About this file

This solicitation is for an indefinite delivery indefinite quantity multiple award construction contract for projects located primarily at Rota, Spain and worldwide. The solicitation seeks design-build and design-bid-build construction services for projects that include but are not limited to military construction, planning and design, environmental, repair, alteration and utilities work. The Naval Facilities Engineering Command is the issuing agency. Offerors are required to have experience in construction projects of similar size and complexity to those described. The period of performance is one base year with four option years. Task orders will be fixed price or cost reimbursement type.

View the file

Other files

File Type Posted
26 32 13.00 20 (24 Feb 2021).pdf PDF
28 10 05 (23 Feb 2021).pdf PDF
N6247020R4011 0006.pdf PDF
1561956 Amend 0005 Dwg (3 Feb 21).pdf PDF
N6247020R4011 0005.pdf PDF
Attachment (G) - Seed Project Task Order General Requirements (11 Feb 2021).pdf PDF
07 32 13.pdf PDF
08 41 13 Rev.pdf PDF
Attachment E - Schedule B Price Proposal Form (3 Feb 2021).pdf PDF
N6247020R4011 0004.pdf PDF
08 56 53.pdf PDF
28 10 05.pdf PDF
08 41 13.pdf PDF
01 45 35.pdf PDF
N6247020R4011 0003.pdf PDF
28 08 10.pdf PDF
ATT J 1561956dwg02Aof19.pdf PDF
N6247020R4011 0002.pdf PDF
N6247020R4011 0001.pdf PDF
ATTACHMENT K Site Location Photos.pdf PDF
ATT J 1561956dwg01of19.pdf PDF
ATT J 1561956dwg09of19.pdf PDF
ATT J 1561956dwg13of19.pdf PDF
N6247020R4011.pdf PDF
Attachment E - Schedule B Price Proposal Form.pdf PDF
ATT G SEED PROJECT TASK ORDER GENERAL REQUIREMENTS.pdf PDF
ATT J 1561956dwg14of19.pdf PDF
ATT J 1561956dwg04of19.pdf PDF
Attachment D - Past Performance Questionnaire.pdf PDF
ATT J 1561956dwg17of19.pdf PDF
ATT J 1561956dwg06of19.pdf PDF
ATT J 1561956dwg19of19.pdf PDF
ATT J 1561956dwg05of19.pdf PDF
ATT J 1561956dwg16of19.pdf PDF
Attachment F - LRA Commercial Vehicle Inspection Procedures.pdf PDF
ATT J 1561956dwg08of19.pdf PDF
ATT J 1561956dwg10of19.pdf PDF
ATT J 1561956dwg02of19.pdf PDF
ATT J 1561956dwg18of19.pdf PDF
ATT J 1561956dwg15of19.pdf PDF
ATT H 1561956spc2of2.pdf PDF
Attachment B - SEC-NAV_5512_1_11787 Form.pdf PDF
ATT J 1561956dwg11of19.pdf PDF
Attachment C - Construction and Design Experience Project Data Sheet.pdf PDF
ATT J 1561956dwg03of19.pdf PDF
ATT J 1561956dwg12of19.pdf PDF
Attachment A - Pre-Proposal Inquiry Form.xls XLS spreadsheet
ATT J 1561956dwg07of19.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WORK ORDER NO.

At the

PREPARED BY:

Architectural: Mechanical:

Civil: Electrical:

Structural:

APPROVED BY:

Specifications:

For Commander, NAVFAC:

Date:

Submitted By: Date:

UNCLASSIFIED/FOR OFFICIAL USE ONLY

Help Note All fields can be edited. If you have trouble selecting a field, either use the tab key or click "highlight fields" in Acrobat 7. Fields that are not needed can be selected and deleted. Tool tips with "additional field" can be deleted or changed. The contract number can also be deleted or changed.

ashepard Image ashepard Image

P-811 Port Operations Facilities 1561956

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 01 15 LIST OF DRAWINGS

00 73 04 SUPPLEMENTARY CONDITIONS FOR PROJECTS IN MEDITERRANEAN

AREA

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 20 00.00 20 PRICE AND PAYMENT PROCEDURES

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 30 01.00 22 DESIGN, PROCUREMENT, AND INSTALLATION OF FURNITURE,

FIXTURES, AND EQUIPMENT

01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 35 40.00 20 ENVIRONMENTAL MANAGEMENT

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 42 15 METRIC MEASUREMENTS

01 45 00.00 20 QUALITY CONTROL

01 45 35 SPECIAL INSPECTIONS

01 50 00.00 22 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 PROJECT IDENTIFICATION

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 24.00 20 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT

INFORMATION (eOMSI)

01 91 00.15 TOTAL BUILDING COMMISSIONING

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 DEMOLITION

02 82 16.00 20 ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS

02 83 13.00 20 LEAD IN CONSTRUCTION

02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs

AND MERCURY

DI VI SI ON 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

03 52 16 LIGHTWEIGHT INSULATING CONCRETE

DI VI SI ON 04 - MASONRY

04 20 00 UNIT MASONRY

DI VI SI ON 05 - METALS

05 12 00 STRUCTURAL STEEL

05 30 00 STEEL DECKS

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 33 METAL LADDERS

PROJECT TABLE OF CONTENTS Page 1

05 52 00 METAL RAILINGS

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

06 10 00 ROUGH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 11 13 BITUMINOUS DAMPPROOFING

07 13 53 ELASTOMERIC SHEET WATERPROOFING

07 16 50 CEMENTITIOUS WATERPROOFING

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 22 00 ROOF AND DECK INSULATION

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 27 19.01 SELF-ADHERING AIR BARRIERS

07 32 13 ROOF TILES

07 54 19 POLYVINYL-CHLORIDE ROOFING

07 60 00 FLASHING AND SHEET METAL

07 81 00 SPRAY-APPLIED FIREPROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DI VI SI ON 08 - OPENI NGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 31 00 ACCESS DOORS AND PANELS

08 33 23 OVERHEAD COILING DOORS

08 39 54 BLAST RESISTANT DOORS

08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 56 53 BLAST RESISTANT TEMPERED GLASS WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL AND DOOR LOUVERS

DI VI SI ON 09 - FI NI SHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 24 23 CEMENT STUCCO

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 90 00 PAINTS AND COATINGS

09 96 00 HIGH-PERFORMANCE COATINGS

DI VI SI ON 10 - SPECI ALTI ES

10 11 00 VISUAL DISPLAY UNITS

10 14 00.10 EXTERIOR SIGNAGE

10 14 00.20 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 22 13 WIRE MESH PARTITIONS

