Attachment 0026 - Use of Existing Government-Furnished Property.xlsx

XLSX spreadsheet 32 KB Posted

Attached to
RFP for Integrated Battle Command System (IBCS) LRIP/FRP
Solicitation number
W31P4Q-20-R-0015
Issued by

About this file

This document contains instructions for an attachment to a Request for Proposal (RFP) for the Integrated Battle Command System (IBCS) Hardware Low Rate Initial Production/Full Rate Production (LRIP/FRP) effort.

The RFP seeks proposals for the production of IBCS hardware end items in accordance with supplied technical data packages and specifications. Offerors proposing to utilize existing Government-Furnished Property on a rent-free basis must calculate price adjustments for evaluation purposes by multiplying the acquisition cost of each property item by specified monthly rental rates based on the property's age and type, and multiplying that figure by the proposed number of months of use. The attachment provides formulas and definitions for offerors to use in calculating these Government-Furnished Property price adjustments as part of their proposals. Questions are due by December 10, 2020 and the RFP is open only to contractors pre-approved by the Integrated Fires Mission Command Project Office within the Department of the Army Materiel Command Contracting Command at Redstone Arsenal.

View the file

Other files

File Type Posted
Attachment 0019 - Section L - Instructions Conditions and Notices to Offerors - 7DEC2020.docx DOCX document
Attachment 0010a.13 – R031 Black Router--FMECA.xlsx XLSX spreadsheet
Attachment 0010a.5 – R005 SCIM-FMECA.xlsx XLSX spreadsheet
Attachment 0013i - D-IBCS-0473_Adv_NetMgr.pdf PDF
Attachment 0010e.4 – E102d thru E111 Vid Extender-FMECA.xlsx XLSX spreadsheet
Attachment 0022a.1.j - PL-ALH-215333 00 S-280 CASS INSTA.pdf PDF
Attachment 0010d.10 – E157 KVM Switch 2 Shelter-FMECA.xlsx XLSX spreadsheet
Attachment 0004a - EOC Acceptance Test Procedures_FINAL.docx DOCX document
Attachment 0010h - SWFMEA Results.xlsx XLSX spreadsheet
Attachment 0010d.1 – E123 TMSS – ECU-FMECA.xlsx XLSX spreadsheet
Attachment 0005 - Software Installation Instructions.docx DOCX document
Attachment 0010a.6 – R006 TIMING UNIT-FMECA.xlsx XLSX spreadsheet
Attachment 0010a.1 – R001 HRFU-FMECA.xlsx XLSX spreadsheet
Exhibit C- IBCS DSL - 24NOV2020.docx DOCX document
Attachment 0004d - Operator Procedures For IFMC GSIL.docx DOCX document
Attachment 0010c.11 – E061 Isolation Router Red-FMECA.xlsx XLSX spreadsheet
Attachment 0010c.6 – E051 IGRM-FMECA.xlsx XLSX spreadsheet
Attachment 0010a.10 – R016 thru R025 Media Converter Module-FMECA.xlsx XLSX spreadsheet
Attachment 0018 - IBCS LRIP FRP IDIQ Pricing Template_29Oct2020 v.3.xlsx XLSX spreadsheet
Attachment 0013c - IBCS-A301-003 Vol II Instructor Guide_redacted.pdf PDF
Attachment 0010e.9 – E147 – Table 3 Assembly-FMECA.xlsx XLSX spreadsheet
Attachment 0010a.9 – R015 PDU Assembly-FMECA.xlsx XLSX spreadsheet
Attachment 0016 - Example Cage Code and Cognizant DCMA DCAA Information.xlsx XLSX spreadsheet
Attachment 0022a.1.e - ALH-215333 00 S-280 CASS INSTALLA.pdf PDF
Attachment 0010c.15 – E068 Media Converter 02 – FMECA.xlsx XLSX spreadsheet
Attachment 0010b.4 – E013 ADSI Shelter – Misc Equip-FMECA.xlsx XLSX spreadsheet
Attachment 0010c.10 – E060 Shelter Switch – 02-FMECA.xlsx XLSX spreadsheet
Attachment 0010e.11 – E149 – Table 5 Assembly-FMECA.xlsx XLSX spreadsheet
Attachment 0010c.13 – E063 Isolation Router Black-FMECA.xlsx XLSX spreadsheet
Attachment 0010a.15 – R033 Media Converter Module 12-FMECA.xlsx XLSX spreadsheet
Attachment 0010b.5 – E029 KVM Switch 1 Shelter Stack-FMECA.xlsx XLSX spreadsheet
Attachment 0004c - ECT Acceptance Test Procedures_FINAL.DOCX DOCX document
Attachment 0010e.6 – E143 – ICE UPS-FMECA.xlsx XLSX spreadsheet
Attachment 0010b.6 – E030 KVM Console-FMECA.xlsx XLSX spreadsheet
Attachment 0012 - Risk Management Plan.pdf PDF
Attachment 0013a -A293-004 ETM 60 Percent Draft_redacted.pdf PDF
Attachment 0022a.2 - PDRS Support information for integration task.pptx PPTX presentation
Attachment 0010c.16 – E069 Media Converter 03 - FMECA.xlsx XLSX spreadsheet
Attachment 0022a.1.f - EOC Shelter views.pptx PPTX presentation
Attachment 0001 - IBCS LRIP FRP Statement of Work - 24NOV2020.docx DOCX document
Attachment 0010a.2 – R002 BPU-FMECA.xlsx XLSX spreadsheet
Attachment 0010a.4 – R004 IGRM-FMECA.xlsx XLSX spreadsheet
Attachment 0022a.1.g - PL-ALH-209032 00 CABLE ASSEMBLY C.pdf PDF
Attachment 0010b.7 – E031 R112 Shelter – Server Stack – 01-FEMCA.xlsx XLSX spreadsheet
Attachment 0004 - Acceptance Test Plan.docx DOCX document
Attachment 0006 - Obsolete Parts List.pdf PDF
Attachment 0010a.11 – R029 PFPU SSHD-1—FMECA.xlsx XLSX spreadsheet
Attachment 0011- Cost Report and Plan.pdf PDF
Attachment 0010d.3 – E150 S-280 PEV-FMECA.xlsx XLSX spreadsheet
Attachment 0013h - D-IBCS-0472_Adv_IDD_redacted.pdf PDF
Show 40 more

Latest 50 of 128 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

W31P4Q-20-R-0015
Attachment 0026 - Use of Existing Government-Furnished Property
Instructions
- Offerors are not to provide any inputs within this Attachment.
- If the offeror is proposing to utilize Government-Furnished Property (GFP) on a rent-free basis in performance of this contract, then the offeror shall calculate the GFP Price Adjustment (which is for evaluation purposes only) in accordance with the instructions detailed below. The offeror is to also provide all supporting calculations to the Government with its proposal. If applicable, the offeror shall calculate an IDIQ GFP Price Adjustment and a seperate TO 0001 GFP Price Adjustment.

a) Rent-free use of existing facilities, special test equipment, and/or special tooling, title to which is in the Government or to which the Government has the right to take title (all of which is herein described as property), including rent-free use by prospective subcontractors, will be a consideration in the evaluation of responses to this solicitation. The offeror shall provide with its proposal, the list of Government Furnished Property (GFP), the acquisition cost, age, and type of GFP.

b) For purposes of evaluation only, the GFP Price Adjustment for each classification of property, computed as follows, shall be added by the Government to the Proposed Price. The GFP Price Adjustment shall be computed by multiplying the acquisition cost of each item of property by the rental rates specified below, and then multiplying the product obtained by the number of months of use proposed. A minimum of one month of use shall be required for purposes of evaluation. Fractional portions of a month shall be counted as a full month. The final GFP Price Adjustment shall be separately set forth by the offeror under the proposed price.

c) Monthly Rental Rates:

(1) For land and land preparation, buildings, building installations, and land installations other than those items specified in (2) below: the prevailing commercial rate.

(2) For industrial plant equipment of the types covered by Federal Supply Classification Code Numbers 3405, 3408, 3410, 3411 through 3419 (machine tools), and 3441 through 3449 (secondary metal forming and cutting machines), the following rates shall apply:

Age of Equipment Monthly Rental Rates 0-2 years 3.00% Over 2 to 3 years 2.00% Over 3 to 6 years 1.50% Over 6 to 10 years 1.00% Over 10 years 0.75%

(3) For personal property and equipment not covered in (1) and (2) above (including all production equipment not in the Federal Supply Classification Codes set forth above, and including special tooling and special test equipment), the following rates shall apply:

-- Two percent (2.00%) per month for electronic test equipment and automotive equipment;

-- One percent (1.00%) per month for special tooling and for all other property and equipment.

d) If any item of property is to be used on other work for which use has been authorized during the period such property is requested for use on any contract resulting from this solicitation, the GFP Price Adjustment shall be calculated in accordance with the following: the acquisition cost of each item of property shall be multiplied by the rental rates specified for the applicable classification of property set forth above, and the product obtained shall then be multiplied by the number of months of rent-free use requested. The resulting product shall be multiplied by a fraction, the numerator of which is the amount of use of the property proposed under this solicitation, and the denominator of which is the sum of the previously authorized use of the property during the period of proposed use and the use proposed under this solicitation. The measurement unit for determining the amount of use to be considered in establishing the fraction referred to in the foregoing calculation shall be direct labor hours, sales, hours of use, or any other measurement unit which will result in an equitable apportionment of the GFP Price Adjustment. The measurement unit used and the amount of respective uses shall be set forth in sufficient detail to support the proration for each item of property.

e) For the purposes of determining the GFP Price Adjustment set forth above, the following definitions apply:

(1) The term acquisition cost means the total cost to the Government for an item of property, including the cost of (i) transportation, (ii) installation, (iii) accessories to be used with the item, and (iv) any rebuilding and modernization which has enhanced the original capability of the item;

(2) The age of an item of property shall be based on the year in which it was manufactured, with an annual birthday on 1 January of each year thereafter. On 1 January following the date of manufacture, the item shall be considered one year old; and on each succeeding January 1st, it shall become one year older (thus, an item manufactured on 15 July 1978 would be one year old on 1 January 1979, and over two years old on and after 1 January 1980).

File details come from the government source that posted it. Updated .