This document provides specifications for the construction of a communications facility project on Naval Support Activity Souda Bay, Greece. The project will construct a three-story concrete structure to consolidate communications functions currently spread across multiple buildings. It will provide a communications center, telephone exchange, electronics maintenance shops, storage, and other related spaces. The exterior will have a reinforced concrete facade and elastomeric coating. Electrical work will include primary power distribution, lighting, telecommunications infrastructure, and security systems. The performance period is approximately 900 days after notice to proceed.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORK ORDER NO.
At the
PREPARED BY:
Architectural: Mechanical:
Civil: Electrical:
Structural:
APPROVED BY:
Specifications:
For Commander, NAVFAC:
Date:
Submitted By: Date:
UNCLASSIFIED/FOR OFFICIAL USE ONLY
P131 Communications Center
Landscape Arch: Chad St. John Telecommunication: Rich Hoffman Interiors: Jennifer Adams
Help Note All fields can be edited. If you have trouble selecting a field, either use the tab key or click "highlight fields" in Acrobat 7. Fields that are not needed can be selected and deleted. Tool tips with "additional field" can be deleted or changed. The contract number can also be deleted or changed.
09059054 Typewriter
Snyder, Brandi LGI00704201 Text Box This page left intentionally blank
P131 Communications Center eProjects No.: 1615269 NSA Souda Bay, Greece
SIGNATURE PAGE - 1
P131 Communications Center NSA Souda Bay, Greece
HAVING PARTICIPATED IN THE DESIGN OF PROJECT NO. 1615269, P-131
COMMUNICATIONS CENTER, NSA SOUDA BAY, AND HAVING THOROUGHLY REVIEWED THE
COMPLETE PROJECT DOCUMENTS, I DECLARE THAT THE FACILITY DESIGN INCLUDED
HEREIN COMPLIES WITH ALL APPLICABLE GREEK AND EUROPEAN CODES AND LAWS.
ΕΧΟΝΤΑΣ ΣΥΜΜΕΤΑΣΧΕΙ ΣΤΟΝ ΣΧΕΔΙΑΣΜΟ ΤΟΥ ΕΡΓΟΥ Νο.1615269, Ρ-131 ΚΕΝΤΡΟ
ΕΠΙΚΟΙΝΩΝΙΩΝ, ΣΤHN NSA ΣΤΟΝ ΚΟΛΠΟ ΤΗΣ ΣΟΥΔΑΣ, ΚΑΙ ΕΧΟΝΤΑΣ ΔΙΕΞΟΔΙΚΑ ΕΛΕΓΞΕΙ
ΤΑ ΟΛΟΚΛΗΡΩΜΕΝΑ ΕΓΓΡΑΦΑ ΤΟΥ ΕΡΓΟΥ, ΔΗΛΩΝΩ ΟΤΙ Ο ΣΧΕΔΙΑΣΜΟΣ ΤΗΣ ΕΓΚΑΤΑΣΤΑΣΗΣ
ΠΟΥ ΠΕΡΙΕΧΕΤΑΙ ΣΕ ΑΥΤΟ ΤΟ ΕΓΓΡΑΦΟ ΣΥΜΜΟΡΦΩΝΕΤΑΙ ΜΕ ΟΛΟΥΣ ΤΟΥΣ ΕΦΑΡΜΟΖΟΜΕΝΟΥΣ
ΕΛΛΗΝΙΚΟΥΣ ΚΑΙ ΕΥΡΩΠΑΙΚΟΥΣ ΚΩΔΙΚΕΣ ΚΑΙ ΝΟΜΟΘΕΣΙΕΣ.
DATE
SIGNATURE
PROFESSIONAL SEAL
MANAGING DIRECTOR
ARCHITECTURAL
CIVIL/STRUCTURAL
ELECTRICAL
MECHANICAL
eathanasoula
METOXIANAKHS AUTOCAD
eathanasoula
LAMPRINOS
eathanasoula
TROULAKIS
eathanasoula
MARKANTONAKIS
eathanasoula
PAPADAKIS ARIS NIKHTAS
SIGNATURE PAGE - 2
STAMP PAGE - 1
NAVFAC ATLANTIC
WORK ORDER NO.1615269
Specifications
P131 Communications Center
At
NSA Souda Bay, Greece Issue for Bid & Construction
PREPARED BY:
CH2M
5701 Cleveland Street Virginia Beach, VA 23462
Task # N6247019F4110
Architectural: Chris Surles Interiors: Jennifer Adams Civil:
Structural:
Irrigation:
Landscape Arch
John Cardenas Laura Presley Jake Baker Chad St. John
Mechanical:
Electrical:
Fire Protection:
Telecomm:
Scott Hinte Mike Neatherlin Max Newton Rich Hoffman
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 01 15 02/11 LIST OF DRAWINGS
00 73 04 08/08 SUPPLEMENTARY CONDITIONS FOR PROJECTS
IN MEDITERRANEAN AREA
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 08/15 SUMMARY OF WORK
01 14 00 11/11 WORK RESTRICTIONS
01 20 00.00 20 11/11 PRICE AND PAYMENT PROCEDURES
01 30 00 08/15 ADMINISTRATIVE REQUIREMENTS
01 30 01.00 20 06/20 DESIGN, PROCUREMENT AND INSTALLATION
OF FURNITURE, FIXTURES, AND EQUIPMENT
01 31 23.13 20 05/17, CHG 6: 02/21 ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM
01 32 17.00 20 05/18 COST-LOADED NETWORK ANALYSIS SCHEDULES
(NAS)
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29 02/17 SUSTAINABILITY REPORTING
01 35 13 11/11 SPECIAL PROJECT PROCEDURES
01 35 26 11/15 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 42 15 02/14 METRIC MEASUREMENTS
01 45 00.00 20 11/11 QUALITY CONTROL
01 45 35 11/20 SPECIAL INSPECTIONS
01 50 00 05/18 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 11/15, CHG 4: 08/20 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.01 20 11/15, CHG 3: 08/20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL
CONTROLS
01 58 00 08/19, CHG 2: 11/20 PROJECT IDENTIFICATION
01 74 19 02/19, CHG 1: 08/20 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 05/19 CLOSEOUT SUBMITTALS
01 78 23 08/15, CHG 1: 11/20 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 02/15, CHG 2: 11/20 FACILITY ELECTRONIC OPERATION AND
MAINTENANCE SUPPORT INFORMATION (eOMSI)
01 91 00.15 20 02/21 TOTAL BUILDING COMMISSIONING
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 05/10 DEMOLITION
DI VI SI ON 03 - CONCRETE
03 30 00 02/19, CHG 1: 02/21 CAST-IN-PLACE CONCRETE
DI VI SI ON 05 - METALS
05 12 00 08/18 STRUCTURAL STEEL
05 30 00 05/15 STEEL DECKS
05 50 13 05/17 MISCELLANEOUS METAL FABRICATIONS
05 51 33 02/16 METAL LADDERS
05 52 00 02/18 METAL RAILINGS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
PROJECT TABLE OF CONTENTS Page 1
06 10 00 08/16 ROUGH CARPENTRY
06 41 16.00 10 08/10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
06 61 16 08/20 SOLID SURFACING FABRICATIONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 05 23 08/19 PRESSURE TESTING AN AIR BARRIER SYSTEM
FOR AIR TIGHTNESS
07 13 53 02/16 ELASTOMERIC SHEET WATERPROOFING
07 21 13 02/16 BOARD AND BLOCK INSULATION
07 21 16 11/11 MINERAL FIBER BLANKET INSULATION
07 22 00 02/16 ROOF AND DECK INSULATION
07 27 10.00 10 08/19 BUILDING AIR BARRIER SYSTEM
07 52 00 05/12 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 60 00 05/17 FLASHING AND SHEET METAL
07 84 00 05/10 FIRESTOPPING
07 92 00 08/16 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 11 16 05/17 ALUMINUM DOORS AND FRAMES
08 14 00 08/16 WOOD DOORS
08 31 00 05/17 ACCESS DOORS AND PANELS
08 33 23 08/20 OVERHEAD COILING DOORS
08 34 73 11/19 SOUND CONTROL DOOR ASSEMBLIES
08 41 13 08/18 ALUMINUM-FRAMED ENTRANCES AND
STOREFRONTS
08 44 00 05/19 CURTAIN WALL AND GLAZED ASSEMBLIES
08 71 00 02/16 DOOR HARDWARE
08 81 00 05/19 GLAZING
08 91 00 08/20 METAL WALL LOUVERS
DI VI SI ON 09 - FI NI SHES
09 22 00 02/10 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 08/16 GYPSUM BOARD
09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 08/17 ACOUSTICAL CEILINGS
09 62 38 08/17 STATIC-CONTROL FLOORING
09 65 00 08/10 RESILIENT FLOORING
09 68 00 11/17, CHG 2: 08/20 CARPETING
09 69 13 11/15 RIGID GRID ACCESS FLOORING
09 90 00 02/21 PAINTS AND COATINGS
09 96 00 11/14 SILICONE ELASTOMERIC COATINGS
DI VI SI ON 10 - SPECI ALTI ES
10 11 00 08/20 VISUAL DISPLAY UNITS
10 14 00.10 08/17 EXTERIOR SIGNAGE
10 14 00.20 08/20 INTERIOR SIGNAGE
10 21 13 08/20 TOILET COMPARTMENTS
10 26 00 08/20 WALL AND DOOR PROTECTION
10 28 13 08/20 TOILET ACCESSORIES
10 44 16 11/19 FIRE EXTINGUISHERS
10 51 13 05/11 METAL LOCKERS
10 56 13 04/06 STEEL SHELVING
PROJECT TABLE OF CONTENTS Page 2
DI VI SI ON 12 - FURNI SHI NGS
12 21 00 08/17 WINDOW BLINDS
12 24 13 08/20 ROLLER WINDOW SHADES
12 48 13 08/17 ENTRANCE FLOOR MATS AND FRAMES
12 93 00 08/17 SITE FURNISHINGS
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 48 73 05/20, CHG 1: 08/20 SEISMIC CONTROL FOR NON-STRUCTURAL
COMPONENTS
DI VI SI ON 14 - CONVEYI NG EQUI PMENT
14 21 23 05/16 ELECTRIC TRACTION PASSENGER ELEVATORS
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
21 22 00 04/20 CLEAN AGENT FIRE EXTINGUISHING SYSTEMS
DI VI SI ON 22 - PLUMBI NG
22 00 00 11/15 PLUMBING, GENERAL PURPOSE
22 05 48.00 20 04/06 MECHANICAL SOUND, VIBRATION, AND
SEISMIC CONTROL
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 03 00.00 20 08/10 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 02/14 COMMON PIPING FOR HVAC
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 02/13 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 09 00 02/19 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 02/19 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 21 23 08/17 HYDRONIC PUMPS
23 23 00 10/07 REFRIGERANT PIPING
23 25 00 11/08 CHEMICAL TREATMENT OF WATER FOR
MECHANICAL SYSTEMS
23 30 00 05/20 HVAC AIR DISTRIBUTION
23 64 10 11/16 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 08/09 CHILLED, CHILLED-HOT, AND CONDENSER
WATER PIPING SYSTEMS
23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 81 23.00 20 02/10 COMPUTER ROOM AIR HANDLING UNITS
23 82 00.00 20 02/16 TERMINAL HEATING UNITS
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11.21 11/17 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS FIRE, AND LIFE SAFETY
25 05 11.23 11/17 CYBERSECURITY FOR FACILITY-RELATED
PROJECT TABLE OF CONTENTS Page 3
CONTROL SYSTEMS ENERGY MANAGEMENT
CONTROL SYSTEM (EMCS) TO INCLUDE HVAC
25 05 11.26 11/17 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS UTILITY CONTROL
SYSTEMS PLC FOR GENERATOR
CONOTROLS,FUEL SYSTEM, UPS, AND
ADVANCE METERING INFRASTRUCTURE (AMI)
25 05 11.28 11/17 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS ELECTRONIC SECURITY
SYSTEMS INCLUDING CCTV, ACCESS
CONTROLS SYSTEMS, AND INTRUSION
DETECTION SYSTEMS
25 10 10 02/19 UTILITY MONITORING AND CONTROL SYSTEM
(UMCS) FRONT END AND INTEGRATION
DI VI SI ON 26 - ELECTRI CAL
26 08 00 08/08 APPARATUS INSPECTION AND TESTING
26 11 16 02/10, CHG 2: 11/19 SECONDARY UNIT SUBSTATIONS
26 20 00 08/19 INTERIOR DISTRIBUTION SYSTEM
26 23 00 05/15 LOW-VOLTAGE SWITCHGEAR
26 24 13 05/15, CHG 1: 08/17 SWITCHBOARDS
26 27 14.00 20 02/11 ELECTRICITY METERING
26 28 01.00 10 10/07 COORDINATED POWER SYSTEM PROTECTION
26 29 23 02/20 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS
UNDER 600 VOLTS
26 31 00 05/15 SOLAR PHOTOVOLTAIC (PV) COMPONENTS
26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY
15-2500 KW, WITH AUXILIARIES
26 33 53 05/19 STATIC UNINTERRUPTIBLE POWER SUPPLY
(UPS)
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
26 51 00 05/20 INTERIOR LIGHTING
26 56 00 05/20 EXTERIOR LIGHTING
DI VI SI ON 27 - COMMUNI CATI ONS
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
27 51 16 05/20 PUBLIC ADDRESS SYSTEMS
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 08 10 05/16 ELECTRONIC SECURITY SYSTEM ACCEPTANCE
TESTING
28 10 05 05/16 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DI VI SI ON 31 - EARTHWORK
31 05 19 08/08 GEOTEXTILE
31 05 22 08/08 GEOTEXTILES USED AS FILTERS
31 11 00 11/18 CLEARING AND GRUBBING
31 21 13 11/18 RADON MITIGATION
31 23 00.00 20 02/11 EXCAVATION AND FILL
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
PROJECT TABLE OF CONTENTS Page 4
32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 11 23 08/17 AGGREGATE BASE COURSES
32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR
ROADS AND SITE FACILITIES
32 14 13.13 11/19 INTERLOCKING PRECAST CONCRETE UNIT
PAVING
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 08/16 PAVEMENT MARKINGS
32 31 13.53 02/20 HIGH-SECURITY FENCES (CHAIN LINK AND
ORNAMENTAL) AND GATES
32 84 24 08/11 IRRIGATION SPRINKLER SYSTEMS
32 93 00 08/17 EXTERIOR PLANTS
DI VI SI ON 33 - UTI LI TI ES
33 01 50.31 02/20 LEAK DETECTION FOR FUELING SYSTEMS
33 11 00 02/18 WATER UTILITY DISTRIBUTION PIPING
33 30 00 05/18 SANITARY SEWERAGE
33 40 00 02/10 STORM DRAINAGE UTILITIES
