ATT1 SOI CM Fire Ops Center.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Huron Manistee NF Construct Cadillac-Manistee Fire Ops Center Federal contract opportunity
- Solicitation number
- 12445523R0018
- Issued by
- Department of Agriculture Forest Service
About this file
This document package includes a bid sheet and related federal contract opportunity details. The bid sheet requests pricing for the construction of a new 6,000 square foot Cadillac-Manistee Fire Operations Center located in Wellston, Michigan, including base bid items for facility construction, services, and site work, as well as optional bid items. An alternate proposal is also included for a reduced 4,920 square foot footprint. The single award firm fixed price contract will be awarded before August 1, 2023 by the U.S. Department of Agriculture Forest Service to build the warehouse structure. Bidders should provide lump sum pricing for mobilization and the various construction elements. The response due date and other submission details are not provided.
View the file
Other files for this federal contract opportunity
Show all 38
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| Item | ||||||
| Number | Description | Pay Unit | Quantity | Unit Price | Total Price | |
| PREFERRED ALTERNATE (6,000SF) | ||||||
| 1 | Mobilization | |||||
| Includes costs for mobilization of equipment, materials, and supplies, which are not included in a line item below. This would include but not limited to; bonding, insurance, permit fees, field office and staff, temporary utilities (phone, power, sanitation), site clean-up, waste disposal, field office vehicles and their operational costs, temporary utilities, superintendence, construction fencing, safety and QC costs, and any other project costs not directly associated with a line item below. | LUMP SUM | 1 | ||||
| 2 | FACILITY CONSTRUCTION SUBGROUP | |||||
| Divisions 03 - 12 | LUMP SUM | 1 | ||||
| 3 | FACILITY SERVICES SUBGROUP | |||||
| Divisions 22 - 28 | LUMP SUM | 1 | ||||
| 4 | SITE AND INFRASTRUCTURE SUBGROUP | |||||
| Divisions 31- 33 | LUMP SUM | 1 | ||||
| TOTAL PRICE FOR BASE BID ITEMS | ||||||
| OPTIONAL BID ITEMS | ||||||
| Item | Description | Pay Unit | Quantity | Unit Price | Total Price | |
| OP-1 | Interior Painting | |||||
| Reference sheet A6-01 for optional "Finish Schedule" | LUMP SUM | 1 | ||||
| OP-2 | CU-1, Grade Mounted Condesning Unit | |||||
| Reference sheet H1-01 & H6-01 for details on optional air conditioning equipment. | LUMP SUM | 1 | ||||
| OP-3 | Electric Duct Heater | |||||
| Reference sheets H1-01 & H6-01 for details on optional duct heater equipemtn. | LUMP SUM | 1 | ||||
| OP-4 | Refreshment Area Cabinetry | |||||
| Includes upper & base cabinets and countertop. Reference sheet A1-01 & A4-04. | LUMP SUM | 1 | ||||
| OP-5 | Fire Cache Enclosure | |||||
| Reference sheets A1-01 & A4-04 | LUMP SUM | 1 | ||||
| OP-6 | Accordion Folding Partion | |||||
| Reference sheets A1-01 & A5-02 | LUMP SUM | 1 | ||||
| OP-7 | Window Shades | |||||
| Reference Divison 12 - Furnishings, 122400 Clutch-Operated Window Shades. | LUMP SUM | 1 | ||||
| OP-8 | Landscape Amentities - Plantings | |||||
| Reference "L" sheets, item includes plantings only. | LUMP SUM | 1 | ||||
| OP-9 | Landscape Amenities - Concrete Walkway, Dumpster Screen, Signage, all other items not included with "Plantings" | |||||
| Reference "L" sheets & A4-05 | LUMP SUM | 1 | ||||
| OP-10 | Demolition of Existing Facility | |||||
| Decommissioning of exisitng fire module office located near main entrance. Separate plans provided. | LUMP SUM | 1 | ||||
| TOTAL PRICE OF OPTION ITEMS |
| Item | |||||
| Number | Description | Pay Unit | Quantity | Unit Price | Total Price |
| ALTERNATE #1, Reducded Footprint (4,920SF) See Sheets AA1-01 & AA2-01 for details | |||||
| 1A | Mobilization | ||||
| Includes costs for mobilization of equipment, materials, and supplies, which are not included in a line item below. This would include but not limited to; bonding, insurance, permit fees, field office and staff, temporary utilities (phone, power, sanitation), site clean-up, waste disposal, field office vehicles and their operational costs, temporary utilities, superintendence, construction fencing, safety and QC costs, and any other project costs not directly associated with a line item below. | LUMP SUM | 1 | |||
| 2A | FACILITY CONSTRUCTION SUBGROUP |
Divisions 03 - 12
| Contractor repsonsible for calculating takeoffs for reduction in square footage for Alternate #1. See sheets AA1-01 & AA2-01 for details. | LUMP SUM | 1 |
| 3A | FACILITY SERVICES SUBGROUP |
Divisions 22 - 28
| For additional details on Aleternate #1 reductions for HVAC and electrical equipment reference sheets H1-01 & E1-03. | LUMP SUM | 1 |
| 4A | SITE AND INFRASTRUCTURE SUBGROUP |
Divisions 31- 33
| Contractor repsonsible for calculating takeoffs for reduction in square footage for Alternate #1. See sheets AA1-01 & AA2-01 for details. | LUMP SUM | 1 | ||||
| TOTAL PRICE FOR BASE BID ITEMS | ||||||
| OPTIONAL BID ITEMS | ||||||
| Item | Description | Pay Unit | Quantity | Unit Price | Total Price | |
| OP-1A | Interior Painting | |||||
| Reference sheet A6-01 for optional "Finish Schedule" | LUMP SUM | 1 | ||||
| OP-2A | CU-1, Grade Mounted Condesning Unit | |||||
| Reference sheet H1-01 & H6-01 for details on optional air conditioning equipment. | LUMP SUM | 1 | ||||
| OP-3A | Electric Duct Heater | |||||
| Reference sheets H1-01 & H6-01 for details on optional duct heater equipemtn. | LUMP SUM | 1 | ||||
| OP-4A | Refreshment Area Cabinetry | |||||
| Includes upper & base cabinets and countertop. Reference sheet A1-01 & A4-04. | LUMP SUM | 1 | ||||
| OP-5A | Fire Cache Enclosure | |||||
| Reference sheets A1-01 & A4-04 | LUMP SUM | 1 | ||||
| OP-6A | Accordion Folding Partion | |||||
| Reference sheets A1-01 & A5-02 | LUMP SUM | 1 | ||||
| OP-7A | Window Shades | |||||
| Reference Divison 12 - Furnishings, 122400 Clutch-Operated Window Shades. | LUMP SUM | 1 | ||||
| OP-8A | Landscape Amentities - Plantings | |||||
| Reference "L" sheets, item includes plantings only. | LUMP SUM | 1 | ||||
| OP-9A | Landscape Amenities - Concrete Walkway, Dumpster Screen, Signage, all other items not included with "Plantings" | |||||
| Reference "L" sheets & A4-05 | LUMP SUM | 1 | ||||
| OP-10A | Demolition of Existing Facility | |||||
| Decommissioning of exisitng fire module office located near main entrance. Separate plans provided. | LUMP SUM | 1 | ||||
| TOTAL PRICE OF OPTION ITEMS |
File details come from the government source that posted it. Updated .