10 22 39 FOLDING PANEL PARTITIONS

10 28 13 TOILET ACCESSORIES

PROJECT TABLE OF CONTENTS Page 2

10 44 16 FIRE EXTINGUISHERS

10 51 13 METAL LOCKERS

10 51 14 METAL MINI LOCKERS

10 56 13 HEAVY-DUTY STEEL SHELVING

DI VI SI ON 11 - EQUI PMENT

11 53 00 LABORATORY EQUIPMENT AND FUMEHOODS

DI VI SI ON 12 - FURNI SHI NGS

12 24 13 ROLLER WINDOW SHADES

12 36 00 EPOXY RESIN COUNTERTOPS

12 48 13 ENTRANCE FLOOR MATS AND FRAMES

DI VI SI ON 13 - SPECI AL CONSTRUCTI ON

13 48 00 SEISMIC BRACING FOR MISCELLANEOUS EQUIPMENT

DI VI SI ON 14 - CONVEYI NG EQUI PMENT

14 21 23 ELECTRIC TRACTION PASSENGER ELEVATORS

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 13 13.00 20 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

21 30 00 FIRE PUMPS

DI VI SI ON 22 - PLUMBI NG

22 00 00 PLUMBING, GENERAL PURPOSE

22 07 19.00 40 PLUMBING PIPING INSULATION

22 15 14.00 40 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSURE

22 33 30.00 10 SOLAR WATER HEATING EQUIPMENT

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING

CONTROL SYSTEMS

23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM

23 23 00 REFRIGERANT PIPING

23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT

23 82 00.00 20 TERMINAL HEATING UNITS

DI VI SI ON 25 - I NTEGRATED AUTOMATI ON

25 05 11.01 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS - HVAC

25 05 11.02 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS -

LIGHTING

25 05 11.03 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS -

ELECTRONIC SECURITY SYSTEMS

25 05 11.04 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS -

ELEVATORS

PROJECT TABLE OF CONTENTS Page 3

25 05 11.05 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS - FIRE

ALARM

25 05 11.06 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS - AMI

25 08 10 UTILITY MONITORING AND CONTROL SYSTEM TESTING

DI VI SI ON 26 - ELECTRI CAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 08 00 APPARATUS INSPECTION AND TESTING

26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS

26 13 00 SF6/HIGH-FIREPOINT FLUIDS INSULATED PAD-MOUNTED SWITCHGEAR

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 27 14.00 20 ELECTRICITY METERING

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 32 13.00 20 SINGLE OPERATION GENERATOR SETS

26 35 43 SOLID STATE FREQUENCY CONVERTER

26 36 23.00 20 AUTOMATIC TRANSFER SWITCHES

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DI VI SI ON 27 - COMMUNI CATI ONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

27 21 00.00 20 INTERCOMMUNICATION SYSTEM

27 54 00.00 20 COMMUNITY ANTENNA TELEVISION (CATV) SYSTEMS

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING

28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DI VI SI ON 31 - EARTHWORK

31 11 00 CLEARING AND GRUBBING

31 23 00.00 20 EXCAVATION AND FILL

31 31 16.13 CHEMICAL TERMITE CONTROL

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID

PAVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 23 AGGREGATE BASE COURSES

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 PAVEMENT MARKINGS

32 31 13 CHAIN LINK FENCES

32 92 19 SEEDING

32 93 00 EXTERIOR PLANTS

DI VI SI ON 33 - UTI LI TI ES

33 11 00 WATER UTILITY DISTRIBUTION PIPING

PROJECT TABLE OF CONTENTS Page 4

33 30 00 SANITARY SEWERAGE

33 32 16 PACKAGED UTILITY WASTEWATER PUMPING STATIONS

33 40 00 STORM DRAINAGE UTILITIES

33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DI VI SI ON 34 - TRANSPORTATI ON

34 71 13.16 VEHICLE CRASH BARRIERS

DI VI SI ON 41 - MATERI AL PROCESSI NG AND HANDLI NG EQUI PMENT

41 22 13.15 20-TON OVERHEAD ELECTRIC TRAVELING BRIDGE CRANE

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 5

THIS PAGE INTENTIONALLY LEFT BLANK

PROJECT TABLE OF CONTENTS Page 6

DOCUMENT 00 01 15

LIST OF DRAWINGS

02/11

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."

1.2 CONTRACT DRAWINGS

Contract drawings are as follows:

NAVFAC SHEET SHEET

DWG. NO. NO. REF. NO. TITLE

GENERAL

14069869 1 GI001 TITLE SHEET

14069870 2 GI002 INDEX OF DRAWINGS

14069871 3 GI003 INDEX OF DRAWINGS

14069872 4 GI004 INDEX OF DRAWINGS

14069873 5 GI101A PORT OPS - FIRST FLOOR LIFE SAFETY PLAN

14069874 6 GI102A PORT OPS - SECOND FLOOR LIFE SAFETY PLAN

14069875 7 GI103A PORT OPS - THIRD FLOOR & TOWER LIFE SAFETY PLANS

14069876 8 GI104A PORT OPS - HOST NATION CODE SUMMARY

14069877 9 GI105A PORT OPS - HOST NATION CODE SUMMARY

14069878 10 GI106A PORT OPS- LIFE SAFETY SITE PLAN

14069879 11 GI110A PORT OPS - AIR BARRIER KEY PLANS

14069880 12 GI101B FDRMC - LIFE SAFETY PLAN

14069881 13 GI102B FDRMC - HOST NATION CODE SUMMARY

14069882 14 GI103B FDRMC - LIFE SAFETY SITE PLAN

14069883 15 GI104B FDRMC- LIFE SAFTEY SITE PLAN

14069884 16 GI110B FDRMC - AIR BARRIER KEY PLAN

HAZARDOUS MATERIALS

14069885 17 H-001 GENERAL NOTES

14069886 18 HM101 BUILDING 189 - HAZARDOUS MATERIALS PLANS

14069887 19 HM102 BUILDINGS 189, 515 & 1976 - HAZARDOUS MATERIALS

PLANS

14069888 20 HM103 BUILDING 215 - HAZARDOUS MATERIALS PLAN

GEOTECHNICAL

14069889 21 BB001 GENERAL NOTES

14069890 22 BB101 BORINGS LOCATION

14069891 23 BB102 BORINGS LOCATION

14069892 24 BB601 BORINGS DB-1 & DB-2

14069893 25 BB602 BORINGS DB-3, SB-1 & SB-2

14069894 26 BB603 BORINGS DB-4 & DB-5

14069895 27 BB604 BORINGS DB-6 & DB-7

14069896 28 BB605 BORING DB-8

14069897 29 BB606 BORINGS SB-3, SB-4, SB-5, SB-6, SB-7, SB-8

14069898 30 BB607 LABORATORY SCHEDULE

14069899 31 BB608 LABORATORY SCHEDULE

DOCUMENT 00 01 15 Page 1

14069900 32 BB609 LABORATORY SCHEDULE

CIVIL

14069901 33 C-001 NOTES

14069902 34 C-002 LEGEND AND ABBREVIATIONS

14069903 35 C-003 KEY PLAN

14069904 36 C-004 SURVEY CONTROL DATA AND NOTES

14069905 37 C-005 SURVEY BENCHMARK INFORMATION

14069906 38 CD101 PIER - DEMOLITION PLAN

14069907 39 CS101 PIER - SITE PLAN

14069908 40 CD101A PORT OPS - DEMOLITION PLAN

14069909 41 CD102A PORT OPS - DEMOLITION PLAN

14069910 42 CS101A PORT OPS - SITE PLAN

14069911 43 CS102A PORT OPS - SITE PLAN

14069912 44 CS401A PORT OPS - CONCRETE PAVEMENT JOINT PLAN

14069913 45 CG101A PORT OPS - GRADING PLAN

14069914 46 CG102A PORT OPS - GRADING PLAN

14069915 47 CU101A PORT OPS - UTILITY PLAN

14069916 48 CU102A PORT OPS - UTILITY PLAN

14069917 49 CU201A PORT OPS - PLAN AND PROFILE

14069918 50 CU202A PORT OPS - PLAN AND PROFILE

14069919 51 CD101B FDRMC - EXISTING AND DEMOLITION PLAN

14069920 52 CS101B FDRMC - SITE PLAN

14069921 53 CS401B FDRMC - CONCRETE PAVEMENT JOINT PLAN

14069922 54 CG101B FDRMC - GRADING PLAN

14069923 55 CU101B FDRMC - UTILITY PLAN

14069924 56 CU201B FDRMC - PLAN AND PROFILE

14069925 57 CU202B FDRMC - PLAN AND PROFILE

14069926 58 CU203B FDRMC - PLAN AND PROFILE

14069927 59 C-501 DETAILS

14069928 60 C-502 DETAILS

14069929 61 C-503 DETAILS

14069930 62 C-504 DETAILS

14069931 63 C-505 DETAILS

14069932 64 C-506 DETAILS

14069933 65 C-507 DETAILS

14069934 66 C-508 DETAILS

LANDSCAPE

14069935 67 LP101A PORT OPS - LANDSCAPE PLAN

14069936 68 LP102A PORT OPS - LANDSCAPE PLAN

14069937 69 LP101B FDRMC - LANDSCAPE PLAN

14069938 70 LP501 SCHEDULE AND DETAILS

STRUCTURAL

14069939 71 S-001 DESIGN NOTES

14069940 72 S-002 GENERAL NOTES

14069941 73 S-003 GENERAL NOTES

14069942 74 S-004 LEGEND AND ABBREVIATIONS

14069943 75 SB101A PORT OPS - FOUNDATION PLAN

14069944 76 SB501 TYPICAL FOUNDATION DETAILS

14069945 77 SB502 TYPICAL FOUNDATION DETAILS

14069946 78 SB503 TYPICAL FOUNDATION DETAILS

14069947 79 SB504 TYPICAL SLAB DETAILS

14069948 80 SF101A PORT OPS - SECOND FLOOR FRAMING PLAN

14069949 81 SF102A PORT OPS - THIRD FLOOR FRAMING PLAN

14069950 82 SF103A PORT OPS - ROOF AND MECHANICAL LEVEL FRAMING PLAN

14069951 83 SF104A PORT OPS - FOURTH FLOOR AND HIGH ROOF FRAMING PLAN

14069952 84 SF301A PORT OPS - FRAMING SECTIONS

DOCUMENT 00 01 15 Page 2

14069953 85 SF302A PORT OPS - FRAMING SECTIONS

14069954 86 SF501 TYPICAL FRAMING DETAILS

14069955 87 SF502 TYPICAL FRAMING DETAILS

14069956 88 SB101B FDRMC - FOUNDATION PLAN

14069957 89 SF101B FDRMC - LOW ROOF FRAMING PLAN

14069958 90 SF102B FDRMC - HIGH ROOF FRAMING PLAN

14069959 91 SF303B FDRMC - FRAMING SECTIONS

ARCHITECTURAL

14069960 92 A-001 LEGEND, NOTES AND ABBREVIATIONS

14069961 93 AD110 BUILDING 189 - SITE PHOTOGRAPHS

14069962 94 AD111 BUILDING 189 - FIRST & SECOND FLOOR DEMOLITION

PLANS

14069963 95 AD112 BUILDING 189 - THIRD FLOOR & ROOF DEMOLITION

PLANS

14069964 96 AD120 BUILDING 215 - SITE PHOTOGRAPHS

14069965 97 AD121 BUILDING 215 - DEMOLITION PLAN

14069966 98 AD130 BUILDING 515 - DEMOLITION PLAN & SITE PHOTOGRAPHS

14069967 99 AD140 BUILDING 1976 - DEMOLITION PLAN & SITE

PHOTOGRAPHS

14069968 100 AE010A PORT OPS - SITE PHOTOGRAPHS

14069969 101 AE101A PORT OPS - FIRST FLOOR PLAN

14069970 102 AE102A PORT OPS - SECOND FLOOR PLAN

14069971 103 AE103A PORT OPS - THIRD FLOOR & TOWER FLOOR PLANS

14069972 104 AE104A PORT OPS - ROOF PLAN

14069973 105 AE111A PORT OPS - FIRST FLOOR REFLECTED CEILING PLAN

14069974 106 AE112A PORT OPS - SECOND FLOOR REFLECTED CEILING PLAN

14069975 107 AE113A PORT OPS - THIRD FLOOR & TOWER REFLECTED CEILING

PLANS

14069976 108 AE201A PORT OPS - NORTH & SOUTH ELEVATIONS

14069977 109 AE202A PORT OPS - EAST & WEST ELEVATIONS

14069978 110 AE301A PORT OPS - BUILDING SECTION

14069979 111 AE302A PORT OPS - WALL SECTIONS

14069980 112 AE303A PORT OPS - WALL SECTIONS

14069981 113 AE401A PORT OPS - ENLARGED PLANS

14069982 114 AE402A PORT OPS - ENLARGED PLANS

14069983 115 AE403A PORT OPS - STAIR PLANS

14069984 116 AE404A PORT OPS - STAIR SECTIONS & DETAILS

14069985 117 AE405A PORT OPS - STAIR SECTIONS & DETAILS

14069986 118 AE406A PORT OPS - ENLARGED ELEVATOR PLANS, SECTIONS &

DETAILS

14069987 119 AE501A PORT OPS - PARTITION TYPES & DETAILS

14069988 120 AE502A PORT OPS - INTERIOR ELEVATIONS & DETAILS

14069989 121 AE503A PORT OPS - INTERIOR ELEVATIONS & DETAILS

14069990 122 AE504A PORT OPS - INTERIOR DETAILS

14069991 123 AE511A PORT OPS - EXTERIOR DETAIILS

14069992 124 AE512A PORT OPS - EXTERIOR DETAIILS

14069993 125 AE513A PORT OPS - EXTERIOR DETAIILS

14069994 126 AE601A PORT OPS - DOOR SCHEDULE & DETAILS

14069995 127 AE602A PORT OPS - DOOR SCHEDULE & DETAILS

14069996 128 AE603A PORT OPS - DOOR DETAILS

14069997 129 AE701A PORT OPS - WINDOW TYPES & DETAILS

14069998 130 AE702A PORT OPS - WINDOW & LOUVER TYPES & DETAILS

14069999 131 AE010B FDRMC - SITE PHOTOGRAPHS

14070000 132 AE101B FDRMC - FLOOR PLAN

14070001 133 AE102B FDRMC - ROOF PLAN

14070002 134 AE111B FDRMC - REFLECTED CEILING PLAN

14070003 135 AE201B FDRMC - ELEVATIONS

14070004 136 AE301B FDRMC - BUILDING SECTIONS

DOCUMENT 00 01 15 Page 3

14070005 137 AE302B FDRMC - WALL SECTIONS

14070006 138 AE401B FDRMC - ENLARGED PLANS

14070007 139 AE501B FDRMC - PARTITION TYPES

14070008 140 AE502B FDRMC - INTERIOR ELEVATIONS

14070009 141 AE511B FDRMC - INTERIOR DETAILS

14070010 142 AE512B FDRMC - EXTERIOR DETAILS

14070011 143 AE513B FDRMC - EXTERIOR DETAILS

14070012 144 AE514B FDRMC - EXTERIOR DETAILS

14070013 145 AE601B FDRMC - DOOR SCHEDULE & DETAILS

INTERIORS

14070014 146 AF101A PORT OPS - FIRST FLOOR FINISH & SIGNAGE PLAN

14070015 147 AF102A PORT OPS - SECOND FLOOR FINISH & SIGNAGE PLAN

14070016 148 AF103A PORT OPS - THIRD FLOOR & TOWER FINISH & SIGNAGE

PLANS

14070017 149 AF601A PORT OPS - ROOM FINISH SCHEDULE

14070018 150 AF602A PORT OPS - ROOM FINISH SCHEDULE & FINISH COLOR

SCHEDULE

14070019 151 AF101B FDRMC - FINISH & SIGNAGE PLAN

14070020 152 AF601B FDRMC - ROOM FINISH SCHEDULE AND FINISH COLOR

SCHEDULE

14070021 153 AG601A PORT OPS - TYPICAL SIGNAGE DETAILS

14070022 154 AG601B FDRMC - TYPICAL SIGNAGE DETAILS

14070023 155 IF101A PORT OPS - FIRST FLOOR FURNITURE PLAN

14070024 156 IF102A PORT OPS - SECOND FLOOR FURNITURE PLAN

14070025 157 IF103A PORT OPS - THIRD & FOURTH FLOOR FURNITURE PLANS

14070026 158 IF101B FDRMC - FURNITURE PLAN

14070027 159 IF601 FURNITURE LEGEND

FIRE PROTECTION

14070028 160 F-001 LEGEND, NOTES AND DIAGRAMS

14070029 161 F-002 FIRE PROTECTION RISERS - FIRE PUMP HOUSE

14070030 162 F-003 FIRE ALARM DETAILS & MATRIX

14070031 163 FP101A PORT OPS - FIRST FLOOR PLAN

14070032 164 FP102A PORT OPS - SECOND FLOOR PLAN

14070033 165 FP103A PORT OPS - THIRD FLOOR & TOWER FLOOR PLANS

14070034 166 FP101B FDRMC - FLOOR PLAN

PLUMBING

14070035 167 P-001 GENERAL NOTES, ABBREVIATIONS AND LEGEND

14070036 168 P-002 GENERAL NOTES, ABBREVIATIONS AND LEGEND

14070037 169 PL101A PORT OPS - FOUNDATION PLAN

14070038 170 PL102A PORT OPS - FIRST FLOOR SANITARY WASTE, DRAIN AND

VENT PLAN

14070039 171 PL103A PORT OPS - SECOND FLOOR SANITARY WASTE, DRAIN AND

VENT PLAN

14070040 172 PL104A PORT OPS - THIRD FLOOR SANITARY WASTE, DRAIN AND

VENT PLAN

14070041 173 PL105A PORT OPS - MECHANICAL LEVEL SANITARY WASTE,

DRAIN, AND VENT PLAN

14070042 174 PL106A PORT OPS - TOWER AND ROOF SANITARY WASTE, DRAIN

AND VENT PLAN

14070043 175 PP101A PORT OPS - FIRST FLOOR PRESSURE PIPING PLAN

14070044 176 PP102A PORT OPS - SECOND FLOOR PRESSURE PIPING PLAN

14070045 177 PP103A PORT OPS - THIRD FLOOR, MECH., AND TOWER PRESSURE

PIPING PLAN

14070046 178 PP401A PORT OPS - ENLARGED FOUNDATION PLAN

14070047 179 PP402A PORT OPS - ENLARGED FIRST FLOOR SANITARY WASTE,

DRAIN, AND VENT PLAN

DOCUMENT 00 01 15 Page 4

14070048 180 PP403A PORT OPS - ENLARGED SANITARY WASTE, DRAIN, AND

VENT FLOOR PLANS

14070049 181 PP404A PORT OPS - ENLARGED SANITARY WASTE, DRAIN, AND

VENT FLOOR PLANS

14070050 182 PP405A PORT OPS - ENLARGED FIRST FLOOR PRESSURE PIPING

PLAN

14070051 183 PP406A PORT OPS - ENLARGED PRESSURE PIPING FLOOR PLANS

14070052 184 PP407A PORT OPS - ENLARGED PRESSURE PIPING FLOOR PLANS

14070053 185 PP601A PORT OPS - WATER HEATING PIPING DIAGRAM

14070054 186 PP602A PORT OPS - SOLAR CONTROLS

14070055 187 PP603A PORT OPS - SCHEDULES

14070056 188 PP604A PORT OPS - SCHEDULES

14070057 189 PP605A PORT OPS - COMPRESSED AIR SYSTEM DETAILS

14070058 190 PL901A PORT OPS - SANITARY WASTE, DRAIN, AND VENT RISER

14070059 191 PL902A PORT OPS - SANITARY WASTE, DRAIN, AND VENT RISER

14070060 192 PL903A PORT OPS - SANITARY WASTE, DRAIN, AND VENT RISER

14070061 193 PL904A PORT OPS - SANITARY WASTE, DRAIN, AND VENT RISER

14070062 194 PP901A PORT OPS - DOMESTIC WATER RISER

14070063 195 PP902A PORT OPS - DOMESTIC WATER RISER

14070064 196 PP903A PORT OPS - DOMESTIC WATER RISER

14070065 197 PP904A PORT OPS - DOMESTIC WATER RISER

14070066 198 PL101B FDRMC - FOUNDATION PLAN

14070067 199 PL102B FDRMC - SANITARY WASTE, DRAIN AND VENT PLAN

14070068 200 PL103B FDRMC - ROOF PLAN

14070069 201 PP101B FDRMC - PRESSURE PIPING PLAN

14070070 202 PP401B FDRMC - ENLARGED FLOOR PLANS

14070071 203 PP402B FDRMC - ENLARGED MECHANICAL ROOM PLANS

14070072 204 PP601B FDRMC - WATER HEATING PIPING DIAGRAM

14070073 205 PP602B FDRMC - SOLAR CONTROLS

14070074 206 PP603B FDRMC - SCHEDULES

14070075 207 PP604B FDRMC - SCHEDULES

14070076 208 PL901B FDRMC - SANITARY WASTE, DRAIN AND VENT RISER

14070077 209 PP901B FDRMC - DOMESTIC WATER RISER

MECHANICAL

14070078 210 M-001 LEGEND

14070079 211 M-002 GENERAL NOTES

14070080 212 M-501 MECHANICAL DETAILS

14070081 213 M-502 MECHANICAL DETAILS

14070082 214 M-503 MECHANICAL DETAILS

14070083 215 MH101A PORT OPS - FIRST FLOOR HVAC PLAN

14070084 216 MH102A PORT OPS - SECOND FLOOR HVAC PLAN

14070085 217 MH103A PORT OPS - THIRD FLOOR HVAC PLAN

14070086 218 MH104A PORT OPS - TOWER FLOOR HVAC PLAN

14070087 219 MP101A PORT OPS - FIRST FLOOR HVAC MECHANICAL PIPING

PLAN

14070088 220 M-301A PORT OPS - SECTIONS

14070089 221 M-302A PORT OPS - SECTIONS

14070090 222 M-303A PORT OPS - SECTIONS

14070091 223 M-401A PORT OPS - HVAC ENLARGED PLANS

14070092 224 M-601A PORT OPS - CONTROLS

14070093 225 M-602A PORT OPS - CONTROLS

14070094 226 M-603A PORT OPS - CONTROLS

14070095 227 M-604A PORT OPS - CONTROLS

14070096 228 M-605A PORT OPS - CONTROLS

14070097 229 M-701A PORT OPS - SCHEDULES

14070098 230 M-702A PORT OPS - SCHEDULES

14070099 231 M-703A PORT OPS - SCHEDULES

14070100 232 MH101B FDRMC - HVAC FLOOR PLAN

DOCUMENT 00 01 15 Page 5

14070101 233 M-301B FDRMC - SECTIONS

14070102 234 M-401B FDRMC - ENLARGED MECHANICAL ROOM HVAC FLOOR PLAN

14070103 235 M-601B FDRMC - CONTROLS

14070104 236 M-602B FDRMC - CONTROLS

14070105 237 M-603B FDRMC - CONTROLS

14070106 238 M-604B FDRMC - CONTROLS

14070107 239 M-701B FDRMC - SCHEDULES

14070108 240 M-702B FDRMC - SCHEDULES

ELECTRICAL

14070109 241 E-001 LEGEND, ABBREVIATIONS AND GENERAL NOTES

14070110 242 E-002 LEGEND, ABBREVIATIONS AND GENERAL NOTES

14070111 243 E-003 ELECTRICAL KEY PLAN

14070112 244 E-501 ELECTRICAL DETAILS

14070113 245 E-502 ELECTRICAL DETAILS

14070114 246 E-503 ELECTRICAL DETAILS

14070115 247 E-504 ELECTRICAL DETAILS

14070116 248 E-505 ELECTRICAL DETAILS

14070117 249 E-601 LIGHTING FIXTURE SCHEDULE

14070118 250 E-602 LIGHTING DETAILS

14070119 251 E-603 LIGHTING DETAILS

14070120 252 E-604 LIGHTING DETAILS

14070121 253 E-605 LIGHTING DETAILS

14070122 254 E-606 LIGHTING DETAILS

14070123 255 E-607 LIGHTING DETAILS

14070124 256 E-608 LIGHTING DETAILS

14070125 257 ED101 PIER - ELECTRICAL DEMOLITION PLAN

14070126 258 ES101A PORT OPS - ELECTRICAL SITE PLAN

14070127 259 ES102A PORT OPS - ELECTRICAL SITE PLAN

14070128 260 ES103A PORT OPS - ELECTRICAL SITE PLAN

14070129 261 ES104A PORT OPS - ELECTRICAL SITE PLAN

14070130 262 ES105A PORT OPS - ELECTRICAL SITE PLAN

14070131 263 ES401A PORT OPS - ENLARGED ELECTRICAL SITE PLAN

14070132 264 ES501A PORT OPS - ELECTRICAL SITE DETAILS

14070133 265 ES502A PORT OPS - ELECTRICAL SITE DETAILS

14070134 266 ES503A PORT OPS - ELECTRICAL SITE DETAILS

14070135 267 EG101A PORT OPS - GROUNDING PLAN

14070136 268 EG102A PORT OPS - LIGHTNING PROTECTION PLAN

14070137 269 EL101A PORT OPS - FIRST FLOOR PLAN - LIGHTING

14070138 270 EL102A PORT OPS - SECOND FLOOR PLAN - LIGHTING

14070139 271 EL103A PORT OPS - THIRD, FLOOR & TOWER FLOOR PLANS -

LIGHTING

14070140 272 EP101A PORT OPS - FIRST FLOOR PLAN - POWER

14070141 273 EP102A PORT OPS - SECOND FLOOR PLAN - POWER

14070142 274 EP103A PORT OPS - THIRD, MECH & FOURTH FLOOR PLANS -

POWER

14070143 275 EP104A PORT OPS - ROOF PLAN - POWER

14070144 276 EP201A PORT OPS - FIRST FLOOR PLAN - POWER EQUIPMENT

14070145 277 EP202A PORT OPS - SECOND FLOOR PLAN - POWER EQUIPMENT

14070146 278 EP203A PORT OPS - THIRD, MECH & FOURTH FLOOR -

POWER EQUIPMENT

14070147 279 EP401A PORT OPS - ENLARGED PLANS - POWER

14070148 280 EP402A PORT OPS - ENLARGED PLANS - POWER

14070149 281 EP601A PORT OPS - EQUIPMENT SCHEDULE

14070150 282 EP602A PORT OPS - PANELBOARD SCHEDULES

14070151 283 EP603A PORT OPS - PANELBOARD SCHEDULES

14070152 284 EP604A PORT OPS - PANELBOARD SCHEDULES

14070153 285 EP605A PORT OPS - PANELBOARD SCHEDULES

14070154 286 EP606A PORT OPS - PANELBOARD SCHEDULES

DOCUMENT 00 01 15 Page 6

14070155 287 EP607A PORT OPS - PANELBOARD SCHEDULES

14070156 288 EP608A PORT OPS - PANELBOARD SCHEDULES

14070157 289 EP609A PORT OPS - PANELBOARD SCHEDULES

14070158 290 EP610A PORT OPS - PANELBOARD SCHEDULES

14070159 291 EP611A PORT OPS - PANELBOARD SCHEDULES

14070160 292 EP612A PORT OPS - PANELBOARD SCHEDULES

14070161 293 EP613A PORT OPS - PANELBOARD SCHEDULES

14070162 294 EP701A PORT OPS - POWER RISER DIAGRAM

14070163 295 EP702A PORT OPS - POWER RISER GROUNDING DIAGRAM

14070164 296 ES101B FDRMC - ELECTRICAL SITE PLAN

14070165 297 ES401B FDRMC - ENLARGED ELECTRICAL SITE PLAN

14070166 298 EG101B FDRMC - GROUNDING PLAN

14070167 299 EG102B FDRMC - LIGHTNING PROTECTION PLAN

14070168 300 EL101B FDRMC - FLOOR PLAN - LIGHTING

14070169 301 EP101B FDRMC - FLOOR PLAN - POWER

14070170 302 EP201B FDRMC - FLOOR PLAN - POWER EQUIPMENT

14070171 303 EP601B FDRMC - EQUIPMENT SCHEDULE & ENLARGED PLAN -

POWER

14070172 304 EP602B FDRMC - PANELBOARD SCHEDULES

14070173 305 EP603B FDRMC - PANELBOARD SCHEDULES

14070174 306 EP604B FDRMC - PANELBOARD SCHEDULES

14070175 307 EP605B FDRMC - PANELBOARD SCHEDULES

14070176 308 EP701B FDRMC - POWER RISER DIAGRAM

14070177 309 EP702B FDRMC - GROUNDING DIAGRAMS

TELECOMMUNICATIONS

140701778 310 T-001 TELECOMMUNICATIONS LEGENDS ABBREVIATIONS

AND GENERAL NOTES

140701779 311 T-501 TELECOMMUNICATIONS DETAILS

140701780 312 T-502 TELECOMMUNICATIONS DETAILS

140701781 313 T-503 SECURITY DETAILS

140701782 314 T-504 SECURITY DETAILS

140701783 315 TT101A PORT OPS - FIRST FLOOR PLAN - TELECOM

140701784 316 TT102A PORT OPS - SECOND FLOOR PLAN - TELECOM

140701785 317 TT103A PORT OPS - THIRD, MECH & FOURTH FLOOR PLANS -

TELECOM

140701786 318 TT401A PORT OPS - ENLARGED PLANS - TELECOM

140701787 319 TT701A PORT OPS - TELECOMMUNICATIONS RISER DIAGRAMS

140701788 320 TT702A PORT OPS - TELECOMMUNICATIONS GROUNDING RISER

DIAGRAM

140701789 321 TY101A PORT OPS - FIRST FLOOR PLAN - SECURITY

140701790 322 TY102A PORT OPS - SECOND FLOOR PLAN - SECURITY

140701791 323 TY103A PORT OPS - THIRD, MECH & FOURTH FLOOR PLANS -

SECURITY

140701792 324 TY701A PORT OPS - SECURITY RISER DIAGRAMS

140701793 325 TT101B FDRMC - FLOOR PLAN - TELECOM

140701794 326 TT701B FDRMC - TELECOMMUNICATIONS RISER DIAGRAMS

140701795 327 TY101B FDRMC - FLOOR PLAN - SECURITY

140701796 328 TY701B FDRMC - SECURITY RISER DIAGRAMS

-- End of Document --

DOCUMENT 00 01 15 Page 7

DOCUMENT 00 01 15 Page 8

DOCUMENT 00 73 04

SUPPLEMENTARY CONDITIONS FOR PROJECTS IN MEDITERRANEAN AREA

08/08

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Contractor Personnel Identification; G

1.2 PUBLIC RELEASE OF INFORMATION

1.2.1 Prohibition

There shall be no public release of information or photographs concerning any aspect of the materials or services relating to this bid, contract, or purchase order or other documents resulting therefrom without the prior written approval of the Contracting Officer.

1.2.2 Subcontracts and Purchase Orders

The Contractor agrees to insert the substance of above paragraph "Prohibition" in each subcontract and purchase order generated for this contract.

1.3 ENGLISH SPEAKING REPRESENTATIVE

At all times when any performance of the work at the site is being conducted by any employee of the Contractor or his subcontractors, the Contractor shall have a representative present on the site who is capable of explaining the work operations and receiving instructions in the English language. The Contracting Officer shall have the right to determine without appeal of such decision, whether the proposed representative has sufficient technical and lingual capabilities and the Contractor shall immediately replace any individual not acceptable to the Contracting Officer. The Construction Contractor's qualified Project Manager, on-site Superintendent, Quality Control Manager, and Quality Control Specialist shall be fluent (can read, speak, and write) in both English and Spanish languages.

1.4 NORMS AND LAWS

In case of differences between project specifications or the accompanying drawings and referenced norms and laws, norms and laws shall govern. In case of differences between project specifications and the accompanying drawings, the specifications shall govern.

DOCUMENT 00 73 04 Page 1

1.5 INDUSTRY STANDARDS

When both U.S. and European, or Spanish, Industry Standards are applicable to this project and the standards are in conflict with each other, the most stringent of the industry shall govern.

1.6 PROHIBITED ITEMS

Use of the following items in this construction project is prohibited:

a. Use of aluminum for electrical conductors.

b. Embedding aluminum conduit in concrete.

c. Use of fluorescent light ballasts and other products containing PCB's.

d. Use of urea-formaldehyde foam insulation products.

e. Use of any paint/coatings having a lead content of over 0.06 percent by weight of non-volatile content. The use of ozone depleting chemicals is prohibited. The use of zinc-chromate is prohibited.

f. The use of materials containing asbestos is prohibited.

1.7 PROPRIETARY NAMES

Manufacturer's proprietary names indicated for colors, textures and patterns of materials are for the purpose of color, texture and pattern selection only. Other manufacturers materials are acceptable and provided they closely approximate colors, textures and patterns indicated and provided they conform to all other requirements subject to Contracting Officer's approval.

1.8 SUBMITTAL OF PROOF OF QUALIFICATIONS AND EXPERIENCE

Where qualifications or experience requirements are set forth in the specifications with respect to equipment and equipment installers, written proof of such qualifications or experience must be provided within thirty

(30) calendar days after Contract award, and before placing any order for such equipment or before dispatching equipment installers to the project site.

1.9 ORAL MODIFICATION

No oral statement of any person other than the Contracting Officer as provided in the clause in this Contract entitled FAR 52.243-4 Changes shall in any manner or degree modify or otherwise affect the terms of this Contract.

1.10 NO WAIVER BY GOVERNMENT

The failure of the Government, in any one or more instances, to insist upon the strict performance of any of the terms of this Contract or to exercise any option herein conferred shall not be construed as a waiver or relinquishment to any extent of the right to assert or rely upon such terms or option on any future occasion.

DOCUMENT 00 73 04 Page 2

1.11 PRODUCTS SPECIFIED USING USA STANDARDS

1.11.1 Local Products Specified Using United States of America (USA) Standards

There are locally available products specified in this contract that meet USA standards. "Locally available products that meet USA standards" are defined as:

a. "Products that meet the referenced USA standards, and are manufactured and distributed in-country, or manufactured and distributed in the European Union, and are readily available locally from in-country sources or from the European Union sources"; or

b. "Products manufactured in the USA and distributed in-country or in the European Union or in the USA, and are readily available locally from in-country sources or from the European Union sources, or from USA sources.".

The products are specified in the technical sections listed below:

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 41 00 LIGHTNING PROTECTION SYSTEM

1.11.2 USA Manufactured Products Specified Using USA Standards

There are products to be provided in this contract that are not readily available locally and must be manufactured in the United States of America (USA) and in compliance with USA standards. Products manufactured in another country are considered USA manufactured, if the manufacturers or suppliers are under license by USA manufacturers and the products meet the same applicable specifications and standards. The products are specified in the technical sections listed below:

1.11.3 Consignment, Marking, and Customs Clearance

In order for the Contractor to be exempt from paying duty on material or equipment to be imported for incorporation into the contract work, all shipments shall be consigned to the OICC/ROICC and marked for the contract by contract number. Additionally, the Contractor shall supply to the OICC/ROICC with certified copies of the confirmed material/equipment orders and invoices in order that the duty free customs clearance may be accomplished. Failure on the part of the Contractor to comply with the requirements herein will not be grounds for non-enforcement of the provisions of the Clause, "Taxes" of the Contract Clauses.

1.11.4 Excess

The Contractor shall furnish to the Contracting Officer, just prior to completion of this contract, a consolidated inventory of all excess supplies, materials, and equipment imported duty free for use under this contract. The Contract shall either pay required duties on the excesses or re-export the excesses.

DOCUMENT 00 73 04 Page 3

1.12 FINAL GOVERNING STANDARDS (FGS)

Final Governing Standards (FGS) for environmental protection at DOD installations and facilities in Spain went into effect June 1994. These standards were developed by comparing and adopting the more protective requirements of the Overseas Environmental Baseline Guidance Document (OEBGD), European Union and national, regional, and local environmental laws and regulations. The FGS are applicable to work under this contract. The FGS (both English and local language versions) may be reviewed at the ROICC Office during normal business hours.

1.13 SECURITY REQUIREMENTS

1.13.1 Responsibility for Physical Security

The Contractor shall be responsible for physical security of all construction materials, supplies, and equipment of every description (including property which may be Government furnished or owned) provided and/or utilized in the execution of this contract.

1.13.2 Access to Operational Areas

Contractor personnel are expressly prohibited and shall be restricted from entering operational buildings or areas without the specific authorization of the Contracting Officer. To perform work, where "security escorts" are required for access to a facility, the Contractor shall coordinate with the Contracting Officer for access to such facilities.

1.13.3 Employment

Should the continued employment of any person in connection with this contract, or any subcontract thereunder, be deemed by the Contracting Officer to be prejudicial to the interests of the Government, that person shall immediately be removed from the work. In this connection the Contractor agrees that:

a. Cases which may involve disciplinary action against such persons, or the necessity of reassignment or termination of their services, shall be investigated, processed, reported and disposed of, as directed by the Contracting Officer.

b. Employment contracts of all persons employed in connection with this contract, or any subcontract thereunder shall include clauses containing the substance of this clause.

1.13.4 Compliance

Compliance with the foregoing provisions of this clause by subcontractors shall be the responsibility of the Contractor.

1.14 EXCLUSION OF PRICE REVISION LAWS

The Contractor and the United States Government, as the sole parties to this contract, do specifically and irrevocably agree that this contract is a FIRM FIXED-PRICE CONTRACT, and do expressly waive and exclude the application of any and all local Laws, Decrees, Orders, and Regulations, which might mandate, authorize, or permit an increase in the contract price, revision or any other mechanism as a result of increased labor

DOCUMENT 00 73 04 Page 4 costs, equipment costs, material costs, supplies, subcontractor costs, other overhead costs, direct or indirect, or otherwise.

The risks and consequences of this exclusion of the application of Laws as aforementioned are understood by the parties, and have been taken into consideration in arriving at the contract price set forth herein.

It is the parties' intention that the work contracted for, including any subsequent modifications to this contract, shall be performed on a firm fixed-price basis without price revision of any kind.

Any dispute in this respect arising between the parties will be resolved by strict interpretation of the provision of the contract itself.

1.15 OPTIONAL PURCHASE

All materials and equipment not specifically required to be purchased in the United States of America shall be purchased in Spain and may not be purchased elsewhere without specific written approval of the Contracting Officer. If purchase of material and equipment is not feasible in Spain or it is specified that material and equipment be purchased in the United States, the Clause, "STATUS OF CONTRACTOR AS DIRECT CONTRACTOR" of this Section, will apply.

1.16 SECURITY REQUIREMENTS

The Contractor shall be responsible for furnishing each employee, and for requiring that each employee engaged in the work display, such identification as may be approved and directed by the Contracting Officer. All prescribed identification shall immediately be delivered to the Contracting Officer for cancellation upon release of any employee.

Contractor personnel identification, including names and photographs, D.N.I. (Documento Nacional de Identidad) numbers, vehicles identification and license plate numbers, of all personnel to be employed in the performance of the work at the site, shall be submitted to the Contracting Officer at least seven (7) days prior to commencement of the work.

Contractor personnel shall be restricted from entering operational buildings or areas without the specific authorization of the Contracting Officer.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Document --

DOCUMENT 00 73 04 Page 5

DOCUMENT 00 73 04 Page 6

SECTION 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Utility Outage Requests

Utility Connection Requests

Salvage Plan; G

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

This project will construct a new Port Operations Facility to serve as a consolidated compound for intermodal management and port operations at Naval Station Rota, Spain. The building will accommodate a small craft maintenance high bay area, workshops, storage areas, oil spill response area, hazardous supply and hazardous waste storage area, and locker and shower rooms on the first floor. Upper floors will provide administrative space for intermodal management and port operations, a multipurpose conference room and bunk rooms. An administrative suite at the third floor level will accommodate Spanish Port Operations personnel and functions. The harbor control tower will house equipment and work areas which will be shared by Spanish and US Port Operations for surveillance of the harbor.

Additionally, the project scope includes a new building for the Forward Deployed Regional Maintenance Center (FDRMC). The new facility will relocate Building 555 functions to a site remote from Pier 1, and it will provide consolidated administrative areas, support spaces, and a conference room for FDRMC personnel. The single story building will contain offices, conference/training rooms, meeting rooms, open office workstations, and a quality assurance testing room.

Site work and utility work are included for both buildings.

1.2.2 Location

The work is located at the U.S. Naval Station Rota, Spain, approximately as indicated. The exact location will be shown by the Contracting Officer.

SECTION 01 11 00 Page 1

1.3 WORK RESCHEDULING

Normal duty hours for work are from 8:30 a.m. to 5:30 p.m., Monday through Friday. Requests for additional work requires written approval from the Contracting Officer 7 days in advance of the proposed work period.

1.4 OCCUPANCY OF PREMISES

Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.

1.5 EXISTING WORK

In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

1.6 ON-SITE PERMITS

1.6.1 Utility Outage Requests and Utility Connection Requests

Schedule work to minimize outages. For utility outages and connections required during the execution of work that affect existing systems, schedule outside the regular working hours or on weekends, as approved by the Contracting Officer. Schedule utility outages and connections to minimize disruptions tothe Government. No additional payment will be provided for utility outages and connections required to be performed outside the regular work hours.

Submit requests for utility outages and connections in writing to the Contracting Officer for approval at least 15 calendar days in advance of the time required. In each request, state the system involved, area involved, approximate duration of outage, and the nature of work involved.

1.7 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.

Contact local utility locating service a minimum of 45 days prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.

Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities,and any type of underground or encased obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations

SECTION 01 11 00 Page 2 to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.

1.7.1 Notification Prior to Excavation

Notify the Contracting Officer at least 45 days prior to starting excavation work.

1.8 SALVAGE MATERIAL AND EQUIPMENT

Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area located within the base perimeter.

Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 11 00 Page 3

SECTION 01 11 00 Page 4

SECTION 01 14 00

WORK RESTRICTIONS

11/11

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

List of Contact Personnel; G

1.2 SPECIAL SCHEDULING REQUIREMENTS

a. Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.

b. The adjacent facilities will remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.

c. Permission to interrupt any Activity roads, railroads, or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.

d. The work under this contract requires special attention to the scheduling and conduct of the work in connection with existing operations. Identify on the construction schedule each factor which constitutes a potential interruption to operations.

The following conditions apply:

(1) Utility Work

(2) Hazardous material removed

e. See Section 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS for special environmental requirements.

1.3 CONTRACTOR ACCESS AND USE OF PREMISES

1.3.1 Activity Regulations

Application for, and use of, Installation Access badges will be as directed by the Base Security Office. Contractor and/or Sponsor may obtain access to the installation for employees by completing and submitting a Work Pass Request IAW Naval Base Rota NORMA GENERAL 02/93

PROCEDURES FOR ENTRY AND EXIT OF AUTHORIZED PERSONS AND VEHICLES

ASSOCIATED WITH THE UNITED STATES FORCES. The Work Pass Request form will require copies of the employees work contract, current Social Security documents, passport or Spanish ID and a medical certificate from the base

SECTION 01 14 00 Page 1 hospital. Coordinate with the Contracting Officer Representative and Base Security prior to employees initial arrival in Spain and/or planned commencement of work. Immediately report instances of lost or stolen Installation Access badges to the Contracting Officer.

Access to the controlled flightline area requires special clearance.

Coordinate with the Contracting Officer Representative and Airfield Security Manager prior to accessing the flight line.

1.3.1.1 One-Day Passes

Personnel applying for One-Day passes at the Base Visitor Control Office are subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government is not responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.

1.3.1.2 Subcontractors and Personnel Contacts

Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.3.1.3 Installation Access

1.3.1.4 Identification Badges and Installation Access

Application for and use of badges will be as directed. Obtain access to the installation by participating in the Navy Commercial Access Control System (NCACS), or by obtaining passes each day from the Base Pass and Identification Office as directed by the Contracting Officer. Costs for obtaining passes through the NCACS are the responsibility of the Contractor. One-day passes, issued through the Base Pass and Identification Office, will be furnished without charge. Furnish a completed EMPLOYMENT ELIGIBILITY VERIFICATION (DHS FORM I-9) form for all personnel requesting badges. This form is available at http://www.uscis.gov/portal/site/uscis by searching or selecting Employment Verification (Form I-9). Immediately report instances of lost or stolen badges to the Contracting Officer.

1.3.1.5 No Smoking Policy

Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

1.3.2 Working Hours

Regular working hours must consist of an 8 1/2 hour period established by the Contracting Officer, between the hours of 7:30 a.m. and 5:00 p.m.

Monday through Friday, excluding Government holidays.

1.3.3 Work Outside Regular Hours

Work outside regular working hours requires Contracting Officer approval.

Make application 15 calendar days prior to such work to allow arrangements

SECTION 01 14 00 Page 2 to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer.

1.3.4 Occupied and Existing Buildings

The Contractor shall be working around existing buildings which are occupied. Do not enter the buildings without prior approval of the Contracting Officer.

The existing buildings and their contents must be kept secure at all times. Provide temporary closures as required to maintain security as directed by the Contracting Officer.

1.3.5 Utility Cutovers and Interruptions

a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.

b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, compressed air, are considered utility cutovers pursuant to the paragraph WORK

OUTSIDE REGULAR HOURS.

d. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.

e. Connection to Existing Sanitary Sewer Line: Provide positive verification that the existing line conveys sanitary sewer; verify line is not incorrectly connected to a storm drain.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .