48-CD-18 UTILITY PLAN.pdf
PDF 834 KB Posted
- Attached to
- Oakbrook Center for Early Education
- Solicitation number
- US.252787
- Issued by
- Berks County, Reese CDP, Pennsylvania
About this file
This is a Utility Plan for the Operations Facility Expansion project located at 150 Pitney Road in Lancaster, Pennsylvania, prepared by RGS Associates for the City of Lancaster Department of Public Works. The plan documents utility infrastructure requirements and coordination procedures for the construction project, including water, sewer, gas, electric, communications, and stormwater systems. The document establishes minimum vertical clearances between utility lines: 18 inches for stormwater, sanitary, and water utilities separated from each other; 12 inches for gas and audiovisual/information technology systems from all other utilities; and electric utilities per PPL requirements. Key responsibilities are delineated among contractors, with the General Contractor responsible for all subgrade preparation and earthwork, including trenching for electrical duct banks and gas service lines, while specialized contractors coordinate installation of their respective systems.
The utility plan specifies that PPL will pull electrical cables and install transformers and metering equipment, while the Electrical Contractor installs primary and secondary duct banks and onsite electrical conduit for generator backup power and lighting. The General Contractor must coordinate with UGI Utilities regarding gas service installation schedules and provide stone dust per UGI specifications and trench spoils for use during backfilling; UGI will install the service connection from the gas main through the meter, with the General Contractor responsible for constructing the concrete pad for the gas meter prior to meter installation. Communications conduits will be extended to proposed termination points as shown on electrical drawings and installed by the contractor. The plan includes multiple addenda issued between October 6, 2026, and November 2, 2026, indicating ongoing design refinements during the pre-construction phase.
View the file
Other files
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROP.
TRANSFORMER
LOCATION
"D O
N O
T
EX
PL
O
D E"
M A
TC
H
LI
N
E
LD
-1
LD
-1
LD-18
SHEET KEY MAP
LD-17
LD-16
PROP. TAPPING
SLEEVE AND VALVE
PROPOSED TREE
PROTECTION FENCE (TYP.)
8" DICL
PROPOSED
LIGHT POST
(TYP.)
"DO NOT EXPLODE"
MATCHLINE
A
B
"D O
N O
T
EX
PL
O
D E"
M A
TC
H
LI
N
E C
D -1
C D
-1
CD-18
SHEET KEY MAP
CD-17
CD-16
"DO NOT EXPLODE"
MATCHLINE
A
B
I- A
I- A
M-A16
W
W
W
W
W
W W
W W
W W
W W
U E
U E
U E
U E
PROP. COMMUNICATIONS
CONDUIT TO BE EXTENDED TO
PROPOSED TERMINATION POINTS
AS SHOWN ON THE ELECTRICAL
DRAWINGS, TO BE INSTALLED BY
CONTRACTOR
COMMUNICATIONS HANDHOLE
INSTALLED BY CITY OF
LANCASTER, TRAFFIC RATED
ELECTRIC HANDHOLE
INSTALLED BY CITY OF
LANCASTER, TRAFFIC RATED
GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL SUBGRADE
PREPARATION AND EARTHWORK. OTHER PRIME CONTRACTORS
TO COORDINATE WORK WITH GENERAL CONTRACTOR.
UTILITY NOTES:
1.GENERAL UTILITY NOTES:
a.WATER, SEWER, AND GAS UTILITY LINES ON THE PLANS
REPRESENT THE CENTER OF THE UTILITY LINE OR
TRENCH.
b.CONTRACTOR SHALL CONFIRM THAT MINIMUM VERTICAL
CLEARANCES ARE PROVIDED AT ALL UTILITY
CROSSINGS.
c. VERTICAL CLEARANCES SHALL BE PROVIDED AS
FOLLOWS:
i. STORMWATER - MIN. 18" SEPARATION FROM
SANITARY/STORM/WATER
ii. SANITARY - MIN. 18" FROM SANITARY/STORM/WATER
iii. WATER - MIN. 18" FROM SANITARY/STORM/WATER
iv. GAS - MIN. 12" FROM ALL OTHER UTILITIES v.AV/IT - MIN. 12" FROM ALL OTHER UTILITIES
vi. ELECTRIC - PER PPL REQUIREMENTS
2.ELECTRIC NOTES:
a.INSTALLATION OF PRIMARY AND SECONDARY DUCT
BANKS SHALL BE PERFORMED BY THE ELECTRICAL
CONTRACTOR. ALL TRENCHING TO BE PROVIDED BY THE
GENERAL CONTRACTOR. SEE MEP PLANS FOR PRIMARY
AND SECONDARY ELECTRICAL SERVICE DETAILS.
b.PPL SHALL PULL THE CABLES AND INSTALL THE XFMR
AND METERING.
c.ELECTRICAL CONTRACTOR TO COORDINATE AND
INSTALL ALL ONSITE ELECTRICAL CONDUIT FOR
GENERATOR/BACK-UP POWER AND LIGHTING. SEE MEP
PLANS.
3.GAS NOTES:
a. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR
COORDINATION WITH UGI REGARDING GAS SERVICE
INSTALLATION SCHEDULE.
b. THE GENERAL CONTRACTOR SHALL PROVIDE TRENCHING
FROM THE EXISTING GAS LINE TO THE RISER/METER
LOCATION(S).
c. THE GENERAL CONTRACTOR SHALL PROVIDE STONE
DUST PER UGI SPECIFICATIONS AND HAVE THIS
MATERIAL AVAILABLE FOR UGI'S USE AT THE TIME OF
SERVICE LINE INSTALLATION. TRENCH SPOILS SHALL
ALSO BE LOCATED ADJACENT TO THE TRENCH FOR UGI'S
USE WHEN BACKFILLING.
d.THE SERVICE CONNECTION FROM THE GAS MAIN UP TO
AND INCLUDING THE GAS METER SHALL BE INSTALLED
BY UGI UTILITIES.
THE GENERAL CONTRACTOR SHALL INSTALL THE CONCRETE PAD
FOR THE GAS METER PER UGI REQUIREMENTS, THIS SHALL BE
INSTALLED PRIOR TO THE INSTALLATION OF THE GAS METER.
EXTENTS OF EXISTING
VEGETATION TO REMAIN (TYP.)
"DO NOT EXPLODE"
MATCHLINE
A
B
"DO NOT EXPLODE"
MATCHLINE
A
B
"DO NOT EXPLODE"MATCHLINE
LD-17
LD-18
PROP. TIE-IN TO EXISTING
SANITARY MAIN
"DO NOT EXPLODE"MATCHLINE
CD-17
CD-18
S S
S S
S S
S S
S S
S S
S
C O
-3 C O
-2 C O
-1 C O
-5 C O
-4
SCRIPT:
SE
AL
SE
AL
MANAGER:
DATE:
PROJECT NO.:
OF
SHEET NO.:
C or po ra te O ffi ce
W es t J am es S tre et
Su ite
, L an ca st er , P
A
Ph on e:
(7
) 7
-1 w w w .rg sa ss oc ia te s.
co m
R eg io na l O ffi ce s:
Yo rk
, H ar ris bu rg , a nd P ao li
La nd
P la nn in g La nd sc ap e
Ar ch ite ct ur e
C iv il En gi ne er in g
XR
EF
S:
E xi st in g;
Ex is tin g-
G
IS
-S ur ve y;
La yo ut ;E as em en ts
;F lo od pl ai n;
Li gh tin g;
Z- U til ity
;P ro fil es
-U til iti es
PL
O
TT
ED
/2 /2
3:
P M
F
IL
EN
AM
E:
P
:\2
5\
2-
4\ C
AD
D
\C on st ru ct io n\ Pl ot \Z
-C D
-U til ity .d w g
N O
D
AT
E R
EV
IS
IO
N
O
PE
R
AT
IO
N
S
FA
C
IL
IT
Y
EX
PA
N
SI
O N
PI
TN
EY
R
O
AD
C O
N
ST
R U
C
TI
O N
P
LA
N
C
IT
Y O
F
LA
N C
AS
TE
R
LA
N C
AS
TE
R C
O U
N
TY
, P A
U
TI
LI
TY
P
LA
N
C
IT
Y O
F
LA
N C
AS
TE
R D
EP
AR
TM
EN
T O
F
PU
BL
IC
W O
R
KS
N O
R
TH
D U
KE
S
TR
EE
T P.
O . B
O X
LA
N
C
AS
TE
R
, P A
(7
) 2
-4
SC
AL
E:
0' 0'
SEPTEMBER 8, 2026
2025992-044
BENJAMIN MORTON, RLA
CD-18 54
/0 6/
AD
D
EN
D
U M
/1 4/
AD
D
EN
D
U M
/2 3/
AD
D
EN
D
U M
/2 9/
AD
D
EN
D
U M
/2 /2
AD
D
EN
D U
M
MULTICORELINK:Z-CD-Utility-CD-17 UTILITY PLAN MULTICORELINK:Z-CD-Utility-CD-17 UTILITY PLAN MULTICORELINK:Z-CD-Utility-CD-17 UTILITY PLAN MULTICORELINK:Z-CD-Utility-CD-16 UTILITY PLAN MULTICORELINK:Z-CD-Utility-CD-16 UTILITY PLAN MULTICORELINK:Z-CD-Utility-CD-17 UTILITY PLAN
| Sheets and Views |
| CD-18 UTILITY PLAN |
File details come from the government source that posted it. Updated .