ATT G 1615269spc4of4.pdf
PDF 3 MB Posted
- Attached to
- P131 Communications Center - Souda Bay
- Solicitation number
- N62470-21-R-0005
About this file
This federal contract opportunity solicitation seeks proposals for the construction of a communications center at Naval Support Activity Souda Bay, Greece. The project involves constructing a three-story cast-in-place concrete structure with concrete shear walls and shallow foundations to house a multi-story communications facility, telephone exchange, electronics maintenance shops, and storage for electronics spares and equipment. Electrical utilities to be provided include primary and secondary distribution systems, transformers, substation upgrades, telecommunications infrastructure, security systems infrastructure, and lighting. The period of performance is approximately 900 days after notice to proceed. The solicitation is issued by the Department of the Navy Naval Facilities Engineering Command as an unrestricted, full and open competitive procurement. The response due date is not specified.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORK ORDER NO.
At the
PREPARED BY:
Architectural: Mechanical:
Civil: Electrical:
Structural:
APPROVED BY:
Specifications:
For Commander, NAVFAC:
Date:
Submitted By: Date:
UNCLASSIFIED/FOR OFFICIAL USE ONLY
P131 Communications Center
Landscape Arch: Chad St. John Telecommunication: Rich Hoffman Interiors: Jennifer Adams
Help Note All fields can be edited. If you have trouble selecting a field, either use the tab key or click "highlight fields" in Acrobat 7. Fields that are not needed can be selected and deleted. Tool tips with "additional field" can be deleted or changed. The contract number can also be deleted or changed.
09059054 Typewriter
Snyder, Brandi LGI00704201 Text Box This page left intentionally blank
P131 Communications Center eProjects No.: 1615269 NSA Souda Bay, Greece
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 01 15 02/11 LIST OF DRAWINGS
00 73 04 08/08 SUPPLEMENTARY CONDITIONS FOR PROJECTS
IN MEDITERRANEAN AREA
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 08/15 SUMMARY OF WORK
01 14 00 11/11 WORK RESTRICTIONS
01 20 00.00 20 11/11 PRICE AND PAYMENT PROCEDURES
01 30 00 08/15 ADMINISTRATIVE REQUIREMENTS
01 30 01.00 20 06/20 DESIGN, PROCUREMENT AND INSTALLATION
OF FURNITURE, FIXTURES, AND EQUIPMENT
01 31 23.13 20 05/17, CHG 6: 02/21 ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM
01 32 17.00 20 05/18 COST-LOADED NETWORK ANALYSIS SCHEDULES
(NAS)
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29 02/17 SUSTAINABILITY REPORTING
01 35 13 11/11 SPECIAL PROJECT PROCEDURES
01 35 26 11/15 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 42 15 02/14 METRIC MEASUREMENTS
01 45 00.00 20 11/11 QUALITY CONTROL
01 45 35 11/20 SPECIAL INSPECTIONS
01 50 00 05/18 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 11/15, CHG 4: 08/20 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.01 20 11/15, CHG 3: 08/20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL
CONTROLS
01 58 00 08/19, CHG 2: 11/20 PROJECT IDENTIFICATION
01 74 19 02/19, CHG 1: 08/20 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 05/19 CLOSEOUT SUBMITTALS
01 78 23 08/15, CHG 1: 11/20 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 02/15, CHG 2: 11/20 FACILITY ELECTRONIC OPERATION AND
MAINTENANCE SUPPORT INFORMATION (eOMSI)
01 91 00.15 20 02/21 TOTAL BUILDING COMMISSIONING
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 05/10 DEMOLITION
DI VI SI ON 03 - CONCRETE
03 30 00 02/19, CHG 1: 02/21 CAST-IN-PLACE CONCRETE
DI VI SI ON 05 - METALS
05 12 00 08/18 STRUCTURAL STEEL
05 30 00 05/15 STEEL DECKS
05 50 13 05/17 MISCELLANEOUS METAL FABRICATIONS
05 51 33 02/16 METAL LADDERS
05 52 00 02/18 METAL RAILINGS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
PROJECT TABLE OF CONTENTS Page 1
06 10 00 08/16 ROUGH CARPENTRY
06 41 16.00 10 08/10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
06 61 16 08/20 SOLID SURFACING FABRICATIONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 05 23 08/19 PRESSURE TESTING AN AIR BARRIER SYSTEM
FOR AIR TIGHTNESS
07 13 53 02/16 ELASTOMERIC SHEET WATERPROOFING
07 21 13 02/16 BOARD AND BLOCK INSULATION
07 21 16 11/11 MINERAL FIBER BLANKET INSULATION
07 22 00 02/16 ROOF AND DECK INSULATION
07 27 10.00 10 08/19 BUILDING AIR BARRIER SYSTEM
07 52 00 05/12 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 60 00 05/17 FLASHING AND SHEET METAL
07 84 00 05/10 FIRESTOPPING
07 92 00 08/16 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 11 16 05/17 ALUMINUM DOORS AND FRAMES
08 14 00 08/16 WOOD DOORS
08 31 00 05/17 ACCESS DOORS AND PANELS
08 33 23 08/20 OVERHEAD COILING DOORS
08 34 73 11/19 SOUND CONTROL DOOR ASSEMBLIES
08 41 13 08/18 ALUMINUM-FRAMED ENTRANCES AND
STOREFRONTS
08 44 00 05/19 CURTAIN WALL AND GLAZED ASSEMBLIES
08 71 00 02/16 DOOR HARDWARE
08 81 00 05/19 GLAZING
08 91 00 08/20 METAL WALL LOUVERS
DI VI SI ON 09 - FI NI SHES
09 22 00 02/10 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 08/16 GYPSUM BOARD
09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 08/17 ACOUSTICAL CEILINGS
09 62 38 08/17 STATIC-CONTROL FLOORING
09 65 00 08/10 RESILIENT FLOORING
09 68 00 11/17, CHG 2: 08/20 CARPETING
09 69 13 11/15 RIGID GRID ACCESS FLOORING
09 90 00 02/21 PAINTS AND COATINGS
09 96 00 11/14 SILICONE ELASTOMERIC COATINGS
DI VI SI ON 10 - SPECI ALTI ES
10 11 00 08/20 VISUAL DISPLAY UNITS
10 14 00.10 08/17 EXTERIOR SIGNAGE
10 14 00.20 08/20 INTERIOR SIGNAGE
10 21 13 08/20 TOILET COMPARTMENTS
10 26 00 08/20 WALL AND DOOR PROTECTION
10 28 13 08/20 TOILET ACCESSORIES
10 44 16 11/19 FIRE EXTINGUISHERS
10 51 13 05/11 METAL LOCKERS
10 56 13 04/06 STEEL SHELVING
PROJECT TABLE OF CONTENTS Page 2
DI VI SI ON 12 - FURNI SHI NGS
12 21 00 08/17 WINDOW BLINDS
12 24 13 08/20 ROLLER WINDOW SHADES
12 48 13 08/17 ENTRANCE FLOOR MATS AND FRAMES
12 93 00 08/17 SITE FURNISHINGS
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 48 73 05/20, CHG 1: 08/20 SEISMIC CONTROL FOR NON-STRUCTURAL
COMPONENTS
DI VI SI ON 14 - CONVEYI NG EQUI PMENT
14 21 23 05/16 ELECTRIC TRACTION PASSENGER ELEVATORS
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
21 22 00 04/20 CLEAN AGENT FIRE EXTINGUISHING SYSTEMS
DI VI SI ON 22 - PLUMBI NG
22 00 00 11/15 PLUMBING, GENERAL PURPOSE
22 05 48.00 20 04/06 MECHANICAL SOUND, VIBRATION, AND
SEISMIC CONTROL
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 03 00.00 20 08/10 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 02/14 COMMON PIPING FOR HVAC
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 02/13 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 09 00 02/19 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 02/19 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 21 23 08/17 HYDRONIC PUMPS
23 23 00 10/07 REFRIGERANT PIPING
23 25 00 11/08 CHEMICAL TREATMENT OF WATER FOR
MECHANICAL SYSTEMS
23 30 00 05/20 HVAC AIR DISTRIBUTION
23 64 10 11/16 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 08/09 CHILLED, CHILLED-HOT, AND CONDENSER
WATER PIPING SYSTEMS
23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 81 23.00 20 02/10 COMPUTER ROOM AIR HANDLING UNITS
23 82 00.00 20 02/16 TERMINAL HEATING UNITS
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11.21 11/17 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS FIRE, AND LIFE SAFETY
25 05 11.23 11/17 CYBERSECURITY FOR FACILITY-RELATED
PROJECT TABLE OF CONTENTS Page 3
CONTROL SYSTEMS ENERGY MANAGEMENT
CONTROL SYSTEM (EMCS) TO INCLUDE HVAC
25 05 11.26 11/17 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS UTILITY CONTROL
SYSTEMS PLC FOR GENERATOR
CONOTROLS,FUEL SYSTEM, UPS, AND
ADVANCE METERING INFRASTRUCTURE (AMI)
25 05 11.28 11/17 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS ELECTRONIC SECURITY
SYSTEMS INCLUDING CCTV, ACCESS
CONTROLS SYSTEMS, AND INTRUSION
DETECTION SYSTEMS
25 10 10 02/19 UTILITY MONITORING AND CONTROL SYSTEM
(UMCS) FRONT END AND INTEGRATION
DI VI SI ON 26 - ELECTRI CAL
26 08 00 08/08 APPARATUS INSPECTION AND TESTING
26 11 16 02/10, CHG 2: 11/19 SECONDARY UNIT SUBSTATIONS
26 20 00 08/19 INTERIOR DISTRIBUTION SYSTEM
26 23 00 05/15 LOW-VOLTAGE SWITCHGEAR
26 24 13 05/15, CHG 1: 08/17 SWITCHBOARDS
26 27 14.00 20 02/11 ELECTRICITY METERING
26 28 01.00 10 10/07 COORDINATED POWER SYSTEM PROTECTION
26 29 23 02/20 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS
UNDER 600 VOLTS
26 31 00 05/15 SOLAR PHOTOVOLTAIC (PV) COMPONENTS
26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY
15-2500 KW, WITH AUXILIARIES
26 33 53 05/19 STATIC UNINTERRUPTIBLE POWER SUPPLY
(UPS)
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
26 51 00 05/20 INTERIOR LIGHTING
26 56 00 05/20 EXTERIOR LIGHTING
DI VI SI ON 27 - COMMUNI CATI ONS
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
27 51 16 05/20 PUBLIC ADDRESS SYSTEMS
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 08 10 05/16 ELECTRONIC SECURITY SYSTEM ACCEPTANCE
TESTING
28 10 05 05/16 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DI VI SI ON 31 - EARTHWORK
31 05 19 08/08 GEOTEXTILE
31 05 22 08/08 GEOTEXTILES USED AS FILTERS
31 11 00 11/18 CLEARING AND GRUBBING
31 21 13 11/18 RADON MITIGATION
31 23 00.00 20 02/11 EXCAVATION AND FILL
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
PROJECT TABLE OF CONTENTS Page 4
32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 11 23 08/17 AGGREGATE BASE COURSES
32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR
ROADS AND SITE FACILITIES
32 14 13.13 11/19 INTERLOCKING PRECAST CONCRETE UNIT
PAVING
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 08/16 PAVEMENT MARKINGS
32 31 13.53 02/20 HIGH-SECURITY FENCES (CHAIN LINK AND
ORNAMENTAL) AND GATES
32 84 24 08/11 IRRIGATION SPRINKLER SYSTEMS
32 93 00 08/17 EXTERIOR PLANTS
DI VI SI ON 33 - UTI LI TI ES
33 01 50.31 02/20 LEAK DETECTION FOR FUELING SYSTEMS
33 11 00 02/18 WATER UTILITY DISTRIBUTION PIPING
33 30 00 05/18 SANITARY SEWERAGE
33 40 00 02/10 STORM DRAINAGE UTILITIES
33 52 10 11/18 FUEL SYSTEMS PIPING (SERVICE STATION)
33 56 10 05/19 FACTORY-FABRICATED FUEL STORAGE TANKS
33 71 02 02/15 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DI VI SI ON 34 - TRANSPORTATI ON
34 71 13.19 02/20 CRASH RATED ACTIVE VEHICLE BARRIERS
AND CONTROLS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 5
THIS PAGE INTENTIONALLY LEFT BLANK
PROJECT TABLE OF CONTENTS Page 6
SECTION 28 08 10
ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING
05/16
PART 1 GENERAL
1.1 SUMMARY
This specification defines the process and procedures for initial acceptance testing of electronic security systems (ESS) to include intrusion detection, access control and video as well as associated power and communications. Requirements to plan, conduct, and document all testing activities are covered along with the Government responsibility to witness testing and review and approve submittals. During the course of the acceptance test, demonstrate that, without exception, the completed and integrated ESS complies with the contract requirements.
1.2 DEFINITIONS
The Government Representative is a qualified individual given specific authority to witness system acceptance testing and evaluate the results.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-05 Design Data
Test Plan; G
SD-06 Test Reports
Draft Test Report
Final Test Report; G
SD-07 Certificates
Qualifications
1.4 QUALITY ASSURANCE
1.4.1 Qualifications
1.4.1.1 General
The Test Director, Operator, and Technician must have prior experience with the specific equipment, hardware and software installed under the contract.
SECTION 28 08 10 Page 1
1.4.1.2 Test Director
The Test Director must have at least five years of hands-on ESS experience to include any combination of design, installation, testing and maintenance.
1.4.1.3 Operator
The Operator must have at least two years of hands-on experience installing and maintaining ESS workstations to include both hardware and software. The Operator must be capable of demonstrating all workstation features and capabilities.
1.4.1.4 Technician
The technician must have at least two years of hands-on experience installing and maintaining ESS field equipment to include sensors, card readers, cameras, local processors, and communications equipment. The Technician must be capable of demonstrating all features and capabilities of ESS field equipment. Qualifications may be met by the individual experience of one technician or by the combined experience of a team of technicians.
1.4.1.5 Test Intruder
The purpose of the test intruder is to activate intrusion sensors in a realistic and repeatable manner. The test intruder must be between 1780 to 1830 mm tall and weigh between 80 to 85 kg. The test intruder must possess sufficient physical strength, agility, and endurance to perform movements required for intrusion testing. These movements may include, but are not limited to, walking, running, crawling, jumping, and climbing.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.1 TEST PLAN
Clearly establish the scope for ESS testing prior to beginning testing.
Submit a Test Plan that addresses the following topics:
3.1.1 Personnel
Identify the Test Director, Operator, Technician, and any other personnel that will be performing test activities.
3.1.2 Equipment
List all equipment that is required to support testing. State the purpose of each piece of equipment. Describe equipment that will be used to enable voice communications between the monitoring location and the field.
3.1.3 Procedures
Provide a step-by-step procedure for conducting each functional test.
Describe actions and expected results. Ensure that functional test procedures address performance standards described in contract
SECTION 28 08 10 Page 2 specifications.
Download example procedures from http://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/forms-graphics-tables and review for applicability and completeness. Adapt example procedures to meet specific project requirements and develop additional ones as needed.
3.1.4 Special Provisions
Discuss any special test provisions such as facility access, safety, integration with existing systems, and coordination with other work.
3.1.5 Test Logs
Provide logs for recording all data from functional testing and burn-in testing.
Download example logs from http://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/forms-graphics-tables and review for applicability and completeness. Adapt example logs to meet specific project requirements and develop additional ones as needed.
3.1.6 Schedule
Provide an overall schedule that includes all testing milestones.
3.2 PRE-ACCEPTANCE TESTING
Conduct a complete test of all field equipment, workstations, and central system hardware and software in accordance with the approved Test Plan.
The Test Director must be on site to conduct a pre-test inspection and oversee all testing activities. Prior to testing, visually inspect all ESS components and correct workmanship and neatness deficiencies as needed. During the pre-test inspection, verify the accuracy of redline drawings and update drawings as needed. Conduct testing in two phases -functional testing followed by burn-in testing.
3.2.1 Phased Testing
3.2.1.1 Functional Testing Phase
During the functional testing phase, verify system performance in accordance with approved Test Plan. Record results in approved Test Logs and provide a written explanation of each failure to include cause, corrective action, and retest result. Continue functional testing until all tests have been successfully completed with no unresolved failures.
3.2.1.2 Burn-In Testing Phase
Begin burn-in testing after successful completion of all functional testing.During the burn-in testing phase, place the ESS in normal operating mode and evaluate system performance for a continuous hour period. During this time, the ESS must be fully functional and programmed such that all features can be exercised and evaluated through normal use.
Record all system anomalies in approved Test Logs. Include a description of each anomaly along with any actions taken in response. Immediately correct minor deficiencies observed during testing and continue with burn-in testing. Determine the root cause of any failures and make
SECTION 28 08 10 Page 3 necessary repairs or modifications to restore full functionality. After a failure is corrected repeat functional tests for components and features associated with the failure, and repeat the entire burn-in testing phase.
3.2.2 Draft Test Report
Prepare and submit a Draft Test Report detailing the results of the testing. Refer to paragraph FINAL TEST REPORT for required content.
Include a cover letter signed by the Test Director stating that pre-acceptance testing has been completed and that the system is ready for acceptance testing.
3.3 SYSTEM ACCEPTANCE
Test the ESS in accordance with the approved Test Plan in the presence of the Government Representative to certify acceptable performance. Verify that the total system meets all requirements of the specification and complies with the specified standards.
Begin acceptance testing upon arrival of the Government Representative at the project site. Place the ESS in normal operating mode and evaluate system performance during the testing period. Immediately report any deficiencies observed during testing to the Government Representative and discuss possible causes and corrective measures. Obtain Government approval prior to making any adjustments, repairs or modifications. The Government retains the right to terminate testing at any time the ESS is found to be incomplete or fails to perform as specified. Such termination of acceptance testing constitutes a FAILED system acceptance test.
3.3.1 Preparation
Notify the Contracting Officer of system readiness 15 days prior to the expected start date of acceptance testing. Prior to acceptance testing, complete all clean-up and patch work requirements. Ensure that security equipment closets and similar areas are free of accumulation of waste materials or rubbish caused by prior installation work.
3.3.2 Personnel
Ensure that the following personnel are on site to perform test activities: Test Director, Operator, and Technician. Ensure that the Quality Control Manager is on site during acceptance testing.
3.3.3 Visual Inspection
Assist the Government Representative in conducting a visual inspection of ESS equipment and wiring. This inspection will focus on the general neatness and quality of workmanship and compliance with applicable codes and manufacturers' recommended installation methods. Provide a comprehensive listing of installed equipment and software along with a complete set of ESS red line drawings to be used during the inspection.
Document deficiencies identified during the inspection.
3.3.4 Functional Testing
Comply with requests from the Government Representative to repeat functional tests performed previously during pre-acceptance testing. The Government reserves the right to request the Contractor to repeat all functional tests or a representative sampling thereof as a means of
SECTION 28 08 10 Page 4 performance verification. Add all test results to approved Test Logs.
3.3.5 System Activity Reports
Retrieve archived data from the system and provide activity reports as requested by the Government Representative. Reports may address any type of activity to include alarms, portal transactions, and video archives.
Assist with analyzing reports to identify trends and anomalies.
3.3.6 Corrective Actions
Correct any deficiencies in coordination with the Government Representative. Maintain a punch list and review status at the end of each day. Work diligently to complete corrective actions the same day that deficiencies are observed. Add deficiencies not corrected on the same day to the rework items list maintained by the Quality Control Manager. Failure to resolve punch list items to the satisfaction of the Government constitutes a FAILED system acceptance test.
3.4 FINAL TEST REPORT
Submit a Final Test Report following the successful completion of acceptance testing to include resolution of all punch list items. Address the following topics in the Final Test Report:
3.4.1 Summary
Provide a chronological summary of all testing. Describe test activities and results in narrative form.
3.4.2 Personnel
Provide a list of all Contractor and Government personnel who participated in the testing.
3.4.3 Test Logs
Provide all completed test logs along with a test log verification signed by the Test Director.
-- End of Section --
SECTION 28 08 10 Page 5
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 28 08 10 Page 6
SECTION 28 10 05
ELECTRONIC SECURITY SYSTEMS (ESS)
05/16
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ASC/X9 X9.52 (1998) Triple Data Encryption Algorithm Modes of Operation
ASTM INTERNATIONAL (ASTM)
ASTM A123/A123M (2017) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM B32 (2020) Standard Specification for Solder Metal
EUROPEAN COMMITTEE FOR STANDARDIZATION (CEN/CENELEC)
EN 60079 (2021) SER Series Explosive atmospheres - ALL PARTS
EN 50131-1 (2006+A3:2020) Alarm systems – Intrusion and hold-up systems – System requirements
EN 50131-2 Alarm systems - Intrusion and hold-up systems
EN 50131-2-2 (2017) Alarm systems - Intrusion and hold-up systems Intrusion detectors - Passive infrared detectors
EN 50131-2-6 (2008/IS1:2014) Alarm systems - Intrusion and hold-up systems - Part 2-6: Opening contacts (magnetic)
EN 60839-11-1 (2013) Alarm and electronic security systems - Part 11-1: Electronic access control systems - System and components requirements
HELLENIC ORGANIZATION FOR STANDARDIZATION (ELOT) (ELOT EN)
ELOT HD 384 (1998) Electrical installations of buildings
SECTION 28 10 05 Page 1
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 802.3 (2018) Ethernet
IEEE C2 (2017; Errata 1-2 2017; INT 1 2017) National Electrical Safety Code
INTELLIGENCE COMMUNITY STANDARD (ICS)
ICS 705-1 (2010) Physical and Technical Security Standard for Sensitive Compartmented Information Facilities
INTERNATIONAL ELECTROTECHNICAL COMMISSION (IEC)
IEC 60364 Electrical Installations for Buildings
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)
ANSI ISO/IEC 7816 (R 2009) Identification Cards - Integrated Circuit Cards
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA ICS 1 (2000; R 2015) Standard for Industrial Control and Systems: General Requirements
NEMA ICS 2 (2000; R 2005; Errata 2008) Industrial Control and Systems Controllers, Contactors, and Overload Relays Rated 600 V
NEMA ICS 6 (1993; R 2016) Industrial Control and Systems: Enclosures
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2020; ERTA 20-1 2020; ERTA 20-2 2020; TIA
20-1; TIA 20-2; TIA 20-3; TIA 20-4)
National Electrical Code
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST)
NIST FIPS 140-2 (2001) Security Requirements for Cryptographic Modules
NIST FIPS 197 (2001) Advance Encryption Standard
NIST FIPS 201-2 (2013) Personal Identity Verification (PIV) of Federal Employees and Contractors
OPEN NETWORK VIDEO INTERFACE FORUM (ONVIF)
ONVIF (2017) Core Specification Version 17.06
TELECOMMUNICATIONS INDUSTRY ASSOCIATION (TIA)
TIA-222 (2005G; Add 1 2007; Add 2 2009; Add 3 2014; Add 4 2014; R 2014; R 2016) Structural Standards for Steel Antenna
SECTION 28 10 05 Page 2
Towers and Antenna Supporting Structures
TIA-568-C.2 (2009; Errata 2010; Add 2 2014; Add 1 2016) Balanced Twisted-Pair Telecommunications Cabling and Components Standards
TIA-606 (2017c) Administration Standard for the Telecommunications Infrastructure
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
47 CFR 15 Radio Frequency Devices
UNDERWRITERS LABORATORIES (UL)
UL 50 (2015) UL Standard for Safety Enclosures for Electrical Equipment, Non-Environmental Considerations
UL 294 (2018; Reprint Oct 2018) UL Standard for Safety Access Control System Units
UL 437 (2013; Reprint Oct 2017) UL Standard for Safety Key Locks
UL 634 (2007; Reprint Mar 2015) Connectors and Switches for Use with Burglar-Alarm Systems
UL 636 (2018) UL Standard for Safety Holdup Alarm Units and Systems
UL 639 (2007; Reprint Nov 2019) Standard for Intrusion Detection Units
UL 681 (2014) Installation and Classification of Burglar and Holdup Alarm Systems
UL 796 (2016) UL Standard for Safety Printed-Wiring Boards
UL 969 (2017; Reprint Mar 2018) UL Standard for Safety Marking and Labeling Systems
UL 1037 (2016; Reprint Sep 2017) UL Standard for Safety Antitheft Alarms and Devices
UL 1076 (2018) UL Standard for Safety Proprietary Burglar Alarm Units and Systems
UL 1610 (2016) UL Standard for Safety Central-Station Burglar-Alarm Units
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING.
SECTION 28 10 05 Page 3
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
Naval Facilities Engineering Command will approve submittals requiring special review in this section.
SD-02 Shop Drawings
ESS Components; G
Overall System Schematic; G
SD-03 Product Data
Premise Control Unit; G
Detection Sensors; G
Access Control Unit; G
Access Control Devices; G
Cameras; G
Camera Housing and Mounts; G
Video Recording; G
Communications Interface Devices; G
Video and ESS Transmission; G
Batteries; G
Component Enclosure; G
Network Switch; G
SD-05 Design Data
Backup Battery Capacity Calculations; G
CCTV Storage Calculations
SD-07 Certificates
Contractor Qualifications; G
Instructor Qualifications; G
Data Encryption; G
SD-10 Operation and Maintenance Data
Training Plan; G
Training Content; G
ESS Components and ESS Software: Data Package 4; G
SECTION 28 10 05 Page 4
ESS Software and ESS Components: Data Package 4; G
Submit data package in accordance with Section 01 78 23
OPERATION AND MAINTENANCE DATA
SD-11 Closeout Submittals
As-Built Drawings; G
1.3 QUALITY ASSURANCE
1.3.1 Regulatory Requirements
The advisory provisions in each of the publications referred to in this specification are mandatory. Interpret these publications as though the word "must" has been substituted for "should" wherever it appears.
Interpret references in these publications to the "authority having jurisdiction," or words of similar meaning, to mean the Contracting Officer.
Equipment, materials, installation, and workmanship must be in accordance with the mandatory and advisory provisions of IEC 60364 , ELOT HD 384 , unless more stringent requirements are specified or indicated.
1.3.2 Standard Products
Provide materials and equipment that are products of manufacturers regularly engaged in the production of such products which are of equal material, design and workmanship and:
a. Have been in satisfactory commercial or industrial use for 2 years prior to bid opening and have been utilized in applications of equipment and materials under similar circumstances and of similar size.
b. Have been available on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2-year period.
c. Where two or more items of the same class of equipment are required, provide products of a single manufacturer.
d. Provide commercial off-the-shelf (COTS) products in which the manufacturer allows a network of qualified distributors to sell, install, integrate, maintain, and repair the hardware and software products that make up the system.
1.3.2.1 Alternative Qualifications
Products having less than a 2-year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturers' factory or laboratory tests, is furnished.
1.3.2.2 Material and Equipment Manufacturing Date
Products manufactured more than one year prior to date of delivery to the site are not acceptable.
SECTION 28 10 05 Page 5
1.3.2.3 Product Safety
System components are to conform to applicable rules and requirements of IEC 60364 , ELOT HD 384 . Equip system components with instruction stickers including warnings and cautions describing physical safety, and special or important procedures to be followed in operating and servicing system equipment.
1.3.3 Shop Drawings
1.3.3.1 ESS Components
Submit the ESS Components, Data Package 4 with the ESS Software submittal package in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA.
Submit drawings that clearly and completely indicate each ESS component function that includes:
a. Termination device points
b. Interconnections required for system operation
c. Interconnections between modules and devices
d. Proposed wireway or conduit systems to be used including:
(1) Locations
(2) Sizes
(3) Types
e. Drawings showing:
(1) Device locations and spacing
(2) Mounting and positioning details
(3) Riser Diagrams with cable sizes and types
(4) Bill of Materials (Device make, model and quantities)
(5) Alarm and access control zones
(6) CCTV and sensor coverage areas
(7) Spare capacity
1.3.3.2 Overall System Schematic
Indicate the relationship of integrated components on one-line diagram and show:
a. Power source. Identify power requirements from UPS or battery backup.
b. System controls
c. Impedance matches
d. Interconnecting wire data including:
SECTION 28 10 05 Page 6
(1) Number
(2) Size
(3) Identification
(4) Maximum lengths
1.3.4 Evidence of Experience and Qualifications
1.3.4.1 Contractor Qualifications
Submit experience and certified qualifications data prior to installation. Show that specific installers who will perform the work have a minimum of 2 years of experience successfully installing ESS of the same type and similar design as specified. Include the names, locations, and points of contact of at least two installations of similar type and design as specified in this document where the installer has installed such systems. Indicate the type of each system installed. Certify that each system has performed satisfactorily in the manner intended for a period of at least 12 months.
1.3.4.2 Instructor Qualifications
Submit the instructor's experience and certified qualifications data prior to installation. Show that the instructor has received a minimum of 24 hours of ESS training from a technical organization such as the National Burglar and Fire Alarm Association, and 2 years' experience in installing the specified ESS type.
1.4 Environmental Conditions
1.4.1 Interior Conditions
Equipment installed in environmentally protected interior areas must meet performance requirements specified for the following ambient conditions:
1.4.1.1 Temperature
0 to 50 degrees C. Components installed in unheated security protected areas must meet performance requirements for temperatures as low as minus 17 degrees C.
1.4.1.2 Pressure
Sea level to 4573 m above sea level.
1.4.1.3 Relative Humidity
5 to 95 percent.
1.4.1.4 Fungus
Components must be constructed of non-fungus nutrient materials or be treated to inhibit fungus growth.
SECTION 28 10 05 Page 7
1.4.1.5 Acoustical Noise
Components must be suitable for use in high noise areas above 100 dB, without adversely affecting their performance.
1.4.2 Exterior Conditions
Components in enclosures must meet performance requirements when exposed to the following ambient conditions:
1.4.2.1 Temperature
Minus 32 to 60 degrees C.
1.4.2.2 Pressure
Sea level to 4573 m above sea level.
1.4.2.3 Solar Radiation
Six hours of solar radiation per day at dry bulb temperature of 60 degrees Cincluding 4 hours of solar radiation at 0.00112 watts per square mm.
1.4.2.4 Sand and Dust
Wind driven for up to 9.6 km per hour (kmph)
1.4.2.5 Rain
50 mm per hour and 125 mm per hour cyclic with wind plus one period of 300 mm per hour.
1.4.2.6 Humidity
5 to 95 percent.
1.4.2.7 Fungus
Warm, humid atmosphere conducive to the growth of heterotrophic plants.
1.4.2.8 Salt Fog
Salt atmosphere with 5 percent salinity.
1.4.2.9 Snow
Snow loading of 234 kg per square m per hour; blowing snow of 22.5 kg per square m per hour.
1.4.2.10 Ice Accretion
Up to 12.7 mm of radial ice.
1.4.2.11 Wind
Continual velocity up to 80 kmph with gusts to 106 kmph.
SECTION 28 10 05 Page 8
1.4.2.12 Acoustical Noise
Components must be suitable for use in high noise areas above 110 dB without adversely affecting their performance. Examples areas include flight lines, run-up pads, and generator sites.
1.5 SYSTEM CALCULATIONS AND ANALYSIS
1.5.1 Backup Battery Capacity Calculations
Submit calculations showing that backup battery capacity exceeds sensor operation, communications supervision, and alarm annunciation power requirements for proposed equipment plus 25 percent spare capacity.
1.5.2 CCTV Storage Calculations
Submit calculations showing the required storage capacity for each video storage device.
1.6 ESS SOFTWARE, DATA PACKAGE 4
Submit the ESS software, Data Package 4 with the ESS Components submittal package in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA. Describe the functions of all software in the software manual and include:
a. All information necessary to enable proper loading, testing, and operation
b. Terms and functions definitions
c. Use of system and application software
d. Procedures for system initialization, start-up and shutdown
e. Alarm reports
f. Reports generation
g. Database format and data entry requirements
h. Directory of all files
i. All communication protocol descriptions, including data formats, command characters, and a sample of each type of data transfer
j. Interface definition
k. List of software keys
1.7 AS-BUILT DRAWINGS
Maintain a separate set of drawings, elementary diagrams, and wiring diagrams of the system to be used for as-built drawings. Keep this set accurately and neatly up-to-date with all changes and additions. This set is not to be used for installation purposes.
Finish the final drawings submitted with the endurance test report in accordance with Section 01 78 00 CLOSEOUT SUBMITTALS for as-built
SECTION 28 10 05 Page 9 requirements.
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
Provide a complete and integrated electronic security system (ESS) that meets the requirements of NAVFAC. ESS must be compatible with the Installation's central monitoring system and monitored within the secure/protected area. Installation's central monitoring system is manufactured by Lenel. The ESS consists of the following subsystems and features:
a. Intrusion Detection System (IDS)
b. Access Control System (ACS)
c. Closed-circuit Television System (CCTV)
Include materials not normally furnished by the manufacturer with the ESS equipment as specified in:
a. Section 33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
b. Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM
2.2 PERFORMANCE REQUIREMENTS
Integrate the installed and operating subsystems into the overall ESS system to detect intrusion, control access, provide CCTV surveillance, provide visual verification, and perform as an entity, as specified below. Provide electronic equipment that complies with 47 CFR 15 and are suitable for the environment where they will be installed.
2.2.1 Growth Capability
Provide capability for modular ESS expansion of inputs, outputs, card readers, and remote-control stations with minimal equipment modification.
Software must be able to handle design requirements plus 25 percent spare capacity. Growth capability is not to be limited by the provided products.
2.2.2 Hazardous Locations
When located in areas where fire or explosion hazards exist, provide system components rated and installed according to Chapter 5 of NFPA 70 .
2.2.3 Network Certification
Certify all Platform Information Technology (PIT) in accordance with EN 60079 and the individual service implementation policy.
2.2.4 Maintainability
Provide components that can be maintained using commercially available tools and equipment. Arrange and assemble components to be readily accessible to maintenance personnel without compromising system defeat resistance and with no degradation in tamper protection, structural integrity, EMI or RFI attenuation, or line supervision after maintenance when it is performed in accordance with manufacturer's instructions.
SECTION 28 10 05 Page 10
2.2.5 Availability
Provide components rated for continuous operation. Provide solid-state electronic components mounted on printed circuit boards, conforming to UL 796 . Provide boards that are plug-in, quick-disconnect type. Do not impede maintenance with densely packed circuitry. Provide power-dissipating components with safety margins of not less than 25 percent with respect to dissipation ratings, maximum voltages, and current-carrying capacity. Provide solid-state type or hermetically sealed electromechanical type light duty relays and similar switching devices.
2.2.6 Fail-Safe Capability
Provide fail-safe capability in critical elements of the ESS including, but not be limited to, the capability to monitor communication link integrity and to provide self-test. Provide fault annunciation when diminished functional capabilities are detected. Annunciate fail-safe alarms to clearly distinguish from other types of alarms.
2.2.7 Line Supervision
Provide the same geographic resolution for fault isolation at the systems level as provided for intrusion detection. Provide either a static or dynamic system with active mode for line supervision of communication links of the ESS.
a. The static system must represent "no-alarm" always by the same signal, which is different than the originally transmitted signal.
b. The dynamic system must represent "no-alarm" with a signal which continually changes with time.
2.2.8 Power Loss Detection
Detect AC and DC power loss and generate an alarm when a critical component of the system experiences temporary or permanent loss of power.
Annunciate the alarm in the Secured Area and the SSO Office to clearly identify the component experiencing power loss.
2.2.9 Controls and Designations
Provide controls and designations as specified in NEMA ICS 1 .
2.2.10 Special Test Equipment
Provide all special test equipment, special hardware, software, tools, and programming or initialization equipment needed to start or maintain any part of the system and its components. Special test equipment is defined as any test equipment not normally used in an electronics maintenance facility.
2.2.11 Electromagnetic Interference (EMI)
Configure and provide ESS components employing electromagnetic radiation constructed to provide minimal vulnerability to electronic countermeasures.
SECTION 28 10 05 Page 11
2.2.12 Electromagnetic Radiation (EMR)
Provide only ESS communication components which are Federal Communications Commission (FCC) licensed and approved. Provide system components which are electromagnetically compatible.
2.2.13 Interchangeability
Use off-the-shelf components which are physically, electrically, and functionally interchangeable with equivalent components as complete items. Equivalent, replacement components must not require new or other component modification. Do not use custom designed or one-of-a-kind items. Interchangeable components or modules must not require trial and error matching in order to meet integrated system requirements, system accuracy, or restore complete system functionality.
2.3 INTRUSION DETECTION SYSTEM (IDS)
The IDS primary function is to detect intrusion into secured areas.
Utilize a single database for all IDS programming data that seamlessly integrates with the ESS under a single operating environment. The IDS events must be viewable as separate or as a combined list of all ESS events. Control the IDS alarm monitoring through software control from the ESS.
a. Provide both supervised and non-supervised alarm point monitoring.
b. Arm or disarm alarm points both manually and automatically by time of day, day of week or by operator command.
2.3.1 IDS Components
Provide components:
a. Premise Control Units (PCU)
b. Detection Sensors
c. Tamper Switches
2.3.2 Detection Sensitivity
The sensitivity of the IDS must allow for the following:
a. Locating intrusions at individually protected assets or at an individual portal
b. Locating intrusions within the coverage on a single volumetric sensor
c. Locating failures or tampering at individual sensors
2.3.3 Detection Alarm and Reporting Capacity
Collect, communicate, and display up to 32 sensor zone alarms and to enable control of one card reader with integral keypad for arming and disarming inside of the protected area with a delayed alarm.
Identify individual sensors in alarm if the sensor zone is a multiple alarm source combination. Annunciate a single alarm within 2 seconds
SECTION 28 10 05 Page 12 maximum, after sensor transducer or other detection device activation.
2.3.4 False Alarm Rate
The false alarm rate for each interior IDS zone must not exceed one false alarm per 30-day period. The false alarm rate for each exterior IDS zone must not exceed one false alarm per 24-hour period.
2.3.5 Nuisance Alarm Rate
The nuisance alarm rate for each interior IDS zone must not exceed three nuisance alarms per 30-day period. The nuisance alarm rate for each exterior IDS zone must not exceed three nuisance alarms per 24-hour period.
2.3.6 Premise Control Unit (PCU)
Install the PCU command processor in a tamper resistant enclosure that is specified in paragraph "Component Enclosure". Package the following with the PCU:
a. Power transformer
b. Battery(s)
c. Network connection cable
d. Keypad(s)
e. Keypad connection cable(s)
f. Additional components as required for full functionality
2.3.6.1 PCU Capabilities
Provide the PCU at a minimum but not limited to, the following capabilities;
a. Expansion to a total of at least 10,000 user codes with 99 user profile definitions.
b. Support 4 keypads with alphanumeric display. Each keypad must be capable of arming and disarming any system area based on a pass code or access control card and or key FOB authorization. Provide keypad alphanumeric display with complete prompt messages during all stages of operation and system programming and display all relevant operating and test data.
c. Four 4 shift schedules per area.
d. A total of at least 100 programmable output relay schedules.
e. 32 individual reporting areas.
f. Data line supervision.
g. Two-man access code or credentials.
h. Support programming to require the same or different access code entered within a programmed delay time of 1 to 15 minutes after
SECTION 28 10 05 Page 13 disarming before activating a silent ambush alarm.
i. Support area programming that disables schedule and time-of-day changes while system is armed so that area can only be disarmed during scheduled times.
j. Provide a minimum of a 4,000 event log buffer per PCU. Record and hold alarm activity information in the log buffer until the ESS is connected and receives the information. Provide a software-configurable warning log buffer filling notification for PCU(s) configured with network switch capabilities.
k. Support a Network Interface Card (NIC) plug-in module with built in network router capable of 128 Bit AES Rijndael Encryption process certified by NIST (National Institute of Standards and Technology).
2.3.6.2 Overcurrent Protection and Indication
When overcurrent more than it is rated for is detected by the PCU, communication bus(es) and keypad(s) are to be shut down and an overcurrent notification LED lit to indicate the situation.
2.3.6.3 Manual and Self-Test
All testing from any alphanumeric keypad include testing for: standby battery, alarm bell or siren, and communication to the ESS Cabinet in the SSO Office. Include provisions for an automatic, daily, weekly, 30 day, or up to 60 day communication link test from the PCU installation site to the SSO Office. Include a provision for displaying the internal system power and wiring conditions.
Include the following for internal monitoring points:
a. The bell circuit
b. AC power
c. Battery voltage level
d. Charging voltage
e. Panel box tamper
f. Phone trouble line 1
g. Phone trouble line 2
h. Transmit trouble
i. Network trouble
A battery test must be automatically performed to test the integrity of the standby battery by disconnecting the standby battery from the charging circuit and placing a load on the battery. Perform this test at an interval no greater than 180 days.
2.3.7 Detection Sensors
a. Sensors are to detect facility perimeter or protected zone
SECTION 28 10 05 Page 14 penetrations by unauthorized personnel or intruders and transmit an alarm signal to the alarm annunciation system upon change detection.
Accomplish this with a probability of detection (PD) of 0.9 with a 95 percent confidence level and conforming to UL 639 or EN 50131-2 all subparts where applicable.
b. Required sensor power is 12 VDC unless otherwise specified.
c. An interior IDS zone is a room or space within a building that can be armed and disarmed independently from all other zones.
d. Provide line supervision for all sensors with an end-of-line resistor at the sensor or within a tampered junction box with conduit from the junction box to the sensor.
d. Provide sensors and components rated for operation in the installed environment. The sensors must transmit an alarm signal to the alarm annunciation system upon change detection. Provide all sensors with a tamper switch and elements housed in a tamper-alarmed enclosure in accordance of paragraph "Component Enclosure".
2.3.7.1 Interior Sensors
2.3.7.1.1 High Security Balanced Magnetic Switch (BMS)
Mount the BMS inside the secure location and on the opening side of the door. BMS sensors do not have the capability to incorporate an end-of-line (EOL) resistor.
2.3.7.1.1.1 Level 1 Switch
UL 634 or EN 50131-2-6 . Level 1 High Security
Mount the MSS inside the secure location and on the opening side of the door. MSS will be utilized on controlled area doors, as indicated on the TY drawings.
2.3.7.1.1.2 Level 2 Switch
UL 634 or EN 50131-2-6 . Level 2 High Security Switch (HSS)
Mount the HSS inside the secure location and on the opening side of the door. HSS will be utilized on controlled area doors, as indicated on the TY drawings.
2.3.7.1.2 Passive Infrared Sensors
UL 639 or EN 50131-2-2 .
2.3.7.2 Duress Alarms (Hold Up Switch)
UL 636 or EN 50131-1 . Duress alarm switches must provide the means for an individual to covertly notify the alarm annunciation system that a duress situation exists with no visible or audible signal in the secure area.
2.3.7.2.1 Hardwire Duress Alarms
Alarms must be capable of being secretly activated by the foot or hand of an average adult in both standing and seated positions. Upon activation
SECTION 28 10 05 Page 15 the alarm signal is to lock-in until manually reset with a key or similar device and be readily identifiable by the ESS. Duress Button will be required in the Quarterdeck under desk.
Provide sensors that are easy to operate and configured to minimize the possibility of accidental activation. Hardwire duress alarms must be rated for a minimum lifetime of 50,000 operations. Securely mount sensors in rugged, corrosion-resistant housing.
2.3.7.3 Tamper Switches
a. Corrosion-resistant tamper switches are required for the following IDS and CCTV equipment with hinged doors or removable covers that contain open circuits:
(1) Enclosures
(2) Cabinets
(3) Housings
(4) Boxes
(5) Sensors
b. Tamper switches are to initiate an alarm signal when the door or cover is moved as little as 6 mm from the normally closed position.
Mechanically mount tamper switches to maximize defeat time when enclosure covers are opened or removed. One second is the minimum amount of time required to depress or defeat the tamper switch after opening or removing the cover. Enclosure and tamper switch must prevent direct line of sight to internal components and prevent switch or circuit tampering. Conceal mounting hardware so switch cannot be observed from enclosure exterior.
c. Tamper switches on doors which are opened to make normal maintenance adjustments to the system and to service power supplies must have a maintenance position.
2.3.7.3.1 Tamper Switch Performance Requirements
Tamper switches are to be:
a. Inaccessible until switch is activated.
b. Under electrical supervision at all times, irrespective of the protection mode in which the circuit is operating.
c. Annunciated to be clearly distinguishable from intrusion detection alarms and exempt from being disarmed, shunted, or silenced.
d. Spring-loaded and held in the closed position by the door or cover protected.
e. Wired to break the circuit when the door or cover is disturbed.
f. Wired so that each sensor and device is annunciated individually at the central reporting processor.
SECTION 28 10 05 Page 16
2.4 ACCESS CONTROL SYSTEM (ACS)
Provide an access control system based upon a modular distributed microprocessor architecture complete with access control cards and ready for operation. The ACS must be compatible with the existing Lenel central monitoring system.
a. The ACS card credentials are required to be Common Access Cards (CAC), and CAC cards are being provided by the Government. Interface system with and provide alarm and other status to the overall ESS. Provide system monitoring and control for the ESS. Provide ACS that meets the communications requirements of UL 1076 and UL 294 or EN 50131-1 and EN 60839-11-1 and has the capability of controlling up to 4 card readers and keypads per card reader controller, 128 alarm inputs, or 128 relay outputs or any components combination.
b. System is to grant or deny access or exit based upon:
(1) Keypad identification data
(2) CAC card identification data
(3) Video
(4) Biometric reader identification data
(5) Smart card identification data
(6) Identification technologies combination
(7) Input through the access control devices compared to data stored within the system
(8) Time of day, day of week, and special day and holiday scheduling with card validation override.
c. Decision to grant or deny access or exit is to be based upon authorization for such data to be input at a specific location for the current time period. Access decisions for high security areas are to be based upon two identification technology combinations: card and keypad or card and biometric.
d. Provide ACS that supports the configuration and simultaneous monitoring of multiple access control devices when TCP/IP communication interfaces are used between the ESS and the primary Access Control Unit (ACU). The events of the ACS are to be viewable as separate or as a combined list of all ESS events. Provide overall control of the ACS, alarm monitoring, and photo identification through software control of the ESS.
e. Access control, photo imaging, and programming data must reside on a single database and instantly…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .