This file is an appendix template for price breakdown and calculation of self-performed and subcontracted work. It does not contain specific information regarding required products or services, pricing terms, response dates, or other substantive solicitation details. The appendix serves as a structured format for offerors to delineate labor, materials, equipment, and other costs between work to be performed directly by the prime contractor and work to be subcontracted to third parties. As a template document, it requires completion by prospective contractors responding to the Centralized Emergency Power System construction solicitation but does not itself specify the scope, schedule, or technical requirements for the project.

View the file

Other files

File Type Posted
05_Mechanical Narrative.pdf PDF
01_Civil Narrative.pdf PDF
589A7-21-132 Wichita Bid Drawings 08_Electrical 1 of 2.pdf PDF
589A7-21-132 Wichita Bid Drawings 07_Mechanical 2 of 2.pdf PDF
589A7-21-132 Wichita Bid Drawings 05_Architectural Complete.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 3 of 10.pdf PDF
36C25526R0125_1.docx DOCX document
03_Architectural Narrative.pdf PDF
02_Structural.pdf PDF
589A7-21-132 Wichita Bid Drawings 08_Electrical 2 of 2.pdf PDF
589A7-21-132 Wichita Bid Drawings 04_Structural_Complete.pdf PDF
04_Fire Protection and Fire Alarm Narrative.pdf PDF
589A7-21-132 Wichita Bid Drawings 09_Fire Alarm_Complete.pdf PDF
589A7-21-132 Wichita Bid Drawings 07_Mechanical 1 of 2.pdf PDF
589A7-21-132 Wichita Bid Drawings 06_Fire Protection_Complete.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 8 of 10.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 6 of 10.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 2 of 10.pdf PDF
589A7-21-132 Wichita Bid Drawings 02_HazMat_Complete.pdf PDF
589A7-21-132 Wichita EPS_Bid Docs - Specifications - Volume II.pdf PDF
852.219-75 VA Notice of Limitations on Subcontracting General Construction.pdf PDF
06_Electrical.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 10 of 10.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 9 of 10.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 7 of 10.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 5 of 10.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 4 of 10.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 1 of 10.pdf PDF
589A7-21-132 Wichita Bid Drawings 01_General_Complete.pdf PDF
589A7-21-132 Wichita EPS_Bid Docs - Specifications - Volume I.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX 2- PRICE BREAKDOWN AND CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK

Solicitation: 36C25526R0125

Project: 589A7-21-132 Construct Centralized Emergency Power System

Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service-disabled veteran-owned small business concerns. Below is the required format.

THIS DOCUMENT MUST BE COMPLETED FOR EACH BID ITEM.

THIS DOCUMENT MUST BE COMPLETED FOR EACH BID ITEM.

Specification Section
SDVOSB (Y or N)
Personnel Cost
Material/ Equipment Costs
Total

Division 01 General Requirements

Division 02 Demolition

Division 03 Concrete

Division 04 Masonry

Division 05 Misc. Steel

Division 06 Carpentry

Division 07 Thermal and Moisture

Division 08 Openings

Division 09 Finishes

Division 10 Specialties

Division 11 Equipment

Division 12 Furnishings

Division 13 Special Construction

Division 14 Conveying Systems

Division 21 Fire Suppression

Division 22 Plumbing

Division 23 HVAC

Division 25 Integrated Automation

Division 26 Electrical

Division 27 Communications

Division 28 Electronic Safety and Security

Division 31 Earthwork

Division 32 Exterior Improvements

Division 33 Utilities

Division 34 Transportation

Division 35 Waterway & Marine Construction

Division 40 Process Integration

Guarantee Period Services

Sub Totals:

$
$
$

Sub Total (Personnel Costs and Material/Equipment Costs)

Profit:

Home Office Overhead:

Bond:

Grand Total :

CALCULATION OF SELF PERFORMED WORK

1. Adjusted Contract Amount (Grand Total less Sub Total of All Material and Equipment Costs):

2. Maximum Subcontracting Amount (Not To Exceed Applicable % of Adjusted Contract Amount ): (Line 1 x Applicable %)

3. Total Amount to be performed by SDVOSB's (Self and any Similarly Situated Entities Personnel Cost + Profit, Overhead, Bond)

4. Total Amount Paid Out to Subcontractors (Line 1-Line 3)

5. Percentage of Adjusted Contract Amount considered to be Self Performed ((Line 3/Line 1) x 100):

6. Percentage of Adjusted Contract Amount Paid to Subcontractors- Not to Exceed Applicable % (Line 4/ Line 1)

Solicitation: 36C25526R0125 Project: 589A7-21-132 Construct Centralized Emergency Power System

I certify the above representations are true and correct to the best of my knowledge.