33 52 10 11/18 FUEL SYSTEMS PIPING (SERVICE STATION)
33 56 10 05/19 FACTORY-FABRICATED FUEL STORAGE TANKS
33 71 02 02/15 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DI VI SI ON 34 - TRANSPORTATI ON
34 71 13.19 02/20 CRASH RATED ACTIVE VEHICLE BARRIERS
AND CONTROLS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 5
THIS PAGE INTENTIONALLY LEFT BLANK
PROJECT TABLE OF CONTENTS Page 6
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
DRAWING NAVFAC SHEET
NUMBER DRAWING DESCRIPTION
GENERAL
G-001 14089015 COVER SHEET
G-002 14089016 INDEX OF DRAWINGS 1 OF 5
G-003 14089017 INDEX OF DRAWINGS 2 OF 5
G-004 14089018 INDEX OF DRAWINGS 3 OF 5
G-005 14089019 INDEX OF DRAWINGS 4 OF 5
G-006 14089020 INDEX OF DRAWINGS 5 OF 5
G-007 14089021 FIRE PROTECTION CODE COMPLIANCE SITE PLAN
G-008 14089022 VICINITY & LOCATION MAPS
G-009 14089023 CODE ANALYSIS
G-010 14089024 CODE ANALYSIS
G-011 14089025 ROOM OCCUPANT LOAD SCHEDULE
G-012 14089026 ROOM OCCUPANT LOAD SCHEDULE
GI101 14089027 LIFE SAFETY PLAN - GROUND FLOOR
GI102 14089028 LIFE SAFETY PLAN - FIRST FLOOR
GI103 14089029 LIFE SAFETY PLAN - SECOND FLOOR
GI104 14089030 AIR BARRIER PLANS AND SECTION
CIVIL
C-001 14089031 GENERAL AND EROSION CONTROL NOTES
C-002 14089032 CIVIL LEGEND AND ABBREVIATIONS
V-001 14089033 SURVEY NOTES AND LEGEND
V-101 14089034 EXISTING CONDITIONS PLAN
C-101 14089035 EROSION AND SEDIMENT CONTROL PLAN
C-501 14089036 EROSION AND SEDIMENT CONTROL DETAILS
C-502 14089037 EROSION AND SEDIMENT CONTROL DETAILS
B-601 14089038 BORING LOGS
B-602 14089039 BORING LOGS
B-603 14089040 BORING LOGS
B-604 14089041 PERMEABILITY TEST LOGS
B-605 14089042 PERMEABILITY TEST LOGS
CD101 14089043 SITE DEMOLITION PLAN - OVERALL
CD102 14089044 SITE DEMOLITION PLAN - A
CD103 14089045 SITE DEMOLITION PLAN - B
CD104 14089046 EXISTING CONDITIONS AND DEMOLITION PLAN - TELECOM
CD105 14089047 EXISTING CONDITIONS AND DEMOLITION PLAN - TELECOM
CD106 14089048 EXISTING CONDITIONS AND DEMOLITION PLAN - TELECOM
CP101 14089049 SITE PAVING JOINTING PLAN - OVERALL
CS101 14089050 SITE LAYOUT PLAN - OVERALL
DOCUMENT 00 01 15 Page 1
CS102 14089051 SITE LAYOUT PLAN - A
CS103 14089052 SITE LAYOUT PLAN - B
CS501 14089053 SITE DETAILS
CS502 14089054 SITE DETAILS
CS503 14089055 SITE DETAILS
CS504 14089056 SITE DETAILS
CS505 14089057 SITE DETAILS
CS506 14089058 SITE DETAILS
CS507 14089059 SITE DETAILS
CS508 14089060 SITE DETAILS
CG101 14089061 SITE GRADING PLAN - OVERALL
CG102 14089062 SITE GRADING PLAN - A
CG103 14089063 SITE GRADING PLAN - B
CG201 14089064 STORM SEWER PROFILES
CG202 14089065 STORM SEWER PROFILES
CG203 14089066 STORM SEWER PROFILES
CG204 14089067 STORM SEWER PROFILES
CG501 14089068 GRADING AND DRAINAGE DETAILS
CG502 14089069 GRADING AND DRAINAGE DETAILS
CU101 14089070 SITE UTILITY PLAN - OVERALL
CU102 14089071 SITE UTILITY PLAN - A
CU103 14089072 SITE UTILITY PLAN - B
CU104 14089073 SITE UTILITY AND LAYOUT PLAN - TELECOM
CU105 14089074 SITE UTILITY AND LAYOUT PLAN - TELECOM
CU106 14089075 SITE UTILITY AND LAYOUT PLAN - TELECOM
CU201 14089076 WATER LINE PROFILES
CU210 14089077 WATERLINE AND SANITARY SEWER PROFILES
CU220 14089078 ELECTRIC DUCTBANK PROFILES
CU221 14089079 ELECTRIC DUCTBANK PROFILES
CU222 14089080 ELECTRIC DUCTBANK PROFILES
CU230 14089081 TELECOM DUCTBANK PROFILES
CU231 14089082 TELECOM DUCTBANK PROFILES
CU232 14089083 TELECOM DUCTBANK PROFILES
CU233 14089084 TELECOM DUCTBANK PROFILES
CU234 14089085 TELECOM DUCTBANK PROFILES
CU235 14089086 TELECOM DUCTBANK PROFILES
CU501 14089087 SITE UTILITY DETAILS
CU502 14089088 SITE UTILITY DETAILS
LANDSCAPE
L-101 14089089 SITE ORIENTATION PLAN
L-102 14089090 LANDSCAPE PLAN
L-103 14089091 HARDSCAPE PLAN
L-104 14089092 IRRIGATION PLAN
L-401 14089093 ENLARGEMENT PLAN FOR BREAK AREA
L-501 14089094 DETAILS LANDSCAPE
L-502 14089095 DETAILS IRRIGATION
L-503 14089096 DETAILS IRRIGATION
L-504 14089097 DETAILS BUILDING SIGNAGE
L-505 14089098 DETAILS HARDSCAPE
L-506 14089099 DETAILS SITE FURNITURE
L-601 14089100 LANDSCAPE PLANTING SCHEDULE
L-602 14089101 IRRIGATION SCHEDULE
STRUCTURAL
S-001 14089102 GENERAL STRUCTURAL NOTES
S-002 14089103 GENERAL STRUCTURAL NOTES
S-003 14089104 GENERAL STRUCTURAL NOTES
S-004 14089105 GENERAL STRUCTURAL NOTES
DOCUMENT 00 01 15 Page 2
S-101 14089106 FOUNDATION PLAN
S-102 14089107 GROUND FLOOR SLAB ON GRADE PLAN
S-103 14089108 FIRST FLOOR FRAMING PLAN
S-104 14089109 SECOND FLOOR FRAMING PLAN
S-105 14089110 ROOF FRAMING PLAN
S-106 14089111 FIRST FLOOR SLAB REINFORCING PLAN
S-107 14089112 SECOND FLOOR SLAB REINFORCING PLAN
S-108 14089113 ROOF SLAB REINFORCING PLAN
S-109 14089114 ROOF SOLAR PANEL SUPPORT FRAMING PLAN
S-201 14089115 CONCRETE WALL ELEVATIONS - DIMENSIONAL
S-202 14089116 CONCRETE WALL ELEVATIONS - DIMENSIONAL
S-203 14089117 CONCRETE WALL ELEVATIONS - DIMENSIONAL
S-204 14089118 CONCRETE WALL ELEVATIONS - DIMENSIONAL
S-205 14089119 CONCRETE WALL ELEVATIONS - DIMENSIONAL
S-211 14089120 CONCRETE WALL ELEVATIONS - REINFORCING
S-212 14089121 CONCRETE WALL ELEVATIONS - REINFORCING
S-213 14089122 CONCRETE WALL ELEVATIONS - REINFORCING
S-214 14089123 CONCRETE WALL ELEVATIONS - REINFORCING
S-215 14089124 CONCRETE WALL ELEVATIONS - REINFORCING
S-301 14089125 BUILDING SECTION
S-302 14089126 BUILDING SECTION
S-401 14089127 STAIR 1 FRAMING PLANS
S-402 14089128 STAIR 2 FRAMING PLANS
S-403 14089129 STAIR 2 ROOF FRAMING PLAN AND DETAILS
S-404 14089130 ELEVATOR PLANS
S-405 14089131 GENERATOR BUILDING
S-406 14089132 ROOF PLATFORMS AND DOGHOUSES
S-407 14089133 SOLAR CARPORT FOUNDATION PLANS
S-408 14089134 SOLAR CARPORT FRAMING PLANS
S-409 14089135 UTILITY ENCLOSURE FOUNDATION PLAN
