About this file

This solicitation notice is for a Design-Build Design-Bid-Build Indefinite Delivery Indefinite Quantity Multiple Award Construction Contract for Projects, primarily located at Rota, Spain and worldwide. The solicitation was issued by the Department of the Navy Naval Facilities Engineering Command to obtain design-build and design-bid-build construction services on an indefinite delivery/indefinite quantity basis. Services will include military construction projects, repair, and modernization of facilities. The multiple award IDIQ contracts have no defined limits and will have ordering periods extending up to 5 years after date of award.

View the file

Other files

File Type Posted
26 32 13.00 20 (24 Feb 2021).pdf PDF
28 10 05 (23 Feb 2021).pdf PDF
N6247020R4011 0006.pdf PDF
1561956 Amend 0005 Dwg (3 Feb 21).pdf PDF
N6247020R4011 0005.pdf PDF
Attachment (G) - Seed Project Task Order General Requirements (11 Feb 2021).pdf PDF
07 32 13.pdf PDF
08 41 13 Rev.pdf PDF
Attachment E - Schedule B Price Proposal Form (3 Feb 2021).pdf PDF
N6247020R4011 0004.pdf PDF
08 56 53.pdf PDF
28 10 05.pdf PDF
08 41 13.pdf PDF
01 45 35.pdf PDF
N6247020R4011 0003.pdf PDF
28 08 10.pdf PDF
ATT J 1561956dwg02Aof19.pdf PDF
N6247020R4011 0002.pdf PDF
N6247020R4011 0001.pdf PDF
ATTACHMENT K Site Location Photos.pdf PDF
ATT J 1561956dwg01of19.pdf PDF
ATT J 1561956dwg09of19.pdf PDF
ATT H 1561956spc1of2.pdf PDF
ATT J 1561956dwg13of19.pdf PDF
N6247020R4011.pdf PDF
Attachment E - Schedule B Price Proposal Form.pdf PDF
ATT G SEED PROJECT TASK ORDER GENERAL REQUIREMENTS.pdf PDF
ATT J 1561956dwg14of19.pdf PDF
ATT J 1561956dwg04of19.pdf PDF
Attachment D - Past Performance Questionnaire.pdf PDF
ATT J 1561956dwg17of19.pdf PDF
ATT J 1561956dwg19of19.pdf PDF
ATT J 1561956dwg05of19.pdf PDF
ATT J 1561956dwg16of19.pdf PDF
Attachment F - LRA Commercial Vehicle Inspection Procedures.pdf PDF
ATT J 1561956dwg08of19.pdf PDF
ATT J 1561956dwg10of19.pdf PDF
ATT J 1561956dwg02of19.pdf PDF
ATT J 1561956dwg18of19.pdf PDF
ATT J 1561956dwg15of19.pdf PDF
ATT H 1561956spc2of2.pdf PDF
Attachment B - SEC-NAV_5512_1_11787 Form.pdf PDF
ATT J 1561956dwg11of19.pdf PDF
Attachment C - Construction and Design Experience Project Data Sheet.pdf PDF
ATT J 1561956dwg03of19.pdf PDF
ATT J 1561956dwg12of19.pdf PDF
Attachment A - Pre-Proposal Inquiry Form.xls XLS spreadsheet
ATT J 1561956dwg07of19.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P -8

P

O R

T O

P E

R A

TI

O

N S

F A

C

IL

IT

IE

S

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

A

TL

A N

TI

C

4525 Main Street, Suite 1400

Virginia Beach, VA 23462

757.455.5800

DESIGN NOTES (CONTINUED)DESIGN NOTES

PORT OPS / FDMRC

DELEGATED DESIGN NOTES

LATERAL LOAD-RESISTING SYSTEM

NOTES

S-001

NOTAS DE DISEÑO NOTAS DE DISEÑO (CONTINUACIÓN)

PORT OPS / FDMRC

NOTAS DEL DISEÑO POR TERCEROS

NOTAS DEL SISTEMA RESISTENTE DE

CARGA LATERAL

PROFESSIONAL ENGIN

EE

R

JAMES E. SPADY

Lic. No. 15374

CO

MM

ON

WEALTH OF VIRGINI A

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

DEPARTMENT OF THE NAVY

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

CONSTR. CONTR. NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

NAVAL FACILITIES ENGINEERING COMMAND

AutoCAD SHX Text

DES

AutoCAD SHX Text

DRW

AutoCAD SHX Text

SYM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

NAVFAC METRIC DRAWFORM REVISION: 01 FEBRUARY 2017

AutoCAD SHX Text

CHK

AutoCAD SHX Text

SATISFACTORY TO

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

ACTIVITY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

FOR COMMANDER NAVFAC

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

A/E INFO

AutoCAD SHX Text

OF

AutoCAD SHX Text

EPROJECT NO.:

AutoCAD SHX Text

NAVAL STATION

AutoCAD SHX Text

ROTA, SPAIN

AutoCAD SHX Text 1561956

AutoCAD SHX Text

AutoCAD SHX Text

SMS/LKJ

AutoCAD SHX Text

NAVFAC ATLANTIC

AutoCAD SHX Text

NORFOLK, VA

AutoCAD SHX Text

CYNTHIA DE JONG, RA

AutoCAD SHX Text

PM/DM

AutoCAD SHX Text

BRANCH MANAGER

AutoCAD SHX Text

DESIGN DIRECTOR

AutoCAD SHX Text

FIRE PROTECTION

AutoCAD SHX Text

1. STRUCTURAL DESIGN IS IN ACCORDANCE WITH THE FOLLOWING UFC CODES AND CRITERIA: STRUCTURAL DESIGN IS IN ACCORDANCE WITH THE FOLLOWING UFC CODES AND CRITERIA: A. UFC 1-200-01, DoD BUILDING CODE (GENERAL BUILDING REQUIREMENTS), UFC 1-200-01, DoD BUILDING CODE (GENERAL BUILDING REQUIREMENTS), 20 JUNE 2016 B. UFC 3-301-01, STRUCTURAL ENGINEERING UFC 3-301-01, STRUCTURAL ENGINEERING (INCLUDING CHANGE 3, 12 SEPTEMBER 2016) C. UFC 3-310-04, SEISMIC DESIGN FOR BUILDINGS UFC 3-310-04, SEISMIC DESIGN FOR BUILDINGS (INCLUDING CHANGE 1, 20 JUNE 2016) D. UFC 3-340-02, STRUCTURES TO RESIST THE EFFECTS OF ACCIDENTAL EXPLOSIONS UFC 3-340-02, STRUCTURES TO RESIST THE EFFECTS OF ACCIDENTAL EXPLOSIONS (INCLUDING CHANGE 2, 1 SEPTEMBER 2014) E. UFC 4-010-01 DoD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS UFC 4-010-01 DoD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS (INCLUDING CHANGE 1, 1 OCTOBER 2013) F. UFC 4-010-02 DoD MINIMUM ATFP STANDOFF DISTANCES FOR BUILDINGS (FOUO) UFC 4-010-02 DoD MINIMUM ATFP STANDOFF DISTANCES FOR BUILDINGS (FOUO) (9 FEB 2012) G. 2012 INTERNATIONAL BUILDING CODE 2012 INTERNATIONAL BUILDING CODE H. ASCE 7-10, MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES ASCE 7-10, MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES I. AISC 360-10, SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS, DATED AISC 360-10, SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS, DATED JUNE 22, 2010 J. ACI 530-13, BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES ACI 530-13, BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES K. ACI 318-14, BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE ACI 318-14, BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE 2. STRUCTURAL DESIGN IS IN ACCORDANCE WITH THE FOLLOWING SPANISH CODES AND STRUCTURAL DESIGN IS IN ACCORDANCE WITH THE FOLLOWING SPANISH CODES AND SPECIFICATIONS: A. CODIGO TECNICO DE LA EDIFICACION (CTE): CODIGO TECNICO DE LA EDIFICACION (CTE): DOCUMENTO BASICO - SEGURIDAD ESTRUCTURAL (DB-SE) DOCUMENTO BASICO - ACCIONES EN LA EDIFICACION (DB-SE-AE) DOCUMENTO BASICO - SEGURIDAD ESTRUCTURAL ACERO (DB-SE-A) B. MINISTERIO DE FOMENTO: MINISTERIO DE FOMENTO: INSTRUCCION DEL HORMIGON ESTRUCTURAL (EHE 08) INSTRUCCION DEL ACERO ESTRUCTURAL (EAE 04) NORMA DE CONSTRUCCION SISMORRESISTENTE (NCSE-02) 3. DESIGN LOAD CRITERIA: DESIGN LOAD CRITERIA: PORT OPS FDMRC FDMRC A. LIVE LOADS (UNIFORM + CONCENTRATED): LIVE LOADS (UNIFORM + CONCENTRATED): PARTITION ALLOWANCE 0.7kPa 0.7kPa 0.7kPa 0.7kPa 0.7kPa FIRST FLOOR CORRIDORS 4.8kPa 4.8kPa 4.8kPa 4.8kPa 4.8kPa MECHANICAL ROOMS 6kPa 6kPa 6kPa 6kPa 6kPa ROOF 1kPa + 2kN 1kPa + 2kN 1kPa + 2kN 1kPa + 2kN 1kPa + 2kN STAIRS 4.8kPa + 1.3kN - 4.8kPa + 1.3kN - - TOILETS AND SHOWERS 3.6kPa 3.6kPa 3.6kPa 3.6kPa 3.6kPa INDUSTRIAL/ HEAVY STORAGE 12.0kPa - 12.0kPa - - BOAT MAINTENANCE BAY 38.9kPa + 38.9kN - 38.9kPa + 38.9kN - - OFFICES 2.4kPa + 8.9kN 2.4kPa + 8.9kN 2.4kPa + 8.9kN 2.4kPa + 8.9kN 2.4kPa + 8.9kN STORAGE 6kPa - 6kPa - - CORRIDORS ABOVE FIRST FLOOR 3.8kPa - 3.8kPa - - CONFERENCE ROOM 4.8kPa 4.8kPa 4.8kPa 4.8kPa 4.8kPa HAZMAT/OIL SPILL RESPONSE 9.6kPa - 9.6kPa - - PIER GEAR/STOCKROOM 14.4kPa - 14.4kPa - - BUNK ROOMS 2kPa - 2kPa - - BREAK ROOMS 4.8kPa - 4.8kPa - - BALCONIES/DECKS 4.8kPa - 4.8kPa - - B. SNOW LOADS: SNOW LOADS: RISK CATEGORY II II II II II SNOW LOAD IMPORTANCE FACTOR, I 1.0 1.0 I 1.0 1.0 s1.0 1.0 1.0 GROUND SNOW LOAD, P 0.24kPa 0.24kPa P 0.24kPa 0.24kPa G0.24kPa 0.24kPa 0.24kPa THERMAL FACTOR, C 1.0 1.0 C 1.0 1.0 t1.0 1.0 1.0 FROST PENETRATION 127mm 127mm 127mm 127mm 127mm FLAT ROOF SNOW LOW, P 0.24kPa 0.24kPa P 0.24kPa 0.24kPa f0.24kPa 0.24kPa 0.24kPa C. WIND LOADS: WIND LOADS: RISK CATEGORY II II II II II WIND IMPORTANCE FACTOR, I 1.0 1.0 I 1.0 1.0 W1.0 1.0 1.0 DESIGN WIND SPEED, V (ULTIMATE) 183km/hr 183km/hr 183km/hr 183km/hr 183km/hr EXPOSURE CATEGORY D D D D D INTERNAL PRESSURES 0.18 0.18 ±0.18±0.18GUST-EFFECT FACTOR 0.85 0.85 0.85 0.85 0.85 D. SEISMIC PARAMETERS: SEISMIC PARAMETERS: RISK CATEGORY II II II II II SEISMIC IMPORTANCE FACTOR, I 1.0 1.0 I 1.0 1.0 E1.0 1.0 1.0 MAPPED SPECTRAL RESPONSE, S 0.760g 0.760g S 0.760g 0.760g S0.760g 0.760g 0.760g MAPPED SPECTRAL RESPONSE, S 0.350g 0.350g S 0.350g 0.350g 10.350g 0.350g 0.350g SPECTRAL RESPONSE COEFFICIENT, S 0.606g 0.606g S 0.606g 0.606g DS0.606g 0.606g 0.606g SPECTRAL RESPONSE COEFFICIENT, S 0.397g 0.397g COEFFICIENT, S 0.397g 0.397g S 0.397g 0.397g D10.397g 0.397g 0.397g SITE CLASSIFICATION D D D D D ANALYSIS PROCEDURE EQUIVALENT EQUIVALENT EQUIVALENT EQUIVALENT EQUIVALENT LATERAL FORCE LATERAL FORCE LATERAL FORCE SEISMIC DESIGN CATEGORY D D D D D BASIC SEISMIC-FORCE-RESISTING SYSTEM SPECIAL REINFORCED SPECIAL REINFORCED SPECIAL REINFORCED SPECIAL REINFORCED SPECIAL REINFORCED CONCRETE SHEAR CONCRETE SHEAR CONCRETE SHEAR WALLS WALLS WALLS RESPONSE MODIFICATION FACTOR, R 5 5 5 5 5 DESIGN BASE SHEAR, V 0.121W 0.121W 0.121W 0.121W 0.121W E. ANTITERRORISM (ATFP) AND ACCIDENTAL EXPLOSION CRITERIA: ANTITERRORISM (ATFP) AND ACCIDENTAL EXPLOSION CRITERIA: ATFP BUILDING CATEGORY PRIMARY GATHERING PRIMARY GATHERING PRIMARY GATHERING PRIMARY GATHERING PRIMARY GATHERING ATFP EXPLOSIVE WEIGHT II II II II II ATFP LEVEL OF PROTECTION LOW LOWLOW LOWLOW

AutoCAD SHX Text

3. DESIGN LOAD CRITERIA: DESIGN LOAD CRITERIA: F. COMPONENTS AND CLADDING: COMPONENTS AND CLADDING: NOTES: 1. POSITIVE AND NEGATIVE SIGNS SIGNIFY PRESSURES ACTING POSITIVE AND NEGATIVE SIGNS SIGNIFY PRESSURES ACTING TOWARD AND AWAY FROM THE SURFACES, RESPECTIVELY. 2. BUILDING ZONES ARE DEFINED IN ASCE 7. BUILDING ZONES ARE DEFINED IN ASCE 7. 3. WIND PRESSURES INDICATED ARE AT STRENGTH-LEVEL WIND PRESSURES INDICATED ARE AT STRENGTH-LEVEL (WIND LOAD FACTOR = 1.0). 4. V (ULTIMATE) = ULTIMATE DESIGN WIND SPEED PER UFC. V (ULTIMATE) = ULTIMATE DESIGN WIND SPEED PER UFC. 5. DESIGN WIND PRESSURES FOR DEFLECTION-CONTROLLED COMPONENTS DESIGN WIND PRESSURES FOR DEFLECTION-CONTROLLED COMPONENTS AND CLADDING MAY UTILIZE A 10-YEAR MEAN RECURRENCE INTERVAL.

AutoCAD SHX Text

COMPONENT TRIBUTARY AREA (M )M )2)

AutoCAD SHX Text

DESIGN WIND PRESSURES FOR ROOF COMPONENTS (N/M )M )2)

AutoCAD SHX Text 0-1.9

AutoCAD SHX Text

ROOF ZONE FOR 7°<Θ<27 Θ<27 <27 27°

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text -1650

AutoCAD SHX Text +770

AutoCAD SHX Text +770

AutoCAD SHX Text +770

AutoCAD SHX Text 2.0-9.3

AutoCAD SHX Text -1610

AutoCAD SHX Text +770

AutoCAD SHX Text 9.4+

AutoCAD SHX Text -1510

AutoCAD SHX Text +770

AutoCAD SHX Text

COMPONENT TRIBUTARY AREA (M )M )2)

AutoCAD SHX Text

DESIGN WIND PRESSURES FOR WALL COMPONENTS (N/M )M )2)

AutoCAD SHX Text 0-1.9

AutoCAD SHX Text

WALL ZONE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text -1640

AutoCAD SHX Text +1510

AutoCAD SHX Text +1510

AutoCAD SHX Text 2.0-9.3

AutoCAD SHX Text -1570

AutoCAD SHX Text +1450

AutoCAD SHX Text 9.4+

AutoCAD SHX Text -1420

AutoCAD SHX Text +1290

AutoCAD SHX Text

1. DESIGN RESPONSIBILITY FOR THE FOLLOWING ENGINEERED SYSTEMS AND DESIGN RESPONSIBILITY FOR THE FOLLOWING ENGINEERED SYSTEMS AND COMPONENTS IS DELEGATED TO A QUALIFIED SPECIALTY STRUCTURAL ENGINEER RETAINED BY THE CONTRACTOR. THESE SYSTEMS AND COMPONENTS INCLUDE, BUT ARE NOT LIMITED TO: A. SEISMIC BRACING FOR NON-STRUCTURAL COMPONENTS SEISMIC BRACING FOR NON-STRUCTURAL COMPONENTS B. OVERHEAD CRANE OVERHEAD CRANE C. STEEL TRUSSES STEEL TRUSSES D. PREFABRICATED STRUCTURAL THERMAL BREAKS PREFABRICATED STRUCTURAL THERMAL BREAKS 2. DELEGATED ENGINEERED SYSTEMS AND COMPONENTS SHALL SATISFY ASCE 7 DELEGATED ENGINEERED SYSTEMS AND COMPONENTS SHALL SATISFY ASCE 7 AND REQUIREMENTS OF APPLICABLE MATERIAL-SPECIFIC STANDARDS. 3. COORDINATE WITH THE CONTRACT DOCUMENTS FOR PROFESSIONAL LICENSURE COORDINATE WITH THE CONTRACT DOCUMENTS FOR PROFESSIONAL LICENSURE AND SEALING REQUIREMENTS, DESIGN CRITERIA, DETAILS OF THE SYSTEM/COMPONENT INTERFACE WITH THE PRIMARY STRUCTURE, AND SUBMITTAL AND CALCULATION REQUIREMENTS.

AutoCAD SHX Text PORT-OPS 1. THE LATERAL LOAD-RESISTING SYSTEM AND STABILITY OF THE COMPLETED THE LATERAL LOAD-RESISTING SYSTEM AND STABILITY OF THE COMPLETED STRUCTURE IN THE NORTH-SOUTH AND EAST-WEST DIRECTIONS IS PROVIDED BY SPECIAL REINFORCED CONCRETE SHEAR WALLS. (ASCE 7-10, TABLE 12.2-1) 2. REINFORCED CONCRETE SLABS AT THE ELEVATED FLOORS ARE RIGID REINFORCED CONCRETE SLABS AT THE ELEVATED FLOORS ARE RIGID DIAPHRAGMS THAT DISTRIBUTE LATERAL WIND AND SEISMIC FORCES HORIZONTALLY TO THE SHEAR WALLS, AND THEIR COLLECTORS. FDMRC 1. THE LATERAL LOAD-RESISTING SYSTEM AND STABILITY OF THE COMPLETED THE LATERAL LOAD-RESISTING SYSTEM AND STABILITY OF THE COMPLETED STRUCTURE IN THE NORTH-SOUTH AND EAST-WEST DIRECTIONS IS PROVIDED BY SPECIAL REINFORCED CONCRETE SHEAR WALLS. (ASCE 7-10, TABLE 12.2-1) 2. REINFORCED CONCRETE SLABS AT THE ELEVATED FLOORS ARE RIGID REINFORCED CONCRETE SLABS AT THE ELEVATED FLOORS ARE RIGID DIAPHRAGMS THAT DISTRIBUTE LATERAL WIND AND SEISMIC FORCES HORIZONTALLY TO THE SHEAR WALLS, AND THEIR COLLECTORS.

AutoCAD SHX Text -1610

AutoCAD SHX Text +770

AutoCAD SHX Text -1510

AutoCAD SHX Text +770

AutoCAD SHX Text -1610

AutoCAD SHX Text +770

AutoCAD SHX Text -1510

AutoCAD SHX Text +770

AutoCAD SHX Text -1650

AutoCAD SHX Text -1650

AutoCAD SHX Text -1640

AutoCAD SHX Text -1570

AutoCAD SHX Text +1450

AutoCAD SHX Text -1420

AutoCAD SHX Text +1290

AutoCAD SHX Text

DESIGN NOTES

AutoCAD SHX Text

JES

AutoCAD SHX Text

SMS

AutoCAD SHX Text

SKE

AutoCAD SHX Text

NONE

AutoCAD SHX Text

AutoCAD SHX Text 14069939

AutoCAD SHX Text

3. CRITERIO DE CARGAS DE DISEÑO: CRITERIO DE CARGAS DE DISEÑO: F. COMPONENTES Y RESIONES DE VIENTO: COMPONENTES Y RESIONES DE VIENTO: NOTAS: 1. LOS SIGNOS POSITIVOS O NEGATIVOS EN LAS PRESIONES INDICAN LOS SIGNOS POSITIVOS O NEGATIVOS EN LAS PRESIONES INDICAN PRESIONES POSITIVAS O DE SUCCION DE LA SUPERFICIE, RESPECTIVAMENTE. 2. LAS ZONAS DEL EDIFICIO ESTAN DEFINIDAS EN ASCE 7. LAS ZONAS DEL EDIFICIO ESTAN DEFINIDAS EN ASCE 7. 3. LAS PRESIONES DE VIENTO INDICADAS SON SIN MAYORAR (FACTOR DE LAS PRESIONES DE VIENTO INDICADAS SON SIN MAYORAR (FACTOR DE (FACTOR DE CARGA DE VIENTO = 1.0). 4. V (ULTIMA) = VELOCIDAD DE VIENTO MAX. DE DISEÑO SEGÚN UFC. V (ULTIMA) = VELOCIDAD DE VIENTO MAX. DE DISEÑO SEGÚN UFC. 5. LAS PRESIONES DE VIENTO DE DISEÑO PARA COMPONENTES Y LAS PRESIONES DE VIENTO DE DISEÑO PARA COMPONENTES Y REVESTIMIENTOS DICTADOS POR DEFORMACION UTILIZARAN UN PERIODO DE RETORNO DE 10 AÑOS.

