Attachment 0004c - ECT Acceptance Test Procedures_FINAL.DOCX

DOCX document 9 MB Posted

Attached to
RFP for Integrated Battle Command System (IBCS) LRIP/FRP Federal contract opportunity
Solicitation number
W31P4Q-20-R-0015
Issued by
Department of the Army Materiel Command Contracting Command Redstone Arsenal

About this file

This document contains acceptance test procedures and wiring diagrams for an Integrated Environmental Control Unit (IECU) to be installed on a trailer as part of a federal contract opportunity for Integrated Battle Command System hardware production. Key details include specifications for inspecting and testing the functionality of walls, decking, D-rings, wiring, and temperature controls of the IECU. Step-by-step instructions are provided for verifying torque on fasteners, raising and lowering sidewalls, removing deck seams, checking wiring connections between the IECU, Power Distribution Interface and External Control Unit, and generator, and conducting temperature readings and resistance measurements to validate heating and cooling operations. Accompanying diagrams depict required tooling, component locations, and wiring schematics.

A related federal contract opportunity involves the production of Integrated Battle Command System hardware in accordance with technical data packages and specifications. Questions regarding this solicitation are due by December 10, 2020, with the final RFP only open to pre-approved contractors. The requirement includes maintaining approved software and firmware updates, cybersecurity, and authority to operate on existing hardware, as well as engineering changes for obsolescence, new capabilities, and export considerations.

View the file

Other files for this federal contract opportunity

Other files attached to RFP for Integrated Battle Command System (IBCS) LRIP/FRP, newest first.
File Type Posted
EXHIBIT A - CONTRACT DATA ITEM REQUIREMENTS LIST (CDRL) - 24NOV2020.pdf PDF
Exhibit C- IBCS DSL - 24NOV2020.docx DOCX document
Attachment 0002 - AIAMD System of Systems (SoS)(MIS-PRF-56500).pdf PDF
Attachment 0004b - Relay Acceptance Test Procedures_FINAL.docx DOCX document
Attachment 0004d - Operator Procedures For IFMC GSIL.docx DOCX document
Attachment 0005 - Software Installation Instructions.docx DOCX document
Attachment 0008 - AIAMD IUID Plan Appendix A - IUID Candidates List Data Items.pdf PDF
Attachment 0009 - R and M Prediction Report.docx DOCX document
Attachment 0010a.3 – R003 KG-250X-FMECA.xlsx XLSX spreadsheet
Attachment 0010a.7 – R007 Relay Network Switch-Parvus Switch-FMECA.xlsx XLSX spreadsheet
Attachment 0010a.9 – R015 PDU Assembly-FMECA.xlsx XLSX spreadsheet
Attachment 0010a.13 – R031 Black Router--FMECA.xlsx XLSX spreadsheet
Attachment 0010c.3 – E048 HRFU-FMECA.xlsx XLSX spreadsheet
Attachment 0010c.8 – E053 Shelter Time Server-FMECA.xlsx XLSX spreadsheet
Attachment 0010c.9 – E059 Shelter Switch – 01-FMECA.xlsx XLSX spreadsheet
Attachment 0010d.7 – E153 RS112 Server -06 Shelter with PT-FMECA.xlsx XLSX spreadsheet
Attachment 0010d.8 – E153 RS112 Server -07 Shelter with PT-FMECA.xlsx XLSX spreadsheet
Attachment 0010e.9 – E147 – Table 3 Assembly-FMECA.xlsx XLSX spreadsheet
Attachment 0012 - Risk Management Plan.pdf PDF
Attachment 0013c - IBCS-A301-003 Vol II Instructor Guide_redacted.pdf PDF
Attachment 0013f - D-IBCS-0428-001_Delta_Software_SG_redacted.pdf PDF
Attachment 0013g - D-IBCS-0471_Delta2_Suppl_PE_redacted.pdf PDF
Attachment 0014 RevC - Technical Library.docx DOCX document
Attachment 0016 - Example Cage Code and Cognizant DCMA DCAA Information.xlsx XLSX spreadsheet
Attachment 0022a - CASS to PDRS.docx DOCX document
Attachment 0022a.1.e - ALH-215333 00 S-280 CASS INSTALLA.pdf PDF
Attachment 0022a.1.h - PL-ALH-211130 00 CABLE ASSEMBLY C.pdf PDF
Attachment 0022a.4 - CASS Task Purpose.v2.pptx PPTX presentation
Attachment 0025 - DD254.pdf PDF
Attachment 0010b.6 – E030 KVM Console-FMECA.xlsx XLSX spreadsheet
Attachment 0010a.5 – R005 SCIM-FMECA.xlsx XLSX spreadsheet
Attachment 0013i - D-IBCS-0473_Adv_NetMgr.pdf PDF
Attachment 0018 - IBCS LRIP FRP IDIQ Pricing Template_29Oct2020 v.3.xlsx XLSX spreadsheet
Attachment 0004 - Acceptance Test Plan.docx DOCX document
Attachment 0006 - Obsolete Parts List.pdf PDF
Attachment 0010a.4 – R004 IGRM-FMECA.xlsx XLSX spreadsheet
Attachment 0010a.8 – R008 Media Converter Chassis-FMECA.xlsx XLSX spreadsheet
Attachment 0010a.11 – R029 PFPU SSHD-1—FMECA.xlsx XLSX spreadsheet
Attachment 0010a.15 – R033 Media Converter Module 12-FMECA.xlsx XLSX spreadsheet
Attachment 0010b.2 – E002 Power Inverter Shelter Power-FMECA.xlsx XLSX spreadsheet
Attachment 0010b.4 – E013 ADSI Shelter – Misc Equip-FMECA.xlsx XLSX spreadsheet
Attachment 0010b.5 – E029 KVM Switch 1 Shelter Stack-FMECA.xlsx XLSX spreadsheet
Attachment 0010b.7 – E031 R112 Shelter – Server Stack – 01-FEMCA.xlsx XLSX spreadsheet
Attachment 0010c.2 – E044 Firewall Black-FMECA.xlsx XLSX spreadsheet
Attachment 0010c.5 – E050 KG-250X-FMECA.xlsx XLSX spreadsheet
Attachment 0010c.10 – E060 Shelter Switch – 02-FMECA.xlsx XLSX spreadsheet
Attachment 0010c.13 – E063 Isolation Router Black-FMECA.xlsx XLSX spreadsheet
Attachment 0010c.15 – E068 Media Converter 02 – FMECA.xlsx XLSX spreadsheet
Attachment 0010d.3 – E150 S-280 PEV-FMECA.xlsx XLSX spreadsheet
Attachment 0010e.1 – E067 – EtherNet Switch-FMECA.xlsx XLSX spreadsheet
Show all 50

RFP for Integrated Battle Command System (IBCS) LRIP/FRP has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W31P4Q-20-R-0015 ATTACHMENT 0004c

ECT Step by Step for ATP 14 April 2020 Required Tooling

Tool
Calibration
Verification

Temperature Gauge

Torque Wrench

Multimeter

Visual Inspection of ECT

Step #
Operator Actions
Expected Results
Actual Results
Comments / TIR
1
Perform an Inventory / Inspection of the ECT
See Appendix A
2
Verify pins are installed on each side of the rear and side walls
See Figure 1: Pin Locations (Both Roadside and Curbside)
3
Remove the pin between the front arch assembly and the roadside leftmost side wall

See Figure 1 , Item 1

4
Disconnect the leftmost sidewall from the right side wall

See Figure 1 , Item 2

5
Lower the sidewall to verify raise / lower capability
The sidewall lowers

See Figure 2

6
Raise sidewall and replace the pin between the front arch assembly and the leftmost side wall

See Figure 1 , Item 1

7
Disconnect the pin between the rightmost side wall and the rear wall

See Figure 1 , Item 3

8
Lower the sidewall to verify raise / lower capability
The sidewall lowers
9
Raise sidewall and replace the pins between the side walls and the rear wall
10
Repeat Steps 3 through 9 on the opposite side of the trailer
11
Verify that all walls (side and rear) appear to be level and do not rest against one another
All walls are level
12
Ensure a 13.5 inch section of the OEM deck seam has been removed above the rear tires (Curbside and Roadside)

See Figure 3: Deck Seam Removal Seam has been removed

13
Perform a spot check (minimum QTY 10) verifying the D-Rings to 35 – 40 ft/lbs torque using a calibrated torque wrench

All D-Rings meet torque spec

Figure 1: Pin Locations (Both Roadside and Curbside)

Figure 2: D-Ring Locations

Figure 3: Deck Seam Removal

IECU Wiring

Step #
Operator Actions
Expected Results
Actual Results
Comments / TIR

****CAUTION****

Verify no power is supplied to the IECU

1
Raise the top cover of the IECU
Top Cover is raised
2
Remove two flexible air ducts, one flange assembly, one T-shaped condensation drain hose, one control cable assembly (with remote box), one power cable, and one power cable (pigtail)
3
Connect supply air duct to IECU. Do not bend or kink ducts.
4
Remove return air duct attachment cover and supply air collar attachment duct cover.
5
Install flange assembly on IECU return air by aligning then inserting locking tabs on flange assembly into return opening. Turn clockwise to fully engage locking tabs.
6
Connect return air duct to IECU flange assembly installed in Step 5

***NOTE***

To assure a continuous supply of fresh make-up air, at least ¾ of the slotted row openings should be exposed

7
Adjust fresh air inlet as needed, then secure flexible duct onto flange assembly with web belt and buckle far enough to expose open indicator
8
Connect one T-shaped condensation hose to barbed fittings at front (see Figure 4: 60K BTU/Hr IECU Deployed) and rear base of equipment
9
Make sure remote box assembly interconnecting cable is connected to electrical box connector in IECU

***CAUTION***

Make sure all items stored under the condenser fan are removed and there are no loose items inside of IECU

10
Lower top cover of the IECU
11
Lift top cover of the PDISE and ensure all circuit breakers are in the OFF position.
See Figure 5: PSIDE w/ Lid Opened
11
Connector 60A power cable from the IECU to the PDISE
See Figure 6: PDISE Connections

See

12
Lower 200A power pigtail from tongue of trailer and connect to PDISE per Figure 7: Wiring Diagram for reference

Figure 4: 60K BTU/Hr IECU Deployed

Figure 5: PSIDE w/ Lid Opened

Figure 6: PDISE Connections

Figure 7: Wiring Diagram

Generator Functional Check out

Step #
Operator Actions
Expected Results
Actual Results
Comments / TIR

****CAUTION****

Verify by visual inspection that all equipment has been properly grounded to ensure proper operation and prevent an electrical hazard for the equipment or operator. The generator is grounded through the ground stud on the curbside.

Verify correct wiring of IECU, PDISE, and generator before beginning See Figure 7: Wiring Diagram

1
Verify fluid levels of generator
Oil level is within the correct range and no leaks are present
2
Verify Voltage selection board is in correct Position

(1) 120/208-V 3 Phase Generator set configured for 120/208-V three-phase load

3
Place DEAD CRANK SWITCH found inside right-side door in NORMAL position
4
Turn main DC circuit breaker found inside left-side door to ON
5
Pull out EMERGENCY STOP on DCS
6
Move engine control switch to PRIME & RUN
7
Ensure voltage selection switch located inside right-side door on the output box assembly panel is positioned to match voltage requirements
120/208V, 3 Phase
8
Ensure BATTLESHORT switch is in the OFF position
9
Push PANEL LIGHTS switch to verify illumination
Panel lights should illuminate
10
Verify fuel level

Should be a minimum of 55%

11
Turn engine control switch to START and release
12
Verify engine control switch returns to PRIME & RUN upon release
13
Check operator main screen for proper phase, voltage, and frequency
Phase = 3 Phase

Voltage = 120/208 V Frequency = 60 Hz

14
Apply load by pushing AC CIRCUIT INTERRUPT switch on control panel
15
Verify the main screen display now shows the generator set is supply power to the load
See Figure 8: Operator Main Screen below.
16
Allow the generator to run for a minimum of 5 minutes
Generator runs without fault for 5 minutes

Figure 8: Operator Main Screen

IECU Check out

Step #
Operator Actions
Expected Results
Actual Results
Comments / TIR

***NOTE***

Verify the generator is operational and running prior to commencement

1
Make sure circuit breaker 2 is in the OFF position and remote box selector switch is OFF
2
Insert multimeter probes in Pins 1 (common), 7, and 8 in the J5 connector (located behind the diagnostic door). Set the multimeters to display the peak resistance measurement.
See Figure 9: J5 Pin Out
3
Place CB1 to ON position

***CAUTION***

IECU must be operated in vent mode first to ensure evaporator blower motor is operating. If evaporator blower motor is not operating, damage may occur.

***NOTE***

Time delay of approximately 60 seconds should be allowed for compressor to start in COOL mode Ensure pressure buildup before condenser fan turns on in COOL mode.

4
Place selector switch (Item 2) on remote box assembly (Item 1) or necessary mode of operation as follows:

COOL Mode. Evaporator blower motor, condenser fan motor, and compressor are energized, and tubular heaters are de-energized when thermostat is set to COOLER position.

See Figure 10: Temperature Settings

5
Adjust temperature control on the remote box assembly by turning the TEMPERATURE knob to COOLER
6
Record the resistance value from the multimeter in pin 8 as R1.
R1 Value
7
Use the Figure 11: Temperature Conversion Chart 1 and Figure 12: Temperature Conversion Chart 2 to transcribe R1 to a temperature value T1
T1 Value
8
Record the resistance value from the multimeter in pin 7 as R2.
R2 Value
9
Use the Figure 11: Temperature Conversion Chart 1 and Figure 12: Temperature Conversion Chart 2 to transcribe R2 to a temperature value T2
T2 Value
10
Calculate the difference between T1 and T2
Calculated difference is greater than 3°, but less than 15°.
11
Use the Temperature Gauge at the IECU exhaust to record temperature T3
T3 Value
12
Place selector switch on remote box assembly or necessary mode of operation as follows:

HEAT Mode. Evaporator blower motor and tubular heaters are energized and condenser fan motor and compressor are de-energized when thermostat is set to WARMER position.

13
Adjust temperature control on the remote box assembly by turning the TEMPERATURE knob to WARMER
14
Wait approximately 60 seconds, then use the Temperature Gauge at the IECU exhaust to record temperature T4
T4 Value
15
Calculate the difference between T3 and T4
Calculated difference is greater than 3°, but less than 15°.
16
Place selector switch on remote box assembly to OFF
17
Place circuit breaker 1 to OFF position.

Figure 9: J5 Pin Out

Figure 10: Temperature Settings

Figure 11: Temperature Conversion Chart 1

Figure 12: Temperature Conversion Chart 2

Appendix A Inventory Sheet Verify presence of each component, and inspect for signs of damage or defects.

Part Number
Part Name
QTY
Verification
Comments
1003506
Power Distribution Unit (PDU)
1
13719146
Generator Cover
1
13719155
PDISE Cable
1
13719156
Ladder Bracket
1
13719167
Data Plate
1
13719171
Ladder
1
13226E7022-2
50’ 60 AMP Cable
2
13226E7024
50' 100 AMP CABLE
2
13226E77411
Ground Rod Driver
1
13229E6350
PDISE-FEEDER SYSTEM ELECTRICAL

THREE PHASE 120/208V 200 AMP

PSTFS2TAN-KC
Fastening Strap
20
TBD
Cover
1
CGU-1B
Ratchet tie down strap
3
B500
EXTINGUISHER, FIRE 5LB

DRY CHEMICAL

ALH-213882-001
GROUNDING KIT
1
184K0000-5
AIR CONDITIONER, 60K BTU

208 VOLT, 3 PHASE, 50/60 HZ

N/A
Chock Blocks w/ Chains
2
N/A
Lock / Unlock Handles of Brake Lines
2
N/A
Trailer Legs
4
N/A
Crank Handles
2
N/A
Airlines
2
N/A
Trailer Lights
14
N/A
Trailer Utility Cable and Socket
1

image2.png image3.png image4.png image5.emf image6.emf image7.png image8.png image9.png image10.png image11.emf image12.png image13.png image14.png image15.png image16.png image17.png image18.png image19.png image20.emf image21.emf image22.emf image23.emf image24.emf image1.png

File details come from the government source that posted it. Updated .