This is a Fire Suppression System design drawing and specification document for a federal construction project at the Robert J. Dole VA Medical Center in Wichita, Kansas. The document provides comprehensive technical requirements, abbreviations, legends, general notes, and detailed plans for the installation of a new automatic dry-pipe fire suppression sprinkler system for the entire new building.

The project requires a complete, automatic dry-type sprinkler system designed and installed in accordance with NFPA 13 (2022), NFPA 101 (2021), IBC 2024, and VA-PG-18-10 Fire Protection Design Manual (November 2023). The system must be designed to cover all building areas with maximum coverage of 130 square feet per head for ordinary hazard occupancies and 100 square feet for extra hazard occupancies. Design criteria specify light hazard at 0.10 GPM/SF over 1,500 SF, ordinary hazard group-1 at 0.15 GPM/SF, ordinary hazard group-2 at 0.20 GPM/SF, and extra hazard group-1 at 0.30 GPM/SF over 2,500 SF. Pipe sizes 2 inches and smaller must be black steel schedule 40 with threaded connections; sizes 2.5 inches and larger must be black steel schedule 10 with grooved connections. All components must be UL-listed and FM-approved. The contractor is responsible for performing water flow tests, developing hydraulic calculations, preparing scaled working drawings, and commissioning the system in accordance with manufacturer and NFPA requirements. All work must be coordinated with other trades to avoid obstructions and maintain proper coverage, with the contractor bearing responsibility for adding heads as needed at no additional cost to the owner. The project includes detailed specifications for seismic bracing, pipe penetrations, hanger installation, and system testing and inspection requirements.

View the file

Other files

File Type Posted
589A7-21-132 Wichita Bid Drawings 01_General_Complete.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 3 of 10.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 4 of 10.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 10 of 10.pdf PDF
02_Structural.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 2 of 10.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 6 of 10.pdf PDF
589A7-21-132 Wichita Bid Drawings 07_Mechanical 1 of 2.pdf PDF
589A7-21-132 Wichita EPS_Bid Docs - Specifications - Volume I.pdf PDF
589A7-21-132 Wichita Bid Drawings 07_Mechanical 2 of 2.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 9 of 10.pdf PDF
04_Fire Protection and Fire Alarm Narrative.pdf PDF
589A7-21-132 Wichita Bid Drawings 02_HazMat_Complete.pdf PDF
589A7-21-132 Wichita EPS_Bid Docs - Specifications - Volume II.pdf PDF
589A7-21-132 Wichita Bid Drawings 08_Electrical 1 of 2.pdf PDF
36C25526R0125_1.docx DOCX document
852.219-75 VA Notice of Limitations on Subcontracting General Construction.pdf PDF
589A7-21-132 Wichita Bid Drawings 09_Fire Alarm_Complete.pdf PDF
05_Mechanical Narrative.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 1 of 10.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 5 of 10.pdf PDF
589A7-21-132 Wichita Bid Drawings 05_Architectural Complete.pdf PDF
01_Civil Narrative.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 8 of 10.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 7 of 10.pdf PDF
06_Electrical.pdf PDF
03_Architectural Narrative.pdf PDF
589A7-21-132 Wichita Bid Drawings 08_Electrical 2 of 2.pdf PDF
589A7-21-132 Wichita Bid Drawings 04_Structural_Complete.pdf PDF
APPENDIX 2- PRICE BREAKDOWN AND CALCULATION OF SELF-PERFORMED and SUBCONTRACTED WORK.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPRINKLER PIPE

ELBOW

TEE

CHECK VALVE

CONTROL VALVE

WATERFLOW INDICATOR

BACKFLOW PREVENTER

RISER CHECK VALVE

ORDINARY HAZARD GROUP 1

ORDINARY HAZARD GROUP 2

EXTRA HAZARD GROUP 1

UPRIGHT SPRINKLER HEAD

FIRE DEPARTMENT CONNECTION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

CONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

STANTON ENGINEERING SERVICES

PROFESSIONAL ENGINEERENGINEER OF RECORD

M-R PROJECT NO:

Civil / Site Utility Engineering:

IMEG, CORP.

Fire & Life Safety:

STANTON ENGINEERING SERVICES

Hazardous Materials:

MABBETT & ASSOCIATES, INC.

Architect:

OCULUS, INC.

Structural:

PROFESSIONAL ENGINEERING

CONSULTANTS, PA (PEC)

A u to d e s k D o c s /W ic h it a

C e n tr a liz e d E m e rg e n c y P o w e r/

-1

-K

S

W ic h it a V

A M

C O

C U

L U

S C

E N

T R

A L -F

IR

E

-R

.r v t

/2

/2

:1

:0

P

M

FX001

CONSTRUCT CENTRALIZED

EMERGENCY POWER SYSTEM

589A7-21-132

Project Director

2026-03-26 KD AL

BID DOCUMENTS

FULLY SPRINKLERED

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

0499-0162

FIRE SUPPRESSION

ABBREVIATIONS, LEGEND

AND GENERAL NOTES

FIRE SUPPRESSION ABBREVIATIONS FIRE SUPPRESSION LEGEND

1. THE FIRE PROTECTION SCOPE OF WORK INVOLVES THE INSTALLATION OF A NEW, DRY-PIPE FIRE SUPPRESSION AUTOMATIC SPRINKLER SYSTEM FOR THE ENTIRE NEW BUILDING.

2. ALL AREAS ARE TO BE PROTECTED WITH AUTOMATIC SPRINKLER SYSTEMS UNLESS OTHERWISE NOTED.

3. SYSTEMS SHALL BE DESIGNED, INSTALLED AND TESTED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AS WELL AS THE FOLLOWING CODES AND STANDARDS:

A. CRITERIA IN VA-PG-18-10 FIRE PROTECTION DESIGN MANUAL (NOVEMBER 2023)

B. IBC - INTERNATIONAL BUILDING CODE, 2024

C. NFPA 13 - STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2022 EDITION

D. NFPA 101 - LIFE SAFETY CODE, 2021 EDITION

E. NFPA 241 - STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS, 2022 EDITION

4. PROVIDE A COMPLETE, AUTOMATIC DRY-TYPE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 REQUIREMENTS AND VA STANDARDS IN ALL AREAS AS NOTED ON PLANS.

5. PROVIDE ALL EQUIPMENT, MATERIAL, LABOR, SUPERVISION, COSTS AND SERVICES REQUIRED TO INSTALL COMPLETE AND WORKING SYSTEMS INCLUDING ALL ITEMS AND APPURTENANCES NECESSARY, REASONABLY INCIDENTAL, OR CUSTOMERILY

INCLUDED, EVEN THOUGH EACH AND EVERY ITEM IS NOT SPECIFIED OR SHOWN.

6. PENETRATIONS OF WALLS OR FLOORS FOR SPRINKLER PIPING AND/OR EQUIPMENT SHALL BE PROPERLY SEALED AFTER INSTALLATIONS.

7. IN GENERAL, SPRINKLERS SHALL BE ARRANGED FOR A MAXIMUM COVERAGE NO GREATER THAN 130 SQUARE FEET PER HEAD FOR ORDINARY HAZARD OCCUPANCIES AND 100 SF FOR EXTRA HAZARD OCCUPANCIES. COORDINATE WITH OTHER DISCIPLINES TO

AVOID OBSTRUCTIONS SUCH AS LIGHTS, DIFFUSERS, ETC.

8. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE PIPING AND SPRINKLER HEADS FOR PROPER COVERAGE IN EACH AREA AND ADD ADDITIONAL HEADS TO OBTAIN PROPER COVERAGE AS REQUIRED BY VARIATIONS IN FIELD LOCATIONS AND OBSTRUCTIONS AT NO ADDITIONAL COST TO OWNER. OBTAIN FINAL APPROVED ARCHITECTURAL LAYOUTS BEFORE LAYING OUT WORKING DRAWINGS.

9. PAINT AND LABEL ALL NEW SPRINKLER PIPE IN ACCORDANCE WITH SPECIFICATION 21 13 13.

10. CONTRACTOR SHALL SEAL ALL PIPE WALL AND FLOOR PENETRATIONS IN FIRE RATED BARRIERS WITH A LISTED FIRE STOP SYSTEM. SEE ARCHITECTURAL LIFE SAFETY PLAN FOR LOCATIONS OF SMOKE AND FIRE RATED PARTITIONS AND BARRIERS.

11. COORDINATE SPRINKLER PIPE RUNS WITH DUCTWORK, PLUMBING PIPING, AND LIGHTS. MAINTAIN 4'' CLEAR ABOVE LIGHTS. DO NO INTERFERE WITH DUCT ACCESS DOORS.

12. PIPE SIZES 2” AND SMALLER SHALL BE BLACK STEEL SCHEDULE 40 WITH THREADED END CONNECTIONS. PIPE SIZES 2.5” AND LARGER SHALL BE BLACK STEEL SCHEDULE 10 WITH GROOVED CONNECTIONS. GROOVES IN SCHEDULE 10 PIPING SHALL BE ROLLED GROOVED ONLY. HANGERS SHALL BE IN ACCORDANCE WITH NFPA 13. SPRINKLERS IN AREAS WITHOUT CEILINGS SHALL HAVE ROUGH BRASS OR FACTORY STANDARD FINISH. ALL COMPONENTS SHALL BE UL LISTED AND FM APPROVED.

13. FLUSH, TEST, AND INSPECT WATER SUPPLY AND SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 AND 25. COMMISSION SYSTEM IN ACCORDANCE WITH MANUFACTURER, NFPA 13, COR, AND COMMISSIONING AGENT REQUIREMENTS. PROVIDE COPIES OF O&M MANUALS, CORRECTED SUBMITTALS, AS-BUILT SHOP DRAWINGS, AND TWO COPIES OF NFPA 25 TO OWNER, PROVIDE SYSTEM MAINTENANCE AND OPERATION INSTRUCTIONS TO OWNER'S PERSONNEL. SCHEDULE ACCEPTANCE TESTING TO BE WITNESSED BY CONTRACTING OFFICER'S REPRESENTATIVE (COR). PROVIDE CONTRACTOR'S CERTIFICATION AND TESTING PAPERWORK PER NFPA 13 AND 25.

14. HYDRAULICALLY DESIGN SYSTEM PER NFPA 13 AND IN ACCORDANCE WITH PROJECT SPECIFICATIONS AND VA FIRE PROTECTION DESIGN MANUAL. CALCULATED DEMAND INCLUDING HOSE STREAM REQUIREMENTS SHALL FALL NO LESS THAN 10 PERCENT BELOW THE AVAILABLE WATER SUPPLY CURVE. PROVIDE A NEW FLOW TEST IN ACCORDANCE WITH NFPA 13 AND NFPA 291 PROCEDURES. SUBMIT HYDRAULIC CALCULATIONS TO CONTRACTING OFFICER'S REPRESENTATIVE (COR).

15. PREPARE SCALED WORKING DRAWINGS IN ACCORDANCE WITH NFPA 13 SHOWING LAYOUT AND DETAILS OF SPRINKLER SYSTEM. SUBMIT DRAWINGS SHOWING LAYOUT TO CONTRACTING OFFICER'S REPRESENTATIVE (COR).

16. THE DESIGN CRITERIA FOR THE SPRINKLER SYSTEM SHALL BE IN ACCORDANCE WITH NFPA 13:

A. LIGHT HAZARD CLASSIFICATION: 0.10 GPM/SF DENSITY OVER 1500 SF FIRE AREA.

B. ORDINARY HAZARD GROUP-1 CLASSIFICATION: 0.15 GPM/SF DENSITY OVER 1500 SF FIRE AREA.

C. ORDINARY HAZARD GROUP-2 CLASSIFICATION: 0.20 GPM/SF DENSITY OVER 1500 SF FIRE AREA.

D. EXTRA HAZARD GROUP-1 CLASSIFICATION: 0.30 GPM/SF DENSITY OVER 2500 SF FIRE AREA.

17. WHERE STATIC PRESSURES EXCEED 100 PSI, SPRINKLERS IN A PENDENT POSITION SHALL HAVE A CUMULATIVE HORIZONTAL LENGTH OF UNSUPPORTED ARM OVERS, BRANCHLINE ENDS, OR SPRINKLER DROP SHALL NOT EXCEED 12 INCHES. IN ADDITION, EACH HANGER CLOSEST TO THE SPRINKLER SHALL BE OF A TYPE THAT PREVENTS UPWARD MOVEMENT OF PIPING.

18. CONTRACTOR TO ENSURE THAT ALL FIXED OBSTRUCTIONS OVER 4 FT IN WIDTH ARE PROVIDED WITH SPRINKLER PROTECTION UNDERNEATH IN ACCORDANCE WITH NFPA 13, 9.5.5.3.1. CONTRACTOR SHALL BE AWARE THAT THE BUILDING HAS EXTENSIVE UTILITY OBSTRUCTIONS THROUGHOUT AND THESE OBSTRUCTIONS MAY NOT ALL BE INDICATED ON THE PLANS HEREIN.

19. OPEN GRATE FLOORING OVER 4 FT IN WIDTH SHALL REQUIRE SPRINKLER PROTECTION BELOW THE GRATING IN ACCORDANCE WITH NFPA 13, 9.5.5.3.1.1.

20. CONTRACTOR SHALL BE RESPONSIBLE FOR PERFORMING A NEW WATER FLOW TEST PRIOR TO DEVELOPMENT OF SHOP DRAWINGS. CONTRACTOR'S HYDRAULIC CALCULATIONS SHALL INDICATE ALL HYDRAULIC NODES BACK TO THE TEST HYDRANT IN

ACCORDANCE WITH NFPA 13.

21. BUILDING WILL UTILIZE SEISMIC DESIGN CATEGORY C. FOLLOW NFPA 13 FOR SEISMIC BRACING REQUIREMENTS.

FIRE SUPPRESSION GENERAL NOTES

AAR

AHU

ALV

AS

BFP

BOR

CHV

CIS

CLG

COR

CV

DACT

DBA

DC

DD

DIA

DIM

DN

DT

EA

EAR

EB

EF

EH

EL

EMER

EQUIP

EST

ETR

EXIST

FA

FD

FDC

FE

FEC

FFE

FH

FHV

FLR

FM

FS

FT

GA

GC

GPM

GR

GF

HGT

HL

AUTOMATIC AIR RELEASE

AIR HANDLING UNIT

ALARM CHECK VALVE

AUTOMATIC SPRINKLER

BACK FLOW PREVENTER

BOTTOM OF RISER

CHECK VALVE

COMMON INTELLIGIBILITY SCORE

CEILING

CONTRACTING OFFICER'S REPRESENTATIVE

CONTROL VALVE

DIGITAL ALRM COMMUNICATOR TRANSMITTER

DECIBEL A-WEIGHTED

DIRECT CURRENT

DUCT SMOKE DETECTOR

DIAMETER

DIMENSION

DOWN/DROP NIPPLE

DRY PIPE VALVE TEMPERATURE

EACH

ELEVATOR ALTERNATE FLOOR RECALL

ELECTRIC BELL

EXHAUST FAN

EXTRA HAZARD

ELEVATION

EMERGENCY

EQUIPMENT

ELEVATOR SHUNT TRIP

EXISTING TO REMAIN

EXISTING

FIRE ALARM

FLOOR DRAIN

FIRE DEPARTMENT CONNECTION

FIRE EXTINGUISHER

FIRE EXTINGUISHER CABINET

FINISHED FLOOR ELEVATION

FIRE HAT

FIRE HOSE VALVE

FLOOR

FACTORY MUTUAL

FLOW SWITCH

FEET

GAUGE

GENERAL CONTRACTOR

GALLONS PER MINUTE

GENERATOR RUNNING

GENERATOR FAULT

HEIGHT

HI/LOW AIR SUPERVISORY

HT

ID

LH

LOC

MNS

OD

OH

PS

PSI

R

RCV

REQ

RM

RN

RPZ

S

SBV

SCHED

SCV

SD

SDC

SGV

SIM

SP

SPEC

SPKR

SP/ST

SQ

SR

SSI

ST

STOR

STS

SYST

TEMP

TOR

TS

TYP

UL

VAC

W/

WMG

W/O

WP

WS

ZCA

HEAT TRACING

INSIDE DIAMETER

LIGHT HAZARD

LOCAL OPERATING CONSOLE

MASS NOTIFICATION SYSTEM

OUTSIDE DIAMETER

ORDINARY HAZARD

PRESSURE SWITCH

POUNDS PER SQUARE INCH

RISER

RISER CONTROL VALVE

REQUIRED

ROOM

RISER NIPPLE

REDUCED PRESSURE ZONE

SUPPLY

SUPERVISED BUTTERFLY VALVE

SCHEDULE

SUPERVISED CONTROL VALVE

SMOKE DETECTOR

SMOKE DAMPER CONTROL

SUPERVISED GATE VALVE

SIMILAR

SPEAKER

SPECIFICATION

SPRINKLER

SPEAKER/STROBE

SQUARE

SLEEPING ROOM

SECURITY SYSTEM INTERFACE

STROBE

STORAGE

SHUNT TRIP SUPERVISION

SYSTEM

TEMPERATURE

TOP OF RISER

TAMPER SWITCH

TYPICAL

UNDERWRITERS' LABORATORY

VOLT, ALTERNATING CURRENT

WITH

WATER MOTOR GONG

WITHOUT

WEATHERPROOF

WET SYSTEM

ZONE CONTROL ASSEMBLY

1 2 3 4

A

C

B

GENERATOR

ROOM

FIRE RISER ROOM

FDC

6" INCOMING

WATER SERVICE

6"

6"

6"

6"

F7

FX101

BACKFLOW

PREVENTER

NITROGEN

GENERATOR

SWITCHGEAR

ROOM

GROUND FLOOR

0"

ROOF

19'-6"

6"

6"

6"

BACKFLOW

PREVENTER

DRY PIPE

VALVE

FIRE

DEPARTMENT

CONNECTION

INCOMING

SERVICE LINE

CHECK VALVE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

CONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

STANTON ENGINEERING SERVICES

PROFESSIONAL ENGINEER

NORTH

ENGINEER OF RECORD

M-R PROJECT NO:

Civil / Site Utility Engineering:

IMEG, CORP.

Fire & Life Safety:

STANTON ENGINEERING SERVICES

Hazardous Materials:

MABBETT & ASSOCIATES, INC.

Architect:

OCULUS, INC.

Structural:

PROFESSIONAL ENGINEERING

CONSULTANTS, PA (PEC)

A u to d e s k D o c s /W ic h it a

C e n tr a liz e d E m e rg e n c y P o w e r/

-1

-K

S

W ic h it a V

A M

C O

C U

L U

S C

E N

T R

A L -F

IR

E

-R

.r v t

/2

/2

:1

:2

P

M

FX101

CONSTRUCT CENTRALIZED

EMERGENCY POWER SYSTEM

589A7-21-132

Project Director

2026-03-26 KD AL

BID DOCUMENTS

FULLY SPRINKLERED

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

0499-0162

FIRE SUPPRESSION

GROUND FLOOR PLAN

GENERAL NOTES

A. PROVIDE FM APPROVED QUICK RESPONSE SPRINKLERS IN THE

FIRE RISER ROOM AND SWITCH GEAR ROOM, AND STANDARD

RESPONSE SPRINKLERS IN ALL OTHER AREAS.

B. IN UNFINISHED ROOMS WITH NO CEILING PROVIDE UPRIGHT TYPE

SPRINKLER HEADS. COORDINATE HEAD LOCATIONS WITH HVAC

CONTRACTOR TO MAINTAIN ADEQUATE COVERAGE ABOVE AND

BELOW LARGE DUCTWORK AND OTHER OBSTRUCTIONS AS

GOVERNED BY NFPA 13.

KEYED NOTES

1/4" = 1'-0"F1

FIRE SUPPRESSION GROUND FLOOR

3/8" = 1'-0"F7

FIRE RISER ROOM ELEVATION VIEW

1. PROVIDE SPRINKLER COVERAGE WITHIN THE ROOM AND SPACE

ABOVE THE ROOM AT CEILING LEVEL. SPRINKLER COVERAGE

ABOVE ROOM WILL BE CONSIDERED EXTRA HAZARD GROUP 1.

BEAM CLAMP HANGER

(FOR BAR JOIST)

I-BEAM CLAMP HANGER

ARMOVER SPRIG UP

I-BEAM CLAMP HANGER

1" PIPE

1" PIPE

BRANCH

LINE

BRANCH

LINE

REDUCING

COUPLING

REDUCING

COUPLING

CEILING

SPRINKLER

HEAD

SPRINKLER

HEAD

ALL THREAD ROD

ALL THREAD ROD

SPLIT RING

HANGER

SPLIT RING

HANGER

BEAM CLAMP

WITH LOCKNUT

BEAM CLAMP

WITH LOCKNUT

ALL THREAD ROD

SPLIT RING

HANGER

CONCRETE SLAB

DROP-IN

ANCHOR

LONITUDINAL BRACE (SIDE VIEW)

LATERAL BRACE (FRONT VIEW)

FOUR WAY RISER BRACE (TOP VIEW)

BRACE PIPE

BRACE PIPE

PIPE CLAMP FOR

SWAY BRACE

1" PIPE

REDUCING COUPLING

CEILING

SPRINKLER HEAD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

CONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

STANTON ENGINEERING SERVICES

PROFESSIONAL ENGINEERENGINEER OF RECORD

M-R PROJECT NO:

Civil / Site Utility Engineering:

IMEG, CORP.

Fire & Life Safety:

STANTON ENGINEERING SERVICES

Hazardous Materials:

MABBETT & ASSOCIATES, INC.

Architect:

OCULUS, INC.

Structural:

PROFESSIONAL ENGINEERING

CONSULTANTS, PA (PEC)

A u to d e s k D o c s /W ic h it a

C e n tr a liz e d E m e rg e n c y P o w e r/

-1

-K

S

W ic h it a V

A M

C O

C U

L U

S C

E N

T R

A L -F

IR

E

-R

.r v t

/2

/2

:1

:1

P

M

FX501

CONSTRUCT CENTRALIZED

EMERGENCY POWER SYSTEM

589A7-21-132

Project Director

2026-03-26 KD AL

BID DOCUMENTS

FULLY SPRINKLERED

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

0499-0162

FIRE SUPPRESSION

DETAILS

NTSF1

SPRINKLER ARMOVER, SPRIG, AND

HANGER DETAILS

NTSF4

SEISMIC/EARTHQUAKE

NTSD1

SEMI-RECESSED SPRINKLER HEAD

DETAIL

FX001 - FIRE SUPPRESSION ABBREVIATIONS, LEGEND AND GENERAL NOTES
FX101 - FIRE SUPPRESSION GROUND FLOOR PLAN
FX501 - FIRE SUPPRESSION DETAILS

File details come from the government source that posted it. Updated .