AutoCAD SHX Text

AREA DE COMPONENTE PROYECTADA (M²)

AutoCAD SHX Text

PRESIONES DE DISEÑO DE VIENTO PARA COMPONENTES DE CUBIERTA (N/M )M )2)

AutoCAD SHX Text 0-1.9

AutoCAD SHX Text

ZONA DE CUBIERTA PARA 7°<Θ<27 Θ<27 <27 27°

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text -1650

AutoCAD SHX Text +770

AutoCAD SHX Text 2.0-9.3

AutoCAD SHX Text -1610

AutoCAD SHX Text +770

AutoCAD SHX Text 9.4+

AutoCAD SHX Text -1510

AutoCAD SHX Text +770

AutoCAD SHX Text

AREA DE COMPONENTE PROYECTADA (M²)

AutoCAD SHX Text

PRESIONES DE DISEÑO DE VIENTO PARA COMPONENTES DE PARED (N/M )(N/M )M )2)

AutoCAD SHX Text 0-1.9

AutoCAD SHX Text

ZONA DE PARED

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text -1640

AutoCAD SHX Text +1510

AutoCAD SHX Text 2.0-9.3

AutoCAD SHX Text -1570

AutoCAD SHX Text +1450

AutoCAD SHX Text 9.4+

AutoCAD SHX Text -1420

AutoCAD SHX Text +1290

AutoCAD SHX Text

NOTAS DE DISEÑO

AutoCAD SHX Text

1. LA RESPONSABILIDAD DEL DISEÑO PARA LOS SISTEMAS DISEÑADOS Y SUS LA RESPONSABILIDAD DEL DISEÑO PARA LOS SISTEMAS DISEÑADOS Y SUS COMPONENTES SE DELEGA A UN INGENIERO CUALIFICADO ESPECIALISTA EN ESTRUCTURAS CONTRATADO POR EL CONTRATISTA. ESTOS SISTEMAS Y COMPONENTES INCLUYEN, PERO NO ESTÁN LIMITADOS A: A. ARRIOSTRAMIENTO SÍSMICO PARA COMPONENTES NO ESTRUCTURALES. ARRIOSTRAMIENTO SÍSMICO PARA COMPONENTES NO ESTRUCTURALES. B. PUENTE GRÚA PUENTE GRÚA C. CERCHAS METÁLICAS CERCHAS METÁLICAS D. MANTENIMIENTO DE EMBARCACIONES MANTENIMIENTO DE EMBARCACIONES 2. LOS SISTEMAS DISEÑADOS POR OTROS Y SUS COMPONENTES SATISFARÁN LOS SISTEMAS DISEÑADOS POR OTROS Y SUS COMPONENTES SATISFARÁN ASCE 7 Y LOS REQUERIMIENTOS DE LAS NORMAS APLICABLES A MATERIALES ESPECÍFICOS. 3. COORDINAR CON LOS DOCUMENTOS DE CONTRATO PARA LOS REQUERIMIENTOS COORDINAR CON LOS DOCUMENTOS DE CONTRATO PARA LOS REQUERIMIENTOS DE TITULACIÓN PROFESIONAL Y SELLADO, PARA EL CRITERIO DE DISEÑO, LOS DETALLES DE LA INTERFAZ DEL SISTEMA/COMPONENTE CON LA ESTRUCTURA PRIMARIA, Y LOS REQUERIMIENTOS DE PRESENTACIÓN Y CÁLCULOS.

AutoCAD SHX Text PORT-OPS 1. EL SISTEMA RESISTENTE A CARGAS LATERALES Y LA ESTABILIDAD DE LA EL SISTEMA RESISTENTE A CARGAS LATERALES Y LA ESTABILIDAD DE LA ESTRUCTURA COMPLETA EN LAS DIRECCIONES NORTE-SUR Y ESTE-OESTE SE HA PROVISTO MEDIANTE MUROS DE HORMIGÓN ARMADO ESPECIAL ARRIOSTRANTES. (ASCE 7-10, TABLA 12.2-1) 2. LAS LOSAS DE HORMIGÓN ARMADO EN LAS PLANTAS ELEVADAS SON LAS LOSAS DE HORMIGÓN ARMADO EN LAS PLANTAS ELEVADAS SON DIAFRAGMAS RÍGIDOS QUE DISTRIBUYEN LAS FUERZAS DE VIENTO Y LAS FUERZAS SÍSMICAS HORIZONTALES A LOS MUROS ARRIOSTRANTES, Y SUS RECEPTORES. FDMRC 1. EL SISTEMA RESISTENTE A CARGAS LATERALES Y LA ESTABILIDAD DE LA EL SISTEMA RESISTENTE A CARGAS LATERALES Y LA ESTABILIDAD DE LA ESTRUCTURA COMPLETA EN LAS DIRECCIONES NORTE-SUR Y ESTE-OESTE SE HA PROVISTO MEDIANTE MUROS DE HORMIGÓN ARMADO ESPECIAL ARRIOSTRANTES. (ASCE 7-10, TABLA 12.2-1) 2. LAS LOSAS DE HORMIGÓN ARMADO EN LAS PLANTAS ELEVADAS SON LAS LOSAS DE HORMIGÓN ARMADO EN LAS PLANTAS ELEVADAS SON DIAFRAGMAS RÍGIDOS QUE DISTRIBUYEN LAS FUERZAS DE VIENTO Y LAS FUERZAS SÍSMICAS HORIZONTALES A LOS MUROS ARRIOSTRANTES, Y SUS RECEPTORES.

