589A7-21-132 Wichita Bid Drawings 03_Civil 1 of 10.pdf
PDF 8 MB Posted
- Solicitation number
- 36C25526R0125
About this file
This document is a civil design drawing set for a construction project at Robert J. Dole VA Medical Center in Wichita, Kansas. The project, identified as 589A7-21-132, involves constructing a centralized emergency power system and is issued by the Office of Construction and Facilities Management under the U.S. Department of Veterans Affairs.
The bid documents include comprehensive civil engineering drawings with notes, legends, site control plans, demolition plans, site plans, grading plans, erosion control plans, and utility plans (electrical, steam, storm, and firewater systems). Key technical elements include horizontal and vertical control points using NAD 83 and NAVD 88 datums respectively, with multiple benchmarks (TBM-1 through TBM-9) established across the facility. The drawing set specifies construction requirements for site preparation, grading to 95% compaction density per ASTM D-698, erosion control measures compliant with Kansas Standards and Specifications, and stormwater management in accordance with the City of Wichita Stormwater Manual. The overall site plan is drawn at 1" = 150' scale, with detail plans at 1" = 20-40' scales. Professional engineering consultants include IMEG Corp. and Professional Engineering Consultants, PA (PEC) for structural work, with civil drawings prepared by Linnea K. Shaw. The project is fully sprinklered and includes extensive utility infrastructure modifications throughout the medical center campus.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HORIZONTAL CONTROL - NAD 83
POINT #
NORTHING
1684352.4109
1684126.5106
1683944.4443
1683992.8662
1684018.3499
1683936.8341
1683942.1261
1684257.5033
1684409.6986
1684592.4773
1684588.9383
1684501.7598
1684387.2231
EASTING
1666380.0298
1666403.1923
1666526.9207
1666732.7066
1666975.1289
1667271.8294
1667566.5738
1667738.6052
1667412.6383
1667066.3605
1666768.4036
1666604.5168
1666380.5130
DESCRIPTION
10" SPIKE
10" SPIKE
10" SPIKE
10" SPIKE
REBAR W/ BROKEN CAP
10" SPIKE
REBAR W/ BROKEN CAP
10" SPIKE
REBAR W/ BROKEN CAP
MAGNAIL
MAGNAIL
10" SPIKE
10" SPIKE
ELEVATION
1347.47
1346.80
1350.95
1356.88
1354.58
1348.82
1347.66
1349.28
1349.46
1359.02
1359.28
1358.35
1347.66
DESCRIPTION
TBM-1
TBM-2
TBM-3
1348.93
1354.88
1355.08
ELEVATION
NORTH BOLT ON FHY LOCATED BETWEEN ER/MAIN
ENTRANCE
BOLT MUELLER ON FHY SOUTH OF BLD 3 MAIN ENT/
BOTTOM OF RAMP
BOLT MUELLER ON FHY SW OF BLDG 1 MAIN ENT
VERTICAL CONTROL - NAVD 88
TBM-4
TBM-5
TBM-6
1347.91
1348.23
1349.76
BOLT MUELLER ON FHY SOUTH OF BLDG 59'/ 60'
COURT YD.
"X" SOUTH COR OF PCC SIGN FOUNDATION FOR BLDG
21 JUST INSIDE WEST GATE
NORTH BOLT ON FHY NORTH EAST COR OF BLDG 60'
ALONG ROADWAY
TBM-7
TBM-8
TBM-9
1352.29
1361.87
1357.44
BOLT MUELLER SOUTH OF BLDG 20' IN ISLAND
"X" ON NW PCC LIGHT BASED BETWEEN SOLAR
PANELS NORTH PARKING LOTS BY CANOPY 6
BOLT MUELLER ON FHY LOCATED NORTHWEST
CORNER OF BLDG 61
NO. DESCRIPTION DATE
on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6"
6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot 4 on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseENGINEER OF RECORDCONSULTANT CONSTRUCT CENTRALIZED
EMERGENCY POWER SYSTEM
589A7-21-132
Project Director
2026-03-26
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
Civil / Site Utility Engineering:Hazardous Materials:
MABBETT & ASSOCIATES, INC.
Fire & Life Safety:
STANTON ENGINEERING SERVICES, LLC
Architectural:
OCULUS, INC.
Structural:
PROFESSIONAL ENGINEERING
CONSULTANTS, PA (PEC)IMEG, CORP. 37
LKS PTD
CIVIL
LINNEA K.
SHAW
062-074863
CJ100
GENERAL NOTES
1. ALL IMPROVEMENTS SHOWN ON THESE ENGINEERING PLANS SHALL COMPLY
WITH THE CITY OF WICHITA DESIGN AND SPECIFICATIONS, VA WICHITA DESIGN
AND SPECIFICATIONS. AND THE STANDARDS OF THE KANSAS DEPARTMENT OF
HEALTH AND ENVIRONMENT, LATEST EDITION.
2. UNDERGROUND FACILITIES, STRUCTURES AND UTILITIES HAVE BEEN PLOTTED
FROM AVAILABLE SURVEYS, RECORDS, AND FIELD INVESTIGATION. THEIR
LOCATIONS MUST BE CONSIDERED APPROXIMATE ONLY. IT IS POSSIBLE THERE
MAY BE OTHERS, THE EXISTENCE OF WHICH PRESENTLY NOT KNOWN OR
SHOWN. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THEIR
EXISTENCE AND EXACT LOCATION AND TO AVOID DAMAGE THERETO.
3. ALL DEBRIS RESULTING FROM CONSTRUCTION OPERATIONS SHALL BE
PROPERLY DISPOSED OF OFF-SITE UNLESS NOTED.
4. THE CONTRACTOR SHALL EXERCISE PROPER CAUTION TO PROTECT THE
EXISTING IMPROVEMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
REPAIRING ANY DAMAGE.
5. CLEANUP AND FINAL INSPECTION. WORK BROKEN OR DAMAGED BY CONTRACTOR
ACTIVITY SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S EXPENSE.
ALL WASTE MATERIAL, CONCRETE WASHOUT, LANDSCAPE WASTE AND BUILDING
MATERIAL SHALL BE REMOVED. SOIL SHALL BE REMOVED FROM PAVED AREAS
AND THE PROJECT SHALL BE LEFT IN A CLEAN AND WORKMANLIKE MANNER.
6. IF SURPLUS SOIL NEEDS TO BE REMOVED FROM SITE, SOIL SHALL BE
CONSIDERED CONTAMINATED AND TREATED AS SUCH PER SPECIFICATION 31 20
11. CONTRACTOR SHALL PROPOSED A STORAGE AREA ON SITE, WITHIN PROJECT
BOUNDARIES, FOR VA REVIEW AND APPROVAL. SURPLUS SOILS CAN BE USED AS
BACKFILL IF THE VA GEMS AND/OR COR APPROVE, AFTER REVIEW OF PROPOSED
WORK. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PICK A PERMITTED
LOCATION FOR SOIL STORAGE AND ASSUME ALL COSTS FOR SOIL DISPOSAL.
GRADING NOTES
1. ALL ELEVATIONS SHOWN ARE TO FLOWLINE FINISHED GRADE OR TOP OF
PAVEMENT UNLESS OTHERWISE STATED.
2. PROVIDE POSITIVE DRAINAGE AT ALL TIMES WITHIN THE CONSTRUCTION AREAS.
DO NOT ALLOW WATER TO POND ON PROPERTY.
3. PRIOR TO PLACEMENT OF ANY FILL, THE STRIPPED SITE SHALL BE SCARIFIED TO
A DEPTH OF 9 INCHES AND RE-COMPACTED TO 95% DENSITY. ANY UNSUITABLE
SOILS FOUND AT THIS TIME SHALL BE DRIED AND RECOMPACTED OR REMOVED IF
REQUIRED COMPACTION CANNOT BE OBTAINED. CUT AREAS SHALL ALSO BE
SCARIFIED TO A DEPTH OF 9 INCHES AND RE-COMPACTED TO 95% DENSITY.
4. ALL FILL MATERIAL SHALL CONSIST OF APPROVED, SUITABLE SOILS PLACED IN
LOOSE LIFTS OF 9 INCHES OR LESS AND COMPACTED TO AT LEAST 95% OF THE
MATERIAL'S MAXIMUM STANDARD PROCTOR DRY DENSITY (ASTM D-698) IN ALL
PAVEMENT, BUILDING ADDITION AND ATHLETIC FIELD AREAS. THE COMPACTION
WILL BE FIELD TESTED BY A SOILS ENGINEERING CONSULTANT REPRESENTING
THE OWNER.
5. PROJECT WILL BE COVERED BY A GENERAL PERMIT REGULATING RUNOFF FROM
CONSTRUCTION SITES. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PERFORM
THE REQUIRED MONITORING, INSPECTION AND MAINTENANCE AS REQUIRED BY
THE PERMIT.
6. ALL DISTURBED EMBANKMENTS GREATER THAN 3:1 SLOPES SHALL BE SEEDED
ACCORDING TO A RECOMMENDED SEEDING MIX BY THE LANDSCAPER AND
COVERED WITH EROSION CONTROL BLANKETS OR AS DIRECTED BY PLAN
DOCUMENTS.
7. CONTRACTOR SHALL ADHERE TO THE CITY OF WICHITA STORMWATER MANUAL
AND THE STATE OF KANSAS STANDARDS AND SPECIFICATIONS FOR EROSION
AND SEDIMENT CONTROL.
8. ALL AREAS TO BE GREENSPACE AT PROJECT COMPLETION SHALL BE LEFT WITH 6
INCHES OF TOPSOIL WHEN MASS GRADING ACTIVITIES ARE COMPLETE.
SITE CONTROL
SCALE: 1" = '150
EROSION CONTROL NOTES
1. EROSION CONTROL SHALL BE INSTALLED PRIOR TO ANY GRADING OPERATIONS
WHERE POSSIBLE.
2. CONSTRUCTION ENTRANCE SHALL BE MAINTAINED TO PREVENT OFF-SITE
TRACKING OF SEDIMENT ONTO PUBLIC ROADWAYS. ANY SEDIMENT DEPOSITED
ON PUBLIC ROADS SHALL BE REMOVED BY SHOVELING OR STREET CLEANING
BEFORE THE END OF EACH WORKING DAY.
3. SHOWN LOCATION OF SILTATION CONTROL IS APPROXIMATE. ACTUAL LOCATIONS
TO BE DETERMINED IN THE FIELD AT THE TIME OF CONSTRUCTION.
4. WATER PUMPED DURING CONSTRUCTION OPERATIONS SHALL BE FILTERED.
5. STABILIZATION OF DISTURBED AREAS. AT A MINIMUM, BE INITIATED IMMEDIATELY
WHENEVER CLEARING, GRADING, EXCAVATING OR OTHER EARTH DISTURBING
ACTIVITIES HAVE PERMANENTLY CEASED ON ANY PORTION OF THE SITE OR
TEMPORARILY CEASED ON ANY PORTION OF THE SITE AND WILL NOT RESUME
FOR A PERIOD EXCEEDING 14 CALENDAR DAYS. EROSION CONTROL DEVICES
SHALL REMAIN IN PLACE AND BE MAINTAINED UNTIL THE CONTRACTOR
ESTABLISHES A GOOD STAND OF GRASS OF UNIFORM COLOR AND DENSITY TO
THE SATISFACTION OF THE ENGINEER.
6. CONTRACTOR SHALL ADHERE TO THE KANSAS STANDARDS AND SPECIFICATIONS
FOR EROSION AND SEDIMENT CONTROL.
7. ALL EROSION CONTROL MEASURES MUST BE INSTALLED ( WHERE POSSIBLE )
PRIOR TO THE COMMENCEMENT OF ANY EARTH DISTURBING OPERATIONS. THE
REMAINING EROSION CONTROL MEASURES SHALL BE INSTALLED AS SOON AS
REASONABLY POSSIBLE AFTER GRADING OPERATIONS BEGIN. WHERE THE
PRESENCE OF SILT FENCE WILL INTERFERE WITH ACTIVITIES, DIVERSION DITCHES
AND SMALL TEMPORARY SEDIMENT TRAPS SHALL BE UTILIZED UNTIL SILT FENCE
OR OTHER MEASURES MAY BE INSTALLED AND VEGETATION ESTABLISHED.
8. EROSION CONTROL MEASURES SHALL BE INSPECTED WEEKLY AND AFTER EACH
PRECIPITATION EVENT AND REPLACED OR REPAIRED AS NECESSARY.
9. SILT FENCE AND SEDIMENT BASIN SHALL BE CLEANED OR REPLACED WHEN SILT
BUILDS UP TO WITHIN ONE HALF CAPACITY OG THE TOP OF THE SILT FENCE.
10. PROJECT WILL BE COVERED BY A GENERAL PERMIT REGULATING RUNOFF FROM
CONSTRUCTION SITES. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PERFORM
THE REQUIRED MONITORING, INSPECTION AND MAINTENANCE AS REQUIRED BY
THE PERMIT.
11. CONCRETE WASHOUT DEBRIS SHOULD BE HAULED OFF-SITE. WASHOUT SHOULD
BE FILLED IN AND SEEDED.
12. ALL AREAS DISTURBED BEYOND LIMITS SHOWN SHOULD BE SEEDED WITH
ADJACENT SEED MIXTURE OR IN-KIND.
INDEX OF SHEETS
SHEET TITLE SHEET NUMBER
NOTES, LEGEND, & SITE CONTROL CJ100
OVERALL EXISTING CONDITIONS CD100
DETAIL DEMOLITION PLAN 1 CD101
DETAIL DEMOLITION PLAN 2 CD102
DETAIL DEMOLITION PLAN 3 CD103
DETAIL DEMOLITION PLAN 4 CD104
DETAIL DEMOLITION PLAN 5 CD105
OVERALL SITE PLAN CS100
DETAIL SITE PLAN 1 CS101
DETAIL SITE PLAN 2 CS102
DETAIL SITE PLAN 3 CS103
DETAIL SITE PLAN 4 CS104
DETAIL SITE PLAN 5 CS105
DETAILED GRADING PLAN CG100
EROSION CONTROL PLAN CG101
OVERALL ELECTRICAL PLAN CU100
P&P ELECTRIC BACKBONE SOUTH 1 CU101
P&P ELECTRIC BACKBONE SOUTH 2 CU102
P&P ELECTRIC BACKBONE SOUTH 3 CU103
P&P ELECTRIC BACKBONE WEST 1 CU104
P&P ELECTRIC BACKBONE WEST 2 CU105
P&P ELECTRIC BACKBONE EAST 1 CU106
P&P ELECTRIC BACKBONE EAST 2 CU107
P&P ELECTRIC BACKBONE EAST 3 CU108
P&P ELECTRIC BUILDING 1 CU109
P&P ELECTRIC BUILDING 4 CU110
P&P ELECTRIC BUILDING 26 CU111
P&P ELECTRIC BUILDING 34 CU112
P&P STEAM CU113
P&P STORM CU114
P&P FIREWATER CU115
CIVIL DETAILS CK100
CIVIL DETAILS CK101
CIVIL DETAILS CK102
NOTES
NOTES, LEGEND, & SITE CONTROL
RAILROAD SPIKE, FOUND
SURVEY BOUNDARY
HANDHOLE
POWER POLE
HYDRANT
WATER VALVE
GAS VALVE
LIGHT POLE
SIGN
SPOT ELEVATION
MEASURED DIMENSION
RECORDED DIMENSION
R.O.W. MARKER, FOUND
ELECTRIC PEDESTAL/TRANSFORMER
TELEPHONE PEDESTAL
TELEPHONE POLE
SOIL BORING HOLE
FLARED END SECTION
SECTION LINE
EASEMENT LINE
OVERHEAD ELECTRIC
GAS LINE
UNDERGROUND ELECTRIC
SANITARY/STORM CLEANOUT
TELEPHONE LINE
R.O.W. LINE
ELECTRIC MANHOLE
TELEPHONE MANHOLE
UTILITY MANHOLE
LIGHT JUNCTION BOX
CONIFER TREE
DECIDUOUS TREE
TREE STUMP
BUSH/SHRUB
VAPOR LIGHT
CONTROL POINT
UNKNOWN MANHOLE
WELL
GUY WIRE
FLAGPOLE
POST/BOLLARD
HISTORICAL LINE - AS NOTED
PROPERTY LINE
DOWNSPOUT
BENCHMARK
ELECTRIC METER
WATER METER
FORCE MAIN
SANITARY SEWER
STORM SEWER
PIPE UNDERDRAIN
WATER LINE
SETBACK LINE
UTILITY LINE
GUY POLE
GRADE LABEL
POWER POLE W/ LIGHT
POWER POLE W/ METER
DRAINAGE SLOPE
LINE CONTINUATION
CENTERLINE
SANITARY MANHOLE
CONCRETE MONUMENT, FOUND
PIPE, FOUND
SPRINKLER BOX
WATER SERVICE
EDGE OF WATER LINE/DITCH FLOWLINE
UTILITY NOTES
1. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT ALL
EXISTING UTILITIES AND PAVED STREETS, INCLUDING ANY NOT SHOWN ON
THESE DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES
PRIOR TO CONSTRUCTION AND NOTIFY THE ENGINEER IF ANY CONFLICTS WITH
THE DRAWINGS OCCUR. ANY DAMAGE TO EXISTING UTILITIES AND/OR PAVED
STREETS CAUSED BY TRENCHING AND GRADING OPERATIONS SHALL BE
REPAIRED AT THE CONTRACTOR'S EXPENSE. EXISTING UTILITY LOCATIONS
SHOWN ON THE DRAWINGS ARE APPROXIMATE.
2. ALL EXISTING UNDERGROUND UTILITIES SHOWN WERE LOCATED PARTIALLY IN
THE FIELD AND PARTIALLY FROM REVIEW OF EXISTING PUBLIC RECORDS. IT IS
THE RESPONSIBILITY OF THE CONTRACTOR TO CONTACT EACH UTILITY
COMPANY FOR THE FIELD LOCATION OF THEIR EXISTING LINES IN OR NEARBY
THE CONSTRUCTION AREA PRIOR TO BEGINNING ANY CONSTRUCTION.
CONTRACTOR IS REQUIRED TO PROVIDE GROUND PENETRATING RADAR SURVEY
WITHIN 10 FEET OF ALL NEW PROPOSED UNDERGROUND UTILITY ROUTES (20
FEET WIDE SURVEY FOR ALL NEW ROUTES). CONTRACTOR IS RESPONSIBLE TO
PROVIDE POTHOLING AT ALL LOCATIONS WHERE A NEW UNDERGROUND UTILITY
WILL CROSS AN EXISTING UNDERGROUND UTILITY IDENTIFIED BY THE GROUND
PENETRATING RADAR PROVIDED BY CONTRACTOR.
3. CONTRACTOR IS RESPONSIBLE FOR PUBLIC AND PRIVATE UTILITY LOCATES.
4. THE CONTRACTOR SHALL EXERCISE PROPER CAUTION TO PROTECT THE
EXISTING IMPROVEMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
REPAIRING ANY DAMAGE.
5. THE LOCATIONS OF THOSE BURIED AND ABOVE GROUND UTILITIES SHOWN ARE
APPROXIMATE, ARE SHOWN FOR CONTRACTOR INFORMATIONAL USE ONLY, AND
ARE NOT TO BE REFERENCED FOR CONSTRUCTION PURPOSES. THE IMPLIED
PRESENCE OR ABSENCE OF UTILITIES IS NOT TO BE CONSTRUED BY THE OWNER,
ENGINEER, CONTRACTOR, OR SUBCONTRACTORS TO BE AN ACCURATE AND
COMPLETE REPRESENTATION OF UTILITIES THAT MAY OR MAY NOT EXIST ON THE
CONSTRUCTION SITE. BURIED AND ABOVE GROUND UTILITY LOCATION,
IDENTIFICATION, AND MARKING ARE THE SOLE RESPONSIBILITY OF THE
CONTRACTOR. REROUTING, DISCONNECTION, PROTECTION, ETC. OF ANY
UTILITY MUST BE COORDINATED BETWEEN THE CONTRACTOR, UTILITY COMPANY
AND OWNER. SITE SAFETY, INCLUDING THE AVOIDANCE OF HAZARDS
ASSOCIATED WITH BURIED AND ABOVEGROUND UTILITIES, REMAINS THE SOLE
RESPONSIBILITY OF THE CONTRACTOR.
6. UTILITY PIPING. ALL WORK SHALL BE PERFORMED IN CONFORMANCE WITH THE
PIPE MANUFACTURER'S RECOMMENDATIONS FOR INSTALLATION METHODS
INCLUDING BACKFILL MATERIAL AND MATERIAL DEPTHS. PIPE MATERIAL SHALL
BE AS SPECIFIED ON THE PLANS. ALL MATERIAL SHALL MEET THE
REQUIREMENTS OF THE LOCAL JURISDICTION FOR STRENGTH, MATERIAL TYPE
AND CONFORMITY WITH THE EXISTING SYSTEM. SEWER LINES SHALL BE
CONSTRUCTED STRAIGHT TO THE SPECIFIED LINE AND GRADES. MANHOLES,
STORM INLETS, VALVE BOXES AND APPURTENANCES SHALL BE ADJUSTED TO
GRADE OR PER PLAN PRIOR TO SEEDING/LANDSCAPING ACTIVITIES.
7. WATER MAIN SHALL BE CONSTRUCTED IN ACCORDANCE WITH LOCAL WATER
COMPANY STANDARD SPECIFICATIONS FOR WATER MAIN CONSTRUCTION.
8. ALL WATER MAIN SHALL HAVE A MINIMUM COVER OF 5 FEET.
9. MAINTAIN 18 INCHES VERTICAL SEPARATION (OUTER EDGE TO OUTER EDGE)
BETWEEN WATER MAIN AND SEWER.
10. NITRILE GASKETS SHALL BE USED WHERE WATER MAIN CROSSES BELOW STORM
SEWER.
REMOVAL LIMITS
TREE LINE
FLOOD PLAIN
FLOODWAY
CONSTRUCTION LIMITS
STEAM LINE
HOT MIX ASPHALT (HMA) HATCH
PORTLAND CEMENT CONCRETE (PCC) HATCH
IMEG CORP. HAS ADOPTED SAFETY PROCEDURES FOR ITS EMPLOYEES WHO PROVIDE PROFESSIONAL ENGINEERING AND SURVEYING SERVICES. A COPY OF THESE PROCEDURES IS AVAILABLE FROM THE SAFETY OFFICER. IMEG CORP. PERSONNEL ARE NOT TRAINED IN CONTRACTOR (CONSTRUCTION) SAFETY AND COMPLIANCE PROCEDURES. THE METHODS AND MEANS TO COMPLY WITH CONSTRUCTION SITE
SAFETY ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
STORM MANHOLE
STORM INLET
STORM DOUBLE INLET
L E G E N D
STORM INLET
PROPOSED EXISTING
CHILLED WATER LINE
FIRE WATER LINE
34A
01B
19A
01C
01A03
26A
10 11 16
13A
FUTURE BUILDING
13B
W L
WL
W L
WL
WL
W L
W L
W L
W L
W L
WL
W L
W L
W L
W L
W L
WL
WLW
L
W L
W L
W L
WL
WL
W L
W L
W L
W L
W L
W L
WLWL
WLWL
W L
W L
W L
WL
WL
WL
W L
W L
W L
W L
W L
W L
W L
W L
W L
WL
WL
WL
W L
W L
W L
W L
W L
W L
W L
W L
W L
WW
W L
W L
WLWL
W
L WL
W L
WL
HEX 1
HEX 2
HEX 3
HEX 4
HEX 6
HEX 7
HEX 8
WW
HEX 5W
L
FIRELANE
FIRELANE
FIRELANE
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIRELANE
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FI
R
EL
AN
E
FIRELANE FIRELANE FIRELANE FIRELANE FIRELANE FIRELANE FIRELANE FIRELANE FIRELANE FIRELANE FIRELANE
FIRELANE
FIRELANE FIRELANE FIRELANE
FIRELANE
FIRELANE
FIRELANE FIRELANE FIRELANE FIRELANE
VAN VAN
VANVAN
VAN
FIRELANE
FI
REL
AN
E
FIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANE
FIRELANE
FIRELANE
FIRELANE
FIRELANE
FIRELANE
FIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANE
FIRELANEFIRELANEFIRELANEFIRELANE
FIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANE
VANVAN
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
FIR
ELAN
E
VAN
FIRELANEFIRELANEFIRELANE
FIRELANE
FIRELANE
VAN VAN VAN VAN
FIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANE
FIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANEFIRELANE
FIRELANE
FIRELANE
FIRELANE
FIRELANE
FIRELANE
FIRELANE
FIRELANE
FIRELANE
8"
8"
8"
6"
4"
4"6"
6"
6"
8" 8"
8" 8"
6"
8"
6"
6" 8"
8"
4"4"
8"
6" 8"
8"
3"
1"
1.
5"
1" 1"
1"
NO. DESCRIPTION DATE
on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6"
6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot 4 on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseENGINEER OF RECORDCONSULTANT CONSTRUCT CENTRALIZED
EMERGENCY POWER SYSTEM
589A7-21-132
Project Director
2026-03-26
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
Civil / Site Utility Engineering:Hazardous Materials:
MABBETT & ASSOCIATES, INC.
Fire & Life Safety:
STANTON ENGINEERING SERVICES, LLC
Architectural:
OCULUS, INC.
Structural:
PROFESSIONAL ENGINEERING
CONSULTANTS, PA (PEC)IMEG, CORP. 37
LKS PTD
CIVIL
LINNEA K.
SHAW
062-074863
CD100
SCALE: 1" = '
0 20 40
OVERALL EXISTING CONDITIONS
ACTUAL NORTH
CD101 - DETAIL DEMOLITION PLAN 1
CD105 - DETAIL DEMOLITION PLAN 5
CD103 - DETAIL DEMOLITION PLAN 3
CD104 - DETAIL DEMOLITION PLAN 4
CD102 - DETAIL DEMOLITION PLAN 2
DEMOLITION
OVERALL EXISTING CONDITIONS
/ / / / / / /8"
8"
8"
6"
4"
4"6"
8"
8"
1.
5"
X X X
XX
XX X
XX
X
X
X
XX
XX
XX
X X X
X
X
XXX
XX
34A
01B
19A
01C
01A03
26A
10 11 16
13A
FUTURE BUILDING
13B
W L
W L
W
LWL
WL
W L
WL
W L
HEX 1
HEX 2
HEX 3
HEX 4
HEX 6
HEX 7
HEX 8
WW
HEX 5
FIR
ELAN
E
FIR
ELAN
E
FIRELANE FIRELANE
FIRELANE
VAN VAN
VANVAN
VAN
FIRELANE
FIRELANE
FIRELANEVANVAN
FIR
ELAN
E
FIR
ELAN
E
VAN
VAN VAN VAN VAN
FIRELANE
FIRELANE
FIRELANE
NO. DESCRIPTION DATE
on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6"
6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot 4 on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseENGINEER OF RECORDCONSULTANT CONSTRUCT CENTRALIZED
EMERGENCY POWER SYSTEM
589A7-21-132
Project Director
2026-03-26
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
ROBERT J. DOLE VA MEDICAL CENTER
WICHITA, KANSAS
Civil / Site Utility Engineering:Hazardous Materials:
MABBETT & ASSOCIATES, INC.
Fire & Life Safety:
STANTON ENGINEERING SERVICES, LLC
Architectural:
OCULUS, INC.
Structural:
PROFESSIONAL ENGINEERING
CONSULTANTS, PA (PEC)IMEG, CORP. 37
LKS PTD
CIVIL
LINNEA K.
SHAW
062-074863
CD101
SCALE: 1" = '
0 20 40
DETAIL DEMOLITION PLAN 1 ACTUAL NORTH
KEYPLAN
DETAIL DEMOLITION PLAN 1
DEMOLITION
| 589A7-21-132 Wichita Bid Drawings 03_Civil 1 |
| CJ100 - CIVIL NOTES NOTES, LEGEND, & SITE CONTROL |
| CD100 - CIVIL DEMOLITION OVERALL EXISTING CONDITIONS |
| CD101 - CIVIL DETAIL DEMOLITION PLAN 1 DEMOLITION |
| CD102 - CIVIL DETAIL DEMOLITION PLAN 2 DEMOLITION |
| CD103 - CIVIL DETAIL DEMOLITION PLAN 3 DEMOLITION |
| CD104 - CIVIL DETAIL DEMOLITION PLAN 4 DEMOLITION |
| CD105 - CIVIL DETAIL DEMOLITION PLAN 5 DEMOLITION |
| CS100 - CIVIL OVERALL SITE PLAN SITE |
| CS101 - CIVIL SITE DETAIL SITE PLAN 1 |
| CS102 - CIVIL SITE DETAIL SITE PLAN 2 |
| CS103 - CIVIL SITE DETAIL SITE PLAN 3 |
| CS104 - CIVIL SITE DETAIL SITE PLAN 4 |
| CS105 - CIVIL SITE DETAIL SITE PLAN 5 |
| CG100 - CIVIL SITE DETAILED GRADING PLAN |
| CG101 - CIVIL EROSION CONTROL PLAN GRADING |
| CU100 - CIVIL UTILITIES OVERALL ELECTRICAL PLAN |
| CU101 - CIVIL P&P ELECTRIC BACKBONE SOUTH 1 UTILITIES |
| CU102 - CIVIL P&P ELECTRIC BACKBONE SOUTH 2 UTILITIES |
| CU103 - CIVIL P&P ELECTRIC BACKBONE SOUTH 3 UTILITIES |
| CU104 - CIVIL P&P ELECTRIC BACKBONE WEST 1 UTILITIES |
| CU105 - CIVIL P&P ELECTRIC BACKBONE WEST 2 UTILITIES |
| CU106 - CIVIL P&P ELECTRIC BACKBONE EAST 1 UTILITIES |
| CU107 - CIVIL P&P ELECTRIC BACKBONE EAST 2 UTILITIES |
| CU108 - CIVIL P&P ELECTRIC BACKBONE EAST 3 UTILITIES |
| CU109 - CIVIL P&P ELECTRIC BUILDING 1 UTILITIES |
| CU110 - CIVIL P&P ELECTRIC BUILDING 4 UTILITIES |
| CU111 - CIVIL P&P ELECTRIC BUILDING 26 UTILITIES |
| CU112 - CIVIL P&P ELECTRIC BUILDING 34 UTILITIES |
| CU113 - CIVIL P&P STEAM UTILITIES |
| CU114 - CIVIL P&P STORM UTILITIES |
| CU115 - CIVIL P&P FIREWATER UTILITIES |
| CK100 - CIVIL DETAILS CIVIL DETAILS |
| CK101 - CIVIL CIVIL DETAILS DETAILS |
| CK102 - CIVIL CIVIL DETAILS DETAILS |
| 20260325_VA Wichita_Civil_Reduce_Reduced 2 |
| 20260325_VA Wichita_Civil_Reduce_Reduced 3 |
File details come from the government source that posted it. Updated .