Bid Tabulation Report Summary

This bid tabulation report documents the sealed bid results for the Oakbrook Center for Early Education improvements and renovations project submitted to the Reading Housing Authority (RHA) in Pennsylvania. The project encompasses multiple prime contracts across five trade categories: General Construction, Mechanical, Electrical, Plumbing, and Fire Protection. The General Construction contract received five bids ranging from $9,311,650.00 to $11,814,000.00, with base bid pricing for work excluding and including a salt shed structure, along with line items for bulk rock removal (175 cubic yards), trench rock removal (75 cubic yards), and unsatisfactory soil remediation and replacement totaling 15,000 cubic yards. The bid tabulation includes 11 deduct alternates addressing site paving, warehouse structures, pallet racking systems, wall panel specifications, flooring substitutions, and locker elimination. The Electrical trade received seven bids ranging from $669,500.00 to $1,320,300.00, the Plumbing trade received four bids ranging from $245,000.00 to $342,912.00, Mechanical received two bids ($212,000.00 and $256,529.00), and Fire Protection received two bids ($160,500.00 and $209,460.00). The bid deadline was November 10, 2026, with a pre-bid conference scheduled for September 23, 2026, at the Willis Center for Administration in Reading, Pennsylvania.

The bid tabulation presents unit prices and total costs for each bidder across all line items and alternates. General Construction base bids ranged from $8,858,250.00 to $10,777,500.00 for work excluding the salt shed structure, with salt shed pricing ranging from $1,087,500.00 to $2,395,000.00. Most deduct alternates were consistently negative across all General Construction bidders, with the exception of two alternates where certain bidders submitted positive pricing (indicating additions rather than deductions). The Electrical trade showed more variability in alternate pricing, with some bidders submitting zero values for certain alternates while others provided deduct amounts. No set-asides are identified in this tabulation document. The report reflects competitive bidding with varying cost approaches among qualified contractors across all trade disciplines for this renovation project.

View the file

Other files

File Type Posted
34-25061 - Addendum 3 Arch-struct-MEP summary.pdf PDF
3-C05 - Site Civil Specifications Combined.pdf PDF
15-2026-10-06 - ES Addendum 1.pdf PDF
35-25061 - Addendum 3 Arch-struct-MEP summary.pdf PDF
10-C08 - Construction Plan.pdf PDF
Demolition.dwg DWG drawing
17-323113 - CHAIN LINK FENCES AND GATES.pdf PDF
321723 - PAVEMENT MARKINGS.pdf PDF
6-C10 - Geotechnical Report.pdf PDF
42-312000 - EARTH MOVING.pdf PDF
PG.dwg DWG drawing
EG.dwg DWG drawing
24-2026-10-14 - CD Addendum 2.pdf PDF
25-061_Pitney Rd Warehouse_Arch-Structural-MEP Drawings_Addendum 3.pdf PDF
28-312000 - EARTH MOVING.pdf PDF
12-25061 - Addendum 1.pdf PDF
48-CD-18 UTILITY PLAN.pdf PDF
9-C06 - Pitney Rd Warehouse Arch-Structural-MEP Bid Set.pdf PDF
32-25-061 Pitney Rd Warehouse Arch-Structural-MEP Drawings Addendum 3.pdf PDF
37-133418-USER-Post Frame Building Systems-10-23-2026.pdf PDF
22-B861-26-01 ADDENDUM 2 - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
25-2026-10-14 - ES Addendum 2.pdf PDF
18-329113 - SOIL PREPARATION.pdf PDF
41-2026-10-29 - ES Addendum 4.pdf PDF
ES.dwg DWG drawing
29-321723 - PAVEMENT MARKINGS.pdf PDF
25061 - Addendum 3_ Arch-struct-MEP summary.pdf PDF
44-B861-26-01 ADDENDUM 4 - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
30-2026-10-23 - ES Addendum 3.pdf PDF
Easements.dwg DWG drawing
Landscape.dwg DWG drawing
16-25-061 Pitney Rd Warehouse Arch-Structural-MEP Addendum 1.pdf PDF
20-City of Lancaster 150 Pitney Road Phase 1 ESA Sept2026.pdf PDF
33-Addendum 03 Arch Front End Specs.pdf PDF
13-133419-RIB- Pre-Engineered Metal Building Systems-09-17-2026.pdf PDF
11-B861-26-01 FINAL - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
26-Pre-Bid Attendees Ops Center Expansion 10072026.pdf PDF
40-2026-10-29 - CD Addendum 4.pdf PDF
38-25061 - Addendum 4 Arch-struct-MEP summary.pdf PDF
2026-10-23 - ES Addendum 3.pdf PDF
Addendum 03_Arch & Front End Specs.pdf PDF
39-25-061 Pitney Rd Warehouse Arch-Structural-MEP Drawings Addendum 4.pdf PDF
45-FINAL QA Report.pdf PDF
2026-10-23 - CD Addendum 3.pdf PDF
47-CD-17 UTILITY PLAN.pdf PDF
7-C09 - Fill Assessment Summary.pdf PDF
31-2026-10-23 - CD Addendum 3.pdf PDF
5-C03 - Operations Facilities Expansion - Bid Specs - Vol I.pdf PDF
312000 - EARTH MOVING.pdf PDF
46-CD-16 UTILITY PLAN.pdf PDF
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet 1

GENERAL CONSTRUCTIONCaldwell, Heckles, and Egan Inc.Lobar, Inc.Skepton Construction, Inc.Uhrig ConstructioneciConstruction LLC
Total Cost$ 9,928,375.00$ 9,311,650.00$ 11,814,000.00$ 9,739,608.00$ 9,513,800.00
#ItemsUnit

of

MeasureQuantity
RequiredUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal

Cost

Base Bid Pricing: Totals$ 11,672,875.00$ 10,441,000.00$ 13,670,000.00$ 11,153,196.00$ 11,184,000.00
#1-1Total Base Bid excluding Salt Shed StructureLS1$ 10,144,000.00$ 10,144,000.00$ 8,858,250.00$ 8,858,250.00$ 10,777,500.00$ 10,777,500.00$ 9,383,000.00$ 9,383,000.00$ 9,467,475.00$ 9,467,475.00
#1-2Salt Shed StructureLS1$ 1,087,500.00$ 1,087,500.00$ 1,100,000.00$ 1,100,000.00$ 2,395,000.00$ 2,395,000.00$ 1,282,446.00$ 1,282,446.00$ 1,275,000.00$ 1,275,000.00
#1-3Bulk Rock RemovalCY175$ 210.00$ 36,750.00$ 200.00$ 35,000.00$ 250.00$ 43,750.00$ 250.00$ 43,750.00$ 168.00$ 29,400.00
#1-4Trench Rock Removal -CY75$ 275.00$ 20,625.00$ 250.00$ 18,750.00$ 250.00$ 18,750.00$ 200.00$ 15,000.00$ 195.00$ 14,625.00
#1-5Unsatisfactory/Unsuitable Soils - RemediationCY9000$ 7.00$ 63,000.00$ 9.00$ 81,000.00$ 15.00$ 135,000.00$ 9.00$ 81,000.00$ 7.50$ 67,500.00
#1-6Unsatisfactory/Unsuitable Soils - Removal and ReplacementCY6000$ 53.50$ 321,000.00$ 58.00$ 348,000.00$ 50.00$ 300,000.00$ 58.00$ 348,000.00$ 55.00$ 330,000.00
DEDUCT ALTERNATE (Unit price represents a deduction from the lump sum base bid and should be a negative number (Ex. $-1000.00): Totals$ (1,744,500.00)$ (1,129,350.00)$ (1,856,000.00)$ (1,413,588.00)$ (1,670,200.00)
#2-1Eliminate: Paving of the Construction Yard and Construction Yard Structure (Covered Storage), Leaving the Entire Site at the Stone Subgrade LevelLS1$ (275,000.00)$ (275,000.00)$ (286,000.00)$ (286,000.00)$ (190,000.00)$ (190,000.00)$ (235,083.00)$ (235,083.00)$ (227,000.00)$ (227,000.00)
#2-2Eliminate: Construction Yard StructureLS1$ (750,000.00)$ (750,000.00)$ (411,000.00)$ (411,000.00)$ (730,000.00)$ (730,000.00)$ (641,377.00)$ (641,377.00)$ (653,700.00)$ (653,700.00)
#2-3Eliminate: Pallet Racking on Perimeter of WarehouseLS1$ (78,500.00)$ (78,500.00)$ (84,900.00)$ (84,900.00)$ (68,000.00)$ (68,000.00)$ (84,282.00)$ (84,282.00)$ (76,000.00)$ (76,000.00)
#2-4Eliminate: Pallet Racking in Center of WarehouseLS1$ (125,000.00)$ (125,000.00)$ (133,700.00)$ (133,700.00)$ (127,000.00)$ (127,000.00)$ (132,715.00)$ (132,715.00)$ (142,000.00)$ (142,000.00)
#2-5Substitute: Reduce Wall Panel Gauge from 24 to 26 GALS1$ (12,500.00)$ (12,500.00)$ (10,800.00)$ (10,800.00)$ (73,000.00)$ (73,000.00)$ (29,668.00)$ (29,668.00)$ (18,500.00)$ (18,500.00)
#2-6Substitute: Alternate Column Protection SystemLS1$ - 0$ - 0$ (5,000.00)$ (5,000.00)$ (10,000.00)$ (10,000.00)$ - 0$ - 0$ (12,500.00)$ (12,500.00)
#2-7Substitute: Asphalt Paving in lieu of Concrete, Salt Shed FloorLS1$ (40,000.00)$ (40,000.00)$ (50,700.00)$ (50,700.00)$ (29,000.00)$ (29,000.00)$ (94,319.00)$ (94,319.00)$ (75,500.00)$ (75,500.00)
#2-8Substitute: Asphalt Paving in lieu of Concrete, Material Storage FloorLS1$ (30,000.00)$ (30,000.00)$ (15,750.00)$ (15,750.00)$ (20,000.00)$ (20,000.00)$ (44,138.00)$ (44,138.00)$ (44,500.00)$ (44,500.00)
#2-9Substitute: Sealed Concrete Flooring in lieu of Epoxy Per PlansLS1$ (325,000.00)$ (325,000.00)$ (281,500.00)$ (281,500.00)$ (249,000.00)$ (249,000.00)$ (269,380.00)$ (269,380.00)$ (276,000.00)$ (276,000.00)
#2-10Substitute: Pre-Engineered Post-Frame Salt Shed Structure System in lieu of Base Bid Salt Shed StructureLS1$ (97,500.00)$ (97,500.00)$ 158,000.00$ 158,000.00$ (350,000.00)$ (350,000.00)$ 129,813.00$ 129,813.00$ (135,000.00)$ (135,000.00)
#2-11Eliminate: All Lockers in Warehouse BuildingLS1$ (11,000.00)$ (11,000.00)$ (8,000.00)$ (8,000.00)$ (10,000.00)$ (10,000.00)$ (12,439.00)$ (12,439.00)$ (9,500.00)$ (9,500.00)
MECHANICALGarden Spot Mechanical, Inc.Vision Mechanical
Total Cost$ 212,000.00$ 256,529.00
#ItemsUnit

of

MeasureQuantity
RequiredUnit
PriceTotal
CostUnit
PriceTotal

Cost

Base Bid Pricing: Totals$212,000.00$256,529.00
#1-1Total Base Bid excluding Salt Shed StructureLS1$212,000.00$ 212,000.00$256,529.00$256,529.00
#1-2Salt Shed StructureLS1$ - 0$ - 0$ - 0$ - 0
DEDUCT ALTERNATE (Unit price represents a deduction from the lump sum base bid and should be a negative number (Ex. $-1000.00): Totals$0.00$0.00
#2-1Eliminate: Paving of the Construction YardLS1$ - 0$ - 0$ - 0$ - 0
#2-2Eliminate: Construction Yard StructureLS1$ - 0$ - 0$ - 0$ - 0
#2-3Eliminate: Pallet Racking on Perimeter of WarehouseLS1$ - 0$ - 0$ - 0$ - 0
#2-4Eliminate: Pallet Racking in Center of WarehouseLS1$ - 0$ - 0$ - 0$ - 0
#2-5Substitute: Reduce Wall Panel Gauge from 24 to 26 GALS1$ - 0$ - 0$ - 0$ - 0
#2-6Substitute: Alternate Column Protection SystemLS1$ - 0$ - 0$ - 0$ - 0
#2-7Substitute: Asphalt Paving in lieu of Concrete, Salt Shed FloorLS1$ - 0$ - 0$ - 0$ - 0
#2-8Substitute: Asphalt Paving in lieu of Concrete, Material Storage FloorLS1$ - 0$ - 0$ - 0$ - 0
#2-9Substitute: Sealed Concrete Flooring in lieu of Epoxy Per PlansLS1$ - 0$ - 0$ - 0$ - 0
ELECTRICALGarden Spot Electric, Inc.Hirneisen Electric, Inc.Lobar, Inc.Manada ElectricMidState Mechanical & Electrical, LLCSchipsi Electric LLCShannon A. Smith, Inc.
Total Cost$ 669,500.00$ 943,230.00$ 973,000.00$ 725,700.00$ 889,450.00$ 779,091.00$ 1,320,300.00
#ItemsUnit

of

MeasureQuantity
RequiredUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal

Cost

Base Bid Pricing: Totals$ 698,600.00$ 949,230.00$ 975,000.00$ 749,000.00$ 912,950.00$ 779,091.00$ 1,320,300.00
#1-1Total Base Bid excluding Salt Shed StructureLS1$ 682,800.00$ 682,800.00$ 924,230.00$ 924,230.00$ 960,000.00$ 960,000.00$ 735,700.00$ 735,700.00$ 889,700.00$ 889,700.00$ 762,496.00$ 762,496.00$ 1,295,000.00$ 1,295,000.00
#1-2Salt Shed StructureLS1$ 15,800.00$ 15,800.00$ 25,000.00$ 25,000.00$ 15,000.00$ 15,000.00$ 13,300.00$ 13,300.00$ 23,250.00$ 23,250.00$ 16,595.00$ 16,595.00$ 25,300.00$ 25,300.00
DEDUCT ALTERNATE (Unit price represents a deduction from the lump sum base bid and should be a negative number (Ex. $-1000.00): Totals$ (29,100.00)$ (6,000.00)$ (2,000.00)$ (23,300.00)$ (23,500.00)$ - 0$ - 0
#2-1Eliminate: Pallet Racking on Perimeter of WarehouseLS1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
#2-2Eliminate: Pallet Racking in Center of WarehouseLS1$ (29,100.00)$ (29,100.00)$ - 0$ - 0$ - 0$ - 0$ (23,300.00)$ (23,300.00)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
#2-3Substitute: Reduce Wall Panel Gauge from 24 to 26 GALS1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
#2-4Substitute: Alternate Column Protection SystemLS1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
#2-5Substitute: Asphalt Paving in lieu of Concrete, Salt Shed FloorLS1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
#2-6Substitute: Asphalt Paving in lieu of Concrete, Material Storage FloorLS1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
#2-7Substitute: Sealed Concrete Flooring in lieu of Epoxy Per PlansLS1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
#2-8Eliminate: Paving of the Construction YardLS1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
#2-9Eliminate: Construction Yard StructureLS1$ - 0$ - 0$ (6,000.00)$ (6,000.00)$ (2,000.00)$ (2,000.00)$ - 0$ - 0$ (23,500.00)$ (23,500.00)$ - 0$ - 0$ - 0$ - 0
PLUMBINGGarden Spot Mechanical, Inc.SSM IndustriesVision MechanicalW.C. Eshenaur & Son Inc
Total Cost$ 245,000.00$ 342,912.00$ 287,300.00$ 276,267.00
#ItemsUnit

of

MeasureQuantity
RequiredUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal

Cost

Base Bid Pricing: Totals$ 245,000.00$ 342,912.00$ 287,300.00$ 276,267.00
#1-1Total Base Bid excluding Salt Shed StructureLS1$ 245,000.00$245,000.00$ 342,912.00$ 342,912.00$ 287,300.00$ 287,300.00$ 276,267.00$ 276,267.00
#1-2Salt Shed StructureLS1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
DEDUCT ALTERNATE (Unit price represents a deduction from the lump sum base bid and should be a negative number (Ex. $-1000.00): Totals$0.00$0.00$0.00$0.00
#2-1Eliminate: Paving of the Construction YardLS1$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
#2-2Eliminate: Construction Yard StructureLS1$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
#2-3Eliminate: Pallet Racking on Perimeter of WarehouseLS1$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
#2-4Eliminate: Pallet Racking in Center of WarehouseLS1$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
#2-5Substitute: Reduce Wall Panel Gauge from 24 to 26 GALS1$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
#2-6Substitute: Alternate Column Protection SystemLS1$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
#2-7Substitute: Asphalt Paving in lieu of Concrete, Salt Shed FloorLS1$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
#2-8Substitute: Asphalt Paving in lieu of Concrete, Material Storage FloorLS1$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
#2-9Substitute: Sealed Concrete Flooring in lieu of Epoxy Per PlansLS1$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
FIRE PROTECTIONAnchor Fire ProtectionTriangle Fire Protection, Inc.
Total Cost$ 160,500.00$ 209,460.00
#ItemsUNITQuantity
RequiredUnit
PriceTotal
CostUnit
PriceTotal

Cost

Base Bid Pricing: Totals$ 160,500.00$ 209,460.00
#1-1Total Base Bid excluding Salt Shed StructureLS1$ 160,500.00$ 160,500.00$ 209,460.00$ 209,460.00
#1-2Salt Shed StructureLS1$ - 0$ - 0$ - 0$ - 0
DEDUCT ALTERNATE (Unit price represents a deduction from the lump sum base bid and should be a negative number (Ex. $-1000.00): Totals$ - 0$ - 0
#2-1Eliminate: Paving of the Construction YardLS1$ - 0$ - 0$ - 0$ - 0
#2-2Eliminate: Construction Yard StructureLS1$ - 0$ - 0$ - 0$ - 0
#2-3Eliminate: Pallet Racking on Perimeter of WarehouseLS1$ - 0$ - 0$ - 0$ - 0
#2-4Eliminate: Pallet Racking in Center of WarehouseLS1$ - 0$ - 0$ - 0$ - 0
#2-5Substitute: Reduce Wall Panel Gauge from 24 to 26 GALS1$ - 0$ - 0$ - 0$ - 0
#2-6Substitute: Alternate Column Protection SystemLS1$ - 0$ - 0$ - 0$ - 0
#2-7Substitute: Asphalt Paving in lieu of Concrete, Salt Shed FloorLS1$ - 0$ - 0$ - 0$ - 0
#2-8Substitute: Asphalt Paving in lieu of Concrete, Material Storage FloorLS1$ - 0$ - 0$ - 0$ - 0
#2-9Substitute: Sealed Concrete Flooring in lieu of Epoxy Per PlansLS1$ - 0$ - 0$ - 0$ - 0