220063_STAFFHOUSE_TABLE OF CONTENTS and SPECS.pdf

PDF 264 KB Posted

Attached to
Huron Manistee NF Construct Cadillac-Manistee Fire Ops Center
Solicitation number
12445523R0018
Issued by

About this file

This document package includes a table of contents, specifications, and solicitation for a federal construction contract. The solicitation requests proposals to construct a new fire warehouse building at the Cadillac-Manistee Ranger Station in Wellston, Michigan. The project scope involves decommissioning an existing fire module building upon completion of the new warehouse, which is required to house all district and Great Lakes Interagency Wildland Fire Module equipment. Proposals are due before August 1, 2023 and contract award will occur thereafter. The selected contractor will be responsible for demolition of the existing structure according to specified procedures for protection, hazardous materials handling, soil remediation, and clean-up. The construction work must be completed according to included division specifications for general requirements, existing conditions, and execution.

View the file

Other files

File Type Posted
Decom Staff Office P7290024.JPG JPG image
Decom Staff Office Page 242 from Report.pdf PDF
Decom Staff Office P7290030.JPG JPG image
Decom Staff Office Page 57 from Report.pdf PDF
Decom Staff Office P7290025.JPG JPG image
Decom Staff Office P7290031.JPG JPG image
099723 Concrete Sealer.pdf PDF
RFI log for Q and A 6-30-2023 FINAL.xlsx XLSX spreadsheet
095123 Acoustical Tile Ceilings.DOC DOC document
090403-ABL2022-0002-A421-A405 INTERI0R SIGN ELEVATIONS_REV01.pdf PDF
RFI log for Q and A 6-28-2023.xlsx XLSX spreadsheet
RFI log for Q and A 6-27-2023.xlsx XLSX spreadsheet
Sol_12445523R0018_Amd_0003.pdf PDF
220063_01_230601_DRAWINGS.pdf PDF
Sign-in sheet.pdf PDF
090403-ABL2022-0002-A626-SCHEDULES_REV03.pdf PDF
RFI log for Q and A.xlsx XLSX spreadsheet
323113 Chain Link Fences and Gates.doc DOC document
329200 SEEDING and MULCHING.pdf PDF
Sol_12445523R0018_Amd_0002.pdf PDF
QandA 6-9-23.pdf PDF
ATT2 CADILLAC-MANISTEE FIRE OPERATIONS CENTER_SPECIFICATIONS_FINAL SUBMISSION_REV03.pdf PDF
Sol_12445523R0018_Amd_0001.pdf PDF
ATT2 CADILLAC-MANISTEE FIRE OPERATIONS CENTER_SPECIFICATIONS_FINAL SUBMISSION_REV02.pdf PDF
ATT5 090403-ABL2022-0002-A417-A401-WALL SECTIONS_REV01.pdf PDF
Sol_12445523R0018.pdf PDF
ATT10 C1-16 SEPTIC DRAINFIELD and SEPTIC TANK-REV01.pdf PDF
ATT12 Wage Determination MI20230134.pdf PDF
ATT3 2022-HM-CADILLAC-MANISTEE FIRE OPERATIONS CENTER-CD FINAL SUBMISSION v.02.pdf PDF
ATT1 SOI CM Fire Ops Center.xlsx XLSX spreadsheet
ATT7 090403-ABL2022-0002-A420-A404 INTERIOR ELEVATION_REV02.pdf PDF
ATT9 C1-02_New Fire House Geometric Plan-REV01.pdf PDF
ATT11 C5-17 SEPTIC and WATER SYSTEM DETAILS-REV-001.pdf PDF
ATT1 SOI CM Fire Ops Center.pdf PDF
ATT2 CADILLAC-MANISTEE FIRE OPERATIONS CENTER_SPECIFICATIONS_FINAL SUBMISSION_REV01.pdf PDF
ATT6 090403-ABL2022-0002-A419-A403 INTERIOR ELEVATIONS_REV01.pdf PDF
ATT8 090403-ABL2022-0002-A626-SCHEDULES_REV02.pdf PDF
ATT4 090403-ABL2022-0002-A214-EXTERIOR ELEVATION_REV01.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Chittenden Existing Structure Renovations Staff House

United States Forest Service Manistee County, MI

C2AE © Project #22-0063 1

06/01/2023 TABLE OF CONTENTS

TABLE OF CONTENTS

Division Section Title

DIVISION 01 - GENERAL REQUIREMENTS

01 1000 Summary

DIVISION 02 - EXISTING CONDITIONS

02 4116 Structure Demolition

END OF TABLE OF CONTENTS

Cadillac-Manistee Fire Operations Center

C2AE © Project #22-0063 01 1000 - 1

06/01/2023 SUMMARY

SECTION 01 1000 - SUMMARY

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Project information.

