About this file
This document includes construction plans and specifications for a septic drainfield and septic tank to support a new fire operations center building. The plans provide details for a 1,250 gallon septic tank, drainfield layout consisting of six 37-foot long lateral pipes laid in a 40-foot by 18-foot area, and specifications for materials, installation, and inspections in accordance with the local health department requirements. The related federal contract opportunity is a solicitation to award a firm fixed-price contract for construction of the Cadillac-Manistee Fire Warehouse. The project will build a new warehouse structure located at 1170 Nursery Road in Wellston, Michigan for the Huron-Manistee National Forest. The contract is expected to be awarded before August 1, 2023 and will be conducted according to the Federal Acquisition Regulation and conducted by the Department of Agriculture Forest Service.
View the file
Other files for this federal contract opportunity
Show all 38
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTE 1250 GALLON SEPTIC TANK SIZE DRAWN AS 6' WIDE X 8' LONG X
5'-7" HIGH WITH INLET INVERT BEING 55" FROM OUTSIDE BOTTOM OF
TANK. OUTLET INVERT 2" BELOW INLET INVERT. TANK DIMENSIONS
MAY VARY - FIELD ADJUST, BUT KEEP PIPE SLOPES AT 2%.
10' OF 4" SCH 40
PVC AT 2% SLOPE
ALL DRAIN FIELD
PIPE LAID LEVEL
WITH INVERTS AT
95.23'
40.0'
1.5' 1.5'
40' X 18', 6A DRAIN
ROCK TOP FOOTPRINT
6 EACH 37' LONG 4" PVC-DS 2 HOLE PERFORATION LATERAL
PIPES LAID LEVEL WITH 5/8" DIA PERFORATIONS AT 5" O.C.
LAID AT 4 & 8 O'CLOCK POSITION WITH PIPE LETTERING AT 12
O'CLOCK. ALL JOINTS TO BE GLUED.
4" PVC-DS PIPE
NON-PERFORATED HEADER
4" PVC-DS PIPE
NON-PERFORATED FOOTER
1 OF 4 OBSERVATION
PORTS - SEE DETAIL
ELBOWS AND TEES AS REQUIRED.
ALL JOINTS ARE TO BE GLUED.
PLAN VIEW OF DRAIN FIELD AND SEPTIC TANK - SCALE 5/16" = 1'
A
A
EFFLUENT FILTER
OUTLET INVERT
95.43' TO FIELD
4" SCH 40 PVC
AT 2% SLOPE
FROM BLDG
6"
INLET INVERT
95.60' FROM BLDG.
30" Ø RISER AND LID.
EXTEND RISER SO LID IS
4" ABOVE FINISHED
GRADE & INCLUDE
CONCRETE TANK LID -
SEE SPECIFICATIONS
· DESIGN FLOW BASED ON:
MEETINGS 41 PEOPLE X 5 GAL/PERSON = 205 GPD
SHOWERS 8 PEOPLE X 15 GAL/PERSON/SHOWER = 120 GPD
10 PERSONS FOR A FULL 8 HOUR SHIFT X 18 GPD = 180 GPD
1 CLOTHES WASHER CYCLE PER DAY X 20 GAL/CYCLE = 20 GPD
· DESIGN FLOW DETERMINED TO BE 525 GPD BASED ON CURRENT
EXPECTED USE. THIS WAS INCREASED BY ~40% DUE TO
POSSIBLE FUTURE INCREASE IN USE THAT IS NOT FORESEEN.
THEREFORE THE DESIGN FLOW OF THIS SYSTEM IS 720 GPD.
· ALLOWABLE LOADING RATE IS 1.0 GPD/SFT BASED ON COARSE TO
MEDIUM SAND BELOW THE DRAIN STONE & IS ALLOWABLE FOR A
BED DESIGN THAT IS LESS THAN 1000 GPD PER MI CRITERIA FOR
SUBSURFACE SEWAGE DISPOSAL
· DESIGN OF COMPONENTS PER THE MI DISTRICT HEALTH
DEPARTMENT #10 SANITARY CODE..
B B
CENTER
EFFLUENT FILTER
IN RISER - SEE
SPECIFICATIONS
LIQUID LEVEL (LL)
EXTEND INLET BAFFLE 12" BELOW LL
& 8" ABOVE LL USING SANITARY
SWEEP T AND 4" SCH 40 PVC PIPE -
GLUE ALL JOINTS. CENTER OF
BAFFLE SHALL BE 6" FROM EDGE OF
TANK OPENING.
1250 GAL SEPTIC TANK SECTION B-B - SCALE 3/8" = 1'
INLET INVERT = 95.60'
OUTLET FOR EFFLUENT FILTER
2" (0.17') BELOW INLET INVERT
OUTLET INVERT = 95.43'
TANK BEDDING SHALL CONSIST OF NATURAL INSITU SAND - NO
BEDDING STONE REQUIRED.
WATER TABLE OBSERVED AT APPROXIMATELY 90.7' +/-
FINISHED GRADE = 97.50'
EXISTING GRADE = 97.5'+/-
30" Ø RISER AND LID.
EXTEND RISER SO
TOP OF LID IS 4"
ABOVE FINISHED
GRADE & INCLUDE
CONCRETE TANK LID
- SEE
SPECIFICATIONS
CROSS SECTION A-A OF DRAIN FIELD - SCALE 3/8" = 1'
20'
18'
EXISTING GRADE ~97.4'
BOTTOM OF 6A STONE = 94.73'
INVERT OF ALL PIPE = 95.23'
TOP OF 6A STONE = 95.73'
FINISHED GRADE 97.5'
TOP OF BACKFILL/BOTTOM
OF TOPSOIL = 97.0'
GEOTEXTILE FABRIC
OVER TOP AND ALL
SIDES OF STONE
1.5' 3' 3' 3' 3' 1.5'
SALVAGED TOPSOIL
BACKFILL - CLEAN
EXCAVATED SOIL
4" PVC
PERFORATED
LATERALS
3'
8'
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
/10
/22
:5 0 R
JS
UT
TO
N
C:
\U
SE
RS
\R
JS
UT
TO
N\
BO
X\ R0
9 R O
EN
G
PR
OG
RA
MS
\74
W
AT
ER
W
AS
TE
W
AT
ER
\D
AV
E&
RU
SS
W
-W W
F
IL
ES
\H
MN
F\
CH
IT
TE
ND
EN
F
IR
E
W
AR
EH
OU
SE
\C
AD
P
DF
\C
HI
TT
F
IR
E
W H
W -W
W
-1 0-
R
JS
V 2 S
MA
LL
ER
F
IE
LD
0%
.D W
G;
R9
EASTERN REGION
CADILLAC -
MANISTEE FIRE
OPERATIONS
CENTER
HURON-MANISTEE
NATIONAL FOREST
CADILLAC-MANISTEE RANGER
DISTRICT
SEPTIC DRAIN FIELD
AND SEPTIC TANK
8-3-2022 090403-ABL2022-0002-C0001
R.SUTTON
R.SUTTON
D.MATTEI
C1-16 6 6760
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
| Sheets and Views |
| Chitt Fire WH w-ww 11-10-2022 RJS V2 smaller field 100%-SEPTIC SITE PLAN |
| OLE1 |
| Chitt Fire WH w-ww 11-10-2022 RJS V2 smaller field 100%-SEPTIC FIELD & TANK |
| OLE1 |
| Chitt Fire WH w-ww 11-10-2022 RJS V2 smaller field 100%-W-WW DETAILS |
| OLE1 |
File details come from the government source that posted it. Updated .