589A7-21-132 Wichita Bid Drawings 09_Fire Alarm_Complete.pdf

PDF 1 MB Posted

Attached to
Z2DA--589A7-21-132 Construct Centralized Emergency Power System
Solicitation number
36C25526R0125
Issued by

About this file

This document is a set of fire alarm system design drawings and specifications for a construction project at Robert J. Dole VA Medical Center in Wichita, Kansas. The project, numbered 589A7-21-132, involves constructing a centralized emergency power system addition and requires a new fire alarm system installation for the new addition to a fully sprinklered facility.

The fire alarm scope includes design, installation, and testing in accordance with VA-PG-18-10 Fire Protection Design Manual (November 2023), IBC 2024, NFPA 13 (2022), NFPA 70 (2023), NFPA 72 (2022), NFPA 90A (2024), and NFPA 101 (2024). All fire alarm wiring must be Class B, installed in red metallic conduit separate from all other systems. The system includes smoke detectors, duct smoke detectors, speaker/strobes, speakers, manual pull stations, a fire alarm control panel (FACP), an annunciator panel (FAA), addressable output modules (AOM), and addressable input modules (AIM). Key requirements include coordination between the fire alarm contractor and sprinkler contractor for electronic supervision of tamper and flow switches; spacing and location of notification appliances per NFPA 72; and coordination with mechanical contractors for duct detector and AHU integration. The contractor must file a Record of Completion and Fire Alarm Test Report with the Contracting Officer's Representative (COR), provide three sets of as-built drawings and computer files two weeks prior to final inspection, and conduct final testing witnessed by the COR. The fire alarm system shall integrate with the VAMC Wichita Campus network. The drawing sets include ground floor plans, detailed wall-mounting height requirements for devices, fire alarm sequence of operations matrix, and a riser diagram showing system architecture.

View the file

Other files

File Type Posted
589A7-21-132 Wichita Bid Drawings 01_General_Complete.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 3 of 10.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 4 of 10.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 10 of 10.pdf PDF
02_Structural.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 2 of 10.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 6 of 10.pdf PDF
589A7-21-132 Wichita Bid Drawings 07_Mechanical 1 of 2.pdf PDF
589A7-21-132 Wichita Bid Drawings 06_Fire Protection_Complete.pdf PDF
589A7-21-132 Wichita EPS_Bid Docs - Specifications - Volume I.pdf PDF
589A7-21-132 Wichita Bid Drawings 07_Mechanical 2 of 2.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 9 of 10.pdf PDF
04_Fire Protection and Fire Alarm Narrative.pdf PDF
589A7-21-132 Wichita Bid Drawings 02_HazMat_Complete.pdf PDF
589A7-21-132 Wichita EPS_Bid Docs - Specifications - Volume II.pdf PDF
589A7-21-132 Wichita Bid Drawings 08_Electrical 1 of 2.pdf PDF
36C25526R0125_1.docx DOCX document
852.219-75 VA Notice of Limitations on Subcontracting General Construction.pdf PDF
05_Mechanical Narrative.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 1 of 10.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 5 of 10.pdf PDF
589A7-21-132 Wichita Bid Drawings 05_Architectural Complete.pdf PDF
01_Civil Narrative.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 8 of 10.pdf PDF
589A7-21-132 Wichita Bid Drawings 03_Civil 7 of 10.pdf PDF
06_Electrical.pdf PDF
03_Architectural Narrative.pdf PDF
589A7-21-132 Wichita Bid Drawings 08_Electrical 2 of 2.pdf PDF
589A7-21-132 Wichita Bid Drawings 04_Structural_Complete.pdf PDF
APPENDIX 2- PRICE BREAKDOWN AND CALCULATION OF SELF-PERFORMED and SUBCONTRACTED WORK.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S

C

S C

F

FACP

AOM

AIM

FAA

SMOKE DETECTOR (YY - SEE ABBREVIATIONS)

DUCT SMOKE DETECTOR

SPEAKER /STROBE (CLEAR)

(C - CEILING MOUNTED)

(XX - CANDELA RATING)

(YY - SEE ABBREVIATIONS)

SPEAKER (C - CEILING MOUNTED)

(YY - SEE ABBREVIATIONS)

MANUAL PULL STATION

FIRE ALARM CONTROL PANEL

FIRE ALARM ANNUNCIATOR PANEL

ADDRESSABLE OUTPUT MODULE

ADDRESSABLE INPUT MODULE

YY

XXYY

YY

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

CONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

STANTON ENGINEERING SERVICES

PROFESSIONAL ENGINEERENGINEER OF RECORD

M-R PROJECT NO:

Civil / Site Utility Engineering:

IMEG, CORP.

Fire & Life Safety:

STANTON ENGINEERING SERVICES

Hazardous Materials:

MABBETT & ASSOCIATES, INC.

Architect:

OCULUS, INC.

Structural:

PROFESSIONAL ENGINEERING

CONSULTANTS, PA (PEC)

A u to d e s k D o c s /W ic h it a

C e n tr a liz e d E m e rg e n c y P o w e r/

-1

-K

S

W ic h it a V

A M

C O

C U

L U

S C

E N

T R

A L -F

IR

E

-R

.r v t

/2

/2

:1

:0

P

M

FA001

CONSTRUCT CENTRALIZED

EMERGENCY POWER SYSTEM

589A7-21-132

Project Director

2026-03-26 KD AL

BID DOCUMENTS

FULLY SPRINKLERED

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

0499-0162

FIRE ALARM

ABBREVIATIONS, LEGEND

AND GENERAL NOTES

FIRE ALARM ABBREVIATIONS FIRE ALARM LEGEND FIRE ALARM GENERAL NOTES

1. THE FIRE ALARM SCOPE OF WORK FOR THE PROJECT INVOLVES PROVIDING A NEW FIRE ALARM SYSTEM FOR THE NEW ADDITION.

2. SYSTEMS SHALL BE DESIGNED, INSTALLED AND TESTED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AS WELL AS THE FOLLOWING CODES AND STANDARDS:

A. CRITERIA IN VA-PG-18-10 FIRE PROTECTION DESIGN MANUAL (NOVEMBER 2023)

B. IBC – INTERNATIONAL BUILDING CODE, 2024 EDITION

C. NFPA 13 – STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2022 EDITION

D. NFPA 70 – NATIONAL ELECTRIC CODE, 2023 EDITION

E. NFPA 72 – NATIONAL FIRE ALARM AND SIGNALING CODE, 2022 EDITION

F. NFPA 90A – STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS, 2024 EDITION

G. NFPA 101 – LIFE SAFETY CODE, 2024 EDITION

3. ALL NEW FIRE ALARM WIRING SHALL BE CLASS B AND INSTALLED IN RED METALLIC CONDUIT. ALL FIRE ALARM WIRING MUST BE INSTALLED IN CONDUIT SEPARATE FROM ALL OTHER SYSTEMS.

4. ALL WIRING FOR FIRE ALARM SYSTEM SHALL BE PER MANUFACTURER'S SPECIFICATIONS, FIRE ALARM SYSTEM WIRING SHALL BE INSTALLED IN CONDUIT AND RACEWAY.

5. FILE A "RECORD OF COMPLETION" PREPARED IN ACCORDANCE WITH NFPA 72, AND THE FIRE ALARM TEST REPORT, WITH THE COR.

6. TAMPER SWITCHES, PRESSURE SWITCHES, AND FLOW SWITCHES SHALL BE INSTALLED UNDER DIVISION 21 BUT SHALL BE CONNECTED TO THE FIRE ALARM SYSTEM BY THE FIRE ALARM CONTRACTOR.

7. EACH NOTIFICATION APPLIANCE SHALL BE SELECTED FOR OR BE SET FOR APPROPRIATE SOUND POWER AND LUMINANCE LEVELS AS REQUIRED BY NFPA 72.

8. FINAL FIRE ALARM SYSTEM TESTING SHALL BE WITNESSED BY THE COR.

9. ALL FIRE ALARM WIRING MUST BE INSTALLED IN CONDUIT SEPARATE FROM ALL OTHER SYSTEMS.

10. TWO WEEKS PRIOR TO FINAL INSPECTION, CONTRACTOR SHALL DELIVER TO THE COR 3 SETS OF AS-BUILT DRAWINGS AND ONE SET OF THE AS BUILT DRAWING COMPUTER FILES SHOWING ALL NEW AND/OR EXISTING DEVICES AND CONDUIT USED FOR

THE FIRE ALARM SYSTEM.

11. FINAL FIRE ALARM SYSTEM TESTING SHALL BE WITNESSED BY THE COR.

12. THE FIRE ALARM SYSTEM SHALL BE INTEGRATED WITH THE VAMC WICHITA CAMPUS NETWORK.

AAR

AHU

ALV

AS

BFP

BOR

CHV

CIS

CLG

COR

CV

DACT

DBA

DC

DD

DIA

DIM

DN

DT

EA

EAR

EB

EF

EH

EL

EMER

EQUIP

EST

ETR

EXIST

FA

FD

FDC

FE

FEC

FFE

FH

FHV

FLR

FM

FS

FT

GA

GC

GPM

GR

GF

HGT

HL

AUTOMATIC AIR RELEASE

AIR HANDLING UNIT

ALARM CHECK VALVE

AUTOMATIC SPRINKLER

BACK FLOW PREVENTER

BOTTOM OF RISER

CHECK VALVE

COMMON INTELLIGIBILITY SCORE

CEILING

CONTRACTING OFFICER'S REPRESENTATIVE

CONTROL VALVE

DIGITAL ALRM COMMUNICATOR TRANSMITTER

DECIBEL A-WEIGHTED

DIRECT CURRENT

DUCT SMOKE DETECTOR

DIAMETER

DIMENSION

DOWN/DROP NIPPLE

DRY PIPE VALVE TEMPERATURE

EACH

ELEVATOR ALTERNATE FLOOR RECALL

ELECTRIC BELL

EXHAUST FAN

EXTRA HAZARD

ELEVATION

EMERGENCY

EQUIPMENT

ELEVATOR SHUNT TRIP

EXISTING TO REMAIN

EXISTING

FIRE ALARM

FLOOR DRAIN

FIRE DEPARTMENT CONNECTION

FIRE EXTINGUISHER

FIRE EXTINGUISHER CABINET

FINISHED FLOOR ELEVATION

FIRE HAT

FIRE HOSE VALVE

FLOOR

FACTORY MUTUAL

FLOW SWITCH

FEET

GAUGE

GENERAL CONTRACTOR

GALLONS PER MINUTE

GENERATOR RUNNING

GENERATOR FAULT

HEIGHT

HI/LOW AIR SUPERVISORY

HT

ID

LH

LOC

MNS

OD

OH

PS

PSI

R

RCV

REQ

RM

RN

RPZ

S

SBV

SCHED

SCV

SD

SDC

SGV

SIM

SP

SPEC

SPKR

SP/ST

SQ

SR

SSI

ST

STOR

STS

SYST

TEMP

TOR

TS

TYP

UL

VAC

W/

WMG

W/O

WP

WS

ZCA

HEAT TRACING

INSIDE DIAMETER

LIGHT HAZARD

LOCAL OPERATING CONSOLE

MASS NOTIFICATION SYSTEM

OUTSIDE DIAMETER

ORDINARY HAZARD

PRESSURE SWITCH

POUNDS PER SQUARE INCH

RISER

RISER CONTROL VALVE

REQUIRED

ROOM

RISER NIPPLE

REDUCED PRESSURE ZONE

SUPPLY

SUPERVISED BUTTERFLY VALVE

SCHEDULE

SUPERVISED CONTROL VALVE

SMOKE DETECTOR

SMOKE DAMPER CONTROL

SUPERVISED GATE VALVE

SIMILAR

SPEAKER

SPECIFICATION

SPRINKLER

SPEAKER/STROBE

SQUARE

SLEEPING ROOM

SECURITY SYSTEM INTERFACE

STROBE

STORAGE

SHUNT TRIP SUPERVISION

SYSTEM

TEMPERATURE

TOP OF RISER

TAMPER SWITCH

TYPICAL

UNDERWRITERS' LABORATORY

VOLT, ALTERNATING CURRENT

WITH

WATER MOTOR GONG

WITHOUT

WEATHERPROOF

WET SYSTEM

ZONE CONTROL ASSEMBLY

F F

F

AIM AIM

F A

C P

F A

A

S

AIM

AIM

AIM

AIM

S AOM

1 2 3 4

A

C

B

GENERATOR

ROOM

FIRE RISER ROOM

TS TS

FS

PS

HL

DT

SWITCHGEAR

ROOM

75 75

AHU

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

CONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

STANTON ENGINEERING SERVICES

PROFESSIONAL ENGINEER

NORTH

ENGINEER OF RECORD

M-R PROJECT NO:

Civil / Site Utility Engineering:

IMEG, CORP.

Fire & Life Safety:

STANTON ENGINEERING SERVICES

Hazardous Materials:

MABBETT & ASSOCIATES, INC.

Architect:

OCULUS, INC.

Structural:

PROFESSIONAL ENGINEERING

CONSULTANTS, PA (PEC)

A u to d e s k D o c s /W ic h it a

C e n tr a liz e d E m e rg e n c y P o w e r/

-1

-K

S

W ic h it a V

A M

C O

C U

L U

S C

E N

T R

A L -F

IR

E

-R

.r v t

/2

/2

:1

:3

P

M

FA101

CONSTRUCT CENTRALIZED

EMERGENCY POWER SYSTEM

589A7-21-132

Project Director

2026-03-26 KD AL

BID DOCUMENTS

FULLY SPRINKLERED

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

0499-0162

FIRE ALARM

GROUND FLOOR PLAN

GENERAL NOTES

KEYED NOTES

1/4" = 1'-0"F1

FIRE ALARM GROUND FLOOR

A. FIRE ALARM CONTRACTOR SHALL COORDINATE THE QUANTITY OF

MONITOR MODULES WITH THE TAMPER AND FLOW SWITCHES

PROVIDED BY THE SPRINKLER CONTRACTOR TO ENSURE

ELECTRONIC SUPERVISION OF THE SPRINKLER SYSTEM.

B. WHERE MANUAL PULL STATIONS ARE LOCATED ADJACENT TO AN

EXIT DOOR, THEY SHALL BE PROVIDED WITHIN 5 FEET OF THE

DOOR.

C. NOTIFICATION APPLIANCE AND INITIATING DEVICE LOCATIONS ARE

DIAGRAMMATIC IN NATURE. CONTRACTOR IS RESPONSIBLE FOR

SPACING AND LOCATION OF APPLIANCES AND DEVICES PER NFPA

72, SPECIFICATIONS, AND PROJECT DESIGN DOCUMENTS.

D. INSTALLATION AND FUNCTIONALITY OF DUCT DETECTORS,

REMOTE TEST INDICATORS, AND SWITCHES, AS WELL AS DEVICE

ADDRESSES AND PROGRAMMING, SHALL BE COORDINATED WITH

MECHANICAL CONTRACTOR. FIRE ALARM CONTRACTOR SHALL BE

RESPONSIBLE FOR FINAL DEVICE LOCATION DUE TO MECHANICAL

EQUIPMENT INSTALLATION CONDITIONS. ALL DUCT DETECTORS

SHALL BE INSTALLED IN A PHYSICALLY ACCESSIBLE LOCATION FOR

FUTURE MAINTENANCE AND REPAIR NEEDS. REMOTE TEST

INDICATORS AND SWITCHES SHALL BE PROVIDED FOR DETECTORS

INSTALLED IN CONCEALED LOCATIONS MORE THAN 10 FT ABOVE

THE FINISHED FLOOR OR IN ARRANGEMENTS WHERE DETECTOR'S

INDICATOR IS NOT VISIBLE TO RESPONDING PERSONNEL.

1. DUCT DETECTOR AND ASSOCIATED AOM ARE LOCATED ON THE

DISCHARGE END OF THE ROOFTOP AIR HANDLING UNIT.

F AIM AIM AIM AIM AIM

S

FAA

REMOTE

ANNUNCIATOR FIRE ALARM

CONTROL

PANEL

NAC

PANEL

NOTE: PROVIDE 6" x 6" x 4" [152.4 x 154.4 x 101.6] NEMA

ENCLOSURE FOR 120 VAC

SURGE PROTECTION. (FIELD

VERIFY HEIGHT) AT LEAST

3'-0" [914.4] BUT NO MORE

THAN 6'-0" [1828.8] OF WIRE

BETWEEN SUPPRESSOR AND

CONTROL PANEL.

FINISHED CEILING

LOW VOLTAGE

CONDUITS

120 VAC CONDUITS

* NO CONDUIT

INTO THE BOTTOM

OF THESE BOXES

* EXCEPTION: IF A BATTERY CABIENT

IS REQUIRED FOR THE FIRE ALARM

CONTROL PANEL, ONLY THEN MAY

CONDUIT PENETRATE INTO BOTTOM

OF THE FIRE ALARM CONTROL PANEL.

FINISHED FLOOR

60" TO

CENTER OF

CONTROLS

60" TO CENTER

OF CONTROLS

SPEAKER

STROBESPEAKER

STROBE

80" MIN, 96" MAX

TO BOTTOM

OF STROBE

SPEAKER

ONLYSPEAKER

ONLY

(WP)

90" MIN

TO TOP

OF

SPEAKER

4'-0"

TO

TOP OF

PULL ARM

PULL

STATION

4'-0"

TO

CENTER

INDICATED

REMOTE

TEST

(KEYED)

FINISHED CEILING

FINISHED FLOOR

PUBLIC AREAS

ROOF

GROUND

6" MIN

NOTE: COMBINATION AUDIO/VISUAL

DEVICES TO BE INSTALLED IN

ACCORDANCE WITH VISUAL

MOUNTING HEIGHTS. SOUNDER

BASES TO BE INSTALLED WITH

APPLIANCE IT SERVES. SPEAKER

MOUNTING HEIGHTS MAY BE

MODIFIED IF SPL CALCULATIONS

SUPPORT MOUNTING HEIGHT.

STROBE

12' TO

BOTTOM OF

SPEAKER

SPEAKER

ONLY

(WP)

FIRST FLOOR

FACP TS FS PS HL DT

AUDIO CIRCUIT

VISUAL CIRCUIT

SLC CIRCUIT

12 VAC

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

CONSULTANTS

321 4 5 6 7 8 9 10

NO. DESCRIPTION DATE

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t

STANTON ENGINEERING SERVICES

PROFESSIONAL ENGINEERENGINEER OF RECORD

M-R PROJECT NO:

Civil / Site Utility Engineering:

IMEG, CORP.

Fire & Life Safety:

STANTON ENGINEERING SERVICES

Hazardous Materials:

MABBETT & ASSOCIATES, INC.

Architect:

OCULUS, INC.

Structural:

PROFESSIONAL ENGINEERING

CONSULTANTS, PA (PEC)

A u to d e s k D o c s /W ic h it a

C e n tr a liz e d E m e rg e n c y P o w e r/

-1

-K

S

W ic h it a V

A M

C O

C U

L U

S C

E N

T R

A L -F

IR

E

-R

.r v t

/2

/2

:1

:1

P

M

FA501

CONSTRUCT CENTRALIZED

EMERGENCY POWER SYSTEM

589A7-21-132

Project Director

2026-03-26 KD AL

BID DOCUMENTS

FULLY SPRINKLERED

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

0499-0162

FIRE ALARM

DETAILS

NTSF1

FIRE ALARM WALL MOUNTING HEIGHT

REQUIREMENTS

* WHILE NFPA 101 DOES NOT REQUIRE SOME DETECTORS TO NOTIFY BUILDING OCCUPANTS, VA REQUIRES ALL SMOKE DETECTORS, OTHER THAN DUCT SMOKE DETECTORS, TO NOTIFY BUILDING OCCUPANTS. ONLY INSTALL SMOKE

DETECTORS WHEN REQUIRED BY THE LIFE SAFETY CODE OR ITS REFERENCES.

** - THE FACILITY IS PERMITTED TO SOUND THE GENERAL ALARM OR NOTIFY STAFF IN LIEU OF INITIATING A

SUPERVISORY SIGNAL TO BE CONSISTENT WITH THE OPERATION OF EXISTING SYSTEMS.

8 DRY-PIPE VALVE ROOM TEMPERATURE ALARM X

7 HIGH/LOW PRESSURE DRY-PIPE SPRINKLER SYSTEM X

6 WATER CONTROL VALVE TAMPER X

5 SPRINKLER WATERFLOW / PRESSURE SWITCH X X

4 MANUAL PULL STATION X X

3 AREA SMOKE DETECTOR* X X

2 DUCT SMOKE DETECTOR* X** X X**

1 INPUT DEVICE

O U

T P

U T

1.

S

O U

N D

G E

N E

R A

L B

U

IL

D

IN

G A

LA

R

M

2.

N

O T

IF

Y

F

IR

E D

E P

A R

T M

E N

T

3.

IN

IT

IA

T E

S U

P E

R V

IS

O

R Y

S

IG

N A

L T

O A

4-

H O

U R

M A

N N

E D

P O

IN

T

F O

R

IM

M E

D

IA

T E

R E

S P

O N

S E

4.

C

LO

S

E D

A M

P E

R S

O N

F A

N P

R O

X

IM

A T

E T

O D

E T

E C

T O

R

5.

S

H U

T D

O W

N A

IR

H

A N

D

LE

R S

E R

V E

D B

Y T

H E

D E

T E

C T

O R

EXPANDED FIRE ALARM SEQUENCE OF OPERATIONS

MATRIX

A B D E G H

FIRE ALARM MATRIX

NTSC1 NTSC4

FIRE ALARM RISER DIAGRAM

FA001 - FIRE ALARM ABBREVIATIONS, LEGEND AND GENERAL NOTES
FA101 - FIRE ALARM GROUND FLOOR PLAN
FA501 - FIRE ALARM DETAILS

File details come from the government source that posted it. Updated .