932.12-HSKP0
NCAUR2016031144/1/2016GOV-VEH-BWBI-WEEKLY INSPECTION OF GOVERNMENT VEHICLES1-167PMC3/18/20164/2/201639.17GOV-VEH-224GEMAW0.09
NCAUR2016031144/1/2016GOV-VEH-BWBI-WEEKLY INSPECTION OF GOVERNMENT VEHICLES1-167PMC3/18/20164/2/201639.17GOV-VEH-251GEMAW0.09
NCAUR2016031144/1/2016GOV-VEH-BWBI-WEEKLY INSPECTION OF GOVERNMENT VEHICLES1-167PMC3/18/20164/2/201639.17GOV-VEH-970GEMAW0.09
NCAUR2016031144/1/2016GOV-VEH-BWBI-WEEKLY INSPECTION OF GOVERNMENT VEHICLES1-167PMC3/18/20164/2/201639.17GOV-VEH-973GEMAW0.09
NCAUR2016031144/1/2016GOV-VEH-BWBI-WEEKLY INSPECTION OF GOVERNMENT VEHICLES1-167PMC3/18/20164/2/201639.17GOV-VEH-981GEMAW0.09
NCAUR2016031144/1/2016GOV-VEH-BWBI-WEEKLY INSPECTION OF GOVERNMENT VEHICLES1-167PMC3/18/20164/2/201639.17GOV-VEH-985GEMAW0.09
NCAUR2016031144/1/2016GOV-VEH-BWBI-WEEKLY INSPECTION OF GOVERNMENT VEHICLES1-167PMC3/18/20164/2/201639.17GOV-VEH-986GEMAW0.09
NCAUR2016031144/1/2016GOV-VEH-BWBI-WEEKLY INSPECTION OF GOVERNMENT VEHICLES1-167PMC3/18/20164/2/201639.17GOV-VEH-988GEMAW0.09
NCAUR2016031153/21/2016GREENHOUSE-VENTS-AANNUAL LUBRICATION OF GREENHOUSE VENTS 11 TOTAL1-153PMC3/17/20163/17/201633.8GRNHSE-VENTS-0314GEMAW2
NCAUR2016031163/16/2016GRHS-FIN-TUBE-MMONTHLY ON FIN TUBE HEATING SYSTEM1-165PMC3/18/20163/29/201633.8GRHS-FIN-TUBE-0314HVAC0.5
NCAUR2016031173/21/2016GRNDS-WRK-WWEEKLY WORK ON GROUNDS1-167CTC3/14/20163/21/201636.49GEN GROUNDSGEMAW32
NCAUR2016031183/31/2016HEAT-TRANS-PAK-04-QQUARTERLY ON NMR HEAT TRANSFER PACKAGE1-001PMC3/14/20163/24/201634.16HEAT-TRANS-PAK-04-0021PIPE1
NCAUR2016031183/31/2016HEAT-TRANS-PAK-04-QQUARTERLY ON NMR HEAT TRANSFER PACKAGE1-001PMC3/14/20163/24/201634.16HWP-NMR-01PIPE1
NCAUR2016031193/21/2016ICE-MACHINE-QQUARTERLY ON ICE MACHINE'S1-159PMC3/9/20163/16/201633.8ICE-MACHINE-01HVAC1
NCAUR2016031203/21/2016ICE-MACHINE-QQUARTERLY ON ICE MACHINE'S1-159PMC3/9/20163/16/201633.8ICE-MACHINE-04HVAC1
NCAUR2016031213/21/2016ICE-MACHINE-QQUARTERLY ON ICE MACHINE'S1-159PMC3/9/20163/16/201633.8ICE-MACHINE-11HVAC1
NCAUR2016031223/21/2016ICE-MACHINE-QQUARTERLY ON ICE MACHINE'S1-159PMC3/9/20163/19/201633.9ICE-MACHINE-13HVAC1
NCAUR2016031233/21/2016ICE-MACHINE-QQUARTERLY ON ICE MACHINE'S1-159PMC3/9/20163/19/201633.9ICE-MACHINE-14HVAC1
NCAUR2016031243/21/2016ICE-MACHINE-QQUARTERLY ON ICE MACHINE'S1-159PMC3/9/20163/19/201633.9ICE-MACHINE-15HVAC1
NCAUR2016031253/21/2016ICE-MACHINE-QQUARTERLY ON ICE MACHINE'S1-159PMC3/9/20163/9/201633.8ICE-MACHINE-16HVAC1
NCAUR2016031263/21/2016INTAKE-AIR-DAMP-QQUARTERLY ON INTAKE AIR DAMPERS1-158PMC3/18/20163/25/201634.21INTAKE-AIR-DAMP-S-01-0330HVAC0.1
NCAUR2016031263/21/2016INTAKE-AIR-DAMP-QQUARTERLY ON INTAKE AIR DAMPERS1-158PMC3/18/20163/25/201634.21INTAKE-AIR-DAMP-S-02HVAC0.1
NCAUR2016031263/21/2016INTAKE-AIR-DAMP-QQUARTERLY ON INTAKE AIR DAMPERS1-158PMC3/18/20163/25/201634.21INTAKE-AIR-DAMP-S-03HVAC0.1
NCAUR2016031263/21/2016INTAKE-AIR-DAMP-QQUARTERLY ON INTAKE AIR DAMPERS1-158PMC3/18/20163/25/201634.21INTAKE-AIR-DAMP-S-04HVAC0.1
NCAUR2016031263/21/2016INTAKE-AIR-DAMP-QQUARTERLY ON INTAKE AIR DAMPERS1-158PMC3/18/20163/25/201634.21INTAKE-AIR-DAMP-S-05HVAC0.1
NCAUR2016031273/21/2016INTAKE-AIR-DAMP-SASEMI-ANNUAL ON INTAKE AIR DAMPERS1-158PMC3/18/20163/25/201634.01INTAKE-AIR-DAMP-S-01-0330HVAC0.5
NCAUR2016031283/21/2016INTAKE-AIR-DAMP-SASEMI-ANNUAL ON INTAKE AIR DAMPERS1-158PMC3/18/20163/25/201634.01INTAKE-AIR-DAMP-S-02HVAC0.5
NCAUR2016031293/21/2016INTAKE-AIR-DAMP-SASEMI-ANNUAL ON INTAKE AIR DAMPERS1-158PMC3/18/20163/25/201634.01INTAKE-AIR-DAMP-S-03HVAC0.5
NCAUR2016031303/21/2016INTAKE-AIR-DAMP-SASEMI-ANNUAL ON INTAKE AIR DAMPERS1-158PMC3/18/20163/25/201634.01INTAKE-AIR-DAMP-S-04HVAC0.5
NCAUR2016031313/16/2016INTAKE-AIR-DAMP-SASEMI-ANNUAL ON INTAKE AIR DAMPERS1-158PMC3/18/20163/25/201633.8INTAKE-AIR-DAMP-S-05HVAC0.5
NCAUR2016031324/13/2016INTAKE-AIR-DAMPS-N-QQUARTERLY ON INTAKE AIR DAMPERS1-159PMC3/16/20163/23/201633.8INTAKE-AIR-DAMP-F10HVAC0.5
NCAUR2016031324/13/2016INTAKE-AIR-DAMPS-N-QQUARTERLY ON INTAKE AIR DAMPERS1-159PMC3/16/20163/23/201633.8INTAKE-AIR-DAMP-F9HVAC0.5
NCAUR2016031333/21/2016LAM-FLOW-M-SFMONTHLY LAMINAR FLOW HOODS1-004PMC3/18/20163/29/201635.65LAM-FLOW-1118BGEMAW0.5
NCAUR2016031343/21/2016LAM-FLOW-M-SFMONTHLY LAMINAR FLOW HOODS1-004PMC3/18/20163/29/201635.65LAM-FLOW-3327GEMAW0.5
NCAUR2016031353/21/2016LIFT-TRUCK-WWEEKLY PM ON LIFT TRUCK1-167PMC3/14/20163/21/201636.49LIFT-TRUCKGEMAW0.25
NCAUR2016031363/21/2016LOBBY-LIGHT-BUG-BWCLEAN LOBBY LIGHT FIXTURES OF BUGS1-161PMC3/14/20163/21/201636.49GEN MISC TASKELEC0.5
NCAUR2016031373/21/2016MAT-CLEAN-WWEEKLY CLEANING OF BUILDING MATS2-102CTC3/14/20163/21/201636.49GEN HSKPHSKP4
NCAUR2016031383/14/2016METER-CHECKCHECK HOUR METER ON ATTACHED EQUIPMENT1-167PMC3/14/20163/21/2016311.19LIFT-TRUCKGEMAW0.06
NCAUR2016031383/14/2016METER-CHECKCHECK HOUR METER ON ATTACHED EQUIPMENT1-167PMC3/14/20163/21/2016311.19TRACTOR-JD4500GEMAW0.06
NCAUR2016031383/14/2016METER-CHECKCHECK HOUR METER ON ATTACHED EQUIPMENT1-167PMC3/14/20163/21/2016311.19TRACTOR-MOWER-EXMARKGEMAW0.06
NCAUR2016031383/14/2016METER-CHECKCHECK HOUR METER ON ATTACHED EQUIPMENT1-167PMC3/14/20163/21/2016311.19TRACTOR-MOWER-JD425GEMAW0.06
NCAUR2016031393/11/2016PMP-BH-19-MMONTHLY ON MAIN SUMP PUMP DUPLEX SYSTEM1-136PMC3/15/20163/25/201633.8PMP-BH-19STEN0.5
NCAUR2016031403/15/2016PORT-EWSS-WWEEKLY ON PORTABLE EYEWASH SAFETY SHOWER STATIONS1-145PMC3/14/20163/14/201633.8SAFETY-SHOWER-COMBO-GH100PLUM0
NCAUR2016031413/21/2016RECYCLE-PREP-WWEEKLY RECYCLE PREP1-167CTC3/18/20163/18/201634.47GEN MISC TASKGEMAW0.5
NCAUR2016031423/21/2016REF-AIR-DRY-11-WWEEKLY ON REFRIGERATED AIR DRYER HOUSE AIR1-158PMC3/14/20163/18/201634.47REF-AIR-DRY-11HVAC0.5
NCAUR2016031433/21/2016REV-OSMOSIS-03-DDAILY ON REVERSE OSMOSIS PURIFIER1-136PMC3/14/20163/24/201638.5REV-OSMOSIS-03STEN3
NCAUR2016031444/18/2016RTU-MMONTHLY ON RTU HEATING & COOLING UNITS1-158PMC3/18/20163/25/201633.8RTU-01-0314HVAC0.5
NCAUR2016031454/18/2016RTU-MMONTHLY ON RTU HEATING & COOLING UNITS1-158PMC3/18/20163/25/201633.8RTU-02-0314HVAC0.5
NCAUR2016031464/18/2016RTU-MMONTHLY ON RTU HEATING & COOLING UNITS1-158PMC3/18/20163/25/201633.8RTU-03-0314-REMOVEDHVAC0.5
NCAUR2016031474/18/2016RTU-MMONTHLY ON RTU HEATING & COOLING UNITS1-158PMC3/18/20163/25/201633.8RTU-04-0314-REMOVEDHVAC0.5
NCAUR2016031484/13/2016RTU-MMONTHLY ON RTU HEATING & COOLING UNITS1-158PMC3/18/20163/25/201633.8RTU-05-0314HVAC0.5
NCAUR2016031494/18/2016RTU-MMONTHLY ON RTU HEATING & COOLING UNITS1-158PMC3/18/20163/25/201633.8RTU-06-0314HVAC0.5
NCAUR2016031503/14/2016TEST-EQUIP-CALIB-WWEEKLY CALIBRATION OF pH TESTING EQUIPMENT1-136PMC3/14/20163/24/201633.8TEST-EQUIP-CALIBSTEN0.5
NCAUR2016031513/14/2016TRACTOR-MOWER-EXMARKWEEKLY INSPECTION OF EXMARK RIDING MOWER1-167PMC3/14/20163/21/2016311.19TRACTOR-MOWER-EXMARKGEMAW0
NCAUR2016031524/11/2016UH-102-108-QQUARTERLY ON UNIT HEATERS1-159PMC3/16/20163/23/201634.11UH-GH-102HVAC0.09
NCAUR2016031524/11/2016UH-102-108-QQUARTERLY ON UNIT HEATERS1-159PMC3/16/20163/23/201634.11UH-GH-103HVAC0.09
NCAUR2016031524/11/2016UH-102-108-QQUARTERLY ON UNIT HEATERS1-159PMC3/16/20163/23/201634.11UH-GH-104HVAC0.09
NCAUR2016031524/11/2016UH-102-108-QQUARTERLY ON UNIT HEATERS1-159PMC3/16/20163/23/201634.11UH-GH-105HVAC0.09
NCAUR2016031524/11/2016UH-102-108-QQUARTERLY ON UNIT HEATERS1-159PMC3/16/20163/23/201634.11UH-GH-106HVAC0.09
NCAUR2016031524/11/2016UH-102-108-QQUARTERLY ON UNIT HEATERS1-159PMC3/16/20163/23/201634.11UH-GH-107HVAC0.09
NCAUR2016031524/11/2016UH-102-108-QQUARTERLY ON UNIT HEATERS1-159PMC3/16/20163/23/201634.11UH-GH-108HVAC0.09
NCAUR2016031524/11/2016UH-102-108-QQUARTERLY ON UNIT HEATERS1-159PMC3/16/20163/23/201634.11UH-GH-109HVAC0.09
NCAUR2016031533/21/2016VAC-PUMP-03-DDAILY ON VACUUM PUMP1-001PMC3/14/20163/18/201634.47VAC-PUMP-03PIPE1
NCAUR2016031543/22/2016WALLS-IN-STAIRWELL-SWASH WALLS IN STAIRWELLCTC3/18/20163/18/201633.83GEN HSKPHSKP7
NCAUR2016031553/21/2016WLK-IN-CLR-01-NW-WWEEKLY PM OF COOLERS (ALARM & LIGHTS)1-161PMC3/18/20163/25/201639.17WLK-IN-FRZR-NW1ELEC0.25
NCAUR2016031563/21/2016WLK-IN-CLR-01-W-SFWEEKLY PM OF COOLERS (ALARM & LIGHTS)1-161PMC3/18/20163/25/201639.17WLK-IN-CLR-SW1ELEC0.25
NCAUR2016031573/21/2016WLK-IN-CLR-01-W-SFWEEKLY PM OF COOLERS (ALARM & LIGHTS)1-161PMC3/18/20163/18/201634.47WLK-IN-FRZR-SW2ELEC0.25
NCAUR2016031583/22/2016WLK-IN-CLR-02-W-SFWEEKLY PM OF WALK IN COOLERS1-165PMC3/17/20163/17/201633.8WLK-IN-CLR-0115AHVAC0.5
NCAUR2016031593/22/2016WLK-IN-CLR-02-W-SFWEEKLY PM OF WALK IN COOLERS1-165PMC3/17/20163/17/201633.8WLK-IN-CLR-0115BHVAC0.5
NCAUR2016031603/22/2016WLK-IN-CLR-02-W-SFWEEKLY PM OF WALK IN COOLERS1-165PMC3/17/20163/24/201638.5WLK-IN-CLR-SW1HVAC0.5
NCAUR2016031613/22/2016WLK-IN-CLR-02-W-SFWEEKLY PM OF WALK IN COOLERS1-165PMC3/17/20163/24/201638.5WLK-IN-FRZR-0102HVAC0.5
NCAUR2016031623/22/2016WLK-IN-CLR-02-W-SFWEEKLY PM OF WALK IN COOLERS1-165PMC3/17/20163/24/201638.5WLK-IN-FRZR-NW1HVAC0.5
NCAUR2016031633/22/2016WLK-IN-CLR-02-W-SFWEEKLY PM OF WALK IN COOLERS1-165PMC3/17/20163/24/201638.5WLK-IN-FRZR-SW2HVAC0.5
NCAUR2016031643/16/2016WTR-SOFT-02-AANNUAL ON DUPLEX WATER SOFTNERPMC3/17/20163/24/201633.8WTR-SOFT-0201STEN4
NCAUR2016031653/21/2016WTR-SOFT-DDAILY ON WATER SOFTNER SYSTEMS1-136PMC3/14/20163/19/201635.14WTR-SOFT-0201STEN0.5
NCAUR2016031653/21/2016WTR-SOFT-DDAILY ON WATER SOFTNER SYSTEMS1-136PMC3/14/20163/19/201635.14WTR-SOFT-BH1STEN0.5
NCAUR2016031653/21/2016WTR-SOFT-DDAILY ON WATER SOFTNER SYSTEMS1-136PMC3/14/20163/19/201635.14WTR-SOFT-COLUMN "E"STEN0.5
NCAUR2016031663/21/2016WTR-TEST-BOILERS-DDAILY BOILER WATER CHEMISTRY TESTING1-136PMC3/14/20163/21/201636.49BOILER-01STEN0.33
NCAUR2016031663/21/2016WTR-TEST-BOILERS-DDAILY BOILER WATER CHEMISTRY TESTING1-136PMC3/14/20163/21/201636.49BOILER-03STEN0.33
NCAUR2016031663/21/2016WTR-TEST-BOILERS-DDAILY BOILER WATER CHEMISTRY TESTING1-136PMC3/14/20163/21/201636.49TEST-EQUIP-CALIBSTEN0.33
NCAUR2016031673/21/2016WTR-TEST-TOWERS-DDAILY TOWER WATER CHEMISTRY TESTING1-136PMC3/14/20163/18/201634.47COOL-TWR-01STEN0.33
NCAUR2016031673/21/2016WTR-TEST-TOWERS-DDAILY TOWER WATER CHEMISTRY TESTING1-136PMC3/14/20163/18/201634.47COOL-TWR-02STEN0.33
NCAUR2016031673/21/2016WTR-TEST-TOWERS-DDAILY TOWER WATER CHEMISTRY TESTING1-136PMC3/14/20163/18/201634.47COOL-TWR-04STEN0.33
NCAUR2016031673/21/2016WTR-TEST-TOWERS-DDAILY TOWER WATER CHEMISTRY TESTING1-136PMC3/14/20163/18/201634.47COOL-TWR-05STEN0.33
NCAUR2016031673/21/2016WTR-TEST-TOWERS-DDAILY TOWER WATER CHEMISTRY TESTING1-136PMC3/14/20163/18/201634.47PMP-CHEM-TWR-04STEN0.33
NCAUR2016031673/21/2016WTR-TEST-TOWERS-DDAILY TOWER WATER CHEMISTRY TESTING1-136PMC3/14/20163/18/201634.47WTR-TREAT-12STEN0.33
NCAUR2016031683/11/2016AIR-COMP-03-WWEEKLY ON AIR COMPRESSOR1-001PMC3/14/20163/21/201633.8AIR-COMP-03-0330PIPE1
NCAUR2016031695/10/2016FILT-CHANGE-04-Q1ST, 2ND & 3RD FLOOR SOUTH WING FILTER INSPECTION1-161PMC3/18/20163/29/201633.8RM-FILTERSGEMAW7.33
NCAUR2016031695/10/2016FILT-CHANGE-04-Q1ST, 2ND & 3RD FLOOR SOUTH WING FILTER INSPECTION1-161PMC3/18/20163/29/201633.8RM-FILTERSGEMAW7.33
NCAUR2016031695/10/2016FILT-CHANGE-04-Q1ST, 2ND & 3RD FLOOR SOUTH WING FILTER INSPECTION1-161PMC3/18/20163/29/201633.8RM-FILTERSGEMAW7.33
NCAUR2016031703/14/2016CM SAFETY INSTRUCTROOM 1116 CENTER WING EXHAUST WEST HOOD IN FAULTCMC3/11/20163/25/201633.8VFD-CW-ATTIC-EF1GHVAC0
NCAUR2016031713/29/2016CM SAFETY INSTRUCTBUILDING 005 INTERIOR FLOOR NEED REPAIRED AT ENTRANCE DOOR NORTH SIDECMC3/11/20163/25/201633.99GEN ARCH & STRUCGEMAW0
NCAUR2016031723/22/2016CM SAFETY INSTRUCTREPLACE BOOT SCRAPER AT WEST SIDE OF GREENHOUSECMC3/11/20163/25/201633.99GEN ARCH & STRUCGEMAW0
NCAUR2016031733/15/2016CM SAFETY INSTRUCTROOM 2057 IS TOO COLDCMC3/11/20163/25/201633.8ASU-A-01-0056HVAC0
NCAUR2016031743/14/2016CM SAFETY INSTRUCTROOM 2057 LIGHTS OUTCMC3/11/20163/25/201633.8GEN ELECELEC0
NCAUR2016031753/14/2016CM SAFETY INSTRUCTROOM 1120 UV LIGHT OUT ON BIO HOODCMC3/11/20163/25/201633.8BIO-HOOD-1120-AELEC0
NCAUR2016031765/11/2016ADDITIONAL WORKROOM 0037 FUME HOOD DID NOT PASS CERTIFIFCATIONCMC3/11/20163/25/201633.8GEN MISC TASKGEMAW0
NCAUR2016031775/16/2016CM SAFETY INSTRUCTROOM 0037 FIX HANDLES ON FLAMMABLE CHEMICAL CABINETSCMC3/11/20163/25/201633.8GEN ARCH & STRUCGEMAW0
NCAUR2016031783/21/2016CM SAFETY INSTRUCTEMPTIED SCRAP METAL BINCMC3/11/20163/25/201633.99GEN MISC TASKGEMAW0
NCAUR2016031793/15/2016CM SAFETY INSTRUCTTRAINING ON NEW VACUUM PUMPCMC3/11/20163/25/201633.8GENERALPIPE0
NCAUR2016031803/16/2016CM SAFETY INSTRUCTNW WALK IN FREEZER OUT OF RANGECMC3/14/20163/28/201633.8WLK-IN-FRZR-NW1HVAC0
NCAUR2016031813/16/2016CM SAFETY INSTRUCTBUILDING 008 TEMP LOWCMC3/14/20163/28/201633.8GEN HVAC & REFHVAC0
NCAUR2016031823/15/2016CM SAFETY INSTRUCTROOM 0009 EYEWASH SAFETY SHOWER LOW FLOWCMC3/14/20163/28/201633.8SAFETY SHOWER COMBO 0009PLUM0
NCAUR2016031835/2/2016CM SAFETY INSTRUCT2ND FLOOR MOP SINK BY RESTROOM 2001 DRAIN STINKSCMC3/14/20163/28/201633.8GEN PLUM & PIPEPLUM0
NCAUR2016031843/15/2016CM SAFETY INSTRUCTROOM 3309 FILTER HOUSING ON WEST STEAM LINE LEAKINGCMC3/14/20163/28/201633.8GEN PLUM & PIPEPIPE0
NCAUR2016031853/16/2016CM SAFETY INSTRUCTROOM 2041 CHANGE CLOCKSCMC3/21/20163/28/201633.96GEN MISC TASKGEMAW0
NCAUR2016031863/21/2016CM SAFETY INSTRUCTROOM 0330 REPLACE VACUUM GAUGECMC3/14/20163/28/201634.06GEN PLUM & PIPEPIPE0
NCAUR2016031873/16/2016CM SAFETY INSTRUCTROOM 1106A AUTOCLAVE LEAKCMC3/14/20163/28/201633.8AUTCLVE-1106APIPE0
NCAUR2016031883/21/2016CM SAFETY INSTRUCTROOM 0042 INTERIOR OF ROOM NEEDS CLEANED (MUD DAUBER NESTS)CMC3/14/20163/28/201634.06GEN MISC TASKGEMAW0
NCAUR2016031893/15/2016CM SAFETY INSTRUCTNW HANDICAP RAMP DOOR NEEDS LOCK LOOKED ATCMC3/14/20163/28/201633.8GEN ARCH & STRUCELEC0
NCAUR2016031903/21/2016CM SAFETY INSTRUCTROOM 1309 NEED HVAC TO LOOK AT TEMP TO CHILLERAW-NO CHRC3/14/20163/28/201634.06GEN HVAC & REFHVAC0
NCAUR2016031913/16/2016CM SAFETY INSTRUCTCLEAN STRAINERS ON SW COOLING TOWER PUMPSCMC3/15/20163/29/201633.8PMP-TWR-LOOP-01HVAC0
NCAUR2016031913/16/2016CM SAFETY INSTRUCTCLEAN STRAINERS ON SW COOLING TOWER PUMPSCMC3/15/20163/29/201633.8PMP-TWR-LOOP-02HVAC0
NCAUR2016031913/16/2016CM SAFETY INSTRUCTCLEAN STRAINERS ON SW COOLING TOWER PUMPSCMC3/15/20163/29/201633.8PMP-TWR-LOOP-03HVAC0
NCAUR2016031913/16/2016CM SAFETY INSTRUCTCLEAN STRAINERS ON SW COOLING TOWER PUMPSCMC3/15/20163/29/201633.8PMP-TWR-LOOP-04HVAC0
NCAUR2016031924/26/2016CM SAFETY INSTRUCTREPLACE DOOR SEAL AND CLEAN WALL AROUND DIFFUSERCMC3/15/20163/29/201633.8GEN ARCH & STRUCGEMAW0
NCAUR2016031933/31/2016CM SAFETY INSTRUCTROOM 2218 REPAIR INSULATIONCMC3/15/20163/29/201634.08GEN PLUM & PIPEPIPE0
NCAUR2016031943/16/2016CM SAFETY INSTRUCT2ND FLOOR ADMIN WING TEMPERATURE APPROACHING 78CMC3/15/20163/29/201633.8GEN HVAC & REFHVAC0
NCAUR2016031953/21/2016CM SAFETY INSTRUCTROOM 3014 LIGHT OUT JUST INSIDE THE DOORCMC3/16/20163/30/201634.11GEN ELECELEC0
NCAUR2016031963/21/2016CM SAFETY INSTRUCTROOM 3004 ADJUST DOOR CLOSURECMC3/16/20163/30/201634.11GEN ARCH & STRUCGEMAW0
NCAUR2016031974/27/2016CM SAFETY INSTRUCTROOM 0019 NMR HUMIDITY TOO HIGHCMC3/16/20163/30/201633.8AHU-NMR-01-0019CHVAC0
NCAUR2016031974/27/2016CM SAFETY INSTRUCTROOM 0019 NMR HUMIDITY TOO HIGHCMC3/16/20163/30/201633.8ASU-A-10-0019HVAC0
NCAUR2016031983/21/2016CM SAFETY INSTRUCTROOM 2313A LIGHT OUTCMC3/16/20163/30/201634.11GEN ELECELEC0
NCAUR2016031993/24/2016CM SAFETY INSTRUCTROOM 2303 REPLACE DOOR GASKET IN AUTOCLAVECMC3/16/20163/30/201634.11AUTCLVE-2303PIPE0
NCAUR2016032003/28/2016CM SAFETY INSTRUCTEXHAUST STACK HAS PULLED FREE FROM ITS ANCHORSCMC3/16/20163/30/201634.11GEN ARCH & STRUCELEC0
NCAUR2016032013/21/2016CM SAFETY INSTRUCTROOM 1325 MENS RESTROOM SOUTH STALL TOILET WILL NOT FLUSHCMC3/17/20163/31/201634.13GEN PLUM & PIPEPLUM0
NCAUR2016032023/21/2016CM SAFETY INSTRUCTHALLWAY OUTSIDE ROOM 2046 LIGHT IS OUTCMC3/17/20163/31/201634.13GEN ELECELEC0
NCAUR2016032033/23/2016CM SAFETY INSTRUCTROOM 0117 CENTER WING HOT WATER SYSTEM AT 114 DEGREES CHECK TEMPCMC3/17/20163/31/201634.13HWP-01-0117PIPE0
NCAUR2016032043/21/2016CM SAFETY INSTRUCTCENTER WING ENTRANCE TO BUILDING DOOR WILL NOT AUTOMATICALLY OPENCMC3/17/20163/31/201634.13GEN ELECELEC0
NCAUR2016032053/21/2016CM SAFETY INSTRUCTTIRE ON TRAILER TONGUE JACK NEEDS FIXEDCMC3/17/20163/31/201634.13GEN GROUNDSGEMAW0
NCAUR2016032063/23/2016CM SAFETY INSTRUCTCHANGE TIRES ON GENERATORCMC3/17/20163/31/201634.13GEN GROUNDSGEMAW0
NCAUR2016032074/8/2016AC-UNIT-N-MMONTHLY ON HANGING AC EVAPORATOR UNIT1-165PMC3/22/20163/29/201635.65AC-UNIT-N-02-3205HVAC0.47
NCAUR2016032084/8/2016AC-UNIT-N-MMONTHLY ON HANGING AC EVAPORATOR UNIT1-165PMC3/22/20163/29/201635.65AC-UNIT-N-04-2205HVAC0.47
NCAUR2016032094/8/2016AC-UNIT-N-MMONTHLY ON HANGING AC EVAPORATOR UNIT1-165PMC3/22/20163/29/201635.65EVAPORATOR UNIT EASHVAC0.47
NCAUR2016032104/8/2016AC-UNIT-N-MMONTHLY ON HANGING AC EVAPORATOR UNIT1-165PMC3/22/20163/29/201635.65EVAPORATOR UNIT EASTHVAC0.47
NCAUR2016032113/24/2016ACC-CONT-COMP-MMONTHLY ON ACCESS CONTROL COMPUTER3-011PMC3/22/20163/24/201634.88ACS-MAINGRD1
NCAUR2016032123/28/2016AIR-COMP-01-MMONTHLY ON AIR COMPRESSOR1-001PMC3/21/20163/31/201636.15AIR-COMP-01-0330PIPE2
NCAUR2016032133/28/2016AIR-COMP-02-WWEEKLY ON AIR COMPRESSOR1-001PMC3/21/20163/28/2016311.19AIR-COMP-02-0330PIPE1
NCAUR2016032143/23/2016AIR-COMP-03-WWEEKLY ON AIR COMPRESSOR1-001PMC3/21/20163/28/2016311.19AIR-COMP-03-0330PIPE1
NCAUR2016032153/28/2016AIR-COMP-05-MMONTHLY ON AIR COMPRESSOR1-001PMC3/21/20163/31/201636.15AIR-COMP-05-ATTICPIPE1.25
NCAUR2016032163/24/2016AIR-COMP-06-WWEEKLY ON AIR COMPRESSOR1-001PMC3/21/20163/28/2016311.19AIR-COMP-06-BLDG003PIPE1
NCAUR2016032174/18/2016AIR-DAMPERS-QQUARTERLY PM OF INTAKE & EXHAUST AIR DAMPERS1-158PMC3/23/20163/30/201633.8AIR-DAMPER-0314HVAC2.82
NCAUR2016032184/21/2016AP-H-SASEMI-ANNUAL ON AIR PURIFIER HUMIDIFIER CEILING UNITS1-159PMC3/23/20163/30/201633.8AP-H-001-2300HVAC0.25
NCAUR2016032194/21/2016AP-H-SASEMI-ANNUAL ON AIR PURIFIER HUMIDIFIER CEILING UNITS1-159PMC3/23/20163/30/201633.8AP-H-002-2302HVAC0.25
NCAUR2016032204/25/2016AP-H-SASEMI-ANNUAL ON AIR PURIFIER HUMIDIFIER CEILING UNITS1-159PMC3/23/20163/30/201633.8AP-H-007-1322HVAC0.25
NCAUR2016032214/25/2016AP-H-SASEMI-ANNUAL ON AIR PURIFIER HUMIDIFIER CEILING UNITS1-159PMC3/23/20163/30/201633.8AP-H-008-1326HVAC0.25
NCAUR2016032223/24/2016BH-HKP-DDAILY BOILERHOUSE HOUSEKEEPING1-136PMC3/21/20163/31/2016313.2GEN BHSTEN1
NCAUR2016032233/21/2016BLDG-003-HSKPWEEKLY TRASH REMOVAL & CLEAN FLOOR IN SEMI-WORKS & SERVICE BUILDING1-167CTC3/21/20163/28/2016311.19GEN MISC TASKGEMAW0.5
NCAUR2016032233/21/2016BLDG-003-HSKPWEEKLY TRASH REMOVAL & CLEAN FLOOR IN SEMI-WORKS & SERVICE BUILDING1-167CTC3/21/20163/28/2016311.19GEN MISC TASKGEMAW0.5
NCAUR2016032243/28/2016BLOWER/VAC-MMONTHLY ON BLOWER/VACUUM-011-167PMC3/26/20164/6/201636.89BLOWER/VAC-01GEMAW0.5
NCAUR2016032253/28/2016BOILER-01-DDAILY INSPECTION OF BOILER #11-136PMC3/23/20164/2/2016314.54BOILER-01STEN6
NCAUR2016032263/24/2016BOILER-01-WWEEKLY INSPECTION OF BOILER #11-136PMC3/21/20163/31/2016313.2BOILER-01STEN1
NCAUR2016032273/28/2016BOILER-03-DDAILY INSPECTION OF BOILER #31-136PMC3/25/20164/5/2016316.56BOILER-03STEN6
NCAUR2016032283/24/2016BOILER-03-WWEEKLY INSPECTION OF BOILER #31-136PMC3/25/20164/5/2016316.56BOILER-03STEN1
NCAUR2016032293/28/2016CARPET-CLEAN-WWEEKLY CLEANING OF BUILDING CARPETS2-102CTC3/21/20163/28/2016311.19GEN HSKPHSKP0.05
NCAUR2016032303/24/2016CCTV-SYS-WWEEKLY ON CCTV SYSTEM3-011PMC3/21/20163/25/201639.17CCTV-KYBRD-JOYSTK-01GRD0.13
NCAUR2016032303/24/2016CCTV-SYS-WWEEKLY ON CCTV SYSTEM3-011PMC3/21/20163/25/201639.17CCTV-MONITOR-02GRD0.13
NCAUR2016032303/24/2016CCTV-SYS-WWEEKLY ON CCTV SYSTEM3-011PMC3/21/20163/25/201639.17CCTV-MONITOR-05GRD0.13
NCAUR2016032303/24/2016CCTV-SYS-WWEEKLY ON CCTV SYSTEM3-011PMC3/21/20163/25/201639.17CCTV-MUX-REC-01GRD0.13
NCAUR2016032313/28/2016CHILLER-01-02-03-WWEEKLY ON CHILLER #1 & #2 & #31-001PMC3/21/20163/25/201639.17CHILLER-01HVAC0.5
NCAUR2009038944/6/2009CARPET-CLEAN-WWEEKLY CLEANING OF BUILDING CARPETSCTC4/2/20094/9/200932.12-HSKP0
NCAUR2016032323/28/2016CHILLER-01-02-03-WWEEKLY ON CHILLER #1 & #2 & #31-001PMC3/21/20163/28/2016311.19CHILLER-02HVAC0.5
NCAUR2016032333/28/2016CHILLER-01-02-03-WWEEKLY ON CHILLER #1 & #2 & #31-001PMC3/21/20163/28/2016311.19CHILLER-03HVAC0.5
NCAUR2016032343/22/2016CHILLER-05-WWEEKLY ON CHILLER #51-158PMC3/21/20163/28/2016311.19CHILLER-05HVAC1
NCAUR2016032355/9/2016CLEAN-MILLBLD-BLDG10GENERAL CLEANING OF MILLING BLDG AND BUILDING 102-028CTC3/22/20164/6/201633.8GEN HSKPHSKP1.25
NCAUR2016032355/9/2016CLEAN-MILLBLD-BLDG10GENERAL CLEANING OF MILLING BLDG AND BUILDING 102-028CTC3/22/20164/6/201633.8GEN HSKPHSKP1.25
NCAUR2016032363/22/2016COMP-AIR-FILT-1-WWEEKLY ON REFRIGERATED AIR DRYER1-158PMC3/22/20163/29/2016311.86AIR-FILT/DRY-0329HVAC0.5
NCAUR2016032375/3/2016COND-AIR-COOL-M ROOFMONTHLY ON CONDENSING UNITS 04, 14, 15, 17, 18, 19, 20, 211-165PMC3/22/20164/1/201633.8COND-AIR-COOL-04HVAC0.03
NCAUR2016032375/3/2016COND-AIR-COOL-M ROOFMONTHLY ON CONDENSING UNITS 04, 14, 15, 17, 18, 19, 20, 211-165PMC3/22/20164/1/201633.8COND-AIR-COOL-14HVAC0.03
NCAUR2016032375/3/2016COND-AIR-COOL-M ROOFMONTHLY ON CONDENSING UNITS 04, 14, 15, 17, 18, 19, 20, 211-165PMC3/22/20164/1/201633.8COND-AIR-COOL-15HVAC0.03
NCAUR2016032375/3/2016COND-AIR-COOL-M ROOFMONTHLY ON CONDENSING UNITS 04, 14, 15, 17, 18, 19, 20, 211-165PMC3/22/20164/1/201633.8COND-AIR-COOL-17HVAC0.03
NCAUR2016032375/3/2016COND-AIR-COOL-M ROOFMONTHLY ON CONDENSING UNITS 04, 14, 15, 17, 18, 19, 20, 211-165PMC3/22/20164/1/201633.8COND-AIR-COOL-18HVAC0.03
NCAUR2016032375/3/2016COND-AIR-COOL-M ROOFMONTHLY ON CONDENSING UNITS 04, 14, 15, 17, 18, 19, 20, 211-165PMC3/22/20164/1/201633.8COND-AIR-COOL-19HVAC0.03
NCAUR2016032375/3/2016COND-AIR-COOL-M ROOFMONTHLY ON CONDENSING UNITS 04, 14, 15, 17, 18, 19, 20, 211-165PMC3/22/20164/1/201633.8COND-AIR-COOL-20HVAC0.03
NCAUR2016032375/3/2016COND-AIR-COOL-M ROOFMONTHLY ON CONDENSING UNITS 04, 14, 15, 17, 18, 19, 20, 211-165PMC3/22/20164/1/201633.8COND-AIR-COOL-21HVAC0.03
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8EYEWASH-BLDG001PLUM0.01
NCAUR2009038944/6/2009CARPET-CLEAN-WWEEKLY CLEANING OF BUILDING CARPETSCTC4/2/20094/9/200932.12-HSKP0
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8EYEWASH-BLDG002-APLUM0.01
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8EYEWASH-BLDG002-BPLUM0.01
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8EYEWASH-BLDG002-CPLUM0.01
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8EYEWASH-BLDG002-DPLUM0.01
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8EYEWASH-BLDG002-EPLUM0.01
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8SAFETY SHOWER COMBO 0009PLUM0.01
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8SAFETY-SHOWER-0037PLUM0.01
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8SAFETY-SHOWER-2328PLUM0.01
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8SAFETY-SHOWER-BLDG001PLUM0.01
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8SAFETY-SHOWER-BLDG002-APLUM0.01
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8SAFETY-SHOWER-BLDG002-BPLUM0.01
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8SAFETY-SHOWER-BLDG002-CPLUM0.01
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8SAFETY-SHOWER-COMBO-0104PLUM0.01
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8SAFETY-SHOWER-COMBO-0330PLUM0.01
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8SAFETY-SHOWER-COMBO-BLDG003PLUM0.01
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8SAFETY-SHOWER-COMBO-BLDG10PLUM0.01
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8SAFETY-SHOWER-COMBO2-BLDG003PLUM0.01
NCAUR2016032393/21/2016COOL-TWR-01-05-MMONTHLY ON COOLING TOWER 01-051-158PMC3/21/20163/28/2016311.19COOL-TWR-02HVAC1
NCAUR2016032403/21/2016COOL-TWR-01-05-WWEEKLY ON COOLING TOWER 01-051-158PMC3/21/20163/28/2016311.19COOL-TWR-03HVAC0.5
NCAUR2016032413/22/2016COOL-TWR-01-05-WWEEKLY ON COOLING TOWER 01-051-158PMC3/21/20163/28/2016311.19COOL-TWR-05HVAC0.5
NCAUR2016032423/23/2016COOL-TWR-01-05-WWEEKLY ON COOLING TOWER 01-051-158PMC3/23/20163/30/2016312.53COOL-TWR-01HVAC0.5
NCAUR2016032433/23/2016COOL-TWR-01-05-WWEEKLY ON COOLING TOWER 01-051-158PMC3/23/20163/30/2016312.53COOL-TWR-02HVAC0.5
NCAUR2016032443/23/2016COOL-TWR-01-05-WWEEKLY ON COOLING TOWER 01-051-158PMC3/23/20163/30/2016312.53COOL-TWR-04HVAC0.5
NCAUR2016032453/23/2016COOL-TWR-01-06-WWEEKLY ON CONDENSER WATER PUMP 01 - 061-158PMC3/22/20163/29/2016311.86COND-WTR-PUMP-05HVAC0.25
NCAUR2016032463/23/2016COOL-TWR-01-06-WWEEKLY ON CONDENSER WATER PUMP 01 - 061-158PMC3/22/20163/29/2016311.86COND-WTR-PUMP-06HVAC0.25
NCAUR2016032473/23/2016COOL-TWR-01-06-WWEEKLY ON CONDENSER WATER PUMP 01 - 061-158PMC3/23/20163/30/2016312.53COND-WTR-PUMP-01HVAC0.25
NCAUR2016032483/23/2016COOL-TWR-01-06-WWEEKLY ON CONDENSER WATER PUMP 01 - 061-158PMC3/23/20163/30/2016312.53COND-WTR-PUMP-02HVAC0.25
NCAUR2016032493/23/2016COOL-TWR-01-06-WWEEKLY ON CONDENSER WATER PUMP 01 - 061-158PMC3/23/20163/30/2016312.53COND-WTR-PUMP-03HVAC0.25
NCAUR2016032503/23/2016COOL-TWR-01-06-WWEEKLY ON CONDENSER WATER PUMP 01 - 061-158PMC3/23/20163/23/201637.83COND-WTR-PUMP-04HVAC0.25
NCAUR2016032515/20/2016COOL-TWR-05-SASEMI-ANNUAL ON COOLING TOWER #51-158PMC3/26/20164/2/201633.8COOL-TWR-04HVAC16
NCAUR2016032523/28/2016CRAM-A-LOT-WWEEKLY ON CRAM-A-LOT TRASH COMPACTOR1-167PMC3/24/20163/31/2016313.2CRAM-A-LOT-TRSH-CMPTRGEMAW1
NCAUR2016032533/23/2016DEAERATOR-01-MMONTHLY INSPECTION OF DEAERATOR #11-136PMC3/25/20164/5/201636.99DEAERATOR-01STEN2
NCAUR2016032543/22/2016DIRT TRAP-SASEMI-ANNUAL ON POTTING SINK DIRT TRAP1-145PMC3/23/20163/30/201634.13DIRT-TRAP-0314PLUM2
NCAUR2016032553/21/2016DRYER-02-QQUARTERLY CHECK ON DRYER1-134PMC3/23/20163/30/201634.47DRYER-02-0021ELEC1
NCAUR2016032563/28/2016ELEV-ALRM-M-SFMONTHLY INSPECTION OF ELEVATOR ALARM SYSTEM1-161PMC3/22/20163/29/201635.65ELEVATOR-01ELEC0.1
NCAUR2016032563/28/2016ELEV-ALRM-M-SFMONTHLY INSPECTION OF ELEVATOR ALARM SYSTEM1-161PMC3/22/20163/29/201635.65ELEVATOR-02ELEC0.1
NCAUR2016032563/28/2016ELEV-ALRM-M-SFMONTHLY INSPECTION OF ELEVATOR ALARM SYSTEM1-161PMC3/22/20163/29/201635.65ELEVATOR-03ELEC0.1
NCAUR2016032563/28/2016ELEV-ALRM-M-SFMONTHLY INSPECTION OF ELEVATOR ALARM SYSTEM1-161PMC3/22/20163/29/201635.65ELEVATOR-06ELEC0.1
NCAUR2016032563/28/2016ELEV-ALRM-M-SFMONTHLY INSPECTION OF ELEVATOR ALARM SYSTEM1-161PMC3/22/20163/29/201635.65ELEVATOR-08ELEC0.1
NCAUR2016032573/22/2016EM-GEN-BLD-10-M-SFMONTHLY ON BLDG 10 EMERGENCY GENERATOR1-134PMC3/25/20164/28/2016310.28EM-GEN-BLDG010ELEC2
NCAUR2016032583/31/2016EM-LIGHT-M-SFMONTHLY INSPECTION OF EMERGENCY LIGHTS (63 TOTAL)1-004PMC3/22/20163/29/201635.65EM-LIGHTSELEC4
NCAUR2016032593/23/2016ETH-BIO-TANK-M-SFMONTHLY ON ETHANOL AND BIO-DIESEL STORAGE TANK1-167PMC3/22/20163/29/201635.65ETH-TANK-01GEMAW0.25
NCAUR2016032603/31/2016EX-FAN-BLD12-QQUARTERLY ON OUTSIDE AIR VENTILATION FANS1-004PMC3/23/20164/26/201635.86EX-FAN-BLD11AGEMAW0.19
NCAUR2016032603/31/2016EX-FAN-BLD12-QQUARTERLY ON OUTSIDE AIR VENTILATION FANS1-004PMC3/23/20164/26/201635.86EX-FAN-BLD11BGEMAW0.19
NCAUR2016032603/31/2016EX-FAN-BLD12-QQUARTERLY ON OUTSIDE AIR VENTILATION FANS1-004PMC3/23/20164/26/201635.86EX-FAN-BLD12AGEMAW0.19
NCAUR2016032603/31/2016EX-FAN-BLD12-QQUARTERLY ON OUTSIDE AIR VENTILATION FANS1-004PMC3/23/20164/26/201635.86EX-FAN-BLD12BGEMAW0.19
NCAUR2016032613/21/2016EX-FAN-CHEM-MTX-MMONTHLY ON EXHAUST FANS1-134PMC3/25/20164/5/201636.73EX-FAN-CHEMST-1ELEC0.25
NCAUR2016032613/21/2016EX-FAN-CHEM-MTX-MMONTHLY ON EXHAUST FANS1-134PMC3/25/20164/5/201636.73EX-FAN-CHEMST-2ELEC0.25
NCAUR2016032613/21/2016EX-FAN-CHEM-MTX-MMONTHLY ON EXHAUST FANS1-134PMC3/25/20164/5/201636.73EX-FAN-CHEMST-3ELEC0.25
NCAUR2016032613/21/2016EX-FAN-CHEM-MTX-MMONTHLY ON EXHAUST FANS1-134PMC3/25/20164/5/201636.73EX-FAN-MYTOXELEC0.25
NCAUR2016032623/22/2016EX-FAN-RANGE-QQUARTERLY ON RANGE HOOD EXHAUST FANS1-134PMC3/23/20163/30/201634.47EX-FAN-RANGE-HD-01ELEC0.75
NCAUR2016032623/22/2016EX-FAN-RANGE-QQUARTERLY ON RANGE HOOD EXHAUST FANS1-134PMC3/23/20163/30/201634.47EX-FAN-RANGE-HD-02ELEC0.75
NCAUR2016032623/22/2016EX-FAN-RANGE-QQUARTERLY ON RANGE HOOD EXHAUST FANS1-134PMC3/23/20163/30/201634.47EX-FAN-RANGE-HD-03ELEC0.75
NCAUR2016032633/31/2016EX-FAN-SW-E-I-QQUARTERLY ON EXHAUST FANS BAYS E-I1-004PMC3/21/20163/31/201634.52EX-FAN-SW-24GEMAW0.15
NCAUR2016032633/31/2016EX-FAN-SW-E-I-QQUARTERLY ON EXHAUST FANS BAYS E-I1-004PMC3/21/20163/31/201634.52EX-FAN-SW-25GEMAW0.15
NCAUR2016032633/31/2016EX-FAN-SW-E-I-QQUARTERLY ON EXHAUST FANS BAYS E-I1-004PMC3/21/20163/31/201634.52EX-FAN-SW-26GEMAW0.15
NCAUR2016032633/31/2016EX-FAN-SW-E-I-QQUARTERLY ON EXHAUST FANS BAYS E-I1-004PMC3/21/20163/31/201634.52EX-FAN-SW-42GEMAW0.15
NCAUR2016032633/31/2016EX-FAN-SW-E-I-QQUARTERLY ON EXHAUST FANS BAYS E-I1-004PMC3/21/20163/31/201634.52EX-FAN-SW-50GEMAW0.15
NCAUR2016032643/28/2016EXH FILTERS-008-MMONTHLY ON EXHAUST FILTERS DIFFERENTIAL PRESSURE READING-BLDG 0081-004PMC3/22/20164/1/201636.12EX-FILTERS - BLDG 008GEMAW0.5
NCAUR2016032653/31/2016EXIT-LIGHT-INSP-M-SFMONTHLY INSPECTION OF EXIT LIGHTS (163 TOTAL)1-004PMC3/22/20163/29/201635.65EXIT-LIGHTSGEMAW4
NCAUR2016032663/23/2016EXT-LGTS-WWEEKLY INSPECTION ON EXTERIOR BUILDING LIGHTS3-011CTC3/21/20163/28/2016311.19EXT-LGHTSGRD0.75
NCAUR2016032673/31/2016FIRE-DOOR-M-SFMONTHLY PM OF ALL FIRE DOORS1-004PMC3/22/20164/7/201637.04FIRE DOORSGEMAW1
NCAUR2016032683/30/2016FIRE-HYDRANT-M-SFMONTHLY ON FIRE HYDRANTS1-001PMC3/22/20164/1/201636.12FIRE-HYDRANT-02PIPE0.1
NCAUR2016032683/30/2016FIRE-HYDRANT-M-SFMONTHLY ON FIRE HYDRANTS1-001PMC3/22/20164/1/201636.12FIRE-HYDRANT-03PIPE0.1
NCAUR2016032683/30/2016FIRE-HYDRANT-M-SFMONTHLY ON FIRE HYDRANTS1-001PMC3/22/20164/1/201636.12FIRE-HYDRANT-04PIPE0.1
NCAUR2016032683/30/2016FIRE-HYDRANT-M-SFMONTHLY ON FIRE HYDRANTS1-001PMC3/22/20164/1/201636.12FIRE-HYDRANT-05PIPE0.1
NCAUR2016032683/30/2016FIRE-HYDRANT-M-SFMONTHLY ON FIRE HYDRANTS1-001PMC3/22/20164/1/201636.12FIRE-HYDRANT-06PIPE0.1
NCAUR2016032693/21/2016FL-SCRUB-01-QQUARTERLY ON FLOOR SCRUBBER1-134PMC3/23/20163/30/201634.47FL-SCRUB-01ELEC1
NCAUR2016032703/22/2016FUEL-OIL-TANK-M-SFMONTHLY UST INSPECTION3-011PMC3/22/20163/24/201634.88FUEL-OIL-TANK-02GRD0.25
NCAUR2016032703/22/2016FUEL-OIL-TANK-M-SFMONTHLY UST INSPECTION3-011PMC3/22/20163/24/201634.88FUEL-OIL-TANK-03GRD0.25
NCAUR2016032713/21/2016FUEL-OIL-TANK-W-SFWEEKLY FUEL OIL LEVEL CHECK1-136PMC3/22/20163/29/2016311.86FUEL-OIL-TANK-02STEN0.25
NCAUR2016032713/21/2016FUEL-OIL-TANK-W-SFWEEKLY FUEL OIL LEVEL CHECK1-136PMC3/22/20163/29/2016311.86FUEL-OIL-TANK-03STEN0.25
NCAUR2016032724/13/2016GRNDS-WRK-WWEEKLY WORK ON GROUNDS1-167CTC3/21/20163/28/201633.8GEN GROUNDSGEMAW32
NCAUR2016032734/7/2016HUM-N-01-N-07-SASEMI-ANNUAL ON STEAM INJECTION HUMIDIFIERS1-001PMC3/25/20164/1/201634.19HUMIDIFIER-N-01-0223PIPE0.07
NCAUR2016032734/7/2016HUM-N-01-N-07-SASEMI-ANNUAL ON STEAM INJECTION HUMIDIFIERS1-001PMC3/25/20164/1/201634.19HUMIDIFIER-N-02-1225PIPE0.07
NCAUR2016032734/7/2016HUM-N-01-N-07-SASEMI-ANNUAL ON STEAM INJECTION HUMIDIFIERS1-001PMC3/25/20164/1/201634.19HUMIDIFIER-N-03-2229PIPE0.07
NCAUR2016032734/7/2016HUM-N-01-N-07-SASEMI-ANNUAL ON STEAM INJECTION HUMIDIFIERS1-001PMC3/25/20164/1/201634.19HUMIDIFIER-N-04-3227PIPE0.07
NCAUR2016032734/7/2016HUM-N-01-N-07-SASEMI-ANNUAL ON STEAM INJECTION HUMIDIFIERS1-001PMC3/25/20164/1/201634.19HUMIDIFIER-N-05-0202PIPE0.07
NCAUR2016032734/7/2016HUM-N-01-N-07-SASEMI-ANNUAL ON STEAM INJECTION HUMIDIFIERS1-001PMC3/25/20164/1/201634.19HUMIDIFIER-N-06-0202PIPE0.07
NCAUR2016032734/7/2016HUM-N-01-N-07-SASEMI-ANNUAL ON STEAM INJECTION HUMIDIFIERS1-001PMC3/25/20164/1/201634.19HUMIDIFIER-N-07-0228PIPE0.07
NCAUR2016032744/19/2016HUMIDIFIER-008-QQUARTERLY ON BLDG 008 HUMIDIFIER1-165PMC3/23/20163/30/201633.8HUMIDIFIER-008-AHVAC0.25
NCAUR2016032744/19/2016HUMIDIFIER-008-QQUARTERLY ON BLDG 008 HUMIDIFIER1-165PMC3/23/20163/30/201633.8HUMIDIFIER-008-BHVAC0.25
NCAUR2016032754/7/2016ICE-MACHINE-01-MMONTHLY ON ICE MACHINE 01 DRAIN1-165PMC3/22/20163/29/201635.65ICE-MACHINE-01HVAC0.5
NCAUR2016032763/28/2016LIFT-TRUCK-WWEEKLY PM ON LIFT TRUCK1-167PMC3/21/20163/28/2016311.19LIFT-TRUCKGEMAW0.25
NCAUR2016032774/4/2016LOBBY-LIGHT-BUG-BWCLEAN LOBBY LIGHT FIXTURES OF BUGS1-161PMC3/21/20163/28/2016311.19GEN MISC TASKELEC0.5
NCAUR2016032783/28/2016MAT-CLEAN-WWEEKLY CLEANING OF BUILDING MATS2-102CTC3/21/20163/28/2016311.19GEN HSKPHSKP4
NCAUR2016032793/21/2016METER-CHECKCHECK HOUR METER ON ATTACHED EQUIPMENT1-167PMC3/21/20163/28/2016355.5LIFT-TRUCKGEMAW0.06
NCAUR2016032793/21/2016METER-CHECKCHECK HOUR METER ON ATTACHED EQUIPMENT1-167PMC3/21/20163/28/2016355.5TRACTOR-JD4500GEMAW0.06
NCAUR2016032793/21/2016METER-CHECKCHECK HOUR METER ON ATTACHED EQUIPMENT1-167PMC3/21/20163/28/2016355.5TRACTOR-MOWER-EXMARKGEMAW0.06
NCAUR2016032793/21/2016METER-CHECKCHECK HOUR METER ON ATTACHED EQUIPMENT1-167PMC3/21/20163/28/2016355.5TRACTOR-MOWER-JD425GEMAW0.06
NCAUR2016032803/31/2016MYTOX-TBL-01-M-SFMONTHLY FILTER CHANGE ON MTX TABLE1-004PMC3/22/20164/1/201636.12MYTOX-TBL-01GEMAW0.5
NCAUR2016032813/21/2016PORT-EWSS-WWEEKLY ON PORTABLE EYEWASH SAFETY SHOWER STATIONS1-145PMC3/21/20163/21/201636.49SAFETY-SHOWER-COMBO-GH100PLUM0
NCAUR2016032823/22/2016PUBLIC-ADDRESS-M-SFMONTHLY ON SIMPLEX PA SYSTEM3-011PMC3/22/20163/29/201635.65PA-SYSTEMGRD0.1
NCAUR2016032833/28/2016RECYCLE-PREP-WWEEKLY RECYCLE PREP1-167CTC3/25/20163/25/201639.17GEN MISC TASKGEMAW0.5
NCAUR2016032844/7/2016REF-AIR-DRY-11-MMONTHLY ON REFRIGERATED AIR DRYER HOUSE AIR1-165PMC3/21/20163/28/201635.65REF-AIR-DRY-11HVAC0.5
NCAUR2016032853/28/2016REV-OSMOSIS-03-DDAILY ON REVERSE OSMOSIS PURIFIER1-136PMC3/21/20163/31/2016313.2REV-OSMOSIS-03STEN3
NCAUR2016032863/31/2016SMP-PMP-02-MMONTHLY ON DUPLEX SUMP PUMP - GREASE BEARINGS1-004PMC3/25/20164/5/201636.73SMP-PMP-02GEMAW1
NCAUR2016032873/31/2016SMP-PMP-P-19-MMONTHLY ON DUPLEX SUMP PUMP1-136PMC3/25/20164/5/201636.73SMP-PMP-P-19ASTEN1
NCAUR2016032883/30/2016SMP-PMP-P-19-MMONTHLY ON DUPLEX SUMP PUMP1-136PMC3/25/20164/5/201636.73SMP-PMP-P-19BSTEN1
NCAUR2016032893/21/2016TEST-EQUIP-CALIB-WWEEKLY CALIBRATION OF pH TESTING EQUIPMENT1-136PMC3/21/20163/31/2016313.2TEST-EQUIP-CALIBSTEN0.5
NCAUR2016032903/29/2016TOXIC-GAS-DET-M-SFMONTHLY PM OF TOXIC GAS DETECTORS1-004PMC3/22/20163/28/201635.5TOXIC-GAS-DET-05-3233GEMAW0.25
NCAUR2016032903/29/2016TOXIC-GAS-DET-M-SFMONTHLY PM OF TOXIC GAS DETECTORS1-004PMC3/22/20163/28/201635.5TOXIC-GAS-DET-06-0217GEMAW0.25
NCAUR2016032913/28/2016TRACTOR-JD4500-WWEEKLY ON JOHN DEERE 4500 TRACTOR1-167PMC3/25/20164/1/2016374.3TRACTOR-JD4500GEMAW0.5
NCAUR2016032923/21/2016TRACTOR-MOWER-EXMARKWEEKLY INSPECTION OF EXMARK RIDING MOWER1-167PMC3/21/20163/28/2016311.19TRACTOR-MOWER-EXMARKGEMAW0
NCAUR2016032933/28/2016VAC-PUMP-03-DDAILY ON VACUUM PUMP1-001PMC3/21/20163/25/201639.17VAC-PUMP-03PIPE1
NCAUR2016032943/23/2016WLK-BH-BL-MMONTHLY ON JOHN DEERE WALK-BEHIND BLOWER B6351-167PMC3/22/20163/29/201635.65WALK-BEHIND BLOWERGEMAW0.5
NCAUR2016032953/28/2016WLK-IN-CLR-01-NW-WWEEKLY PM OF COOLERS (ALARM & LIGHTS)1-161PMC3/25/20164/1/2016313.87WLK-IN-FRZR-NW1ELEC0.25
NCAUR2016032963/28/2016WLK-IN-CLR-01-W-SFWEEKLY PM OF COOLERS (ALARM & LIGHTS)1-161PMC3/25/20164/1/2016313.87WLK-IN-CLR-SW1ELEC0.25
NCAUR2016032973/28/2016WLK-IN-CLR-01-W-SFWEEKLY PM OF COOLERS (ALARM & LIGHTS)1-161PMC3/25/20163/25/201639.17WLK-IN-FRZR-SW2ELEC0.25
NCAUR2016032983/31/2016WLK-IN-CLR-02-W-SFWEEKLY PM OF WALK IN COOLERS1-165PMC3/24/20163/24/201638.5WLK-IN-CLR-0115AHVAC0.5
NCAUR2016032993/31/2016WLK-IN-CLR-02-W-SFWEEKLY PM OF WALK IN COOLERS1-165PMC3/24/20163/24/201638.5WLK-IN-CLR-0115BHVAC0.5
NCAUR2016033003/31/2016WLK-IN-CLR-02-W-SFWEEKLY PM OF WALK IN COOLERS1-165PMC3/24/20163/31/2016313.2WLK-IN-CLR-SW1HVAC0.5
NCAUR2016033013/31/2016WLK-IN-CLR-02-W-SFWEEKLY PM OF WALK IN COOLERS1-165PMC3/24/20163/31/2016313.2WLK-IN-FRZR-0102HVAC0.5
NCAUR2016033023/31/2016WLK-IN-CLR-02-W-SFWEEKLY PM OF WALK IN COOLERS1-165PMC3/24/20163/31/2016313.2WLK-IN-FRZR-NW1HVAC0.5
NCAUR2016033033/31/2016WLK-IN-CLR-02-W-SFWEEKLY PM OF WALK IN COOLERS1-165PMC3/24/20163/31/2016313.2WLK-IN-FRZR-SW2HVAC0.5
NCAUR2016033043/22/2016WTR-CL-LOOPS-MMONTHLY CLOSED LOOP WATER TESTING1-136PMC3/25/20164/1/201636.12HEAT-TRANS-PAK-01-NW-ATTICSTEN0.5
NCAUR2016033053/28/2016WTR-SOFT-DDAILY ON WATER SOFTNER SYSTEMS1-136PMC3/21/20163/26/201639.84WTR-SOFT-0201STEN0.5
NCAUR2016033053/28/2016WTR-SOFT-DDAILY ON WATER SOFTNER SYSTEMS1-136PMC3/21/20163/26/201639.84WTR-SOFT-BH1STEN0.5
NCAUR2016033053/28/2016WTR-SOFT-DDAILY ON WATER SOFTNER SYSTEMS1-136PMC3/21/20163/26/201639.84WTR-SOFT-COLUMN "E"STEN0.5
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-01-3328HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-01-ATTICHVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-02-3328HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-03-3328HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-04-3328HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-05-3328HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-06-3328HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-07-3322HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-08-3323HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-09-3318HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-10-3317HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-11-3312HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-12-3313HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-13-3310HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-14-3311HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-15-3309HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-16-3308HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-17-3306HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-18-3307HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-19-3304HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-20-3305HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-21-3302HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-22-3300HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-23-3301HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-85-3321HVAC0.04
NCAUR2016033076/20/2016WTR-SRC-HP-GRP2-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/1/201633.8WTR-SRC-HP-0322HVAC0.04
NCAUR2016033076/20/2016WTR-SRC-HP-GRP2-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/1/201633.8WTR-SRC-HP-25-2328HVAC0.04
NCAUR2016033076/20/2016WTR-SRC-HP-GRP2-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/1/201633.8WTR-SRC-HP-26-2321HVAC0.04
NCAUR2016033076/20/2016WTR-SRC-HP-GRP2-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/1/201633.8WTR-SRC-HP-27-2314HVAC0.04
NCAUR2016033076/20/2016WTR-SRC-HP-GRP2-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/1/201633.8WTR-SRC-HP-28-2302HVAC0.04
NCAUR2016033076/20/2016WTR-SRC-HP-GRP2-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/1/201633.8WTR-SRC-HP-29-2302HVAC0.04
NCAUR2016033076/20/2016WTR-SRC-HP-GRP2-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/1/201633.8WTR-SRC-HP-30-2300HVAC0.04
NCAUR2016033076/20/2016WTR-SRC-HP-GRP2-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/1/201633.8WTR-SRC-HP-31-1328HVAC0.04
NCAUR2016033076/20/2016WTR-SRC-HP-GRP2-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/1/201633.8WTR-SRC-HP-32-1328HVAC0.04
NCAUR2016033076/20/2016WTR-SRC-HP-GRP2-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/1/201633.8WTR-SRC-HP-33-1328HVAC0.04
NCAUR2016033076/20/2016WTR-SRC-HP-GRP2-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/1/201633.8WTR-SRC-HP-34-1328HVAC0.04
NCAUR2016033076/20/2016WTR-SRC-HP-GRP2-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/1/201633.8WTR-SRC-HP-35-1324HVAC0.04