ATT1 SOI CM Fire Ops Center.pdf

PDF 210 KB Posted

Attached to
Huron Manistee NF Construct Cadillac-Manistee Fire Ops Center Federal contract opportunity
Solicitation number
12445523R0018
Issued by
Department of Agriculture Forest Service

About this file

This document contains a schedule of items and specifications for the construction of a new fire operations center. The project involves building a 6,000 square foot warehouse structure for the Cadillac-Manistee National Forest located in Wellston, Michigan. The schedule of items includes line items for mobilization, facility construction, facility services, site and infrastructure work, and optional bid items such as interior painting, HVAC equipment, cabinetry, and landscaping. An alternate proposal is also included for a reduced 4,920 square foot footprint. The related federal contract opportunity specifies this will be a single award firm fixed price contract conducted according to FAR Parts 15 and 36. The project is to be awarded before August 1, 2023 by the U.S. Department of Agriculture Forest Service.

View the file

Other files for this federal contract opportunity

Other files attached to Huron Manistee NF Construct Cadillac-Manistee Fire Ops Center, newest first.
File Type Posted
Decom Staff Office P7290024.JPG JPG image
Decom Staff Office P7290030.JPG JPG image
Decom Staff Office Page 57 from Report.pdf PDF
Decom Staff Office Page 242 from Report.pdf PDF
Decom Staff Office P7290031.JPG JPG image
Decom Staff Office P7290025.JPG JPG image
099723 Concrete Sealer.pdf PDF
RFI log for Q and A 6-30-2023 FINAL.xlsx XLSX spreadsheet
095123 Acoustical Tile Ceilings.DOC DOC document
090403-ABL2022-0002-A421-A405 INTERI0R SIGN ELEVATIONS_REV01.pdf PDF
RFI log for Q and A 6-28-2023.xlsx XLSX spreadsheet
RFI log for Q and A 6-27-2023.xlsx XLSX spreadsheet
220063_01_230601_DRAWINGS.pdf PDF
220063_STAFFHOUSE_TABLE OF CONTENTS and SPECS.pdf PDF
Sol_12445523R0018_Amd_0003.pdf PDF
RFI log for Q and A.xlsx XLSX spreadsheet
323113 Chain Link Fences and Gates.doc DOC document
090403-ABL2022-0002-A626-SCHEDULES_REV03.pdf PDF
Sign-in sheet.pdf PDF
329200 SEEDING and MULCHING.pdf PDF
QandA 6-9-23.pdf PDF
Sol_12445523R0018_Amd_0002.pdf PDF
ATT2 CADILLAC-MANISTEE FIRE OPERATIONS CENTER_SPECIFICATIONS_FINAL SUBMISSION_REV03.pdf PDF
ATT2 CADILLAC-MANISTEE FIRE OPERATIONS CENTER_SPECIFICATIONS_FINAL SUBMISSION_REV02.pdf PDF
Sol_12445523R0018_Amd_0001.pdf PDF
ATT3 2022-HM-CADILLAC-MANISTEE FIRE OPERATIONS CENTER-CD FINAL SUBMISSION v.02.pdf PDF
ATT9 C1-02_New Fire House Geometric Plan-REV01.pdf PDF
ATT11 C5-17 SEPTIC and WATER SYSTEM DETAILS-REV-001.pdf PDF
ATT5 090403-ABL2022-0002-A417-A401-WALL SECTIONS_REV01.pdf PDF
Sol_12445523R0018.pdf PDF
ATT7 090403-ABL2022-0002-A420-A404 INTERIOR ELEVATION_REV02.pdf PDF
ATT10 C1-16 SEPTIC DRAINFIELD and SEPTIC TANK-REV01.pdf PDF
ATT12 Wage Determination MI20230134.pdf PDF
ATT1 SOI CM Fire Ops Center.xlsx XLSX spreadsheet
ATT2 CADILLAC-MANISTEE FIRE OPERATIONS CENTER_SPECIFICATIONS_FINAL SUBMISSION_REV01.pdf PDF
ATT4 090403-ABL2022-0002-A214-EXTERIOR ELEVATION_REV01.pdf PDF
ATT6 090403-ABL2022-0002-A419-A403 INTERIOR ELEVATIONS_REV01.pdf PDF
ATT8 090403-ABL2022-0002-A626-SCHEDULES_REV02.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: 2/23/2023

Item Number

Description Pay Unit Quantity Unit Price Total Price

Mobilization Includes costs for mobilization of equipment, materials, and supplies, which are not included in a line item below. This would include but not limited to;

bonding, insurance, permit fees, field office and staff, temporary utilities (phone, power, sanitation), site clean-up, waste disposal, field office vehicles and their operational costs, temporary utilities, superintendence, construction fencing, safety and QC costs, and any other project costs not directly associated with a line item below.

LUMP SUM 1

FACILITY CONSTRUCTION SUBGROUP

Divisions 03 - 12

LUMP SUM 1

FACILITY SERVICES SUBGROUP

Divisions 22 - 28

LUMP SUM 1

SITE AND INFRASTRUCTURE SUBGROUP

Divisions 31- 33

LUMP SUM 1

OPTIONAL BID ITEMS

Item Description Pay Unit Quantity Unit Price Total Price

OP-1

Interior Painting Reference sheet A6-01 for optional "Finish Schedule"

LUMP SUM 1

OP-2

CU-1, Grade Mounted Condesning Unit Reference sheet H1-01 & H6-01 for details on optional air conditioning equipment.

LUMP SUM 1

OP-3

Electric Duct Heater Reference sheets H1-01 & H6-01 for details on optional duct heater equipemtn.

LUMP SUM 1

OP-4

Refreshment Area Cabinetry Includes upper & base cabinets and countertop.

Reference sheet A1-01 & A4-04.

LUMP SUM 1

OP-5

Fire Cache Enclosure Reference sheets A1-01 & A4-04

LUMP SUM 1

OP-6

Accordion Folding Partion Reference sheets A1-01 & A5-02

LUMP SUM 1

OP-7

Window Shades Reference Divison 12 - Furnishings, 122400 Clutch-Operated Window Shades.

LUMP SUM 1

OP-8

Landscape Amentities - Plantings Reference "L" sheets, item includes plantings only.

LUMP SUM 1

OP-9

Landscape Amenities - Concrete Walkway, Dumpster Screen, Signage, all other items not included with "Plantings" Reference "L" sheets & A4-05

LUMP SUM 1

OP-10

Demolition of Existing Facility Decommissioning of exisitng fire module office located near main entrance.

Separate plans provided.

LUMP SUM 1

Cadillac‐Manistee Fire Operations Center

Schedule of Items

TOTAL PRICE FOR BASE BID ITEMS

TOTAL PRICE OF OPTION ITEMS

PREFERRED ALTERNATE (6,000SF)

Date: 2/23/2023

Item Number

Description Pay Unit Quantity Unit Price Total Price

1A

Mobilization Includes costs for mobilization of equipment, materials, and supplies, which are not included in a line item below. This would include but not limited to;

bonding, insurance, permit fees, field office and staff, temporary utilities (phone, power, sanitation), site clean-up, waste disposal, field office vehicles and their operational costs, temporary utilities, superintendence, construction fencing, safety and QC costs, and any other project costs not directly associated with a line item below.

LUMP SUM 1

2A

FACILITY CONSTRUCTION SUBGROUP

Divisions 03 - 12 Contractor repsonsible for calculating takeoffs for reduction in square footage for Alternate #1. See sheets AA1-01 & AA2-01 for details.

LUMP SUM 1

3A

FACILITY SERVICES SUBGROUP

Divisions 22 - 28 For additional details on Aleternate #1 reductions for HVAC and electrical equipment reference sheets H1-01 & E1-03.

LUMP SUM 1

4A

SITE AND INFRASTRUCTURE SUBGROUP

Divisions 31- 33 Contractor repsonsible for calculating takeoffs for reduction in square footage for Alternate #1. See sheets AA1-01 & AA2-01 for details.

LUMP SUM 1

OPTIONAL BID ITEMS

Item Description Pay Unit Quantity Unit Price Total Price

OP-1A

Interior Painting Reference sheet A6-01 for optional "Finish Schedule"

LUMP SUM 1

OP-2A

CU-1, Grade Mounted Condesning Unit Reference sheet H1-01 & H6-01 for details on optional air conditioning equipment.

LUMP SUM 1

OP-3A

Electric Duct Heater Reference sheets H1-01 & H6-01 for details on optional duct heater equipemtn.

LUMP SUM 1

OP-4A

Refreshment Area Cabinetry Includes upper & base cabinets and countertop.

Reference sheet A1-01 & A4-04.

LUMP SUM 1

OP-5A

Fire Cache Enclosure Reference sheets A1-01 & A4-04

LUMP SUM 1

OP-6A

Accordion Folding Partion Reference sheets A1-01 & A5-02

LUMP SUM 1

OP-7A

Window Shades Reference Divison 12 - Furnishings, 122400 Clutch-Operated Window Shades.

LUMP SUM 1

OP-8A

Landscape Amentities - Plantings Reference "L" sheets, item includes plantings only.

LUMP SUM 1

OP-9A

Landscape Amenities - Concrete Walkway, Dumpster Screen, Signage, all other items not included with "Plantings" Reference "L" sheets & A4-05

LUMP SUM 1

OP-10A

Demolition of Existing Facility Decommissioning of exisitng fire module office located near main entrance.

Separate plans provided.

LUMP SUM 1

TOTAL PRICE OF OPTION ITEMS

Cadillac‐Manistee Fire Operations Center

Schedule of Items

ALTERNATE #1, Reducded Footprint (4,920SF) See Sheets AA1-01 & AA2-01 for details

TOTAL PRICE FOR BASE BID ITEMS

File details come from the government source that posted it. Updated .