APPENDIX 2- PRICE BREAKDOWN AND CALCULATION OF SELF-PERFORMED and SUBCONTRACTED WORK.docx
DOCX document 27 KB Posted
- Solicitation number
- 36C25526R0125
About this file
This file is an appendix template for price breakdown and calculation of self-performed and subcontracted work. It does not contain specific information regarding required products or services, pricing terms, response dates, or other substantive solicitation details. The appendix serves as a structured format for offerors to delineate labor, materials, equipment, and other costs between work to be performed directly by the prime contractor and work to be subcontracted to third parties. As a template document, it requires completion by prospective contractors responding to the Centralized Emergency Power System construction solicitation but does not itself specify the scope, schedule, or technical requirements for the project.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX 2- PRICE BREAKDOWN AND CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK
Solicitation: 36C25526R0125
Project: 589A7-21-132 Construct Centralized Emergency Power System
Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service-disabled veteran-owned small business concerns. Below is the required format.
THIS DOCUMENT MUST BE COMPLETED FOR EACH BID ITEM.
THIS DOCUMENT MUST BE COMPLETED FOR EACH BID ITEM.
| Specification Section |
| SDVOSB (Y or N) |
| Personnel Cost |
| Material/ Equipment Costs |
| Total |
Division 01 General Requirements
Division 02 Demolition
Division 03 Concrete
Division 04 Masonry
Division 05 Misc. Steel
Division 06 Carpentry
Division 07 Thermal and Moisture
Division 08 Openings
Division 09 Finishes
Division 10 Specialties
Division 11 Equipment
Division 12 Furnishings
Division 13 Special Construction
Division 14 Conveying Systems
Division 21 Fire Suppression
Division 22 Plumbing
Division 23 HVAC
Division 25 Integrated Automation
Division 26 Electrical
Division 27 Communications
Division 28 Electronic Safety and Security
Division 31 Earthwork
Division 32 Exterior Improvements
Division 33 Utilities
Division 34 Transportation
Division 35 Waterway & Marine Construction
Division 40 Process Integration
Guarantee Period Services
Sub Totals:
| $ |
| $ |
| $ |
Sub Total (Personnel Costs and Material/Equipment Costs)
Profit:
Home Office Overhead:
Bond:
Grand Total :
CALCULATION OF SELF PERFORMED WORK
1. Adjusted Contract Amount (Grand Total less Sub Total of All Material and Equipment Costs):
2. Maximum Subcontracting Amount (Not To Exceed Applicable % of Adjusted Contract Amount ): (Line 1 x Applicable %)
3. Total Amount to be performed by SDVOSB's (Self and any Similarly Situated Entities Personnel Cost + Profit, Overhead, Bond)
4. Total Amount Paid Out to Subcontractors (Line 1-Line 3)
5. Percentage of Adjusted Contract Amount considered to be Self Performed ((Line 3/Line 1) x 100):
6. Percentage of Adjusted Contract Amount Paid to Subcontractors- Not to Exceed Applicable % (Line 4/ Line 1)
Solicitation: 36C25526R0125 Project: 589A7-21-132 Construct Centralized Emergency Power System
I certify the above representations are true and correct to the best of my knowledge.
Signed: _________________________________
Date
(Typed Name of Authorized Representative)
(Title of Authorized Representative)
File details come from the government source that posted it. Updated .