About this file

This Contract Data Requirements List outlines Maintainability Evaluation Planning data requirements for the Type I Family of All Terrain Crane contract. The contractor must deliver initial planning data 160 days before the evaluation event, allowing 30 days for government review and comments. Resubmitted data is due 120 days before with a 15-day review period. Final data is to be delivered 90 days before the evaluation, with the government's final plan 30 days before. The planning data must include fault symptoms, methods, equipment conditions, work packages, corrective action conditions, task times, mandatory replacement parts, and be in Microsoft Excel format. Distribution includes the logistics manager, maintenance system manager, and Integrated Product Support Manager.

View the file

Other files

File Type Posted
A082 _ Tool Locator Guide.pdf PDF
A053 _ NMWR Data Summary.pdf PDF
A007 _ Integrated Product Support (IPS).pdf PDF
A071 _ Critical Task List-FOATC.pdf PDF
A056 _ Storage_ Exercise_ Care and Maintenance Plan.pdf PDF
Attachment 0014 _ Hazardous Materials Management Report _ HMMR.XLSX XLSX spreadsheet
A029 _ Safety Assessment Report _ SAR.pdf PDF
A005 _ Integrated Master Schedule (IMS).pdf PDF
Attachment 0027 _ LMI Summary Worksheet _ NMWR Data.pdf PDF
A074 _ New Equipment Training Classes.pdf PDF
Attachment 0009 _ Provisioning Requirements Statement.pdf PDF
A070 _ Training Material Format and Documentation.pdf PDF
Attachment 0025 _ EPCO Source File Requirements.pdf PDF
A017 _ Provisioning Pre-Procurement Screening.pdf PDF
A095 _ Test Support Package _ TSP.pdf PDF
A030 _ System Safety Program Plan _ SSPP.pdf PDF
A058 _ Provisioning Plan.pdf PDF
A036 _ Logistics Support Analysis (LSA).pdf PDF
Attachment 0037 _ Unique Item Identifier Raw Scan Report.xlsx XLSX spreadsheet
A055 _ Accountability Report.pdf PDF
Attachment 0001 - Type I FOATC PD - AT-PRF-0001 Type I FOATC PD 2020-10-08.pdf PDF
A028 _ Hazard Tracking System - HTS.pdf PDF
Attachment 0010 _ LMI Summary Worksheet _ Maintenance Analysis.pdf PDF
A038 _ Logistics Product Data Summary (LPDS).pdf PDF
A075 _ Training Course Completion Report-Student Training Administration.pdf PDF
A063 _ Logistics Product Data.PDF PDF
Attachment 0028 _ Attribute Selection Sheet.pdf PDF
Attachment 0007 _ Exhibit A CDRL DD Form 1423.pdf PDF
Attachment 0016 _ Level of Repair Analysis (LORA).pdf PDF
A089 _ Obsolescence Supportability Analysis Report.pdf PDF
A079 _ Sample IUID Data Plate Report.pdf PDF
A093 _ Analysis Requirement.pdf PDF
A001 _ Basic Issue Items (BII) List.pdf PDF
A062 _ Bill of Materials Report.pdf PDF
A052 _ NMWR Technical Manual.pdf PDF
Attachment 0006 _ Government Furnished Property (GFP) List.xlsx XLSX spreadsheet
Attachment 0012 _ Risk Management Scoring Criteria and Reporting Template.xlsx XLSX spreadsheet
A067 _ Field Level Maintenance New Equipment Training.pdf PDF
A020 _ Failure Mode _ Effects and Criticality Analysis (FMECA).pdf PDF
A065 _ Packaging Test Report.PDF PDF
A083 _ System Tracking and Shipping Report.pdf PDF
Attachment 0030 _ LMI Data Products Worksheet.pdf PDF
Attachment 0005 _ COTS Publications Requirements.pdf PDF
Attachment 0029 _ GEIA-STD-0007 Attribute Selection Worksheet.xlsx XLSX spreadsheet
Attachment 0038 _ TACOM IUID Data Plate Minimum Requirements.pdf PDF
A085 _ DMSMS Management Plan.pdf PDF
Attachment 0022 _ Copyright Release.pdf PDF
Attachment 0017 _ Deployment Equipment Publications Style Guide.pdf PDF
A027 _ Risk Tracking Report.pdf PDF
A037 _ Product Support Analysis (PSA) and Logistics Product Data (LPD) Objectives.pdf PDF
Show 40 more

Latest 50 of 133 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

Type I FOATC

E. CONTRACT/PR NO.

W56HZV-19-R-0118

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A057

2. TITLE OF DATA ITEM

Logistics Product Data

3. SUBTITLE

Maintainability Evaluation Planning

4. AUTHORITY (Data Acquisition Document No.)

SAE-GEIA-STD-0007, AR 700-127

5. CONTRACT REFERENCE

C.7.2

6. REQUIRING OFFICE

SFAE-CSS-FP-C

7. DD 250 REQ

DD

9. DIST

STATEMENT

A

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

Draft

Final

Reg Repro

16. REMARKS

BLK 12: Initial Maintainability Evaluation Planning data delivered 160 calendar days prior to the scheduled Maintainability Evaluation event. The Government team will review and provide comments within 30 calendar days after receipt.

BLK 13: The Contractor shall resubmit Maintainability Evaluation Planning data 120 calendar days prior to the scheduled Maintainability Evaluation. The Government PSM IPT will review and provide comments within 15 calendar days after receipt.

The contractor shall deliver final data 90 calendar days prior to the scheduled Maintainability Evaluation. The Government will provide the final Maintainability Evaluation Plan 30 calendar days prior to the scheduled Maintainability Evaluation.

The Maintainability Evaluation Planning data shall include:

a. Fault Symptom

b. Fault

c. Method of Fault Insertion

d. Equipment Conditions for Troubleshooting

e. Reference Work Packages

f. Equipment Conditions for Corrective Action

g. Estimated time to complete task series

h. Mandatory Replacement Parts (MRPs)

Delivery shall be electronic in Microsoft Excel.

*See Attachment 0008 – Type I FOATC Point of Contact (POC) List for distribution names and contact information.

APM* 1 1

Logistics Manager* 1 1

Maintenace System Manager*

1 1

15. TOTAL --------- 3 3

G. PREPARED BY

Integrated Product Support

Manager

H. DATE

12/3/2020

I. APPROVED BY

Assistant Product Manager (APM)

J. DATE

10/21/2015

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page _1_ of _1_ Pages

17. PRICE

GROUP

File details come from the government source that posted it. Updated .