02 - Schedule B Addendum.xls

XLS spreadsheet 68 KB Posted

Attached to
Operations and Maintenance Services Federal contract opportunity
Solicitation number
12505B21R0003
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Midwest Area

View the file

Other files for this federal contract opportunity

Other files attached to Operations and Maintenance Services, newest first.
File Type Posted
SF-30 Amendment 03.pdf PDF
Past Performance Questionnaire.pdf PDF
RFIs.pdf PDF
Attachment 004-Documents by Reference-rev 07-08-2021.pdf PDF
Attachment 016-Work Order Summary-B.xlsx XLSX spreadsheet
Listing of Fire Alarm System Devices.pdf PDF
SF-30 Amendment 02.pdf PDF
Sign In Sheets.pdf PDF
Attachment 016-Work Order Summary-A.xlsx XLSX spreadsheet
Attachment 016-Work Order Summary-B.pdf PDF
Attachment 016-Work Order Summary-A.pdf PDF
SF-30.pdf PDF
Attachment 05 - MP2 Equipment Report-Simple.xlsx XLSX spreadsheet
Schedule B Addendum.xls XLS spreadsheet
Attachment 16 - Work Order Summary.xlsx XLSX spreadsheet
Schedule B Addendum.xls XLS spreadsheet
Attachment 012-Flooring Surfaces.pdf PDF
Attachment 014-Supplies Services-Government Furnished.pdf PDF
Attachment 021-Space Temperature and Humidity Requirements.pdf PDF
Attachment 007-MP2 Task Report.pdf PDF
Attachment 020-Stock Level Summary.pdf PDF
Attachment 022-Supplemental Work Items.pdf PDF
Exhibit 004-Quality Assurance Surveillance Plan.pdf PDF
Exhibit 001-Performance Work Statement.pdf PDF
SF-33 with Sections B-M.pdf PDF
Attachment 002-Work Order Types.pdf PDF
Attachment 003-Work Order Statistics.pdf PDF
Attachment 004-Documents Incorporated by Reference.pdf PDF
Attachment 008-Inventory of Goverment Vehicles.pdf PDF
Attachment 011-Housekeeping Matrix.pdf PDF
Attachment 013-Elevators and Lifting Devices.pdf PDF
Attachment 015-Pest Treatment Matrix.pdf PDF
Attachment 016-Work Order Summary.pdf PDF
Attachment 019-Government Furnished Equipment.pdf PDF
Exhibit 006-Wage Determination (Construction).pdf PDF
Exhibit 007-Wage Determination (Services).pdf PDF
Attachment 001-Craft Codes.pdf PDF
Attachment 005-MP2 Equipment Report-Simple.pdf PDF
Attachment 006-MP2 Task Instruction List.pdf PDF
Attachment 009-Contractor Space.pdf PDF
Attachment 010-Facility Drawings.pdf PDF
Attachment 017-Personal Identify Information (PII) Sheet.pdf PDF
Attachment 018-Ozone Depleting Substances (ODS) Management Program-rev01-20-2021.pdf PDF
Exhibit 002-NCAUR BSHEM Manual v2020-11.pdf PDF
Exhibit 003-NCAUR Bldg Standards.pdf PDF
Exhibit 005-SCA Directory of Occupations.pdf PDF
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Schedule B For NCAUR Operations and Maintenance Contract
Total Price – Transition Period$0.00
Total Price – Base Period$225,000.00
Total Price – Option Period I$225,000.00
Total Price – Option Period II$225,000.00
Total Price – Option Period III$225,000.00
Total Price – Option Period IV$225,000.00
Total Price - Six Month Extension$0.00
Total Price$1,125,000.00
Total Firm Fixed Price for labor, material and equipment to perform all
routine work as specified in Section C, except for additional work
specifically identified as being included in the Indefinite
Delivery/Indefinate Quantity portions of the contract
Routine Price – Transition Period$0.00
Routine Price – Base Period
B.1Work Management$0.00
B.2Admin Services$0.00
B.3Safety$0.00
B.4Utilities Service$0.00
B.5Facility Services$0.00
Base Total$0.00
Routine Price – Option Period I
1.1Work Management$0.00
1.2Admin Services$0.00
1.3Safety$0.00
1.4Utilities Service$0.00
1.5Facility Services$0.00
OY 1 Total$0.00
Routine Price – Option Period II
2.1Work Management$0.00
2.2Admin Services$0.00
2.3Safety$0.00
2.4Utilities Service$0.00
2.5Facility Services$0.00
OY II Total$0.00
Routine Price – Option Period III
3.1Work Management$0.00
3.2Admin Services$0.00
3.3Safety$0.00
3.4Utilities Service$0.00
3.5Facility Services$0.00
OY III Total$0.00
Routine Price – Option Period IV
4.1Work Management$0.00
4.2Admin Services$0.00
4.3Safety$0.00
4.4Utilities Service$0.00
4.5Facility Services$0.00
OY IV Total$0.00
Routine Price – Six Month Extension (if needed)
5.1Work Management$0.00
5.2Admin Services$0.00
5.3Safety$0.00
5.4Utilities Service$0.00
5.5Facility Services$0.00
Six Month Extension Total$0.00
Total Routine Work$0.00
Additional Work
AW Price – Base Period$225,000.00
AW Price – Option Period I$225,000.00
AW Price – Option Period II$225,000.00
AW Price – Option Period III$225,000.00
AW Price – Option Period IV$225,000.00
Total Additional Work$1,125,000.00

&L12505B21R0003&CNCAUR PEORIA&RFAR FAC 2021-05

&LMOD 011&C&P&R05/21/2015

DBA AW

Base Period – Additional Work (Davis Bacon Act (DBA))
Provide a fully burdened labor rate for the categories that may be required in order to perform any additional work required in performance of this contract.
Item No.Labor CategoryEstimated DBA HoursFully Burdened Hourly Rate DBATotal Price
B.6Electrician800$0.00$0.00
B.7Roofer100$0.00$0.00
B.8Building/Sheet Metal Worker100$0.00$0.00
B.9Carpenter100$0.00$0.00
B.10Painter100$0.00$0.00
B.11Plumber/Steamfitter600$0.00$0.00
B.12Boiler Maker100$0.00$0.00
B.13Elevator Mechanic100$0.00$0.00
B.14Heavy Equipment Operator225$0.00$0.00
B.15Laborer300$0.00$0.00
B.16Cement Mason100$0.00$0.00
B.17Bricklayer100$0.00$0.00
B.18Truck Driver100$0.00$0.00
B.19DBA MaterialsLSUM$125,000.00
B.20Contractor Markup, OH&P and materials Handling for materials onlyLSUM0.00%$0.00
Total DBA Work B.6-B.20 Base Period$125,000.00
Option Period I - Additional Work (Davis Bacon Act (DBA))
Provide a fully burdened labor rate for the categories that may be required in order to perform any additional work required in performance of this contract.
Item No.Labor CategoryEstimated DBA HoursFully Burdened Hourly Rate DBATotal Price
1.6Electrician800$0.00$0.00
1.7Roofer100$0.00$0.00
1.8Building/Sheet Metal Worker100$0.00$0.00
1.9Carpenter100$0.00$0.00
1.10Painter100$0.00$0.00
1.11Plumber/Steamfitter600$0.00$0.00
1.12Boiler Maker100$0.00$0.00
1.13Elevator Mechanic100$0.00$0.00
1.14Heavy Equipment Operator225$0.00$0.00
1.15Laborer300$0.00$0.00
1.16Cement Mason100$0.00$0.00
1.17Bricklayer100$0.00$0.00
1.18Truck Driver100$0.00$0.00
1.19DBA MaterialsLSUM$125,000.00
1.20Contractor Markup, OH&P and materials Handling for materials onlyLSUM0.00%$0.00
Total DBA Work 1.6-1.20 Option Period One$125,000.00
Option Period II - Additional Work (Davis Bacon Act (DBA))
Provide a fully burdened labor rate for the categories that may be required in order to perform any additional work required in performance of this contract.
Item No.Labor CategoryEstimated DBA HoursFully Burdened Hourly Rate DBATotal Price
2.6Electrician800$0.00$0.00
2.7Roofer100$0.00$0.00
2.8Building/Sheet Metal Worker100$0.00$0.00
2.9Carpenter100$0.00$0.00
2.10Painter100$0.00$0.00
2.11Plumber/Steamfitter600$0.00$0.00
2.12Boiler Maker100$0.00$0.00
2.13Elevator Mechanic100$0.00$0.00
2.14Heavy Equipment Operator225$0.00$0.00
2.15Laborer300$0.00$0.00
2.16Cement Mason100$0.00$0.00
2.17Bricklayer100$0.00$0.00
2.18Truck Driver100$0.00$0.00
2.19DBA MaterialsLSUM$125,000.00
2.20Contractor Markup, OH&P and materials Handling for materials onlyLSUM0.00%$0.00
Total DBA Work 2.6-2.20 Option Period Two$125,000.00
Option Period III - Additional Work (Davis Bacon Act (DBA))
Provide a fully burdened labor rate for the categories that may be required in order to perform any additional work required in performance of this contract.
Item No.Labor CategoryEstimated DBA HoursFully Burdened Hourly Rate DBATotal Price
3.6Electrician800$0.00$0.00
3.7Roofer100$0.00$0.00
3.8Building/Sheet Metal Worker100$0.00$0.00
3.9Carpenter100$0.00$0.00
3.10Painter100$0.00$0.00
3.11Plumber/Steamfitter600$0.00$0.00
3.12Boiler Maker100$0.00$0.00
3.13Elevator Mechanic100$0.00$0.00
3.14Heavy Equipment Operator225$0.00$0.00
3.15Laborer300$0.00$0.00
3.16Cement Mason100$0.00$0.00
3.17Bricklayer100$0.00$0.00
3.18Truck Driver100$0.00$0.00
3.19DBA MaterialsLSUM$125,000.00
3.20Contractor Markup, OH&P and materials Handling for materials onlyLSUM0.00%$0.00
Total DBA Work 3.6-3.20 Option Period Three$125,000.00
Option Period IV - Additional Work (Davis Bacon Act (DBA))
Provide a fully burdened labor rate for the categories that may be required in order to perform any additional work required in performance of this contract.
Item No.Labor CategoryEstimated DBA HoursFully Burdened Hourly Rate DBATotal Price
4.6Electrician800$0.00$0.00
4.7Roofer100$0.00$0.00
4.8Building/Sheet Metal Worker100$0.00$0.00
4.9Carpenter100$0.00$0.00
4.10Painter100$0.00$0.00
4.11Plumber/Steamfitter600$0.00$0.00
4.12Boiler Maker100$0.00$0.00
4.13Elevator Mechanic100$0.00$0.00
4.14Heavy Equipment Operator225$0.00$0.00
4.15Laborer300$0.00$0.00
4.16Cement Mason100$0.00$0.00
4.17Bricklayer100$0.00$0.00
4.18Truck Driver100$0.00$0.00
4.19DBA MaterialsLSUM$125,000.00
4.20Contractor Markup, OH&P and materials Handling for materials onlyLSUM0.00%$0.00
Total DBA Work 4.6-4.20 Option Period Four$125,000.00
Total Additional work Base and Four options$625,000.00

&L12505B21R0003&CNCAUR PEORIA&RFAR FAC 2021-05

&LMOD 011&C7&R05/21/2015

SCA AW

Base Period – Additional Work (Service Contract Act (SCA))
Provide a fully burdened labor rate for the categories that may be required in order to perform any additional work required in performance of this contract.
Item No.Labor CategoryEstimated SCA HoursFully Burdened Hourly Rate SCATotal Price
B.25Housekeeping100$0.00$0.00
B.26General Clerk II75$0.00$0.00
B.27Security Guard100$0.00$0.00
B.28Laborer Grounds Maintenance100$0.00$0.00
B.29N/A0$0.00$0.00
B.30Shipping/Receiving Clerk75$0.00$0.00
B.31Electrician300$0.00$0.00
B.32General Maintenance300$0.00$0.00
B.33HVAC Research400$0.00$0.00
B.34Maintenance Trades Helper200$0.00$0.00
B.35Painter300$0.00$0.00
B.36Pipefitter200$0.00$0.00
B.37Plumber200$0.00$0.00
B.38Boiler Operator100$0.00$0.00
B.39N/A0$0.00$0.00
B.40SCA MaterialsLSUM$100,000.00
B.41Contractor Markup, OH&P and materials Handling for materials onlyLSUM0.00%$0.00
Total SCA Work B.25-B.41 Base Period$100,000.00
Option Period One
Provide a fully burdened labor rate for the categories that may be required in order to perform any additional work required in performance of this contract.
Item No.Labor CategoryEstimated SCA HoursFully Burdened Hourly Rate SCATotal Price
1.25Housekeeping100$0.00$0.00
1.26General Clerk II75$0.00$0.00
1.27Security Guard100$0.00$0.00
1.28Laborer Grounds Maintenance100$0.00$0.00
1.29N/A0$0.00$0.00
1.3Shipping/Receiving Clerk75$0.00$0.00
1.31Electrician300$0.00$0.00
1.34General Maintenance300$0.00$0.00
1.33HVAC Research400$0.00$0.00
1.34Maintenance Trades Helper200$0.00$0.00
1.35Painter300$0.00$0.00
1.36Pipefitter200$0.00$0.00
1.37Plumber200$0.00$0.00
1.38Boiler Operator100$0.00$0.00
1.39N/A0$0.00$0.00
1.4SCA MaterialsLSUM$100,000.00
1.41Contractor Markup, OH&P and materials Handling for materials onlyLSUM0.00%$0.00
Total SCA Work 1.25-1.41 Option Period One$100,000.00
Option Period Two – Additional Work (Service Contract Act (SCA))
Provide a fully burdened labor rate for the categories that may be required in order to perform any additional work required in performance of this contract.
Item No.Labor CategoryEstimated SCA HoursFully Burdened Hourly Rate SCATotal Price
2.25Housekeeping100$0.00$0.00
2.26General Clerk II75$0.00$0.00
2.27Security Guard100$0.00$0.00
2.28Laborer Grounds Maintenance100$0.00$0.00
2.29N/A0$0.00$0.00
2.3Shipping/Receiving Clerk75$0.00$0.00
2.31Electrician300$0.00$0.00
2.32General Maintenance300$0.00$0.00
2.33HVAC Research400$0.00$0.00
2.34Maintenance Trades Helper200$0.00$0.00
2.35Painter300$0.00$0.00
2.36Pipefitter200$0.00$0.00
2.37Plumber200$0.00$0.00
2.38Boiler Operator100$0.00$0.00
2.39N/A0$0.00$0.00
2.4SCA MaterialsLSUM$100,000.00
2.41Contractor Markup, OH&P and materials Handling for materials onlyLSUM0.00%$0.00
Total SCA Work 2.25-2.41 Option Period Two$100,000.00
Option Period Three – Additional Work (Service Contract Act (SCA))
Provide a fully burdened labor rate for the categories that may be required in order to perform any additional work required in performance of this contract.
Item No.Labor CategoryEstimated SCA HoursFully Burdened Hourly Rate SCATotal Price
3.25Housekeeping100$0.00$0.00
3.26General Clerk II75$0.00$0.00
3.27Security Guard100$0.00$0.00
3.28Laborer Grounds Maintenance100$0.00$0.00
3.29N/A0$0.00$0.00
3.3Shipping/Receiving Clerk75$0.00$0.00
3.31Electrician300$0.00$0.00
3.32General Maintenance300$0.00$0.00
3.33HVAC Research400$0.00$0.00
3.34Maintenance Trades Helper200$0.00$0.00
3.35Painter300$0.00$0.00
3.36Pipefitter200$0.00$0.00
3.37Plumber200$0.00$0.00
3.38Boiler Operator100$0.00$0.00
3.39N/A0$0.00$0.00
3.4SCA MaterialsLSUM$100,000.00
3.41Contractor Markup, OH&P and materials Handling for materials onlyLSUM0.00%$0.00
Total SCA Work 3.25-3.41 Option Period Three$100,000.00
Optio Period Four – Additional Work (Service Contract Act (SCA))
Provide a fully burdened labor rate for the categories that may be required in order to perform any additional work required in performance of this contract.
Item No.Labor CategoryEstimated SCA HoursFully Burdened Hourly Rate SCATotal Price
4.25Housekeeping100$0.00$0.00
4.26General Clerk II75$0.00$0.00
4.27Security Guard100$0.00$0.00
4.28Laborer Grounds Maintenance100$0.00$0.00
4.29N/A0$0.00$0.00
4.3Shipping/Receiving Clerk75$0.00$0.00
4.31Electrician300$0.00$0.00
4.32General Maintenance300$0.00$0.00
4.33HVAC Research400$0.00$0.00
4.34Maintenance Trades Helper200$0.00$0.00
4.35Painter300$0.00$0.00
4.36Pipefitter200$0.00$0.00
4.37Plumber200$0.00$0.00
4.38Boiler Operator100$0.00$0.00
4.39N/A0$0.00$0.00
4.4SCA MaterialsLSUM$100,000.00
4.41Contractor Markup, OH&P and materials Handling for materials onlyLSUM0.00%$0.00
Total SCA Work 4.25-4.41 Option Period Four$100,000.00
$500,000.00

&L12505B21R0003&CNCAUR PEORIA&RFAR FAC 2021-05

&LMOD 011&R05/21/2015

File details come from the government source that posted it. Updated .