2. Work covered by Contract Documents.

3. Contractor's use of site and premises.

4. Coordination with occupants.

5. Work restrictions.

6. Specification and Drawing conventions.

1.2 PROJECT INFORMATION

A. Project Identification: Cadillac-Manistee Fire Operations Center

1. Project Location: 1170 Nursery Road, Wellston, MI 49689; Manistee County.

B. Owner: United States Forest Service, Cadillac-Manistee Ranger Station, 1170 Nursery Road, Wellston, MI 49689; Manistee County

1. Contracting Officer’s Representative (COR)/Technical POC: Kenny Papes, Facilities Engineer, kenneth.papes@usda.gov, 231-285-1684.

C. Architect: C2AE, 50 Lewis St. NW, Suite 200, Grand Rapids, MI 49503.

1. Architect's Representative POC: Kelly Homic, Project Manager, kelly.homic@C2AE.com.

1.3 WORK COVERED BY CONTRACT DOCUMENTS

A. The Work of Project is defined by the Contract Documents and consists of the following:

1. This project includes the decommission of the existing fire module building (Staff

House) upon the completion of the new fire warehouse that would be capable of housing all district and Great Lakes Interagency Wildland Fire Module (GLIAWFM) fire equipment, and other Work indicated in the Contract Documents.

B. Type of Contract:

1. Project will be constructed under a single prime contract.

1.4 CONTRACTOR'S USE OF SITE AND PREMISES

A. Unrestricted Use of Site: Contractor shall have full use of Project site for construction operations during construction period. Contractor's use of Project site is limited only by Owner's right to perform work or to retain other contractors on portions of Project.

C2AE © Project #22-0063 01 1000 - 2

B. Restricted Use of Site: Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits and as indicated by requirements of this Section.

C. Limits on Use of Site: Limit use of Project site to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.

1. Limits on Use of Site: Confine construction operations to areas marks onsite.

2. Driveways, Walkways, and Entrances: Keep driveways and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or for storage of materials.

D. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weathertight condition throughout construction period.

Repair damage caused by construction operations.

E. Condition of Existing Grounds: Maintain portions of existing grounds, landscaping, and hardscaping affected by construction operations throughout construction period. Repair damage caused by construction operations.

1.5 COORDINATION WITH OCCUPANTS

A. Partial Owner Occupancy: Owner will occupy the premises during entire construction period, with the exception of areas under construction. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's operations. Maintain existing exits unless otherwise indicated.

B. Owner Limited Occupancy of Completed Areas of Construction: Owner reserves the right to occupy and to place and install equipment in completed portions of the Work, prior to Substantial Completion of the Work, provided such occupancy does not interfere with completion of the Work. Such placement of equipment and limited occupancy shall not constitute acceptance of the total Work.

1.6 WORK RESTRICTIONS

A. Comply with restrictions on construction operations.

1. Comply with limitations on use of public streets, work on public streets, rights of way, and other requirements of authorities having jurisdiction.

B. On-Site Work Hours: Limit work in the existing building to normal business working hours of 8 a.m. to 4:30 p.m., Monday through Friday, unless otherwise indicated or coordinated with the owner.

C2AE © Project #22-0063 01 1000 - 3

C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:

1. Notify Owner not less than two days in advance of proposed utility interruptions.

D. Noise, Vibration, Dust, and Odors: Coordinate operations that may result in high levels of noise and vibration, dust, odors, or other disruption to Owner occupancy with Owner.

1. Notify Owner not less than two days in advance of proposed disruptive operations.

E. Smoking and Controlled Substance Restrictions: Use of tobacco products, alcoholic beverages, and other controlled substances on Project site is not permitted.