AutoCAD SHX Text EL DISEÑO DE LA ESTRUCTURA ES ACORDE A LOS SIGUIENTES CÓDIGOS UFC Y CRITERIO: A. UFC 1-200-01, DoD BUILDING CODE (GENERAL BUILDING REQUIREMENTS), UFC 1-200-01, DoD BUILDING CODE (GENERAL BUILDING REQUIREMENTS), 20 JUNE 2016 B. UFC 3-301-01, STRUCTURAL ENGINEERING UFC 3-301-01, STRUCTURAL ENGINEERING (INCLUDING CHANGE 3, 12 SEPTEMBER 2016) C. UFC 3-310-04, SEISMIC DESIGN FOR BUILDINGS UFC 3-310-04, SEISMIC DESIGN FOR BUILDINGS (INCLUDING CHANGE 1, 20 JUNE 2016) D. UFC 3-340-02, STRUCTURES TO RESIST THE EFFECTS OF ACCIDENTAL EXPLOSIONS UFC 3-340-02, STRUCTURES TO RESIST THE EFFECTS OF ACCIDENTAL EXPLOSIONS (INCLUDING CHANGE 2, 1 SEPTEMBER 2014) E. UFC 4-010-01 DoD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS (INCLUDING UFC 4-010-01 DoD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS (INCLUDING CHANGE 1, 1 OCTOBER 2013) F. UFC 4-010-02 DoD MINIMUM ATFP STANDOFF DISTANCES FOR BUILDINGS (FOUO) (9 FEB UFC 4-010-02 DoD MINIMUM ATFP STANDOFF DISTANCES FOR BUILDINGS (FOUO) (9 FEB 2012) G. 2012 INTERNATIONAL BUILDING CODE 2012 INTERNATIONAL BUILDING CODE H. ASCE 7-10, MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES ASCE 7-10, MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES I. AISC 360-10, SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS, DATED AISC 360-10, SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS, DATED JUNE 22, 2010 J. ACI 530-13, BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES ACI 530-13, BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES K. ACI 318-14, BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE ACI 318-14, BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE 2. EL DISEÑO DE LA ESTRUCTURA ES ACORDE A LOS SIGUIENTES CÓDIGOS ESPAÑOLES Y EL DISEÑO DE LA ESTRUCTURA ES ACORDE A LOS SIGUIENTES CÓDIGOS ESPAÑOLES Y ESPECIFICACIONES: A. CÓDIGO TÉCNICO DE LA EDIFICACIÓN (CTE): CÓDIGO TÉCNICO DE LA EDIFICACIÓN (CTE): DOCUMENTO BÁSICO - SEGURIDAD ESTRUCTURAL (DB-SE) DOCUMENTO BÁSICO - ACCIONES EN LA EDIFICACION (DB-SE-AE) DOCUMENTO BÁSICO - SEGURIDAD ESTRUCTURAL ACERO (DB-SE-A) B. MINISTERIO DE FOMENTO: MINISTERIO DE FOMENTO: INSTRUCCIÓN DEL HORMIGÓN ESTRUCTURAL (EHE 08) INSTRUCCIÓN DEL ACERO ESTRUCTURAL (EAE 04) NORMA DE CONSTRUCCIÓN SISMORRESISTENTE (NCSE-02) 3. CRITERIO DE CARGAS DE DISEÑO: CRITERIO DE CARGAS DE DISEÑO: PORT OPS FDMRC FDMRC A. CARGAS VIVAS (UNIFORMES + CONCENTRADAS): CARGAS VIVAS (UNIFORMES + CONCENTRADAS): TABIQUERÍA 0.7kPa 0.7kPa 0.7kPa 0.7kPa 0.7kPa PASILLOS PRIMERA PLANTA 4.8kPa 4.8kPa 4.8kPa 4.8kPa 4.8kPa CUARTOS MECÁNICOS 6kPa 6kPa 6kPa 6kPa 6kPa CUBIERTA 1kPa + 2kN 1kPa + 2kN 1kPa + 2kN 1kPa + 2kN 1kPa + 2kN ESCALERAS 4.8kPa + 1.3kN - 4.8kPa + 1.3kN - - ASEOS Y DUCHAS 3.6kPa 3.6kPa 3.6kPa 3.6kPa 3.6kPa INDUSTRIAL/ ALMACENAJE PESADO 12.0kPa - 12.0kPa - - PUENTE TÉRMICO ESTRUCTURAL PREFABRICADO 38.9kPa + 38.9kN - 38.9kPa + 38.9kN - - OFICINAS 2.4kPa + 8.9kN 2.4kPa + 8.9kN 2.4kPa + 8.9kN 2.4kPa + 8.9kN 2.4kPa + 8.9kN ALMACÉN 6kPa - 6kPa - - PASILLOS SOBRE PRIMERA PLANTA 3.8kPa - 3.8kPa - - SALA DE CONFERENCIAS 4.8kPa 4.8kPa 4.8kPa 4.8kPa 4.8kPa MAT. PELIGROSOS/RESP. DERRAME PETROL. 9.6kPa - 9.6kPa - - ENGRANAJE/ALMACÉN 14.4kPa - 14.4kPa - - ALOJAMIENTOS 2kPa - 2kPa - - SALAS DE DESCANSO 4.8kPa - 4.8kPa - - BALCONES/TERRAZAS 4.8kPa - 4.8kPa - - B. CARGA DE NIEVE: CARGA DE NIEVE: CATEGORÍA DE RIESGO II II II II II FACTOR IMPORTANCIA CARGA NIEVE, I 1.0 1.0 I 1.0 1.0 s1.0 1.0 1.0 SOBRECARGA DE NIEVE EN EL TERRENO, P 0.24kPa 0.24kPa P 0.24kPa 0.24kPa G0.24kPa 0.24kPa 0.24kPa FACTOR TÉRMICO, C 1.0 1.0 C 1.0 1.0 t1.0 1.0 1.0 PROFUNDIDAD DE CONGELACIÓN 127mm 127mm 127mm 127mm 127mm CARGA DE NIEVE EN CUBIERTA PLANA, P 0.24kPa 0.24kPa P 0.24kPa 0.24kPa f0.24kPa 0.24kPa 0.24kPa C. CARGA DE VIENTO: CARGA DE VIENTO: CATEGORÍA DE RIESGO II II II II II FACTOR IMPORTANCIA VIENTO, I 1.0 1.0 I 1.0 1.0 W1.0 1.0 1.0 VELOCIDAD DISEÑO VIENTO, V (ÚLTIMA) 183km/hr 183km/hr 183km/hr 183km/hr 183km/hr CATEGORÍA DE EXPOSICIÓN D D D D D PRESIONES INTERNAS 0.18 0.18 ±0.18±0.18FACTOR EFECTO RÁFAGA 0.85 0.85 0.85 0.85 0.85 D. PARÁMETROS SÍSMICOS: PARÁMETROS SÍSMICOS: CATEGORÍA DE RIESGO II II II II II FACTOR DE IMPORTANCIA SÍSMICA, I 1.0 1.0 I 1.0 1.0 E1.0 1.0 1.0 RESPUESTA ESPECTRAL, S 0.760g 0.760g S 0.760g 0.760g S0.760g 0.760g 0.760g RESPUESTA ESPECTRAL, S 0.350g 0.350g S 0.350g 0.350g 10.350g 0.350g 0.350g COEFICIENTE DE RESP. ESPECTRAL, S 0.606g 0.606g S 0.606g 0.606g DS0.606g 0.606g 0.606g COEFICIENTE DE RESP. ESPECTRAL, S 0.397g 0.397g S 0.397g 0.397g D10.397g 0.397g 0.397g CLASIFICACIÓN DE LA ZONA D D D D D PROCEDIMIENTO DE ANÁLISIS EQUIVALENTE EQUIVALENTE EQUIVALENTE EQUIVALENTE EQUIVALENTE FUERZA LATERAL FUERZA LATERAL FUERZA LATERAL CATEGORÍA DE DISEÑO SÍSMICO D D D D D SIST. RESIST. FUERZA SÍSMICA BASE REFUERZO ESPECIAL REFUERZO ESPECIAL REFUERZO ESPECIAL REFUERZO ESPECIAL REFUERZO ESPECIAL MUROS DE HORMIGÓN MUROS DE HORMIGÓN MUROS DE HORMIGÓN ARRIOSTRANTES ARRIOSTRANTES ARRIOSTRANTES FACTOR MODIFICACIÓN DE RESPUESTA, R 5 5 5 5 5 CORTANTE BASE PARA DISEÑO, V 0.121W 0.121W 0.121W 0.121W 0.121W E. CRITERIO PARA ANTITERRORISMO (ATFP) Y EXPLOSIÓN ACCIDENTAL: CRITERIO PARA ANTITERRORISMO (ATFP) Y EXPLOSIÓN ACCIDENTAL: CATEGORÍA DEL EDIFICIO ATFP PÚBLICA CONCURRENCIA PÚBLICA CONCURRENCIA PÚBLICA CONCURRENCIA PESO DE EXPLOSIVOS ATFP II II II II II NIVEL DE PROTECCIÓN ATFP BAJO BAJOBAJO BAJOBAJO

AutoCAD SHX Text -1650

AutoCAD SHX Text +770

AutoCAD SHX Text -1610

AutoCAD SHX Text +770

AutoCAD SHX Text -1510

AutoCAD SHX Text +770

AutoCAD SHX Text -1650

AutoCAD SHX Text +770

AutoCAD SHX Text -1610

AutoCAD SHX Text +770

AutoCAD SHX Text -1510

AutoCAD SHX Text +770

AutoCAD SHX Text -1640

AutoCAD SHX Text +1510

AutoCAD SHX Text -1570

AutoCAD SHX Text +1450

AutoCAD SHX Text -1420

AutoCAD SHX Text +1290

P

O R

T O

P E

R A

TI

O

N S

F A

C

IL

IT

IE

S

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

A

TL

A N

TI

C

4525 Main Street, Suite 1400

Virginia Beach, VA 23462

757.455.5800

FOUNDATION NOTES

CONCRETE NOTESGENERAL NOTES

DAVIT NOTES

S-002

NOTAS DE CIMENTACIÓN

NOTAS DEL HORMIGÓNNOTAS GENERALES

NOTAS PARA LA POLEA

PROFESSIONAL ENGIN

EE

R

JAMES E. SPADY

Lic. No. 15374

CO

MM

ON

WEALTH OF V IRGINI A

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

DEPARTMENT OF THE NAVY

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

CONSTR. CONTR. NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

NAVAL FACILITIES ENGINEERING COMMAND

AutoCAD SHX Text

DES

AutoCAD SHX Text

DRW

AutoCAD SHX Text

SYM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

NAVFAC METRIC DRAWFORM REVISION: 01 FEBRUARY 2017

AutoCAD SHX Text

CHK

AutoCAD SHX Text

SATISFACTORY TO

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

ACTIVITY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

FOR COMMANDER NAVFAC

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

A/E INFO

AutoCAD SHX Text

OF

AutoCAD SHX Text

EPROJECT NO.:

AutoCAD SHX Text

NAVAL STATION

AutoCAD SHX Text

ROTA, SPAIN

AutoCAD SHX Text 1561956

AutoCAD SHX Text

AutoCAD SHX Text

SMS/LKJ

AutoCAD SHX Text

NAVFAC ATLANTIC

AutoCAD SHX Text

NORFOLK, VA

AutoCAD SHX Text

CYNTHIA DE JONG, RA

AutoCAD SHX Text

PM/DM

AutoCAD SHX Text

BRANCH MANAGER

AutoCAD SHX Text

DESIGN DIRECTOR

AutoCAD SHX Text

FIRE PROTECTION

AutoCAD SHX Text

1. FOUNDATIONS HAVE BEEN DESIGNED IN ACCORDANCE WITH THE RECOMMENDATIONS IN FOUNDATIONS HAVE BEEN DESIGNED IN ACCORDANCE WITH THE RECOMMENDATIONS IN THE GEOTECHNICAL REPORT PREPARED BY LABSON CONTROL DE CALIDAD Y GEOTECNIA DATED APRIL, 2018. 2. PORT OPERATIONS BUILDING (PORT OPS) FOUNDATIONS HAVE BEEN DESIGNED TO PORT OPERATIONS BUILDING (PORT OPS) FOUNDATIONS HAVE BEEN DESIGNED TO BEAR ON ENGINEERED FILL WITH A NET ALLOWABLE BEARING CAPACITY OF 200 KPA. FORWARD DEPLOYED REGIONAL MAINTENANCE CENTER (FDRMC) FOUNDATIONS HAVE BEEN DESIGNED WITH A NET ALLOWABLE BEARING CAPACITY OF 49 KPA 3. PRIOR TO PLACING FOUNDATION CONCRETE, THE CONTRACTOR SHALL ENSURE THAT PRIOR TO PLACING FOUNDATION CONCRETE, THE CONTRACTOR SHALL ENSURE THAT FOUNDATION EXCAVATIONS ARE INSPECTED BY AN INDEPENDENT TESTING LABORATORY AND GEOTECHNICAL ENGINEER TO EVALUATE THE EXTENT OF LOOSE, SOFT OR OTHERWISE UNSATISFACTORY SOIL MATERIAL AND TO VERIFY THE BEARING CAPACITY. SOILS NOT SUITABLE FOR FOUNDATION SUPPORT SHALL BE UNDERCUT AND REPLACED WITH ENGINEERED FILL. 4. MINIMUM SUBGRADE PREPARATIONS ARE AS INDICATED IN THE GEOTECHNICAL MINIMUM SUBGRADE PREPARATIONS ARE AS INDICATED IN THE GEOTECHNICAL REPORT. REMOVE EXISTING SOIL MATERIALS TO A DEPTH OF 3 METERS FOR A DISTANCE OF 1.5 METERS OUTSIDE OF THE PORT OPERATIONS BUILDING FOOTPRINT. INSTALL ENGINEERED FILL TO GRADE IN ACCORDANCE WITH THE RECOMMENDATIONS OF THE GEOTECHNICAL REPORT. 5. ADEQUATELY PROTECT FOUNDATION EXCAVATIONS TO PREVENT WATER FROM ADEQUATELY PROTECT FOUNDATION EXCAVATIONS TO PREVENT WATER FROM ACCUMULATING AND STANDING IN THE EXCAVATION BOTTOMS. DO NOT PLACE FOUNDATION CONCRETE ON FROZEN OR SATURATED SUBGRADES. 6. ENSURE THAT EARTH-FORMED FOOTINGS CONFORM TO THE SHAPE, LINES AND ENSURE THAT EARTH-FORMED FOOTINGS CONFORM TO THE SHAPE, LINES AND THICKNESSES INDICATED ON THE FOUNDATION PLAN. 7. PLACE FOUNDATION CONCRETE THE SAME DAY EXCAVATIONS ARE MADE OR AS SOON PLACE FOUNDATION CONCRETE THE SAME DAY EXCAVATIONS ARE MADE OR AS SOON AS PRACTICAL THEREAFTER. 8. DO NOT INSTALL FOUNDATIONS UNTIL FOUNDATION WORK HAS BEEN COORDINATED DO NOT INSTALL FOUNDATIONS UNTIL FOUNDATION WORK HAS BEEN COORDINATED WITH ADJACENT UNDERGROUND UTILITIES AND STRUCTURES. ANY FOOTING STEPS INDICATED ON PLAN ARE SCHEMATIC AND SHALL BE COORDINATED WITH OTHER TRADES. 9. CONTINUOUS FOOTINGS SHALL BE LOWERED AS REQUIRED TO PASS UNDER UTILITY CONTINUOUS FOOTINGS SHALL BE LOWERED AS REQUIRED TO PASS UNDER UTILITY LINES. STEP CONTINUOUS FOOTINGS DOWN AS SHOWN IN THE "TYPICAL STEPPED FOOTING" DETAIL ON SHEET SB501. IN LIEU OF STEPPED FOOTINGS, PIPE SLEEVES BELOW CONTINUOUS FOOTINGS MAY BE PROVIDED IN ACCORDANCE WITH THE "TYPICAL PIPE SLEEVE BENEATH FOOTING" DETAIL ON SHEET SB501.

AutoCAD SHX Text 1.

AutoCAD SHX Text

1. CAST-IN-PLACE CONCRETE SHALL ATTAIN THE FOLLOWING MINIMUM 28-DAY CAST-IN-PLACE CONCRETE SHALL ATTAIN THE FOLLOWING MINIMUM 28-DAY COMPRESSIVE STRENGTHS (f'c): A. COLUMNS AND ELEVATED BEAMS 30 mPa COLUMNS AND ELEVATED BEAMS 30 mPa 30 mPa B. ELEVATED SLABS 30 mPa ELEVATED SLABS 30 mPa 30 mPa C. WALLS 30 mPa WALLS 30 mPa 30 mPa D. SLAB-ON-GRADE 30 mPa SLAB-ON-GRADE 30 mPa 30 mPa E. FOOTINGS 25 mPa FOOTINGS 25 mPa 25 mPa F. GRADE BEAMS 30 mPa GRADE BEAMS 30 mPa 30 mPa G. ALL OTHER CONCRETE 25 mPa ALL OTHER CONCRETE 25 mPa 25 mPa 2. CONCRETE DENSITY SHALL BE NORMAL WEIGHT UNLESS SPECIFICALLY OTHERWISE CONCRETE DENSITY SHALL BE NORMAL WEIGHT UNLESS SPECIFICALLY OTHERWISE NOTED. 3. CONCRETE REINFORCING STEEL SHALL CONFORM TO UNE-EN 36068 (B400S), CONCRETE REINFORCING STEEL SHALL CONFORM TO UNE-EN 36068 (B400S), INCLUDING TIES AND STIRRUPS. ACTUAL Fy SHALL NOT EXCEED SPECIFIED Fy BY MORE THAN 125 MPa BASED ON MILL TEST. RATIO OF ACTUAL TENSILE STRENGTH TO THE ACTUAL YIELD STRENGTH IS NOT LESS THAN 1.25. 4. WELDED WIRE REINFORCEMENT SHALL CONFORM TO UNE-EN 10080 (B400S). WELDED WIRE REINFORCEMENT SHALL CONFORM TO UNE-EN 10080 (B400S). PROVIDE IN FLAT SHEETS. ROLLS ARE NOT PERMITTED. 5. ANCHOR BOLTS SHALL BE CLASS 5.0 BOLTS. ANCHOR BOLTS SHALL BE CLASS 5.0 BOLTS. 6. REINFORCING STEEL SHALL BE CONTINUOUS UNLESS OTHERWISE NOTED. CONTINUOUS REINFORCING STEEL SHALL BE CONTINUOUS UNLESS OTHERWISE NOTED. CONTINUOUS REINFORCING STEEL SHALL BE LAPPED AS INDICATED. 7. MINIMUM CONCRETE COVER FOR REINFORCING STEEL SHALL BE AS INDICATED. MINIMUM CONCRETE COVER FOR REINFORCING STEEL SHALL BE AS INDICATED. A. CONCRETE DEPOSITED AGAINST THE GROUND 75mm CONCRETE DEPOSITED AGAINST THE GROUND 75mm 75mm B. CONCRETE EXPOSED TO EARTH OR WEATHER (> 20) 50mm CONCRETE EXPOSED TO EARTH OR WEATHER (> 20) 50mm > 20) 50mm 20)50mm C. CONCRETE EXPOSED TO EARTH OR WEATHER (< 20) 50mm CONCRETE EXPOSED TO EARTH OR WEATHER (< 20)50mm D. BEAMS AND COLUMNS 40mm BEAMS AND COLUMNS 40mm 40mm E. WALLS 40mm WALLS 40mm 40mm F. ELEVATED SLABS 25mm ELEVATED SLABS 25mm 25mm 8. CONCRETE REINFORCING STEEL MARKED STANDARD HOOK SHALL HAVE A 90-DEGREE CONCRETE REINFORCING STEEL MARKED STANDARD HOOK SHALL HAVE A 90-DEGREE HOOK UNLESS OTHERWISE NOTED. 9. ALL EMBEDDED ITEMS SHALL BE PROPERLY PLACED, ACCURATELY POSITIONED, AND ALL EMBEDDED ITEMS SHALL BE PROPERLY PLACED, ACCURATELY POSITIONED, AND MAINTAINED SECURELY IN PLACE PRIOR TO AND DURING CONCRETE PLACEMENT. 10. PROVIDE 12mm THICK JOINT FILLER MATERIAL WHERE SLABS-ON-GRADE ABUT PROVIDE 12mm THICK JOINT FILLER MATERIAL WHERE SLABS-ON-GRADE ABUT VERTICAL SURFACES. 11. REINFORCING STEEL SHALL BE SPREAD AT SLEEVES, TIEBACKS, RECESSES, AND REINFORCING STEEL SHALL BE SPREAD AT SLEEVES, TIEBACKS, RECESSES, AND OTHER EMBEDDED ITEMS UNLESS OTHERWISE NOTED. REINFORCING SHALL NOT BE CUT TO FACILITATE PLACEMENT OF EMBEDDED ITEMS. 12. WHERE CONDUITS AND PIPES ARE INDICATED TO BE EMBEDDED WITHIN A SLAB, WHERE CONDUITS AND PIPES ARE INDICATED TO BE EMBEDDED WITHIN A SLAB, WALL, OR BEAM, THEY SHALL NOT BE LARGER IN OUTSIDE DIMENSION THAN 1/3 THE OVERALL THICKNESS OF THE SLAB, WALL, OR BEAM IN WHICH THEY ARE EMBEDDED. CONDUITS AND PIPES EMBEDDED IN A SLAB, WALL, OR BEAM SHALL BE SPACED NO LESS THAN THREE DIAMETERS ON CENTER AND RUN MID-DEPTH, UNLESS OTHERWISE NOTED. 13. NO CONCRETE SHALL BE PLACED UNTIL THE CONTRACTING OFFICER HAS INSPECTED NO CONCRETE SHALL BE PLACED UNTIL THE CONTRACTING OFFICER HAS INSPECTED ALL EMBEDDED WORK, INCLUDING REINFORCING. 14. ALL EXPOSED CONCRETE EDGES SHALL BE CHAMFERED 20mm OR AS INDICATED. ALL EXPOSED CONCRETE EDGES SHALL BE CHAMFERED 20mm OR AS INDICATED. 15. DO NOT PLACE ALUMINUM CONDUITS, PIPES, OR ACCESSORIES IN DIRECT CONTACT DO NOT PLACE ALUMINUM CONDUITS, PIPES, OR ACCESSORIES IN DIRECT CONTACT WITH CONCRETE UNLESS COATED TO PREVENT ELECTROLYSIS. 16. PROVIDE NECESSARY CONSTRUCTION JOINTS IN MONOLITHIC CONCRETE POURS SO PROVIDE NECESSARY CONSTRUCTION JOINTS IN MONOLITHIC CONCRETE POURS SO THAT THE QUALITY OF PLACEMENT AND FINISH MEETS REQUIREMENTS OF THE CONTRACT DOCUMENTS. 17. THERE SHALL BE NO HORIZONTAL CONSTRUCTION JOINTS IN HORIZONTALLY-ORIENTED THERE SHALL BE NO HORIZONTAL CONSTRUCTION JOINTS IN HORIZONTALLY-ORIENTED MEMBERS SUCH AS BEAMS, SLABS, AND FOOTINGS. THE LOCATION OF HORIZONTAL CONSTRUCTION JOINTS IN VERTICALLY-ORIENTED MEMBERS SUCH AS WALLS AND COLUMNS SHALL BE SELECTED TO MINIMIZE IMPACT ON MEMBER STRENGTH AND APPEARANCE. ALL VERTICAL CONSTRUCTION JOINTS SHALL BE MADE WITH BULKHEADS. REFER TO TYPICAL CONSTRUCTION JOINT DETAILS.

AutoCAD SHX Text

1. USE STRUCTURAL DRAWINGS IN CONJUNCTION WITH ALL OTHER DRAWINGS AND THE USE STRUCTURAL DRAWINGS IN CONJUNCTION WITH ALL OTHER DRAWINGS AND THE SPECIFICATIONS. COORDINATE THE WORK OF OTHER TRADES INCLUDING, BUT NOT LIMITED TO THE REQUIREMENTS FOR SLEEVES, INSERTS, HOLES, PRINCIPAL OPENINGS, DEPRESSIONS, EQUIPMENT PADS, HANGERS, AND ANCHORS. 2. ELEVATIONS ON THE STRUCTURAL DRAWINGS ARE DENOTED AS [±XXX] REFERENCED ELEVATIONS ON THE STRUCTURAL DRAWINGS ARE DENOTED AS [±XXX] REFERENCED TO THE FINISHED FIRST FLOOR ELEVATION DATUM. REFER TO THE CIVIL DRAWINGS FOR ACTUAL DATUM ELEVATION. 3. REPORT DISCREPANCIES IN DIMENSIONS BETWEEN DIFFERENT DRAWINGS TO THE REPORT DISCREPANCIES IN DIMENSIONS BETWEEN DIFFERENT DRAWINGS TO THE OWNER'S REPRESENTATIVE PRIOR TO BEGINNING WORK IN AREAS THAT WILL BE AFFECTED. DO NOT SCALE DIMENSIONS FROM THE DRAWINGS. 4. DETAILS AND SECTIONS APPLY NOT ONLY WHERE SPECIFICALLY INDICATED OR DETAILS AND SECTIONS APPLY NOT ONLY WHERE SPECIFICALLY INDICATED OR REFERENCED, BUT ALSO IN ALL OTHER LIKE OR SIMILAR CONSTRUCTION THAT REQUIRES THEIR USE. 5. THE STRUCTURAL DRAWINGS CONTAINED HEREIN REPRESENT THE FINISHED THE STRUCTURAL DRAWINGS CONTAINED HEREIN REPRESENT THE FINISHED STRUCTURE. PROVIDE ALL TEMPORARY SHORING, GUYING, AND BRACING REQUIRED TO ERECT AND HOLD THE STRUCTURE IN PROPER ALIGNMENT UNTIL ALL STRUCTURAL WORK, INCLUDING ALL CONNECTIONS, IS COMPLETE. THE ANALYSIS, DESIGN, SAFETY, ADEQUACY, AND INSPECTION OF SUCH TEMPORARY SUPPORTS ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. 6. CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND SUPERVISION OF CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND SUPERVISION OF THE WORK ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. 7. REPRODUCTION OF CONTRACT DRAWINGS SHALL NOT BE USED AS SHOP DRAWINGS REPRODUCTION OF CONTRACT DRAWINGS SHALL NOT BE USED AS SHOP DRAWINGS UNDER ANY CIRCUMSTANCE. 8. DEVIATIONS FROM THE STRUCTURAL DRAWINGS SHALL BE MADE ONLY WITH THE DEVIATIONS FROM THE STRUCTURAL DRAWINGS SHALL BE MADE ONLY WITH THE WRITTEN APPROVAL OF THE STRUCTURAL ENGINEER OF RECORD. 9. CONNECTIONS OF VERTICALLY OR LATERALLY SUPPORTED COMPONENTS SHALL BE CONNECTIONS OF VERTICALLY OR LATERALLY SUPPORTED COMPONENTS SHALL BE CONCENTRICALLY FASTENED TO THE STRUCTURAL MEMBER, UNLESS SPECIFICALLY NOTED OTHERWISE. 10. THIS PROJECT REQUIRES SPECIAL INSPECTIONS AS DESCRIBED IN THE APPLICABLE THIS PROJECT REQUIRES SPECIAL INSPECTIONS AS DESCRIBED IN THE APPLICABLE BUILDING CODE. REFER TO THE STATEMENT OF SPECIAL INSPECTIONS AND PROJECT SPECIFICATIONS FOR REQUIREMENTS. 11. WHERE PLAN DIMENSIONS OR ELEVATIONS ARE PROVIDED WITHOUT UNITS, THE UNIT WHERE PLAN DIMENSIONS OR ELEVATIONS ARE PROVIDED WITHOUT UNITS, THE UNIT OF MEASUREMENT IS MILLIMETERS, UNLESS OTHERWISE NOTED.

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text

1. DAVIT SHALL BE A PRE-MANUFACTURED, MANUALLY OPERATED DEVICE WITH A DAVIT SHALL BE A PRE-MANUFACTURED, MANUALLY OPERATED DEVICE WITH A LIFTING CAPACITY OF 455 KG (MIN). 2. BOOM LENGTH SHALL BE ADJUSTABLE WITH A MINIMUM LENGTH OF 965 AND A BOOM LENGTH SHALL BE ADJUSTABLE WITH A MINIMUM LENGTH OF 965 AND A MAXIMUM LENGTH OF 1725. MAST DIAMETER SHALL BE 89 (MIN). 3. WIRE ROPE SHALL BE 10 (MIN). WIRE ROPE SHALL BE 10 (MIN). 4. DAVIT SHALL INCLUDE A MOUNTING BASE SIZED FOR THE REQUIRED LIFTING DAVIT SHALL INCLUDE A MOUNTING BASE SIZED FOR THE REQUIRED LIFTING CAPACITY. ATTACHED DAVIT BASE TO CONCRETE STRUCTURE IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS. 5. SUBMIT SHOP DRAWINGS FOR REVIEW PRIOR TO EXECUTING THE WORK.SUBMIT SHOP DRAWINGS FOR REVIEW PRIOR TO EXECUTING THE WORK.

AutoCAD SHX Text

JES

AutoCAD SHX Text

SMS

AutoCAD SHX Text

SKE

AutoCAD SHX Text

NONE

AutoCAD SHX Text

AutoCAD SHX Text 14069940

AutoCAD SHX Text

1. LA CIMENTACIÓN SE HA DISEÑADO DE ACUERDO CON LAS RECOMENDACIONES DEL LA CIMENTACIÓN SE HA DISEÑADO DE ACUERDO CON LAS RECOMENDACIONES DEL INFORME GEOTÉCNICO PREPARADO POR LABSON CONTROL DE CALIDAD Y GEOTECNICA CON FECHA DE ABRIL, 2018. 2. LA CIMENTACIÓN DEL EDIFICIO DE OPERACIONES DEL PUERTO (PORT OPS) SE HA LA CIMENTACIÓN DEL EDIFICIO DE OPERACIONES DEL PUERTO (PORT OPS) SE HA DISEÑADO PARA ESTAR SOPORTADA SOBRE UN RELLENO DISEÑADO CON UNA CAPACIDAD PORTANTE NETA DE 200 KPA. EDIFICIO DE MANDO DE MANTENIMIENTO DE BUQUES (FDRMC) SE HA DISEÑADO CON UNA CAPACIDAD PORTANTE DE 49 KPA. 3. ANTES DE VERTER EL HORMIGÓN DE LA CIMENTACIÓN, EL CONTRATISTA GARANTIZARÁ ANTES DE VERTER EL HORMIGÓN DE LA CIMENTACIÓN, EL CONTRATISTA GARANTIZARÁ QUE LAS EXCAVACIONES PARA LA CIMENTACIÓN SE HAYAN INSPECCIONADO POR UN LABORATORIO DE ENSAYO E INGENIERO INDEPENDIENTES PARA EVALUAR LA EXISTENCIA DE MATERIAL SUELTO, BLANDO O CON MATERIAL DE TERRENO NO SATISFACTORIO Y VERIFICAR LA CAPACIDAD PORTANTE. LOS TERRENOS NO ADECUADOS PARA EL SOPORTE DE LA CIMENTACIÓN SE CORTARÁN Y SUSTITUIRÁN POR RELLENOS SELECCIONADOS. 4. LA PREPARACIÓN MÍNIMA DEL TERRENO SE INDICA EN EL INFORME GEOTÉCNICO. LA PREPARACIÓN MÍNIMA DEL TERRENO SE INDICA EN EL INFORME GEOTÉCNICO. RETIRAR EL TERRENO EXISTENTE HASTA UNA PROFUNDIDAD DE 3 METROS EN UNA DISTANCIA DE 1.5 METROS MÁS ALLÁ DEL PERÍMETRO DE LA CIMENTACIÓN DEL EDIFICIO DEL PORT OPS. COLOCAR RELLENO SELECCIONADO PARA NIVELAR DE ACUERDO CON LAS RECOMENDACIONES DEL ESTUDIO GEOTÉCNICO. 5. PROTEGER LAS EXCAVACIONES DE LA CIMENTACIÓN ADECUADAMENTE PARA PREVENIR PROTEGER LAS EXCAVACIONES DE LA CIMENTACIÓN ADECUADAMENTE PARA PREVENIR LA ACUMULACIÓN DE AGUA Y SU PERMANENCIA EN LA BASE DE LA EXCAVACIÓN. NO VERTER HORMIGÓN PARA LA CIMENTACIÓN SOBRE TERRENOS CONGELADOS O SATURADOS. 6. GARANTIZAR QUE LAS ZAPATAS EN EL TERRENO SE CONFORMAN SEGÚN LA FORMA, GARANTIZAR QUE LAS ZAPATAS EN EL TERRENO SE CONFORMAN SEGÚN LA FORMA, LÍNEAS Y ESPESORES INDICADOS EN LA PLANTA DE CIMENTACIÓN. 7. VERTER EL HORMIGÓN DE LA CIMENTACIÓN EL MISMO DÍA EN QUE SE HACEN LAS VERTER EL HORMIGÓN DE LA CIMENTACIÓN EL MISMO DÍA EN QUE SE HACEN LAS EXCAVACIONES O TAN PRONTO COMO SEA POSIBLE. 8. NO REALIZAR LA CIMENTACIÓN HASTA QUE LOS TRABAJOS DE CIMENTACIÓN SE NO REALIZAR LA CIMENTACIÓN HASTA QUE LOS TRABAJOS DE CIMENTACIÓN SE HAYAN COORDINADO CON LAS INSTALACIONES Y ESTRUCTURAS ENTERRADAS ADYACENTES. CUALQUIER ESCALONADO EN LAS ZAPATAS INDICADO EN PLANO ES ESQUEMÁTICO Y SE COORDINARÁ CON LAS OTRAS DISCIPLINAS. 9. LAS ZAPATAS CONTINUAS SE BAJARÁN SEGÚN SE REQUIERA PARA PASAR BAJO LAS LAS ZAPATAS CONTINUAS SE BAJARÁN SEGÚN SE REQUIERA PARA PASAR BAJO LAS LÍNEAS DE INSTALACIONES. ESCALONAR LAS ZAPATAS CONTINUAS DEBAJO SEGÚN SE MUESTRA EN EL DETALLE "TÍPICA ZAPATA ESCALONADA" EN EL PLANO SB501.

AutoCAD SHX Text

1. EL HORMIGÓN VERTIDO IN SITU PRESENTARÁ LAS SIGUIENTES RESISTENCIAS A EL HORMIGÓN VERTIDO IN SITU PRESENTARÁ LAS SIGUIENTES RESISTENCIAS A COMPRESIÓN MÍNIMAS A LOS 28 DÍAS: A. PILARES Y VIGAS ELEVADAS 30 mPa PILARES Y VIGAS ELEVADAS 30 mPa 30 mPa B. LOSAS ELEVADAS 30 mPa LOSAS ELEVADAS 30 mPa 30 mPa C. MUROS 30 mPa MUROS 30 mPa 30 mPa D. LOSAS SOBRE EL TERRENO 30 mPa LOSAS SOBRE EL TERRENO 30 mPa 30 mPa E. ZAPATAS 25 mPa ZAPATAS 25 mPa 25 mPa F. VIGAS DE CIMENTACIÓN 30 mPa VIGAS DE CIMENTACIÓN 30 mPa 30 mPa G. TODOS LOS OTROS HORMIGONES 25 mPa TODOS LOS OTROS HORMIGONES 25 mPa 25 mPa 2. LA DENSIDAD DEL HORMIGÓN TENDRÁ UN PESO NORMAL A MENOS QUE SE INDIQUE OTRA COSA. 3. EL ARMADO DEL HORMIGÓN SERÁ CONFORME A LA UNE-EN 36068 (B400S), EL ARMADO DEL HORMIGÓN SERÁ CONFORME A LA UNE-EN 36068 (B400S), INCLUYENDO CERCOS Y ESTRIBOS. LA Fy REAL NO EXCEDERÁ LO ESPECIFICADO PARA Fy PARA MÁS DE 125 MPa BASADO EN EL ENSAYO. EL RATIO DE LA RESISTENCIA A TRACCIÓN REAL CON EL LÍMITE ELÁSTICO REAL NO SERÁ MENOR DE 1.25. 4. EL MALLAZO ELECTROSOLDADO ESTARÁ CONFORME A LA UNE-EN 10080 (B400S). PROVEER EN PLANCHAS PLANAS. LOS ROLLOS NO SE PERMITEN. 5. LOS PERNOS DE ANCLAJE SERÁN PERNOS CLASE 5.0. LOS PERNOS DE ANCLAJE SERÁN PERNOS CLASE 5.0. 6. LA ARMADURA SERÁ CONTINUA A MENOS QUE SE INDIQUE OTRA COSA. LA LA ARMADURA SERÁ CONTINUA A MENOS QUE SE INDIQUE OTRA COSA. LA ARMADURA CONTINUA SE SOLAPARÁ SEGÚN SE INDICA. 7. EL RECUBRIMIENTO MÍNIMO DEL HORMIGÓN PARA LA ARMADURA SERÁ COMO SE EL RECUBRIMIENTO MÍNIMO DEL HORMIGÓN PARA LA ARMADURA SERÁ COMO SE INDICA. A. HORMIGÓN VERTIDO CONTRA EL TERRENO 75mm HORMIGÓN VERTIDO CONTRA EL TERRENO 75mm 75mm B. HORMIGÓN EXPUESTO AL TERRENO O A INTEMPERIE (> 20) 50mm HORMIGÓN EXPUESTO AL TERRENO O A INTEMPERIE (> 20) 50mm > 20) 50mm 20)50mm C. HORMIGÓN EXPUESTO AL TERRENO O A INTEMPERIE (< 20) 50mm HORMIGÓN EXPUESTO AL TERRENO O A INTEMPERIE (< 20)50mm D. VIGAS Y PILARES 40mm VIGAS Y PILARES 40mm 40mm E. MUROS 40mm MUROS 40mm 40mm F. LOSAS ELEVADAS 25mm LOSAS ELEVADAS 25mm 25mm 8. LA ARMADURA DEL HORMIGÓN INDICADA CON PATILLA LLEVARÁ LA PATILLA A 90 LA ARMADURA DEL HORMIGÓN INDICADA CON PATILLA LLEVARÁ LA PATILLA A 90 GRADOS A MENOS QUE SE INDIQUE OTRA COSA. 9. TODOS LOS ELEMENTOS EMPOTRADOS SE COLOCARÁN ADECUADAMENTE, EN SU TODOS LOS ELEMENTOS EMPOTRADOS SE COLOCARÁN ADECUADAMENTE, EN SU POSICIÓN EXACTA, Y SE MANTENDRÁN COGIDOS EN EL SITIO ANTES Y DURANTE EL VERTIDO DEL HORMIGÓN. 10. PROVEER MATERIAL DE RELLENO DE JUNTA DE 12mm DE ESPESOR DONDE LAS PROVEER MATERIAL DE RELLENO DE JUNTA DE 12mm DE ESPESOR DONDE LAS LOSAS SOBRE EL TERRENO MUERAN CONTRA SUPERFICIES VERTICALES. 11. LA ARMADURA SE DISTRIBUIRÁ EN LOS PASATUBOS, ANCLAJES, RECESOS, Y OTROS LA ARMADURA SE DISTRIBUIRÁ EN LOS PASATUBOS, ANCLAJES, RECESOS, Y OTROS ELEMENTOS EMPOTRADOS A MENOS QUE SE INDIQUE OTRA COSA. LA ARMADURA NO SE CORTARÁ PARA FACILITAR LA COLOCACIÓN DE LOS ELEMENTOS EMPOTRADOS. 12. DONDE LOS CONDUCTOS Y TUBERÍAS SE INDIQUEN A EMBEBER DENTRO DE LA LOSA, DONDE LOS CONDUCTOS Y TUBERÍAS SE INDIQUEN A EMBEBER DENTRO DE LA LOSA, MURO, O VIGA, SU DIMENSIÓN EXTERIOR NO SERÁ MAYOR DE 1/3 DEL ESPESOR TOTAL DE LA LOSA, MURO O VIGA, EN EL QUE SE EMBEBAN. LOS CONDUCTOS Y TUBERÍAS EMBEBIDOS EN UNA LOSA, MURO O VIGA SE ESPACIARÁN A NO MENOS DE 3 VECES SU DIÁMETRO EN EL CENTRO Y DISCURRIRÁN POR LA MITAD DEL ESPESOR, A MENOS QUE SE INDIQUE OTRA COSA. 13. NO SE VERTIRÁ HORMIGÓN HASTA QUE EL OFICIAL CONTRATANTE HAYA NO SE VERTIRÁ HORMIGÓN HASTA QUE EL OFICIAL CONTRATANTE HAYA INSPECCIONADO TODOS LOS TRABAJOS DE EMPOTRAMIENTO, INCLUYENDO LA ARMADURA. 14. TODOS LOS BORDES DE HORMIGÓN EXPUESTOS SE ACHAFLANARÁN 20mm O COMO TODOS LOS BORDES DE HORMIGÓN EXPUESTOS SE ACHAFLANARÁN 20mm O COMO SE INDIQUE. 15. NO COLOCAR CONDUCTOS DE ALUMINIO, TUBERÍAS O ACCESORIOS EN CONTACTO NO COLOCAR CONDUCTOS DE ALUMINIO, TUBERÍAS O ACCESORIOS EN CONTACTO DIRECTO CON EL HORMIGÓN A MENOS QUE SE RECUBRAN PARA EVITAR LA ELECTRÓLISIS. 16. PROVEER LAS JUNTAS DE CONSTRUCCIÓN NECESARIAS EN EL HORMIGÓN VERTIDO PROVEER LAS JUNTAS DE CONSTRUCCIÓN NECESARIAS EN EL HORMIGÓN VERTIDO MONOLÍTICAMENTE (DE UNA VEZ) DE MANERA QUE LA CALIDAD DEL VERTIDO Y LOS REQUERIMIENTOS DE ACABADO CUMPLAN LOS DOCUMENTOS DE CONTRATO. 17. NO HABRÁ JUNTAS DE CONSTRUCCIÓN HORIZONTALES EN ELEMENTOS ORIENTADOS NO HABRÁ JUNTAS DE CONSTRUCCIÓN HORIZONTALES EN ELEMENTOS ORIENTADOS HORIZONTALMENTE COMO VIGAS, LOSAS, Y ZAPATAS. LA POSICIÓN DE LAS JUNTAS DE CONSTRUCCIÓN EN ELEMENTOS ORIENTADOS VERTICALMENTE COMO MUROS Y PILARES SE SELECCIONARÁN PARA MINIMIZAR EL IMPACTO EN LA RESISTENCIA DE LOS ELEMENTOS Y EL ASPECTO. TODAS LAS JUNTAS DE CONSTRUCCIÓN VERTICALES SE HARÁN CON MAMPAROS. VER DETALLES TÍPICOS DE JUNTA DE CONSTRUCCIÓN.

AutoCAD SHX Text

1. UTILIZAR LOS PLANOS DE ESTRUCTURA EN CONJUNTO CON TODOS LOS OTROS UTILIZAR LOS PLANOS DE ESTRUCTURA EN CONJUNTO CON TODOS LOS OTROS PLANOS Y LAS ESPECIFICACIONES. COORDINAR LOS TRABAJOS CON LAS OTRAS DISCIPLINAS INCLUYENDO, PERO NO LIMITÁNDOSE A LOS REQUERIMIENTOS PARA PASATUBOS, INSERTOS, AGUJEROS, ABERTURAS PRINCIPALES, REBAJES, LOSAS DE EQUIPOS, CUELGUES, Y ANCLAJES. 2. LAS ELEVACIONES EN LOS PLANOS DE ESTRUCTURA SE INDICAN COMO [ XXX ] CON LAS ELEVACIONES EN LOS PLANOS DE ESTRUCTURA SE INDICAN COMO [±XXX ] CONREFERENCIA AL DATO DE ELEVACIÓN DEL SUELO ACABADO DE PRIMERA PLANTA. VER LOS PLANOS DE URBANIZACIÓN PARA LA ELEVACIÓN REAL. 3. INFORMAR DE LAS DISCREPANCIAS EN DIMENSIONES ENTRE LOS DIFERENTES PLANOS INFORMAR DE LAS DISCREPANCIAS EN DIMENSIONES ENTRE LOS DIFERENTES PLANOS AL REPRESENTANTE DE LA PROPIEDAD ANTES DE COMENZAR LOS TRABAJOS EN LAS ZONAS QUE SE VERÁN AFECTADAS. NO ESCALAR LOS PLANOS PARA LAS DIMENSIONES. 4. LOS DETALLES Y SECCIONES APLICAN NO SÓLO DONDE ESTÉ INDICADO O LOS DETALLES Y SECCIONES APLICAN NO SÓLO DONDE ESTÉ INDICADO O REFERENCIADO ESPECÍFICAMENTE, SINO TAMBIÉN EN TODAS LAS CONSTRUCCIONES IGUALES O SIMILARES QUE REQUIERAN SU USO. 5. LOS PLANOS DE ESTRUCTURA CONTENIDOS AQUÍ REPRESENTAN LA ESTRUCTURA LOS PLANOS DE ESTRUCTURA CONTENIDOS AQUÍ REPRESENTAN LA ESTRUCTURA ACABADA. PROVEER LOS PUNTALES, TENSORES Y ARRIOSTRAMIENTOS REQUERIDOS PARA MANTENER LA ESTRUCTURA ERIGIDA Y ESTABLE EN SU ALINEACIÓN ADECUADA HASTA QUE TODOS LOS TRABAJOS DE ESTRUCTURA, INCLUYENDO TODAS LAS CONEXIONES, ESTÉN COMPLETOS. EL ANÁLISIS, DISEÑO, SEGURIDAD, ADECUACIÓN, E INSPECCIÓN DE LOS SOPORTES TEMPORALES SON SÓLO RESPONSABILIDAD DEL CONTRATISTA. 6. LOS MEDIOS PARA LA CONSTRUCCIÓN, MÉTODOS, TÉCNICAS, SECUENCIAS, Y LOS MEDIOS PARA LA CONSTRUCCIÓN, MÉTODOS, TÉCNICAS, SECUENCIAS, Y SUPERVISIÓN DE LOS TRABAJOS SON SÓLO RESPONSABILIDAD DEL CONTRATISTA. 7. LA REPRODUCCIÓN DE LOS PLANOS DE CONTRATO NO SE UTILIZARÁ COMO PLANOS LA REPRODUCCIÓN DE LOS PLANOS DE CONTRATO NO SE UTILIZARÁ COMO PLANOS DE TALLER BAJO NINGUNA CIRCUNSTANCIA. 8. LAS MODIFICACIONES DE LOS PLANOS DE ESTRUCTURA SE REALIZARÁN SÓLO CON LA LAS MODIFICACIONES DE LOS PLANOS DE ESTRUCTURA SE REALIZARÁN SÓLO CON LA APROBACIÓN ESCRITA DEL INGENIERO DE ESTRUCTURAS DEL PROYECTO. 9. LAS CONEXIONES DE LOS COMPONENTES DE LOS SOPORTES VERTICALES O LAS CONEXIONES DE LOS COMPONENTES DE LOS SOPORTES VERTICALES O LATERALES SE COGERÁN DE MANERA CONCÉNTRICA A LOS MIEMBROS DE LA ESTRUCTURA, A MENOS QUE SE INDIQUE OTRA COSA ESPECÍFICAMENTE. 10. ESTE PROYECTO REQUIERE INSPECCIONES ESPECIALES TAL Y COMO SE DESCRIBEN ESTE PROYECTO REQUIERE INSPECCIONES ESPECIALES TAL Y COMO SE DESCRIBEN EN EL CÓDIGO DEL EDIFICIO APLICABLE. VER EL ESTADO DE LAS INSPECCIONES ESPECIALES Y LAS ESPECIFICACIONES DEL PROYECTO PARA LOS REQUERIMIENTOS. 11. DONDE LAS DIMENSIONES EN PLANTA O EN ALZADOS SE PROVEEAN SIN UNIDAD, LA DONDE LAS DIMENSIONES EN PLANTA O EN ALZADOS SE PROVEEAN SIN UNIDAD, LA UNIDAD DE MEDIDA SERÁ EN MILÍMETROS, A MENOS QUE SE INDIQUE OTRA COSA.

AutoCAD SHX Text

NOTAS GENERALES

1. LA POLEA SERÁ PREFABRICADA, CON DISPOSITIVO DE FUNCIONAMIENTO MANUAL LA POLEA SERÁ PREFABRICADA, CON DISPOSITIVO DE FUNCIONAMIENTO MANUAL PARA UNA CAPACIDAD DE ELEVACIÓN DE 455 KG (MIN.) 2. LA LONGITUD DE PLUMA SERÁ AJUSTABLE CON UNA LONGITUD MÍNIM A DE 965 Y LA LONGITUD DE PLUMA SERÁ AJUSTABLE CON UNA LONGITUD MÍNIM A DE 965 Y UNA LONGITUD MÁXIMA DE 1725. EL DIÁMETRO DEL MÁSTIL SERÁ 89 (MIN). 3. LA CADENA SERÁ DE 10 (MIN). LA CADENA SERÁ DE 10 (MIN). 4. LA POLEA INCLUIRÁ UNA BASE DE MONTAJE DIMENSIONADA PARA LA CAPACIDAD DE LA POLEA INCLUIRÁ UNA BASE DE MONTAJE DIMENSIONADA PARA LA CAPACIDAD DE ELEVACIÓN REQUERIDA. ANCLAR LA BASE DE LA POLEA A LA ESTRUCTURA DE HORMIGÓN DE ACUERDO CON LAS RECOMENDACIONES DEL FABRICANTE. 5. ENTREGAR PLANOS DE TALLER PARA SU REVISIÓN PREVIAMENTE A LA EJECUCIÓN ENTREGAR PLANOS DE TALLER PARA SU REVISIÓN PREVIAMENTE A LA EJECUCIÓN DE LOS TRABAJO.S

P

O R

T O

P E

R A

TI

O

N S

F A

C

IL

IT

IE

S

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

A

TL

A N

TI

C

4525 Main Street, Suite 1400

Virginia Beach, VA 23462

757.455.5800

OVERHEAD CRANE NOTES

ANTI-TERRORISM/ FORCE PROTECTION

NOTES

STEEL NOTES

CONCRETE MASONRY NOTES

S-003

NOTAS PARA EL PUENTE GRÚA

NOTAS PARA PROTECCIÓN

ANTITERRORISTA/EXPLOSIONES

NOTAS PARA EL ACERO

NOTAS PARA FÁBRICA DE HORMIGÓN

PROFESSIONAL ENGIN

EE

R

JAMES E. SPADY

Lic. No. 15374

CO

MM

ON

WEALTH OF V IRGINI A

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

DEPARTMENT OF THE NAVY

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

CONSTR. CONTR. NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

NAVAL FACILITIES ENGINEERING COMMAND

AutoCAD SHX Text

DES

AutoCAD SHX Text

DRW

AutoCAD SHX Text

SYM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

NAVFAC METRIC DRAWFORM REVISION: 01 FEBRUARY 2017

AutoCAD SHX Text

CHK

AutoCAD SHX Text

SATISFACTORY TO

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

ACTIVITY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

FOR COMMANDER NAVFAC

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

A/E INFO

AutoCAD SHX Text

OF

AutoCAD SHX Text

EPROJECT NO.:

AutoCAD SHX Text

NAVAL STATION

AutoCAD SHX Text

ROTA, SPAIN

AutoCAD SHX Text 1561956

AutoCAD SHX Text

AutoCAD SHX Text

SMS/LKJ

AutoCAD SHX Text

NAVFAC ATLANTIC

AutoCAD SHX Text

NORFOLK, VA

AutoCAD SHX Text

CYNTHIA DE JONG, RA

AutoCAD SHX Text

PM/DM

AutoCAD SHX Text

BRANCH MANAGER

AutoCAD SHX Text

DESIGN DIRECTOR

AutoCAD SHX Text

FIRE PROTECTION

AutoCAD SHX Text

1. ANTI-TERRORISM/ FORCE PROTECTION DESIGN IS IN ACCORDANCE WITH THE ANTI-TERRORISM/ FORCE PROTECTION DESIGN IS IN ACCORDANCE WITH THE FOLLOWING UNIFIED FACILITIES CRITERIA: A. UFC 4-010-01, "DOD MINIMUM ANTI-TERRORISM STANDARDS FOR BUILDINGS", UFC 4-010-01, "DOD MINIMUM ANTI-TERRORISM STANDARDS FOR BUILDINGS", DATED 9 FEBRUARY 2012 INCLUDING CHANGE 1 (1 OCTOBER 2013) 2. DESIGN CRITERIA: DESIGN CRITERIA: PORT OPERATIONS FACILITY: A. AT/FP AT/FP BUILDING CATEGORY PRIMARY GATHERING PRIMARY GATHERING BASELINE EXPLOSIVE II II BASELINE STANDOFF (MIN) 9140 9140 LEVEL OF PROTECTION LOW/ VERY LOW LOW/ VERY LOW PRESSURE (NORTH ELEVATION) 5.4 PSI (NORTH ELEVATION) 5.4 PSI 5.4 PSI (TOWER) 8.1 PSI 8.1 PSI IMPULSE (NORTH ELEVATION) 12.4 PSI-MS (NORTH ELEVATION) 12.4 PSI-MS 12.4 PSI-MS (TOWER) 12.4 PSI-MS 12.4 PSI-MS B. ACCIDENTAL EXPLOSION ACCIDENTAL EXPLOSION REFLECTED PRESSURE 3.4 PSI 3.4 PSI REFLECTED IMPULSE 528 PSI-MS 528 PSI-MS INCIDENT PRESSURE 1.6 PSI 1.6 PSI INCIDENT IMPULSE 280 PSI-MS 280 PSI-MS FDRMC FACILITY: C. AT/FP AT/FP BUILDING CATEGORY PRIMARY GATHERING PRIMARY GATHERING BASELINE EXPLOSIVE II II BASELINE STANDOFF (MIN) 9140 9140 LEVEL OF PROTECTION LOW/ VERY LOW LOW/ VERY LOW PRESSURE 44.6 PSI 44.6 PSI IMPULSE 38.4 PSI-MS 38.4 PSI-MS D. ACCIDENTAL EXPLOSION ACCIDENTAL EXPLOSION REFLECTED PRESSURE 3.9 PSI 3.9 PSI REFLECTED IMPULSE 719 PSI-MS 719 PSI-MS INCIDENT PRESSURE 1.9 PSI 1.9 PSI INCIDENT IMPULSE 379 PSI-MS 379 PSI-MS 3. ALL EXTERIOR GLAZING COMPONENTS, INCLUDING SUPPORTING STRUCTURE AND ITS ALL EXTERIOR GLAZING COMPONENTS, INCLUDING SUPPORTING STRUCTURE AND ITS CONNECTIONS, SHALL BE DESIGNED FOR DYNAMIC BLAST PRESSURE AND IMPULSE CORRESPONDING TO THE ACTUAL STANDOFF DISTANCE FROM PARKING AND ROADWAYS. 4. CALCULATIONS SIGNED AND SEALED BY A PROFESSIONAL ENGINEER EXPERIENCED IN CALCULATIONS SIGNED AND SEALED BY A PROFESSIONAL ENGINEER EXPERIENCED IN BLAST DESIGN SHALL BE PROVIDED TO THE STRUCTURAL ENGINEER OF RECORD FOR ALL DELEGATED BLAST DESIGNS INCLUDING BUT NOT LIMITED TO GLAZING AND CURTAIN WALL, AND ANCHORAGE TO CONCRETE WALLS.

AutoCAD SHX Text

1. ALL STRUCTURAL STEEL SHALL BE DETAILED, FABRICATED AND ERECTED IN ALL STRUCTURAL STEEL SHALL BE DETAILED, FABRICATED AND ERECTED IN ACCORDANCE WITH ALL APPLICABLE SPANISH NORMS. 2. STEEL SHALL CONFORM TO THE FOLLOWING GRADES: STEEL SHALL CONFORM TO THE FOLLOWING GRADES: A. IPE, HE, HD SHAPES S275 JR UNE-EN 10025 IPE, HE, HD SHAPES S275 JR UNE-EN 10025 S275 JR UNE-EN 10025 B. ANGLES S275 JR UNE-EN 10025 ANGLES S275 JR UNE-EN 10025 S275 JR UNE-EN 10025 C. CHANNELS S275 JR UNE-EN 10025 CHANNELS S275 JR UNE-EN 10025 S275 JR UNE-EN 10025 D. STRUCTURAL TUBE S275 JR UNE-EN 10210 STRUCTURAL TUBE S275 JR UNE-EN 10210 S275 JR UNE-EN 10210 3. ALL WELDING SHALL BE IN ACCORDANCE WITH UNE-EN ISO 14555. ELECTRODES ALL WELDING SHALL BE IN ACCORDANCE WITH UNE-EN ISO 14555. ELECTRODES FOR WELDING SHALL HAVE A WELD ELECTRODE STRENGTH OF 480 MPa. ALL WELDS SHALL DEVELOP FULL STRENGTH OF THE WEAKER MEMBER. 4.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .