This is a Utility Plan for the Operations Facility Expansion project located at 150 Pitney Road in Lancaster, Pennsylvania, prepared by RGS Associates for the City of Lancaster Department of Public Works. The plan documents utility infrastructure requirements and coordination procedures for the construction project, including water, sewer, gas, electric, communications, and stormwater systems. The document establishes minimum vertical clearances between utility lines: 18 inches for stormwater, sanitary, and water utilities separated from each other; 12 inches for gas and audiovisual/information technology systems from all other utilities; and electric utilities per PPL requirements. Key responsibilities are delineated among contractors, with the General Contractor responsible for all subgrade preparation and earthwork, including trenching for electrical duct banks and gas service lines, while specialized contractors coordinate installation of their respective systems.

The utility plan specifies that PPL will pull electrical cables and install transformers and metering equipment, while the Electrical Contractor installs primary and secondary duct banks and onsite electrical conduit for generator backup power and lighting. The General Contractor must coordinate with UGI Utilities regarding gas service installation schedules and provide stone dust per UGI specifications and trench spoils for use during backfilling; UGI will install the service connection from the gas main through the meter, with the General Contractor responsible for constructing the concrete pad for the gas meter prior to meter installation. Communications conduits will be extended to proposed termination points as shown on electrical drawings and installed by the contractor. The plan includes multiple addenda issued between October 6, 2026, and November 2, 2026, indicating ongoing design refinements during the pre-construction phase.

View the file

Other files

File Type Posted
34-25061 - Addendum 3 Arch-struct-MEP summary.pdf PDF
3-C05 - Site Civil Specifications Combined.pdf PDF
15-2026-10-06 - ES Addendum 1.pdf PDF
35-25061 - Addendum 3 Arch-struct-MEP summary.pdf PDF
10-C08 - Construction Plan.pdf PDF
Demolition.dwg DWG drawing
17-323113 - CHAIN LINK FENCES AND GATES.pdf PDF
321723 - PAVEMENT MARKINGS.pdf PDF
6-C10 - Geotechnical Report.pdf PDF
42-312000 - EARTH MOVING.pdf PDF
PG.dwg DWG drawing
EG.dwg DWG drawing
49-B861-26-01 BidTabulationReport.xlsx XLSX spreadsheet
24-2026-10-14 - CD Addendum 2.pdf PDF
25-061_Pitney Rd Warehouse_Arch-Structural-MEP Drawings_Addendum 3.pdf PDF
28-312000 - EARTH MOVING.pdf PDF
12-25061 - Addendum 1.pdf PDF
9-C06 - Pitney Rd Warehouse Arch-Structural-MEP Bid Set.pdf PDF
32-25-061 Pitney Rd Warehouse Arch-Structural-MEP Drawings Addendum 3.pdf PDF
37-133418-USER-Post Frame Building Systems-10-23-2026.pdf PDF
22-B861-26-01 ADDENDUM 2 - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
25-2026-10-14 - ES Addendum 2.pdf PDF
18-329113 - SOIL PREPARATION.pdf PDF
41-2026-10-29 - ES Addendum 4.pdf PDF
ES.dwg DWG drawing
29-321723 - PAVEMENT MARKINGS.pdf PDF
25061 - Addendum 3_ Arch-struct-MEP summary.pdf PDF
44-B861-26-01 ADDENDUM 4 - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
30-2026-10-23 - ES Addendum 3.pdf PDF
Easements.dwg DWG drawing
Landscape.dwg DWG drawing
16-25-061 Pitney Rd Warehouse Arch-Structural-MEP Addendum 1.pdf PDF
20-City of Lancaster 150 Pitney Road Phase 1 ESA Sept2026.pdf PDF
33-Addendum 03 Arch Front End Specs.pdf PDF
13-133419-RIB- Pre-Engineered Metal Building Systems-09-17-2026.pdf PDF
11-B861-26-01 FINAL - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
26-Pre-Bid Attendees Ops Center Expansion 10072026.pdf PDF
40-2026-10-29 - CD Addendum 4.pdf PDF
38-25061 - Addendum 4 Arch-struct-MEP summary.pdf PDF
2026-10-23 - ES Addendum 3.pdf PDF
Addendum 03_Arch & Front End Specs.pdf PDF
39-25-061 Pitney Rd Warehouse Arch-Structural-MEP Drawings Addendum 4.pdf PDF
45-FINAL QA Report.pdf PDF
2026-10-23 - CD Addendum 3.pdf PDF
47-CD-17 UTILITY PLAN.pdf PDF
7-C09 - Fill Assessment Summary.pdf PDF
31-2026-10-23 - CD Addendum 3.pdf PDF
5-C03 - Operations Facilities Expansion - Bid Specs - Vol I.pdf PDF
312000 - EARTH MOVING.pdf PDF
46-CD-16 UTILITY PLAN.pdf PDF
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROP.

TRANSFORMER

LOCATION

"D O

N O

T

EX

PL

O

D E"

M A

TC

H

LI

N

E

LD

-1

LD

-1

LD-18

SHEET KEY MAP

LD-17

LD-16

PROP. TAPPING

SLEEVE AND VALVE

PROPOSED TREE

PROTECTION FENCE (TYP.)

8" DICL

PROPOSED

LIGHT POST

(TYP.)

"DO NOT EXPLODE"

MATCHLINE

A

B

"D O

N O

T

EX

PL

O

D E"

M A

TC

H

LI

N

E C

D -1

C D

-1

CD-18

SHEET KEY MAP

CD-17

CD-16

"DO NOT EXPLODE"

MATCHLINE

A

B

I- A

I- A

M-A16

W

W

W

W

W

W W

W W

W W

W W

U E

U E

U E

U E

PROP. COMMUNICATIONS

CONDUIT TO BE EXTENDED TO

PROPOSED TERMINATION POINTS

AS SHOWN ON THE ELECTRICAL

DRAWINGS, TO BE INSTALLED BY

CONTRACTOR

COMMUNICATIONS HANDHOLE

INSTALLED BY CITY OF

LANCASTER, TRAFFIC RATED

ELECTRIC HANDHOLE

INSTALLED BY CITY OF

LANCASTER, TRAFFIC RATED

GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL SUBGRADE

PREPARATION AND EARTHWORK. OTHER PRIME CONTRACTORS

TO COORDINATE WORK WITH GENERAL CONTRACTOR.

UTILITY NOTES:

1.GENERAL UTILITY NOTES:

a.WATER, SEWER, AND GAS UTILITY LINES ON THE PLANS

REPRESENT THE CENTER OF THE UTILITY LINE OR

TRENCH.

b.CONTRACTOR SHALL CONFIRM THAT MINIMUM VERTICAL

CLEARANCES ARE PROVIDED AT ALL UTILITY

CROSSINGS.

c. VERTICAL CLEARANCES SHALL BE PROVIDED AS

FOLLOWS:

i. STORMWATER - MIN. 18" SEPARATION FROM

SANITARY/STORM/WATER

ii. SANITARY - MIN. 18" FROM SANITARY/STORM/WATER

iii. WATER - MIN. 18" FROM SANITARY/STORM/WATER

iv. GAS - MIN. 12" FROM ALL OTHER UTILITIES v.AV/IT - MIN. 12" FROM ALL OTHER UTILITIES

vi. ELECTRIC - PER PPL REQUIREMENTS

2.ELECTRIC NOTES:

a.INSTALLATION OF PRIMARY AND SECONDARY DUCT

BANKS SHALL BE PERFORMED BY THE ELECTRICAL

CONTRACTOR. ALL TRENCHING TO BE PROVIDED BY THE

GENERAL CONTRACTOR. SEE MEP PLANS FOR PRIMARY

AND SECONDARY ELECTRICAL SERVICE DETAILS.

b.PPL SHALL PULL THE CABLES AND INSTALL THE XFMR

AND METERING.

c.ELECTRICAL CONTRACTOR TO COORDINATE AND

INSTALL ALL ONSITE ELECTRICAL CONDUIT FOR

GENERATOR/BACK-UP POWER AND LIGHTING. SEE MEP

PLANS.

3.GAS NOTES:

a. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR

COORDINATION WITH UGI REGARDING GAS SERVICE

INSTALLATION SCHEDULE.

b. THE GENERAL CONTRACTOR SHALL PROVIDE TRENCHING

FROM THE EXISTING GAS LINE TO THE RISER/METER

LOCATION(S).

c. THE GENERAL CONTRACTOR SHALL PROVIDE STONE

DUST PER UGI SPECIFICATIONS AND HAVE THIS

MATERIAL AVAILABLE FOR UGI'S USE AT THE TIME OF

SERVICE LINE INSTALLATION. TRENCH SPOILS SHALL

ALSO BE LOCATED ADJACENT TO THE TRENCH FOR UGI'S

USE WHEN BACKFILLING.

d.THE SERVICE CONNECTION FROM THE GAS MAIN UP TO

AND INCLUDING THE GAS METER SHALL BE INSTALLED

BY UGI UTILITIES.

THE GENERAL CONTRACTOR SHALL INSTALL THE CONCRETE PAD

FOR THE GAS METER PER UGI REQUIREMENTS, THIS SHALL BE

INSTALLED PRIOR TO THE INSTALLATION OF THE GAS METER.

EXTENTS OF EXISTING

VEGETATION TO REMAIN (TYP.)

"DO NOT EXPLODE"

MATCHLINE

A

B

"DO NOT EXPLODE"

MATCHLINE

A

B

"DO NOT EXPLODE"MATCHLINE

LD-17

LD-18

PROP. TIE-IN TO EXISTING

SANITARY MAIN

"DO NOT EXPLODE"MATCHLINE

CD-17

CD-18

S S

S S

S S

S S

S S

S S

S

C O

-3 C O

-2 C O

-1 C O

-5 C O

-4

SCRIPT:

SE

AL

SE

AL

MANAGER:

DATE:

PROJECT NO.:

OF

SHEET NO.:

C or po ra te O ffi ce

W es t J am es S tre et

Su ite

, L an ca st er , P

A

Ph on e:

(7

) 7

-1 w w w .rg sa ss oc ia te s.

co m

R eg io na l O ffi ce s:

Yo rk

, H ar ris bu rg , a nd P ao li

La nd

P la nn in g La nd sc ap e

Ar ch ite ct ur e

C iv il En gi ne er in g

XR

EF

S:

E xi st in g;

Ex is tin g-

G

IS

-S ur ve y;

La yo ut ;E as em en ts

;F lo od pl ai n;

Li gh tin g;

Z- U til ity

;P ro fil es

-U til iti es

PL

O

TT

ED

/2 /2

3:

P M

F

IL

EN

AM

E:

P

:\2

5\

2-

4\ C

AD

D

\C on st ru ct io n\ Pl ot \Z

-C D

-U til ity .d w g

N O

D

AT

E R

EV

IS

IO

N

O

PE

R

AT

IO

N

S

FA

C

IL

IT

Y

EX

PA

N

SI

O N

PI

TN

EY

R

O

AD

C O

N

ST

R U

C

TI

O N

P

LA

N

C

IT

Y O

F

LA

N C

AS

TE

R

LA

N C

AS

TE

R C

O U

N

TY

, P A

U

TI

LI

TY

P

LA

N

C

IT

Y O

F

LA

N C

AS

TE

R D

EP

AR

TM

EN

T O

F

PU

BL

IC

W O

R

KS

N O

R

TH

D U

KE

S

TR

EE

T P.

O . B

O X

LA

N

C

AS

TE

R

, P A

(7

) 2

-4

SC

AL

E:

0' 0'

SEPTEMBER 8, 2026

2025992-044

BENJAMIN MORTON, RLA

CD-18 54

/0 6/

AD

D

EN

D

U M

/1 4/

AD

D

EN

D

U M

/2 3/

AD

D

EN

D

U M

/2 9/

AD

D

EN

D

U M

/2 /2

AD

D

EN

D U

M

MULTICORELINK:Z-CD-Utility-CD-17 UTILITY PLAN MULTICORELINK:Z-CD-Utility-CD-17 UTILITY PLAN MULTICORELINK:Z-CD-Utility-CD-17 UTILITY PLAN MULTICORELINK:Z-CD-Utility-CD-16 UTILITY PLAN MULTICORELINK:Z-CD-Utility-CD-16 UTILITY PLAN MULTICORELINK:Z-CD-Utility-CD-17 UTILITY PLAN

Sheets and Views
CD-18 UTILITY PLAN

File details come from the government source that posted it. Updated .