F. Employee Identification: Provide identification tags for Contractor personnel working on Project site. Require personnel to use identification tags at all times.

G. Employee Screening: Comply with Owner's requirements for screening of Contractor personnel working on Project site.

1. Maintain list of approved screened personnel with Owner's representative.

1.7 SPECIFICATION AND DRAWING CONVENTIONS

A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows:

1. Imperative mood and streamlined language are generally used in the

Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

2. Text Color: Text used in the Specifications, including units of measure, manufacturer and product names, and other text may appear in multiple colors or underlined as part of a hyperlink; no emphasis is implied by text with these characteristics.

3. Hypertext: Text used in the Specifications may contain hyperlinks. Hyperlinks may allow for access to linked information that is not residing in the Specifications. Unless otherwise indicated, linked information is not part of the Contract Documents.

4. Specification requirements are to be performed by Contractor unless specifically stated otherwise.

B. Contracting Requirements: General provisions of the Contract, including General and Supplementary Conditions, apply to all Sections of the Specifications.

C. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.

C2AE © Project #22-0063 01 1000 - 4

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 1000

C2AE © Project #22-0063 02 4116 - 1

06/01/2023 STRUCTURE DEMOLITION

SECTION 02 4116 - STRUCTURE DEMOLITION

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Demolition and removal of buildings and site improvements.

2. Removing below-grade construction.

3. Disconnecting, capping or sealing, abandoning in-place, and removing site utilities.

1.2 MATERIALS OWNERSHIP

A. Unless otherwise indicated, demolition waste becomes property of Contractor.

B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Owner that may be uncovered during demolition remain the property of Owner.

1. Carefully salvage in a manner to prevent damage and promptly return to Owner.

1.3 INFORMATIONAL SUBMITTALS

A. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property, for environmental protection. Indicate proposed locations and construction of barriers.

B. Schedule of building demolition activities with starting and ending dates for each activity.

C. Statement of Refrigerant Recovery: Signed by refrigerant recovery technician.

1.4 QUALITY ASSURANCE

A. Refrigerant Recovery Technician Qualifications: Certified by EPA-approved certification program.

1.5 FIELD CONDITIONS

A. Buildings to be demolished will be vacated and their use discontinued before start of the Work.

B. Buildings immediately adjacent to demolition area will be occupied. Conduct building demolition so operations of occupied buildings will not be disrupted.

1. Provide not less than 72 hours' notice of activities that will affect operations of adjacent occupied buildings.

C2AE © Project #22-0063 02 4116 - 2

2. Maintain access to existing walkways, exits, and other facilities used by occupants of adjacent buildings.

a. Do not close or obstruct walkways, exits, or other facilities used by occupants of adjacent buildings without written permission from authorities having jurisdiction.

C. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.

D. Hazardous Materials: It is expected that hazardous materials will be encountered in the Work.

1. Hazardous materials are to be removed and properly disposed of by Contractor.

2. Hazardous materials include asbestos-containing materials (ACM) in the following components:

a. Vinyl floor tile.

b. Roof flashing tar.

3. Hazardous materials include lead-based paints (LBP) in amounts greater than

0.3 mg/cm3 on the following surfaces:

a. Exterior wood siding.

b. Exterior wood soffits and trim.

c. Exterior wood doors and frames.

d. Exterior wood windows.

E. On-site storage or sale of removed items or materials is not permitted.

F. Arrange demolition schedule so as not to interfere with Owner's on-site operations or operations of adjacent occupied buildings.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with ANSI/ASSP A10.6 and NFPA 241.

2.2 SOIL MATERIALS

A. Satisfactory Soils: Soil Classification Groups GW, GP, GM, SW, SP, and SM according to ASTM D2487, or a combination of these groups; free of rock or gravel larger than 2 inches in any dimension, debris, waste, frozen materials, vegetation, and other deleterious matter.

B. Planting-Soil (Topsoil) Type: Manufactured soil consisting of manufacturer's basic topsoil, blended in a manufacturing facility with sand, stabilized organic soil amendments, and other materials to produce viable planting soil.

C2AE © Project #22-0063 02 4116 - 3

2.3 SEED

A. Grass Seed: Comply with Standard specifications for Construction of Roads and Bridges on Federal Highways Projects (FP-14)

B. Mixture to be native mix, approved by COR.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that utilities have been disconnected and capped before starting demolition operations.

3.2 PREPARATION

A. Refrigerant: Before starting demolition, remove refrigerant from mechanical equipment according to 40 CFR 82 and regulations of authorities having jurisdiction.

3.3 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS

A. Existing Utilities to Be Disconnected: Locate, identify, disconnect, and seal or cap off utilities serving buildings and structures to be demolished.

1. Arrange to shut off utilities with utility companies.

2. If removal, relocation, or abandonment of utility services will affect adjacent occupied buildings, then provide temporary utilities that bypass buildings and structures to be demolished and that maintain continuity of service to other buildings and structures.

3. Cut off pipe or conduit a minimum of 24 inches below grade. Cap, valve, or plug and seal remaining portion of pipe or conduit after bypassing according to requirements of authorities having jurisdiction.

4. Do not start demolition work until utility disconnecting and sealing have been completed and verified in writing.

3.4 PROTECTION

A. Existing Facilities: Protect adjacent walkways, loading docks, building entries, and other building facilities during demolition operations. Maintain exits from existing buildings.

B. Temporary Shoring: Provide and maintain interior and exterior shoring, bracing, or structural support to preserve stability and prevent unexpected movement or collapse of construction being demolished.

C. Existing Utilities to Remain: Maintain utility services to remain and protect from damage during demolition operations. Do not interrupt existing utilities serving adjacent occupied or operating facilities unless authorized in writing by Owner and authorities having jurisdiction.

C2AE © Project #22-0063 02 4116 - 4

D. Temporary Protection: Erect temporary protection, such as walks, fences, railings, canopies, and covered passageways, where required by authorities having jurisdiction and as indicated.

1. Protect adjacent buildings and facilities from damage due to demolition activities.

2. Protect existing site improvements, utilities, drain field, appurtenances, and landscaping to remain.

3. Erect a plainly visible fence around drip line of individual trees or around perimeter drip line of groups of trees to remain.

4. Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

5. Provide protection to ensure safe passage of people around building demolition area and to and from occupied portions of adjacent buildings and structures.

6. Protect walls, windows, roofs, and other adjacent exterior construction that are to remain and that are exposed to building demolition operations.

7. Erect and maintain dustproof partitions and temporary enclosures to limit dust, noise, and dirt migration to occupied portions of adjacent buildings.

E. Remove temporary barriers and protections where hazards no longer exist. Where open excavations or other hazardous conditions remain, leave temporary barriers and protections in place.

3.5 DEMOLITION

A. General: Demolish indicated buildings and site improvements completely. Use methods required to complete the Work within limitations of governing regulations and as follows:

1. Do not use cutting torches until work area is cleared of flammable materials.

Maintain portable fire-suppression devices during flame-cutting operations.

2. Maintain fire watch during and for at least two hours after flame-cutting operations.

3. Maintain adequate ventilation when using cutting torches.

4. Locate building demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.

B. Site Access and Temporary Controls: Conduct building demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

1. Do not close or obstruct streets, walks, walkways, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction.

Provide alternate routes around closed or obstructed trafficways if required by authorities having jurisdiction.

2. Use water mist and other suitable methods to limit spread of dust and dirt.

Comply with governing environmental-protection regulations.

C. Explosives: Use of explosives is not permitted.

C2AE © Project #22-0063 02 4116 - 5

D. Proceed with demolition of structural framing members systematically, from higher to lower level. Complete building demolition operations above each floor or tier before disturbing supporting members on the next lower level.

E. Remove debris from elevated portions of the building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.

F. Demolish foundation walls and other below-grade construction.

1. Remove below-grade construction, including basements, foundation walls, footings, and cistern completely.

G. Existing Utilities: Demolish existing utilities and below-grade utility structures back to source as shown on the drawings.

3.6 SOIL FILL

A. Plow, scarify, bench, or break up sloped surfaces steeper than 1 vertical to 4 horizontal so fill material will bond with existing material.

B. Below-Grade Areas: Completely fill below-grade areas and voids resulting from building demolition operations with satisfactory soil materials.

