Sheet1
| Schedule B For NCAUR Operations and Maintenance Contract | |||
| Total Price – Transition Period | $0.00 | ||
| Total Price – Base Period | $225,000.00 | ||
| Total Price – Option Period I | $225,000.00 | ||
| Total Price – Option Period II | $225,000.00 | ||
| Total Price – Option Period III | $225,000.00 | ||
| Total Price – Option Period IV | $225,000.00 | ||
| Total Price - Six Month Extension | $0.00 | ||
| Total Price | $1,125,000.00 | ||
| Total Firm Fixed Price for labor, material and equipment to perform all | |||
| routine work as specified in Section C, except for additional work | |||
| specifically identified as being included in the Indefinite | |||
| Delivery/Indefinate Quantity portions of the contract | |||
| Routine Price – Transition Period | $0.00 | ||
| Routine Price – Base Period | |||
| B.1 | Work Management | $0.00 | |
| B.2 | Admin Services | $0.00 | |
| B.3 | Safety | $0.00 | |
| B.4 | Utilities Service | $0.00 | |
| B.5 | Facility Services | $0.00 | |
| Base Total | $0.00 | ||
| Routine Price – Option Period I | |||
| 1.1 | Work Management | $0.00 | |
| 1.2 | Admin Services | $0.00 | |
| 1.3 | Safety | $0.00 | |
| 1.4 | Utilities Service | $0.00 | |
| 1.5 | Facility Services | $0.00 | |
| OY 1 Total | $0.00 | ||
| Routine Price – Option Period II | |||
| 2.1 | Work Management | $0.00 | |
| 2.2 | Admin Services | $0.00 | |
| 2.3 | Safety | $0.00 | |
| 2.4 | Utilities Service | $0.00 | |
| 2.5 | Facility Services | $0.00 | |
| OY II Total | $0.00 | ||
| Routine Price – Option Period III | |||
| 3.1 | Work Management | $0.00 | |
| 3.2 | Admin Services | $0.00 | |
| 3.3 | Safety | $0.00 | |
| 3.4 | Utilities Service | $0.00 | |
| 3.5 | Facility Services | $0.00 | |
| OY III Total | $0.00 | ||
| Routine Price – Option Period IV | |||
| 4.1 | Work Management | $0.00 | |
| 4.2 | Admin Services | $0.00 | |
| 4.3 | Safety | $0.00 | |
| 4.4 | Utilities Service | $0.00 | |
| 4.5 | Facility Services | $0.00 | |
| OY IV Total | $0.00 | ||
| Routine Price – Six Month Extension (if needed) | |||
| 5.1 | Work Management | $0.00 | |
| 5.2 | Admin Services | $0.00 | |
| 5.3 | Safety | $0.00 | |
| 5.4 | Utilities Service | $0.00 | |
| 5.5 | Facility Services | $0.00 | |
| Six Month Extension Total | $0.00 | ||
| Total Routine Work | $0.00 | ||
| Additional Work | |||
| AW Price – Base Period | $225,000.00 | ||
| AW Price – Option Period I | $225,000.00 | ||
| AW Price – Option Period II | $225,000.00 | ||
| AW Price – Option Period III | $225,000.00 | ||
| AW Price – Option Period IV | $225,000.00 | ||
| Total Additional Work | $1,125,000.00 |
&CERRC Wyndmoor&RFAR FAC 96
&LMOD 011&C&P&R05/21/2015
DBA AW
| Base Period – Additional Work (Davis Bacon Act (DBA)) | ||||
| Provide a fully burdened labor rate for the categories that may be required in order to perform any additional work required in performance of this contract. | ||||
| Item No. | Labor Category | Estimated DBA Hours | Fully Burdened Hourly Rate DBA | Total Price |
| B.6 | Electrician | 800 | $0.00 | $0.00 |
| B.7 | Roofer | 100 | $0.00 | $0.00 |
| B.8 | Building/Sheet Metal Worker | 100 | $0.00 | $0.00 |
| B.9 | Carpenter | 100 | $0.00 | $0.00 |
| B.10 | Painter | 100 | $0.00 | $0.00 |
| B.11 | Plumber/Steamfitter | 600 | $0.00 | $0.00 |
| B.12 | Boiler Maker | 100 | $0.00 | $0.00 |
| B.13 | Elevator Mechanic | 100 | $0.00 | $0.00 |
| B.14 | Heavy Equipment Operator | 225 | $0.00 | $0.00 |
| B.15 | Laborer | 300 | $0.00 | $0.00 |
| B.16 | Cement Mason | 100 | $0.00 | $0.00 |
| B.17 | Bricklayer | 100 | $0.00 | $0.00 |
| B.18 | Truck Driver | 100 | $0.00 | $0.00 |
| B.19 | DBA Materials | LSUM | $125,000.00 | |
| B.20 | Contractor Markup, OH&P and materials Handling for materials only | LSUM | 0.00% | $0.00 |
| Total DBA Work B.6-B.20 Base Period | $125,000.00 | |||
| Option Period I - Additional Work (Davis Bacon Act (DBA)) | ||||
| Provide a fully burdened labor rate for the categories that may be required in order to perform any additional work required in performance of this contract. | ||||
| Item No. | Labor Category | Estimated DBA Hours | Fully Burdened Hourly Rate DBA | Total Price |
| 1.6 | Electrician | 800 | $0.00 | $0.00 |
| 1.7 | Roofer | 100 | $0.00 | $0.00 |
| 1.8 | Building/Sheet Metal Worker | 100 | $0.00 | $0.00 |
| 1.9 | Carpenter | 100 | $0.00 | $0.00 |
| 1.10 | Painter | 100 | $0.00 | $0.00 |
| 1.11 | Plumber/Steamfitter | 600 | $0.00 | $0.00 |
| 1.12 | Boiler Maker | 100 | $0.00 | $0.00 |
| 1.13 | Elevator Mechanic | 100 | $0.00 | $0.00 |
| 1.14 | Heavy Equipment Operator | 225 | $0.00 | $0.00 |
| 1.15 | Laborer | 300 | $0.00 | $0.00 |
| 1.16 | Cement Mason | 100 | $0.00 | $0.00 |
| 1.17 | Bricklayer | 100 | $0.00 | $0.00 |
| 1.18 | Truck Driver | 100 | $0.00 | $0.00 |
| 1.19 | DBA Materials | LSUM | $125,000.00 | |
| 1.20 | Contractor Markup, OH&P and materials Handling for materials only | LSUM | 0.00% | $0.00 |
| Total DBA Work 1.6-1.20 Option Period One | $125,000.00 | |||
| Option Period II - Additional Work (Davis Bacon Act (DBA)) | ||||
| Provide a fully burdened labor rate for the categories that may be required in order to perform any additional work required in performance of this contract. | ||||
| Item No. | Labor Category | Estimated DBA Hours | Fully Burdened Hourly Rate DBA | Total Price |
| 2.6 | Electrician | 800 | $0.00 | $0.00 |
| 2.7 | Roofer | 100 | $0.00 | $0.00 |
| 2.8 | Building/Sheet Metal Worker | 100 | $0.00 | $0.00 |
| 2.9 | Carpenter | 100 | $0.00 | $0.00 |
| 2.10 | Painter | 100 | $0.00 | $0.00 |
| 2.11 | Plumber/Steamfitter | 600 | $0.00 | $0.00 |
| 2.12 | Boiler Maker | 100 | $0.00 | $0.00 |
| 2.13 | Elevator Mechanic | 100 | $0.00 | $0.00 |
| 2.14 | Heavy Equipment Operator | 225 | $0.00 | $0.00 |
| 2.15 | Laborer | 300 | $0.00 | $0.00 |
| 2.16 | Cement Mason | 100 | $0.00 | $0.00 |
| 2.17 | Bricklayer | 100 | $0.00 | $0.00 |
| 2.18 | Truck Driver | 100 | $0.00 | $0.00 |
| 2.19 | DBA Materials | LSUM | $125,000.00 | |
| 2.20 | Contractor Markup, OH&P and materials Handling for materials only | LSUM | 0.00% | $0.00 |
| Total DBA Work 2.6-2.20 Option Period Two | $125,000.00 | |||
| Option Period III - Additional Work (Davis Bacon Act (DBA)) | ||||
| Provide a fully burdened labor rate for the categories that may be required in order to perform any additional work required in performance of this contract. | ||||
| Item No. | Labor Category | Estimated DBA Hours | Fully Burdened Hourly Rate DBA | Total Price |
| 3.6 | Electrician | 800 | $0.00 | $0.00 |
| 3.7 | Roofer | 100 | $0.00 | $0.00 |
| 3.8 | Building/Sheet Metal Worker | 100 | $0.00 | $0.00 |
| 3.9 | Carpenter | 100 | $0.00 | $0.00 |
| 3.10 | Painter | 100 | $0.00 | $0.00 |
| 3.11 | Plumber/Steamfitter | 600 | $0.00 | $0.00 |
| 3.12 | Boiler Maker | 100 | $0.00 | $0.00 |
| 3.13 | Elevator Mechanic | 100 | $0.00 | $0.00 |
| 3.14 | Heavy Equipment Operator | 225 | $0.00 | $0.00 |
| 3.15 | Laborer | 300 | $0.00 | $0.00 |
| 3.16 | Cement Mason | 100 | $0.00 | $0.00 |
| 3.17 | Bricklayer | 100 | $0.00 | $0.00 |
| 3.18 | Truck Driver | 100 | $0.00 | $0.00 |
| 3.19 | DBA Materials | LSUM | $125,000.00 | |
| 3.20 | Contractor Markup, OH&P and materials Handling for materials only | LSUM | 0.00% | $0.00 |
| Total DBA Work 3.6-3.20 Option Period Three | $125,000.00 | |||
| Option Period IV - Additional Work (Davis Bacon Act (DBA)) | ||||
| Provide a fully burdened labor rate for the categories that may be required in order to perform any additional work required in performance of this contract. | ||||
| Item No. | Labor Category | Estimated DBA Hours | Fully Burdened Hourly Rate DBA | Total Price |
| 4.6 | Electrician | 800 | $0.00 | $0.00 |
| 4.7 | Roofer | 100 | $0.00 | $0.00 |
| 4.8 | Building/Sheet Metal Worker | 100 | $0.00 | $0.00 |
| 4.9 | Carpenter | 100 | $0.00 | $0.00 |
| 4.10 | Painter | 100 | $0.00 | $0.00 |
| 4.11 | Plumber/Steamfitter | 600 | $0.00 | $0.00 |
| 4.12 | Boiler Maker | 100 | $0.00 | $0.00 |
| 4.13 | Elevator Mechanic | 100 | $0.00 | $0.00 |
| 4.14 | Heavy Equipment Operator | 225 | $0.00 | $0.00 |
| 4.15 | Laborer | 300 | $0.00 | $0.00 |
| 4.16 | Cement Mason | 100 | $0.00 | $0.00 |
| 4.17 | Bricklayer | 100 | $0.00 | $0.00 |
| 4.18 | Truck Driver | 100 | $0.00 | $0.00 |
| 4.19 | DBA Materials | LSUM | $125,000.00 | |
| 4.20 | Contractor Markup, OH&P and materials Handling for materials only | LSUM | 0.00% | $0.00 |
| Total DBA Work 4.6-4.20 Option Period Four | $125,000.00 | |||
| Total Additional work Base and Four options | $625,000.00 |
&LAG-32SC-S-14-0010&CNCAUR PEORIA&RFARFAC 78
&LMOD 011&C7&R05/21/2015
SCA AW
| Base Period – Additional Work (Service Contract Act (SCA)) | ||||
| Provide a fully burdened labor rate for the categories that may be required in order to perform any additional work required in performance of this contract. | ||||
| Item No. | Labor Category | Estimated SCA Hours | Fully Burdened Hourly Rate SCA | Total Price |
| B.25 | Housekeeping | 100 | $0.00 | $0.00 |
| B.26 | General Clerk II | 75 | $0.00 | $0.00 |
| B.27 | Security Guard | 100 | $0.00 | $0.00 |
| B.28 | Laborer Grounds Maintenance | 100 | $0.00 | $0.00 |
| B.29 | N/A | 0 | $0.00 | $0.00 |
| B.30 | Shipping/Receiving Clerk | 75 | $0.00 | $0.00 |
| B.31 | Electrician | 300 | $0.00 | $0.00 |
| B.32 | General Maintenance | 300 | $0.00 | $0.00 |
| B.33 | HVAC Research | 400 | $0.00 | $0.00 |
| B.34 | Maintenance Trades Helper | 200 | $0.00 | $0.00 |
| B.35 | Painter | 300 | $0.00 | $0.00 |
| B.36 | Pipefitter | 200 | $0.00 | $0.00 |
| B.37 | Plumber | 200 | $0.00 | $0.00 |
| B.38 | Boiler Operator | 100 | $0.00 | $0.00 |
| B.39 | N/A | 0 | $0.00 | $0.00 |
| B.40 | SCA Materials | LSUM | $100,000.00 | |
| B.41 | Contractor Markup, OH&P and materials Handling for materials only | LSUM | 0.00% | $0.00 |
| Total SCA Work B.25-B.41 Base Period | $100,000.00 | |||
| Option Period One | ||||
| Provide a fully burdened labor rate for the categories that may be required in order to perform any additional work required in performance of this contract. | ||||
| Item No. | Labor Category | Estimated SCA Hours | Fully Burdened Hourly Rate SCA | Total Price |
| 1.25 | Housekeeping | 100 | $0.00 | $0.00 |
| 1.26 | General Clerk II | 75 | $0.00 | $0.00 |
| 1.27 | Security Guard | 100 | $0.00 | $0.00 |
| 1.28 | Laborer Grounds Maintenance | 100 | $0.00 | $0.00 |
| 1.29 | N/A | 0 | $0.00 | $0.00 |
| 1.3 | Shipping/Receiving Clerk | 75 | $0.00 | $0.00 |
| 1.31 | Electrician | 300 | $0.00 | $0.00 |
| 1.34 | General Maintenance | 300 | $0.00 | $0.00 |
| 1.33 | HVAC Research | 400 | $0.00 | $0.00 |
| 1.34 | Maintenance Trades Helper | 200 | $0.00 | $0.00 |
| 1.35 | Painter | 300 | $0.00 | $0.00 |
| 1.36 | Pipefitter | 200 | $0.00 | $0.00 |
| 1.37 | Plumber | 200 | $0.00 | $0.00 |
| 1.38 | Boiler Operator | 100 | $0.00 | $0.00 |
| 1.39 | N/A | 0 | $0.00 | $0.00 |
| 1.4 | SCA Materials | LSUM | $100,000.00 | |
| 1.41 | Contractor Markup, OH&P and materials Handling for materials only | LSUM | 0.00% | $0.00 |
| Total SCA Work 1.25-1.41 Option Period One | $100,000.00 | |||
| Option Period Two – Additional Work (Service Contract Act (SCA)) | ||||
| Provide a fully burdened labor rate for the categories that may be required in order to perform any additional work required in performance of this contract. | ||||
| Item No. | Labor Category | Estimated SCA Hours | Fully Burdened Hourly Rate SCA | Total Price |
| 2.25 | Housekeeping | 100 | $0.00 | $0.00 |
| 2.26 | General Clerk II | 75 | $0.00 | $0.00 |
| 2.27 | Security Guard | 100 | $0.00 | $0.00 |
| 2.28 | Laborer Grounds Maintenance | 100 | $0.00 | $0.00 |
| 2.29 | N/A | 0 | $0.00 | $0.00 |
| 2.3 | Shipping/Receiving Clerk | 75 | $0.00 | $0.00 |
| 2.31 | Electrician | 300 | $0.00 | $0.00 |
| 2.32 | General Maintenance | 300 | $0.00 | $0.00 |
| 2.33 | HVAC Research | 400 | $0.00 | $0.00 |
| 2.34 | Maintenance Trades Helper | 200 | $0.00 | $0.00 |
| 2.35 | Painter | 300 | $0.00 | $0.00 |
| 2.36 | Pipefitter | 200 | $0.00 | $0.00 |
| 2.37 | Plumber | 200 | $0.00 | $0.00 |
| 2.38 | Boiler Operator | 100 | $0.00 | $0.00 |
| 2.39 | N/A | 0 | $0.00 | $0.00 |
| 2.4 | SCA Materials | LSUM | $100,000.00 | |
| 2.41 | Contractor Markup, OH&P and materials Handling for materials only | LSUM | 0.00% | $0.00 |
| Total SCA Work 2.25-2.41 Option Period Two | $100,000.00 | |||
| Option Period Three – Additional Work (Service Contract Act (SCA)) | ||||
| Provide a fully burdened labor rate for the categories that may be required in order to perform any additional work required in performance of this contract. | ||||
| Item No. | Labor Category | Estimated SCA Hours | Fully Burdened Hourly Rate SCA | Total Price |
| 3.25 | Housekeeping | 100 | $0.00 | $0.00 |
| 3.26 | General Clerk II | 75 | $0.00 | $0.00 |
| 3.27 | Security Guard | 100 | $0.00 | $0.00 |
| 3.28 | Laborer Grounds Maintenance | 100 | $0.00 | $0.00 |
| 3.29 | N/A | 0 | $0.00 | $0.00 |
| 3.3 | Shipping/Receiving Clerk | 75 | $0.00 | $0.00 |
| 3.31 | Electrician | 300 | $0.00 | $0.00 |
| 3.32 | General Maintenance | 300 | $0.00 | $0.00 |
| 3.33 | HVAC Research | 400 | $0.00 | $0.00 |
| 3.34 | Maintenance Trades Helper | 200 | $0.00 | $0.00 |
| 3.35 | Painter | 300 | $0.00 | $0.00 |
| 3.36 | Pipefitter | 200 | $0.00 | $0.00 |
| 3.37 | Plumber | 200 | $0.00 | $0.00 |
| 3.38 | Boiler Operator | 100 | $0.00 | $0.00 |
| 3.39 | N/A | 0 | $0.00 | $0.00 |
| 3.4 | SCA Materials | LSUM | $100,000.00 | |
| 3.41 | Contractor Markup, OH&P and materials Handling for materials only | LSUM | 0.00% | $0.00 |
| Total SCA Work 3.25-3.41 Option Period Three | $100,000.00 | |||
| Optio Period Four – Additional Work (Service Contract Act (SCA)) | ||||
| Provide a fully burdened labor rate for the categories that may be required in order to perform any additional work required in performance of this contract. | ||||
| Item No. | Labor Category | Estimated SCA Hours | Fully Burdened Hourly Rate SCA | Total Price |
| 4.25 | Housekeeping | 100 | $0.00 | $0.00 |
| 4.26 | General Clerk II | 75 | $0.00 | $0.00 |
| 4.27 | Security Guard | 100 | $0.00 | $0.00 |
| 4.28 | Laborer Grounds Maintenance | 100 | $0.00 | $0.00 |
| 4.29 | N/A | 0 | $0.00 | $0.00 |
| 4.3 | Shipping/Receiving Clerk | 75 | $0.00 | $0.00 |
| 4.31 | Electrician | 300 | $0.00 | $0.00 |
| 4.32 | General Maintenance | 300 | $0.00 | $0.00 |
| 4.33 | HVAC Research | 400 | $0.00 | $0.00 |
| 4.34 | Maintenance Trades Helper | 200 | $0.00 | $0.00 |
| 4.35 | Painter | 300 | $0.00 | $0.00 |
| 4.36 | Pipefitter | 200 | $0.00 | $0.00 |
| 4.37 | Plumber | 200 | $0.00 | $0.00 |
| 4.38 | Boiler Operator | 100 | $0.00 | $0.00 |
| 4.39 | N/A | 0 | $0.00 | $0.00 |
| 4.4 | SCA Materials | LSUM | $100,000.00 | |
| 4.41 | Contractor Markup, OH&P and materials Handling for materials only | LSUM | 0.00% | $0.00 |
| Total SCA Work 4.25-4.41 Option Period Four | $100,000.00 | |||
| $500,000.00 |
&LAG-32SC-S-14-0010&CNCAUR PEORIA&RFAR FAC 78
&LMOD 011&R05/21/2015
File details come from the government source that posted it. Updated .