589A7-21-132 Wichita EPS_Bid Docs - Specifications - Volume I.pdf

PDF 4 MB Posted

Attached to
Z2DA--589A7-21-132 Construct Centralized Emergency Power System
Solicitation number
36C25526R0125
Issued by

About this file

This document is the Specifications Volume I (Divisions 00-23) for Bid Documents related to the construction of a Centralized Emergency Power System at Robert J. Dole VA Medical Center in Wichita, Kansas, under VA Project No. 589A7-21-132. The contract period of performance is 730 calendar days from award.

The project scope encompasses multiple construction disciplines: architectural work includes a fully enclosed, blast-resistant CMU envelope with brick veneer generator building with utilitarian interior finishes; civil work covers site preparation, underground electrical duct banks, fuel oil storage tanks, steam piping, storm water piping, fire service piping, parking modifications, and security features; structural work involves foundations, steel framing, and equipment supports meeting PSRDM requirements; fire suppression includes a dry-pipe sprinkler system with nitrogen generator; fire alarm installation integrated with campus systems; mechanical systems include makeup air, ventilation, exhaust, cooling, heating, steam piping extension, and fuel oil systems for generators; and electrical work constructs a new centralized medium-voltage emergency power system with new generators, underground concrete-encased ductbanks for both normal and emergency power loops, and replacement of existing scattered life safety generators across campus. The new system must deliver power to emergency loads within the Code-mandated 10-second interval and back up main utility services for the entire campus with capacity for 150,000 square feet of future expansion. The specifications detail extensive requirements for contractor responsibilities including security procedures, utility coordination, phasing to maintain 24/7 medical center operations, construction fencing, temporary environmental controls, warranty management with 4 and 9-month post-construction inspections, photographic documentation with interactive digital indexing, equipment testing and commissioning, operations manuals, and Critical Path Method scheduling with monthly computerized reports and cost-loaded activities.

View the file

Other files

File Type Posted
05_Mechanical Narrative.pdf PDF
01_Civil Narrative.pdf PDF
589A7-21-132 Wichita Bid Drawings 08_Electrical 1 of 2.pdf PDF
589A7-21-132 Wichita Bid Drawings 07_Mechanical 2 of 2.pdf PDF
589A7-21-132 Wichita Bid Drawings 05_Architectural Complete.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 3 of 10.pdf PDF
36C25526R0125_1.docx DOCX document
06_Electrical.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 10 of 10.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 9 of 10.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 7 of 10.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 5 of 10.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 4 of 10.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 1 of 10.pdf PDF
589A7-21-132 Wichita Bid Drawings 01_General_Complete.pdf PDF
03_Architectural Narrative.pdf PDF
02_Structural.pdf PDF
589A7-21-132 Wichita Bid Drawings 08_Electrical 2 of 2.pdf PDF
589A7-21-132 Wichita Bid Drawings 04_Structural_Complete.pdf PDF
APPENDIX 2- PRICE BREAKDOWN AND CALCULATION OF SELF-PERFORMED and SUBCONTRACTED WORK.docx DOCX document
04_Fire Protection and Fire Alarm Narrative.pdf PDF
589A7-21-132 Wichita Bid Drawings 09_Fire Alarm_Complete.pdf PDF
589A7-21-132 Wichita Bid Drawings 07_Mechanical 1 of 2.pdf PDF
589A7-21-132 Wichita Bid Drawings 06_Fire Protection_Complete.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 8 of 10.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 6 of 10.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 2 of 10.pdf PDF
589A7-21-132 Wichita Bid Drawings 02_HazMat_Complete.pdf PDF
589A7-21-132 Wichita EPS_Bid Docs - Specifications - Volume II.pdf PDF
852.219-75 VA Notice of Limitations on Subcontracting General Construction.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID DOCUMENTS

SPECIFICATIONS

VOLUME I

DIV 00 – DIV 23

CENTRALIZED EMERGENCY POWER SYSTEM

Project# 589A7-21-132

Department of Veterans Affairs

Robert J. Dole VA Medical Center

Wichita, Kansas

1040 Kings Highway North

Suite 700

Cherry Hill, New Jersey 08034

(856) 429-4000

March 26, 2026

Department of Veterans Affairs VA Project No. 589A7-21-132

Robert J. Dole VA Medical Center Centralized Emergency Power System

Wichita, Kansas Bid Documents: 03/26/2026

08-01-2025

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 11-21

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 01-24

01 33 23 Shop Drawings, Product Data, and Samples 06-25

01 33 23.01 Submittal Register

01 35 26 Safety Requirements for Major Projects 05-24

01 42 19 Reference Standards 11-20

01 45 00 Quality Control 02-21

01 45 29 Testing Laboratory Services 11-18

01 45 35 Special Inspections 06-21

01 57 19 Temporary Environmental Controls 01-21

01 58 16 Temporary Interior Signage 07-15

01 74 19 Construction Waste Management 04-22

01 81 13 Sustainable Construction Requirements 10-17

01 91 00 General Commissioning Requirements 04-22

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17

02 82 11 Traditional Asbestos Abatement 01-21

02 83 33.13 Lead-Based Paint Removal and Disposal 01-21

DIVISION 03 – CONCRETE

03 30 00 Cast-in-Place Concrete 01-21

DIVISION 04 – MASONRY

04 05 13 Masonry Mortaring 10-17

04 20 00 Unit Masonry 08-17

04 72 00 Cast Stone Masonry 01-21

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-18

05 21 00 Steel Joist Framing 11-18

05 31 00 Steel Decking 01-21

00 01 10-2

05 50 00 Metal Fabrications 08-18

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 13 Thermal Insulation 01-21

07 22 00 Roof and Deck Insulation 01-21

07 54 23 Thermoplastic Polyolefin (TPO) Roofing 01-21

07 60 00 Flashing and Sheet Metal 01-21

07 72 00 Roof Accessories 01-21

07 92 00 Joint Sealants 04-22

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-21

08 33 00 Extreme Impact Resistant Coiling Doors 01-21

08 56 53 Blast Resistant Windows 01-21

08 71 00 Door Hardware 03-24

08 80 00 Glazing 01-21

DIVISION 09 – FINISHES

09 06 00 Schedule for Finishes 01-21

09 91 00 Painting 01-21

DIVISION 10 – SPECIALTIES

10 14 00 Signage 01-21

10 22 13 Wire Mesh Partitions 01-21

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural

Components

01-21

DIVISION 21- FIRE SUPPRESSION

21 13 16 Dry-Pipe Sprinkler Systems 01-15

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 03-23

23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment

03-23

00 01 10-3

23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment

03-23

23 05 93 Testing, Adjusting, and Balancing for HVAC 03-23

23 07 11 HVAC and Boiler Plant Insulation 02-20

23 08 00 Commissioning of HVAC Systems 03-23

23 09 23 Direct-Digital Control System for HVAC 03-23

23 10 00 Facility Fuel Systems 04-20

23 22 13 Steam and Condensate Heating Piping 03-24 23 22 23 Steam Condensate Pumps 04-20

23 31 00 HVAC Ducts and Casings 03-23

23 34 00 HVAC Fans 03-23

23 37 00 Air Outlets and Inlets 03-23

23 40 00 HVAC Air Cleaning Devices 03-23

23 74 13 Packaged, Outdoor, Central-Station Air-Handling Units 03-23

23 81 00 Decentralized Unitary HVAC Equipment 03-24

23 82 00 Convection Heating and Cooling Units 03-23

23 82 16 Air Coils 03-24

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 11-22

26 05 13 Medium-Voltage Cables 06-25

26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22

26 05 26 Grounding and Bonding for Electrical Systems 11-22

26 05 33 Raceway and Boxes for Electrical Systems 11-22

26 05 41 Underground Electrical Construction 06-25

26 05 73 Overcurrent Protective Device Coordination Study 11-22

26 08 00 Commissioning of Electrical Systems 11-22

26 09 23 Lighting Controls 11-22

26 12 19 Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers 11-22

26 13 13 Medium-Voltage Circuit Breaker Switchgear 06-25

26 13 16 Medium-Voltage Fusible Interrupter Switches 11-22

26 22 00 Low-Voltage Transformers 11-22

26 23 13 Generator Paralleling Controls 11-22

26 23 15 Emergency Power Sequence of Operation 02-26

26 24 16 Panelboards 11-22

26 27 26 Wiring Devices 11-22

26 29 11 Motor Controllers 11-22

26 29 21 Enclosed Switches and Circuit Breakers 11-22

26 32 13 Engine Generators 11-22

26 36 23 Automatic Transfer Switches 11-22

26 41 00 Facility Lightning Protection 11-22

26 51 00 Interior Lighting 03-24

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19

27 05 26 Grounding and Bonding for Communications Systems 06-15

00 01 10-4

27 05 33 Raceways and Boxes for Communications Systems 10-18

27 08 00 Commissioning of Communications Systems 11-16

27 10 00 Control, Communication and Signal Wiring 06-15

27 15 00 Communications Structured Cabling 01-16

27 31 31 Voice Communications Switching and Routing Equipment -

Extension

06-15

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18

28 05 13 Conductors and Cables for Electronic Safety and

Security

10-18

28 05 28.33 Conduits and Backboxes for Electronic Safety and

Security

09-11

28 08 00 Commissioning of Electronic Safety and Security Systems 11-16

28 13 00 Physical Access Control System 10-11

28 23 00 Video Surveillance 09-11

28 31 00 Fire Detection and Alarm 10-11

DIVISION 31 – EARTHWORK

31 20 11 Earthwork (Short Form) 10-12

31 63 26 Drilled Caissons 10-12

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 08-16

32 12 16 Asphalt Paving 09-15

32 17 23 Pavement Markings 08-16

32 31 40 High Security Fences and Gates 08-16

32 90 00 Planting 08-16

DIVISION 33 – UTILITIES

33 10 00 Water Utilities 03-17

33 40 00 Storm Sewer Utilities 12-17

33 63 00 Steam Energy Distribution 02-24

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWINGS

The drawings listed below accompanying this specification form a part of the contract.

DRAWING NO. TITLE

GENERAL

GI001 COVER SHEET

HAZARDOUS MATERIALS

HA101 ABATEMENT PLAN - HOSPITAL CAMPUS

CIVIL

CJ100 NOTES, LEGEND, & SITE CONTROL

CD100 DEMOLITION OVERALL EXISTING CONDITIONS

CD101 DETAIL DEMOLITION PLAN 1

CD102 DETAIL DEMOLITION PLAN 2

CD103 DETAIL DEMOLITION PLAN 3

CD104 DETAIL DEMOLITION PLAN 4

CD105 DETAIL DEMOLITION PLAN 5

CS100 OVERALL SITE PLAN

CS101 DETAIL SITE PLAN 1

CS102 DETAIL SITE PLAN 2

CS103 DETAIL SITE PLAN 3

CS104 DETAIL SITE PLAN 4

CS105 DETAIL SITE PLAN 5

CG100 DETAILED GRADING PLAN

CG101 EROSION CONTROL PLAN

CU100 OVERALL ELECTRICAL PLAN

CU101 UTILITIES P&P ELECTRIC BACKBONE SOUTH 1

CU102 UTILITIES P&P ELECTRIC BACKBONE SOUTH 2

CU103 UTILITIES P&P ELECTRIC BACKBONE SOUTH 3

CU104 UTILITIES P&P ELECTRIC BACKBONE WEST 1

CU105 UTILITIES P&P ELECTRIC BACKBONE WEST 2

00 01 15 - 2

CU106 UTILITIES P&P ELECTRIC BACKBONE EAST 1

CU107 UTILITIES P&P ELECTRIC BACKBONE EAST 2

CU108 UTILITIES P&P ELECTRIC BACKBONE EAST 3

CU109 UTILITIES P&P ELECTRIC BUILDING 1

CU110 UTILITIES P&P ELECTRIC BUILDING 4

CU111 UTILITIES P&P ELECTRIC BUILDING 26

CU112 UTILITIES P&P ELECTRIC BUILDING 34

CU113 UTILITIES P&P STEAM

CU114 UTILITIES P&P STORM

CU115 UTILITIES P&P FIREWATER

CK100 CIVIL DETAILS

CK101 CIVIL DETAILS

CK102 CIVIL DETAILS

STRUCTURAL

S-000 NOTES, SYMBOLS, ABBREVIATIONS - STRUCTURAL

COVER SHEET

S-001 GENERAL NOTES

S-002 GENERAL NOTES AND SPECIAL INSPECTION TABLES

S-100 FLOOR PLANS - GRADE BEAN AND DRILLED PIER PLAN

S-101 FLOOR PLANS - FOUNDATION PLAN

S-111 FLOOR PLANS - LID AND CATWALK FRAMING PLAN

S-112 FLOOR PLANS - ROOF FRAMING PLAN

S-201 ELEVATIONS - BRACED AND MOMENT FRAMES

S-202 ELEVATIONS - BRACED AND MOMENT FRAMES

S-203 ELEVATIONS - CMU WALLS

S-204 ELEVATIONS - CMU WALLS

S-501 TYPICAL FOUNDATION DETAILS

S-502 FOUNDATION DETAILS

S-503 FOUNDATION DETAILS

S-511 TYPICAL FRAMING DETAILS

S-512 FRAMING DETAILS

S-513 FRAMING DETAILS

S-521 TYPICAL CMU DETAIL

S-522 SECURITY FENCING DETAILS

S-701 SCHEDULES

00 01 15 - 3

ARCHITECTURAL

A-001 NOTES, SYMBOLS, ABBREVIATIONS

A-101 LIFE SAFETY PLAN

A-111 FLOOR PLAN

A-112 FLOOR PLAN

A-114 ROOF PLAN

AI111 INTERIORS FLOOR PLAN

AI112 INTERIORS FLOOR PLAN

A-201 EXTERIOR ELEVATIONS

A-202 EXTERIOR ELEVATIONS

A-301 BUILDING SECTIONS

A-303 WALL SECTIONS

A-304 WALL SECTIONS

A-305 WALL SECTIONS

A-501 DETAILS

A-502 DETAILS

A-503 TYPICAL ROOF DETAILS

AS501 SITE WALL DETAILS

AF601 SIGNAGE DETAILS/SCHEDULE

A-701 DOOR AND WINDOW SCHEDULE

FIRE SUPPRESSION

FX001 ABBREVIATIONS, LEGEND, AND GENERAL NOTES

FX101 GROUND FLOOR PLAN

FX501 DETAILS

MECHANICAL

M-001 ABBREVIATIONS, NOTES, & SYMBOLS

M-002 NOTES

MS101 OVERALL SITE PLAN

MS102 SITE PLAN - ENLARGED PLAN TANKS & NEW TRENCHES

MS103 SITE DETAILS

MQ111 EQUIPMENT PLAN - GROUND FLOOR

MQ131 EQUIPMENT PLAN - ROOF

MH111 DUCTWORK PLAN - GROUND FLOOR

MH131 DUCTWORK PLAN - ROOF

00 01 15 - 4

MP111 PIPING PLAN - GROUND FLOOR

MP131 PIPING PLAN - ROOF

M-301 BUILDING ELEVATIONS AND SECTIONS

M-302 BUILDING SECTION

M-303 3D VIEW @ FUEL OIL EQUIPMENT

MP501 DETAILS

MP502 DETAILS

MP503 DETAILS

MP601 NO. 2 FUEL OIL FLOW DIAGRAM - GENERATORS #1 &

#2

MP602 NO. 2 FUEL OIL FLOW DIAGRAM - GENERATORS #3 &

ENTRY PIT

M-603 FLOW DIAGRAM - STEAM

M-701 SCHEDULES

M-702 SCHEDULES

M-703 SCHEDULES

M-801 CONTROLS - BUILDING 37

M-802 CONTROLS - BUILDING 37

M-803 SEQUENCE OF OPERATIONS

ELECTRICAL

E-001 ABBREVIATIONS & SYMBOLS

E-002 NOTES

ED601 DEMOLITION CAMPUS SINGLE LINE DIAGRAM

ED602 DEMOLITION BUILDING SINGLE LINE DIAGRAMS

ES101 DEMOLITION SITE PLAN

ES102 NEW WORK SITE PLAN

EP101 POWER PLAN BUILDING 35A

EL111 LIGHTING PLAN GROUND FLOOR

EP111 POWER PLAN GROUND FLOOR

EP131 POWER & LIGHTNING PROTECTION PLAN ROOF

EY111 SIGNAL PLAN GROUND FLOOR

EP401 ENLARGED PLANS - BUILDINGS 1, 2, 5 & 36

EP402 ENLARGED PLANS - BUILDINGS 13, 20, 26, 29 & 62

EP403 ENLARGED PLANS - BUILDINGS 34, 60 & 61

E-501 DETAILS

00 01 15 - 5

E-502 DETAILS

E-601 NEW WORK SWITCHGEAR SINGLE LINE DIAGRAM

E-602 NEW WORK CAMPUS NORMAL LOOP SINGLE LINE DIAGRAM

E-603 NEW WORK CAMPUS EMERGENCY LOOP SINGLE LINE

DIAGRAM

E-701 SCHEDULES & BUILDING 37 SINGLE LINE DIAGRAM

FIRE ALARM

FA001 ABBREVIATIONS, LEGEND, AND GENERAL NOTES

FA101 GROUND FLOOR PLAN

FA501 DETAILS

- - - E N D - - -

00 01 15 - 6

Page Intentionally Left Blank

11-01-21

01 00 00 - 1

SECTION 01 00 00

GENERAL REQUIREMENTS

GENERAL

1.1 SAFETY REQUIREMENTS

A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for Construct Centralized

Emergency Power System, Robert J. Dole VA Medical Center, Wichita

Kansas, VA Project 589A7-21-132 as required by drawings and specifications.

B. Only one site visit will be scheduled prior to the bid date.

Attendance is highly recommended.

C. The offices of Miller-Remick, LLC, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.

D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the COR.

E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

1.3 STATEMENT OF BID ITEM

ITEM I, GENERAL:

01 00 00 - 2

The Architectural scope is to erect a fully enclosed, blast-resistant, CMU envelope with brick veneer to house the new emergency backup generators. Interior construction will be utilitarian in nature and consist of block walls and a coated concrete floor.

The Civil construction includes but is not limited to, site work required for the installation of the new Generator Building as well as routing of new underground electrical duct banks, underground fuel oil tanks, steam tunnel, storm water piping, new fire service piping and modifications to parking and traffic flows along with new security features.

The structural scope of work includes but is not limited to foundations and steel framing and supports aligned with PSRDM requirements for the new

Generator Building as well as support for all associated equipment and devices. Work also includes support for PSRDM required fences and barriers on the site.

The Fire suppression scope of work includes but is not limited to the installation of a dry pipe sprinkler system with nitrogen generator, including all piping, fittings, sprinkler heads, pipe supports, wiring and controls.

The Fire alarm Scope of work includes, but is not limited to the installation of a New fire alarm system that will provide notification and initiation and integration with the Campus Fire Alarm system.

The Mechanical scope includes the installation of makeup, ventilation, exhaust air, space cooling and heating systems for the new generator building. The contractor shall also extending the existing campus steam piping to the new building and install the fuel oil system for the generators including: new underground fuel oil storage tanks, fuel oil pumps, filtration equipment, day tanks and the associated piping.

The Electrical scope shall construct a new Centralized Emergency Power

System, sized and configured to satisfy the emergency power demand for the existing campus and future campus expansions totaling 150,000 square feet.

The Centralized Emergency Power System shall consist of a new blast rated

01 00 00 - 3 generator building that has the capacity to back up the main electric utility services entering the campus.

A new medium voltage normal power loop shall be constructed to distribute normal power to one side of the existing campus selector switches via a new underground concrete-encased ductbank system.

The new medium voltage generators shall serve as the life safety essential electrical system for the entire campus. The project includes removal of the existing life safety generators scattered across the campus. The new medium voltage generators will be signaled to start via new low voltage pathways from each existing automatic transfer switch and shall deliver power to the emergency loads within the Code mandated 10-second interval.

Power shall be routed to the existing emergency distribution systems in each building via a separate emergency power medium voltage underground concrete encased campus loop. The building generators shall be replaced with pad-mounted stepdown transformers with primary loop switches.

The period of performance for the contract shall be 730 calendar days from

Award.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can

01 00 00 - 4 be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

C. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including toolboxes and parked machines and take any emergency action.

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71

00, DOOR HARDWARE and coordinate.

D. Document Control:

1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of

“sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.

Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting

Officer.

01 00 00 - 5

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document

Management Software (EDMS).

Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the

EDMS system.

“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

E. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

A limited number of permits shall be issued for General Contractor and its employees for parking in designated areas only. Contractor to coordinate with VA Medical Center Facility Manager.

1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the

Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the

Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the

Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting

Officer, the buildings and utilities may be abandoned and need not be removed.

01 00 00 - 6

C. The Contractor shall, under regulations prescribed by the Contracting

Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting

Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The

Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

D. Working space and space available for storing materials shall be as determined by the COR.

E. Workers are subject to rules of the Medical Center applicable to their conduct.

F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.

G. Execute work so as to interfere as little as possible with normal functioning of the Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of

Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to the Medical Center areas required to remain in operation.

H. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR. All such actions shall be coordinated with the COR or Utility Company involved:

1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction

01 00 00 - 7 project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

I. Phasing:

1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur.

It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:

2. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to the COR and Contractor, as follows:

1. Phase I: Construction of the New Generator Building and associated equipment and devices

2. Phase II: Installation of underground utilities loop and extension to building services.

3. Phase III: Demolition of existing local generators and associated equipment and devices.

J. All Building(s) will be occupied during performance of work but immediate areas of alterations will be vacated.

1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of

Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and

01 00 00 - 8 equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access.

Coordinate alteration work in areas occupied by Department of

Veterans Affairs so that Medical Center operations will continue during the construction period.

K. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the construction area indicated on the drawings.

Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches). Bottom of fences shall extend to 25mm

(one inch) above grade. Remove the fence when directed by COR.

L. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from

Contractor's employee or watchman.

M. Utilities Services: Maintain existing utility services for the Medical

Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.

Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of the COR. Electrical work shall

01 00 00 - 9 be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR

COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR

ELECTRONIC SAFETY AND SECURITY for additional requirements.

2. Contractor shall submit a request to interrupt any such services to the COR, in writing, 7 days in advance of proposed interruption.

Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of the Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.

5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

N. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished

01 00 00 - 10 areas, or within walls or partitions; so that they are completely behind the finished surfaces.

O. To minimize interference of construction activities with flow of

Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval.

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.

P. Coordinate the work for this contract with other construction operations as directed by the COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF

ROADWAYS.

1.7 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from the Medical Center.

1.8 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS (FAR 52.236-9)

A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the

01 00 00 - 11 careless operation of equipment, or by workers, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.

B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the

Contractor fails or refuses to repair the damage promptly, the

Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and

"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.

1.10 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the

COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to

01 00 00 - 12 existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"

(FAR 52.243-4) and "DIFFERING SITE CONDITIONS" (FAR 52.236-2).

1.11 PHYSICAL DATA – SOIL CONDITIONS

A. Data and information furnished or referred to below is for the

Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

1. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by PEC Field

Services.

(FAR 52.236-4)

B. Subsurface conditions have been developed by core borings and test pits. Logs of subsurface exploration are shown diagrammatically on drawings.

C. A copy of the soil report will be made available for inspection by bidders upon request to the Engineering Officer at the VA Medical

Center, and shall be considered part of the contract documents.

D. Government does not guarantee that other materials will not be encountered nor that proportions, conditions or character of several materials will not vary from those indicated by explorations. Bidders are expected to examine site of work and logs of borings; and, after investigation, decide for themselves character of materials and make their bids accordingly. Upon proper application to Department of

Veterans Affairs, bidders will be permitted to make subsurface explorations of their own at site.

1.12 PROFESSIONAL SURVEYING SERVICES

A. A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the Contractor shall perform services specified herein and in other specification sections.

The Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the Contractor, and that the

01 00 00 - 13 land surveyor or civil engineer has no financial interest in this contract.

1.13 LAYOUT OF WORK

A. The Contractor shall lay out the work from Government established base lines and benchmarks, indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The

Contractor shall furnish, at Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work. The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the Contracting Officer. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by the Contracting Officer until authorized to remove them.

If such marks are destroyed by the Contractor or through Contractor's negligence before their removal is authorized, the Contracting Officer may replace them and deduct the expense of the replacement from any amounts due or to become due to the Contractor.

(FAR 52.236-17)

B. Establish and plainly mark center lines for each building and corner of column lines andand such other lines and grades that are reasonably necessary to properly assure that location, orientation, and elevations established for each such structure, roads, parking lots, are in accordance with lines and elevations shown on contract drawings.

C. Following completion of general mass excavation and before any other permanent work is performed, establish and plainly mark (through use of appropriate batter boards or other means) sufficient additional survey control points or system of points as may be necessary to assure proper alignment, orientation, and grade of all major features of work. Survey shall include, but not be limited to, location of lines and grades of footings, exterior walls, center lines of columns in both directions, major utilities and elevations of floor slabs:

1. Such additional survey control points or system of points thus established shall be checked and certified by a registered land surveyor or registered civil engineer. Furnish such certification to the COR before any work (such as footings, floor slabs, columns, walls, utilities and other major controlling features) is placed.

01 00 00 - 14

D. During progress of work, and particularly as work progresses from floor to floor, Contractor shall have line grades and plumbness of all major form work checked and certified by a registered land surveyor or registered civil engineer as meeting requirements of contract drawings.

Furnish such certification to the COR before any major items of concrete work are placed. In addition, Contractor shall also furnish to the COR certificates from a registered land surveyor or registered civil engineer that the following work is complete in every respect as required by contract drawings.

1. Lines of each building and/or addition.

2. Elevations of bottoms of footings and tops of floors of each building and/or addition.

3. Lines and elevations of sewers and of all outside distribution systems.

4. Lines of elevations of all swales and interment areas.

5. Lines and elevations of roads, streets and parking lots.

E. Whenever changes from contract drawings are made in line or grading requiring certificates, record such changes on a reproducible drawing bearing the registered land surveyor or registered civil engineer seal, and forward these drawings upon completion of work to COR.

F. The Contractor shall perform the surveying and layout work of this and other articles and specifications in accordance with the provisions of

Article "Professional Surveying Services".

1.14 AS-BUILT DRAWINGS

A. The contractor shall maintain two full-size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.

B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR review, as often as requested.

C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.

D. Paragraphs A, B, & C shall also apply to all shop drawings.

01 00 00 - 15

1.15 WARRANTY MANAGEMENT

A. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of Construction in at least 30 days before the planned pre-warranty conference, submit one set of the warranty management plan. Include within the warranty management plan all required actions and documents to assure that the

Government receives all warranties to which it is entitled. The plan must be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesman, or of engineering background, not necessarily familiar with this contract. The term “status” as indicated below must include due date and whether item has been submitted or was approved. Warranty information made available during the construction phase must be submitted to the Contracting Officer for approval prior to each monthly invoice for payment. Assemble approved information in a binder and turn over to the Government upon acceptance of the work. The construction warranty period will begin on the date of the project acceptance and continue for the product warranty period. A joint 4 month and 9 month warranty inspection will be conducted, measured from time of acceptance, by the Contactor and the Contracting Officer. Include in the warranty management plan, but not limited to, the following:

1. Roles and responsibilities of all personnel associated with the warranty process, including points of contact and telephone numbers within the company of the Contractor, subcontractors, manufacturers or suppliers involved.

2. Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest project location.

3. Listing and status of delivery of all Certificates of Warranty for extended warranty items, to include roofs, HVAC balancing, pumps, motors, transformers and for all commissioned systems such as fire protection and alarm systems, sprinkler systems and lightning protection systems, etc.

4. A list for each warranted equipment item, feature of construction or system indicating:

a. Name of item.

b. Model and serial numbers.

01 00 00 - 16

c. Location where installed.

d. Name and phone numbers of manufacturers and suppliers.

e. Name and phone numbers of manufacturers or suppliers.

f. Names, addresses and phone numbers of sources of spare parts.

g. Warranties and terms of warranty. Include one-year overall warranty of construction, including the starting date of warranty of construction. Items which have extended warranties must be indicated with separate warranty expiration dates.

h. Starting point and duration of warranty period.

i. Summary of maintenance procedures required to continue the warranty in force.

j. Cross-reference to specific pertinent Operation and Maintenance manuals.

k. Organizations, names and phone numbers of persons to call for warranty service.

l. Typical response time and repair time expected for various warranted equipment.

5. The plans for attendance at the 4 and 9-month post construction warranty inspections conducted by the government.

6. Procedure and status of tagging of all equipment covered by extended warranties.

7. Copies of instructions to be posted near selected pieces of equipment where operation is critical for warranty and/or safety reasons.

B. Performance & Payment Bonds: The Performance & Payment Bonds must remain effective throughout the construction period.

1. In the event the Contractor fails to commence and diligently pursue any construction warranty work required, the Contracting Officer will have the work performed by others, and after completion of the work, will charge the remaining construction warranty funds of expenses incurred by the Government while performing the work, including, but not limited to administrative expenses.

2. In the event sufficient funds are not available to cover the construction warranty work performed by the Government at the contractor’s expenses, the Contracting Officer will have the right to recoup expenses from the bonding company.

01 00 00 - 17

3. Following oral or written notification of required construction warranty repair work, the Contractor shall respond in a timely manner. Written verification will follow oral instructions. Failure to respond will be cause for the Contracting Officer to proceed against the Contractor.

C. Pre-Warranty Conference: Prior to contract completion, and at a time designated by the Contracting Officer, the Contractor shall meet with the Contracting Officer to develop a mutual understanding with respect to the requirements of this section. Communication procedures for

Contractor notification of construction warranty defects, priorities with respect to the type of defect, reasonable time required for

Contractor response, and other details deemed necessary by the

Contracting Officer for the execution of the construction warranty will be established/ reviewed at this meeting. In connection with these requirements and at the time of the Contractor’s quality control completion inspection, furnish the name, telephone number and address of a licensed and bonded company which is authorized to initiate and pursue construction warranty work action on behalf of the Contractor.

This point of contract will be located within the local service area of the warranted construction, be continuously available and be responsive to Government inquiry on warranty work action and status. This requirement does not relieve the Contractor of any of its responsibilities in conjunction with other portions of this provision.

D. Contractor’s Response to Construction Warranty Service Requirements:

E. Following oral or written notification by the Contracting Officer, the

Contractor shall respond to construction warranty service requirements in accordance with the “Construction Warranty Service Priority List” and the three categories of priorities listed below. Submit a report on any warranty item that has been repaired during the warranty period.

Include within the report the cause of the problem, date reported, corrective action taken, and when the repair was completed. If the

Contractor does not perform the construction warranty within the timeframe specified, the Government will perform the work and back charge the construction warranty payment item established.

01 00 00 - 18

1. First Priority Code 1. Perform onsite inspection to evaluate situation, and determine course of action within 4 hours, initiate work within 6 hours and work continuously to completion or relief.

2. Second Priority Code 2. Perform onsite inspection to evaluate situation, and determine course of action within 8 hours, initiate work within 24 hours and work continuously to completion or relief.

3. Third Priority Code 3. All other work to be initiated within 3 work days and work continuously to completion or relief.

4. The “Construction Warranty Service Priority List” is as follows:

a) Code 1-Life Safety Systems

Fire suppression systems.

Fire alarm system(s).

b) Code 1-Air Conditioning Systems

Air conditioning leak in part of the building, if causing damage.

Air conditioning system not cooling properly.

c) Code 1 Doors

Overhead doors not operational, causing a security, fire or safety problem.

1) Interior, exterior personnel doors or hardware, not functioning properly, causing security, fire or safety problem.

d) Code 3-Doors

Overhead doors not operational.

Interior/exterior personnel doors or hardware not functioning properly.

e) Code 1-Electrical

Power failure (entire area or any building operational after

1600 hours).

Security lights.

Smoke detectors.

f) Code 2-Electrical

Power failure (no power to a room or part of building).

Receptacle and lights not operational (in a room or part of building).

g) Code 3-Electrical

01 00 00 - 19

Exterior lights not operational.

h) Code 1-Gas

Leaks and pipeline breaks.

i) Code 1-Heat

Power failure affecting heat.

j) Code 1-Plumbing

Hot water heater failure.

2) Leaking water supply pipes

k) Code 2-Plumbing

Flush valves not operating properly

Fixture drain, supply line or any water pipe leaking.

Toilet leaking at base.

l) Code 3- Plumbing

Leaky faucets.

m) Code 3-Interior

Floors damaged.

Paint chipping or peeling.

Casework damaged.

n) Code 1-Roof Leaks

Damage to property is occurring.

o) Code 2-Water (Exterior)

No water to facility.

p) Code 2-Water (Hot)

No hot water in portion of building listed.

q) Code 3

All work not listed above.

F. Warranty Tags: At the time of installation, tag each warranted item with a durable, oil and water-resistant tag approved by the Contracting

Officer. Attach each tag with a copper wire and spray with a silicone waterproof coating. Also submit two record copies of the warranty tags showing the layout and design. The date of acceptance and the QC signature must remain blank until the project is accepted for beneficial occupancy. Show the following information on the tag.

01 00 00 - 20

Warranty Tags

Type of product/material

Model number

Serial number

Contract number

Warranty period from/to

Inspector’s signature

Construction Contractor

Address

Telephone number

Warranty Contact

Address

Telephone number

Warranty response time priority code

1.16 USE OF ROADWAYS

A. For hauling, use only established public roads and roads on Medical

Center property and, when authorized by the COR, such temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed and restoration performed by the Contractor at Contractor's expense. When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.

B. When new permanent roads are to be a part of this contract, Contractor may construct them immediately for use to facilitate building operations. These roads may be used by all who have business thereon within zone of building operations.

1.17 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to written approval and compliance with the following provisions:

1. Permission to use each unit or system must be given by COR in writing.

This is the start of the file's text. The full file is on GovTribe.