C. Site Grading: Uniformly rough grade area of demolished construction to a smooth surface, free from irregular surface changes. Provide a smooth transition between adjacent existing grades and new grades.

1. Place and compact fill material in layers to required elevations as follows:

a. Under grass and planted areas, use satisfactory soil material.

D. Finish Grading: Grade planting soil to a smooth, uniform surface plane with loose, uniformly fine texture. Roll and rake, remove ridges, and fill depressions to meet finish grades.

3.7 HYDROMULCH SEEDING

A. All areas disturbed by demolition to be hydromulch seeded at the rate of 8lbs / 1,000

sq. ft.

3.8 CLEANING

A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction.

B. Do not burn demolished materials.

C. Clean adjacent structures and improvements of dust, dirt, and debris caused by building demolition operations. Return adjacent areas to condition existing before building demolition operations began.

C2AE © Project #22-0063 02 4116 - 6

END OF SECTION 02 4116

024116 SF - Structure Demolition.pdf
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Demolition and removal of buildings and site improvements.
2. Removing below-grade construction.
3. Disconnecting, capping or sealing, abandoning in-place, and removing site utilities.
1.2 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Owner that may be uncovered during demolition remain th...
1. Carefully salvage in a manner to prevent damage and promptly return to Owner.
1.3 INFORMATIONAL SUBMITTALS
A. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property, for environmental protection. Indicate proposed locations and construction of barriers.
B. Schedule of building demolition activities with starting and ending dates for each activity.
C. Statement of Refrigerant Recovery: Signed by refrigerant recovery technician.
1.4 QUALITY ASSURANCE
A. Refrigerant Recovery Technician Qualifications: Certified by EPA-approved certification program.
1.5 FIELD CONDITIONS
A. Buildings to be demolished will be vacated and their use discontinued before start of the Work.
B. Buildings immediately adjacent to demolition area will be occupied. Conduct building demolition so operations of occupied buildings will not be disrupted.
1. Provide not less than 72 hours' notice of activities that will affect operations of adjacent occupied buildings.
2. Maintain access to existing walkways, exits, and other facilities used by occupants of adjacent buildings.
a. Do not close or obstruct walkways, exits, or other facilities used by occupants of adjacent buildings without written permission from authorities having jurisdiction.
C. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
D. Hazardous Materials: It is expected that hazardous materials will be encountered in the Work.
1. Hazardous materials are to be removed and properly disposed of by Contractor.
2. Hazardous materials include asbestos-containing materials (ACM) in the following components:
a. Vinyl floor tile.
b. Roof flashing tar.
3. Hazardous materials include lead-based paints (LBP) in amounts greater than 0.3 mg/cm3 on the following surfaces:
a. Exterior wood siding.
b. Exterior wood soffits and trim.
c. Exterior wood doors and frames.
d. Exterior wood windows.
E. On-site storage or sale of removed items or materials is not permitted.
F. Arrange demolition schedule so as not to interfere with Owner's on-site operations or operations of adjacent occupied buildings.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ANSI/ASSP A10.6 and NFPA 241.
2.2 SOIL MATERIALS
A. Satisfactory Soils: Soil Classification Groups GW, GP, GM, SW, SP, and SM according to ASTM D2487, or a combination of these groups; free of rock or gravel larger than 2 inches in any dimension, debris, waste, frozen materials, vegetation, and othe...
B. Planting-Soil (Topsoil) Type: Manufactured soil consisting of manufacturer's basic topsoil, blended in a manufacturing facility with sand, stabilized organic soil amendments, and other materials to produce viable planting soil.
2.3 SEED
A. Grass Seed: Comply with Standard specifications for Construction of Roads and Bridges on Federal Highways Projects (FP-14)
B. Mixture to be native mix, approved by COR.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting demolition operations.
3.2 PREPARATION
A. Refrigerant: Before starting demolition, remove refrigerant from mechanical equipment according to 40 CFR 82 and regulations of authorities having jurisdiction.
3.3 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Utilities to Be Disconnected: Locate, identify, disconnect, and seal or cap off utilities serving buildings and structures to be demolished.
1. Arrange to shut off utilities with utility companies.
2. If removal, relocation, or abandonment of utility services will affect adjacent occupied buildings, then provide temporary utilities that bypass buildings and structures to be demolished and that maintain continuity of service to other buildings an...
3. Cut off pipe or conduit a minimum of 24 inches below grade. Cap, valve, or plug and seal remaining portion of pipe or conduit after bypassing according to requirements of authorities having jurisdiction.
4. Do not start demolition work until utility disconnecting and sealing have been completed and verified in writing.
3.4 PROTECTION
A. Existing Facilities: Protect adjacent walkways, loading docks, building entries, and other building facilities during demolition operations. Maintain exits from existing buildings.
B. Temporary Shoring: Provide and maintain interior and exterior shoring, bracing, or structural support to preserve stability and prevent unexpected movement or collapse of construction being demolished.
C. Existing Utilities to Remain: Maintain utility services to remain and protect from damage during demolition operations. Do not interrupt existing utilities serving adjacent occupied or operating facilities unless authorized in writing by Owner and ...
D. Temporary Protection: Erect temporary protection, such as walks, fences, railings, canopies, and covered passageways, where required by authorities having jurisdiction and as indicated.
1. Protect adjacent buildings and facilities from damage due to demolition activities.
2. Protect existing site improvements, utilities, drain field, appurtenances, and landscaping to remain.
3. Erect a plainly visible fence around drip line of individual trees or around perimeter drip line of groups of trees to remain.
4. Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
5. Provide protection to ensure safe passage of people around building demolition area and to and from occupied portions of adjacent buildings and structures.
6. Protect walls, windows, roofs, and other adjacent exterior construction that are to remain and that are exposed to building demolition operations.
7. Erect and maintain dustproof partitions and temporary enclosures to limit dust, noise, and dirt migration to occupied portions of adjacent buildings.

E. Remove temporary barriers and protections where hazards no longer exist. Where open excavations or other hazardous conditions remain, leave temporary barriers and protections in place.

3.5 DEMOLITION
A. General: Demolish indicated buildings and site improvements completely. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Do not use cutting torches until work area is cleared of flammable materials. Maintain portable fire-suppression devices during flame-cutting operations.
2. Maintain fire watch during and for at least two hours after flame-cutting operations.
3. Maintain adequate ventilation when using cutting torches.
4. Locate building demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
B. Site Access and Temporary Controls: Conduct building demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
1. Do not close or obstruct streets, walks, walkways, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction. Provide alternate routes around closed or obstructed trafficways if required by auth...
2. Use water mist and other suitable methods to limit spread of dust and dirt. Comply with governing environmental-protection regulations.
C. Explosives: Use of explosives is not permitted.
D. Proceed with demolition of structural framing members systematically, from higher to lower level. Complete building demolition operations above each floor or tier before disturbing supporting members on the next lower level.
E. Remove debris from elevated portions of the building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.
F. Demolish foundation walls and other below-grade construction.
1. Remove below-grade construction, including basements, foundation walls, footings, and cistern completely.

G. Existing Utilities: Demolish existing utilities and below-grade utility structures back to source as shown on the drawings.

3.6 SOIL FILL
A. Plow, scarify, bench, or break up sloped surfaces steeper than 1 vertical to 4 horizontal so fill material will bond with existing material.
B. Below-Grade Areas: Completely fill below-grade areas and voids resulting from building demolition operations with satisfactory soil materials.
C. Site Grading: Uniformly rough grade area of demolished construction to a smooth surface, free from irregular surface changes. Provide a smooth transition between adjacent existing grades and new grades.
1. Place and compact fill material in layers to required elevations as follows:
a. Under grass and planted areas, use satisfactory soil material.

D. Finish Grading: Grade planting soil to a smooth, uniform surface plane with loose, uniformly fine texture. Roll and rake, remove ridges, and fill depressions to meet finish grades.

3.7 HYDROMULCH SEEDING
A. All areas disturbed by demolition to be hydromulch seeded at the rate of 8lbs / 1,000 sq. ft.
3.8 CLEANING
A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction.
B. Do not burn demolished materials.
C. Clean adjacent structures and improvements of dust, dirt, and debris caused by building demolition operations. Return adjacent areas to condition existing before building demolition operations began.
011000 SF - Summary.pdf
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Project information.
2. Work covered by Contract Documents.
3. Contractor's use of site and premises.
4. Coordination with occupants.
5. Work restrictions.
6. Specification and Drawing conventions.
1.2 PROJECT INFORMATION
A. Project Identification: Cadillac-Manistee Fire Operations Center
1. Project Location: 1170 Nursery Road, Wellston, MI 49689; Manistee County.
B. Owner: United States Forest Service, Cadillac-Manistee Ranger Station, 1170 Nursery Road, Wellston, MI 49689; Manistee County
1. Contracting Officer’s Representative (COR)/Technical POC: Kenny Papes, Facilities Engineer, kenneth.papes@usda.gov, 231-285-1684.
C. Architect: C2AE, 50 Lewis St. NW, Suite 200, Grand Rapids, MI 49503.
1. Architect's Representative POC: Kelly Homic, Project Manager, kelly.homic@C2AE.com.
1.3 WORK COVERED BY CONTRACT DOCUMENTS
A. The Work of Project is defined by the Contract Documents and consists of the following:
1. This project includes the decommission of the existing fire module building (Staff House) upon the completion of the new fire warehouse that would be capable of housing all district and Great Lakes Interagency Wildland Fire Module (GLIAWFM) fire eq...
B. Type of Contract:
1. Project will be constructed under a single prime contract.
1.4 CONTRACTOR'S USE OF SITE AND PREMISES
A. Unrestricted Use of Site: Contractor shall have full use of Project site for construction operations during construction period. Contractor's use of Project site is limited only by Owner's right to perform work or to retain other contractors on por...
B. Restricted Use of Site: Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits and as indicated by requirements of this Section.
C. Limits on Use of Site: Limit use of Project site to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.
1. Limits on Use of Site: Confine construction operations to areas marks onsite.
2. Driveways, Walkways, and Entrances: Keep driveways and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or for storage of materials.
D. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weathertight condition throughout construction period. Repair damage caused by construction operations.
E. Condition of Existing Grounds: Maintain portions of existing grounds, landscaping, and hardscaping affected by construction operations throughout construction period. Repair damage caused by construction operations.
1.5 COORDINATION WITH OCCUPANTS
A. Partial Owner Occupancy: Owner will occupy the premises during entire construction period, with the exception of areas under construction. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform...
B. Owner Limited Occupancy of Completed Areas of Construction: Owner reserves the right to occupy and to place and install equipment in completed portions of the Work, prior to Substantial Completion of the Work, provided such occupancy does not inter...
1.6 WORK RESTRICTIONS
A. Comply with restrictions on construction operations.
1. Comply with limitations on use of public streets, work on public streets, rights of way, and other requirements of authorities having jurisdiction.
B. On-Site Work Hours: Limit work in the existing building to normal business working hours of 8 a.m. to 4:30 p.m., Monday through Friday, unless otherwise indicated or coordinated with the owner.
C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:
1. Notify Owner not less than two days in advance of proposed utility interruptions.
D. Noise, Vibration, Dust, and Odors: Coordinate operations that may result in high levels of noise and vibration, dust, odors, or other disruption to Owner occupancy with Owner.
1. Notify Owner not less than two days in advance of proposed disruptive operations.
E. Smoking and Controlled Substance Restrictions: Use of tobacco products, alcoholic beverages, and other controlled substances on Project site is not permitted.
F. Employee Identification: Provide identification tags for Contractor personnel working on Project site. Require personnel to use identification tags at all times.
G. Employee Screening: Comply with Owner's requirements for screening of Contractor personnel working on Project site.
1. Maintain list of approved screened personnel with Owner's representative.
1.7 SPECIFICATION AND DRAWING CONVENTIONS
A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows:
1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.
2. Text Color: Text used in the Specifications, including units of measure, manufacturer and product names, and other text may appear in multiple colors or underlined as part of a hyperlink; no emphasis is implied by text with these characteristics.
3. Hypertext: Text used in the Specifications may contain hyperlinks. Hyperlinks may allow for access to linked information that is not residing in the Specifications. Unless otherwise indicated, linked information is not part of the Contract Documents.
4. Specification requirements are to be performed by Contractor unless specifically stated otherwise.
B. Contracting Requirements: General provisions of the Contract, including General and Supplementary Conditions, apply to all Sections of the Specifications.
C. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)