Revised_Atch_2__IDIQ_Binding_Price_Schedule_0004.pdf
PDF 99 KB Posted
- Attached to
- Environmental Remediation Services MATOC Federal contract opportunity
- Solicitation number
- 140A1625R0007
About this file
This is a binding price schedule template for an IDIQ environmental remediation services contract spanning a base year, four option years, and a six-month extension period. The schedule lists 26 line items covering three main service categories: assessment, remediation planning, and remediation execution. Assessment services include mold, asbestos-containing material (ACM), and lead paint assessments measured by square footage, along with associated reports and plans. Remediation services encompass mold removal, various types of ACM removal and disposal (including pipe insulation, walls, ceilings, attic insulation, roofing, siding, flooring, and HVAC ducts), lead paint removal/encapsulation, and repair work such as drywall replacement. The schedule also includes hourly rates for specialized personnel including Certified Industrial Hygienists, Certified Asbestos Inspectors, and Certified Lead Inspectors. The template notes that manlift requirements for elevated work will be negotiated separately at the task order level.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM NO. SERVICE QTY BASE YEAR 1 YEAR 2 YEAR 3 YEAR 4 Six-Month Extension
1 Mold Assessment SF* 2 ACM (Asbestos Containing Material) Assessment SF* 3 Lead Paint Assessment SF* 4 Assessment Report each 5 Sampling Plan each 6 Mitigation Plan each 7 Mold Remediation SF** 8 ACM Removal and Disposal: pipe insultation LF** 9 ACM Removal and Disposal: pipe wraps LF**
10 ACM Removal and Disposal: walls and drywall SF** 11 ACM Encapsulation: walls and drywall SF** 12 ACM Removal and Disposal: ceilings SF** 13 ACM Encapsulation: walls and ceilings SF** 14 ACM Removal and Disposal: attic insulation SF** 15 ACM Removal and Disposal: roof SF** 16 ACM Removal and Disposal: siding SF** 17 ACM Removal and Disposal: flooring and tiles SF** 18 ACM Removal and Disposal: HVAC ducts SF** 19 Lead Paint Removal and Disposal SF** 20 Lead Paint Encapsulation SF** 21 Patch, sand, prime and paint SF** 22 Drywall Replacement SF** 23 Plywood Replacement SF** 24 Certified Industrial Hygienist 1 hour 25 Certified Asbestos Inspector 1 hour 26 Certified Lead Inspector 1 hour
*Square feet of the structure or structures to be assessed.
**Square feet or linear feet of the material identified for remediation during the assessment.
Pricing assumes no requirement for manlifts for piping/ductwork that may be located at height. If manlifts are required at the task order level, the price of the manlifts will be negotiated seperately.