Addendum 03_Arch & Front End Specs.pdf

PDF 1 MB Posted

Attached to
Oakbrook Center for Early Education
Solicitation number
US.252787
Issued by
Berks County, Reese CDP, Pennsylvania

About this file

This document is Addendum 03 to the architectural and front-end specifications for the Operations Facilities Expansion project (BH 25-061) managed by the City of Lancaster Department of Public Works. The addendum comprises multiple specification sections governing the coordination and execution of a complex construction project involving General Construction, Plumbing, HVAC, Electrical, and Fire Protection contracts. Key scope modifications include clarification that a job trailer is not required with meetings held at the Water Admin facility; confirmation that all utility costs will be paid by the Owner; specification that trenches and excavation remain the General Contractor's responsibility; and designation that the HVAC Contractor provides temporary heating, cooling, and ventilation. Additional specifications address exterior painting requirements for concrete and steel substrates using Sherwin-Williams products or approved equals, pallet storage racks with 10,000-pound shelf capacity, manual window shades with 25-year warranties on hardware and fabric, plastic laminate countertops with one-year warranties, and pre-engineered metal building systems. The project establishes a Project Coordinator role (General Construction Contractor) and a Mechanical/Electrical/Plumbing/Fire Protection Coordinator role (HVAC Contractor) responsible for comprehensive multi-trade coordination including scheduling, utility management, material compatibility, and completion sequencing.

The specifications establish detailed product standards referencing industry codes including the 2021 IBC, AWS D1.1/D1.1M, ANSI MH16.1, and MPI standards, with manufacturers identified as basis-of-design products including Sherwin-Williams paints, Penco Products pallet racks, Draper Inc. window shades, and various approved equals from named manufacturers. Contractors and subcontractors must be certified and licensed in the municipality where work is performed. The document requires extensive submittals including product data, shop drawings, design calculations for delegated design items, and manufacturer/installer qualification statements. Field conditions specify maintenance of appropriate environmental controls, prohibition on installation during adverse weather, and moisture content testing for various substrates before coating application. The project includes special inspections for pallet rack systems and welding in compliance with referenced standards, with corrective work required at no cost to the Owner within specified warranty periods ranging from one year to 25 years depending on the component.

View the file

Other files

File Type Posted
34-25061 - Addendum 3 Arch-struct-MEP summary.pdf PDF
3-C05 - Site Civil Specifications Combined.pdf PDF
15-2026-10-06 - ES Addendum 1.pdf PDF
35-25061 - Addendum 3 Arch-struct-MEP summary.pdf PDF
10-C08 - Construction Plan.pdf PDF
Demolition.dwg DWG drawing
17-323113 - CHAIN LINK FENCES AND GATES.pdf PDF
321723 - PAVEMENT MARKINGS.pdf PDF
6-C10 - Geotechnical Report.pdf PDF
42-312000 - EARTH MOVING.pdf PDF
PG.dwg DWG drawing
EG.dwg DWG drawing
49-B861-26-01 BidTabulationReport.xlsx XLSX spreadsheet
24-2026-10-14 - CD Addendum 2.pdf PDF
25-061_Pitney Rd Warehouse_Arch-Structural-MEP Drawings_Addendum 3.pdf PDF
28-312000 - EARTH MOVING.pdf PDF
12-25061 - Addendum 1.pdf PDF
48-CD-18 UTILITY PLAN.pdf PDF
9-C06 - Pitney Rd Warehouse Arch-Structural-MEP Bid Set.pdf PDF
32-25-061 Pitney Rd Warehouse Arch-Structural-MEP Drawings Addendum 3.pdf PDF
37-133418-USER-Post Frame Building Systems-10-23-2026.pdf PDF
22-B861-26-01 ADDENDUM 2 - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
25-2026-10-14 - ES Addendum 2.pdf PDF
18-329113 - SOIL PREPARATION.pdf PDF
41-2026-10-29 - ES Addendum 4.pdf PDF
ES.dwg DWG drawing
29-321723 - PAVEMENT MARKINGS.pdf PDF
25061 - Addendum 3_ Arch-struct-MEP summary.pdf PDF
44-B861-26-01 ADDENDUM 4 - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
30-2026-10-23 - ES Addendum 3.pdf PDF
Easements.dwg DWG drawing
Landscape.dwg DWG drawing
16-25-061 Pitney Rd Warehouse Arch-Structural-MEP Addendum 1.pdf PDF
20-City of Lancaster 150 Pitney Road Phase 1 ESA Sept2026.pdf PDF
33-Addendum 03 Arch Front End Specs.pdf PDF
13-133419-RIB- Pre-Engineered Metal Building Systems-09-17-2026.pdf PDF
11-B861-26-01 FINAL - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
26-Pre-Bid Attendees Ops Center Expansion 10072026.pdf PDF
40-2026-10-29 - CD Addendum 4.pdf PDF
38-25061 - Addendum 4 Arch-struct-MEP summary.pdf PDF
2026-10-23 - ES Addendum 3.pdf PDF
39-25-061 Pitney Rd Warehouse Arch-Structural-MEP Drawings Addendum 4.pdf PDF
45-FINAL QA Report.pdf PDF
2026-10-23 - CD Addendum 3.pdf PDF
47-CD-17 UTILITY PLAN.pdf PDF
7-C09 - Fill Assessment Summary.pdf PDF
31-2026-10-23 - CD Addendum 3.pdf PDF
5-C03 - Operations Facilities Expansion - Bid Specs - Vol I.pdf PDF
312000 - EARTH MOVING.pdf PDF
46-CD-16 UTILITY PLAN.pdf PDF
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Operations Facilities Expansion BH 25-061 City of Lancaster - Department of Public Works

MULTIPLE CONTRACT SUMMARY 011200 - 1

SECTION 011200 - MULTIPLE CONTRACT SUMMARY

PART 1 GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes a summary of each contract, including responsibilities for coordination and temporary facilities and controls.

B. Specific requirements for Work of each contract are also indicated in individual Specification Sections and on Drawings.

1.3 DEFINITIONS

A. Permanent Enclosure: As determined by Architect, the condition at which roofing is insulated and weathertight; exterior walls are insulated and weathertight; and openings are closed with permanent construction or substantial temporary closures equivalent in weather protection to permanent construction.

1.4 PROJECT COORDINATOR

A. Project Coordinator shall be responsible for coordination between the General Construction Contract, Plumbing Contract, HVAC Contract, Electrical Contract and the Fire Protection Contract.

1. General Construction Contractor shall act as Project Coordinator.

B. Mechanical/Electrical/Plumbing/Fire Protection Coordinator, who shall be under the direction of Project Coordinator, shall be responsible for coordination between the Plumbing Contract, HVAC Contract, Electrical Contract, and Fire Protection Contract.

1. HVAC Contractor shall act as Mechanical/Electrical/Plumbing/Fire Protection coordinator.

1.5 PROJECT COORDINATOR RESPONSIBILITIES

A. Project Coordinator shall assign a full-time on-site individual who is experienced in administration and supervision of building construction, including HVAC, plumbing, electrical, and fire protection work.

B. Project coordinator shall perform Project coordination activities for the multiple contracts, including, but not limited to, the following:

MULTIPLE CONTRACT SUMMARY 011200 - 2

1. Provide overall coordination of the Work between the General Construction Contract, Plumbing Contract, HVAC Contract, Electrical Contract, and Fire Protection Contract.

2. Coordinate shared access to workspaces.

3. Coordinate product selections for compatibility.

4. Provide overall coordination of temporary facilities and controls.

5. Coordinate, schedule, and approve interruptions of permanent and temporary utilities, including those necessary to make connections for temporary services.

6. Coordinate construction and operations of the Work with work performed by each

Contract. In addition to that required under Section 011200, prepare Coordination Drawings in collaboration with each contractor to coordinate work by more than one contract.

7. Prepare coordination drawings in collaboration with each contractor to coordinate work by more than one contract.

8. Coordinate sequencing and scheduling of the Work. Include the following:

a. Initial Coordination Meeting: At earliest possible date, arrange and conduct a meeting with contractors for sequencing and coordinating the Work; negotiate reasonable adjustments to schedules.

b. Prepare combined Contractors' Construction Schedule for entire Project. Base schedule on preliminary construction schedule. Secure time commitments for performing critical construction activities from contractors. Show activities of each contract on a separate sheet. Prepare a simplified summary sheet indicating combined construction activities of contracts.

1) Submit schedules for approval.

2) Distribute copies of approved schedules to contractors.

9. Trenches, other excavation, and associated trench backfill, for the work of each contract shall be the work of the Project Coordinator.

10. Provide photographic documentation.

11. Coordinate sequence of activities to accommodate tests and inspections, and coordinate schedule of tests and inspections.

12. Provide information necessary to adjust, move, or relocate existing utility structures affected by construction.

13. Locate existing permanent benchmarks, control points, and similar reference points, and establish permanent benchmarks on Project site.

14. Provide field surveys of in-progress construction and site work.

15. Provide progress cleaning of common areas and coordinate progress cleaning of areas or pieces of equipment where more than one contractor has worked.

16. Coordinate cutting and patching.

17. Coordinate protection of the Work.

18. Coordinate firestopping.

19. Coordinate completion of interrelated punch list items.

20. Coordinate preparation of Project Record Documents if information from more than one contractor is to be integrated with information from other contractors to form one combined record.

21. Submit Record Documents if installations by more than one contractor are indicated on the same Contract Drawing or Shop Drawing.

22. Collect record Specification Sections from contractors, collate Sections into numeric order, and submit complete set.

MULTIPLE CONTRACT SUMMARY 011200 - 3

23. Coordinate preparation of operation and maintenance manuals if information from more than one contractor is to be integrated with information from other contractors to form one combined record.

C. Responsibilities of Project coordinator for temporary facilities and controls include, but are not limited to, the following:

1. Provide common-use field office for use by all personnel engaged in construction activities. (Addendum #3 - A job trailer is not required; job meetings can be held at the Water Admin facility on campus).

1.6 MECHANICAL/ELECTRICAL/PLUMBING/FIRE PROTECTION COORDINATOR

RESPONSIBILITIES

A. Mechanical/Electrical/Plumbing/Fire Protection Coordinator: Coordination activities of mechanical/electrical coordinator include, but are not limited to, the following:

1. Schedule and sequence mechanical and electrical activities.

2. Coordinate sharing access to workspaces by mechanical, plumbing and electrical, and fire protection contractors.

3. Coordinate integration of mechanical, plumbing, and electrical and fire protection work into limited spaces.

4. Coordinate protection of mechanical, plumbing, and electrical and fire protection contractors' work.

5. Coordinate cutting and patching for mechanical and electrical and fire protection work.

6. Prepare mechanical and electrical and fire protection coordination drawings.

7. Coordinate tests and inspections for mechanical and electrical and fire protection work.

8. Coordinate mechanical and electrical temporary services and facilities.

1.7 GENERAL REQUIREMENTS OF CONTRACTS

A. Extent of Contract: Unless the Agreement contains a more specific description of the Work of each Contract, requirements indicated on Drawings and in Specification Sections determine which contract includes a specific element of Project.

1. Unless otherwise indicated, the work described in this Section for each contract shall be complete systems and assemblies, including products, components, accessories, and installation required by the Contract Documents.

2. Trenches, other excavation, and associated trench backfill, for the work of each contract shall be the work of the General Contractor.

3. All setting beds, pipe bedding, conduit, pipe, duct banks, tracing wire, warning tape, and other trade-specific materials are by the applicable prime contractor for each trade. (Addendum #3)

4. Blocking, backing panels, sleeves, and metal fabrication supports for the work of each contract shall be the work of each contract for its own work.

5. Furnishing of access panels for the work of each contract shall be the work of each contract for its own work. Installation of access panels shall be the work of each contract for its own work.

6. Equipment pads for the work of each contract shall be the work of the General Contractor.

MULTIPLE CONTRACT SUMMARY 011200 - 4

7. Roof-mounted equipment curbs for the work of each contract shall be the work of each contract for its own work.

8. Painting for the work of each contract shall be the work of the General Construction Contract.

9. Each Contractor shall coordinate elements to be painted with the General Contractor. Any painting made necessary by failure of HVAC/Mechanical, Plumbing, Electrical, or Fire Protection Contractor to coordinate with the General Contractor shall be performed by the General Contractor, at the expense of the contractor that failed to coordinate HVAC/Mechanical, Plumbing, Electrical, or Fire Protection elements related to painting.

10. Each Contractor shall provide sealants in accordance with Joint Sealant specification 079200 - Joint Sealants any and all conditions where materials installed by the Contractor abut dissimilar materials (vertical and horizontal joints). Each Contractor is also responsible for sealing penetrations required for the scope of that trade.

a. General Construction Contract to provide all sealants for exterior walls and roof penetrations (Addendum #3).

11. Cutting and Patching: Provided under each contract for its own work.

a. Any cutting and patching in masonry or concrete made necessary by failure of HVAC/Mechanical, Plumbing, Electrical, or Fire Protection Contractor to coordinate with the General Contractor shall be performed by the General Contractor, at the expense of the contractor that failed to coordinate HVAC/Mechanical, Plumbing, Electrical, or Fire Protection system-related penetrations.

b. General Construction Contract to provide all cutting and patching for exterior walls and roofs (Addendum #3).

12. Through-penetration firestopping for the work of each contract shall be provided by each contract for its own work.

13. Contractor’s Startup Construction Schedule: Within five (5) working days after startup horizontal bar-chart-type construction schedule submittal has been received from Project coordinator, submit a matching startup horizontal bar-chart schedule showing construction operations sequenced and coordinated with overall construction.

B. Substitutions: Each contractor shall cooperate with other contractors involved to coordinate approved substitutions with remainder of the work.

1. Project Coordinator shall coordinate substitutions.

C. Temporary Facilities and Controls: Each contractor is responsible for the following:

1. Installation, operation, maintenance, and removal of each temporary facility necessary for its own normal construction activity, and costs and use charges associated with each facility, except as otherwise provided for in this Section.

2. Plug-in electric power cords and extension cords, supplementary plug-in task lighting, and special lighting necessary exclusively for its own activities.

3. Its own field office, complete with necessary furniture, utilities, and telephone service.

4. Its own storage and fabrication sheds.

5. Temporary enclosures for its own construction activities.

6. Staging and scaffolding for its own construction activities.

7. Waste disposal facilities, including collection and legal disposal of its own hazardous, dangerous, unsanitary, or other harmful waste materials.

8. Progress cleaning of work areas affected by its operations on a daily basis.

9. Secure lockup of its own tools, materials, and equipment.

MULTIPLE CONTRACT SUMMARY 011200 - 5

10. Construction aids and miscellaneous services and facilities necessary exclusively for its own construction activities.

D. Temporary Heating, Cooling, and Ventilation: The HVAC General Contractor is responsible for temporary heating, cooling, and ventilation. (Addendum #3)

1. Gas Service/Fuel: (Addendum #3)

a. Include the cost for temporary heating equipment and propane equipment for use by all parties engaged in construction activities at Project site in the General Construction Contract.

b. Provide all propane required.

c. Owner will pay utility cost upon completion of permanent gas line.

2. All utility costs will be paid by the Owner. (Addendum #3)

E. Use Charges: Comply with the following:

1. Sewer Service: Include the cost for sewer service use by all parties engaged in construction activities at Project site in the General Construction Contract.

2. Water Service: Include the cost for water service, whether metered or otherwise, for water used by all entities engaged in construction activities at Project site in the Plumbing Contract.

3. New Electric Power Service:

a. Include the cost for electric power service usage charges, whether metered or otherwise, for electricity used by all entities engaged in construction activities at Project site in the General Construction Contract.

b. Electrical Contractor shall meter service and pay for meter, temporary service connection and disconnection costs, and all other costs associated with metering and providing temporary service, except for usage charges, for electricity used by all entities engaged in construction activities at Project site.

c. Electrical Contractor shall be responsible for connection and set-up of temporary power service directly from utility company power service and shall not tap into existing building power service.

4. All utility costs will be paid by the Owner. (Addendum #3)

1.8 GENERAL CONSTRUCTION CONTRACT

A. Work of the General Construction Contract includes, but is not limited to, the following:

1. Remaining work not identified as work under other contracts.

2. Site preparation, including clearing, building demolition and relocations, and earthwork.

3. Site improvements, including roadways, parking lots, pedestrian paving, site development furnishings and equipment, and landscaping.

4. Site water supply and distribution up to within five (5) feet of building structure(s).

5. Site sanitary sewerage up to within five (5) feet of building structure(s).

6. Site storm drainage up to within five (5) feet of building structure(s).

7. Site fuel distribution up to within five (5) feet of building structure(s)..

8. Site special plumbing systems.

9. Tunnels for site utilities.

10. Equipment pads for the work of each contract shall be the work of the General Contractor.

11. Selective demolition.

MULTIPLE CONTRACT SUMMARY 011200 - 6

12. Foundations, including footings, foundation walls, and piles.

13. Slabs-on-grade, including earthwork, subdrainage systems, and insulation.

14. Below-grade building construction, including excavation, backfill, and insulation and waterproofing/dampproofing.

15. Superstructure, including floor and roof construction.

16. Exterior closure, including walls, parapets, doors, and windows.

17. Penetrations in exterior walls and roof, closures, and flashing, including for mechanical, plumbing, and electrical penetrations. (Addendum #3)

18. Roofing, including roof insulation, coverings, flashings, roof specialties, roof accessories, and glazed openings.

19. Interior construction, including partitions, doors, and fittings.

20. Fire-protection specialties.

21. Stairs, including railings and finishes.

22. Interior finishes, finish carpentry, architectural woodwork, interior specialties, and floor and ceiling finishes.

23. All lintels, including lintels for mechanical, plumbing, and electrical penetrations.

(Addendum #3)

24. All access doors, including for mechanical, plumbing, and electrical access points.

(Addendum #3)

25. Miscellaneous items, including painting of mechanical and electrical work.

26. Conveying systems, including elevators. (Addendum #3)

27. Furnishings, including casework, countertops and window treatments.

28. Special construction, including the following:

a. Preengineered structures.

29. Penetrations in exterior slab for entrance work, including for plumbing penetrations, shall be under the General Contract.

a. General Construction Contract shall include GPR scanning to determine reinforcement locations in existing exterior slab.

B. Temporary facilities and controls in the General Construction Contract include, but are not limited to, the following:

1. Temporary facilities and controls that are not otherwise specifically assigned to the Plumbing Contract, HVAC Contract, Electrical Contract, and Fire Protection Contract.

2. Sediment and erosion control.

3. Unpiped sewers and drainage, including drainage ditches, dry wells, stabilization ponds, and containers.

4. Stormwater control.

5. Unpiped temporary toilet fixtures, wash facilities, and drinking water facilities, including disposable supplies.

6. Temporary enclosure for building exterior, except as indicated.

7. Temporary roads and paved areas.

8. Dewatering facilities and drains.

9. Excavation support and protection, unless required solely for the Work of another contract.

10. Special or unusual hoisting requirements for construction activities, including hoisting loads in excess of 2 tons (2000 kg), hoisting material or equipment into spaces below grade, and hoisting requirements outside building enclosure.

11. Project identification and temporary signs.

MULTIPLE CONTRACT SUMMARY 011200 - 7

12. General waste disposal facilities, including dumpsters for trash and scrap metals, wood, and recycling, as appropriate. (Addendum #3)

13. Pest control.

14. Temporary stairs.

15. Temporary fire-protection facilities.

16. Barricades, warning signs, and lights.

17. Site enclosure fence.

18. Covered walkways.

19. Security enclosure and lockup.

20. Environmental protection.

21. Maintenance and restoration of Owner's existing facilities used as temporary facilities.

22. Temporary heating, ventilation, and air conditioning. (Addendum #3)

C. General Contractor and subcontractors shall be certified/licensed to do work in the municipality where the Project is located.

1.9 PLUMBING CONTRACT

A. Work of the Plumbing Contract includes, but is not limited to, the following:

1. Connection of plumbing systems to site plumbing work, and all materials and labor to connect building plumbing system to points within five (5) feet outside of the building's exterior wall.

2. Interior plumbing systems and piping.

3. Plumbing fixtures.

4. Domestic water distribution.

5. Sanitary waste.

6. Stormwater drainage.

7. Special plumbing systems, including the following:

a. Fuel oil.

b. Natural gas.

8. Plumbing connections to equipment furnished by the General Construction Contract, Plumbing Contract, HVAC Contract, Electrical, and Fire Protection Contract.

B. Temporary facilities and controls in the Plumbing Contract include, but are not limited to, the following:

1. Piped sewerage and drainage.

2. Piped gas service.

3. Piped water service.

4. Piped temporary toilet fixtures, wash facilities, and drinking water facilities.

5. Plumbing connections to existing systems and temporary facilities and controls furnished by the General Construction Contract, Plumbing Contract, HVAC Contract, Electrical Contract, and Fire Protection Contract.

C. Plumbing Contractor and subcontractors shall be certified/licensed to do work in the municipality where the Project is located.

MULTIPLE CONTRACT SUMMARY 011200 - 8

1.10 HVAC CONTRACT

A. Work of the HVAC Contract includes, but is not limited to, the following:

1. HVAC systems and equipment.

2. HVAC instrumentation and controls.

3. HVAC testing, adjusting, and balancing.

4. Building automation system.

5. Mechanical connections to equipment furnished by the General Construction Contract, Plumbing Contract, HVAC Contract, Electrical Contract, and Fire Protection Contract.

B. Temporary facilities and controls in the HVAC Contract include, but are not limited to, the following:

1. Temporary heating, ventilation, and air conditioning. (Addendum #3)

C. HVAC Contractor and subcontractors shall be certified/licensed to do work in the municipality where the Project is located.

1.11 ELECTRICAL CONTRACT

A. Work of the Electrical Contract includes, but is not limited to, the following:

1. Site electrical distribution.

2. Site lighting.

3. Site communications and security.

4. Electrical distribution equipment.

5. Power.

6. Exterior lighting and pole bases.

7. Interior lighting and controls.

8. Telecommunications wiring and devices.

9. Power, raceway and boxes for telecommunications equipment provided by Owner’s vendor.

10. Power, raceway and boxes for security and access equipment provided by Owner’s vendor.

11. Fire alarm system modifications, additional equipment, programming and testing/inspections.

12. Electrical connections to equipment furnished by the General Construction Contract, Plumbing Contract, HVAC Contract, Electrical Contract, and Fire Protection Contract.

B. Temporary facilities and controls in the Electrical Contract include, but are not limited to, the following:

1. Electric power service and distribution.

2. Lighting, including site lighting.

3. Electrical connections to existing systems and temporary facilities and controls furnished by the General Construction Contract, Plumbing Contract, HVAC Contract, Electrical Contract, and Fire Protection Contract.

MULTIPLE CONTRACT SUMMARY 011200 - 9

C. Electrical Contractor and subcontractors shall be certified/licensed to do work in the municipality where the Project is located.

1.12 FIRE PROTECTION CONTRACT

A. Work of the Fire Protection Contract includes, but is not limited to, the following:

1. Fire-suppression systems, and all materials and labor to connect building plumbing system to points within five (5) feet outside of the building's exterior wall.

2. Special fire-suppression systems, including the following:

a. Foam fire-extinguishing systems.

b. Clean-agent extinguishing systems.

B. Temporary facilities and controls in the Fire Protection Contract include, but are not limited to, the following:

1. Not applicable.

C. Fire Protection Contractor and subcontractors shall be certified/licensed to do work in the municipality where the Project is located.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

MULTIPLE CONTRACT SUMMARY 011200 - 10

THIS PAGE INTENTIONALLY LEFT BLANK

EXTERIOR PAINTING 099113 - 1

SECTION 099113 - EXTERIOR PAINTING

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Surface preparation.

B. Field application of paints.

C. Scope: Finish exterior surfaces exposed to view, unless fully factory-finished and unless otherwise indicated, including the following:

1. Both sides and edges of plywood backboards for electrical and telecom equipment before installing equipment.

2. Exposed surfaces of steel lintels and ledge angles.

3. Mechanical and Electrical:

a. On the roof and outdoors, paint equipment exposed to weather or to view, including factory-finished materials.

D. Do Not Paint or Finish the Following Items:

1. Items factory-finished unless otherwise indicated; materials and products having factory-applied primers are not considered factory finished.

2. Items indicated to receive other finishes.

3. Items indicated to remain unfinished.

4. Fire rating labels, equipment serial number and capacity labels, and operating parts of equipment.

5. Floors, unless specifically indicated.

6. Glass.

7. Concealed pipes, ducts, and conduits.

1.2 DEFINITIONS

A. Comply with ASTM D16 for interpretation of terms used in this section.

B. MPI Gloss Level 1: FLAT (matte finish): Not more than five units at 60 degrees and 10 units at 85 degrees, according to ASTM D523.

C. MPI Gloss Level 3: EGGSHELL; 10 to 25 units at 60 degrees and 10 to 35 units at 85 degrees, according to ASTM D523.

D. MPI Gloss Level 4: SATIN: 20 to 35 units at 60 degrees and not less than 35 units at 85 degrees, according to ASTM D523.

E. MPI Gloss Level 5: SEMIGLOSS: 35 to 70 units at 60 degrees, according to ASTM D523.

F. MPI Gloss Level 6: GLOSS: 70 to 85 units at 60 degrees, according to ASTM D523.

EXTERIOR PAINTING 099113 - 2

G. MPI Gloss Level 7: HIGH GLOSS: More than 85 units at 60 degrees, according to ASTM D523.

1.3 REFERENCE STANDARDS

A. ASTM D16 - Standard Terminology for Paint, Related Coatings, Materials, and Applications;

2024.

B. ASTM D523 - Standard Test Method for Specular Gloss; 2025.

C. ASTM D4442 - Standard Test Methods for Direct Moisture Content Measurement of Wood and Wood-Based Materials; 2020 (Reapproved 2025).

D. MPI (APL) - Master Painters Institute Approved Products List; Master Painters and Decorators Association; Current Edition.

E. MPI (APSM) - Master Painters Institute Architectural Painting Specification Manual; Current Edition.

F. SSPC-SP 1 - Solvent Cleaning; 2015, with Editorial Revision (2016).

G. SSPC-SP 2 - Hand Tool Cleaning; 2024.

H. SSPC-SP 3 - Power Tool Cleaning; 2024.

I. SSPC-SP 6/NACE No.3 - Commercial Blast Cleaning; 2006.

J. SSPC-SP 7/NACE No.4 - Brush-Off Blast Cleaning; 2007.

K. SSPC-SP 11 - Power-Tool Cleaning to Bare Metal; 2020.

L. SSPC-SP 13/NACE No.6 - Surface Preparation of Concrete; 2018.

1.4 SUBMITTALS

A. Product Data: Provide complete list of products to be used, with the following information for each:

1. Manufacturer's name, product name and/or catalog number, and general product category (e.g. "alkyd enamel").

2. MPI product number (e.g. MPI #47).

3. Cross-reference to specified paint system(s) product is to be used in; include description of each system.

4. VOC conten

B. Samples: Submit two paper "draw down" samples, 8-1/2 by 11 inches (216 by 279 mm) in size, illustrating range of colors available for each finishing product specified.

1. Where sheen is specified, submit samples in only that sheen.

2. Label each coat of each sample.

3. Label each sample for location and application area.

EXTERIOR PAINTING 099113 - 3

C. Product List: Cross-reference to paint system and locations of application areas. Use same designations indicated on Drawings and in schedules. Include color designations.

1.5 CLOSEOUT SUBMITTALS

A. Maintenance Materials: Furnish the following for Owner's use in maintenance of project.

1. Credit for Extra Paint and Finish Materials: Credit to the clients preferred paint store or distributor in the amount equal to 5 gal (18.9 L) per paint type and color.

2. Label each container with color in addition to the manufacturer's label.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Deliver products to site in sealed and labeled containers; inspect to verify acceptability.

B. Container Label: Include manufacturer's name, type of paint, brand name, lot number, brand code, coverage, surface preparation, drying time, cleanup requirements, color designation, and instructions for mixing and reducing.

C. Paint Materials: Store at minimum ambient temperature of 45 degrees F (7 degrees C) and a maximum of 90 degrees F (32 degrees C), in ventilated area, and as required by manufacturer's instructions.

D. Maintain containers in clean condition, free of foreign materials and residue.

E. Remove rags and waste from storage areas daily.

1.7 FIELD CONDITIONS

A. Do not apply materials when surface and ambient temperatures are outside the paint product manufacturer's temperature ranges.

B. Follow manufacturer's recommended procedures for producing best results, including testing of substrates, moisture in substrates, and humidity and temperature limitations.

C. Do not apply exterior paint and finishes during rain or snow, or when relative humidity is outside the humidity ranges required by the paint product manufacturer.

D. Provide lighting level of 80 ft candles (860 lx) measured mid-height at substrate surface.

PART 2 PRODUCTS

2.1 MANUFACTURERS

A. Basis of Design Manufacturer: Provide products by Sherwin Williams, Inc., as indicated, or equal as approved by the Architect in writing before the Bid.

1. Approved Equals: Equivalents by the following manufacturers:

a. Benjamin Moore & Co.

EXTERIOR PAINTING 099113 - 4

b. PPG Architectural Finishes, Inc.

c. Tnemec Company, Inc.

2. All products submitted as equals by pre-approved manufacturers are subject to review by the Architect for verification that they are substantially equivalent to the Basis of Design products.

3. Named product specifications are used to establish the design, quality, sizes, functions, and accessories required for the Project. Subject to review and acceptance, minor variations in products by the other named manufacturers will be considered as long as other work is unaffected.

2.2 PAINTS AND FINISHES - GENERAL

A. MPI Standards: Products shall comply with MPI standards indicated and shall be listed in its "MPI Approved Products Lists."

B. Paints and Finishes: Ready-mixed, unless required to be a field-catalyzed paint.

1. Where MPI paint numbers are specified, provide products listed in Master Painters Institute Approved Product List, current edition available at www.paintinfo.com, for specified MPI categories, except as otherwise indicated.

2. Provide paints and finishes of a soft paste consistency, capable of being readily and uniformly dispersed to a homogeneous coating, with good flow and brushing properties, and capable of drying or curing free of streaks or sags.

3. Provide materials that are compatible with one another and the substrates indicated under conditions of service and application, as demonstrated by manufacturer based on testing and field experience.

a. For each coat in a paint system, products shall be recommended in writing by topcoat manufacturers for use in paint system and on substrate indicated.

4. Supply each paint material in quantity required to complete entire project's work from a single production run.

5. Do not reduce, thin, or dilute paint or finishes or add materials unless such procedure is described explicitly in manufacturer's product instructions.

6. VOC Content: Provide materials that comply with VOC limits of authorities having jurisdiction.

7. Colors: As selected by Architect from manufacturer's full range.

2.3 SOURCE QUALITY CONTROL

A. Testing of Paint Materials: Owner reserves the right to invoke the following procedure:

1. Owner will engage the services of a qualified testing agency to sample paint materials.

Contractor will be notified in advance and may be present when samples are taken. If paint materials have already been delivered to Project site, samples may be taken at Project site. Samples will be identified, sealed, and certified by testing agency.

2. Testing agency will perform tests for compliance with product requirements.

3. Owner may direct Contractor to stop applying paints if test results show materials being used do not comply with product requirements. Contractor shall remove noncomplying paint materials from Project site, pay for testing, and repaint surfaces painted with rejected materials. Contractor will be required to remove rejected materials from previously

EXTERIOR PAINTING 099113 - 5

painted surfaces if, on repainting with complying materials, the two paints are incompatible.

PART 3 EXECUTION

3.1 EXAMINATION

A. Verify that surfaces are ready to receive work as instructed by the product manufacturer. Verify suitability of substrates, including surface conditions and compatibility, with existing finishes and primers. Where acceptability of substrate conditions is in question, apply samples and perform in-situ testing to verify compatibility, adhesion, and film integrity of new paint application.

B. Examine surfaces scheduled to be finished, with Applicator present, prior to commencement of work. Report any condition that may potentially affect proper application.

C. Test shop-applied primer for compatibility with subsequent cover materials.

D. Measure moisture content of surfaces using an electronic moisture meter. Do not apply finishes unless moisture content of surfaces are below the following maximums:

1. Concrete: 12 percent.

2. Masonry, Concrete, and Concrete Masonry Units: 12 percent.

3. Exterior Wood: 15 percent, measured in accordance with ASTM D4442.

4. Gypsum Board: 12 percent.

E. Portland Cement Plaster Substrates: Verify that plaster is fully cured.

F. Exterior Gypsum Board Substrates: Verify that finishing compound is sanded smooth.

G. Proceed with coating application only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Comply with manufacturer's written instructions and recommendations in "MPI Architectural Painting Specification Manual" applicable to substrates and paint systems indicated.

B. Clean surfaces thoroughly and correct defects prior to application. Remove dust, dirt, oil, grease, and incompatible paints and encapsulants.

1. Remove incompatible primers and reprime substrate with compatible primers or apply tie coat as required to produce paint systems indicated.

C. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.

D. Remove surface appurtenances, including electrical plates, hardware, light fixture trim, escutcheons, and fittings that are removable and are not to be painted, prior to preparing surfaces for finishing.

EXTERIOR PAINTING 099113 - 6

E. Seal surfaces that might cause bleed through or staining of topcoat.

F. Remove mildew from impervious surfaces by scrubbing with solution of tetra-sodium phosphate and bleach. Rinse with clean water and allow surface to dry.

G. Concrete:

1. Remove release agents, curing compounds, efflorescence, and chalk. Do not coat surfaces if moisture content or alkalinity of surfaces to be coated exceeds that permitted in manufacturer's written instructions.

2. Prepare surface as recommended by top coat manufacturer and in accordance with SSPC- SP 13/NACE No.6.

H. Galvanized Surfaces:

1. Remove surface contamination and oils and wash with solvent according to SSPC-SP 1.

2. Prepare surface according to SSPC-SP 2.

I. Ferrous Metal:

1. Shop-Primed Surfaces: Sand and scrape to remove loose primer and rust. Feather edges to make touch-up patches inconspicuous. Clean surfaces with solvent. Prime bare steel surfaces. Re-prime entire shop-primed item.

2. Remove rust, loose mill scale, and other foreign substances using methods recommended in writing by paint manufacturer. Cleaning methods sthall not be less than the following:

blast cleaning in accordance with SSPC-SP 6/NACE No.3. Protect from corrosion until coated.

a. SSPC-SP 2.

b. SSPC-SP 3.

c. SSPC-SP 7/NACE No.4.

d. SSPC-SP 11.

J. Aluminum Substrates: Remove loose surface oxidation.

3.3 APPLICATION

A. Remove unfinished louvers, grilles, covers, and access panels on mechanical and electrical components and paint separately.

B. Apply products in accordance with manufacturer's written instructions and recommendations in "MPI Architectural Painting Specification Manual".

1. Use applicators and techniques suited for paint and substrate indicated.

2. Paint surfaces behind movable items same as similar exposed surfaces. Before final installation, paint surfaces behind permanently fixed items with prime coat only.

3. Paint both sides and edges of exterior doors and entire exposed surface of exterior door frames.

4. Do not paint over labels of independent testing agencies or equipment name, identification, performance rating, or nomenclature plates.

5. Primers specified in painting schedules may be omitted on items that are factory primed or factory finished if acceptable to topcoat manufacturers.

EXTERIOR PAINTING 099113 - 7

C. Do not apply finishes to surfaces that are not dry. Allow applied coats to dry before next coat is applied.

D. Apply each coat to uniform appearance. Apply paints to produce surface films without cloudiness, spotting, holidays, laps, brush marks, roller tracking, runs, sags, ropiness, or other surface imperfections. Cut in sharp lines and color breaks.

E. Tint undercoats same color as topcoat but tint each undercoat a lighter shade to facilitate identification of each coat if multiple coats of same material are to be applied. Provide sufficient difference in shade of undercoats to distinguish each separate coat.

F. If undercoats or other conditions show through topcoat, apply additional coats until cured film has a uniform paint finish, color, and appearance.

G. Dark Colors and Deep Clear Colors: Regardless of number of coats specified, apply additional coats until complete hide is achieved.

H. Vacuum clean surfaces of loose particles. Use tack cloth to remove dust and particles just prior to applying next coat.

I. Reinstall electrical cover plates, hardware, light fixture trim, escutcheons, and fittings removed prior to finishing.

3.4 FIELD QUALITY CONTROL

A. See Section 014000 - Quality Requirements, for general requirements for field inspection.

B. Dry Film Thickness Testing: Owner may engage the services of a qualified testing and inspecting agency to inspect and test paint for dry film thickness.

1. Contractor shall touch up and restore painted surfaces damaged by testing.

2. If test results show that dry film thickness of applied paint does not comply with paint manufacturer's written recommendations, Contractor shall pay for testing and apply additional coats as needed to provide dry film thickness that complies with paint manufacturer's written recommendations.

3.5 CLEANING

A. Collect waste material that could constitute a fire hazard, place in closed metal containers, and remove daily from site.

B. After completing paint application, clean spattered surfaces. Remove spattered paints by washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces.

3.6 PROTECTION

A. Protect finishes until completion of project. Correct damage to work of other trades by cleaning, repairing, replacing, and refinishing, as approved by Architect, and leave in an undamaged condition.

EXTERIOR PAINTING 099113 - 8

B. Touch-up damaged finishes after Substantial Completion.

3.7 EXTERIOR PAINTING SCHEDULE

A. Concrete Substrates:

1. Acrylic Self-Cleaning Systems:

a. Eggshell finish.

b. Prep: Clean, dry, dull, and sound.

1) Spot Primer on Bare Concrete/CMU: Loxon Acrylic Block Surfacer, LX01 Series.

2) 2nd and 3rd Coats: Sherwin-Williams Loxon Self-Cleaning Acrylic Coating, LX13 Series.

(a) 5 to 7 mils wet, 2 to 2.8 mils dry per coat.

B. Steel Substrates - Structural Steel, Hollow Metal Doors and Frames:

1. Shall be provided for Covered Shed Structure (Addendum #3).

2. Urethane Systems; Waterbased: Gloss Finish Single Component.

a. Prime Coat: S-W Pro Industrial Pro-Cryl Universal Primer, B66-1310 Series. (5.0-

10.0 mils. wet, 1.8-3.6 mils. dry per coat).

b. Intermediate Coat: Pro Industrial Waterbased Alkyd Urethane Enamel Semi-Gloss, B53 Series.

c. Topcoat: Pro Industrial Waterbased Alkyd Urethane Enamel Semi-Gloss, B53 Series.

C. Galvanized-Metal Substrates and Aluminum Substrates:

1. Urethane Systems; Waterbased: Gloss Finish Single Component.

a. Prime Coat: S-W DTM Wash Primer, B71Y1 (3.4-6.4 mils. wet, 0.7-1.3 mils. dry per coat).

b. Intermediate Coat: S-W S-W Pro Industrial Pre-Catalyzed Waterbased Urethane

Gloss, B65-120 Series.

c. Topcoat: S-W Pro Industrial Pre-Catalyzed Waterbased Urethane Gloss, B65-120

Series (6.0-12.0 mils. wet, 1.9-3.8 mils. dry per coat).

D. Steel Bollards with Concrete Cap:

1. High-Performance; humidity and moisture resistant.

a. Prep steel if exposed: Clean with Great Lakes Labs Clean N Etch.

b. Prime Coat: S-W Macropoxy 646 Fast Cure Epoxy, B58 Series, 5-10 mils DFT.

c. Topcoat: S-W Hi Solids Polyurethane 250 Semi-Gloss, B65 Series (4.5-8 mils wet;

3.0-5.0 mils dry).

END OF SECTION 099113

PALLET STORAGE RACKS 105629.16 - 1

SECTION 105629.16 - PALLET STORAGE RACKS

PART 1 GENERAL

1.1 RELATED REQUIREMENTS

A. Section 012300 - Alternates: Descriptions of items, administrative requirements.

B. Section 017419 - Construction Waste Management and Disposal.

C. Section 017800 - Closeout Submittals: Project record documents, operation and maintenance (O&M) data, warranties and bonds.

1.2 REFERENCE STANDARDS

A. 29 CFR 1910 - Occupational Safety and Health Standards; Current Edition.

B. ANSI MH16.1 - Design, Testing, and Utilization of Industrial Steel Storage Racks; 2023.

C. ASTM A153/A153M - Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware; 2023.

D. ASTM A500/A500M - Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes; 2023.

E. AWS D1.1/D1.1M - Structural Welding Code - Steel; 2025, with Amendment (2026).

F. SSPC-Paint 15 - Steel Joist Shop Primer/Metal Building Primer; 2004.

G. SSPC-Paint 20 - Zinc-Rich Coating (Type I - Inorganic, and Type II - Organic); 2019.

1.3 ADMINISTRATIVE REQUIREMENTS

A. Preinstallation Meeting: Conduct a preinstallation meeting one week prior to the start of the work of this section; require attendance by all affected installers.

1.4 SUBMITTALS

A. Product Data: Materials and details of design and construction. Include system components, accessories, and substrate preparation recommendations.

B. Shop Drawings: Indicate locations, type and layout of pallet racks, and erection sequence.

Include lengths, heights, and aisle layout, and relationship (and connections, if any) to adjacent construction. Indicate configuration, and method of installation of decking units.

1. Include a notice in conspicuous text on drawings stating that deviations from limitations noted in structural design data submittal may impair the safety of the rack installation.

PALLET STORAGE RACKS 105629.16 - 2

C. Design Data: Provide design calculations, bearing seal and signature of structural engineer licensed to practice in the State in which the Project is located, showing load application and rack configuration(s).

1. If a pallet rack or stacker rack system is permitted in more than one shelf configuration or profile, include in tabular form either (a) all the permissible configurations or (b) limitations as to the maximum number of shelves, the maximum distance between shelves and the maximum distance from the floor to the bottom shelf.

2. If the racks are connected to the building structure, show the location and magnitude of maximum possible horizontal and vertical forces imposed on the building.

D. Designer's Qualification Statement.

E. Manufacturer's Qualification Statement.

F. Project Record Documents: Record actual locations and initial configuration of racks in the project.

1.5 QUALITY ASSURANCE

A. Designer Qualifications: Perform design under direct supervision of a Professional Engineer experienced in design of this type of work and licensed in the State in which the Project is located.

B. Manufacturer Qualifications: Company specializing in manufacturing products specified in this section, with not less than three years of documented experience.

C. Installer Qualifications: Company specializing in performing work of the type specified and with minimum three years of documented experience.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Deliver all items to project site in packaging.

B. Inspect for dents, scratches, or other damage.

1. Repair damaged finishes.

2. Replace damaged components.

C. Store rack system components, accessories and installation anchors and fasteners in manufacturer's unopened packaging until ready for installation.

D. Store rack system components, accessories and installation anchors and fasteners under cover and elevated above grade.

1.7 FIELD CONDITIONS

A. Ambient Conditions: Maintain temperature within range recommended by the rack manufacturer during and after installation of pallet rack system.

PALLET STORAGE RACKS 105629.16 - 3

1.8 WARRANTY

A. Correct defective Work within a one year period after Date of Substantial Completion.

1. Failures include, but are not limited to, the following:

a. Deterioration of metals, metal finishes, and other materials beyond normal wear.

PART 2 PRODUCTS

2.1 MANUFACTURERS

A. Basis-of-Design Manufacturer: Provide Heavy-Duty Pallet Racks as manufactured by Penco Products: www.pencoproducts.com, or equal as approved by the Architect in writing before the Bid.

1. Approved Equal Manufacturers:

a. Husky Rack and Wire: www.huskyrackandwire.com.

b. Steel King Industries, Inc: www.steelking.com.

c. Unarco Material Handling, Inc: www.unarcorack.com.

2.2 PERFORMANCE REQUIREMENTS

A. Delegated Design: Engage a qualified professional engineer, licensed in the State in which the Project is located to design storage systems.

B. Structural Performance: Provide pallet systems capable of safely supporting loads as indicated below.

1. Design in compliance with applicable requirements of 2021 IBC, including any amendments made by the State in which the Project is located.

2. Each shelf shall be capable of supporting a load of 10,000 lbs. (Addendum #3)

2.3 SYSTEMS AND COMPONENTS

A. General: Provide manufacturer's standard storage shelving systems and components.

B. Where components are not explicitly indicated, provide manufacturer's standard components as required for a complete system.

2.4 PALLET RACK TYPES

A. Single-Face Rack: One continuous row of units joined together and side-to-side, positioned along a wall, to be serviced by one service aisle, single-deep.

B. Double-Face Rack: One continuous row of units joined together and side-to-side, to be serviced from either front or back by two service aisles, single-deep.

PALLET STORAGE RACKS 105629.16 - 4

2.5 STEEL PALLET RACKS

A. Pallet Racks: Heavy-Duty Rack system consisting of upright frames, and beams with integral locking devices for bolted connection to frame columns.

1. Roll-formed Columns: Formed into an "M" design for added strength, with slots on the column allowing for beam placement on 3" vertical centers. Gauge as determined by structural design calculations.

2. Pallet Rack Beams:

a. Steel Step Beams: Manufacturer's standard, unslotted-style, continuously-welded tubing, with fully-welded end-plates; size and gauge selected to safely carry design loads.

1) Stamp each beam with load-bearing capacity or identifying mark referencing load-bearing capacity.

3. Beam End Connectors: Extra-heavy gauge steel with three-prong connection.

4. Welded Upright Frame Bracing: Upright frame columns shall be securely welded together with channel type braces for maximum rigidity.

5. Upright Column: Continuous post roll formed into an "M" design for added strength.

6. Beam Locking Key: Manufacturer's standard safety key, designed to resist upward force from material handling equipment up to 1000 pounds.

7. Bases: Manufacturer's heavy-duty bases; fully-welded to columns in compliance with requirements of AWS D1.1/D1.1M; size and thickness as required by loads.

a. Provide holes for floor anchoring.

8. Horizontal and Diagonal Bracing: Manufacturer's standard, sized and configured to provide required stability and minimize sway, selection of members determined by structural design calculations.

9. Finish: Baked enamel.

B. Storage Positions:

1. Number of Aisles and Storage Lanes: As indicated on drawings.

2. Sizes: As indicated on drawings.

3. Decking: Manufactuere's heavy-duty wire decking.

4. Pushback Cart System: Manufacturer's standard telescoped cart system designed for 'Last-in, First-out' picking. (Deleted in Addendum #3)

a. Inclined (3 percent) track rails, with lift-out prevention guides.

b. Multi-Purpose Push Plates: One per loading lane. Designed to act as height gauge, end stop, and full-lane indicator. Fastened to the frontmost cart.

c. Nested Carts: Four-sided, rigid-box, heavy-duty construction.

d. Guide Rail Support Beams: Angle- or tube-shaped. Front, intermediate and rear beams, as required for depth of system.

2.6 ACCESSORIES

A. Cross Bars: Manufacturer's standard, to support heavy loads smaller than unit depth.

B. Column Protector Guards: Manufacturer's standard, independently-mounted; install at base and at 3" increments on front of upright post.

PALLET STORAGE RACKS 105629.16 - 5

1. Color: Safety Yellow, complying with requirements of 29 CFR 1910 Subpart J, Standard 1910.144(a)(3).

C. End-Aisle Protector Assembly: Manufacturer's standard.

D. Wall Brackets: Welded or bolted, manufacturer's standard to connect racks to wall.

E. Row Spacers: Welded or bolted, manufacturer's standard.

F. Frame Deflectors:

G. Fasteners and Anchors:

1. Metal and Finish: Hot-dipped galvanized steel complying with ASTM A153/A153M.

2.7 MATERIALS

A. Steel Sections and Plates: ASTM A36/A36M.

B. Steel Tubing: ASTM A500/A500M tubing.

C. Bolts, Nuts, and Washers: ASTM A325 (ASTM A325M), Type 1, galvanized to ASTM A153/A153M where connecting galvanized components.

D. Shop and Touch-Up Primer: SSPC-Paint 15, complying with VOC limitations of authorities having jurisdiction.

E. Touch-Up Primer for Galvanized Surfaces: SSPC-Paint 20, Type I - Inorganic, complying with VOC limitations of authorities having jurisdiction.

2.8 FINISHES - STEEL

A. Baked-Enamel or Powder-Coat Finish: Manufacturer's standard two-coat finish consisting of prime coat applied as per SSPC-Paint 15 or SSPC-Paint 20 requirements, and a thermosetting topcoat to achieve a minimum dry film thickness of 2 mils, 0.002 inch (0.05 mm).

B. Appearance of Finished Work: Noticeable variations in same piece are not acceptable.

Variations in appearance of adjoining components are acceptable if they are within the range of approved samples and are assembled or installed to minimize contrast.

C. Color and Gloss: As selected by Architect from manufacturer's full range.

PART 3 EXECUTION

3.1 EXAMINATION

A. Examine areas, with installer present, for compliance with requirements for installation tolerances, location of framing and reinforcements, and other conditions affecting performance of storage systems.

PALLET STORAGE RACKS 105629.16 - 6

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 INSTALLATION - GENERAL

A. Level and plumb racks to a tolerance of 1/2 inch in 120 inches (12.5 mm in 3048 mm).

B. Use permanent shims or non-shrink grout as indicated by manufacturer.

C. Set pallet rack system sufficiently away from walls to allow access behind shelving for maintenance, including treatment for pests and vermin.

3.3 RACK SYSTEM INSTALLATION

A. Install rack system according to manufacturer's written instructions and as required to prevent movement and seismic distortion, to meet loading requirements, and to allow access for future adjustment of shelves.

B. Provide anchors and fasteners required for securing rack system to structure.

C. Connect groups together with standard fasteners according to manufacturer's written instructions, using concealed fasteners where possible.

D. Install horizontal members at locations indicated on Drawings and as indicated in field by Architect, according to manufacturer's written instructions.

E. Install cart pushback system rails and carts in designated bays, centered in each bay.

F. Install accessories in compliance with shop drawings.

3.4 SPECIAL INSPECTIONS

A. Provide special inspections as required by 2021 IBC, Chapter…

This is the start of the file's text. The full file is on GovTribe.