The provided file is an IDIQ Binding Price Schedule that lists the various services and associated pricing for an Environmental Remediation Services Multiple Award Task Order Contract (MATOC) solicitation. The solicitation, issued by the Department of the Interior Bureau of Indian Affairs Central Office, includes assessment and remediation services for mold, asbestos-containing materials (ACM), and lead paint. The price schedule covers services such as assessments, sampling plans, mitigation plans, remediation, removal, and disposal, as well as the associated unit pricing for the base year and four option years. Key services include mold assessment, ACM assessment, lead paint assessment, assessment reports, mold remediation, ACM removal and disposal, lead paint removal and disposal, and encapsulation. The solicitation number is 140A1625R0007, and the contract type is an IDIQ MATOC.

View the file

Other files for this federal contract opportunity

Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ITEM NO.SERVICEQTYBASEYEAR 1YEAR 2YEAR 3YEAR 4Six-Month Extension
1Mold AssessmentSF*
2ACM (Asbestos Containing Material) AssessmentSF*
3Lead Paint AssessmentSF*
4Assessment Reporteach
5Sampling Planeach
6Mitigation Planeach
7Mold RemediationSF**
8ACM Removal and Disposal: pipe insultationSF**
9ACM Removal and Disposal: pipe wrapsLF**
10ACM Removal and Disposal: walls and drywallSF**
11ACM Encapsulation: walls and drywallSF**
12ACM Removal and Disposal: ceilingsSF**
13ACM Encapsulation: walls and ceilingsSF**
14ACM Removal and Disposal: attic insulationSF**
15ACM Removal and Disposal: roofSF**
16ACM Removal and Disposal: sidingSF**
17ACM Removal and Disposal: flooring and tilesSF**
18ACM Removal and Disposal: HVAC ductsSF**
19Lead Paint Removal and DisposalSF**
20Lead Paint EncapsulationSF**
21Patch, sand, prime and paintSF**
22Drywall ReplacementSF**
23Plywood ReplacementSF**
24Certified Industrial Hygienist1 hour
25Certified Asbestos Inspector1 hour
26Certified Lead Inspector1 hour
*Square feet of the structure or structures to be assessed.
**Square feet or linear feet of the material identified for remediation during the assessment.