Bid Tabulation Report Summary
This bid tabulation report documents the sealed bid results for the Oakbrook Center for Early Education improvements and renovations project submitted to the Reading Housing Authority (RHA) in Pennsylvania. The project encompasses multiple prime contracts across five trade categories: General Construction, Mechanical, Electrical, Plumbing, and Fire Protection. The General Construction contract received five bids ranging from $9,311,650.00 to $11,814,000.00, with base bid pricing for work excluding and including a salt shed structure, along with line items for bulk rock removal (175 cubic yards), trench rock removal (75 cubic yards), and unsatisfactory soil remediation and replacement totaling 15,000 cubic yards. The bid tabulation includes 11 deduct alternates addressing site paving, warehouse structures, pallet racking systems, wall panel specifications, flooring substitutions, and locker elimination. The Electrical trade received seven bids ranging from $669,500.00 to $1,320,300.00, the Plumbing trade received four bids ranging from $245,000.00 to $342,912.00, Mechanical received two bids ($212,000.00 and $256,529.00), and Fire Protection received two bids ($160,500.00 and $209,460.00). The bid deadline was November 10, 2026, with a pre-bid conference scheduled for September 23, 2026, at the Willis Center for Administration in Reading, Pennsylvania.
The bid tabulation presents unit prices and total costs for each bidder across all line items and alternates. General Construction base bids ranged from $8,858,250.00 to $10,777,500.00 for work excluding the salt shed structure, with salt shed pricing ranging from $1,087,500.00 to $2,395,000.00. Most deduct alternates were consistently negative across all General Construction bidders, with the exception of two alternates where certain bidders submitted positive pricing (indicating additions rather than deductions). The Electrical trade showed more variability in alternate pricing, with some bidders submitting zero values for certain alternates while others provided deduct amounts. No set-asides are identified in this tabulation document. The report reflects competitive bidding with varying cost approaches among qualified contractors across all trade disciplines for this renovation project.
View the file
Other files
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet 1
| GENERAL CONSTRUCTION | Caldwell, Heckles, and Egan Inc. | Lobar, Inc. | Skepton Construction, Inc. | Uhrig Construction | eciConstruction LLC | |||
| Total Cost | $ 9,928,375.00 | $ 9,311,650.00 | $ 11,814,000.00 | $ 9,739,608.00 | $ 9,513,800.00 | |||
| # | Items | Unit |
of
| Measure | Quantity |
| Required | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
Cost
| Base Bid Pricing: Totals | $ 11,672,875.00 | $ 10,441,000.00 | $ 13,670,000.00 | $ 11,153,196.00 | $ 11,184,000.00 | ||||||||
| #1-1 | Total Base Bid excluding Salt Shed Structure | LS | 1 | $ 10,144,000.00 | $ 10,144,000.00 | $ 8,858,250.00 | $ 8,858,250.00 | $ 10,777,500.00 | $ 10,777,500.00 | $ 9,383,000.00 | $ 9,383,000.00 | $ 9,467,475.00 | $ 9,467,475.00 |
| #1-2 | Salt Shed Structure | LS | 1 | $ 1,087,500.00 | $ 1,087,500.00 | $ 1,100,000.00 | $ 1,100,000.00 | $ 2,395,000.00 | $ 2,395,000.00 | $ 1,282,446.00 | $ 1,282,446.00 | $ 1,275,000.00 | $ 1,275,000.00 |
| #1-3 | Bulk Rock Removal | CY | 175 | $ 210.00 | $ 36,750.00 | $ 200.00 | $ 35,000.00 | $ 250.00 | $ 43,750.00 | $ 250.00 | $ 43,750.00 | $ 168.00 | $ 29,400.00 |
| #1-4 | Trench Rock Removal - | CY | 75 | $ 275.00 | $ 20,625.00 | $ 250.00 | $ 18,750.00 | $ 250.00 | $ 18,750.00 | $ 200.00 | $ 15,000.00 | $ 195.00 | $ 14,625.00 |
| #1-5 | Unsatisfactory/Unsuitable Soils - Remediation | CY | 9000 | $ 7.00 | $ 63,000.00 | $ 9.00 | $ 81,000.00 | $ 15.00 | $ 135,000.00 | $ 9.00 | $ 81,000.00 | $ 7.50 | $ 67,500.00 |
| #1-6 | Unsatisfactory/Unsuitable Soils - Removal and Replacement | CY | 6000 | $ 53.50 | $ 321,000.00 | $ 58.00 | $ 348,000.00 | $ 50.00 | $ 300,000.00 | $ 58.00 | $ 348,000.00 | $ 55.00 | $ 330,000.00 |
| DEDUCT ALTERNATE (Unit price represents a deduction from the lump sum base bid and should be a negative number (Ex. $-1000.00): Totals | $ (1,744,500.00) | $ (1,129,350.00) | $ (1,856,000.00) | $ (1,413,588.00) | $ (1,670,200.00) | ||||||||
| #2-1 | Eliminate: Paving of the Construction Yard and Construction Yard Structure (Covered Storage), Leaving the Entire Site at the Stone Subgrade Level | LS | 1 | $ (275,000.00) | $ (275,000.00) | $ (286,000.00) | $ (286,000.00) | $ (190,000.00) | $ (190,000.00) | $ (235,083.00) | $ (235,083.00) | $ (227,000.00) | $ (227,000.00) |
| #2-2 | Eliminate: Construction Yard Structure | LS | 1 | $ (750,000.00) | $ (750,000.00) | $ (411,000.00) | $ (411,000.00) | $ (730,000.00) | $ (730,000.00) | $ (641,377.00) | $ (641,377.00) | $ (653,700.00) | $ (653,700.00) |
| #2-3 | Eliminate: Pallet Racking on Perimeter of Warehouse | LS | 1 | $ (78,500.00) | $ (78,500.00) | $ (84,900.00) | $ (84,900.00) | $ (68,000.00) | $ (68,000.00) | $ (84,282.00) | $ (84,282.00) | $ (76,000.00) | $ (76,000.00) |
| #2-4 | Eliminate: Pallet Racking in Center of Warehouse | LS | 1 | $ (125,000.00) | $ (125,000.00) | $ (133,700.00) | $ (133,700.00) | $ (127,000.00) | $ (127,000.00) | $ (132,715.00) | $ (132,715.00) | $ (142,000.00) | $ (142,000.00) |
| #2-5 | Substitute: Reduce Wall Panel Gauge from 24 to 26 GA | LS | 1 | $ (12,500.00) | $ (12,500.00) | $ (10,800.00) | $ (10,800.00) | $ (73,000.00) | $ (73,000.00) | $ (29,668.00) | $ (29,668.00) | $ (18,500.00) | $ (18,500.00) |
| #2-6 | Substitute: Alternate Column Protection System | LS | 1 | $ - 0 | $ - 0 | $ (5,000.00) | $ (5,000.00) | $ (10,000.00) | $ (10,000.00) | $ - 0 | $ - 0 | $ (12,500.00) | $ (12,500.00) |
| #2-7 | Substitute: Asphalt Paving in lieu of Concrete, Salt Shed Floor | LS | 1 | $ (40,000.00) | $ (40,000.00) | $ (50,700.00) | $ (50,700.00) | $ (29,000.00) | $ (29,000.00) | $ (94,319.00) | $ (94,319.00) | $ (75,500.00) | $ (75,500.00) |
| #2-8 | Substitute: Asphalt Paving in lieu of Concrete, Material Storage Floor | LS | 1 | $ (30,000.00) | $ (30,000.00) | $ (15,750.00) | $ (15,750.00) | $ (20,000.00) | $ (20,000.00) | $ (44,138.00) | $ (44,138.00) | $ (44,500.00) | $ (44,500.00) |
| #2-9 | Substitute: Sealed Concrete Flooring in lieu of Epoxy Per Plans | LS | 1 | $ (325,000.00) | $ (325,000.00) | $ (281,500.00) | $ (281,500.00) | $ (249,000.00) | $ (249,000.00) | $ (269,380.00) | $ (269,380.00) | $ (276,000.00) | $ (276,000.00) |
| #2-10 | Substitute: Pre-Engineered Post-Frame Salt Shed Structure System in lieu of Base Bid Salt Shed Structure | LS | 1 | $ (97,500.00) | $ (97,500.00) | $ 158,000.00 | $ 158,000.00 | $ (350,000.00) | $ (350,000.00) | $ 129,813.00 | $ 129,813.00 | $ (135,000.00) | $ (135,000.00) |
| #2-11 | Eliminate: All Lockers in Warehouse Building | LS | 1 | $ (11,000.00) | $ (11,000.00) | $ (8,000.00) | $ (8,000.00) | $ (10,000.00) | $ (10,000.00) | $ (12,439.00) | $ (12,439.00) | $ (9,500.00) | $ (9,500.00) |
| MECHANICAL | Garden Spot Mechanical, Inc. | Vision Mechanical | |||||||||||
| Total Cost | $ 212,000.00 | $ 256,529.00 | |||||||||||
| # | Items | Unit |
of
| Measure | Quantity |
| Required | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
Cost
| Base Bid Pricing: Totals | $212,000.00 | $256,529.00 | ||||||||||
| #1-1 | Total Base Bid excluding Salt Shed Structure | LS | 1 | $212,000.00 | $ 212,000.00 | $256,529.00 | $256,529.00 | |||||
| #1-2 | Salt Shed Structure | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| DEDUCT ALTERNATE (Unit price represents a deduction from the lump sum base bid and should be a negative number (Ex. $-1000.00): Totals | $0.00 | $0.00 | ||||||||||
| #2-1 | Eliminate: Paving of the Construction Yard | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| #2-2 | Eliminate: Construction Yard Structure | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| #2-3 | Eliminate: Pallet Racking on Perimeter of Warehouse | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| #2-4 | Eliminate: Pallet Racking in Center of Warehouse | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| #2-5 | Substitute: Reduce Wall Panel Gauge from 24 to 26 GA | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| #2-6 | Substitute: Alternate Column Protection System | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| #2-7 | Substitute: Asphalt Paving in lieu of Concrete, Salt Shed Floor | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| #2-8 | Substitute: Asphalt Paving in lieu of Concrete, Material Storage Floor | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| #2-9 | Substitute: Sealed Concrete Flooring in lieu of Epoxy Per Plans | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| ELECTRICAL | Garden Spot Electric, Inc. | Hirneisen Electric, Inc. | Lobar, Inc. | Manada Electric | MidState Mechanical & Electrical, LLC | Schipsi Electric LLC | Shannon A. Smith, Inc. | |||||
| Total Cost | $ 669,500.00 | $ 943,230.00 | $ 973,000.00 | $ 725,700.00 | $ 889,450.00 | $ 779,091.00 | $ 1,320,300.00 | |||||
| # | Items | Unit |
of
| Measure | Quantity |
| Required | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
Cost
| Base Bid Pricing: Totals | $ 698,600.00 | $ 949,230.00 | $ 975,000.00 | $ 749,000.00 | $ 912,950.00 | $ 779,091.00 | $ 1,320,300.00 | ||||||||||
| #1-1 | Total Base Bid excluding Salt Shed Structure | LS | 1 | $ 682,800.00 | $ 682,800.00 | $ 924,230.00 | $ 924,230.00 | $ 960,000.00 | $ 960,000.00 | $ 735,700.00 | $ 735,700.00 | $ 889,700.00 | $ 889,700.00 | $ 762,496.00 | $ 762,496.00 | $ 1,295,000.00 | $ 1,295,000.00 |
| #1-2 | Salt Shed Structure | LS | 1 | $ 15,800.00 | $ 15,800.00 | $ 25,000.00 | $ 25,000.00 | $ 15,000.00 | $ 15,000.00 | $ 13,300.00 | $ 13,300.00 | $ 23,250.00 | $ 23,250.00 | $ 16,595.00 | $ 16,595.00 | $ 25,300.00 | $ 25,300.00 |
| DEDUCT ALTERNATE (Unit price represents a deduction from the lump sum base bid and should be a negative number (Ex. $-1000.00): Totals | $ (29,100.00) | $ (6,000.00) | $ (2,000.00) | $ (23,300.00) | $ (23,500.00) | $ - 0 | $ - 0 | ||||||||||
| #2-1 | Eliminate: Pallet Racking on Perimeter of Warehouse | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| #2-2 | Eliminate: Pallet Racking in Center of Warehouse | LS | 1 | $ (29,100.00) | $ (29,100.00) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ (23,300.00) | $ (23,300.00) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| #2-3 | Substitute: Reduce Wall Panel Gauge from 24 to 26 GA | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| #2-4 | Substitute: Alternate Column Protection System | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| #2-5 | Substitute: Asphalt Paving in lieu of Concrete, Salt Shed Floor | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| #2-6 | Substitute: Asphalt Paving in lieu of Concrete, Material Storage Floor | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| #2-7 | Substitute: Sealed Concrete Flooring in lieu of Epoxy Per Plans | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| #2-8 | Eliminate: Paving of the Construction Yard | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| #2-9 | Eliminate: Construction Yard Structure | LS | 1 | $ - 0 | $ - 0 | $ (6,000.00) | $ (6,000.00) | $ (2,000.00) | $ (2,000.00) | $ - 0 | $ - 0 | $ (23,500.00) | $ (23,500.00) | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| PLUMBING | Garden Spot Mechanical, Inc. | SSM Industries | Vision Mechanical | W.C. Eshenaur & Son Inc | |||||||||||||
| Total Cost | $ 245,000.00 | $ 342,912.00 | $ 287,300.00 | $ 276,267.00 | |||||||||||||
| # | Items | Unit |
of
| Measure | Quantity |
| Required | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
Cost
| Base Bid Pricing: Totals | $ 245,000.00 | $ 342,912.00 | $ 287,300.00 | $ 276,267.00 | ||||||||
| #1-1 | Total Base Bid excluding Salt Shed Structure | LS | 1 | $ 245,000.00 | $245,000.00 | $ 342,912.00 | $ 342,912.00 | $ 287,300.00 | $ 287,300.00 | $ 276,267.00 | $ 276,267.00 | |
| #1-2 | Salt Shed Structure | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| DEDUCT ALTERNATE (Unit price represents a deduction from the lump sum base bid and should be a negative number (Ex. $-1000.00): Totals | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| #2-1 | Eliminate: Paving of the Construction Yard | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| #2-2 | Eliminate: Construction Yard Structure | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| #2-3 | Eliminate: Pallet Racking on Perimeter of Warehouse | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| #2-4 | Eliminate: Pallet Racking in Center of Warehouse | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| #2-5 | Substitute: Reduce Wall Panel Gauge from 24 to 26 GA | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| #2-6 | Substitute: Alternate Column Protection System | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| #2-7 | Substitute: Asphalt Paving in lieu of Concrete, Salt Shed Floor | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| #2-8 | Substitute: Asphalt Paving in lieu of Concrete, Material Storage Floor | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| #2-9 | Substitute: Sealed Concrete Flooring in lieu of Epoxy Per Plans | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| FIRE PROTECTION | Anchor Fire Protection | Triangle Fire Protection, Inc. | ||||||||||
| Total Cost | $ 160,500.00 | $ 209,460.00 | ||||||||||
| # | Items | UNIT | Quantity | |||||||||
| Required | Unit | |||||||||||
| Price | Total | |||||||||||
| Cost | Unit | |||||||||||
| Price | Total |
Cost
| Base Bid Pricing: Totals | $ 160,500.00 | $ 209,460.00 | |||||
| #1-1 | Total Base Bid excluding Salt Shed Structure | LS | 1 | $ 160,500.00 | $ 160,500.00 | $ 209,460.00 | $ 209,460.00 |
| #1-2 | Salt Shed Structure | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| DEDUCT ALTERNATE (Unit price represents a deduction from the lump sum base bid and should be a negative number (Ex. $-1000.00): Totals | $ - 0 | $ - 0 | |||||
| #2-1 | Eliminate: Paving of the Construction Yard | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| #2-2 | Eliminate: Construction Yard Structure | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| #2-3 | Eliminate: Pallet Racking on Perimeter of Warehouse | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| #2-4 | Eliminate: Pallet Racking in Center of Warehouse | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| #2-5 | Substitute: Reduce Wall Panel Gauge from 24 to 26 GA | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| #2-6 | Substitute: Alternate Column Protection System | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| #2-7 | Substitute: Asphalt Paving in lieu of Concrete, Salt Shed Floor | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| #2-8 | Substitute: Asphalt Paving in lieu of Concrete, Material Storage Floor | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| #2-9 | Substitute: Sealed Concrete Flooring in lieu of Epoxy Per Plans | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |