589A7-21-132 Wichita Bid Drawings 08_Electrical 1 of 2.pdf
PDF 7 MB Posted
- Solicitation number
- 36C25526R0125
About this file
Summary
This document package comprises bid documents for the Construct Centralized Emergency Power System project at Robert J. Dole VA Medical Center in Wichita, Kansas (Project No. 589A7-21-132). The project is issued by the U.S. Department of Veterans Affairs, Office of Construction and Facilities Management, with an issue date of March 26, 2026. The engineering team includes Miller-Remick LLC as the professional engineer of record, with supporting consultants including IMEG Corp (electrical), Stanton Engineering Services LLC (fire and life safety), Oculus Inc (architectural), Professional Engineering Consultants PA (structural), and Mabbett & Associates Inc (hazardous materials).
The project scope encompasses demolition and renovation of the facility's electrical systems, construction of a new generator building (Building 37), installation of centralized medium-voltage generators to replace existing building-level generators, and construction of new underground concrete-encased ductbanks for medium-voltage, emergency, and low-voltage cables. Key deliverables include electrical demolition and removal work, installation of new pad-mounted transformers and automatic transfer switches for nine buildings, construction of new interconnected generator systems with paralleling switchgear and control systems, lightning protection systems, grounding infrastructure, and comprehensive testing and commissioning. The work must be coordinated to maintain facility operations throughout construction, with phased implementation allowing work to proceed one building at a time while maintaining emergency power coverage through temporary generators as required. All work must comply with the National Electrical Code, state and local codes, and manufacturers' specifications.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NO. DESCRIPTION DATE
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT CENTRALIZED
EMERGENCY POWER SYSTEM
589A7-21-132
Project Director
2026-03-26
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
M-R PROJECT NO: 0499-0162
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
Civil / Site Utility Engineering:Hazardous Materials:
MABBETT & ASSOCIATES, INC.
Fire & Life Safety:
STANTON ENGINEERING SERVICES, LLC
Architectural:
OCULUS, INC.
Structural:
PROFESSIONAL ENGINEERING
CONSULTANTS, PA (PEC)
IMEG, CORP. 37
ELECTRICAL
ABBREVIATIONS & SYMBOLS
E-001
MJRTO
FIRE
S
CR
IC
MDMD
RX RX
RX
ES
TYPICAL DEVICE MOUNTING HEIGHTS
ALL DIMENSIONS SHOWN ARE TYPICAL, U.O.N.
NONE
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT CENTRALIZED
EMERGENCY POWER SYSTEM
589A7-21-132
Project Director
2026-03-26
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
M-R PROJECT NO: 0499-0162
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
Civil / Site Utility Engineering:Hazardous Materials:
MABBETT & ASSOCIATES, INC.
Fire & Life Safety:
STANTON ENGINEERING SERVICES, LLC
Architectural:
OCULUS, INC.
Structural:
PROFESSIONAL ENGINEERING
CONSULTANTS, PA (PEC)
IMEG, CORP. 37
ELECTRICAL
NOTES
E-002
MJRTO
1. THE CONTRACTOR SHALL INCLUDE IN HIS BID ALL COSTS ASSOCIATED WITH
RELOCATION AND REMOVAL OF ELECTRICAL WORK AS DESCRIBED IN THE
DRAWINGS AND SPECIFICATIONS WITH ALLOWANCES FOR EXPECTED OR
UNFORESEEN ISSUES WHEN CONCEALED WORK HAS BEEN EXPOSED. NO
ADDITIONAL CLAIMS FOR WORK ASSOCIATED WITH DEMOLITION WILL BE
ACCEPTED, UNLESS, IN CERTAIN CASES, CONSIDERED JUSTIFIABLE BY THE
ENGINEER.
2. NOTE THAT THE FACILITY WILL BE OPERATIONAL DURING THE COURSE OF
THIS PROJECT.
2.1. THE CONTRACTOR IS TO COORDINATE ALL OF THE DEMOLITION WORK
WITH THE FACILITY PERSONNEL TO MINIMIZE DISTURBING THE
OPERATING EQUIPMENT, WIRING AND SYSTEMS.
2.2. THE CONTRACTOR SHALL PERFORM REMOVAL AND DEMOLITION WORK
WITH MINIMAL INTERFERENCE WITH EXISTING SYSTEMS.
2.3. IF NECESSARY THE CONTRACTOR SHALL PROVIDE TEMPORARY POWER
FOR THE FACILITY.
3. DEMOLITION AND REMOVAL OF WORK SHALL BE PERFORMED IN A NEAT AND
PROFESSIONAL MANNER. THE CONTRACTOR SHALL RESTORE, PATCH, PAINT,
ETC., ANY INTERIOR/EXTERIOR BUILDING SURFACE TO ITS ORIGINAL
CONDITION.
4. REFER TO ELECTRICAL DEMOLITION AND RENOVATION PLANS FOR NEW
EQUIPMENT LAYOUT AND EXTENT OF EQUIPMENT BEING REPLACED,
RELOCATED, OR REMOVED. COORDINATE WITH ALL TRADES AS TO EXTENT OF
EQUIPMENT BEING REMOVED OR RELOCATED. CLOSELY COORDINATE THE
EXTENT OF DEMOLITION SCOPE OF WORK WITH ARCHITECT, ENGINEER
AND/OR MECHANICAL PLANS. PATCH AND PAINT (TO MATCH SURROUNDING
CONDITIONS) ALL OPENINGS CREATED BY THIS DEMOLITION.
5. EXISTING CONDITIONS, EQUIPMENT, MATERIALS & SIZES ARE SHOWN FOR
REFERENCE ONLY. VERIFY EXISTING CONDITIONS AND BRING ANY
DISCREPANCIES TO THE ENGINEER'S ATTENTION IN WRITING PRIOR TO BID
SUBMISSION.
6. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ELECTRICAL
DEMOLITION WORK FOR THIS PROJECT WHETHER OR NOT SPECIFICALLY
INDICATED ON THIS OR OTHER DEMOLITION PLANS. THIS WORK SHALL
INCLUDE BUT IS NOT LIMITED TO THE DISCONNECTION, REMOVAL AND
DISPOSAL OF; LIGHTING FIXTURES, PANELBOARDS, DISCONNECT SWITCHES,
RECEPTACLES, JUNCTION BOXES, WIRE, CABLE, CONDUIT, MOUNTING
HARDWARE STRAPS OR CABLES, ELECTRICAL SERVICES ETC. PER THE SCOPE
OF WORK FOR THIS PROJECT.
7. THE ELECTRICAL CONTRACTOR SHALL REMOVE ALL ELECTRICAL OUTLETS,
SWITCHES, ETC., INCLUDING ASSOCIATED WIRING, CONDUITS, COVERS,
BOXES, ETC., WHERE SHOWN ON THE DEMOLITION DRAWING. WHERE THE
REMOVAL OF THESE ITEMS DISRUPTS EXISTING WIRING THAT IS TO REMAIN,
THE CONTRACTOR SHALL INSTALL IN THE CEILING SPACE; JUNCTION BOXES
AND OTHER DEVICES AND PROVIDE BYPASS CONNECTIONS NECESSARY TO
MAKE CIRCUITS AFFECTED CONTINUOUS AND READY FOR OPERATION.
OTHERWISE, WIRING SHALL BE REMOVED BACK TO THE NEAREST ELECTRICAL
JUNCTION BOX THAT IS TO REMAIN OR TO THE SOURCE PANELBOARD.
8. ALL WORK MUST BE SCHEDULED AND PERFORMED AS NOT TO INTERRUPT
NORMAL OPERATIONS. REMOVAL OF ITEMS THAT WILL CAUSE ANY TYPE OF
TEMPORARY SHUTDOWN SHALL BE PERFORMED DURING OFF-PEAK HOURS.
ALL SUCH OUTAGES SHALL BE SCHEDULED AND COORDINATED WITH OWNER
FIELD REPRESENTATIVE TO ENSURE ESSENTIAL SERVICES OR AREAS CAN BE
MAINTAINED.
9. THE CONTRACTOR SHALL NOTIFY THE OWNER AT THE APPROPRIATE TIME OF
THE PROJECTED DEMOLITION AND PHASING SCHEDULE SO THAT REMOVAL OR
RELOCATION OF AFFECTED UTILITIES MAY BE CARRIED OUT IN COORDINATION
WITH THE PROJECT REQUIREMENTS. THE CONTRACTOR SHALL CLOSELY
FOLLOW THE DEMOLITION AND PHASING SCHEDULE AND PROCEED IN THE
SPECIFIED SEQUENCE.
10. THE SHUTDOWN OF EXISTING BUILDING ELECTRICAL SERVICES SHALL BE
COORDINATED WITH THE OWNER. MAKE APPROPRIATE ARRANGEMENTS AT
LEAST 5 BUSINESS DAYS PRIOR TO A SHUTDOWN.
11. THE CONTRACTOR SHALL REMOVE AND/OR RELOCATE ALL EXISTING
ELECTRICAL WORK WHICH INTERFERES WITH THE NEW ELECTRICAL AND
ARCHITECTURAL LAYOUTS IN FULL COORDINATION WITH THE ENGINEER'S
DEMOLITION PLANS. ALL SYSTEMS WHICH ARE NO LONGER REQUIRED TO
FUNCTION SHALL BE DE-ENERGIZED AND DISCONNECTED AT THE POWER
SUPPLY SOURCE.
12. ELECTRICAL CONTRACTOR SHALL PROVIDE AND MAINTAIN ANY CONNECTIONS
/ DISCONNECTIONS AS NEEDED TO ENSURE ADEQUATE SAFETY AND
PROTECTION OF ALL PERSONNEL AND EQUIPMENT.
13. ALL ELECTRICAL PANELS SHALL BE MAINTAINED AS WORKING PANELS
THROUGHOUT CONSTRUCTION AND WILL CONTINUE TO MAINTAIN CIRCUITS
FOR EXISTING LIGHTING OR EQUIPMENT TO REMAIN. PROVIDE AS NECESSARY
TEMPORARY LIGHTING AND ELECTRICAL FEEDS TO ANY DEVICES THAT MAY BE
REQUIRED FOR UNINTERRUPTED USE. PROVIDE TEMPORARY CONNECTIONS
FOR RELOCATED EQUIPMENT DURING CONSTRUCTION.
14. ELECTRICAL CONTRACTOR SHALL ENSURE THAT ANY DEVICES AND/OR
FIXTURES LOCATED OUTSIDE OF DEMOLITION WORK AREA ARE NOT
AFFECTED BY REMOVAL OF WIRING AND/OR CIRCUITING. WIRING/CONDUIT
SHALL BE LEFT IN A SAFE CONDITION, LABELED FOR ITS USE, AND EXTENDED
AS REQUIRED TO MAINTAIN CIRCUIT CONTINUITY, INCLUDING ALL APPLICABLE
CONTROLS.
15. PORTIONS OF FEEDER RUNS THAT SHALL BE REMOVED OR ABANDONED AS A
RESULT OF DEMOLITION WORK, BUT WHICH ARE REQUIRED TO REMAIN
ENERGIZED, SHALL BE CUT AT CONVENIENT LOCATIONS, REROUTED AND
RECONNECTED. NEW FEEDER EXTENSIONS SHALL MATCH EXISTING FEEDER
EXTENSIONS IN ALL ASPECTS INCLUDING BUT NOT LIMITED TO CABLE TYPE,
CONDUIT SIZES, CONDUCTOR AMPACITY, ETC..
16. ALL EXISTING LOW VOLTAGE WIRING FOR FIRE ALARM/SECURITY, SOUND,
AND/OR TELECOMMUNICATIONS THAT IS NOT REUSED SHALL BE REMOVED IN
ITS ENTIRETY BY THE RESPONSIBLE CONTRACTOR. ALL EXISTING LOW
VOLTAGE WIRING FOR MECHANICAL SYSTEMS THAT ARE NOT USED SHALL BE
REMOVED IN ITS ENTIRETY BY THE CONTRACTOR.
17. CONTRACTOR IS TO EXERCISE EXTREME CAUTION WHEN CUTTING SLAB TO
AVOID DAMAGE TO ANY EXISTING CONDUITS, PIPING, ETC. THAT MAY BE
CONCEALED IN OR BENEATH THE SLAB. ANY FLOOR SLAB AFFECTED BY THE
REMOVAL OF DEVICES FED VIA UNDERGROUND CONDUIT OR WIRING, SHALL
BE FIRESTOPPED AND PATCHED BY THE GENERAL CONTRACTOR AND TO
MATCH SURROUNDING FLOOR.
18. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR DISCONNECTING,
RELOCATING, AND/OR RECONNECTING ALL EXISTING EQUIPMENT THAT IS TO
REMAIN, EVEN IF THIS EQUIPMENT IS NOT SHOWN ON PLANS OR PANEL
SCHEDULES. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR EXTENDING
EXISTING CIRCUITS FROM EXISTING EQUIPMENT THAT IS REMAINING TO NEW
LOCATION. CONTRACTOR SHALL MATCH EXISTING GAUGE WIRE FROM
EXISTING BREAKER TO RELOCATED EQUIPMENT.
19. IN THE EVENT THAT ELECTRICAL PLANS CALL FOR EXISTING WIRING TO BE
REUSED, THE ELECTRICAL CONTRACTOR SHALL SURVEY EXISTING WIRING,
BOXES, ETC. TO DETERMINE IF THE EXISTING BRANCH CIRCUIT MAY BE
REUSED FOR NEW EQUIPMENT (IF WIRING REMAINS IN ITS ORIGINAL CONDUIT).
ELECTRICAL CONTRACTOR SHALL DETERMINE THAT THE ENTIRE RUN OF
EXISTING POWER CONDUIT AND WIRING, FROM SOURCE PANEL TO LOAD FOR
WIRING TO BE REUSED, IS FEASIBLE FOR REUSE AND MEETS THE
REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE, STATE AND LOCAL
CODES HAVING JURISDICTION.
IN INSTANCES WHERE EXISTING CIRCUITS ARE TO BE EXTENDED OR
REUSED, ELECTRICAL CONTRACTOR SHALL DISCONNECT EXISTING BRANCH
CIRCUIT AND LEAVE IN A SAFE CONDITION (TAG AND LABEL ITS USE) FOR
FUTURE RECONNECTION DURING RENOVATION PHASE.
20. ALL WIRING NOT INDICATED FOR REUSE SHALL DISCONNECTED AND REMOVED
FROM LOAD TO SOURCE (INCLUDING DATA, COMMUNICATION, OR TELEPHONE
WIRING). ANY CONDUITS STUBBED OUT OF MASONRY SURFACE SHALL BE CUT
INTO SURFACE AND PATCHED TO MATCH SURROUNDING CONDITIONS.
21. PANELBOARD CABINETS SHALL NOT BE USED FOR OTHER PURPOSES THAN
CIRCUIT BREAKER INSTALLATIONS AND DISTRIBUTION POINTS, AND SHALL
NOT BE USED AS A JUNCTION OR PULLBOX.
22. ALL UNUSED OUTLET BOXES THAT ARE TO REMAIN SHALL BE PROVIDED WITH
MATCHING BLANK COVERS.
23. ALL RACEWAYS WHICH ARE EXPOSED AS A RESULT OF NEW WORK SHALL BE
REMOVED AND REROUTED CONCEALED BEHIND FINISHED SURFACES.
24. EXISTING RACEWAYS THAT ARE NOT BEING REUSED SHALL BE REMOVED
BACK TO THE NEAREST JUNCTION OR PULLBOX, AND THE OPENINGS BLANKED.
ANY CONDUITS PENETRATING MASONRY SURFACES SHALL BE CUT INTO
SURFACE, PATCHED, AND PAINTED TO MATCH SURROUNDINGS.
25. DISCONNECT, RELOCATE OR REMOVE ELECTRICAL INSTALLATIONS AND
EQUIPMENT AS INDICATED BY PLANS AND AS REQUIRED BY CHANGES IN
CONSTRUCTION. WHERE EXISTING ELECTRICAL INSTALLATIONS INTERFERE
WITH NEW WORK AND WHERE SUCH INSTALLATIONS ARE TO REMAIN IN USE,
THE NEW INSTALLATIONS SHALL BE RELOCATED AND/OR RECONNECTED TO
COORDINATE WITH THE WORK INDICATED ON THE CONTRACT DRAWINGS.
DETERMINE AND COORDINATE ALL EQUIPMENT LOCATIONS PRIOR TO INITIAL
ROUGH-IN.
26. DISCONNECT AND RELOCATE/RECONNECT ANY ELECTRICAL LINES, BRANCH
CIRCUITS, DEVICES (INCLUDING FIRE ALARM DEVICES), ETC. AND REPAIR PULL
BOXES THAT MAY BE DISTURBED DURING THIS RENOVATION. UNLESS NOTED
OTHERWISE, ALL EXISTING ELECTRICAL WORK WHICH WILL NOT BE RENDERED
OBSOLETE AND WHICH MAY BE DISTURBED DUE TO ANY CHANGES REQUIRED
UNDER THE CONTRACT, SHALL BE RESTORED TO ITS ORIGINAL OPERATING
CONDITION AT NO COST TO OWNER. IF ANY EQUIPMENT TO REMAIN IS
DAMAGED DURING CONSTRUCTION, IT SHALL BE REPLACED WITH NEW (WITH
NO COST APPLIED TO OWNER).
27. FOR EXISTING PANELS MODIFIED AS PART OF THIS PROJECT, E.C. SHALL TEST
AND KEEP ALL EXISTING WORKING CIRCUIT BREAKERS AND SHALL USE THEM
FOR NEW EQUIPMENT, DEVICES, LIGHTING, AND/OR SPARES. E.C. SHALL
REPLACE NON-WORKING BREAKERS WITH NEW "IN KIND" BREAKERS. PROVIDE
BLANK COVERS/COVERPLATES FOR ALL EXPOSED CIRCUIT BREAKER SPACES
(THOSE WITHOUT INSTALLED CIRCUIT BREAKERS; EXPOSED BUS BARS) FOR
PERSONNEL PROTECTION.
26. ALL MATERIALS AND EQUIPMENT TO BE DEMOLISHED ARE TO BE DISPOSED OF
BY THE CONTRACTOR, UNLESS DIRECTED OTHERWISE BY THE OWNER.
CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ALL MATERIALS IN
ACCORDANCE WITH LOCAL AND FEDERAL LAWS. ALL MATERIALS THAT ARE
CONSIDERED TO BE RECYCLABLE ARE TO BE RECYCLED ACCORDINGLY BY
THE CONTRACTOR.
27. REMOVAL OF BRANCH CIRCUITS IN ASSOCIATED PANELS SHALL BE
COORDINATED WITH THE REMOVAL OF EQUIPMENT IN SPECIFIED AREA. REFER
TO RENOVATION PLANS AND ELECTRICAL PANEL SCHEDULES FOR NEW
CIRCUITING ARRANGEMENT. ANY WIRING OR CIRCUITS BEING REVISED SHALL
MEET MINIMUM WIRE SIZES AS INDICATED ON DRAWINGS. ELECTRICAL
CONTRACTOR SHALL REMOVE WIRING/CONDUIT BACK TO SOURCE FROM
UNUSED OR ABANDONED CIRCUITS, LABEL CIRCUIT BREAKER AS "SPARE", AND
LEAVE IN THE "OFF" POSITION.
28. EXISTING PANELBOARD DIRECTORIES AFFECTED BY THE ALTERATION WORK
SHALL BE REPLACED WITH NEW "TYPED" DIRECTORIES, TO ACCURATELY
REFLECT THE BRANCH CIRCUIT WIRING MODIFICATIONS AND EXISTING
CONDITIONS.
ELECTRICAL DEMOLITION NOTES:
1. THESE DRAWINGS WERE PREPARED FROM INFORMATION TAKEN FROM THE
AVAILABLE BUILDING DRAWINGS, ARCHITECTURAL BACKGROUNDS PROVIDED
BY THE OWNER AND FIELD SURVEY INFORMATION COMPILED BY THE
ENGINEERING DESIGN TEAM FOR THE PURPOSE OF ENGINEERING DESIGN.
EXISTING CONDITIONS ARE SHOWN AS ACCURATELY AS POSSIBLE. THERE IS
THE POSSIBILITY THAT CONDITIONS SHOWN ARE NOT EXACTLY AS EXISTING.
CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS, LOCATIONS,
SIZES AND CONDITIONS AT THE SITE AND REPORT ANY DISCREPANCIES TO
THE ARCHITECT PRIOR TO BEGINNING INSTALLATION OR FABRICATION WORK.
1.1. DRAWINGS ARE DIAGRAMMATIC.
1.2. SHOULD IT APPEAR THAT THE WORK INTENDED TO BE DESCRIBED OR
RELATED WORK ARE NOT SUFFICIENTLY DETAILED OR EXPLAINED ON
THE DRAWINGS, OR IN THE SPECIFICATIONS, CONSULT THE ENGINEER
FOR NECESSARY CLARIFICATIONS, AND CONFORM TO THOSE
CLARIFICATIONS INSOFAR AS THEY ARE CONSISTENT WITH THE
ORIGINAL DRAWINGS AND SPECIFICATIONS. IN NO CASE SHALL WORK
PROCEED IN UNCERTAINTY.
1.3. EQUIPMENT ARRANGEMENTS ARE DESIGNED TO SHOW PREFERRED
CONFIGURATIONS TO SUIT KNOWN CONDITIONS. ACTUAL INSTALLATION
BY CONTRACTOR MAY BE ALTERED AS REQUIRED TO SUIT FIELD
CONDITIONS ENCOUNTERED DURING CONSTRUCTION WITHOUT
COMPROMISING THE INTENT OF THE ORIGINAL DESIGN.
1.4. THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AND
CONDITIONS AT SITE PRIOR TO STARTING WORK.
2. THE CONTRACTOR WILL BE RESPONSIBLE FOR ENSURING THAT ALL RULES
AND REGULATIONS, INCLUDING THOSE WHICH MAY BE ISSUED BY THE OWNER,
ARE BEING OBSERVED, PARTICULARLY WORKPLACE SAFETY AND THE
CONDUCT OF ALL THOSE EMPLOYED DIRECTLY AND INDIRECTLY BY HIM ON
THE PREMISES, AND THE OWNER'S EMPLOYEES WHO MAY BE IMPACTED OR
AFFECTED BY CONSTRUCTION ACTIVITIES. THE CONTRACTOR WILL INSTALL
SIGNAGE, BARRIERS, AND OTHER MEANS TO PROVIDE WARNING AND
PERSONNEL SAFETY. PLACEMENT OF THESE ITEMS WILL BE COORDINATED
WITH THE OWNER AND HIS ONGOING OPERATIONS AND WILL PROMPTLY BE
REVISED WHEN WORK IN A PARTICULAR AREA HAS BEEN COMPLETED.
2.1. DURING PERFORMANCE OF WORK, THE CONTRACTOR SHALL BE
RESPONSIBLE FOR PROVISION AND MAINTENANCE OF WARNING SIGNS,
LIGHT SIGNAL DEVICES, GUARD LIGHTS, BARRICADES, GUARD RAILS,
FENCES AND OTHER DEVICES, APPROPRIATELY LOCATED ON AND
AROUND THE JOB SITE WHICH GIVE PROPER AND UNDERSTANDABLE
WARNING TO PERSONS WITH REGARD TO HAZARDOUS CONDITIONS,
EQUIPMENT AND OPERATIONS BEING PERFORMED IN CONJUNCTION
WITH THE WORK.
3. THIS INSTALLATION WILL CONFORM TO ALL CODES AND THE REQUIREMENTS
OF FEDERAL, STATE, AND LOCAL REGULATORY AGENCIES HAVING
JURISDICTION INCLUDING, BUT NOT LIMITED TO THE FOLLOWING:
ELECTRICAL: NATIONAL ELECTRIC CODE: NFPA 70 - LATEST EDITION
4. ALL WORK WILL BE LAWFULLY EXECUTED IN A NEAT AND WORKMANLIKE
MANNER AND WILL BE COMPLETED IN ACCORDANCE WITH THE GOVERNING
CODES (ABOVE), INDUSTRY STANDARDS, AND IN CONFORMANCE WITH THE
MANUFACTURERS RECOMMENDATIONS AND REQUIREMENTS.
5. WORK UNDER THIS CONTRACT SHALL CONSIST OF THE CONTRACTOR
PROVIDING ALL LABOR, MATERIALS, AND SERVICES, INCLUDING WORK NOT
SPECIFICALLY SHOWN BUT REASONABLY IMPLIED. THIS SHALL INCLUDE
CUTTING, PATCHING AND RESTORATION OF EXISTING SURFACES DAMAGED
DURING THE CONSTRUCTION. CONTRACTOR SHALL ALSO PROVIDE ALL
EQUIPMENT SHOWN OR SPECIFIED OR AN APPROVED EQUIVALENT.
SUBSTITUTED EQUIPMENT OR MATERIALS SHALL NOT BE INSTALLED UNTIL
GIVEN WRITTEN APPROVAL BY THE OWNER.
6. EACH TRADE CONTRACTOR SHALL BE WHOLLY RESPONSIBLE FOR PROVIDING,
INSTALLING, AND MAINTAINING ALL TEMPORARY POWER SOURCES AND ANY
REQUIRED UTILITIES FOR ANY TEMPORARY MECHANICAL, PLUMBING, AND/OR
ELECTRICAL EQUIPMENT OR SYSTEMS (REQUIRED BY THEIR INDIVIDUAL
TRADES SCOPE OF WORK) DURING THE COURSE OF CONSTRUCTION AND
PHASING/SEQUENCING OF WORK. THIS SHALL INCLUDE BUT NOT BE LIMITED
TO THE INSTALLATION AND ROUTING OF: TEMPORARY FEEDERS, CONDUIT,
TRANSFORMERS, ON-SITE GENERATOR PACKAGES, OVERCURRENT
PROTECTION DEVICES, DISCONNECTS, CONNECTIONS AND DISCONNECTION
OF EQUIPMENT, ETC. ALL ELECTRICAL WORK MUST BE PERFORMED BY A
LICENSED ELECTRICIAN. REFER TO SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR COSTS INCURRED FOR
NONCOMPLIANCE WITH THESE CONTRACT DOCUMENTS. CONTRACTOR WILL
NOT BE ALLOWED CHANGE ORDERS FOR PROBLEMS ARISING FROM NEGLECT
OF PROVISIONS INCLUDED IN THESE CONDITIONS.
8. MAINTAIN ORDERLY HOUSEKEEPING DURING CONSTRUCTION, AND UPON
SUBSTANTIAL COMPLETION PERFORM FINAL CLEANUP. REMOVE
CONSTRUCTION RUBBISH, SCAFFOLDING, EQUIPMENT, TEMPORARY
PROTECTION, TEMPORARY FIELD STRUCTURES, AND OTHER MATERIALS OR
EQUIPMENT THAT WAS REQUIRED IN CONNECTION WITH THE CONSTRUCTION,
BUT NOT A PERMANENT PART THEREOF.
9. THOSE PERFORMING WORK AS A CONTRACTOR MUST EXAMINE SUBSTRATES
AND CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED AND NOTIFY
THE CONTRACTOR IN WRITING, OF CONDITIONS DETRIMENTAL TO THE
PROPER AND TIMELY COMPLETION OF THE WORK. COMMENCEMENT OF WORK
BY A TRADE ON A SURFACE OR CONSTRUCTION SHALL IMPLY ACCEPTANCE OF
SUCH SURFACE OR CONSTRUCTION. DO NOT PROCEED WITH INSTALLATION
UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED.
10. THE CONTRACTOR SHALL SECURE ALL APPLICATIONS AND PAY ANY AND ALL
FEES AS REQUIRED. THE CONTRACTOR SHALL GIVE ALL NECESSARY NOTICES
AND CERTIFICATES OF INSPECTION REQUIRED BY THE AUTHORITIES HAVING
JURISDICTION. DELIVER ALL CERTIFICATES AND APPROVALS TO THE OWNER
AGENT PRIOR TO FINAL ACCEPTANCE OF THE WORK. THE CONTRACTOR MUST
FILE NECESSARY DRAWINGS, PREPARE DOCUMENTS AND MAKE
APPLICATIONS FOR EACH REQUIRED INSPECTION, PRIOR TO COMMENCING
WORK TO AVOID DELAYS DURING CONSTRUCTION.
11. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND MANUFACTURERS DATA
SHEETS ON ALL EQUIPMENT AND MATERIALS SPECIFIED ON DRAWINGS FOR
APPROVAL BY OWNER OR AGENT FOR THE OWNER. THESE DRAWINGS OR
SHEETS SHALL CONTAIN ALL NECESSARY DATA, I.E., MANUFACTURER,
CATALOG NUMBER, SIZE, DIMENSIONS, CAPACITY, WIRING DETAILS AND ALL
OTHER ENGINEERING DATA AND DETAILS NECESSARY FOR COMPLETE
CLARITY AND INSTALLATION.
12. THE CONTRACTOR SHALL KEEP ONE SET OF THE LATEST ISSUE OF DRAWINGS
WHICH SHALL REFLECT THE ACTUAL INSTALLED CONDITIONS AND
CONNECTIONS OF ALL EQUIPMENT AND DEVICES. THE CONTRACTOR SHALL
PROVIDE COPIES OF ALL MAINTENANCE INFORMATION AND INSTRUCTIONS
RECEIVED WITH EQUIPMENT AND SYSTEMS. ALL "AS-BUILT" DRAWINGS AND
MISCELLANEOUS INFORMATION SHALL BE GIVEN TO THE OWNER AND
ENGINEER AT COMPLETION OF WORK. THE CONTRACTOR SHALL GUARANTEE
ALL MATERIAL AND LABOR TO BE FREE FROM DEFECTS FOR A ONE YEAR
PERIOD FROM THE TIME OF OWNER ACCEPTANCE. ANY DEFECTS OCCURRING
DURING THIS PERIOD SHALL BE CORRECTED BY THE CONTRACTOR AT NO
ADDITIONAL COST TO THE OWNER.
13. CONTRACTOR IS TO PROVIDE ALL REQUIRED SCAFFOLDING, LADDERS,
RIGGING, HOISTING AND ALL OTHER EQUIPMENT REQUIRED FOR THE
INSTALLATION OF THEIR WORK.
14. ESTABLISH PASSAGE CLEARANCES REQUIRED TO DELIVER, INSTALL AND
ERECT ALL REQUIRE EQUIPMENT. IF STRUCTURES, EQUIPMENT AND SYSTEMS
MUST BE ALTERED TO PROVIDE PASSAGE OF EQUIPMENT, THE CONTRACTOR
SHALL RESTORE STRUCTURES, EQUIPMENT AND SYSTEMS TO THEIR ORIGINAL
CONDITION AT THE CONTRACTOR'S EXPENSE; INCLUDING REMOVING AND
REPLACEMENT OF ALL CEILING AS REQUIRED TO COMPLETE THE WORK.
15. THE CONTRACTOR SHALL REPLACE ALL FIREPROOFING MATERIAL, INCLUDING
SPRAY APPLIED AND MASONRY TYPES, THAT IS REMOVED TO ACCOMMODATE
EQUIPMENT, HANGERS, ANCHORS, ETC. ALL FIREPROOFING MATERIAL THAT
IS INTEGRAL TO THE RATING OF AN EXISTING FIRE-RATED ASSEMBLY SHALL
BE REPLACED SO THAT THE FULL FIRE RATING IS PRESERVED.
GENERAL NOTES AND CONDITIONS:
1. ALL ELECTRICAL WORK SHALL BE COORDINATED WITH THE CONSTRUCTION
MANAGER/GENERAL CONTRACTOR AND ALL OTHER DISCIPLINES INVOLVED IN
THIS PROJECT.
1.1. CONTRACTOR SHALL REVIEW ALL TRADES' CONTRACT DOCUMENTS AND
APPLICABLE SHOP DRAWINGS TO DETERMINE SPECIFIC MOUNTING
LOCATIONS FOR ELECTRICAL EQUIPMENT.
1.2. VERIFY EXACT LOCATIONS AND MOUNTING OF ALL LIGHT FIXTURES,
SWITCHES, RECEPTACLES, OUTLETS, FIRE ALARM DEVICES, VOICE/DATA
DEVICES AND OTHER EQUIPMENT WITH ARCHITECTURAL DRAWINGS AND
IN THE FIELD PRIOR TO ROUGH-IN. IN CENTERING OUTLETS AND
LOCATION BOXES, ALLOW FOR OVERHEAD PIPES, DUCTS AND
MECHANICAL EQUIPMENT VARIATIONS IN FIREPROOFING AND
PLASTERING, WINDOW AND DOOR TRIM, PANELING, HUNG CEILINGS AND
THE LIKE, AND CORRECT ANY INACCURACY RESULTING FROM FAILURE
TO DO SO WITHOUT EXPENSE TO OWNER.
1.3. LOCATIONS INDICATED FOR LOCAL WALL SWITCHES ARE SUBJECT TO
MODIFICATIONS AT OR NEAR DOORS. COORDINATE WITH
ARCHITECTURAL AND/OR ENGINEERING PLANS AND INSTALL SWITCH ON
SIDE OPPOSITE HINGE. VERIFY FINAL HINGE LOCATIONS IN FIELD PRIOR
TO SWITCH OUTLET INSTALLATION.
2. THE CONDUITS SHOWN ON THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE,
THEY SHOW THE GENERAL ARRANGEMENT AND SIZE OF THE CONDUITS. THEY
ARE NOT INTENDED TO SHOW EVERY OFFSET OR INTERFERENCE THAT MAY
BE ENCOUNTERED. CONTRACTOR IS RESPONSIBLE FOR ROUTING ALL
CONDUIT IN THE MOST EFFICIENT MANNER IN ACCORDANCE WITH PROJECT
SPECIFICATIONS.
3. ALL CONTRACTOR SUPPLIED MATERIALS SHALL BE NEW AND UL APPROVED
(OR APPROVED BY ANOTHER NATIONALLY RECOGNIZED ORGANIZATION).
4. ALL EQUIPMENT SHALL BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER,
RECTILINEAR TO BUILDING STRUCTURE. HORIZONTAL OR CROSS RUNS IN
PARTITIONS AND WALLS NOT PERMITTED.
5. UNLESS OTHERWISE STATED, ALL ABOVE GROUND WIRING SHALL BE IN
CONDUIT, 3/4 INCH MINIMUM SIZE FOR ELECTRIC SERVICES. ALL CONDUIT
BENDS SHALL BE OF THE LONG RADIUS TYPE. ALL OUTDOOR WIRING SHALL BE
IN CONDUIT, 3/4 INCH MINIMUM SIZE. ALL MOTORS AND TRANSFORMERS SHALL
HAVE FLEXIBLE CONNECTIONS TO MINIMIZE VIBRATION. REFER TO
ELECTRICAL SPECIFICATIONS FOR ADDITIONAL INFORMATION.
6. ALL WIRING SHALL BE RUN CONCEALED IN CONDUIT UNLESS SPECIFIED
OTHERWISE.
7. CONTRACTOR SHALL USE TRAPEZE TO SUPPORT MULTIPLE CONDUITS FROM
BUILDING STEEL
8. SECURE ALL SUPPORTS TO BUILDING STRUCTURE BY STEEL FOR VERTICAL
SUPPORT AND BY MEANS OF TOGGLE BOLTS ON HOLLOW MASONRY UNITS,
EXPANSION SHIELDS IN CONCRETE OR BRICK. MACHINE SCREWS ON METAL
SURFACE, AND WOOD SCREWS ON WOOD CONSTRUCTION. NAILS, RAWL OR
WOOD PLUGS NOT PERMITTED. SUPPORT HORIZONTAL RUNS OF METALLIC
CONDUITS NOT MORE THAN 10 FT. APART. SUPPORT RACEWAY RISERS AT
EACH FLOOR LEVEL. RUN EXPOSED RACEWAYS PARALLEL WITH OR AT RIGHT
ANGLES TO WALLS.
9. ALL CONDUIT INSTALLATIONS CROSSING EXPANSION JOINTS SHALL HAVE
EXPANSION OR EXPANSION/DEFLECTION TYPE FITTINGS AS REQUIRED. NOTE:
FOR THE EXACT LOCATIONS OF EXPANSION JOINTS, SEE OWNER FOR
EXISTING STRUCTURAL DRAWINGS.
10. ALL UNDERGROUND CONDUITS SHALL BE SEALED TO PREVENT THE ENTRY OF
WATER OR GASES.
11. PASS RACEWAYS OVER WATER, STEAM, OR OTHER PIPING WHEN PULL BOXES
ARE NOT REQUIRED. NO RACEWAY SHALL BE INSTALLED WITHIN 6 IN. OF
STEAM OR HOT WATER PIPES, OR APPLIANCES, EXCEPT CROSSINGS WHERE
RACEWAY SHALL BE AT LEAST 2 IN. FROM PIPE COVER.
12. FURNISH PULL STRING IN EACH RACEWAY RUN OVER 10 FT IN WHICH WIRING
IS NOT INSTALLED.
13. CUT STEEL CONDUIT ENDS SQUARE, REAM SMOOTH, PAINT MALE THREADS OF
FIELD THREADED CONDUIT WITH GRAPHITE BASE PIPE COMPOUND. DRAW UP
TIGHT WITH CONDUIT COUPLINGS.
14. ALL WIRING SHALL BE STRANDED COPPER CONDUCTOR. MINIMUM SIZE #12
AWG (POWER) & 14 AWG (CONTROL), 600 VOLT INSULATION THW/THWN.
REFERENCE SPECIFICATIONS FOR MORE INFORMATION.
15. GROUNDING SHALL BE INSTALLED IN ACCORDANCE WITH THE NATIONAL
ELECTRICAL CODE REGARDING ELECTRODE, GROUNDING AND BONDING
REQUIREMENTS FOR SERVICE, EQUIPMENT AND ENCLOSURES. ALL
EQUIPMENT SHALL BE PROVIDED WITH A SEPARATE GROUNDING
CONDUCTOR.
16. CONNECT CONDUIT TO MOTOR CONDUIT TERMINAL BOXES WITH FLEXIBLE
CONDUIT (MINIMUM 18 IN. LENGTH AND 50% SLACK). DO NOT TERMINATE IN OR
FASTEN RACEWAYS TO MOTOR FOUNDATION.
17. PROVIDE SEPARATE RACEWAYS FOR CONDUCTORS OF NORMAL AND
EMERGENCY CIRCUITS. IN COMMON BOXES, PROVIDE BARRIERS BETWEEN
EMERGENCY AND NORMAL WIRING.
18. LEAVE WIRE SUFFICIENTLY LONG TO PERMIT MAKING FINAL CONNECTIONS.
19. WIRE COLOR CODING: PER CODE. WHERE COLOR-CODED CABLE IS NOT
AVAILABLE, CERTIFY IN WRITING AND REQUEST PERMISSION FOR OVERLAP
COLOR TAPING OF CONDUCTORS (MINIMUM LENGTH 6") IN ACCESSIBLE
LOCATIONS. COLOR CODING, ONCE SELECTED, MUST BE USED CONSISTENTLY
FOR THE ENTIRE PROJECT.
20. PULL NO THERMOPLASTIC WIRES AT TEMPERATURES LOWER THAN 32°F.
21. PROVIDE CABLE SUPPORTS FOR WIRE IN RISER CONDUITS AS REQUIRED BY
CODE.
22. ALL SWITCHES SHALL BE MOUNTED AT 48" (TOP OF THE TOGGLE SWITCH)
ABOVE THE TOP OF FINISHED FLOOR, UNLESS OTHERWISE NOTED. ALL
RECEPTACLES SHALL BE MOUNTED AT 18" ABOVE THE TOP OF FINISHED
FLOOR, UNLESS OTHERWISE NOTED.
23. PROVIDE PULL BOXES AS INDICATED AND WHEREVER NECESSARY TO
FACILITATE PULLING OF WIRE AND COORDINATE LOCATIONS WITH OTHER
TRADES.
24. FOR EMPTY RACEWAY RUNS, PROVIDE PULL BOXES EVERY 100FT AND AS
INDICATED. COORDINATE LOCATIONS WITH OTHER TRADES.
25. JUNCTION AND PULL BOXES: LOCATE GENERALLY NOT EXPOSED IN FINISHED
SPACES. WHERE NECESSARY, REROUTE CONDUITS OR MAKE OTHER
ARRANGEMENTS FOR CONCEALMENT. COVERS OF JUNCTION AND PULL
BOXES SHALL BE ACCESSIBLE.
26. SUPPORT JUNCTION AND PULL BOXES INDEPENDENTLY TO BUILDING
STRUCTURE WITH NO WEIGHT BEARING ON CONDUITS.
27. FIRESTOP SHALL BE INSTALLED WHENEVER WIRING OR RACEWAYS CROSS
FIRE RATED WALLS.
28. PANELBOARDS, DISCONNECTS, AUTOMATIC TRANSFER SWITCHES, ETC.,
SHALL BE MOUNTED SO THAT THE DISTANCE FROM THE TOP CIRCUIT
BREAKER OPERATING HANDLE, TO THE TOP OF THE FINISHED FLOOR SHALL
NOT EXCEED 6'-6" (MAX.).
29. ALL PANELS SHALL BE BALANCED AS EVENLY AS POSSIBLE ACROSS PHASES.
ALL PANELS SHALL HAVE PERMANENT DIRECTORIES. CIRCUIT CHANGES
SHALL BE REFLECTED ON "AS BUILT" DRAWINGS.
30. ALL SURFACE MOUNTED PANELS AND PANELBOARDS INSTALLED ON THE
INSIDE FACE OF EXTERIOR WALLS, ABOVE GRADE OR IN OTHER LOCATIONS
CONSIDERED AS DAMP, SHALL BE MOUNTED SO AS TO MAINTAIN A 1/4" AIR
SPACE BETWEEN THE ENCLOSURE AND THE FACE OF THE WALL.
31. ALL NEW ELECTRICAL PANELS SHALL BE LOCKABLE. PROVIDE OWNER WITH
TWO (2) KEYS PER PANEL.
32. MCC OR PANEL COMPARTMENT DESIGNATIONS ARE AS INDICATED BELOW:
32.1. BLANK- NOT INTENDED FOR USE, COVERPLATE ONLY.
32.2. SPACE- CONTAINS NECESSARY BUS AND HARDWARE FOR FUTURE
ADDITION OF BREAKERS OR STARTERS WITHIN RANGE SHOWN.
32.3. SPARE- CONTAINS A COMPLETE BREAKER OR STARTER INSTALLED, SIZE
AS INDICATED, AVAILABLE FOR FUTURE USE.
33. EXACT LOCATION OF MECHANICAL EQUIPMENT THAT REQUIRE ELECTRICAL
CONNECTIONS ARE SHOWN ON THE MECHANICAL DRAWINGS.
34. ALL DEVICES SHALL BE ADEQUATELY IDENTIFIED WITH PERMANENT LABELS
OR TAGS. WIRING SHALL BE IDENTIFIED AS TO PHASING AND CONDUCTOR
IDENTIFICATION.
35. CONDUIT HOMERUNS SHOWN ON THE DRAWING WITH MORE THAN 3 CURRENT
CARRYING CONDUCTORS ARE SHOWN DIAGRAMMATICALLY. CONTRACTOR
SHALL NOT INSTALL MORE THAN 3 CURRENT CARRYING CONDUCTORS IN A
RACEWAY UNLESS DONE SO STRICTLY BY THE NATIONAL ELECTRIC CODE.
36. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE NO MORE THAN THREE
CIRCUITS. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE A SEPARATE
NEUTRAL & GREEN INSULATED EQUIPMENT GROUNDING CONDUCTOR.
37. MULTI-GANG BACKBOXES FOR DIFFERENT VOLTAGES AND TYPES OF
EMERGENCY AND NORMAL BRANCH WIRING DEVICES SHALL HAVE DIVIDERS
BETWEEN DEVICES.
38. ALL TEMPORARY WIRING, LIGHTING AND POWER CIRCUITS AND DEVICES
SHALL BE INSTALLED TO MEET THE LATEST REQUIREMENTS OF THE NATIONAL
ELECTRICAL CODE, LOCAL, STATE AND FEDERAL REQUIREMENTS FOR SUCH
TEMPORARY INSTALLATION.
39. THE ELECTRICAL CONTRACTOR SHALL ENSURE THAT RECEPTACLES USED
FOR HAND TOOLS AND OTHER MISCELLANEOUS EQUIPMENT SHALL BE
INSTALLED WITH GROUND FAULT INTERRUPTER OR OTHER APPROVED AND
RECOGNIZED INTERRUPTING SENSORS.
40. EXISTING FIREPROOFING PENETRATED OR DAMAGED DURING WORK SHALL BE
BROUGHT BACK TO EXISTING RATING UPON COMPLETION OF WORK.
41. THE COMPLETE INSTALLATION SHALL BE TESTED AT COMPLETION OF WORK,
TO BE FREE OF GROUNDS AND SHORT CIRCUITS CONDITIONS. ALL INTERLOCK
CIRCUITS SHALL BE TESTED TO VERIFY CORRECT OPERATION OF EACH
DEVICE. ALL ROTATING EQUIPMENT SHALL BE JOGGED TO VERIFY CORRECT
ROTATION BEFORE PERMANENTLY ENERGIZING.
42. CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL WORK AND
SHUTDOWNS OF EQUIPMENT WITH FACILITY.
43. EXCAVATION FOR UNDERSLAB OR UNDERGROUND INSTALLATION OF
CONDUITS SHALL BE APPROACHED WITH EXTREME CAUTION SO AS NOT TO
DAMAGE EXISTING UNDERGROUND PIPING, WIRING AND CONDUITS.
44. ELECTRICAL CONTRACTOR SHALL PROVIDE CONSTRUCTION
MANAGER/GENERAL CONTRACTOR A SURFACE PENETRATING RADAR SURVEY
FOR THE PURPOSE OF LOCATING ALL UNDERGROUND (OR IN-SLAB) CONDUITS,
PIPING, UTILITIES, STRUCTURAL MEMBERS, ETC. IN ALL AREAS WHERE SLAB
CUTTING MAY OCCUR (FOR THE PURPOSES OF ELECTRICAL WORK REQUIRED).
SURVEY MUST BE COMPLETED TWO WEEKS PRIOR TO CUTTING OF ANY SLAB.
THE CONTRACTOR SHALL ASSUME THE RESPONSIBILITY (AND ALL
ASSOCIATED COSTS) OF REPAIRING AND/OR REPLACING ANY SYSTEMS
DAMAGED BY THE SLAB CUTTING PROCEDURES, WHEN PREVENTATIVE
MEASURES WERE NOT CONSIDERED OR UTILIZED. COST FOR SURVEY(S)
SHALL BE SUBMITTED AS A SEPARATE LINE ITEM PRICE (WHEN APPLICABLE).
45. THE ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING VOLTAGE,
PHASE, MCA, MOCP, REQUIRED FOR ALL EQUIPMENT PROVIDED BY OTHER
CONTRACTORS PRIOR TO PURCHASING AND INSTALLING CONDUCTORS,
BREAKERS, DISCONNECTS, CONDUIT, ETC. VERIFY RATINGS WITH FINAL,
APPROVED CONTRACTOR EQUIPMENT SUBMITTALS AND EQUIPMENT
NAMEPLATES DIRECTLY WITH THE PROVIDING CONTRACTOR.
46. UNLESS NOTED OTHERWISE WITHIN THE PROJECT CONSTRUCTION
DOCUMENTS AND SPECIFICATIONS, ALL NEW ELECTRICAL DEVICES INDICATED
ON THE ELECTRICAL PLANS SHALL BE PROVIDED BY THE ELECTRICAL
CONTRACTOR (EXAMPLE: DISCONNECT SWITCHES, CIRCUIT BREAKERS,
WIRING, CONDUIT, ETC.). VARIABLE FREQUENCY DRIVES, VFD CONTROL
PANELS, DISCONNECT SWITCHES, COMBINATION MOTOR
STARTER/DISCONNECTS AND ASSOCIATED COMPONENTS FOR NEW
EQUIPMENT PROVIDED BY OTHERS SHALL BE PROVIDED BY THE
CORRESPONDING CONTRACTOR AND INSTALLED BY THE ELECTRICAL
CONTRACTOR (WHEN NOT FACTORY INSTALLED).
47. IT IS THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR TO REVIEW THE
ELECTRICAL PLANS AND SPECIFICATIONS, AS WELL AS ALL RELATED PROJECT
PLANS AND SPECIFICATIONS FROM OTHER DISCIPLINES, TO BECOME FAMILIAR
WITH THE FULL PROJECT SCOPE AND COORDINATED RESPONSIBILITIES.
CONFLICT OF INTENDED RESPONSIBILITIES SHALL BE BROUGHT TO
ENGINEERS ATTENTION, PRIOR TO SUBMISSION OF BID.
48. DURING THE COURSE OF CONSTRUCTION, COORDINATION AND FINAL
TURNOVER, IT IS THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR TO
WORK CLOSELY WITH ALL CONTRACTORS AND TRADESMEN IN ORDER TO
ENSURE A SMOOTH RUNNING AND CAREFULLY COORDINATED INSTALLATION.
49. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE WITH
OTHER TRADES FOR ITEMS IN THEIR SCOPE OF WORK WHICH COULD REQUIRE
ADDITIONAL ELECTRICAL WORK, (DISCONNECTION, RECONNECTION, ETC.) AND
ARE NOT INDICATED ON THE ELECTRICAL DRAWINGS.
50. ALL MECHANICAL/PLUMBING EQUIPMENT CONTROLS RATED 10V AND ABOVE
SHALL BE WIRED BY A LICENSED ELECTRICIAN.
GENERAL ELECTRICAL NOTES:
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT CENTRALIZED
EMERGENCY POWER SYSTEM
589A7-21-132
Project Director
2026-03-26
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
M-R PROJECT NO: 0499-0162
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
Civil / Site Utility Engineering:Hazardous Materials:
MABBETT & ASSOCIATES, INC.
Fire & Life Safety:
STANTON ENGINEERING SERVICES, LLC
Architectural:
OCULUS, INC.
Structural:
PROFESSIONAL ENGINEERING
CONSULTANTS, PA (PEC)
IMEG, CORP. 37
1. REFER TO SHEETS E-001 AND E-002 FOR SYMBOLS, ABBREVIATIONS AND
NOTES.
2. REFER TO SHEET ES102 AND CIVIL DRAWINGS FOR LOCATION OF ALL NEW
AND EXISTING DUCTBANKS AND MANHOLES.
3. ALL MEDIUM VOLTAGE CABLES SHOWN AS DEMOLISHED ON THIS PLAN SHALL
BE PULLED OUT OF THE UNDERGROUND DUCTBANK AND REMOVED AFTER
NEW DUCTBANK IS CONSTRUCTED. DUCTBANKS AND MANHOLES SHALL BE
EXISTING TO REMAIN AS PATHWAYS FOR NEW MEDIUM VOLTAGE CABLES OR
AS SPARE PATHWAYS. CONTRACTOR SHALL FIELD VERIFY VIABILITY OF
EXISTING CONDUIT PATHWAY FOR REUSE WITH NEW MV CABLE. PROVIDE
SCOPING OF EXISTING CONDUIT TO ENSURE INTEGRITY.
4. TO MINIMIZE DISRUPTION TO THE CAMPUS, WORK SHOWN ON THIS PLAN WILL
NOT PROCEED UNTIL NEW UNDERGROUND CONCRETE ENCASED NORMAL
POWER DUCTBANK IS INSTALLED IN ITS ENTIRETY AND NEW CABLES ARE
PULLED.
GENERAL SHEET NOTES:
ELECTRICAL
DEMOLITION
CAMPUS SINGLE LINE DIAGRAM
ED601
MJRLIB
SCALE: NTS
DEMOLITION
EXISTING TO
REMAIN
(E) MAIN SWITCHGEAR 35, BUILDING 35A
12470V, 3Ø, 4W, 34KA MOMENTARY BRACING
TIE BREAKER
1200AF
1200AT
3P
PAWNEE
LINE 12-12
M1
EASTBOROUGH
LINE 12-34
(E)
SELECTOR
SWITCH 2
(E) XFMR
500 KVA
12470-480/2770V
CATH LAB
BLDG 2
(H1)
BLDG 19
(E)
SELECTOR
SWITCH 61
(E) XFMR
1000 KVA
12470-480/2770V
(SWGR 61)
BLDG 61
(E)
SELECTOR
SWITCH 55
(E)
SELECTOR
SWITCH 19
(E) XFMR
500 KVA
12470-480/2770V
(E)
SELECTOR
SWITCH 34
(E) XFMR
1000 KVA
12470-480/2770V
(SWGR 34A)
BLDG 34
(E)
SELECTOR
SWITCH 41
(E) XFMR 41
225 KVA
12470-480/2770V
(ML4B)
BLDG 4
(E)
SELECTOR
SWITCH 49
(E)
SELECTOR
SWITCH 42
(E) XFMR
500 KVA
12470-480/2770V
(SWGR 61)
BLDG 5,6,7
(E)
SELECTOR
SWITCH 60
(E) XFMR
300 KVA
12470-208/120V
(SWGR 61)
BLDG 60
(E) SELECTOR
SWITCH 53
NEAR BLDG 11
(SWGR 53)
NEAR BLDG 11
(SWGR 49)
BLDG 1
(SWGR 55)
BLDGS 3 & 26
NEW/TEMPORARY
WORK
1200AF
1200AT
3P
M1
(E) XFMR
1000 KVA
480-12470V
SOLAR SYSTEM
SPACE SPACE
EXISTING MEDIUM VOLTAGE FEEDER TAG (TYPICAL)
SEE ES101 FOR LOCATIONS OF FEEDERS WITHIN
EXISTING DUCTBANKS.
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT CENTRALIZED
EMERGENCY POWER SYSTEM
589A7-21-132
Project Director
2026-03-26
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
M-R PROJECT NO: 0499-0162
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
Civil / Site Utility Engineering:Hazardous Materials:
MABBETT & ASSOCIATES, INC.
Fire & Life Safety:
STANTON ENGINEERING SERVICES, LLC
Architectural:
OCULUS, INC.
Structural:
PROFESSIONAL ENGINEERING
CONSULTANTS, PA (PEC)
IMEG, CORP. 37
1. REFER TO SHEETS E-001 AND E-002 FOR SYMBOLS, ABBREVIATIONS AND
NOTES.
2. REFER TO SHEET ES101 FOR LOCATION OF ALL GENERATORS THAT SHALL BE
DEMOLISHED AS PART OF THIS PROJECT SCOPE.
3. ALL EQUIPMENT AND PATHWAYS SHOWN ON THIS DRAWING SHALL BE
EXISTING TO REMAIN, UNLESS OTHERWISE NOTED.
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1. AFTER THE EMERGENCY SYSTEM LOOP AND NEW MEDIUM VOLTAGE
GENERATORS ARE INSTALLED, TESTED, COMMISSIONED AND FULLY
OPERATIONAL, BUILDING GENERATOR DEMOLITION CAN BE STARTED.
ELECTRICAL CONTRACTOR SHALL PROVIDE A TEMPORARY GENERATOR AS
REQUIRED TO POWER THE EMERGENCY SYSTEM OF EACH BUILDING WHILE
NEW TRANFORMER IS BEING SET, TESTED AND FINAL CONNECTIONS ARE
MADE. CUTOVERS SHALL OCCUR ON WEEKENDS. NOTIFY VA COR AT LEAST 2
WEEKS IN ADVANCE OF ANY EMERGENCY POWER OUTAGE. FEEDER TO
GENERATOR SHALL BE EXISTING TO REMAIN FOR REUSE WITH TEMPORARY
GENERATOR AND NEW TRANSFORMER.
TEMPORARY GENERATOR CONNECTION WILL VARY FROM BUILDING TO
BUILDING AND SHALL BE EVALUATED AT EACH SITE INDEPENDENTLY BY E.C. IN
BUILDINGS WHERE THERE IS A MAIN EMERGENCY PANEL, THE TEMPORARY
GENERATOR SHALL BE LUGGED ONTO THE MAIN CIRCUIT BREAKER OR PANEL
BUS. WHERE THE GENERATOR IS WIRED DIRECTLY TO THE TRANSFER SWITCH,
TEMPORARY GENERATOR SHALL BE LUGGED TO THE (E) ATS.
2. MAINTAIN EXISTING SIGNALING WIRE CONDUIT FROM ATS TO GENERATOR FOR
EXTENSION TO NEW GENERATOR BUILDING VIA NEW UNDERGROUND
CONCRETE ENCASED DUCTBANK. ELECTRICAL CONTRACTOR SHALL PROVIDE
TWO (2) NEW #10 TWISTED PAIR STRANDED CONTROL WIRES BETWEEN
EXISTING ATS AND NEW MEDIUM VOLTAGE GENERATORS. NEW CONTROL
WIRES SHALL BE RUN IN THE NEW LOW VOLTAGE DUCTBANK. REFER TO ES102
AND CIVIL DRAWINGS FOR FURTHER INFORMATION ON DUCTBANK ROUTING.
ELECTRICAL
DEMOLITION BUILDING
SINGLE LINE DIAGRAMS
ED602
MJRTO
DEMOLITION
EXISTING TO
REMAIN
NEW/TEMPORARY
WORK
(D) GENERATOR "62"
352KW
480-VOLT
G
SCALE: NTS
(E) ATS-20
480-VOLT, 225A
CRITICAL
(E) DISTRIBUTION
(E) ATS-21
480-VOLT, 225A
EQUIPMENT
(E) DISTRIBUTION
(E) ATS-22
480-VOLT, 100A
LIFE SAFETY
(E) DISTRIBUTION
(E) ATS-23
480-VOLT, 100A
CRITICAL
(E) DISTRIBUTION
(D) GENERATOR "26"
300KW
208-VOLT
G
SCALE: NTS
(D) GENERATOR "31"
242KW
208-VOLT
G
SCALE: NTS
(E) ATS-3
208-VOLT, 400A
LIFE SAFETY
(E) DISTRIBUTION
1200A
(E) PANEL "31"
400A
(E) ATS-1
208V, 400A
EQUIPMENT
(E) DISTRIBUTION
400A 200A 400A 200A
(E) ATS-1FP
208-VOLT
(E) ATS-2
208-VOLT, 400A
CRITICAL
(E) DISTRIBUTION
(E) ATS-2FP
208-VOLT
(E) FIRE PUMP40
(E) FIRE
PUMP
(D) GENERATOR "31A"
242KW
240-VOLT
G
SCALE: NTS
(E) ATS-4
240-VOLT, 800A
EQUIPMENT
(E) DISTRIBUTION
(D) GENERATOR "1B & 2"
500KW
480-VOLT
G
SCALE: NTS
(E) ATS-6
480-VOLT, 600A
EQUIPMENT
(E) DISTRIBUTION
(E) PANEL "1B & 2"
600A
(E) ATS-5
480-VOLT, 225A
CRITICAL
(E) DISTRIBUTION
250A
SCALE: NTS
(D) TEMPORARY ROLLUP
GENERATOR "21"
65KW
208-VOLT
G
(D) MTS-21
208-VOLT
EXTERIOR
(E) DISTRIBUTION
SCALE: NTS
(D) GENERATOR "5"
80KW
208-VOLT
G
(E) ATS-BUILDING 5
208-VOLT
LIFE SAFETY
(E) DISTRIBUTION
(E) ATS-10
208-VOLT
(E) DISTRIBUTION
SCALE: NTS
(D) GENERATOR "13"
115KW
208-VOLT
G
(E) ATS-8
240-VOLT
(E) DISTRIBUTION
(E) PANEL "2"
250A
(E) ATS-9
208-VOLT
(E) DISTRIBUTION
400A
(E) XFMR
9-KVA
208V-240V
(D) GENERATOR "34"
800KW
480-VOLT
G
SCALE: NTS
(E) ATS-16
480-VOLT, 225A
LIFE SAFETY
(E) DISTRIBUTION
1200A
(E) PANEL "34"
225A
(E) ATS-18
208-VOLT, 150A
CRITICAL
(E) DISTRIBUTION
70A 400A 400A 600A
(E) ATS-14
480-VOLT
400A
EQUIPMENT
(E) DISTRIBUTION
(E) ATS-15
480-VOLT
600A
(E) ATS-12
480-VOLT, 600A
EQUIPMENT
(E) DISTRIBUTION
(E) DISTRIBUTION (E) DISTRIBUTION
(E) XFMR-60
45-KVA
480V-208V
(E) ATS-17
208-VOLT, 225A
LIFE SAFETY
(E) DISTRIBUTION
(E) ATS-19
208-VOLT, 200A
ZENITH
(E) DISTRIBUTION
100A
(E) ATS-11
480-VOLT, 225A
CUMMINS
(E) DISTRIBUTION
(E) INFILL PROJECT ATS
ASCO 7000
208-VOLT
(E) DISTRIBUTION
(E) ATS-13
480-VOLT
400A
CRITICAL
WW
FIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANE
FIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANE
F
IR
E L A
N E
F
IR
E L A
N E
F
IR
E L A
N E
F
IR
E L A
N E
F
IR
E L A
N E
F
IR
E L A
N E
F
IR
E L A
N E
F
IR
E L A
N E
F
IR
E L A
N E
F
IR
E L A
N E
F
IR
E L A
N E
F
IR
E L A
N E
F
IR
E L A
N E
F
IR
E L A
N E
F
IR
E L A
N E
F
IR
E L A
N E
F
IR
E L A
N E
F
IR
E L A
N E
F
IR
E L A
N E
F
IR
E L A
N E
F
IR
E L A
N E
F
IR
E L A
N E
F
IR
E L A
N E
F
IR
E L A
N E
F
IR
E L A
N E
F
IR
E L A
N E
F
IR
E L A
N E
FIRELANE FIRELANE FIRELANE FIRELANE FIRELANE FIRELANE FIRELANE FIRELANE FIRELANE FIRELANE FIRELANE
FIRELANEFIRELANEFIRELANEFIRELANEFIRELANE
FIRELANE
F
IR
E L A
N E
FIRELANE
FIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANE
FIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANE
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELANE
FIRELANE
FIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANE
(D)2000KVA PAD MOUNTED XFMR
UTILITY TRANSFORMERS
(D)15KV SWITCHGEAR
MH-2A
MH-2B
(D)LOAD BANK
(D)PANEL 03-35A-01-2
MH-2
MH-3
SELECTOR SWITCH "53":
- XFMR 44562, T-43, 208V
- XFMR T-44, 240V
(D) GENERATOR "5"
100KVA, 80KW, 208V
BLDGS 5, 6 & 7
SELECTOR SWITCH "42"
EE 9811
SELECTOR SWITCH "60":
- FEEDERS 1, 2, & 3
MH-5
MH-5.5
SELECTOR SWITCH "41" BYPASS
MH-8
MH-7
MH-4B
SELECTOR SW "34"
XFMR 44541 TL-23
(D) GENERATOR "34"
800KW, 480V
BUILDINGS 24 & 60
SELECTOR SW "49"
BLDG 1:
- 49-6, 5, 4, 3, 2, 49
(D) 2 GENERATORS "31" & "31A"
303KVA, 242 KW, 208V & 240V
BLDGS 1, 1A, 2, 4 & 19
OHM-8
OHM-9
SELECTOR SW "55"
SWGR
(D) GENERATOR "26"
300KW, 208V
BLDGS 3, 26, 29 & 61
(D) GENERATOR "1B & 2"
629KVA, 500KW, 480V
SELECTOR SW "2" &
XFMR 137631, TL-36 B2
SELECTOR SW "19" &
XFMR 54947, TL-32, 500KVA
(D) GENERATOR "62"
352-KW, 480V
MH-6
MH-11
HV-10
F1 F7F2 F3
F5F4
F1 F7F2
F3 F5F4
F1 F3
F1 F3
F1 F3
F1 F3
F7 F2F4
F5F2 F4
F7 F5F2
F4
F5 F7
F5 F7
F2 F4
F2 F4
F2 F4
F5 F7
(D) TEMPORARY ROLLUP
GENERATOR "21"
65KW, 208V
(D) GENERATOR "13"
115KW, 208V
BLDGS 12, 13, 16 & 20
SEE DETAIL 1/EP402
FOR FURTHER
INFORMATION.
SEE DETAIL 2/EP402
FOR FURTHER
INFORMATION
SEE DETAIL 6/EP403
FOR FURTHER
INFORMATION.
SEE DETAIL 1/EP403
FOR FURTHER
INFORMATION
SEE DETAILS 3&4/EP402
FOR FURTHER
INFORMATION.
(E) U.G. FUEL TANKS
(D) XFMR 03-35-01-1
75KVA
(D)PANEL 03-35A-01-1
(D)PANEL 03-35A-01-3
(D)LIGHT POLE
(D)LIGHT POLE
(D)LIGHT POLE
(D) U.G. FUEL TANK
SEE DETAIL 5/EP402
FOR FURTHER
INFORMATION
SEE DETAILS 6&7/EP402
FOR FURTHER
INFORMATION
SEE DETAIL 2/EP403
FOR FURTHER
INFORMATION
SEE DETAIL 5/EP403
FOR FURTHER
INFORMATION.
SEE DETAILS 3&4/EP403
FOR FURTHER
INFORMATION.
(D) U.G. FUEL TANK
SEE DETAIL 3/EP401
FOR FURTHER
INFORMATION.
SEE DETAIL 4/EP401
FOR FURTHER
INFORMATION
SEE DETAILS 1&2/EP401
FOR FURTHER
INFORMATION.
(D) U.G.
FUEL TANK
(D) MTS-21
SELECTOR SW "61"
(E)SOLAR CANOPY ELECTRICAL
GEAR. SEE CIVIL DRAWINGS
NO. DESCRIPTION DATE
PLAN
NORTH
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
KEYPLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT CENTRALIZED
EMERGENCY POWER SYSTEM
589A7-21-132
Project Director
2026-03-26
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
M-R PROJECT NO: 0499-0162
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
Civil / Site Utility Engineering:Hazardous Materials:
MABBETT & ASSOCIATES, INC.
Fire & Life Safety:
STANTON ENGINEERING SERVICES, LLC
Architectural:
OCULUS, INC.
Structural:
PROFESSIONAL ENGINEERING
CONSULTANTS, PA (PEC)
IMEG, CORP. 37
20 12
34, 34A
1B
2A
5B
1A
35A
7A
1C
5A
3A
1. REFER TO SHEETS E-001 AND E-002 FOR SYMBOLS, ABBREVIATIONS AND
NOTES.
2. ALL ELECTRICAL EQUIPMENT SHOWN ON THIS DRAWING SHALL BE EXISTING
TO REMAIN, UNLESS OTHERWISE NOTED.
3. EQUIPMENT TAGS SHOWN DARK AND DASHED INDICATE MEDIUM VOLTAGE
FEEDERS MARKED FOR DEMOLITION. EQUIPMENT TAGS SHOWN LIGHT SHALL
BE EXISTING TO REMAIN. FEEDERS SHALL BE REMOVED FROM EXISTING
DUCTBANKS AND REPLACED WITH THE NEW NORMAL POWER FEEDER LOOP.
SEE CIVIL DRAWINGS, ES102 AND E-600 SERIES DRAWINGS FOR FURTHER
INFORMATION.
4. SEE DRAWING ED601 FOR FURTHER INFORMATION ON EQUIPMENT TO BE
DEMOLISHED.
GENERAL SHEET NOTES:
ELECTRICAL
DEMOLITION
SITE PLAN
ES101
MJRTO
SCALE: 1" = 60'-0"
DEMOLITION
EXISTING TO
REMAIN
NEW/TEMPORARY
WORK
1. PHASE 1 OF THIS PROJECT ENTAILS THE CONSTRUCTION OF THE NEW
GENERATOR BUILDING AND ALSO THE CONSTRUCTION OF THE NEW NORMAL,
EMERGENCY AND LOW VOLTAGE DUCTBANKS.
2. NEW MEDIUM VOLTAGE GENERATORS SHALL FULLY BE TESTED AND
COMMISSIONED BEFORE PROCEEDING.
3. PHASE 2 OF THIS PROJECT WILL REPLACE (9) BUILDING-LEVEL EMERGENCY
GENERATORS WITH PAD-MOUNTED TRANSFORMERS. A TEMPORARY
GENERATOR IS REQUIRED FOR THIS WORK TO ENSURE THAT THE BUILDING
WILL NOT BE LEFT WITHOUT EMERGENCY POWER. THE TEMPORARY
GENERATOR SIZE AND VOLTAGE SHALL BE COMMENSURATE WITH THE SIZE
OF EACH DEMOLISHED GENERATOR. CONTRACTOR SHALL NOTIFY VA OF AN
EMERGENCY POWER SHUTDOWN AT LEAST 2 WEEKS IN ADVANCE.
4. THIS WORK CAN PROCEED ONE BUILDING AT A TIME, HOWEVER MULTIPLE
GENERATORS CAN BE REPLACED AT THE SAME TIME, PROVIDED THAT
MULTIPLE TEMPORARY GENERATORS ARE AVAILABLE.
GENERAL PHASING NOTES:
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELANE
FIRELANE
FIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANE
UTILITY TRANSFORMERS
MH-2A
MH-2B
MH-2
MH-3
SELECTOR SWITCH "53":
- XFMR 44562, T-43, 208V
- XFMR T-44, 240V
SELECTOR SWITCH "42"
EE 9811
SELECTOR SWITCH "60":
- FEEDERS 1, 2, & 3
MH-5
MH-5.5
SELECTOR SWITCH "41" BYPASS
MH-8
MH-7
MH-4B
SELECTOR SW "34"
XFMR 44541 TL-23
SELECTOR SW "49"
BLDG 1:
- 49-6, 5, 4, 3, 2, 49
OHM-8
OHM-9
SELECTOR SW "55"
SWGR
SELECTOR SW "2" &
XFMR 137631, TL-36 B2
SELECTOR SW "19" &
XFMR 54947, TL-32, 500KVA
MH-6
MH-11
HV-10
F1 F7F2
F1 F7F2
F1
F1
F1
F1
F7 F2
F2
F7 F2
F7
F7
F2
F2
F2
F7
SELECTOR SW "61"
NEW FENCE WITH DUAL AUTHENTICATION
SCREENING GATE SYSTEM. SEE DETAILS 5
& 6/EP403 FOR CONNECTION INFORMATION
FOR POWER AND SECURITY SYSTEMS.
NEW GENERATOR BUILDING 37
SEE INTERIOR ELECTRICAL PLANS
FOR FURTHER INFORMATION
NEW CONCRETE ENCASED DUCTBANK
SEE CIVIL DRAWINGS FOR FURTHER
INFORMATION.
F4F4
F4
F4
F4
(N) MANHOLE MH-18N
& MANHOLE MH-21E
(N) MANHOLE MH-15N
& MANHOLE MH-16E
F4 (N) MANHOLE MH-17N
& MANHOLE MH-17E
F4
F4 F5
F5
F4 F5
(N) MANHOLE MH-14N
& MANHOLE MH-15E
(N) MANHOLE MH-13N
& MANHOLE MH-13E
F4 F5
(N) MANHOLE MH-10N
& MANHOLE MH-10E F4
F5
F3
F3
F3
(N) XFMR-5, 112.5-KVA
12470-VOLT::208-VOLT
(N) XFMR-21, 75-KVA
12470-VOLT::208-VOLT
(N) XFMR-31 & XFMR-31A,
300-KVA, 12470-VOLT::208-VOLT
300-KVA, 12470-VOLT::240-VOLT
(N) XFMR-26, 225-KVA
12470-VOLT::208-VOLT
(N) XFMR-62, 300-KVA
12470-VOLT::480-VOLT (N) XFMR-2, 750-KVA
12470-VOLT::480-VOLT
(N) XFMR-34, 750-KVA
12470-VOLT::480-VOLT
(N) XFMR-13, 150-KVA
12470-VOLT::208-VOLT
(N) MANHOLE MH-12N
& MANHOLE MH-12E
(N) MANHOLE MH-16N
(N) MANHOLE MH-19N
E1
E1
E1
E1
E1
E2
E1 E2 E2
E2
E2
E1
E2
NEW CONCRETE ENCASED DUCTBANK
FOR UTILITIES TO NEW BUILDING. SEE
EP400 SERIES FOR CONTINUATION.
E1 E1
E1
E2
(N) ATS-21, 208-VOLT, 225-AMP
NEMA 3R RATED
NEW PAD MOUNTED LOAD BANK AND
TRANSFORMER MOUNTED ON SKID RAILS
F3 F3
(N) MANHOLE MH-20N
& MANHOLE MH-20E
E1
BUILDING 35A. SEE DRAWING EP101
FOR FURTHER INFORMATION.
MH-2A
MH-2B
F3
F3
F3
E1
(N) MANHOLE MH-14E
F5
(N) MANHOLE MH-19E
(N) MANHOLE MH-18E
E1
E2
F4
F4
E2
NO. DESCRIPTION DATE
PLAN
NORTH
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
KEYPLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT CENTRALIZED
EMERGENCY POWER SYSTEM
589A7-21-132
Project Director
2026-03-26
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
M-R PROJECT NO: 0499-0162
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
Civil / Site Utility Engineering:Hazardous Materials:
MABBETT & ASSOCIATES, INC.
Fire & Life Safety:
STANTON ENGINEERING SERVICES, LLC
Architectural:
OCULUS, INC.
Structural:
PROFESSIONAL ENGINEERING
CONSULTANTS, PA (PEC)
IMEG, CORP. 37
20 12
34, 34A
1B
2A
5B
1A
35A
7A
1C
5A
3A
1. REFER TO SHEETS E-001 AND E-002 FOR SYMBOLS, ABBREVIATIONS AND
NOTES.
2. ALL NEW MANHOLES AND HANDHOLES SHALL BE LOCKABLE.
3. THIS DRAWING IS DIAGRAMMATIC. SEE E-600 SERIES AND CIVIL DRAWINGS
FOR FOR FURTHER INFORMATION ON NEW DUCTBANKS, MANHOLES,
HANDHOLES AND NEW ELECTRICAL EQUIPMENT. ATS/LOW VOLTAGE CABLING
SHALL HAVE HANDHOLES LOCATED AS SHOWN ON CIVIL DRAWINGS.
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1. RUN NEW MEDIUM VOLTAGE NORMAL POWER CABLES IN EXISTING CONCRETE
ENCASED DUCTBANK FROM MANHOLE TO SELECTOR SWITCH. SPARE
CONDUIT PATHWAY WILL BE MADE AVAILABLE VIA DEMOLITION OF EXISTING
FEEDER.
2. NEW UNDERGROUND CONCRETE ENCASED DUCTBANK FOR EMERGENCY
LOOP CABLES TO LOCATION OF EXISTING PAD FOR DEMOLISHED GENERATOR.
3. NEW UNDERGROUND CONCRETE ENCASED DUCTBANK CONDUITS SHALL BE
EXTENDED AS REQUIRED FOR LOOP FEEDER TERMINATIONS UNDER THE
EXISTING GENERATOR CONCRETE PAD AT THE LOCATION OF EACH OF THE
TWO (2) LOOP FEED SWITCHES.
ELECTRICAL
NEW WORK SITE PLAN
ES102
MJRTO
SCALE: 1" = 60'-0"
UNDERGROUND
EXISTING TO
REMAIN
NEW/TEMPORARY
WORK
1. PHASE 1 OF THIS PROJECT ENTAILS THE CONSTRUCTION OF THE NEW
GENERATOR BUILDING AND ALSO THE CONSTRUCTION OF THE NEW NORMAL,
EMERGENCY AND LOW VOLTAGE DUCTBANKS.
2. NEW MEDIUM VOLTAGE GENERATORS SHALL FULLY BE TESTED AND
COMMISSIONED BEFORE PROCEEDING.
3. PHASE 2 OF THIS PROJECT WILL REPLACE (9) BUILDING-LEVEL EMERGENCY
GENERATORS WITH PAD-MOUNTED TRANSFORMERS. A TEMPORARY
GENERATOR IS REQUIRED FOR THIS WORK TO ENSURE THAT THE BUILDING
WILL NOT BE LEFT WITHOUT EMERGENCY POWER. THE TEMPORARY
GENERATOR SIZE AND VOLTAGE SHALL BE COMMENSURATE WITH THE SIZE
OF EACH DEMOLISHED GENERATOR. CONTRACTOR SHALL NOTIFY VA OF AN
EMERGENCY POWER SHUTDOWN AT LEAST 2 WEEKS IN ADVANCE.
4. THIS WORK CAN PROCEED ONE BUILDING AT A TIME, HOWEVER MULTIPLE
GENERATORS CAN BE REPLACED AT THE SAME TIME, PROVIDED THAT
MULTIPLE TEMPORARY GENERATORS ARE AVAILABLE.
GENERAL PHASING NOTES:
(E) PANEL EE109836
(E) BATTERIES
(E) HINDLE POWER PANEL
(E) PANEL EE109823
(E) PANEL EE109834(D) PLC BOX
SECT. 9
EASTBOROUGH SWITCHGEAR
PAWNEE SWITCHGEAR
SECT. 8 SECT. 7 SECT. 6 SECT. 5
SECT. 1 SECT. 2 SECT. 3 SECT. 4
(E) PAWNEE UTILITY
LINE TRANSFORMER (E) EASTBOROUGH UTILITY
LINE TRANSFORMER
(E) BUS
BETWEEN
SWITCHGEAR
(N)
SECT. 0
SECT. 5 SECT. 6 SECT. 7 SECT. 8 SECT. 9
(E) BUS BETWEEN SWITCHGEAR
(E) PANEL EE109836
VENT
VENT
BUS 2
P.T.
FUTURE
(SPARE)
FEEDER
F4
FUTURE
(SPARE)
FEEDER
F3
FEEDER
F5
MAIN 2
AUX-2
CPT-2
GEN-1
(SPARE)
AUX-G
SECT. 1 SECT. 2 SECT. 3 SECT. 4
(E) BUS BETWEEN SWITCHGEAR
MAIN 1
AUX-1
CPT-1
FEEDER
F7
FEEDER
F2
FEEDER
F1
1000KVA
SOLAR
XFMR
BUS 1
TIE
AUX-1
BUS 1
PT
(E) BATTERIES
(E) PANEL EE109834
(E) EXHAUST FAN
(N)
CIRCUIT
BREAKER
SPARE
(N)
CIRCUIT
BREAKER
FEED F9
(D) PLC BOX
NO. DESCRIPTION DATE
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT CONSTRUCT CENTRALIZED
EMERGENCY POWER SYSTEM
589A7-21-132
Project Director
2026-03-26
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
M-R PROJECT NO: 0499-0162
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
Civil / Site Utility Engineering:Hazardous Materials:
MABBETT & ASSOCIATES, INC.
Fire & Life Safety:
STANTON ENGINEERING SERVICES, LLC
Architectural:
OCULUS, INC.
Structural:
PROFESSIONAL ENGINEERING
CONSULTANTS, PA (PEC)
IMEG, CORP. 37
1. REFER TO SHEETS E-001 AND E-002 FOR SYMBOLS, ABBREVIATIONS AND
NOTES.
2. ALL ELECTRICAL EQUIPMENT SHOWN ON THIS DRAWING SHALL BE EXISTING
TO REMAIN, UNLESS OTHERWISE NOTED.
GENERAL SHEET NOTES:
ELECTRICAL
POWER PLAN
BUILDING 35A
EP101
MJRTO
SCALE: 1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
3 3 O
S
2 31 4
A
B
C
'EM1'
'EM1'
'EM1' 'EM1'
'EM1'
'A1''A1''A1'
'A1'
'W1'
'X1'
'W1'
'W1'
'X1'
'W1''W1''W1'
'W1'
'W1'
'X1'
'W1'
'A1''A1''A1'
2 2 2 2
'A1'
'A1'
'A1'
31313131
31 31
31 31 31
31 31
EL1-7
EL1-7
EL1-7
EL1-7
EL1-7
EL1-7
EL1-7
EL1-7
'EM1' EL1-7
'C1''C1''C1'
'C1''C1''C1'
'C1''C1'
313131
GENERATOR
ROOM
FIRE RISER
ROOM
SWITCHGEAR
ROOM
'W1' 31 'W1' 31
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
CONSULTANTS
321 4 5 6 7 8 9 10
NO.
This is the start of the file's text. The full file is on GovTribe.