Attachment 16 - Work Order Summary.xlsx

XLSX spreadsheet 1 MB Posted

Attached to
Operations and Maintenance Services
Solicitation number
12505B21R0003
Issued by

View the file

Other files

File Type Posted
Past Performance Questionnaire.pdf PDF
SF-30 Amendment 03.pdf PDF
Attachment 016-Work Order Summary-B.pdf PDF
RFIs.pdf PDF
Attachment 004-Documents by Reference-rev 07-08-2021.pdf PDF
Attachment 016-Work Order Summary-A.xlsx XLSX spreadsheet
SF-30 Amendment 02.pdf PDF
Attachment 016-Work Order Summary-A.pdf PDF
Sign In Sheets.pdf PDF
Listing of Fire Alarm System Devices.pdf PDF
Attachment 016-Work Order Summary-B.xlsx XLSX spreadsheet
02 - Schedule B Addendum.xls XLS spreadsheet
Attachment 05 - MP2 Equipment Report-Simple.xlsx XLSX spreadsheet
SF-30.pdf PDF
Schedule B Addendum.xls XLS spreadsheet
Schedule B Addendum.xls XLS spreadsheet
Attachment 008-Inventory of Goverment Vehicles.pdf PDF
Exhibit 007-Wage Determination (Services).pdf PDF
Exhibit 001-Performance Work Statement.pdf PDF
Attachment 006-MP2 Task Instruction List.pdf PDF
Exhibit 005-SCA Directory of Occupations.pdf PDF
Attachment 017-Personal Identify Information (PII) Sheet.pdf PDF
Attachment 013-Elevators and Lifting Devices.pdf PDF
Attachment 010-Facility Drawings.pdf PDF
Attachment 003-Work Order Statistics.pdf PDF
Attachment 018-Ozone Depleting Substances (ODS) Management Program-rev01-20-2021.pdf PDF
Attachment 012-Flooring Surfaces.pdf PDF
Attachment 014-Supplies Services-Government Furnished.pdf PDF
Attachment 002-Work Order Types.pdf PDF
Attachment 019-Government Furnished Equipment.pdf PDF
Attachment 021-Space Temperature and Humidity Requirements.pdf PDF
Attachment 009-Contractor Space.pdf PDF
Attachment 004-Documents Incorporated by Reference.pdf PDF
Attachment 011-Housekeeping Matrix.pdf PDF
Exhibit 006-Wage Determination (Construction).pdf PDF
Attachment 005-MP2 Equipment Report-Simple.pdf PDF
Exhibit 002-NCAUR BSHEM Manual v2020-11.pdf PDF
Attachment 001-Craft Codes.pdf PDF
Exhibit 003-NCAUR Bldg Standards.pdf PDF
Attachment 015-Pest Treatment Matrix.pdf PDF
SF-33 with Sections B-M.pdf PDF
Attachment 016-Work Order Summary.pdf PDF
Attachment 007-MP2 Task Report.pdf PDF
Attachment 020-Stock Level Summary.pdf PDF
Attachment 022-Supplemental Work Items.pdf PDF
Exhibit 004-Quality Assurance Surveillance Plan.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Work Order Summary

Attachment 16
Operation and Maintenance Contract
USDA-NCAUR, Peoria, IL
WORK ORDER SUMMARY
SiteWO No.Close DateTask No.DescriptionAssigned ToWO TypeStatusScheduled Start DateScheduled Finish DatePriorityWork PriorityEquipment No.CraftEstimated Labor Hours
NCAUR2016031124/1/2016FIRE-SPRNK-VLVE-Q-SFQUARTERLY ON FIRE SPRINKLER CONTROL VALVES-PIPCO1-134PMC3/16/20163/26/201634.26FIRE-SPRINK-VALVE-12ELEC0.01
NCAUR2016031124/1/2016FIRE-SPRNK-VLVE-Q-SFQUARTERLY ON FIRE SPRINKLER CONTROL VALVES-PIPCO1-134PMC3/16/20163/26/201634.26FIRE-SPRINK-VALVE-13ELEC0.01
NCAUR2016031124/1/2016FIRE-SPRNK-VLVE-Q-SFQUARTERLY ON FIRE SPRINKLER CONTROL VALVES-PIPCO1-134PMC3/16/20163/26/201634.26FIRE-SPRINK-VALVE-14ELEC0.01
NCAUR2016031124/1/2016FIRE-SPRNK-VLVE-Q-SFQUARTERLY ON FIRE SPRINKLER CONTROL VALVES-PIPCO1-134PMC3/16/20163/26/201634.26FIRE-SPRINK-VALVE-15ELEC0.01
NCAUR2016031124/1/2016FIRE-SPRNK-VLVE-Q-SFQUARTERLY ON FIRE SPRINKLER CONTROL VALVES-PIPCO1-134PMC3/16/20163/26/201634.26FIRE-SPRINK-VALVE-16ELEC0.01
NCAUR2016031124/1/2016FIRE-SPRNK-VLVE-Q-SFQUARTERLY ON FIRE SPRINKLER CONTROL VALVES-PIPCO1-134PMC3/16/20163/26/201634.26FIRE-SPRINK-VALVE-17ELEC0.01
NCAUR2016031124/1/2016FIRE-SPRNK-VLVE-Q-SFQUARTERLY ON FIRE SPRINKLER CONTROL VALVES-PIPCO1-134PMC3/16/20163/26/201634.26FIRE-SPRINK-VALVE-18ELEC0.01
NCAUR2016031124/1/2016FIRE-SPRNK-VLVE-Q-SFQUARTERLY ON FIRE SPRINKLER CONTROL VALVES-PIPCO1-134PMC3/16/20163/26/201634.26FIRE-SPRINK-VALVE-19ELEC0.01
NCAUR2016031124/1/2016FIRE-SPRNK-VLVE-Q-SFQUARTERLY ON FIRE SPRINKLER CONTROL VALVES-PIPCO1-134PMC3/16/20163/26/201634.26FIRE-SPRINK-VALVE-20ELEC0.01
NCAUR2016031124/1/2016FIRE-SPRNK-VLVE-Q-SFQUARTERLY ON FIRE SPRINKLER CONTROL VALVES-PIPCO1-134PMC3/16/20163/26/201634.26FIRE-SPRINK-VALVE-21ELEC0.01
NCAUR2016031133/14/2016FUEL-OIL-TANK-W-SFWEEKLY FUEL OIL LEVEL CHECK1-136PMC3/15/20163/22/201633.8FUEL-OIL-TANK-02STEN0.25
NCAUR2016031133/14/2016FUEL-OIL-TANK-W-SFWEEKLY FUEL OIL LEVEL CHECK1-136PMC3/15/20163/22/201633.8FUEL-OIL-TANK-03STEN0.25
NCAUR2016031144/1/2016GOV-VEH-BWBI-WEEKLY INSPECTION OF GOVERNMENT VEHICLES1-167PMC3/18/20164/2/201639.17GOV-VEH-016GEMAW0.09
NCAUR2016031144/1/2016GOV-VEH-BWBI-WEEKLY INSPECTION OF GOVERNMENT VEHICLES1-167PMC3/18/20164/2/201639.17GOV-VEH-025GEMAW0.09
NCAUR2016031144/1/2016GOV-VEH-BWBI-WEEKLY INSPECTION OF GOVERNMENT VEHICLES1-167PMC3/18/20164/2/201639.17GOV-VEH-215GEMAW0.09
NCAUR2009038944/6/2009CARPET-CLEAN-WWEEKLY CLEANING OF BUILDING CARPETSCTC4/2/20094/9/200932.12-HSKP0
NCAUR2016031144/1/2016GOV-VEH-BWBI-WEEKLY INSPECTION OF GOVERNMENT VEHICLES1-167PMC3/18/20164/2/201639.17GOV-VEH-224GEMAW0.09
NCAUR2016031144/1/2016GOV-VEH-BWBI-WEEKLY INSPECTION OF GOVERNMENT VEHICLES1-167PMC3/18/20164/2/201639.17GOV-VEH-251GEMAW0.09
NCAUR2016031144/1/2016GOV-VEH-BWBI-WEEKLY INSPECTION OF GOVERNMENT VEHICLES1-167PMC3/18/20164/2/201639.17GOV-VEH-970GEMAW0.09
NCAUR2016031144/1/2016GOV-VEH-BWBI-WEEKLY INSPECTION OF GOVERNMENT VEHICLES1-167PMC3/18/20164/2/201639.17GOV-VEH-973GEMAW0.09
NCAUR2016031144/1/2016GOV-VEH-BWBI-WEEKLY INSPECTION OF GOVERNMENT VEHICLES1-167PMC3/18/20164/2/201639.17GOV-VEH-981GEMAW0.09
NCAUR2016031144/1/2016GOV-VEH-BWBI-WEEKLY INSPECTION OF GOVERNMENT VEHICLES1-167PMC3/18/20164/2/201639.17GOV-VEH-985GEMAW0.09
NCAUR2016031144/1/2016GOV-VEH-BWBI-WEEKLY INSPECTION OF GOVERNMENT VEHICLES1-167PMC3/18/20164/2/201639.17GOV-VEH-986GEMAW0.09
NCAUR2016031144/1/2016GOV-VEH-BWBI-WEEKLY INSPECTION OF GOVERNMENT VEHICLES1-167PMC3/18/20164/2/201639.17GOV-VEH-988GEMAW0.09
NCAUR2016031153/21/2016GREENHOUSE-VENTS-AANNUAL LUBRICATION OF GREENHOUSE VENTS 11 TOTAL1-153PMC3/17/20163/17/201633.8GRNHSE-VENTS-0314GEMAW2
NCAUR2016031163/16/2016GRHS-FIN-TUBE-MMONTHLY ON FIN TUBE HEATING SYSTEM1-165PMC3/18/20163/29/201633.8GRHS-FIN-TUBE-0314HVAC0.5
NCAUR2016031173/21/2016GRNDS-WRK-WWEEKLY WORK ON GROUNDS1-167CTC3/14/20163/21/201636.49GEN GROUNDSGEMAW32
NCAUR2016031183/31/2016HEAT-TRANS-PAK-04-QQUARTERLY ON NMR HEAT TRANSFER PACKAGE1-001PMC3/14/20163/24/201634.16HEAT-TRANS-PAK-04-0021PIPE1
NCAUR2016031183/31/2016HEAT-TRANS-PAK-04-QQUARTERLY ON NMR HEAT TRANSFER PACKAGE1-001PMC3/14/20163/24/201634.16HWP-NMR-01PIPE1
NCAUR2016031193/21/2016ICE-MACHINE-QQUARTERLY ON ICE MACHINE'S1-159PMC3/9/20163/16/201633.8ICE-MACHINE-01HVAC1
NCAUR2016031203/21/2016ICE-MACHINE-QQUARTERLY ON ICE MACHINE'S1-159PMC3/9/20163/16/201633.8ICE-MACHINE-04HVAC1
NCAUR2016031213/21/2016ICE-MACHINE-QQUARTERLY ON ICE MACHINE'S1-159PMC3/9/20163/16/201633.8ICE-MACHINE-11HVAC1
NCAUR2016031223/21/2016ICE-MACHINE-QQUARTERLY ON ICE MACHINE'S1-159PMC3/9/20163/19/201633.9ICE-MACHINE-13HVAC1
NCAUR2016031233/21/2016ICE-MACHINE-QQUARTERLY ON ICE MACHINE'S1-159PMC3/9/20163/19/201633.9ICE-MACHINE-14HVAC1
NCAUR2016031243/21/2016ICE-MACHINE-QQUARTERLY ON ICE MACHINE'S1-159PMC3/9/20163/19/201633.9ICE-MACHINE-15HVAC1
NCAUR2016031253/21/2016ICE-MACHINE-QQUARTERLY ON ICE MACHINE'S1-159PMC3/9/20163/9/201633.8ICE-MACHINE-16HVAC1
NCAUR2016031263/21/2016INTAKE-AIR-DAMP-QQUARTERLY ON INTAKE AIR DAMPERS1-158PMC3/18/20163/25/201634.21INTAKE-AIR-DAMP-S-01-0330HVAC0.1
NCAUR2016031263/21/2016INTAKE-AIR-DAMP-QQUARTERLY ON INTAKE AIR DAMPERS1-158PMC3/18/20163/25/201634.21INTAKE-AIR-DAMP-S-02HVAC0.1
NCAUR2016031263/21/2016INTAKE-AIR-DAMP-QQUARTERLY ON INTAKE AIR DAMPERS1-158PMC3/18/20163/25/201634.21INTAKE-AIR-DAMP-S-03HVAC0.1
NCAUR2016031263/21/2016INTAKE-AIR-DAMP-QQUARTERLY ON INTAKE AIR DAMPERS1-158PMC3/18/20163/25/201634.21INTAKE-AIR-DAMP-S-04HVAC0.1
NCAUR2016031263/21/2016INTAKE-AIR-DAMP-QQUARTERLY ON INTAKE AIR DAMPERS1-158PMC3/18/20163/25/201634.21INTAKE-AIR-DAMP-S-05HVAC0.1
NCAUR2016031273/21/2016INTAKE-AIR-DAMP-SASEMI-ANNUAL ON INTAKE AIR DAMPERS1-158PMC3/18/20163/25/201634.01INTAKE-AIR-DAMP-S-01-0330HVAC0.5
NCAUR2016031283/21/2016INTAKE-AIR-DAMP-SASEMI-ANNUAL ON INTAKE AIR DAMPERS1-158PMC3/18/20163/25/201634.01INTAKE-AIR-DAMP-S-02HVAC0.5
NCAUR2016031293/21/2016INTAKE-AIR-DAMP-SASEMI-ANNUAL ON INTAKE AIR DAMPERS1-158PMC3/18/20163/25/201634.01INTAKE-AIR-DAMP-S-03HVAC0.5
NCAUR2016031303/21/2016INTAKE-AIR-DAMP-SASEMI-ANNUAL ON INTAKE AIR DAMPERS1-158PMC3/18/20163/25/201634.01INTAKE-AIR-DAMP-S-04HVAC0.5
NCAUR2016031313/16/2016INTAKE-AIR-DAMP-SASEMI-ANNUAL ON INTAKE AIR DAMPERS1-158PMC3/18/20163/25/201633.8INTAKE-AIR-DAMP-S-05HVAC0.5
NCAUR2016031324/13/2016INTAKE-AIR-DAMPS-N-QQUARTERLY ON INTAKE AIR DAMPERS1-159PMC3/16/20163/23/201633.8INTAKE-AIR-DAMP-F10HVAC0.5
NCAUR2016031324/13/2016INTAKE-AIR-DAMPS-N-QQUARTERLY ON INTAKE AIR DAMPERS1-159PMC3/16/20163/23/201633.8INTAKE-AIR-DAMP-F9HVAC0.5
NCAUR2016031333/21/2016LAM-FLOW-M-SFMONTHLY LAMINAR FLOW HOODS1-004PMC3/18/20163/29/201635.65LAM-FLOW-1118BGEMAW0.5
NCAUR2016031343/21/2016LAM-FLOW-M-SFMONTHLY LAMINAR FLOW HOODS1-004PMC3/18/20163/29/201635.65LAM-FLOW-3327GEMAW0.5
NCAUR2016031353/21/2016LIFT-TRUCK-WWEEKLY PM ON LIFT TRUCK1-167PMC3/14/20163/21/201636.49LIFT-TRUCKGEMAW0.25
NCAUR2016031363/21/2016LOBBY-LIGHT-BUG-BWCLEAN LOBBY LIGHT FIXTURES OF BUGS1-161PMC3/14/20163/21/201636.49GEN MISC TASKELEC0.5
NCAUR2016031373/21/2016MAT-CLEAN-WWEEKLY CLEANING OF BUILDING MATS2-102CTC3/14/20163/21/201636.49GEN HSKPHSKP4
NCAUR2016031383/14/2016METER-CHECKCHECK HOUR METER ON ATTACHED EQUIPMENT1-167PMC3/14/20163/21/2016311.19LIFT-TRUCKGEMAW0.06
NCAUR2016031383/14/2016METER-CHECKCHECK HOUR METER ON ATTACHED EQUIPMENT1-167PMC3/14/20163/21/2016311.19TRACTOR-JD4500GEMAW0.06
NCAUR2016031383/14/2016METER-CHECKCHECK HOUR METER ON ATTACHED EQUIPMENT1-167PMC3/14/20163/21/2016311.19TRACTOR-MOWER-EXMARKGEMAW0.06
NCAUR2016031383/14/2016METER-CHECKCHECK HOUR METER ON ATTACHED EQUIPMENT1-167PMC3/14/20163/21/2016311.19TRACTOR-MOWER-JD425GEMAW0.06
NCAUR2016031393/11/2016PMP-BH-19-MMONTHLY ON MAIN SUMP PUMP DUPLEX SYSTEM1-136PMC3/15/20163/25/201633.8PMP-BH-19STEN0.5
NCAUR2016031403/15/2016PORT-EWSS-WWEEKLY ON PORTABLE EYEWASH SAFETY SHOWER STATIONS1-145PMC3/14/20163/14/201633.8SAFETY-SHOWER-COMBO-GH100PLUM0
NCAUR2016031413/21/2016RECYCLE-PREP-WWEEKLY RECYCLE PREP1-167CTC3/18/20163/18/201634.47GEN MISC TASKGEMAW0.5
NCAUR2016031423/21/2016REF-AIR-DRY-11-WWEEKLY ON REFRIGERATED AIR DRYER HOUSE AIR1-158PMC3/14/20163/18/201634.47REF-AIR-DRY-11HVAC0.5
NCAUR2016031433/21/2016REV-OSMOSIS-03-DDAILY ON REVERSE OSMOSIS PURIFIER1-136PMC3/14/20163/24/201638.5REV-OSMOSIS-03STEN3
NCAUR2016031444/18/2016RTU-MMONTHLY ON RTU HEATING & COOLING UNITS1-158PMC3/18/20163/25/201633.8RTU-01-0314HVAC0.5
NCAUR2016031454/18/2016RTU-MMONTHLY ON RTU HEATING & COOLING UNITS1-158PMC3/18/20163/25/201633.8RTU-02-0314HVAC0.5
NCAUR2016031464/18/2016RTU-MMONTHLY ON RTU HEATING & COOLING UNITS1-158PMC3/18/20163/25/201633.8RTU-03-0314-REMOVEDHVAC0.5
NCAUR2016031474/18/2016RTU-MMONTHLY ON RTU HEATING & COOLING UNITS1-158PMC3/18/20163/25/201633.8RTU-04-0314-REMOVEDHVAC0.5
NCAUR2016031484/13/2016RTU-MMONTHLY ON RTU HEATING & COOLING UNITS1-158PMC3/18/20163/25/201633.8RTU-05-0314HVAC0.5
NCAUR2016031494/18/2016RTU-MMONTHLY ON RTU HEATING & COOLING UNITS1-158PMC3/18/20163/25/201633.8RTU-06-0314HVAC0.5
NCAUR2016031503/14/2016TEST-EQUIP-CALIB-WWEEKLY CALIBRATION OF pH TESTING EQUIPMENT1-136PMC3/14/20163/24/201633.8TEST-EQUIP-CALIBSTEN0.5
NCAUR2016031513/14/2016TRACTOR-MOWER-EXMARKWEEKLY INSPECTION OF EXMARK RIDING MOWER1-167PMC3/14/20163/21/2016311.19TRACTOR-MOWER-EXMARKGEMAW0
NCAUR2016031524/11/2016UH-102-108-QQUARTERLY ON UNIT HEATERS1-159PMC3/16/20163/23/201634.11UH-GH-102HVAC0.09
NCAUR2016031524/11/2016UH-102-108-QQUARTERLY ON UNIT HEATERS1-159PMC3/16/20163/23/201634.11UH-GH-103HVAC0.09
NCAUR2016031524/11/2016UH-102-108-QQUARTERLY ON UNIT HEATERS1-159PMC3/16/20163/23/201634.11UH-GH-104HVAC0.09
NCAUR2016031524/11/2016UH-102-108-QQUARTERLY ON UNIT HEATERS1-159PMC3/16/20163/23/201634.11UH-GH-105HVAC0.09
NCAUR2016031524/11/2016UH-102-108-QQUARTERLY ON UNIT HEATERS1-159PMC3/16/20163/23/201634.11UH-GH-106HVAC0.09
NCAUR2016031524/11/2016UH-102-108-QQUARTERLY ON UNIT HEATERS1-159PMC3/16/20163/23/201634.11UH-GH-107HVAC0.09
NCAUR2016031524/11/2016UH-102-108-QQUARTERLY ON UNIT HEATERS1-159PMC3/16/20163/23/201634.11UH-GH-108HVAC0.09
NCAUR2016031524/11/2016UH-102-108-QQUARTERLY ON UNIT HEATERS1-159PMC3/16/20163/23/201634.11UH-GH-109HVAC0.09
NCAUR2016031533/21/2016VAC-PUMP-03-DDAILY ON VACUUM PUMP1-001PMC3/14/20163/18/201634.47VAC-PUMP-03PIPE1
NCAUR2016031543/22/2016WALLS-IN-STAIRWELL-SWASH WALLS IN STAIRWELLCTC3/18/20163/18/201633.83GEN HSKPHSKP7
NCAUR2016031553/21/2016WLK-IN-CLR-01-NW-WWEEKLY PM OF COOLERS (ALARM & LIGHTS)1-161PMC3/18/20163/25/201639.17WLK-IN-FRZR-NW1ELEC0.25
NCAUR2016031563/21/2016WLK-IN-CLR-01-W-SFWEEKLY PM OF COOLERS (ALARM & LIGHTS)1-161PMC3/18/20163/25/201639.17WLK-IN-CLR-SW1ELEC0.25
NCAUR2016031573/21/2016WLK-IN-CLR-01-W-SFWEEKLY PM OF COOLERS (ALARM & LIGHTS)1-161PMC3/18/20163/18/201634.47WLK-IN-FRZR-SW2ELEC0.25
NCAUR2016031583/22/2016WLK-IN-CLR-02-W-SFWEEKLY PM OF WALK IN COOLERS1-165PMC3/17/20163/17/201633.8WLK-IN-CLR-0115AHVAC0.5
NCAUR2016031593/22/2016WLK-IN-CLR-02-W-SFWEEKLY PM OF WALK IN COOLERS1-165PMC3/17/20163/17/201633.8WLK-IN-CLR-0115BHVAC0.5
NCAUR2016031603/22/2016WLK-IN-CLR-02-W-SFWEEKLY PM OF WALK IN COOLERS1-165PMC3/17/20163/24/201638.5WLK-IN-CLR-SW1HVAC0.5
NCAUR2016031613/22/2016WLK-IN-CLR-02-W-SFWEEKLY PM OF WALK IN COOLERS1-165PMC3/17/20163/24/201638.5WLK-IN-FRZR-0102HVAC0.5
NCAUR2016031623/22/2016WLK-IN-CLR-02-W-SFWEEKLY PM OF WALK IN COOLERS1-165PMC3/17/20163/24/201638.5WLK-IN-FRZR-NW1HVAC0.5
NCAUR2016031633/22/2016WLK-IN-CLR-02-W-SFWEEKLY PM OF WALK IN COOLERS1-165PMC3/17/20163/24/201638.5WLK-IN-FRZR-SW2HVAC0.5
NCAUR2016031643/16/2016WTR-SOFT-02-AANNUAL ON DUPLEX WATER SOFTNERPMC3/17/20163/24/201633.8WTR-SOFT-0201STEN4
NCAUR2016031653/21/2016WTR-SOFT-DDAILY ON WATER SOFTNER SYSTEMS1-136PMC3/14/20163/19/201635.14WTR-SOFT-0201STEN0.5
NCAUR2016031653/21/2016WTR-SOFT-DDAILY ON WATER SOFTNER SYSTEMS1-136PMC3/14/20163/19/201635.14WTR-SOFT-BH1STEN0.5
NCAUR2016031653/21/2016WTR-SOFT-DDAILY ON WATER SOFTNER SYSTEMS1-136PMC3/14/20163/19/201635.14WTR-SOFT-COLUMN "E"STEN0.5
NCAUR2016031663/21/2016WTR-TEST-BOILERS-DDAILY BOILER WATER CHEMISTRY TESTING1-136PMC3/14/20163/21/201636.49BOILER-01STEN0.33
NCAUR2016031663/21/2016WTR-TEST-BOILERS-DDAILY BOILER WATER CHEMISTRY TESTING1-136PMC3/14/20163/21/201636.49BOILER-03STEN0.33
NCAUR2016031663/21/2016WTR-TEST-BOILERS-DDAILY BOILER WATER CHEMISTRY TESTING1-136PMC3/14/20163/21/201636.49TEST-EQUIP-CALIBSTEN0.33
NCAUR2016031673/21/2016WTR-TEST-TOWERS-DDAILY TOWER WATER CHEMISTRY TESTING1-136PMC3/14/20163/18/201634.47COOL-TWR-01STEN0.33
NCAUR2016031673/21/2016WTR-TEST-TOWERS-DDAILY TOWER WATER CHEMISTRY TESTING1-136PMC3/14/20163/18/201634.47COOL-TWR-02STEN0.33
NCAUR2016031673/21/2016WTR-TEST-TOWERS-DDAILY TOWER WATER CHEMISTRY TESTING1-136PMC3/14/20163/18/201634.47COOL-TWR-04STEN0.33
NCAUR2016031673/21/2016WTR-TEST-TOWERS-DDAILY TOWER WATER CHEMISTRY TESTING1-136PMC3/14/20163/18/201634.47COOL-TWR-05STEN0.33
NCAUR2016031673/21/2016WTR-TEST-TOWERS-DDAILY TOWER WATER CHEMISTRY TESTING1-136PMC3/14/20163/18/201634.47PMP-CHEM-TWR-04STEN0.33
NCAUR2016031673/21/2016WTR-TEST-TOWERS-DDAILY TOWER WATER CHEMISTRY TESTING1-136PMC3/14/20163/18/201634.47WTR-TREAT-12STEN0.33
NCAUR2016031683/11/2016AIR-COMP-03-WWEEKLY ON AIR COMPRESSOR1-001PMC3/14/20163/21/201633.8AIR-COMP-03-0330PIPE1
NCAUR2016031695/10/2016FILT-CHANGE-04-Q1ST, 2ND & 3RD FLOOR SOUTH WING FILTER INSPECTION1-161PMC3/18/20163/29/201633.8RM-FILTERSGEMAW7.33
NCAUR2016031695/10/2016FILT-CHANGE-04-Q1ST, 2ND & 3RD FLOOR SOUTH WING FILTER INSPECTION1-161PMC3/18/20163/29/201633.8RM-FILTERSGEMAW7.33
NCAUR2016031695/10/2016FILT-CHANGE-04-Q1ST, 2ND & 3RD FLOOR SOUTH WING FILTER INSPECTION1-161PMC3/18/20163/29/201633.8RM-FILTERSGEMAW7.33
NCAUR2016031703/14/2016CM SAFETY INSTRUCTROOM 1116 CENTER WING EXHAUST WEST HOOD IN FAULTCMC3/11/20163/25/201633.8VFD-CW-ATTIC-EF1GHVAC0
NCAUR2016031713/29/2016CM SAFETY INSTRUCTBUILDING 005 INTERIOR FLOOR NEED REPAIRED AT ENTRANCE DOOR NORTH SIDECMC3/11/20163/25/201633.99GEN ARCH & STRUCGEMAW0
NCAUR2016031723/22/2016CM SAFETY INSTRUCTREPLACE BOOT SCRAPER AT WEST SIDE OF GREENHOUSECMC3/11/20163/25/201633.99GEN ARCH & STRUCGEMAW0
NCAUR2016031733/15/2016CM SAFETY INSTRUCTROOM 2057 IS TOO COLDCMC3/11/20163/25/201633.8ASU-A-01-0056HVAC0
NCAUR2016031743/14/2016CM SAFETY INSTRUCTROOM 2057 LIGHTS OUTCMC3/11/20163/25/201633.8GEN ELECELEC0
NCAUR2016031753/14/2016CM SAFETY INSTRUCTROOM 1120 UV LIGHT OUT ON BIO HOODCMC3/11/20163/25/201633.8BIO-HOOD-1120-AELEC0
NCAUR2016031765/11/2016ADDITIONAL WORKROOM 0037 FUME HOOD DID NOT PASS CERTIFIFCATIONCMC3/11/20163/25/201633.8GEN MISC TASKGEMAW0
NCAUR2016031775/16/2016CM SAFETY INSTRUCTROOM 0037 FIX HANDLES ON FLAMMABLE CHEMICAL CABINETSCMC3/11/20163/25/201633.8GEN ARCH & STRUCGEMAW0
NCAUR2016031783/21/2016CM SAFETY INSTRUCTEMPTIED SCRAP METAL BINCMC3/11/20163/25/201633.99GEN MISC TASKGEMAW0
NCAUR2016031793/15/2016CM SAFETY INSTRUCTTRAINING ON NEW VACUUM PUMPCMC3/11/20163/25/201633.8GENERALPIPE0
NCAUR2016031803/16/2016CM SAFETY INSTRUCTNW WALK IN FREEZER OUT OF RANGECMC3/14/20163/28/201633.8WLK-IN-FRZR-NW1HVAC0
NCAUR2016031813/16/2016CM SAFETY INSTRUCTBUILDING 008 TEMP LOWCMC3/14/20163/28/201633.8GEN HVAC & REFHVAC0
NCAUR2016031823/15/2016CM SAFETY INSTRUCTROOM 0009 EYEWASH SAFETY SHOWER LOW FLOWCMC3/14/20163/28/201633.8SAFETY SHOWER COMBO 0009PLUM0
NCAUR2016031835/2/2016CM SAFETY INSTRUCT2ND FLOOR MOP SINK BY RESTROOM 2001 DRAIN STINKSCMC3/14/20163/28/201633.8GEN PLUM & PIPEPLUM0
NCAUR2016031843/15/2016CM SAFETY INSTRUCTROOM 3309 FILTER HOUSING ON WEST STEAM LINE LEAKINGCMC3/14/20163/28/201633.8GEN PLUM & PIPEPIPE0
NCAUR2016031853/16/2016CM SAFETY INSTRUCTROOM 2041 CHANGE CLOCKSCMC3/21/20163/28/201633.96GEN MISC TASKGEMAW0
NCAUR2016031863/21/2016CM SAFETY INSTRUCTROOM 0330 REPLACE VACUUM GAUGECMC3/14/20163/28/201634.06GEN PLUM & PIPEPIPE0
NCAUR2016031873/16/2016CM SAFETY INSTRUCTROOM 1106A AUTOCLAVE LEAKCMC3/14/20163/28/201633.8AUTCLVE-1106APIPE0
NCAUR2016031883/21/2016CM SAFETY INSTRUCTROOM 0042 INTERIOR OF ROOM NEEDS CLEANED (MUD DAUBER NESTS)CMC3/14/20163/28/201634.06GEN MISC TASKGEMAW0
NCAUR2016031893/15/2016CM SAFETY INSTRUCTNW HANDICAP RAMP DOOR NEEDS LOCK LOOKED ATCMC3/14/20163/28/201633.8GEN ARCH & STRUCELEC0
NCAUR2016031903/21/2016CM SAFETY INSTRUCTROOM 1309 NEED HVAC TO LOOK AT TEMP TO CHILLERAW-NO CHRC3/14/20163/28/201634.06GEN HVAC & REFHVAC0
NCAUR2016031913/16/2016CM SAFETY INSTRUCTCLEAN STRAINERS ON SW COOLING TOWER PUMPSCMC3/15/20163/29/201633.8PMP-TWR-LOOP-01HVAC0
NCAUR2016031913/16/2016CM SAFETY INSTRUCTCLEAN STRAINERS ON SW COOLING TOWER PUMPSCMC3/15/20163/29/201633.8PMP-TWR-LOOP-02HVAC0
NCAUR2016031913/16/2016CM SAFETY INSTRUCTCLEAN STRAINERS ON SW COOLING TOWER PUMPSCMC3/15/20163/29/201633.8PMP-TWR-LOOP-03HVAC0
NCAUR2016031913/16/2016CM SAFETY INSTRUCTCLEAN STRAINERS ON SW COOLING TOWER PUMPSCMC3/15/20163/29/201633.8PMP-TWR-LOOP-04HVAC0
NCAUR2016031924/26/2016CM SAFETY INSTRUCTREPLACE DOOR SEAL AND CLEAN WALL AROUND DIFFUSERCMC3/15/20163/29/201633.8GEN ARCH & STRUCGEMAW0
NCAUR2016031933/31/2016CM SAFETY INSTRUCTROOM 2218 REPAIR INSULATIONCMC3/15/20163/29/201634.08GEN PLUM & PIPEPIPE0
NCAUR2016031943/16/2016CM SAFETY INSTRUCT2ND FLOOR ADMIN WING TEMPERATURE APPROACHING 78CMC3/15/20163/29/201633.8GEN HVAC & REFHVAC0
NCAUR2016031953/21/2016CM SAFETY INSTRUCTROOM 3014 LIGHT OUT JUST INSIDE THE DOORCMC3/16/20163/30/201634.11GEN ELECELEC0
NCAUR2016031963/21/2016CM SAFETY INSTRUCTROOM 3004 ADJUST DOOR CLOSURECMC3/16/20163/30/201634.11GEN ARCH & STRUCGEMAW0
NCAUR2016031974/27/2016CM SAFETY INSTRUCTROOM 0019 NMR HUMIDITY TOO HIGHCMC3/16/20163/30/201633.8AHU-NMR-01-0019CHVAC0
NCAUR2016031974/27/2016CM SAFETY INSTRUCTROOM 0019 NMR HUMIDITY TOO HIGHCMC3/16/20163/30/201633.8ASU-A-10-0019HVAC0
NCAUR2016031983/21/2016CM SAFETY INSTRUCTROOM 2313A LIGHT OUTCMC3/16/20163/30/201634.11GEN ELECELEC0
NCAUR2016031993/24/2016CM SAFETY INSTRUCTROOM 2303 REPLACE DOOR GASKET IN AUTOCLAVECMC3/16/20163/30/201634.11AUTCLVE-2303PIPE0
NCAUR2016032003/28/2016CM SAFETY INSTRUCTEXHAUST STACK HAS PULLED FREE FROM ITS ANCHORSCMC3/16/20163/30/201634.11GEN ARCH & STRUCELEC0
NCAUR2016032013/21/2016CM SAFETY INSTRUCTROOM 1325 MENS RESTROOM SOUTH STALL TOILET WILL NOT FLUSHCMC3/17/20163/31/201634.13GEN PLUM & PIPEPLUM0
NCAUR2016032023/21/2016CM SAFETY INSTRUCTHALLWAY OUTSIDE ROOM 2046 LIGHT IS OUTCMC3/17/20163/31/201634.13GEN ELECELEC0
NCAUR2016032033/23/2016CM SAFETY INSTRUCTROOM 0117 CENTER WING HOT WATER SYSTEM AT 114 DEGREES CHECK TEMPCMC3/17/20163/31/201634.13HWP-01-0117PIPE0
NCAUR2016032043/21/2016CM SAFETY INSTRUCTCENTER WING ENTRANCE TO BUILDING DOOR WILL NOT AUTOMATICALLY OPENCMC3/17/20163/31/201634.13GEN ELECELEC0
NCAUR2016032053/21/2016CM SAFETY INSTRUCTTIRE ON TRAILER TONGUE JACK NEEDS FIXEDCMC3/17/20163/31/201634.13GEN GROUNDSGEMAW0
NCAUR2016032063/23/2016CM SAFETY INSTRUCTCHANGE TIRES ON GENERATORCMC3/17/20163/31/201634.13GEN GROUNDSGEMAW0
NCAUR2016032074/8/2016AC-UNIT-N-MMONTHLY ON HANGING AC EVAPORATOR UNIT1-165PMC3/22/20163/29/201635.65AC-UNIT-N-02-3205HVAC0.47
NCAUR2016032084/8/2016AC-UNIT-N-MMONTHLY ON HANGING AC EVAPORATOR UNIT1-165PMC3/22/20163/29/201635.65AC-UNIT-N-04-2205HVAC0.47
NCAUR2016032094/8/2016AC-UNIT-N-MMONTHLY ON HANGING AC EVAPORATOR UNIT1-165PMC3/22/20163/29/201635.65EVAPORATOR UNIT EASHVAC0.47
NCAUR2016032104/8/2016AC-UNIT-N-MMONTHLY ON HANGING AC EVAPORATOR UNIT1-165PMC3/22/20163/29/201635.65EVAPORATOR UNIT EASTHVAC0.47
NCAUR2016032113/24/2016ACC-CONT-COMP-MMONTHLY ON ACCESS CONTROL COMPUTER3-011PMC3/22/20163/24/201634.88ACS-MAINGRD1
NCAUR2016032123/28/2016AIR-COMP-01-MMONTHLY ON AIR COMPRESSOR1-001PMC3/21/20163/31/201636.15AIR-COMP-01-0330PIPE2
NCAUR2016032133/28/2016AIR-COMP-02-WWEEKLY ON AIR COMPRESSOR1-001PMC3/21/20163/28/2016311.19AIR-COMP-02-0330PIPE1
NCAUR2016032143/23/2016AIR-COMP-03-WWEEKLY ON AIR COMPRESSOR1-001PMC3/21/20163/28/2016311.19AIR-COMP-03-0330PIPE1
NCAUR2016032153/28/2016AIR-COMP-05-MMONTHLY ON AIR COMPRESSOR1-001PMC3/21/20163/31/201636.15AIR-COMP-05-ATTICPIPE1.25
NCAUR2016032163/24/2016AIR-COMP-06-WWEEKLY ON AIR COMPRESSOR1-001PMC3/21/20163/28/2016311.19AIR-COMP-06-BLDG003PIPE1
NCAUR2016032174/18/2016AIR-DAMPERS-QQUARTERLY PM OF INTAKE & EXHAUST AIR DAMPERS1-158PMC3/23/20163/30/201633.8AIR-DAMPER-0314HVAC2.82
NCAUR2016032184/21/2016AP-H-SASEMI-ANNUAL ON AIR PURIFIER HUMIDIFIER CEILING UNITS1-159PMC3/23/20163/30/201633.8AP-H-001-2300HVAC0.25
NCAUR2016032194/21/2016AP-H-SASEMI-ANNUAL ON AIR PURIFIER HUMIDIFIER CEILING UNITS1-159PMC3/23/20163/30/201633.8AP-H-002-2302HVAC0.25
NCAUR2016032204/25/2016AP-H-SASEMI-ANNUAL ON AIR PURIFIER HUMIDIFIER CEILING UNITS1-159PMC3/23/20163/30/201633.8AP-H-007-1322HVAC0.25
NCAUR2016032214/25/2016AP-H-SASEMI-ANNUAL ON AIR PURIFIER HUMIDIFIER CEILING UNITS1-159PMC3/23/20163/30/201633.8AP-H-008-1326HVAC0.25
NCAUR2016032223/24/2016BH-HKP-DDAILY BOILERHOUSE HOUSEKEEPING1-136PMC3/21/20163/31/2016313.2GEN BHSTEN1
NCAUR2016032233/21/2016BLDG-003-HSKPWEEKLY TRASH REMOVAL & CLEAN FLOOR IN SEMI-WORKS & SERVICE BUILDING1-167CTC3/21/20163/28/2016311.19GEN MISC TASKGEMAW0.5
NCAUR2016032233/21/2016BLDG-003-HSKPWEEKLY TRASH REMOVAL & CLEAN FLOOR IN SEMI-WORKS & SERVICE BUILDING1-167CTC3/21/20163/28/2016311.19GEN MISC TASKGEMAW0.5
NCAUR2016032243/28/2016BLOWER/VAC-MMONTHLY ON BLOWER/VACUUM-011-167PMC3/26/20164/6/201636.89BLOWER/VAC-01GEMAW0.5
NCAUR2016032253/28/2016BOILER-01-DDAILY INSPECTION OF BOILER #11-136PMC3/23/20164/2/2016314.54BOILER-01STEN6
NCAUR2016032263/24/2016BOILER-01-WWEEKLY INSPECTION OF BOILER #11-136PMC3/21/20163/31/2016313.2BOILER-01STEN1
NCAUR2016032273/28/2016BOILER-03-DDAILY INSPECTION OF BOILER #31-136PMC3/25/20164/5/2016316.56BOILER-03STEN6
NCAUR2016032283/24/2016BOILER-03-WWEEKLY INSPECTION OF BOILER #31-136PMC3/25/20164/5/2016316.56BOILER-03STEN1
NCAUR2016032293/28/2016CARPET-CLEAN-WWEEKLY CLEANING OF BUILDING CARPETS2-102CTC3/21/20163/28/2016311.19GEN HSKPHSKP0.05
NCAUR2016032303/24/2016CCTV-SYS-WWEEKLY ON CCTV SYSTEM3-011PMC3/21/20163/25/201639.17CCTV-KYBRD-JOYSTK-01GRD0.13
NCAUR2016032303/24/2016CCTV-SYS-WWEEKLY ON CCTV SYSTEM3-011PMC3/21/20163/25/201639.17CCTV-MONITOR-02GRD0.13
NCAUR2016032303/24/2016CCTV-SYS-WWEEKLY ON CCTV SYSTEM3-011PMC3/21/20163/25/201639.17CCTV-MONITOR-05GRD0.13
NCAUR2016032303/24/2016CCTV-SYS-WWEEKLY ON CCTV SYSTEM3-011PMC3/21/20163/25/201639.17CCTV-MUX-REC-01GRD0.13
NCAUR2016032313/28/2016CHILLER-01-02-03-WWEEKLY ON CHILLER #1 & #2 & #31-001PMC3/21/20163/25/201639.17CHILLER-01HVAC0.5
NCAUR2009038944/6/2009CARPET-CLEAN-WWEEKLY CLEANING OF BUILDING CARPETSCTC4/2/20094/9/200932.12-HSKP0
NCAUR2016032323/28/2016CHILLER-01-02-03-WWEEKLY ON CHILLER #1 & #2 & #31-001PMC3/21/20163/28/2016311.19CHILLER-02HVAC0.5
NCAUR2016032333/28/2016CHILLER-01-02-03-WWEEKLY ON CHILLER #1 & #2 & #31-001PMC3/21/20163/28/2016311.19CHILLER-03HVAC0.5
NCAUR2016032343/22/2016CHILLER-05-WWEEKLY ON CHILLER #51-158PMC3/21/20163/28/2016311.19CHILLER-05HVAC1
NCAUR2016032355/9/2016CLEAN-MILLBLD-BLDG10GENERAL CLEANING OF MILLING BLDG AND BUILDING 102-028CTC3/22/20164/6/201633.8GEN HSKPHSKP1.25
NCAUR2016032355/9/2016CLEAN-MILLBLD-BLDG10GENERAL CLEANING OF MILLING BLDG AND BUILDING 102-028CTC3/22/20164/6/201633.8GEN HSKPHSKP1.25
NCAUR2016032363/22/2016COMP-AIR-FILT-1-WWEEKLY ON REFRIGERATED AIR DRYER1-158PMC3/22/20163/29/2016311.86AIR-FILT/DRY-0329HVAC0.5
NCAUR2016032375/3/2016COND-AIR-COOL-M ROOFMONTHLY ON CONDENSING UNITS 04, 14, 15, 17, 18, 19, 20, 211-165PMC3/22/20164/1/201633.8COND-AIR-COOL-04HVAC0.03
NCAUR2016032375/3/2016COND-AIR-COOL-M ROOFMONTHLY ON CONDENSING UNITS 04, 14, 15, 17, 18, 19, 20, 211-165PMC3/22/20164/1/201633.8COND-AIR-COOL-14HVAC0.03
NCAUR2016032375/3/2016COND-AIR-COOL-M ROOFMONTHLY ON CONDENSING UNITS 04, 14, 15, 17, 18, 19, 20, 211-165PMC3/22/20164/1/201633.8COND-AIR-COOL-15HVAC0.03
NCAUR2016032375/3/2016COND-AIR-COOL-M ROOFMONTHLY ON CONDENSING UNITS 04, 14, 15, 17, 18, 19, 20, 211-165PMC3/22/20164/1/201633.8COND-AIR-COOL-17HVAC0.03
NCAUR2016032375/3/2016COND-AIR-COOL-M ROOFMONTHLY ON CONDENSING UNITS 04, 14, 15, 17, 18, 19, 20, 211-165PMC3/22/20164/1/201633.8COND-AIR-COOL-18HVAC0.03
NCAUR2016032375/3/2016COND-AIR-COOL-M ROOFMONTHLY ON CONDENSING UNITS 04, 14, 15, 17, 18, 19, 20, 211-165PMC3/22/20164/1/201633.8COND-AIR-COOL-19HVAC0.03
NCAUR2016032375/3/2016COND-AIR-COOL-M ROOFMONTHLY ON CONDENSING UNITS 04, 14, 15, 17, 18, 19, 20, 211-165PMC3/22/20164/1/201633.8COND-AIR-COOL-20HVAC0.03
NCAUR2016032375/3/2016COND-AIR-COOL-M ROOFMONTHLY ON CONDENSING UNITS 04, 14, 15, 17, 18, 19, 20, 211-165PMC3/22/20164/1/201633.8COND-AIR-COOL-21HVAC0.03
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8EYEWASH-BLDG001PLUM0.01
NCAUR2009038944/6/2009CARPET-CLEAN-WWEEKLY CLEANING OF BUILDING CARPETSCTC4/2/20094/9/200932.12-HSKP0
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8EYEWASH-BLDG002-APLUM0.01
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8EYEWASH-BLDG002-BPLUM0.01
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8EYEWASH-BLDG002-CPLUM0.01
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8EYEWASH-BLDG002-DPLUM0.01
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8EYEWASH-BLDG002-EPLUM0.01
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8SAFETY SHOWER COMBO 0009PLUM0.01
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8SAFETY-SHOWER-0037PLUM0.01
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8SAFETY-SHOWER-2328PLUM0.01
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8SAFETY-SHOWER-BLDG001PLUM0.01
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8SAFETY-SHOWER-BLDG002-APLUM0.01
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8SAFETY-SHOWER-BLDG002-BPLUM0.01
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8SAFETY-SHOWER-BLDG002-CPLUM0.01
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8SAFETY-SHOWER-COMBO-0104PLUM0.01
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8SAFETY-SHOWER-COMBO-0330PLUM0.01
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8SAFETY-SHOWER-COMBO-BLDG003PLUM0.01
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8SAFETY-SHOWER-COMBO-BLDG10PLUM0.01
NCAUR2016032384/27/2016CONTR-SAFETY-INSP-MMONTHLY INSPECTION OF CONTRACTOR CONTROLLED SAFETY EQUIPMENT1-145CT-SAFETYC3/25/20164/7/201633.8SAFETY-SHOWER-COMBO2-BLDG003PLUM0.01
NCAUR2016032393/21/2016COOL-TWR-01-05-MMONTHLY ON COOLING TOWER 01-051-158PMC3/21/20163/28/2016311.19COOL-TWR-02HVAC1
NCAUR2016032403/21/2016COOL-TWR-01-05-WWEEKLY ON COOLING TOWER 01-051-158PMC3/21/20163/28/2016311.19COOL-TWR-03HVAC0.5
NCAUR2016032413/22/2016COOL-TWR-01-05-WWEEKLY ON COOLING TOWER 01-051-158PMC3/21/20163/28/2016311.19COOL-TWR-05HVAC0.5
NCAUR2016032423/23/2016COOL-TWR-01-05-WWEEKLY ON COOLING TOWER 01-051-158PMC3/23/20163/30/2016312.53COOL-TWR-01HVAC0.5
NCAUR2016032433/23/2016COOL-TWR-01-05-WWEEKLY ON COOLING TOWER 01-051-158PMC3/23/20163/30/2016312.53COOL-TWR-02HVAC0.5
NCAUR2016032443/23/2016COOL-TWR-01-05-WWEEKLY ON COOLING TOWER 01-051-158PMC3/23/20163/30/2016312.53COOL-TWR-04HVAC0.5
NCAUR2016032453/23/2016COOL-TWR-01-06-WWEEKLY ON CONDENSER WATER PUMP 01 - 061-158PMC3/22/20163/29/2016311.86COND-WTR-PUMP-05HVAC0.25
NCAUR2016032463/23/2016COOL-TWR-01-06-WWEEKLY ON CONDENSER WATER PUMP 01 - 061-158PMC3/22/20163/29/2016311.86COND-WTR-PUMP-06HVAC0.25
NCAUR2016032473/23/2016COOL-TWR-01-06-WWEEKLY ON CONDENSER WATER PUMP 01 - 061-158PMC3/23/20163/30/2016312.53COND-WTR-PUMP-01HVAC0.25
NCAUR2016032483/23/2016COOL-TWR-01-06-WWEEKLY ON CONDENSER WATER PUMP 01 - 061-158PMC3/23/20163/30/2016312.53COND-WTR-PUMP-02HVAC0.25
NCAUR2016032493/23/2016COOL-TWR-01-06-WWEEKLY ON CONDENSER WATER PUMP 01 - 061-158PMC3/23/20163/30/2016312.53COND-WTR-PUMP-03HVAC0.25
NCAUR2016032503/23/2016COOL-TWR-01-06-WWEEKLY ON CONDENSER WATER PUMP 01 - 061-158PMC3/23/20163/23/201637.83COND-WTR-PUMP-04HVAC0.25
NCAUR2016032515/20/2016COOL-TWR-05-SASEMI-ANNUAL ON COOLING TOWER #51-158PMC3/26/20164/2/201633.8COOL-TWR-04HVAC16
NCAUR2016032523/28/2016CRAM-A-LOT-WWEEKLY ON CRAM-A-LOT TRASH COMPACTOR1-167PMC3/24/20163/31/2016313.2CRAM-A-LOT-TRSH-CMPTRGEMAW1
NCAUR2016032533/23/2016DEAERATOR-01-MMONTHLY INSPECTION OF DEAERATOR #11-136PMC3/25/20164/5/201636.99DEAERATOR-01STEN2
NCAUR2016032543/22/2016DIRT TRAP-SASEMI-ANNUAL ON POTTING SINK DIRT TRAP1-145PMC3/23/20163/30/201634.13DIRT-TRAP-0314PLUM2
NCAUR2016032553/21/2016DRYER-02-QQUARTERLY CHECK ON DRYER1-134PMC3/23/20163/30/201634.47DRYER-02-0021ELEC1
NCAUR2016032563/28/2016ELEV-ALRM-M-SFMONTHLY INSPECTION OF ELEVATOR ALARM SYSTEM1-161PMC3/22/20163/29/201635.65ELEVATOR-01ELEC0.1
NCAUR2016032563/28/2016ELEV-ALRM-M-SFMONTHLY INSPECTION OF ELEVATOR ALARM SYSTEM1-161PMC3/22/20163/29/201635.65ELEVATOR-02ELEC0.1
NCAUR2016032563/28/2016ELEV-ALRM-M-SFMONTHLY INSPECTION OF ELEVATOR ALARM SYSTEM1-161PMC3/22/20163/29/201635.65ELEVATOR-03ELEC0.1
NCAUR2016032563/28/2016ELEV-ALRM-M-SFMONTHLY INSPECTION OF ELEVATOR ALARM SYSTEM1-161PMC3/22/20163/29/201635.65ELEVATOR-06ELEC0.1
NCAUR2016032563/28/2016ELEV-ALRM-M-SFMONTHLY INSPECTION OF ELEVATOR ALARM SYSTEM1-161PMC3/22/20163/29/201635.65ELEVATOR-08ELEC0.1
NCAUR2016032573/22/2016EM-GEN-BLD-10-M-SFMONTHLY ON BLDG 10 EMERGENCY GENERATOR1-134PMC3/25/20164/28/2016310.28EM-GEN-BLDG010ELEC2
NCAUR2016032583/31/2016EM-LIGHT-M-SFMONTHLY INSPECTION OF EMERGENCY LIGHTS (63 TOTAL)1-004PMC3/22/20163/29/201635.65EM-LIGHTSELEC4
NCAUR2016032593/23/2016ETH-BIO-TANK-M-SFMONTHLY ON ETHANOL AND BIO-DIESEL STORAGE TANK1-167PMC3/22/20163/29/201635.65ETH-TANK-01GEMAW0.25
NCAUR2016032603/31/2016EX-FAN-BLD12-QQUARTERLY ON OUTSIDE AIR VENTILATION FANS1-004PMC3/23/20164/26/201635.86EX-FAN-BLD11AGEMAW0.19
NCAUR2016032603/31/2016EX-FAN-BLD12-QQUARTERLY ON OUTSIDE AIR VENTILATION FANS1-004PMC3/23/20164/26/201635.86EX-FAN-BLD11BGEMAW0.19
NCAUR2016032603/31/2016EX-FAN-BLD12-QQUARTERLY ON OUTSIDE AIR VENTILATION FANS1-004PMC3/23/20164/26/201635.86EX-FAN-BLD12AGEMAW0.19
NCAUR2016032603/31/2016EX-FAN-BLD12-QQUARTERLY ON OUTSIDE AIR VENTILATION FANS1-004PMC3/23/20164/26/201635.86EX-FAN-BLD12BGEMAW0.19
NCAUR2016032613/21/2016EX-FAN-CHEM-MTX-MMONTHLY ON EXHAUST FANS1-134PMC3/25/20164/5/201636.73EX-FAN-CHEMST-1ELEC0.25
NCAUR2016032613/21/2016EX-FAN-CHEM-MTX-MMONTHLY ON EXHAUST FANS1-134PMC3/25/20164/5/201636.73EX-FAN-CHEMST-2ELEC0.25
NCAUR2016032613/21/2016EX-FAN-CHEM-MTX-MMONTHLY ON EXHAUST FANS1-134PMC3/25/20164/5/201636.73EX-FAN-CHEMST-3ELEC0.25
NCAUR2016032613/21/2016EX-FAN-CHEM-MTX-MMONTHLY ON EXHAUST FANS1-134PMC3/25/20164/5/201636.73EX-FAN-MYTOXELEC0.25
NCAUR2016032623/22/2016EX-FAN-RANGE-QQUARTERLY ON RANGE HOOD EXHAUST FANS1-134PMC3/23/20163/30/201634.47EX-FAN-RANGE-HD-01ELEC0.75
NCAUR2016032623/22/2016EX-FAN-RANGE-QQUARTERLY ON RANGE HOOD EXHAUST FANS1-134PMC3/23/20163/30/201634.47EX-FAN-RANGE-HD-02ELEC0.75
NCAUR2016032623/22/2016EX-FAN-RANGE-QQUARTERLY ON RANGE HOOD EXHAUST FANS1-134PMC3/23/20163/30/201634.47EX-FAN-RANGE-HD-03ELEC0.75
NCAUR2016032633/31/2016EX-FAN-SW-E-I-QQUARTERLY ON EXHAUST FANS BAYS E-I1-004PMC3/21/20163/31/201634.52EX-FAN-SW-24GEMAW0.15
NCAUR2016032633/31/2016EX-FAN-SW-E-I-QQUARTERLY ON EXHAUST FANS BAYS E-I1-004PMC3/21/20163/31/201634.52EX-FAN-SW-25GEMAW0.15
NCAUR2016032633/31/2016EX-FAN-SW-E-I-QQUARTERLY ON EXHAUST FANS BAYS E-I1-004PMC3/21/20163/31/201634.52EX-FAN-SW-26GEMAW0.15
NCAUR2016032633/31/2016EX-FAN-SW-E-I-QQUARTERLY ON EXHAUST FANS BAYS E-I1-004PMC3/21/20163/31/201634.52EX-FAN-SW-42GEMAW0.15
NCAUR2016032633/31/2016EX-FAN-SW-E-I-QQUARTERLY ON EXHAUST FANS BAYS E-I1-004PMC3/21/20163/31/201634.52EX-FAN-SW-50GEMAW0.15
NCAUR2016032643/28/2016EXH FILTERS-008-MMONTHLY ON EXHAUST FILTERS DIFFERENTIAL PRESSURE READING-BLDG 0081-004PMC3/22/20164/1/201636.12EX-FILTERS - BLDG 008GEMAW0.5
NCAUR2016032653/31/2016EXIT-LIGHT-INSP-M-SFMONTHLY INSPECTION OF EXIT LIGHTS (163 TOTAL)1-004PMC3/22/20163/29/201635.65EXIT-LIGHTSGEMAW4
NCAUR2016032663/23/2016EXT-LGTS-WWEEKLY INSPECTION ON EXTERIOR BUILDING LIGHTS3-011CTC3/21/20163/28/2016311.19EXT-LGHTSGRD0.75
NCAUR2016032673/31/2016FIRE-DOOR-M-SFMONTHLY PM OF ALL FIRE DOORS1-004PMC3/22/20164/7/201637.04FIRE DOORSGEMAW1
NCAUR2016032683/30/2016FIRE-HYDRANT-M-SFMONTHLY ON FIRE HYDRANTS1-001PMC3/22/20164/1/201636.12FIRE-HYDRANT-02PIPE0.1
NCAUR2016032683/30/2016FIRE-HYDRANT-M-SFMONTHLY ON FIRE HYDRANTS1-001PMC3/22/20164/1/201636.12FIRE-HYDRANT-03PIPE0.1
NCAUR2016032683/30/2016FIRE-HYDRANT-M-SFMONTHLY ON FIRE HYDRANTS1-001PMC3/22/20164/1/201636.12FIRE-HYDRANT-04PIPE0.1
NCAUR2016032683/30/2016FIRE-HYDRANT-M-SFMONTHLY ON FIRE HYDRANTS1-001PMC3/22/20164/1/201636.12FIRE-HYDRANT-05PIPE0.1
NCAUR2016032683/30/2016FIRE-HYDRANT-M-SFMONTHLY ON FIRE HYDRANTS1-001PMC3/22/20164/1/201636.12FIRE-HYDRANT-06PIPE0.1
NCAUR2016032693/21/2016FL-SCRUB-01-QQUARTERLY ON FLOOR SCRUBBER1-134PMC3/23/20163/30/201634.47FL-SCRUB-01ELEC1
NCAUR2016032703/22/2016FUEL-OIL-TANK-M-SFMONTHLY UST INSPECTION3-011PMC3/22/20163/24/201634.88FUEL-OIL-TANK-02GRD0.25
NCAUR2016032703/22/2016FUEL-OIL-TANK-M-SFMONTHLY UST INSPECTION3-011PMC3/22/20163/24/201634.88FUEL-OIL-TANK-03GRD0.25
NCAUR2016032713/21/2016FUEL-OIL-TANK-W-SFWEEKLY FUEL OIL LEVEL CHECK1-136PMC3/22/20163/29/2016311.86FUEL-OIL-TANK-02STEN0.25
NCAUR2016032713/21/2016FUEL-OIL-TANK-W-SFWEEKLY FUEL OIL LEVEL CHECK1-136PMC3/22/20163/29/2016311.86FUEL-OIL-TANK-03STEN0.25
NCAUR2016032724/13/2016GRNDS-WRK-WWEEKLY WORK ON GROUNDS1-167CTC3/21/20163/28/201633.8GEN GROUNDSGEMAW32
NCAUR2016032734/7/2016HUM-N-01-N-07-SASEMI-ANNUAL ON STEAM INJECTION HUMIDIFIERS1-001PMC3/25/20164/1/201634.19HUMIDIFIER-N-01-0223PIPE0.07
NCAUR2016032734/7/2016HUM-N-01-N-07-SASEMI-ANNUAL ON STEAM INJECTION HUMIDIFIERS1-001PMC3/25/20164/1/201634.19HUMIDIFIER-N-02-1225PIPE0.07
NCAUR2016032734/7/2016HUM-N-01-N-07-SASEMI-ANNUAL ON STEAM INJECTION HUMIDIFIERS1-001PMC3/25/20164/1/201634.19HUMIDIFIER-N-03-2229PIPE0.07
NCAUR2016032734/7/2016HUM-N-01-N-07-SASEMI-ANNUAL ON STEAM INJECTION HUMIDIFIERS1-001PMC3/25/20164/1/201634.19HUMIDIFIER-N-04-3227PIPE0.07
NCAUR2016032734/7/2016HUM-N-01-N-07-SASEMI-ANNUAL ON STEAM INJECTION HUMIDIFIERS1-001PMC3/25/20164/1/201634.19HUMIDIFIER-N-05-0202PIPE0.07
NCAUR2016032734/7/2016HUM-N-01-N-07-SASEMI-ANNUAL ON STEAM INJECTION HUMIDIFIERS1-001PMC3/25/20164/1/201634.19HUMIDIFIER-N-06-0202PIPE0.07
NCAUR2016032734/7/2016HUM-N-01-N-07-SASEMI-ANNUAL ON STEAM INJECTION HUMIDIFIERS1-001PMC3/25/20164/1/201634.19HUMIDIFIER-N-07-0228PIPE0.07
NCAUR2016032744/19/2016HUMIDIFIER-008-QQUARTERLY ON BLDG 008 HUMIDIFIER1-165PMC3/23/20163/30/201633.8HUMIDIFIER-008-AHVAC0.25
NCAUR2016032744/19/2016HUMIDIFIER-008-QQUARTERLY ON BLDG 008 HUMIDIFIER1-165PMC3/23/20163/30/201633.8HUMIDIFIER-008-BHVAC0.25
NCAUR2016032754/7/2016ICE-MACHINE-01-MMONTHLY ON ICE MACHINE 01 DRAIN1-165PMC3/22/20163/29/201635.65ICE-MACHINE-01HVAC0.5
NCAUR2016032763/28/2016LIFT-TRUCK-WWEEKLY PM ON LIFT TRUCK1-167PMC3/21/20163/28/2016311.19LIFT-TRUCKGEMAW0.25
NCAUR2016032774/4/2016LOBBY-LIGHT-BUG-BWCLEAN LOBBY LIGHT FIXTURES OF BUGS1-161PMC3/21/20163/28/2016311.19GEN MISC TASKELEC0.5
NCAUR2016032783/28/2016MAT-CLEAN-WWEEKLY CLEANING OF BUILDING MATS2-102CTC3/21/20163/28/2016311.19GEN HSKPHSKP4
NCAUR2016032793/21/2016METER-CHECKCHECK HOUR METER ON ATTACHED EQUIPMENT1-167PMC3/21/20163/28/2016355.5LIFT-TRUCKGEMAW0.06
NCAUR2016032793/21/2016METER-CHECKCHECK HOUR METER ON ATTACHED EQUIPMENT1-167PMC3/21/20163/28/2016355.5TRACTOR-JD4500GEMAW0.06
NCAUR2016032793/21/2016METER-CHECKCHECK HOUR METER ON ATTACHED EQUIPMENT1-167PMC3/21/20163/28/2016355.5TRACTOR-MOWER-EXMARKGEMAW0.06
NCAUR2016032793/21/2016METER-CHECKCHECK HOUR METER ON ATTACHED EQUIPMENT1-167PMC3/21/20163/28/2016355.5TRACTOR-MOWER-JD425GEMAW0.06
NCAUR2016032803/31/2016MYTOX-TBL-01-M-SFMONTHLY FILTER CHANGE ON MTX TABLE1-004PMC3/22/20164/1/201636.12MYTOX-TBL-01GEMAW0.5
NCAUR2016032813/21/2016PORT-EWSS-WWEEKLY ON PORTABLE EYEWASH SAFETY SHOWER STATIONS1-145PMC3/21/20163/21/201636.49SAFETY-SHOWER-COMBO-GH100PLUM0
NCAUR2016032823/22/2016PUBLIC-ADDRESS-M-SFMONTHLY ON SIMPLEX PA SYSTEM3-011PMC3/22/20163/29/201635.65PA-SYSTEMGRD0.1
NCAUR2016032833/28/2016RECYCLE-PREP-WWEEKLY RECYCLE PREP1-167CTC3/25/20163/25/201639.17GEN MISC TASKGEMAW0.5
NCAUR2016032844/7/2016REF-AIR-DRY-11-MMONTHLY ON REFRIGERATED AIR DRYER HOUSE AIR1-165PMC3/21/20163/28/201635.65REF-AIR-DRY-11HVAC0.5
NCAUR2016032853/28/2016REV-OSMOSIS-03-DDAILY ON REVERSE OSMOSIS PURIFIER1-136PMC3/21/20163/31/2016313.2REV-OSMOSIS-03STEN3
NCAUR2016032863/31/2016SMP-PMP-02-MMONTHLY ON DUPLEX SUMP PUMP - GREASE BEARINGS1-004PMC3/25/20164/5/201636.73SMP-PMP-02GEMAW1
NCAUR2016032873/31/2016SMP-PMP-P-19-MMONTHLY ON DUPLEX SUMP PUMP1-136PMC3/25/20164/5/201636.73SMP-PMP-P-19ASTEN1
NCAUR2016032883/30/2016SMP-PMP-P-19-MMONTHLY ON DUPLEX SUMP PUMP1-136PMC3/25/20164/5/201636.73SMP-PMP-P-19BSTEN1
NCAUR2016032893/21/2016TEST-EQUIP-CALIB-WWEEKLY CALIBRATION OF pH TESTING EQUIPMENT1-136PMC3/21/20163/31/2016313.2TEST-EQUIP-CALIBSTEN0.5
NCAUR2016032903/29/2016TOXIC-GAS-DET-M-SFMONTHLY PM OF TOXIC GAS DETECTORS1-004PMC3/22/20163/28/201635.5TOXIC-GAS-DET-05-3233GEMAW0.25
NCAUR2016032903/29/2016TOXIC-GAS-DET-M-SFMONTHLY PM OF TOXIC GAS DETECTORS1-004PMC3/22/20163/28/201635.5TOXIC-GAS-DET-06-0217GEMAW0.25
NCAUR2016032913/28/2016TRACTOR-JD4500-WWEEKLY ON JOHN DEERE 4500 TRACTOR1-167PMC3/25/20164/1/2016374.3TRACTOR-JD4500GEMAW0.5
NCAUR2016032923/21/2016TRACTOR-MOWER-EXMARKWEEKLY INSPECTION OF EXMARK RIDING MOWER1-167PMC3/21/20163/28/2016311.19TRACTOR-MOWER-EXMARKGEMAW0
NCAUR2016032933/28/2016VAC-PUMP-03-DDAILY ON VACUUM PUMP1-001PMC3/21/20163/25/201639.17VAC-PUMP-03PIPE1
NCAUR2016032943/23/2016WLK-BH-BL-MMONTHLY ON JOHN DEERE WALK-BEHIND BLOWER B6351-167PMC3/22/20163/29/201635.65WALK-BEHIND BLOWERGEMAW0.5
NCAUR2016032953/28/2016WLK-IN-CLR-01-NW-WWEEKLY PM OF COOLERS (ALARM & LIGHTS)1-161PMC3/25/20164/1/2016313.87WLK-IN-FRZR-NW1ELEC0.25
NCAUR2016032963/28/2016WLK-IN-CLR-01-W-SFWEEKLY PM OF COOLERS (ALARM & LIGHTS)1-161PMC3/25/20164/1/2016313.87WLK-IN-CLR-SW1ELEC0.25
NCAUR2016032973/28/2016WLK-IN-CLR-01-W-SFWEEKLY PM OF COOLERS (ALARM & LIGHTS)1-161PMC3/25/20163/25/201639.17WLK-IN-FRZR-SW2ELEC0.25
NCAUR2016032983/31/2016WLK-IN-CLR-02-W-SFWEEKLY PM OF WALK IN COOLERS1-165PMC3/24/20163/24/201638.5WLK-IN-CLR-0115AHVAC0.5
NCAUR2016032993/31/2016WLK-IN-CLR-02-W-SFWEEKLY PM OF WALK IN COOLERS1-165PMC3/24/20163/24/201638.5WLK-IN-CLR-0115BHVAC0.5
NCAUR2016033003/31/2016WLK-IN-CLR-02-W-SFWEEKLY PM OF WALK IN COOLERS1-165PMC3/24/20163/31/2016313.2WLK-IN-CLR-SW1HVAC0.5
NCAUR2016033013/31/2016WLK-IN-CLR-02-W-SFWEEKLY PM OF WALK IN COOLERS1-165PMC3/24/20163/31/2016313.2WLK-IN-FRZR-0102HVAC0.5
NCAUR2016033023/31/2016WLK-IN-CLR-02-W-SFWEEKLY PM OF WALK IN COOLERS1-165PMC3/24/20163/31/2016313.2WLK-IN-FRZR-NW1HVAC0.5
NCAUR2016033033/31/2016WLK-IN-CLR-02-W-SFWEEKLY PM OF WALK IN COOLERS1-165PMC3/24/20163/31/2016313.2WLK-IN-FRZR-SW2HVAC0.5
NCAUR2016033043/22/2016WTR-CL-LOOPS-MMONTHLY CLOSED LOOP WATER TESTING1-136PMC3/25/20164/1/201636.12HEAT-TRANS-PAK-01-NW-ATTICSTEN0.5
NCAUR2016033053/28/2016WTR-SOFT-DDAILY ON WATER SOFTNER SYSTEMS1-136PMC3/21/20163/26/201639.84WTR-SOFT-0201STEN0.5
NCAUR2016033053/28/2016WTR-SOFT-DDAILY ON WATER SOFTNER SYSTEMS1-136PMC3/21/20163/26/201639.84WTR-SOFT-BH1STEN0.5
NCAUR2016033053/28/2016WTR-SOFT-DDAILY ON WATER SOFTNER SYSTEMS1-136PMC3/21/20163/26/201639.84WTR-SOFT-COLUMN "E"STEN0.5
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-01-3328HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-01-ATTICHVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-02-3328HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-03-3328HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-04-3328HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-05-3328HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-06-3328HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-07-3322HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-08-3323HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-09-3318HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-10-3317HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-11-3312HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-12-3313HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-13-3310HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-14-3311HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-15-3309HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-16-3308HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-17-3306HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-18-3307HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-19-3304HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-20-3305HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-21-3302HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-22-3300HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-23-3301HVAC0.04
NCAUR2016033065/25/2016WTR-SRC-HP-GRP1-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/28/201633.8WTR-SRC-HP-85-3321HVAC0.04
NCAUR2016033076/20/2016WTR-SRC-HP-GRP2-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/1/201633.8WTR-SRC-HP-0322HVAC0.04
NCAUR2016033076/20/2016WTR-SRC-HP-GRP2-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/1/201633.8WTR-SRC-HP-25-2328HVAC0.04
NCAUR2016033076/20/2016WTR-SRC-HP-GRP2-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/1/201633.8WTR-SRC-HP-26-2321HVAC0.04
NCAUR2016033076/20/2016WTR-SRC-HP-GRP2-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/1/201633.8WTR-SRC-HP-27-2314HVAC0.04
NCAUR2016033076/20/2016WTR-SRC-HP-GRP2-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/1/201633.8WTR-SRC-HP-28-2302HVAC0.04
NCAUR2016033076/20/2016WTR-SRC-HP-GRP2-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/1/201633.8WTR-SRC-HP-29-2302HVAC0.04
NCAUR2016033076/20/2016WTR-SRC-HP-GRP2-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/1/201633.8WTR-SRC-HP-30-2300HVAC0.04
NCAUR2016033076/20/2016WTR-SRC-HP-GRP2-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/1/201633.8WTR-SRC-HP-31-1328HVAC0.04
NCAUR2016033076/20/2016WTR-SRC-HP-GRP2-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/1/201633.8WTR-SRC-HP-32-1328HVAC0.04
NCAUR2016033076/20/2016WTR-SRC-HP-GRP2-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/1/201633.8WTR-SRC-HP-33-1328HVAC0.04
NCAUR2016033076/20/2016WTR-SRC-HP-GRP2-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/1/201633.8WTR-SRC-HP-34-1328HVAC0.04
NCAUR2016033076/20/2016WTR-SRC-HP-GRP2-SASEMI-ANNUAL ON WATER SOURCE HEAT PUMPS1-158PMC3/25/20164/1/201633.8WTR-SRC-HP-35-1324HVAC0.04