S-501 14089136 CONCRETE SECTIONS AND DETAILS
S-502 14089137 CONCRETE SECTIONS AND DETAILS
S-503 14089138 CONCRETE SECTIONS AND DETAILS
S-504 14089139 CONCRETE SECTIONS AND DETAILS
S-505 14089140 CONCRETE SECTIONS AND DETAILS
S-506 14089141 CONCRETE SECTIONS AND DETAILS
S-507 14089142 CONCRETE SECTIONS AND DETAILS
S-511 14089143 CONCRETE SECTIONS AND DETAILS
S-512 14089144 CONCRETE SECTIONS AND DETAILS
S-513 14089145 CONCRETE SECTIONS AND DETAILS
S-521 14089146 CONCRETE SECTIONS AND DETAILS
S-522 14089147 CONCRETE SECTIONS AND DETAILS
S-523 14089148 CONCRETE SECTIONS AND DETAILS
S-524 14089149 CONCRETE SECTIONS AND DETAILS
S-525 14089150 CONCRETE SECTIONS AND DETAILS
S-531 14089151 STEEL SECTIONS AND DETAILS
S-532 14089152 STEEL SECTIONS AND DETAILS
S-533 14089153 STEEL SECTIONS AND DETAILS
S-534 14089154 STEEL SECTIONS AND DETAILS
ARCHITECTURAL
A-001 14089153 GENERAL NOTES / ABBREVIATIONS
AD101 14089154 DEMOLITION PLAN - BUILDING 4
A-101 14089155 FLOOR PLAN - GROUND FLOOR – DIMENSIONAL
A-102 14089156 FLOOR PLAN - FIRST FLOOR – DIMENSIONAL
A-103 14089157 FLOOR PLAN - SECOND FLOOR – DIMENSIONAL
A-111 14089158 FLOOR PLAN - GROUND FLOOR – ANNOTATIVE
A-112 14089159 FLOOR PLAN - FIRST FLOOR – ANNOTATIVE
A-113 14089160 FLOOR PLAN - SECOND FLOOR – ANNOTATIVE
DOCUMENT 00 01 15 Page 3
A-121 14089161 REFLECTED CEILING PLAN - GROUND FLOOR
A-122 14089162 REFLECTED CEILING PLAN - FIRST FLOOR
A-123 14089163 REFLECTED CEILING PLAN - SECOND FLOOR
A-131 14089164 ROOF PLAN
A-201 14089165 EXTERIOR ELEVATIONS
A-202 14089166 EXTERIOR ELEVATIONS
A-301 14089167 BUILDING SECTIONS
A-311 14089168 WALL SECTIONS
A-312 14089169 WALL SECTIONS
A-401 14089170 ENLARGED PLANS - RESTROOMS
A-402 14089171 ENLARGED PLANS - LOBBY
A-403 14089172 ENLARGED PLANS - CONFERENCE ROOMS
A-404 14089173 ENLARGED PLANS - CONFERENCE ROOMS
A-405 14089174 RESTROOM ACCESSORIES
A-411 14089175 ENLARGED PLAN - GENERATOR ENCLOSURE
A-412 14089176 ENLARGED PLAN - UTILITY ENCLOSURE
A-413 14089177 ENLARGED REFLECTED CEILING PLANS - PENTHOUSE
A-421 14089178 VERTICAL CIRCULATION - ELEVATOR PLANS
A-422 14089179 VERTICAL CIRCULATION - ELEVATOR SECTIONS
A-423 14089180 VERTICAL CIRCULATION - STAIR 1 PLANS
A-424 14089181 VERTICAL CIRCULATION - STAIR 1 SECTION
A-425 14089182 VERTICAL CIRCULATION - STAIR 2 PLANS
A-426 14089183 VERTICAL CIRCULATION - STAIR 2 SECTION
A-501 14089184 PLAN DETAILS
A-502 14089185 PLAN DETAILS
A-503 14089186 PLAN DETAILS
A-504 14089187 PLAN DETAILS
A-511 14089188 SECTION DETAILS
A-512 14089189 SECTION DETAILS
A-513 14089190 SECTION DETAILS
A-515 14089191 CANOPY DETAILS
A-521 14089192 CEILING DETAILS
A-531 14089193 ROOF DETAILS
A-541 14089194 STAIR DETAILS
A-542 14089195 STAIR DETAILS
A-551 14089196 MISCELLANEOUS DETAILS
A-601 14089197 PARTITION TYPES
A-602 14089198 PARTITION DETAILS
A-611 14089199 DOOR AND WINDOW SCHEDULE
A-612 14089200 DOOR SCHEDULE
A-631 14089201 EXTERIOR DOOR DETAILS
A-632 14089202 INTERIOR DOOR DETAILS
A-633 14089203 INTERIOR DOOR DETAILS
A-641 14089204 WINDOW DETAILS
A-642 14089205 LOUVER SCHEUDLE/DETAILS
A-650 14089206 PENETRATION DETAILS
INTERIORS
I-001 14089207 GENERAL NOTES AND ABBREVIATIONS
I-002 14089208 STANDARD MOUNTING HEIGHTS
I-003 14089209 STANDARD MOUNTING HEIGHTS
I-101 14089210 FINISH PLAN - GROUND FLOOR - OVERALL
I-102 14089211 FINISH PLAN - FIRST FLOOR - OVERALL
I-103 14089212 FINISH PLAN - SECOND FLOOR - OVERALL
I-201 14089213 INTERIOR ELEVATIONS
I-401 14089214 ENLARGED FINISH PLANS
I-402 14089215 ENLARGED FINISH PLANS
I-501 14089216 CASEWORK DETAILS
I-502 14089217 INTERIOR FLOOR FINISH DETAILS
DOCUMENT 00 01 15 Page 4
I-503 14089218 INTERIOR WALL FINISH DETAILS
I-601 14089219 COLOR AND MATERIALS SCHEDULE
I-602 14089220 ROOM FINISH SCHEDULE
I-603 14089221 ROOM FINISH SCHEDULE
IF101 14089222 FURNITURE PLAN - GROUND FLOOR - OVERALL
IF102 14089223 FURNITURE PLAN - FIRST FLOOR - OVERALL
IF103 14089224 FURNITURE PLAN - SECOND FLOOR - OVERALL
IF201 14089225 INTERIOR FURNITURE ELEVATIONS
IF401 14089226 ENLARGED FURNITURE PLANS
IG101 14089227 SIGNAGE PLAN - GROUND FLOOR - OVERALL
IG102 14089228 SIGNAGE PLAN - FIRST FLOOR - OVERALL
IG103 14089229 SIGNAGE PLAN - SECOND FLOOR - OVERALL
IG401 14089230 ENLARGED SIGNAGE PLANS
IG501 14089231 SIGNAGE DETAILS
IG502 14089232 SIGNAGE DETAILS
IG503 14089233 SIGNAGE DETAILS
IG601 14089234 SIGNAGE SCHEDULE
IG602 14089235 SIGNAGE SCHEDULE
IG603 14089236 SIGNAGE SCHEDULE
IG604 14089237 SIGNAGE SCHEDULE
IG605 14089238 SIGNAGE SCHEDULE
FIRE PROTECTION
F-001 14089239 FIRE PROTECTION GENERAL NOTES & ABBREVIATIONS
F-002 14089240 FIRE PROTECTION SYMBOLS AND REQUIREMENTS
F-101 14089241 FIRE PROTECTION PLAN - GROUND FLOOR
F-102 14089242 FIRE PROTECTION PLAN - FIRST FLOOR
F-103 14089243 FIRE PROTECTION PLAN - SECOND FLOOR
F-301 14089244 BUILDING SECTION
F-401 14089245 ENLARGED FIRE RISER ROOM
F-402 14089246 ENLARGED CLEAN AGENT SUPPRESSION SYSTEMS
F-403 14089247 ENLARGED CLEAN AGENT SUPPRESSION SYSTEMS
F-414 14089248 GENERATOR ENCLOSURE - FIRE PROTECTION
F-501 14089249 FIRE PROTECTION DETAILS
F-502 14089250 FIRE PROTECTION DETAILS
F-503 14089251 FIRE PROTECTION DETAILS
F-504 14089252 FIRE PROTECTION DETAILS
FIRE ALARM
FA001 14089253 FIRE ALARM LEGEND
FA101 14089254 FIRE ALARM PLAN - GROUND FLOOR
FA102 14089255 FIRE ALARM PLAN - FIRST FLOOR
FA103 14089256 FIRE ALARM PLAN - SECOND FLOOR
FA414 14089257 GENERATOR ENCLOSURE - FIRE ALARM PLAN
FA501 14089258 FIRE ALARM DETAILS
FA502 14089259 FIRE ALARM DETAILS
FA503 14089260 FIRE ALARM DETAILS
FA504 14089261 FIRE ALARM DETAILS
FA601 14089262 ACCOUSTICAL SCHEDULE
PLUMBING
P-001 14089263 SYMBOLS
P-002 14089264 LEGEND AND ABBREVIATIONS
P-101U 14089265 PLUMBING UNDERFLOOR PLAN
P-101 14089266 PLUMBING PLAN - GROUND FLOOR
P-102 14089267 PLUMBING PLAN - FIRST FLOOR
P-103 14089268 PLUMBING PLAN - SECOND FLOOR
P-104 14089269 PLUMBING ROOF PLAN
P-401 14089270 PLUMBING ENLARGED PLANS
DOCUMENT 00 01 15 Page 5
P-402 14089271 PLUMBING ENLARGED PLANS
P-501 14089272 PLUMBING DETAILS
P-502 14089273 PLUMBING DETAILS
P-503 14089274 PLUMBING DETAILS
P-504 14089275 RADON GAS DETAILS
P-505 14089276 PLUMBING DETAILS
P-601 14089277 PLUMBING SCHEDULES
P-602 14089278 PLUMBING SCHEDULES
P-701 14089279 RISER DIAGRAM - SANITARY SEWER
P-702 14089280 RISER DIAGRAM - DOMESTIC WATER
P-801 14089281 SEQUENCE OF OPERATIONS
P-901 14089282 FUELING PLAN
P-902 14089283 FUELING DETAILS
P-903 14089284 FUELING DETAILS
MECHANICAL
M-001 14089285 GENERAL NOTES / ABBREVIATIONS
MH101 14089286 HVAC FLOOR PLANS - GROUND FLOOR
MH102 14089287 HVAC FLOOR PLANS - FIRST FLOOR
MH103 14089288 HVAC FLOOR PLANS - SECOND FLOOR
MH104 14089289 HVAC ROOF PLAN
MP101U 14089290 MECH PIPING PLAN - GROUND LEVEL RAISED FLR
MP101 14089291 MECH PIPING FLOOR PLAN - GROUND FLOOR
MP102 14089292 MECH PIPING FLOOR PLAN - FIRST FLOOR
MP103U 14089293 MECH PIPING PLAN - SECOND LEVEL RAISED FLR
MP103 14089294 MECH PIPING FLOOR PLAN - SECOND FLOOR
MP104 14089295 MECHANICAL PIPING ROOF PLAN
M-301 14089296 MECHANICAL SECTIONS
M-302 14089297 MECHANICAL SECTIONS
M-401 14089298 MECHANICAL ENLARGED PLANS
M-402 14089299 MECHANICAL ENLARGED PLANS
M-501 14089300 MECHANICAL DETAILS
M-502 14089301 MECHANICAL DETAILS
M-503 14089302 MECHANICAL DETAILS
M-504 14089303 MECHANICAL DETAILS
M-505 14089304 MECHANICAL DETAILS
M-506 14089305 MECHANICAL DETAILS
M-507 14089306 MECHANICAL DETAILS
M-508 14089307 MECHANICAL DETAILS
M-509 14089308 MECHANICAL DETAILS
M-510 14089309 MECHANICAL DETAILS
M-511 14089310 MECHANICAL DETAILS
M-512 14089311 MECHANICAL DETAILS
M-513 14089312 MECHANICAL DETAILS
M-514 14089313 MECHANICAL DETAILS
M-515 14089314 MECHANICAL DETAILS
M-516 14089315 MECHANICAL DETAILS
M-601 14089316 MECHANICAL SCHEDULES
M-602 14089317 MECHANICAL SCHEDULES
M-603 14089318 MECHANICAL SCHEDULES
M-604 14089319 MECHANICAL SCHEDULES
M-605 14089320 MECHANICAL SCHEDULES
M-606 14089321 MECHANICAL SCHEDULES
M-607 14089322 MECHANICAL SCHEDULES
M-608 14089323 MECHANICAL SCHEDULES
M-609 14089324 MECHANICAL SCHEDULES
M-701 14089325 HVAC AIRFLOW SCHEMATIC - AHU
M-702 14089326 HVAC AIRFLOW SCHEMATIC - DOAS
M-703 14089327 CHILLED WATER FLOW DIAGRAM
DOCUMENT 00 01 15 Page 6
M-704 14089328 HEATING WATER FLOW DIAGRAM
M-705 14089329 AIR HANDLING UNIT (AHU-1) ISOMETRIC VIEW
M-706 14089330 DEDICATED OA SYSTEM (DOAS-1) ISOMETRIC VIEW
M-707 14089331 CHILLED WATER ISOMETRIC VIEW
M-708 14089332 HEATING WATER ISOMETRIC VIEW
M-801 14089333 DDC FUNCTIONAL BLOCK DIAGRAM
M-802 14089334 CONTROL DIAGRAMS AND SEQUENCE - AHU
M-803 14089335 CONTROL DIAGRAMS AND SEQUENCE - AHU
M-804 14089336 CONTROL DIAGRAMS AND SEQUENCE - AHU
M-805 14089337 CONTROL DIAGRAMS AND SEQUENCE - DOAS
M-806 14089338 CONTROL DIAGRAMS AND SEQUENCE - DOAS
M-807 14089339 OUTSIDE AIR WEATHER STATION
M-808 14089340 CHILLED WATER SYSTEM - DIAGRAM AND I/O POINTS
M-809 14089341 CHILLED WATER SYSTEM - DIAGRAM AND I/O POINTS
M-810 14089342 CHILLED WATER SYSTEM - SEQUENCE OF OPERATIONS
M-811 14089343 CHILLED WATER SYSTEM - SEQUENCE OF OPERATIONS
M-812 14089344 HEATING WATER SYSTEM-DIAGRAM AND I/O POINTS
M-813 14089345 HEATING WATER SYSTEM - SEQUENCE OF OPERATIONS
M-814 14089346 COMPUTER ROOM AIR HANDLER UNIT (CRAHU)
M-815 14089347 CONTROL DIAGRAMS AND SEQUENCE - FCU
M-816 14089348 CONTROL DIAGRAMS AND SEQUENCE - ATFP & BH & UH
M-817 14089349 CONTROL DIAGRAM & SEQUENCE - EF
M-818 14089350 CONTROL DIAGRAM & SEQUENCE - EF
M-819 14089351 CONTROL DIAGRAMS AND SEQUENCE - VAV & ATFP
M-820 14089352 HVAC CONTROL DIAGRAMS AND SEQUENCE - FPB
M-821 14089353 HVAC CONTROL DIAGRAMS AND SEQUENCE - FPB
M-822 14089354 CONTROL DIAGRAMS AND SEQUENCE-GENERATORS EF
M-823 14089355 COMPUTER ROOM AIR CONDITIONER (CRAC)
ELECTRICAL
E-001 14089356 ELECTRICAL ABBREVIATIONS
E-002 14089357 ELECTRICAL LEGEND
E-003 14089358 ELECTRICAL LEGEND
E-004 14089359 ELECTRICAL LEGEND
ED101 14089360 SITE DEMOLITION PLAN
ED401 14089361 SUBSTATION 8 - ENLARGED SITE DEMOLITION PLAN
ED402 14089362 SUBSTATION 1 - ENLARGED SITE DEMOLITION PLAN
ES101 14089363 SITE PLAN - OVERALL
ES102 14089364 ELECTRICAL SITE PLAN - A
ES103 14089365 ELECTRICAL SITE PLAN - B
ES104 14089366 ELECTRICAL SITE PLAN
ES105 14089367 ELECTRICAL SITE PLAN
ES106 14089368 ELECTRICAL SITE PLAN
ES401 14089369 SUBSTATION 8 - ENLARGED SITE POWER PLAN
ES402 14089370 SUBSTATION 1 - ENLARGED SITE POWER PLAN
EG101 14089371 LIGHTNING PROTECTION PLAN
EG102 14089372 GROUNDING PLAN - GROUND FLOOR
EG103 14089373 GROUNDING PLAN - FIRST FLOOR
EG104 14089374 GROUNDING PLAN - SECOND FLOOR
EG105 14089375 GROUNDING PLAN - ROOF
EL101 14089376 LIGHTING PLAN - GROUND FLOOR
EL102 14089377 LIGHTING PLAN - FIRST FLOOR
EL103 14089378 LIGHTING PLAN - SECOND FLOOR
EP101 14089379 POWER PLAN - GROUND FLOOR
EP102 14089380 POWER PLAN - FIRST FLOOR
EP103 14089381 POWER PLAN - SECOND FLOOR
EP104 14089382 LIGHTING AND POWER PLAN - ROOF
EY101 14089383 EQUIPMENT CONNECTION PLAN - GROUND FLOOR
EY102 14089384 EQUIPMENT CONNECTION PLAN - FIRST FLOOR
DOCUMENT 00 01 15 Page 7
EY103 14089385 EQUIPMENT CONNECTION PLAN - SECOND FLOOR
EY104 14089386 EQUIPMENT CONNECTION PLAN - ROOF
E-201 14089387 ELEVATION ELECTRICAL PLANS
E-202 14089388 ELEVATION ELECTRICAL PLANS
E-301 14089389 SECTION ELECTRICAL PLANS
E-401 14089390 ENLARGED ELECTRICAL PLANS
E-402 14089391 ENLARGED ELECTRICAL PLANS
E-403 14089392 ENLARGED ELECTRICAL PLANS
E-404 14089393 ENLARGED ELECTRICAL PLANS
E-405 14089394 ENLARGED ELECTRICAL PLANS
E-406 14089395 ENLARGED ELECTRICAL PLANS
E-501 14089396 ELECTRICAL DETAILS
E-502 14089397 ELECTRICAL DETAILS
E-503 14089398 ELECTRICAL DETAILS
E-504 14089399 ELECTRICAL DETAILS
E-505 14089400 ELECTRICAL DETAILS
E-506 14089401 ELECTRICAL DETAILS
E-507 14089402 ELECTRICAL DETAILS
E-508 14089403 ELECTRICAL DETAILS
E-509 14089404 ELECTRICAL DETAILS
E-510 14089405 ELECTRICAL DETAILS
E-511 14089406 ELECTRICAL DETAILS
E-512 14089407 ELECTRICAL DETAILS
E-513 14089408 SUBSTATION DETAILS
E-514 14089409 SUBSTATION DETAILS
E-515 14089410 ELECTRICAL DETAILS
E-601 14089411 SUBSTATION ONE-LINE DIAGRAM
E-602 14089412 SINGLE LINE DIAGRAM - MSG-A
E-603 14089413 SINGLE LINE DIAGRAM - MSG-B
E-604 14089414 SINGLE LINE DIAGRAM - UPS-A
E-605 14089415 SINGLE LINE DIAGRAM - UPS-B
E-606 14089416 GROUNDING AND PV ONE LINES
E-607 14089417 SUBSTATION 1 & 8, SINGLE LINE DIAGRAM AND WIRING DETAILS
E-701 14089418 LUMINAIRE SCHEDULES
E-702 14089419 LUMINAIRE CONTROL MATRIX
E-703 14089420 EQUIPMENT CONNECTION SCHEDULE
E-704 14089421 EQUIPMENT CONNECTION SCHEDULE
E-705 14089422 EQUIPMENT CONNECTION SCHEDULE
E-706 14089423 DUCT BANK AND CONDUIT SCHEDULE
E-707 14089424 ELECTRICAL PANEL SCHEDULES
E-708 14089425 ELECTRICAL PANEL SCHEDULES
E-709 14089426 ELECTRICAL PANEL SCHEDULES
E-710 14089427 ELECTRICAL PANEL SCHEDULES
E-711 14089428 ELECTRICAL PANEL SCHEDULES
E-712 14089429 ELECTRICAL PANEL SCHEDULES
E-713 14089430 ELECTRICAL PANEL SCHEDULES
E-714 14089431 ELECTRICAL PANEL SCHEDULES
E-715 14089432 ELECTRICAL PANEL SCHEDULES
E-716 14089433 ELECTRICAL PANEL SCHEDULES
E-717 14089434 ELECTRICAL PANEL SCHEDULES
E-718 14089435 ELECTRICAL PANEL SCHEDULES
E-719 14089436 SUBSTATION 1 & 8 SCHEDULES
TELECOM
T-001 14089437 TELECOMMUNICATIONS LEGEND
T-002 14089438 TELECOM GENERAL NOTES & ABBREVIATIONS
TD101 14089439 SITE TELECOMMUNICATIONS DEMOLITION PLAN - OVERALL
TD501 14089440 TELECOMMUNICATIONS SITE DEMO PLAN - DETAILS
TD701 14089441 DEMOLITION OSP CABLE SCHEDULE
DOCUMENT 00 01 15 Page 8
TS051 14089442 TELECOMMUNICATIONS SITE FIBER PLAN - OVERALL PLAN
TS052 14089443 TELECOMMUNICATIONS SITE FIBER PLAN - SECTOR 052
TS053 14089444 TELECOMMUNICATIONS SITE FIBER PLAN - SECTOR 053
TS054 14089445 TELECOMMUNICATIONS SITE FIBER PLAN - SECTOR 054
TS055 14089446 TELECOMMUNICATIONS SITE FIBER PLAN - SECTOR 055
TS056 14089447 TELECOMMUNICATIONS SITE FIBER PLAN - SECTOR 056
TS057 14089448 TELECOMMUNICATIONS SITE FIBER PLAN - SECTOR 057
TS058 14089449 TELECOMMUNICATIONS SITE FIBER PLAN - SECTOR 058
TS059 14089450 TELECOMMUNICATIONS SITE FIBER PLAN - SECTOR 059
TS060 14089451 TELECOMMUNICATIONS SITE FIBER PLAN - SECTOR 0606
TS061 14089452 TELECOMMUNICATIONS SITE FIBER PLAN - SECTOR 061
TS062 14089453 TELECOMMUNICATIONS SITE FIBER PLAN - SECTOR 062
TS063 14089454 TELECOMMUNICATIONS SITE FIBER PLAN - SECTOR 063
TS064 14089455 TELECOMMUNICATIONS SITE FIBER PLAN - SECTOR 064
TS065 14089456 TELECOMMUNICATIONS SITE FIBER PLAN - SECTOR 065
TS066 14089457 TELECOMMUNICATIONS SITE FIBER PLAN - SECTOR 066
TS067 14089458 TELECOMMUNICATIONS SITE FIBER PLAN - SECTOR 067
TS068 14089459 TELECOMMUNICATIONS SITE FIBER PLAN - ASOS PAD
TS101 14089460 TELECOMMUNICATIONS SITE FIBER PLAN - OVERALL
TS102 14089461 TELECOMMUNICATIONS SITE PLAN - A
TS103 14089462 TELECOMMUNICATIONS SITE PLAN - B
TS104 14089463 SITE UTILITY PLAN - TELECOM
TS105 14089464 SITE UTILITY PLAN - TELECOM
TS106 14089465 SITE UTILITY AND LAYOUT PLAN - TELECOM
T-101 14089466 TELECOMMUNICATIONS PLAN - GROUND FLOOR
T-102 14089467 TELECOMMUNICATIONS PLAN - FIRST FLOOR
T-103 14089468 TELECOMMUNICATIONS PLAN - SECOND FLOOR
T-104 14089469 TELECOMMUNICATIONS PLAN - ROOF LEVEL
T-105 14089470 TELECOMMUNICATIONS PAGING PLAN - FIRST FLOOR
T-106 14089471 TELECOMMUNICATIONS PAGING PLAN - SECOND FLOOR
T-201 14089472 DEMARC 1 ELEVATIONS
T-202 14089473 DEMARC 2 ELEVATIONS
T-203 14089474 N6 EQUIPMENT ELEVATIONS
T-204 14089475 N9 EQUIPMENT ELEVATIONS
T-205 14089476 N9 EQUIPMENT ELEVATIONS
T-206 14089477 N9 EQUIPMENT ELEVATIONS
T-207 14089478 FLEET CYBER ELEVATIONS
T-208 14089479 OFFICE ROOM ELEVATIONS
T-209 14089480 ELEVATIONS
T-210 14089481 ELEVATIONS
T-401 14089482 DEMARC 1 ENLARGED PLANS
T-402 14089483 DEMARC 2 ENLARGED PLANS
T-403 14089484 N6 EQUIPMENT ENLARGED PLANS
T-404 14089485 TR G-1 ENLARGED PLANS AND ELEVATIONS
T-405 14089486 TR 1-1 ENLARGED PLANS AND ELEVATIONS
T-406 14089487 TR 2-1 ENLARGED PLANS AND ELEVATIONS
T-407 14089488 N9 EQUIPMENT ENLARGED PLAN
T-408 14089489 N9 EQUIPMENT ENLARGED RUNWAY PLAN
T-409 14089490 FLEET CYBER ENLARGED PLANS
T-410 14089491 CONFERENCE ROOM ENLARGED PLANS
T-411 14089492 CONFERENCE ROOM ENLARGED PLANS
T-412 14089493 NETWORK DISTRIBUTION AREA ENLARGED PLANS
T-501 14089494 TELECOMMUNCATION DETAILS
T-502 14089495 TELECOMMUNCATION DETAILS
T-503 14089496 TELECOMMUNICATION DETAILS
T-504 14089497 TELECOMMUNICATION DETAILS
T-505 14089498 TELECOMMUNICATION DETAILS
T-506 14089499 TELECOMMUNCATION DETAILS
T-507 14089500 TELECOMMUNCATION DETAILS
DOCUMENT 00 01 15 Page 9
T-508 14089501 TELECOMMUNCATION DETAILS
T-509 14089502 TELECOMMUNCATION DETAILS
T-520 14089503 TELECOMMUNICATIONS DETAILS
T-521 14089504 TELECOMMUNICATIONS DETAILS
T-522 14089505 BUTTERFLY DIAGRAMS
T-523 14089506 BUTTERFLY DIAGRAMS
T-601 14089507 PREMISE FIBER RISER DIAGRAM
T-602 14089508 PREMISE COPPER RISER DIAGRAM
T-603 14089509 BUILDING BACKBONE PATHWAY DIAGRAM
T-604 14089510 OSP BACKBONE COPPER DIAGRAMS
T-605 14089511 HORIZONTAL CABLING DIAGRAM
T-606 14089512 AUXILIARY SYSTEMS ONE-LINE DIAGRAMS
T-701 14089513 N6 EQUIPMENT ROOM CABLE SCHEDULE
T-702 14089514 N9 EQUIPMENT ROOM CABLE SCHEDULE
T-703 14089515 PREMISE BACKBONE CABLE SCHEDULE
T-704 14089516 TELECOMMUNICATIONS SITE CABLE SCHEDULE
T-705 14089517 TELECOMMUNICATIONS SITE CABLE SCHEDULE
T-706 14089518 TELECOMMUNICATIONS SITE CABLE SCHEDULE
T-707 14089519 TELECOMMUNICATIONS CABLE SCHEDULE
TU101 14089520 TELECOMMUNICATIONS PLAN - UNDERSLAB
TT101 14089521 TELECOM RACEWAY PLAN - GROUND FLOOR
TT102 14089522 TELECOM RACEWAY PLAN - FIRST FLOOR
TT103 14089523 TELECOM RACEWAY PLAN - SECOND FLOOR
SECURITY
TY001 14089524 ESS LEGEND, GENERAL NOTES AND ABBREVIATIONS
TY101 14089525 ESS FLOOR PLAN - GROUND FLOOR
TY102 14089526 ESS FLOOR PLAN - FIRST FLOOR
TY103 14089527 ESS FLOOR PLAN - SECOND FLOOR
TY104 14089528 ESS FLOOR PLAN - ROOF LEVEL
TY201 14089529 ESS ELEVATIONS
TY501 14089530 ESS DETAILS
TY502 14089531 ESS DETAILS
TY503 14089532 ESS DETAILS
TY504 14089533 ESS DETAILS
TY505 14089534 ESS DETAILS
TY601 14089535 ESS RISER DIAGRAM
TY602 14089536 ESS DIAGRAM - GROUND AND FIRST FLOOR
TY603 14089537 ESS DIAGRAM - SECOND FLOOR
1.3 SUPPLEMENTARY DRAWINGS
These supplementary drawings may not be a part of the contract but are included with the drawings for information.
1.3.1 Reference Drawings
The following reference drawings are intended only to show the original construction. Drawings are the property of the Government and shall not be used for any purpose other than that intended by the contract.
NCTAMS Phase 1
G-001 TITLE SHEET
C-001 TOPOGRAPHICAL SURVEY
A-001 LEGENDS AND GENERAL NOTES
AE101 DEMOLITION PLAN
AE102 NEW LAYOUT PLANS
AE103 SECTIONS - DETAILS
AE104 DETAILS
DOCUMENT 00 01 15 Page 10
M-001 SYMBOLS-ABBREVIATIONS-SCHEDULES
M-101 MECHANICAL-MODIFICATIONS AND NEW WORK
E-001 ELECTRICAL-MODIFICATIONS AND NEW WORK
E-002 ELECTRICAL - RAISED FLOOR
NCTAMS Phase 2
G-001 TITLE SHEET
G-002 INDEX OF DRAWINGS
C-001 TOPOGRAPHICAL SURVEY AND DEMOLITION PLAN
C-002 NEW LAYOUT PLAN
C-301 DETAILS
C-302 DETAILS
CU101 EXISTING SITE UTILITIES AND MODIFICATIONS
CU102 NEW SITE UTILITIES
CU501 DETAILS
A-001 LEGENDS AND GENERAL NOTES
AE101 GROUND FLOOR PLAN
AE102 ROOF PLAN
AE201 BUILDING ELEVATIONS
AE301 BUILDING SECTIONS
AE401 REFLECTED CEILING PLAN
AE402 WALL DETAILS
AE403 ENLARGED PLANS
AE501 PARTITION TYPES
AE502 PARTITION TYPES DETAILS
AE503 MISCELLANEOUS DETAILS
AE601 DOOR SCHEDULE AND WINDOW DETAILS
AE701 DOOR DETAILS
AE801 SUSP. CEILING DETAILS
AE802 INTERIOR ELEVATIONS
AF401 GROUND FLOOR FINISH PLAN
AF601 FINISH SCHEDULE & NOTES
S-001 GENERAL NOTES AND LEGEND
S-101 FOUNDATION FORM PLAN
S-102 SLAB ON GRADE FORM PLAN
S-103 CONCRETE WALL FORM PLAN
S-104 ROOF FORM PLAN
M-001 LEGEND, NOTES AND ABBREVIATIONS
M-002 GENERAL NOTES
MH101 HVAC-GROUND AND ROOF PLAN DUCTWORK
MP101 HVAC-GROUND AND ROOF PLAN PIPING
MH301 SECTIONS
M-501 DETAILS
M-502 DETAILS
M-601 SCHEDULES
M-701 CONTROL DIAGRAMS
P-001 LEGEND, NOTES, ABBREVIATIONS AND SCHEDULES
PL101 GROUND FLOOR PLAN-WASTE AND WATER
PL201 WASTE AND WATER PIPING DIAGRAMS
PL501 DETAILS-SECTIONS
E-001 ELECTRICAL LEGEND
ES101 EXISTING ELECTRICAL SITE PLAN
ES102 NEW ELECTRICAL SITE PLAN
ES103 GROUNDING PLAN AND DETAILS
E-101 GROUND FLOOR PLAN - LIGHTING AND SYSTEMS
E-102 GROUND AND ROOF FLOOR PLANS - POWER
E-103 GROUND FLOOR PLAN - FIRE ALARM
E-501 LIGHTING FIXTURE DETAILS
E-502 LIGHTING FIXTURE DETAILS
DOCUMENT 00 01 15 Page 11
E-601 PANELBOARD SCHEDULE
E-701 COMMUNICATIONS, POWER AND TV RISER DIAGRAMS
-- End of Document --
DOCUMENT 00 01 15 Page 12
DOCUMENT 00 73 04
SUPPLEMENTARY CONDITIONS FOR PROJECTS IN MEDITERRANEAN AREA
08/08
PART 1 GENERAL
1.1 PUBLIC RELEASE OF INFORMATION
1.1.1 Prohibition
There shall be no public release of information or photographs concerning any aspect of the materials or services relating to this bid, contract, or purchase order or other documents resulting therefrom without the prior written approval of the Contracting Officer.
1.1.2 Subcontracts and Purchase Orders
The Contractor agrees to insert the substance of above paragraph "Prohibition" in each subcontract and purchase order generated for this contract.
1.2 ENGLISH SPEAKING REPRESENTATIVE
At all times when any performance of the work at the site is being conducted by any employee of the Contractor or his subcontractors, the Contractor shall have a representative present on the site who is capable of explaining the work operations and receiving instructions in the English language. The Contracting Officer shall have the right to determine without appeal of such decision, whether the proposed representative has sufficient technical and lingual capabilities and the Contractor shall immediately replace any individual not acceptable to the Contracting Officer. The Construction Contractor's qualified Project Manager, on-site Superintendent, Quality Control Manager, and Quality Control Specialist shall be fluent (can read, speak, and write) in both English and Greek languages.
1.3 NORMS AND LAWS
In case of differences between project specifications or the accompanying drawings and referenced norms and laws, norms and laws shall govern. In case of differences between project specifications and the accompanying drawings, the specifications shall govern.
1.4 INDUSTRY STANDARDS
When both U.S. and European, or Greek, Industry Standards are applicable to this project and the standards are in conflict with each other, the most stringent of the industry shall govern.
1.5 PROHIBITED ITEMS
Use of the following items in this construction project is prohibited:
a. Use of aluminum for electrical conductors.
b. Embedding aluminum conduit in concrete.
DOCUMENT 00 73 04 Page 1
c. Use of fluorescent light ballasts and other products containing PCB's.
d. Use of urea-formaldehyde foam insulation products.
e. Use of any paint/coatings having a lead content of over 0.06 percent by weight of non-volatile content. The use of ozone depleting chemicals is prohibited. The use of zinc-chromate is prohibited.
f. The use of materials containing asbestos is prohibited.
1.6 PROPRIETARY NAMES
Manufacturer's proprietary names indicated for colors, textures and patterns of materials are for the purpose of color, texture and pattern selection only. Other manufacturers materials are acceptable and provided they closely approximate colors, textures and patterns indicated and provided they conform to all other requirements subject to Contracting Officer's approval.
1.7 SUBMITTAL OF PROOF OF QUALIFICATIONS AND EXPERIENCE
Where qualifications or experience requirements are set forth in the specifications with respect to equipment and equipment installers, written proof of such qualifications or experience must be provided within thirty
(30) calendar days after Contract award, and before placing any order for such equipment or before dispatching equipment installers to the project site.
1.8 ORAL MODIFICATION
No oral statement of any person other than the Contracting Officer as provided in the clause in this Contract entitled FAR 52.243-4 Changes shall in any manner or degree modify or otherwise affect the terms of this Contract.
1.9 NO WAIVER BY GOVERNMENT
The failure of the Government, in any one or more instances, to insist upon the strict performance of any of the terms of this Contract or to exercise any option herein conferred shall not be construed as a waiver or relinquishment to any extent of the right to assert or rely upon such terms or option on any future occasion.
1.10 PRODUCTS SPECIFIED USING USA STANDARDS
1.10.1 Consignment, Marking, and Customs Clearance
In order for the Contractor to be exempt from paying duty on material or equipment to be imported for incorporation into the contract work, all shipments shall be consigned to the OICC/ROICC and marked for the contract by contract number. Additionally, the Contractor shall supply to the OICC/ROICC with certified copies of the confirmed material/equipment orders and invoices in order that the duty free customs clearance may be accomplished. Failure on the part of the Contractor to comply with the requirements herein will not be grounds for non-enforcement of the provisions of the Clause, "Taxes" of the Contract Clauses.
DOCUMENT 00 73 04 Page 2
1.10.2 Excess
The Contractor shall furnish to the Contracting Officer, just prior to completion of this contract, a consolidated inventory of all excess supplies, materials, and equipment imported duty free for use under this contract. The Contract shall either pay required duties on the excesses or re-export the excesses.
1.11 FINAL GOVERNING STANDARDS (FGS)
Final Governing Standards (FGS) for environmental protection at DOD installations and facilities in Greece went into effect June 1994. These standards were developed by comparing and adopting the more protective requirements of the Overseas Environmental Baseline Guidance Document (OEBGD), European Union and national, regional, and local environmental laws and regulations. The FGS are applicable to work under this contract. The FGS (both English and local language versions) may be reviewed at the ROICC Office during normal business hours.
1.12 SECURITY REQUIREMENTS
The Contractor shall be responsible for furnishing each employee, and for requiring that each employee engaged in the project, display such identification as may be approved and directed by the Contracting Officer.
Every employee of the prime contractor, all subcontractor employees, and all material suppliers' employees, who require access to the base for any reason and for any length of time will be required to obtain a base access pass.
1.12.1 Contractor Employee Base Access Pass:
The Contractor shall be responsible for furnishing and requiring that each person employed in connection with this contract or any subcontract hereunder, be provided with a valid/current Contractor Employee Base Access Pass. All prescribed identification shall be immediately delivered and/or surrendered to the Contracting Officer for cancellation upon: (1) termination or release of any employee; (2) termination or completion of contract.
1.12.2 Contractor Employee Base Access Pass:
The Contractor shall be responsible for furnishing and requiring that each person employed in connection with this contract or any subcontract hereunder, be provided with a valid/current Contractor Employee Base Access Pass.
Every 30 days, the Contractor shall submit a list of personnel who have badges. In order to obtain a base access pass, the Contractor shall complete a USAFE Form 79, REQUEST FOR BASE ENTRY IDENTIFICATION AND CONTRACTOR PERSONNEL IDENTIFICATION, available at the Office of the Contracting Officer, and present it to the Base Security Officer for approval. After approval, the Contractor can obtain a base badge.
The Contractor shall be responsible for obtaining permission for his personnel to enter the work site areas and for ensuring that such information is up-to-date and remains valid.
All prescribed identification shall be immediately delivered and/or
DOCUMENT 00 73 04 Page 3 surrendered to the Contracting Officer for cancellation upon: (1) termination or release of any employee; (2) termination or completion of contract.
1.12.3 Responsibility for Physical Security
The Contractor shall be responsible for physical security of all construction materials, supplies, and equipment of every description (including property which may be Government furnished or owned) provided and/or utilized in the execution of this contract.
1.12.4 Access to Operational Areas
Contractor personnel are expressly prohibited and shall be restricted from entering operational buildings or areas without the specific authorization of the Contracting Officer. To perform work, where "security escorts" are required for access to a facility, the Contractor shall coordinate with the Contracting Officer for access to such facilities.
1.12.5 Employment
Should the continued employment of any person in connection with this contract, or any subcontract thereunder, be deemed by the Contracting Officer to be prejudicial to the interests of the Government, that person shall immediately be removed from the work. In this connection the Contractor agrees that:
a. Cases which may involve disciplinary action against such persons, or the necessity of reassignment or termination of their services, shall be investigated, processed, reported and disposed of, as directed by the Contracting Officer.
b. Employment contracts of all persons employed in connection with this contract, or any subcontract thereunder shall include clauses containing the substance of this clause.
1.12.6 Compliance
Compliance with the foregoing provisions of this clause by subcontractors shall be the responsibility of the Contractor.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Document --
DOCUMENT 00 73 04 Page 4
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals Salvage Plan; G
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The work includes the following and incidental related work:
a. This project will construct a multi-story communications facility for Naval Computer and Telecommunications Area Master Station Atlantic (NCTAMS LANT) Detachment and Base N6 Communications Department at NSA Souda Bay, Greece. The new facility will consolidate all base communications under one building. A new communications center, telephone exchange, electronics maintenance shops, EKMS vault, and storage for electronics spares and equipment for use by NSA Souda Bay, NCTAMS, and N6 personnel will be provided within the facility.
b. The facility will be a three story, cast-in-place concrete structure with concrete shear walls and shallow concrete foundations. The exterior facade will consist of full-height reinforced concrete to the top of the parapet, with a silicone based elastomeric coating over the concrete.
c. The new Communications Center will be located between the existing NGIS, Galley, Joint Mobility Processing Center, and the current Communication Facility, Building 4. Once construction of the new communications center is complete and operations are transferred to the new facility, the existing Building 4 and associated facilities will be demolished. Parking for the new Communications Center will be located in place of the existing facility.
1.2.2 Location
The work is located at the Naval Support Activity, Souda Bay, Greece, approximately as indicated. The exact location will be shown by the Contracting Officer.
1.3 OCCUPANCY OF PREMISES
Existing building(s) will be occupied during performance of work under this Contract.
SECTION 01 11 00 Page 1
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
1.4 EXISTING WORK
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
1.5 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.
Contact local utility locating service a minimum of 48 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.
Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground, or paved surface where existing underground utilities or utilities encased in pier structures are discovered. Verify the elevations of existing piping, utilities,and any type of underground or encased obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
1.5.1 Notification Prior to Excavation
Notify the Contracting Officer at least, 15 days prior to starting excavation work.
1.6 NAVY AND MARINE CORPS (NMCI) COORDINATION REQUIREMENTS
1.6.1 NMCI Contractor Access
Allow the NMCI Contractor access to the facility towards the end of construction (finishes 90 percent complete, rough-in 100 percent complete, Inside Plant (ISP)/Outside Plant (OSP) infrastructure in place) to provide equipment in the telecommunications rooms and make final connections.
Coordinate efforts with the NMCI Contractor to facilitate joint use of building spaces during the final phases of construction. After the Contracting Officer has facilitated coordination meetings between the two contractors, within one week, incorporate the effort of additional…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .