This document is a specification section for Pre-Engineered Metal Building Systems (PEMBS) for the Operations Facilities Expansion project (BH 25-061) under the City of Lancaster Department of Public Works. The specification establishes comprehensive requirements for the design, fabrication, and installation of a complete metal building system, including primary rigid frames, secondary framing (purlins, girts, and eave struts), metal roof and wall panels, thermal insulation, gutters, downspouts, and associated accessories. The basis-of-design manufacturer is American Buildings Company, with approved equal manufacturers including Butler Manufacturing, Ceco Building Systems, Corle Building Systems, Kirby Building Systems, MBCI, Metallic Building Company, Nucor Building Systems, and VP Buildings. The project requires compliance with the 2021 International Building Code, design loads including 30 PSF roof live load, 30 PSF ground snow load, 126 MPH ultimate design wind speed, and seismic performance parameters for Site Class D soils. Structural steel framing shall comply with ASTM A572 Grade 50, secondary framing with cold-formed Z-sections, and all components must be obtained from a single manufacturer source. Metal roof panels are specified as Standing Seam SS360 with 24-gauge thickness, 55 percent aluminum-zinc alloy coating, and 70 percent PVDF finish with 35-year warranty; metal wall panels are R-Panel systems with matching specifications.

Quality assurance requirements mandate that the designer be a licensed Professional Structural Engineer in the project state, the manufacturer be accredited under IAS AC472 with minimum five years of documented experience, and the erector have minimum five years of specialized experience. Welders must be qualified per AWS D1.1/D1.1M and AWS D1.3/D1.3M standards dated no more than 12 months prior to welding commencement. The manufacturer shall provide a one-year warranty covering all materials and components with a 35-year finish warranty for pre-finished surfaces and a 20-year weathertightness warranty for standing-seam metal roof assemblies. Installation must comply with AISC 360 and the Metal Building Systems Manual, with field conditions requiring ambient temperatures above 45 degrees Fahrenheit for panel installation. Thermal performance requirements specify R-13 continuous insulation for walls and R-11 liner system for roofs, with deflection limits not exceeding 1/150 of span for purlins and rafters, 1/180 of span for girts, and 1/60 of span for panels. Shop drawings, erection drawings, manufacturer qualification statements, designer qualifications, and welder certifications must be submitted prior to work commencement.

View the file

Other files

File Type Posted
34-25061 - Addendum 3 Arch-struct-MEP summary.pdf PDF
3-C05 - Site Civil Specifications Combined.pdf PDF
15-2026-10-06 - ES Addendum 1.pdf PDF
35-25061 - Addendum 3 Arch-struct-MEP summary.pdf PDF
10-C08 - Construction Plan.pdf PDF
Demolition.dwg DWG drawing
17-323113 - CHAIN LINK FENCES AND GATES.pdf PDF
321723 - PAVEMENT MARKINGS.pdf PDF
6-C10 - Geotechnical Report.pdf PDF
42-312000 - EARTH MOVING.pdf PDF
PG.dwg DWG drawing
EG.dwg DWG drawing
49-B861-26-01 BidTabulationReport.xlsx XLSX spreadsheet
24-2026-10-14 - CD Addendum 2.pdf PDF
25-061_Pitney Rd Warehouse_Arch-Structural-MEP Drawings_Addendum 3.pdf PDF
28-312000 - EARTH MOVING.pdf PDF
12-25061 - Addendum 1.pdf PDF
48-CD-18 UTILITY PLAN.pdf PDF
9-C06 - Pitney Rd Warehouse Arch-Structural-MEP Bid Set.pdf PDF
32-25-061 Pitney Rd Warehouse Arch-Structural-MEP Drawings Addendum 3.pdf PDF
37-133418-USER-Post Frame Building Systems-10-23-2026.pdf PDF
22-B861-26-01 ADDENDUM 2 - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
25-2026-10-14 - ES Addendum 2.pdf PDF
18-329113 - SOIL PREPARATION.pdf PDF
41-2026-10-29 - ES Addendum 4.pdf PDF
ES.dwg DWG drawing
29-321723 - PAVEMENT MARKINGS.pdf PDF
25061 - Addendum 3_ Arch-struct-MEP summary.pdf PDF
44-B861-26-01 ADDENDUM 4 - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
30-2026-10-23 - ES Addendum 3.pdf PDF
Easements.dwg DWG drawing
Landscape.dwg DWG drawing
16-25-061 Pitney Rd Warehouse Arch-Structural-MEP Addendum 1.pdf PDF
20-City of Lancaster 150 Pitney Road Phase 1 ESA Sept2026.pdf PDF
33-Addendum 03 Arch Front End Specs.pdf PDF
11-B861-26-01 FINAL - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
26-Pre-Bid Attendees Ops Center Expansion 10072026.pdf PDF
40-2026-10-29 - CD Addendum 4.pdf PDF
38-25061 - Addendum 4 Arch-struct-MEP summary.pdf PDF
2026-10-23 - ES Addendum 3.pdf PDF
Addendum 03_Arch & Front End Specs.pdf PDF
39-25-061 Pitney Rd Warehouse Arch-Structural-MEP Drawings Addendum 4.pdf PDF
45-FINAL QA Report.pdf PDF
2026-10-23 - CD Addendum 3.pdf PDF
47-CD-17 UTILITY PLAN.pdf PDF
7-C09 - Fill Assessment Summary.pdf PDF
31-2026-10-23 - CD Addendum 3.pdf PDF
5-C03 - Operations Facilities Expansion - Bid Specs - Vol I.pdf PDF
312000 - EARTH MOVING.pdf PDF
46-CD-16 UTILITY PLAN.pdf PDF
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Operations Facilities Expansion BH 25-061 City of Lancaster - Department of Public Works

PRE-ENGINEERED METAL BUILDING SYSTEMS 133419 - 1

SECTION 133419 - PRE-ENGINEERED METAL BUILDING SYSTEMS

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Manufacturer-engineered, shop-fabricated, and field-erected structural steel building frame, including:

1. Metal wall and roof panels, including soffits and gutters and downspouts.

2. Thermal insulation.

3. Accessories.

4. Other building system components specified in this Section.

B. Design engineering of metal building system, including exterior weather enclosure systems.

C. Metal wall and roof panels, including soffits, gutters, downspouts, and accessories, for adjacent, non-PEMB structures.

1.2 RELATED REQUIREMENTS

A. Section 079200 - Joint Sealants: Sealing joints between accessory components and wall system.

B. Section 081113 - Hollow Metal Doors and Frames.

C. Section 083613 - Sectional Doors.

1.3 DEFINITIONS

A. Terminology Standard: See MBMA (MBSM) for definitions of terms for metal building system construction not otherwise defined in this Section or in standards referenced by this Section.

B. Metal Building System: A building system that will employ:

1. Either a continuous or simple-span ‘Z’ or ‘C’-shaped cold-formed purlins or open-web steel joists for support of the roof cladding.

2. Either a continuous or simple-span ‘Z’ or ‘C’-shaped cold-formed girts or open-web steel joists for support of the steel wall cladding.

3. Three-plate, built-up rigid space frames and/or cold-formed ‘C’ or hot-rolled I-shaped post-and-beam framing to support the roof and wall secondary members.

4. All systems (cladding, roof and wall secondary, lateral primary framing, and longitudinal bracing) work together to provide resistance to vertical and lateral loading demands.

C. Gable Symmetrical: A continuous frame building with the ridge in the center of the building, consisting of tapered or straight columns and tapered or straight rafters. The sidewall girts may be continuous (by-passing the columns) or simple span (inset in the column line). The rafters may or may not have interior columns.

PRE-ENGINEERED METAL BUILDING SYSTEMS 133419 - 2

D. Gable Asymmetrical: A continuous frame building with an off-center ridge, consisting of tapered or straight columns and tapered or straight rafters. The eave height and roof slope may differ on each side of the ridge. The sidewall girts may be continuous (by-passing the columns) or simple span (flush in the column line). The rafters may or may not have interior columns.

E. Single-Slope: A continuous frame building which does not contain a ridge, but consists of one continuous slope from side to side. The building consists of straight or tapered columns and tapered or straight rafters. The sidewall girts may be continuous (by-passing the columns) or simple span (flush in the column line). The rafters may or may not have interior columns.

F. Lean-To (LTO): A building extension, which does not contain a ridge, but consists of one continuous slope from side to side. These units usually have the same roof slope and girt design as the building to which they are attached and supported by.

G. Roof Slope: Pitch expressed as inches of rise for each 12" of horizontal run.

H. Building Width: Measured from outside to outside of sidewall secondary structural member (girt).

I. Building Eave Height: A nominal dimension measured from the finished floor to top flange of eave strut.

J. Building Length: Measured from outside to outside of endwall secondary structural member.

K. Auxiliary Loads: Dynamic loads induced by cranes, conveyors, or other material handling systems.

L. Collateral Loads: The weight of any non-moving equipment or material, such as ceilings, electrical or mechanical equipment, sprinkler systems, plumbing, or ceilings.

M. Dead Load: The actual weight of the building system (as provided by the metal building supplier) supported by a given member.

N. Roof Live Loads: Loads produced by maintenance activities, rain, erection activities, and other movable or moving loads but not including wind, snow, seismic, crane, or dead loads.

O. Roof Snow Loads: Gravity load induced by the weight of snow or ice on the roof, assumed to act on the horizontal projection of the roof.

P. Seismic Loads: Loads acting in any direction on a structural system due to the action of an earthquake.

Q. Wind Loads: The loads on a structure induced by the forces of wind blowing from any horizontal direction.

1.4 REFERENCE STANDARDS

A. AISC (SDG3) - Serviceability Design Considerations for Steel Buildings, 2nd edition; 2003.

B. AISC 303 - Code of Standard Practice for Steel Buildings and Bridges; 2022, with Errata (2025).

PRE-ENGINEERED METAL BUILDING SYSTEMS 133419 - 3

C. AISC 360 - Specification for Structural Steel Buildings; 2022, with Errata (2025).

D. ASCE 7 - Minimum Design Loads and Associated Criteria for Buildings and Other Structures;

Most Recent Edition Cited by Referring Code or Reference Standard.

E. ASTM A36/A36M - Standard Specification for Carbon Structural Steel; 2019.

F. ASTM A153/A153M - Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware; 2023.

G. ASTM A500/A500M - Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes; 2023.

H. ASTM A501/A501M - Standard Specification for Hot-Formed Welded and Seamless Carbon Steel Structural Tubing; 2021.

I. ASTM A529/A529M - Standard Specification for High-Strength Carbon-Manganese Steel of Structural Quality; 2026.

J. ASTM A572/A572M - Standard Specification for High-Strength Low-Alloy Columbium- Vanadium Structural Steel; 2021, with Editorial Revision.

K. ASTM A653/A653M - Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process; 2025.

L. ASTM A780/A780M - Standard Practice for Repair of Damaged and Uncoated Areas of Hot- Dip Galvanized Coatings; 2020.

M. ASTM A792/A792M - Standard Specification for Steel Sheet, 55% Aluminum-Zinc Alloy- Coated by the Hot-Dip Process; 2025.

N. ASTM C827/C827M - Standard Test Method for Change in Height at Early Ages of Cylindrical Specimens of Cementitious Mixtures; 2023.

O. ASTM C920 - Standard Specification for Elastomeric Joint Sealants; 2018 (Reapproved 2024).

P. ASTM C1107/C1107M - Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrink); 2020.

Q. ASTM D638 - Standard Test Method for Tensile Properties of Plastics; 2022.

R. ASTM D751 - Standard Test Methods for Coated Fabrics; 2019.

S. ASTM D790 - Standard Test Methods for Flexural Properties of Unreinforced and Reinforced Plastics and Electrical Insulating Materials; 2017.

T. ASTM D1003 - Standard Test Method for Haze and Luminous Transmittance of Transparent Plastics; 2021.

U. ASTM D1929 - Standard Test Method for Determining Ignition Temperature of Plastics; 2023.

PRE-ENGINEERED METAL BUILDING SYSTEMS 133419 - 4

V. ASTM D1970/D1970M - Standard Specification for Self-Adhering Polymer Modified Bituminous Sheet Materials Used as Steep Roofing Underlayment for Ice Dam Protection;

2021.

W. ASTM D1970/D1970M - Standard Specification for Self-Adhering Polymer Modified Bituminous Sheet Materials Used as Steep Roofing Underlayment for Ice Dam Protection;

2021.

X. ASTM E96/E96M - Standard Test Methods for Gravimetric Determination of Water Vapor Transmission Rate of Materials; 2024a.

Y. ASTM E108 - Standard Test Methods for Fire Tests of Roof Coverings; 2025.

Z. ASTM E119 - Standard Test Methods for Fire Tests of Building Construction and Materials;

2022.

AA. ASTM E1592 - Standard Test Method for Structural Performance of Sheet Metal Roof and Siding Systems by Uniform Static Air Pressure Difference; 2025.

BB. ASTM E1646 - Standard Test Method for Water Penetration of Exterior Metal Roof Panel Systems by Uniform Static Air Pressure Difference; 1995 (Reapproved 2024).

CC. ASTM E1680 - Standard Test Method for Rate of Air Leakage through Exterior Metal Roof Panel Systems; 2016 (Reapproved 2022).

DD. ASTM F1554 - Standard Specification for Anchor Bolts, Steel, 36, 55, and 105-ksi Yield Strength; 2020.

EE. ASTM F3125/F3125M - Standard Specification for High Strength Structural Bolts and Assemblies, Steel and Alloy Steel, Heat Treated, Inch Dimensions 120 ksi, 144 ksi, and 150 ksi Minimum Tensile Strength, and Metric Dimensions 830 MPa and 1040 MPa Minimum Tensile Strength; 2025a.

FF. AWS A2.4 - Standard Symbols for Welding, Brazing, and Nondestructive Examination; 2020.

GG. AWS B2.1/B2.1M - Specification for Welding Procedure and Performance Qualification; 2026.

HH. AWS D1.1/D1.1M - Structural Welding Code - Steel; 2025, with Amendment (2026).

II. AWS D1.3/D1.3M - Structural Welding Code - Sheet Steel; 2025, with Errata (2026).

JJ. FM 4471 - Examination Standard for Class 1 Panel Roofs; 2025.

KK. IAS AC472 - Accreditation Criteria for Inspection Programs for Manufacturers of Metal Building Systems; 2024.

LL. MBMA (MBSM) - Metal Building Systems Manual; 2024.

MM. NFPA 285 - Standard Fire Test Method for Evaluation of Fire Propagation Characteristics of Exterior Wall Assemblies Containing Combustible Components; 2025.

NN. RCSC (HSBOLT) - Specification for Structural Joints Using High-Strength Bolts; Research Council on Structural Connections; 2020.

PRE-ENGINEERED METAL BUILDING SYSTEMS 133419 - 5

OO. SSPC-Paint 20 - Zinc-Rich Coating (Type I - Inorganic, and Type II - Organic); 2019.

PP. SSPC-SP 2 - Hand Tool Cleaning; 2024.

QQ. UL 580 - Standard for Tests for Uplift Resistance of Roof Assemblies; Current Edition, Including All Revisions.

RR. UL 790 - Standard for Standard Test Methods for Fire Tests of Roof Coverings; Current Edition, Including All Revisions.

1.5 ADMINISTRATIVE REQUIREMENTS

A. Coordination:

1. Coordinate sizes and locations of concrete foundations and casting of anchor-rod inserts into foundation walls and footings. Anchor rod installation, concrete, reinforcement, and formwork requirements are specified in Section 033000 - Cast-in-Place Concrete.

2. Coordinate metal panel assemblies with rain drainage work, flashing, trim, and construction of supports and other adjoining work to provide a leakproof, secure, and noncorrosive installation.

B. Preinstallation Meeting: Convene minimum one week before starting work of this Section.

1. Review methods and procedures related to metal building systems including, but not limited to, the following:

a. Condition of foundations and other preparatory work performed by other trades.

b. Construction schedule. Verify availability of materials and erector's personnel, equipment, and facilities needed to make progress and avoid delays.

c. Required tests, inspections, and certifications.

d. Unfavorable weather and forecasted weather conditions and impact on construction schedule.

2. Review methods and procedures related to metal roof panel assemblies including, but not limited to, the following:

a. Compliance with requirements for purlin and rafter conditions, including flatness and attachment to structural members.

b. Structural limitations of purlins and rafters during and after roofing.

c. Flashings, special roof details, roof drainage, roof penetrations, equipment curbs, and condition of other construction that will affect metal roof panels.

d. Temporary protection requirements for metal roof panel assembly during and after installation.

3. Review methods and procedures related to metal wall panel assemblies including, but not limited to, the following:

a. Compliance with requirements for support conditions, including alignment between and attachment to structural members.

b. Structural limitations of girts and columns during and after wall panel installation.

c. Flashings, special siding details, wall penetrations, openings, and condition of other construction that will affect metal wall panels.

d. Temporary protection requirements for metal wall panel assembly during and after installation.

PRE-ENGINEERED METAL BUILDING SYSTEMS 133419 - 6

1.6 SUBMITTALS

A. Product Data: Provide data on component profiles, component dimensions, finishes, and characteristics of other specified components.

1. Include the following:

a. Preparation instructions and recommendations.

b. Storage and handling requirements and recommendations.

c. Installation methods.

2. Provide documentation supporting thermal performance of building envelope components specified in this section.

B. Shop Drawings: Indicate assembly dimensions, locations of structural members, connections, attachments, openings, and loads; wall and roof system dimensions, panel layouts, flashings and underlayments, general construction details, anchorages and method of anchorage, and installation methods; framing anchor bolt settings, sizes, and locations from datum, foundation loads; indicate welded connections with AWS A2.4 welding symbols; indicate net weld lengths.

1. Anchor-Rod Plans: Submit anchor-rod plans and templates before foundation work begins. Include location, diameter, and minimum required projection of anchor rods required to attach metal building to foundation. Indicate column reactions at each location.

2. Show roof-mounted items including roof hatches, equipment supports, pipe supports and penetrations, lighting fixtures, and items mounted on roof curbs.

3. Show wall-mounted items including personnel doors, vehicular doors, windows, louvers, and lighting fixtures.

4. Provide details of accessories, including flashing, trim, gutters, downspouts, downspout boots, and service walkways.

5. Delegated Design Documents: Drawings and calculations sealed by Designer.

6. Indicate components by others.

C. Samples: Submit two samples of precoated metal panels for each color available for each component, in manufacturer's standard size, illustrating color and texture of finish.

D. Manufacturer's Instructions: Indicate preparation requirements and anchor bolt placement.

E. Erection Drawings: Indicate members by label, assembly sequence, and temporary erection bracing.

F. Designer's qualification statement.

G. Manufacturer's Qualification Statement: Provide documentation showing metal building manufacturer is accredited under IAS AC472.

H. Erector's qualification statement.

I. Welder's Qualification Statement: Welder's certificates in accordance with AWS B2.1/B2.1M and dated no more than 12 months before start of scheduled welding work.

J. Sample warranties.

PRE-ENGINEERED METAL BUILDING SYSTEMS 133419 - 7

1.7 CLOSEOUT SUBMITTALS

A. Project Record Documents: Record actual locations of concealed components and utilities.

B. Maintenance data for metal panel finishes.

1.8 QUALITY ASSURANCE

A. Designer Qualifications: Design structural components, develop shop drawings, and perform shop and site work under direct supervision of a Professional Structural Engineer experienced in design of this Work.

1. Design Engineer: Licensed in the State in which the Project is located.

2. Comply with applicable code for submission of design calculations as required for acquiring permits.

3. Cooperate with regulatory agency or authorities having jurisdiction (AHJ), and provide data as requested.

B. Perform work in accordance with AISC 360, MBMA (MBSM), and manufacturer's published specifications.

C. Manufacturer Qualifications: Company specializing in the manufacture of products similar to those required for this project.

1. Not less than five years of documented experience.

2. Accredited by IAS in accordance with IAS AC472.

D. Erector Qualifications: Company specializing in performing the work of this Section with minimum five years experience.

E. Welder Qualifications: Welding processes and welding operators qualified in accordance with AWS D1.1/D1.1M and AWS D1.3/D1.3M and no more than 12 months before start of scheduled welding work.

1.9 DELIVERY, STORAGE, AND HANDLING

A. Deliver materials to site in manufacturer’s original, unopened containers and packaging, with labels clearly identifying product name and manufacturer.

B. Deliver components, sheets, panels, and other manufactured items so as not to be damaged or deformed. Package metal panels for protection during transportation and handling.

C. Unload, store, and erect metal panels in a manner to prevent bending, warping, twisting, and surface damage.

D. Stack metal panels horizontally on platforms or pallets, covered with suitable weathertight and ventilated covering. Store metal panels to ensure dryness, with positive slope for drainage of water. Do not store metal panels in contact with other materials that might cause staining, denting, or other surface damage.

E. Do not store materials directly on ground.

PRE-ENGINEERED METAL BUILDING SYSTEMS 133419 - 8

F. Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside the manufacturer’s absolute limits.

1.10 FIELD CONDITIONS

A. Weather Limitations: Proceed with panel installation only when weather conditions permit metal panels to be installed according to manufacturers' written instructions and warranty requirements.

B. Do not install metal roof panels, eave protection membrane or underlayment on sheathing substrate when surface, ambient air, or wind chill temperatures are below 45 degrees F (7 degrees C).

1.11 WARRANTY

A. Extended Correction Period: Correct defective Work within a five year period after Date of Substantial Completion.

B. Manufacturer's Warranty: Provide one year manufacturer warranty for complete metal building system, including all materials and components comprising weather enclosure of metal building system.

1. Include coverage for exterior pre-finished surfaces to cover pre-finished color coat against chipping, cracking or crazing, blistering, peeling, chalking, or fading. Include coverage for weather tightness of building enclosure elements after installation.

a. Finish Warranty Period: 35 years from the date of Substantial Completion.

C. Extended Weathertightness Warranty: Provide 20 year weathertightness warranty for standing-seam metal roof panel assemblies. Replace or repair roof assemblies that leak during this time period.

PART 2 PRODUCTS

2.1 MANUFACTURERS

A. Basis of Design: Specifications are based on metal building systems by specified basis of design manufacturer and product(s). Metal building systems manufactured by other acceptable manufacturers are permitted, subject to compliance with specified requirements; and provided that deviations in aesthetic design, performance, and configurations are minor, and do not detract substantially from the indicated design intent.

B. Additional materials (such as gypsum board) required due to deviations in structural member sizes between the Construction Documents and manufacturer's shop drawings shall be included in the contract. Such materials will not be considered for change order approval unless modifications are substantial, at the discretion of the Architect.

PRE-ENGINEERED METAL BUILDING SYSTEMS 133419 - 9

C. Source Limitations: Obtain metal building system components, including primary and secondary framing and metal panel assemblies, from a single source, from a single manufacturer.

D. Basis of Design Manufacturer:

1. American Buildings: www.americanbuildings.com.

E. Approved Equal Manufacturers:

1. Butler Manufacturing Company: www.butlermfg.com.

2. Ceco Building Systems: www.cecobuildings.com.

3. Corle Building Systems: www.corle.com.

4. Kirby Building Systems: www.kirbybuildingsystems.com.

5. MBCI: www.mbci.com/#sle

6. Metallic Building Company: www.metallic.com.

7. Nucor Building Systems: www.nucorbuildingsystems.com.

8. VP Buildings: www.vp.com.

F. For listed equal manufacturers, provide manufacturer’s product data to Architect for review and acceptance of equal products against listed Basis of Design components for Architect’s approval prior to the Bid.

2.2 BUILDING ASSEMBLIES

A. Provide a complete, integrated set of components and assemblies that form a metal building system capable of withstanding structural and other loads, thermally induced movement, and exposure to weather without failure or infiltration of water into building interior.

B. Primary Frame Type: As indicated on Drawings.

C. Bay Spacing: As indicated on Drawings.

D. Primary Framing: Rigid frame of rafter beams and columns, canopy beams, intermediate columns, braced end frames, and end wall columns, and wind bracing; designed to withstand required loads.

1. General: Provide frames with attachment plates, bearing plates, and splice members.

Factory drill for field-bolted assembly. Provide frame span and spacing indicated.

a. Slight variations in span and spacing may be acceptable if necessary to comply with manufacturer's standard, as approved by Architect.

2. Rigid Frames: Fabricated as welded built-up "I" sections or hot-rolled sections.

3. Frame Design: Gable Symmetrical.

4. Frame Type: Clear-Span.

5. Rigid Frame Columns: Tapered, or as otherwise indicated on Drawings.

6. Rigid Frame Rafters:

a. Straight/Uniform depth.

b. Tapered.

PRE-ENGINEERED METAL BUILDING SYSTEMS 133419 - 10

7. Endwall Frames / Roof Beams: Fabricated as mill-rolled sections or built-up "I" sections depending on design requirements. Fabricate endwall columns of cold-formed sections, mill-rolled sections, or built-up "I" sections depending on design requirements.

8. Finish: Red-Oxide. Gray Primer. (Addendum #1)

9. Field Bolted Connections: All field bolted connections shall be designed and detailed utilizing ASTM F3125/F3125M Grades A325 or A490 as required by design.

E. Secondary Framing: Include purlins, girts, eave struts, flange bracing, sill supports, and clips, and other items detailed or indicated on Drawings.

1. Purlins and Girts: Purlins and girts shall be cold-formed "Z" sections with stiffened flanges. Flange stiffeners shall be sized to comply with the requirements of the latest edition of AISI S100. They shall be pre-punched at the factory to provide for field bolting to the rigid frames. They shall be simple or continuous span as required by design.

Connection bolts will install through the purlin/girt webs, not purlin/girt flanges.

2. Purlins (Excluding Open Web Joists): Horizontal structural members which support roof coverings.

a. Depth: To be determined by design. (8”, 9.5” or 12”)

b. Maximum Length: To be determined by design.

c. Finish: Gray Primer.

3. Girts: Horizontal structural members that support vertical panels.

a. Depth: To be determined by design. (8”, 9.5” or 12”)

b. Maximum Length: To be determined by design.

c. Finish: Gray Primer.

4. Eave Struts: Equal flange, cold-formed "C" sections or “Z” purlins.

a. Depth: To be determined by design. (8”, 9.5” or 12”)

b. Maximum Length: To be determined by design.

c. Finish: Gray Primer.

5. Base Framing: Base members to which the base of the wall covering may be attached to the perimeter of the slab. Secured to the concrete slab with mechanical anchors.

a. Formed base sill.

b. Base channel.

c. Base angle.

d. Base girt.

1) Finish: Gray Primer.

e. Provide flashing where required for drainage.

F. Wall System: Preformed metal panels of profile as indicated, with sub-girt framing/anchorage assembly, and accessory components.

G. Roof System: Preformed metal panels oriented parallel to slope, with sub-girt framing/anchorage assembly, insulation, and liner panels, and accessory components.

1. Roof Slopes: As indicated on Drawings.

2.3 PERFORMANCE REQUIREMENTS

A. Thermal Performance:

PRE-ENGINEERED METAL BUILDING SYSTEMS 133419 - 11

1. Installed Thermal Resistance of Wall System: R-value of 13, plus R-13 continuous insulation system.

2. Installed Thermal Resistance of Roof System: R-value of 19, plus R-11 liner system.

Provide thermal blocks in accordance with IECC requirements.

B. Structural Performance:

1. Design Loads: As specified on structural Drawings.

2. Design Loads:

a. Roof Live Load: 30 PSF.

3. Building Code: 2021 IBC.

a. Occupancy Category: IV.

4. Deflection and Drift Limits: Design metal building system assemblies to withstand serviceability design loads without exceeding deflections and drift limits recommended in AISC (SDG3); deflection and drift limits not to exceed the following:

a. Purlins and Rafters: Vertical deflection 1/150 of span.

b. Girts: Horizontal deflection 1/180 of span.

c. Metal Roof Panels: Vertical deflection 1/60 of span.

d. Metal Wall Panels: Horizontal deflection 1/60 of span.

e. Secondary Framing: Design to accommodate deflection of primary framing and construction tolerances, and to maintain required clearances at openings.

f. Lateral Drift: Maximum 1/100 of the building height.

5. Snow Load:

a. Ground Snow Load – 30 PSF.

b. Roof Snow Load – 30 PSF.

6. Wind Load:

a. Ultimate Design Wind Speed (3 Second Gust): 126 MPH.

b. Nominal Wind Speed: 98 MPH.

c. Exposure Category– “C”.

7. Wind-Uplift Resistance: Provide metal roof panel assemblies that comply with UL 580 for wind-uplift-resistance class indicated.

a. Uplift Rating: UL 30.

8. The higher the value in the options in "Uplift Rating" Subparagraph below, the greater the uplift resistance.

a. Uplift Rating: UL 30.

9. Seismic Performance: Design framing system to withstand effects of earthquake motions as determined by ASCE 7 for applicable seismic zone.

a. Spectral response acceleration parameter at a period of 0.2 s (Ss) – 0.162.

b. Spectral response acceleration parameter at a period of 1-sec. (S1) – 0.046.

c. Site Class – “D” Stiff Soils (Assumed).

10. Thermal Movement: Allow for thermal movements from ambient and surface temperature changes by preventing buckling, opening of joints, overstressing of components, failure of sealant joints, failure of connections, and other detrimental effects.

a. Base calculations on surface temperatures of materials due to both solar heat gain and nighttime-sky heat loss.

b. Temperature Change Range: 120 degrees F (67 degrees C) ambient, 180 degrees F

(100 degrees C) material surfaces.

PRE-ENGINEERED METAL BUILDING SYSTEMS 133419 - 12

C. Fire-Resistance Ratings: Where assemblies are indicated to have a fire-resistance rating, provide metal panel assemblies identical to those of assemblies tested for fire resistance per ASTM E119 or ASTM E108 by a qualified testing agency. Identify products with appropriate markings of applicable testing agency.

1. Indicate design designations from UL's "Fire Resistance Directory," FM Global's "Approval Guide," or from the listings of another qualified testing agency.

D. Fire Propagation: Exterior wall assemblies containing foam plastics shall pass NFPA 285 fire test.

E. Exterior Envelope Performance:

1. Provide drainage to exterior for water entering or condensation occurring within wall or roof system.

2. Thermal Movement: Allow for thermal movements from ambient and surface temperature changes by preventing buckling, opening of joints, overstressing of components, failure of sealant joints, failure of connections, and other detrimental effects.

a. Base calculations on surface temperatures of materials due to both solar heat gain and nighttime-sky heat loss.

b. Temperature Change Range: 120 degrees F (67 degrees C) ambient, 180 degrees F

(100 degrees C) material surfaces.

3. Structural Performance of Metal Wall and Roof Panels: Design panel systems to withstand effects of specified loads when tested in accordance with ASTM E1592, and in accordance with other requirements specified in related wall and roof panel specification Sections:

a. Wind Loads: As specified on structural Drawings.

4. Air Infiltration for Metal Wall and Roof Panels: Air leakage of not more than 0.06 cfm/sq.

ft. (0.3 L/s per sq. m) when tested according to ASTM E 283 at the following test-pressure difference:

a. Test-Pressure Difference: 1.57 lbf/sq. ft. (75 Pa).

5. Water Penetration for Metal Wall and Roof Panels: No water penetration when tested according to ASTM E 331 at the following test-pressure difference:

a. Test-Pressure Difference: 2.86 lbf/sq. ft. (137 Pa).

6. Size and fabricate wall and roof systems free of distortion or defects detrimental to appearance or performance.

2.4 METAL ROOF PANELS

A. Basis-of-Design Product: Provide Standing Seam SS360 as manufactured by American Building Systems: www.americanbuildings.com, or equal as approved by the Architect in writing before the Bid.

B. Assembly Performance Requirements: Provide roof products and assemblies meeting the following requirements:

1. UL 580, Class 90 assemblies approved and listed under manufacturer.

2. Class A rated and listed in accordance with UL 790 for External Fire.

3. Class 4 rated and listed in accordance with UL 2218A for Impact Resistance.

PRE-ENGINEERED METAL BUILDING SYSTEMS 133419 - 13

C. FM Approvals Rating: Provide FM 4471 approved assemblies on the basis of the following ratings. All NBG single skin panels meet FM 4471 standards listed below. Identify materials with FM Approvals markings:

D. External Fire: Class A.

1. Internal Fire: Class 1.

2. Hail: Severe.

E. Panel Description: A mechanically seamed trapezoidal standing seam roof panel with concealed clips. Installed directly over purlins. Tested in accordance with ASTM E1646 and ASTM E1680 for water penetration and air infiltration, and per ASTM E1592 for wind uplift capacity.

1. Gauge: 24.

2. Dimensions: 24 inches (610mm) wide by 3 inches (76mm) high.

3. Clips: Tall Sliding.

F. Standing seam panels shall have 55 percent minimum aluminum-zinc alloy- coating and conform to ASTM A792/A792M or ASTM A653/A653M with a minimum yield of 50 ksi.

G. Panel Finish:

1. Pre-painted Galvalume® or Galvanized G90 Exterior-Side and G60 Interior-Side.

2. 70% PVDF paint system with a 35-year finish warranty.

H. Color: To be selected by Architect from manufacturer’s standard range.

2.5 TRANSLUCENT ROOF PANELS

A. Basis-of-Design Product: Provide GLASTEEL Acrylit High Strength Fiberglass Panels for Lamination to Standing Seam SS360 panels, as manufactured by American Building Systems:

www.americanbuildings.com, or equal as approved by the Architect in writing before the Bid.

B. Panel Description: Manufacturer's standard 8 oz. 100% acrylic translucent panel, woven roving combined with chopped strand fiberglass reinforcement.

1. Tensile Strength, ASTM D638: Minimum 25,000 psi.

2. Flexural Strength, ASTM D790: Minimum 24,000 psi.

3. Compressive Strength, ASTM D695: Minimum 25,000 psi.

4. Bearing Strength, D953: 24.8 ksi.

5. Self-Ignition Temperature, ASTM D1929: Greater than 650 degrees F.

6. Smoke Density, ASTM E84: Less than 450.

7. U-Factor: 1.08.

8. Light Transmission, D1494: 55-60.

9. Solar Heat Gain Coefficient: 0.45.

10. Luminous Transmittance, ASTM D1003-07: 77%.

PRE-ENGINEERED METAL BUILDING SYSTEMS 133419 - 14

2.6 METAL WALL PANELS

A. Basis-of-Design Product: Provide R-Panel Metal Wall Panel System as manufactured by American Building Systems: www.americanbuildings.com/#sle, or equal as approved by the Architect in writing before the Bid..

B. Panel Description: A through-fastened sidewall panel with 1 1/4 inch (32mm) ribs at 12 inches (305mm) on center. The area between the ribs is reinforced to minimize oil-canning.

1. Gauge:

a. Basis of Design: 24 gauge.

b. Alternate: 26 gauge.

2. Dimensions: 36 inches (915mm) wide by 1 1/4 inch (32mm) high.

C. Standing seam panels shall have 55 percent minimum aluminum-zinc alloy- coating and conform to ASTM A792 or ASTM A653 with a minimum yield of 50 ksi.

D. Panel Finish: 70% PVDF paint system with a 30-year finish warranty.

E. Color: To be selected by Owner from manufacturer’s standard range; to match existing.

2.7 MATERIALS - GENERAL

A. System Materials and Components Compatibility: Provide metal building system materials that are compatible with one another under conditions of service and application required, as demonstrated by metal building system manufacturer based on testing and field experience.

1. Provide system materials and components manufactured by the accepted system manufacturer; components fabricated by others must be specifically approved for use within the system by the accepted system manufacturer.

2.8 MATERIALS - FRAMING

A. Structural Steel Members: ASTM A572/A572M, Grade 50.

B. Structural Tubing: ASTM A500/A500M Grade B cold-formed.

C. Plate or Bar Stock: ASTM A529/A529M, Grade 50.

D. Anchor Bolts: ASTM F1554, Grade 36, Class 1A, with hot dip type for protective coating.

E. Bolts, Nuts, and Washers: ASTM F3125/F3125M, Type 1; galvanized to ASTM A153/A153M.

F. Welding Materials: Perform in accordance with AWS D1.1/D1.1M.

G. Primer: SSPC-Paint 20 zinc rich, gray.

H. Grout: ASTM C1107/C1107M; Non-shrink; premixed compound consisting of non-metallic aggregate, cement, water reducing and plasticizing agents.

PRE-ENGINEERED METAL BUILDING SYSTEMS 133419 - 15

1. Minimum Compressive Strength at 48 Hours: 2,000 pounds per square inch (13.7 MPa).

2. Minimum Compressive Strength at 28 Days: 8,000 pounds per square inch (55 MPa).

3. Height Change, Plastic State: When tested in accordance with ASTM C827/C827M:

a. Maximum: Plus 4 percent.

b. Minimum: Plus 1 percent.

2.9 ACCESSORY MATERIALS - WALLS AND ROOF

A. Soffit Panels:

1. R-Panel (Basis of Design): A through-fastened panel with 1 1/4 inch (32mm) ribs at 12 inches (305mm) on center. The area between the ribs are reinforced to minimize oil-canning.

2. Gauge: 26.

3. Dimensions: 36 inches (915mm) wide by 1 1/4 inch (32mm) high.

4. Panel Finish: 70% PVDF paint system with a 30-year finish warranty.

5. Color: To be selected by Owner from manufacturer’s standard range.

B. Roof Insulation and Liner System:

1. Basis-of-Design Product: Provide Silvercote Energy Saver Liner System with Double Layer Insulation as manufactured by American Building Systems, or equal as approved by the Architect in writing before the Bid.

2. Seams of liner system shall meet requirements of ASTM D751.

3. Provide metal liner panel where indicated.

4. Provide all components required for complete installation.

C. Wall Insulation and Liner System:

1. Basis-of-Design Product: Provide Silvercote Energy Saver Liner System with Double Layer Insulation as manufactured by American Building Systems, or equal as approved by the Architect in writing before the Bid.

2. Seams of liner system shall meet requirements of ASTM D751.

3. Provide metal liner panel where indicated.

4. Provide all components required for complete installation.

D. Weather Barrier for Metal Wall Panels on Sheathing: See Section 072500 - Weather Barriers.

E. Underlayment for Metal Roofing Installation on Sheathing: Synthetic non-asphaltic sheet, intended by manufacturer for installation under metal panel roof materials.

1. Basis-of-Design Product: Provide DuPont Tyvek Roof Protector as manufactured by Dupont, or equal as approved by the Architect.

2. Type: Four-layer syntheic underlayment.

3. Thickness: 10 mils.

4. Flammability: Minimum of Class A, in accordance with ASTM E108 test method.

5. Water Vapor Permeance: 0.05 perms, maximum, when tested in accordance with ASTM

E96/E96M, Desiccant Method A.

6. UV Exposure: Up to 90 days.

PRE-ENGINEERED METAL BUILDING SYSTEMS 133419 - 16

F. Ridge Vents: As manufactured or approved by pre-engineered metal building manufacturer, with vent openings do not permit direct water or weather entry; flanged to receive shingles.

1. Net Free Ventilation Area: 12 square inches per linear foot minimum.

2. Provide mesh for bird control on underside of vent for structures open to the exterior

(Covered Shed and Salt Shed).

G. Fasteners: Manufacturer's standard type, galvanized to comply with requirements of ASTM A153/A153M; fastener head finish to match adjacent surfaces when exterior exposed.

H. Roof Clips:

1. All clips must have factory-applied mastic and designed so that movement between the panel and the clip does not occur.

2. Tall Sliding Clips: Shall be either 3 ½ inches (89mm) or 4 ½ inches (114mm) in height and provide either 1-7/8 inches from neutral position or 3 3/4 total inches of travel for panel thermal expansion and contraction, depending on clip choice.

I. Sealant: ASTM C920, elastomeric sealant with movement capability of at least plus/minus 50 percent; 100 percent silicone; for exposed applications, match adjacent colors as closely as possible.

J. Slip Sheet: Manufacturer's standard slip sheet for metal roof panel installation on sheathing, as required by manufacturer to allow adequate panel movement.

K. Trim, Closure Pieces, Caps, Flashings, Gutters, Downspouts, Rain Water Diverter, Fascias, and Infills: Same material, thickness and finish as exterior sheets; brake formed to required profiles.

2.10 COMPONENTS

A. Doors and Frames: See Section 081113.

B. Overhead Doors: See Section 083613.

2.11 FABRICATION - GENERAL

A. General: Design components and field connections required for erection to permit easy assembly.

1. Mark each piece and part of the assembly to correspond with previously prepared erection drawings, diagrams, and instruction manuals.

2. Fabricate structural framing to produce clean, smooth cuts and bends. Punch holes of proper size, shape, and location. Members shall be free of cracks, tears, and ruptures.

B. Tolerances: Comply with MBMA (MBSM) for fabrication and erection tolerances.

2.12 FABRICATION - FRAMING

A. Fabricate members in accordance with AISC 360 for plate, bar, tube, or rolled structural shapes.

PRE-ENGINEERED METAL BUILDING SYSTEMS 133419 - 17

1. The surfaces of bolted connections shall be smooth and free from burrs or distortions.

2. All framing members must carry an identifying mark.

B. Primary Framing: Shop fabricate framing components to indicated size and section, with baseplates, bearing plates, stiffeners, and other items required for erection welded into place.

Cut, form, punch, drill, and weld framing for bolted field assembly.

1. Make shop connections by welding or by using high-strength bolts.

2. Join flanges to webs of built-up members by a continuous, submerged arc-welding process.

3. Brace compression flange of primary framing with steel angles or cold-formed structural tubing between frame web and purlin web or girt web, so flange compressive strength is within allowable limits for any combination of loadings.

4. Factory weld clips to frames for attaching secondary framing if applicable, or punch for bolts. Shop fabricated webs to include bracing holes.

5. Factory weld base plates splice plates, cap plates, and stiffeners into place on the structural members.

6. Shop Priming: Prepare surfaces for shop priming according to SSPC-SP 2. Shop prime primary framing with specified primer after fabrication.

C. Secondary Framing: Shop fabricate framing components to indicated size and section by roll forming or break forming, with baseplates, bearing plates, stiffeners, and other plates required for erection welded into place. Cut, form, punch, drill, and weld secondary framing for bolted field connections to primary framing.

1. Make shop connections by welding or by using non-high-strength bolts.

2. Shop Priming: Prepare uncoated surfaces for shop priming according to SSPC-SP 2. Shop prime uncoated secondary framing with specified primer after fabrication.

3. Open-Web Roof Joists:

a. Secondary framing for ‘long-bay’ building layouts shall consist of open-web bar joists designed under Steel Joist Institute (SJI) specifications by an SJI-Certified Joist Manufacturer for the prescribed loads.

4. Zee Purlins:

a. Fabricate purlins from cold-formed "Z" sections with stiffened flanges. Size flange stiffeners to comply with the requirements of the latest edition of AISI. Connection bolts will install through the webs, not the flanges.

5. Girts:

a. Girts must be simple or continuous span as required by design. Connection bolts will install through the webs, not the flanges.

6. Bracing:

a. Diagonal Bracing:

1) Longitudinal bracing in the roof and/or walls need not be furnished where it can be shown that the diaphragm strength of the roof and/or wall covering is adequate to resist the applied wind or seismic forces. Diagonal bracing in the roof and sidewalls may be used to resist longitudinal loads (wind, crane, etc.) in the structure if diaphragm action cannot be used.

2) Diagonal bracing will be furnished to length and equipped with hillside washers and nuts at each end. It may consist of rods threaded at each end or galvanized cable with suitable threaded end anchors. If load requirements dictate, bracing may be of structural angle and/or tube, bolted in place.

PRE-ENGINEERED METAL BUILDING SYSTEMS 133419 - 18

b. Special Bracing: When diagonal bracing is not permitted in the sidewall, a rigid frame type portal or fixed base column may be used. Shear walls can also be used where adequate to resist the applied wind or seismic forces.

c. Flange Braces: The inside compression flange of all primary framing must be braced laterally with angles connecting to the bottom chords of joists or to the webs of purlins/girts so that the flange compressive stress is within allowable limits for any combination of loading.

d. Bridging: Laterally bridge the top and bottom chords of the open-web bar joists as required by design thereof and specified on the building erection drawings.

e. Overhead Rack Ties: Provide manufacturer's standard overhead rack ties at the top of racks at all spans between racking.

D. Anchor Bolts: As specified by engineering professional. Headed anchor rods or with nuts and plate washer assemblies.

E. Provide wall opening framing for doors, windows, and other indicated accessory components.

2.13 FABRICATION - WALL AND ROOF PANELS

A. General: Comply with requirements specified in other Sections for wall and roof panel products and components.

B. Metal Panels: Fabricate and finish metal panels at the factory to greatest extent possible, by manufacturer's standard procedures and processes, as necessary to fulfill indicated performance requirements. Comply with indicated profiles and with dimensional and structural requirements.

1. Provide panel profile, including major ribs and intermediate stiffening ribs, if any, for full length of metal panel.

C. Vertical Rib Standing Seam Panels - General:

1. One side of the panel is configured as female, having factory applied mastic inside the female seam. The female side will hook over the male side and when seamed creates a continuous lock, forming a weathertight seam.

2. Panels are factory swaged when endlaps are required. Panels cannot start at both ends of the building and work towards each other.

3. Endlaps:

a. Endlaps must have a 16 gauge backup plate and have the (5) endlap joint fasteners installed in dimpled locations in the flat at each endlap.

b. Apply mastic between the panels and secured with #1/4-14 x 1 1/4 inch (32mm) self-drilling fasteners through the panels and backup plate to form a compression joint.

c. "Through-the-Roof" fasteners may only be used at endlaps and eaves.

D. Metal Liner Panel: Manufacturer's standard metal thickness and profile, lapped V edges fitted with continuous gaskets.

E. Flashings, Closure Pieces, Fascia, Infills, and Caps: Same material and finish as adjacent material, profile to suit system.

PRE-ENGINEERED METAL BUILDING SYSTEMS 133419 - 19

F. Fasteners: To maintain load requirements and weather tight installation, same finish as cladding, non-corrosive type.

G. Column Protectors:

1. Basis-of-Design Product: Provide iFlexRail Column Guard+ as manufactured by A-Safe, or equal as approved by the Architect in writing before the Bid.

2. Alternate Product: IronFlex Column Protectors Type 2 as manufactured by Impact Recovery Systems, Inc., or equal as approved by the Architect in writing before the Bid.

a. Impact Rating: 33,300 joules.

2.14 FABRICATION - GUTTERS AND DOWNSPOUTS

A. Fabricate of same material and finish as roofing metal.

B. Form gutters and downspouts and scuppers of profile and size indicated on Drawings to collect and remove water. Fabricate with connection pieces.

C. Form sections in maximum possible lengths. Hem exposed edges. Allow for expansion at joints.

D. Fabricate support straps of same material and finish as roofing metal, color as selected.

2.15 FINISHES

A. Framing Members: Clean, prepare, and shop prime. Do not prime surfaces to be field welded.

B. Exterior Surfaces of Wall Components and Accessories: Precoated enamel on steel of modified silicone finish, color as selected by Architect from manufacturer's standard range.

C. Interior Surfaces of Wall Components and Accessories: Precoated enamel on steel of modified silicone finish, color as selected by Architect from manufacturer's standard range.

D. Allow for a different color selection for each type of component.

2.16 SOURCE QUALITY CONTROL

A. Special Inspection: Owner will engage a qualified special inspector to perform source quality control inspections and to submit reports.

B. Accredited Manufacturers: Special inspections will not be required if fabrication is performed by an IAS AC472-accredited manufacturer approved by authorities having jurisdiction to perform such work without special inspection.

1. After fabrication, submit copy of certificate of compliance to authorities having jurisdiction, certifying that Work was performed according to Contract requirements.

PRE-ENGINEERED METAL BUILDING SYSTEMS 133419 - 20

PART 3 EXECUTION

3.1 EXAMINATION

A. Verify that foundation, floor slab, mechanical and electrical utilities, and placed anchors are in correct position.

B. Examine substrates, areas, and conditions, with erector present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.

C. Before erection proceeds, survey elevations and locations of concrete- and masonry-bearing surfaces and locations of anchor rods, bearing plates, and other embedments to receive structural framing, with erector present, for compliance with requirements and metal building system manufacturer's tolerances.

D. Proceed with erection only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Clean and prepare surfaces to be painted according to manufacturer's written instructions for each particular substrate condition.

B. Provide temporary shores, guys, braces, and other supports during erection to keep structural framing secure, plumb, and in alignment against temporary construction loads and loads equal in intensity to design loads. Remove temporary supports when permanent structural framing, connections, and bracing are in place unless otherwise indicated.

3.3 ERECTION - FRAMING

A. The erection of the building system shall be performed by a qualified erector, in accordance with the appropriate erection drawings, erection guides and /or other documents furnished by manufacturer, using proper tools, equipment and safety practices.

B. Erect framing in accordance with AISC 360 and MBMA Metal Building Systems Manual, Chapter IV Common Industry Practices, and in accordance with building system manufacturer's published specifications and erection drawings.

C. Provide for erection and wind loads. Provide temporary bracing to maintain structure plumb and in alignment until completion of erection and installation of permanent bracing.

D. Set column base plates with non-shrink grout to achieve full plate bearing.

E. Do not field cut or alter structural members without approval.

F. After erection, prime welds, abrasions, and surfaces not shop primed.

G. Do not field cut, drill, or alter structural members without written approval from metal building system manufacturer's professional engineer. There shall be no field modifications to primary structural members except as authorized and specified by the manufacturer.

PRE-ENGINEERED METAL BUILDING SYSTEMS 133419 - 21

H. Set structural framing accurately in locations and to elevations indicated. Maintain structural stability of frame during erection.

I. Base and Bearing Plates: Clean concrete- and masonry-bearing surfaces of bond-reducing materials, and roughen surfaces prior to setting plates. Clean bottom surface of plates.

1. Set plates for structural members on wedges, shims, or setting nuts as required.

2. Tighten anchor rods after supported members have been positioned and plumbed. Do not remove wedges or shims but, if protruding, cut off flush with edge of plate before packing with grout.

3. Promptly pack grout solidly between bearing surfaces and plates so no voids remain.

Neatly finish exposed surfaces; protect grout and allow to cure. Comply with manufacturer's written installation instructions for shrinkage-resistant grouts.

J. Align and adjust structural framing before permanently fastening. Before assembly, clean bearing surfaces and other surfaces that will be in permanent contact with framing. Perform necessary adjustments to compensate for discrepancies in elevations and alignment.

1. Level and plumb individual members of structure.

K. Make allowances for difference between temperature at time of erection and mean temperature when structure will be completed and in service.

L. Primary Framing and End Walls: Erect framing level, plumb, rigid, secure, and true to line.

Level baseplates to a true even plane with full bearing to supporting structures, set with double-nutted anchor bolts. Use grout to obtain uniform bearing and to maintain a level base-line elevation. Moist-cure grout for not less than seven days after placement.

M. Make field connections using high-strength bolts installed according to RCSC (HSBOLT) for bolt type and joint type specified.

1. Joint Type: Snug tightened or pretensioned as required by manufacturer.

N. Secondary Framing: Erect framing level, plumb, rigid, secure, and true to line. Field bolt secondary framing to clips attached to primary framing.

O. Locate and space wall girts to suit openings such as doors and windows.

P. Provide supplemental framing at entire perimeter of openings, including doors, windows, louvers, ventilators, and other penetrations of roof and walls.

Q. Steel Joists and Joist Girders: Install joists, girders, and accessories plumb, square, and true to line; securely fasten to supporting construction according to SJI's "Standard Specifications and Load Tables for Steel Joists and Joist Girders," joist manufacturer's written instructions, and requirements in this Section.

R. Before installation, splice joists delivered to Project site in more than one piece.

1. Space, adjust, and align joists accurately in…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .