This is a utility plan document for the Operations Facility Expansion project located at 150 Pitney Road for the City of Lancaster, Lancaster County, Pennsylvania. The plan details the installation and coordination of water, sewer, gas, electrical, and stormwater utilities required for the facility expansion. Key utility infrastructure includes an 8-inch DICL water main previously installed by the City of Lancaster, a terminal hydrant, frost-free hydrants (Woodward Y2 or approved equal), roof leaders for stormwater management (ranging from 6 to 8 inches), and electrical service components including primary and secondary duct banks. The General Contractor is responsible for all subgrade preparation, earthwork, and trenching coordination, while specialized contractors (electrical, plumbing, gas) coordinate their respective installations. The plan was finalized on September 8, 2026, with the project number 2025992-044, and has undergone five addendum revisions through November 2, 2026.
The utility plan establishes minimum vertical clearances between utilities to ensure safe installation and operation: stormwater, sanitary, and water lines require 18-inch separation from each other; gas lines require 12-inch separation from all other utilities; and AV/IT lines require 12-inch separation from all other utilities, with electrical installations following PPL requirements. The General Contractor must coordinate with utility providers including the City of Lancaster Water Bureau, UGI Utilities for gas service, and PPL for electrical service. UGI Utilities will install the service connection from the gas main to the meter, while the General Contractor must prepare the concrete pad for the gas meter and provide stone dust and trench spoils per UGI specifications. Electrical service installation will be performed by the electrical contractor with cable pulling and transformer/metering installation by PPL. The contractor must confirm the acceptability of all materials, such as the frost-free hydrant basis of design, with the City of Lancaster Water Bureau prior to ordering.
View the file
Other files
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SALT STORAGE
BUILDING
STORAGE YARD
TRASH AREA
846 SF.
COVERED STORAGE
FROST FREE HYDRANT (TYP.),
WOODWARD Y2 OR APPROVED
EQUAL
INSTALLED FORD METER BOX
COMPANY - BASIS OF DESIGN
PSBH-488-20-60-NL-FP:
CONTRACTOR TO CONFIRM
ACCEPTABILITY WITH CITY OF
LANCASTER WATER BUREAU
PRIOR TO ORDERING
SCM-002
SCM-001
"D O
N O
T
EX
PL
O
D E"
M A
TC
H
LI
N
E
LD
-1
LD
-1
LD-18
SHEET KEY MAP
LD-17
LD-16
8" DICL WATER MAIN PREVIOUSLY
INSTALLED BY CITY OF LANCASTER
"DO NOT EXPLODE"MATCHLINE
LD-17
LD-18
TERMINAL HYDRANT PREVIOUSLY
INSTALLED BY CITY OF LANCASTER
MATERIAL STORAGE
PROPOSED TREE
PROTECTION FENCE (TYP.)
EXTENTS OF EXISTING
VEGETATION TO REMAIN (TYP.)
EX. ELECTRIC / COMMUNICATIONS
UTILITY, IF ADJUSTMENT/REBURIAL
REQUIRED TO PROVIDE REQUIRED
COVER, UTILITY AND OWNER SHALL
RELOCATE AT OWNER'S EXPENSE.
GC IS REQUIRED TO COORDINATE
ACCESS AND INCORPORATE WORK
INTO SCHEDULE
EX. ELECTRIC TO BE REBURIED
PER UTILITY PROVIDER
SPECIFICATIONS, IF
INSUFFICIENT COVER WILL
RESULT FROM ROADWAY
GRADING, CONTRACTOR TO
TEST PIT AND CONFIRM
PROPOSED LIGHT
POST (TYP.)
6" ROOF LEADER
TIE-IN (TYP.)
8" ROOF LEADER
6" ROOF LEADER
TIE-IN (TYP.)
6" ROOF LEADER
TIE-IN (TYP.)
6" ROOF LEADER
TIE-IN (TYP.)
6" ROOF LEADER
APPROXIMATE LOCATION OF EX. 6" WATER LINE
PER EDEN MANOR INTERCEPTOR REPLACEMENT &
CONESTOGA PINES TRAIL IMPROVEMENT PLAN,
LAST REVISED 10/11/2022.
"D O
N O
T
EX
PL
O
D E"
M A
TC
H
LI
N
E C
D -1
C D
-1
CD-18
SHEET KEY MAP
CD-17
CD-16
"DO NOT EXPLODE"MATCHLINE
CD-17
CD-18
M -A
M-A5
M -A
M-A3
M-A2
EW-A1
I-A7
I-A10
M-A12
SW-A27
OS-1
M-A29
O S-
M-A28
M-A30
FE
S-
A3
FE
S-
A3
M-A26
OS-3
M-A11 I-A8
G G
S S
S S
S S
S S
S
S S
S S
S S
S
S S
S
C O
-8
C O
-6
C O
-7
C O
-5 C O
-4
CO-9
W W
WW
W
WWWWWW
W
(NOT IN SCOPE)
GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL SUBGRADE
PREPARATION AND EARTHWORK. OTHER PRIME CONTRACTORS
TO COORDINATE WORK WITH GENERAL CONTRACTOR.
(NOT IN SCOPE)
FROST FREE HYDRANT (TYP.),
WOODWARD Y2 OR APPROVED
EQUAL
INSTALLED FORD METER BOX
COMPANY - BASIS OF DESIGN
PSBH-488-20-60-NL-FP:
CONTRACTOR TO CONFIRM
ACCEPTABILITY WITH CITY OF
LANCASTER WATER BUREAU
PRIOR TO ORDERING
UTILITY NOTES:
1.GENERAL UTILITY NOTES:
a.WATER, SEWER, AND GAS UTILITY LINES ON THE PLANS
REPRESENT THE CENTER OF THE UTILITY LINE OR
TRENCH.
b.CONTRACTOR SHALL CONFIRM THAT MINIMUM VERTICAL
CLEARANCES ARE PROVIDED AT ALL UTILITY CROSSINGS.
c. VERTICAL CLEARANCES SHALL BE PROVIDED AS FOLLOWS:
i. STORMWATER - MIN. 18" SEPARATION FROM
SANITARY/STORM/WATER
ii. SANITARY - MIN. 18" FROM SANITARY/STORM/WATER
iii. WATER - MIN. 18" FROM SANITARY/STORM/WATER
iv. GAS - MIN. 12" FROM ALL OTHER UTILITIES v.AV/IT - MIN. 12" FROM ALL OTHER UTILITIES
vi. ELECTRIC - PER PPL REQUIREMENTS
2.ELECTRIC NOTES:
a.INSTALLATION OF PRIMARY AND SECONDARY DUCT
BANKS SHALL BE PERFORMED BY THE ELECTRICAL
CONTRACTOR. ALL TRENCHING TO BE PROVIDED BY THE
GENERAL CONTRACTOR. SEE MEP PLANS FOR PRIMARY
AND SECONDARY ELECTRICAL SERVICE DETAILS.
b.PPL SHALL PULL THE CABLES AND INSTALL THE XFMR AND
METERING.
c.ELECTRICAL CONTRACTOR TO COORDINATE AND INSTALL
ALL ONSITE ELECTRICAL CONDUIT FOR
GENERATOR/BACK-UP POWER AND LIGHTING. SEE MEP
PLANS.
3.GAS NOTES:
a. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR
COORDINATION WITH UGI REGARDING GAS SERVICE
INSTALLATION SCHEDULE.
b. THE GENERAL CONTRACTOR SHALL PROVIDE TRENCHING
FROM THE EXISTING GAS LINE TO THE RISER/METER
LOCATION(S).
c. THE GENERAL CONTRACTOR SHALL PROVIDE STONE DUST
PER UGI SPECIFICATIONS AND HAVE THIS MATERIAL
AVAILABLE FOR UGI'S USE AT THE TIME OF SERVICE LINE
INSTALLATION. TRENCH SPOILS SHALL ALSO BE LOCATED
ADJACENT TO THE TRENCH FOR UGI'S USE WHEN
BACKFILLING.
d.THE SERVICE CONNECTION FROM THE GAS MAIN UP TO
AND INCLUDING THE GAS METER SHALL BE INSTALLED BY
UGI UTILITIES.
THE GENERAL CONTRACTOR SHALL INSTALL THE CONCRETE PAD
FOR THE GAS METER PER UGI REQUIREMENTS, THIS SHALL BE
INSTALLED PRIOR TO THE INSTALLATION OF THE GAS METER.
SCRIPT:
SE
AL
SE
AL
MANAGER:
DATE:
PROJECT NO.:
OF
SHEET NO.:
C or po ra te O ffi ce
W es t J am es S tre et
Su ite
, L an ca st er , P
A
Ph on e:
(7
) 7
-1 w w w .rg sa ss oc ia te s.
co m
R eg io na l O ffi ce s:
Yo rk
, H ar ris bu rg , a nd P ao li
La nd
P la nn in g La nd sc ap e
Ar ch ite ct ur e
C iv il En gi ne er in g
XR
EF
S:
E xi st in g;
Ex is tin g-
G
IS
-S ur ve y;
La yo ut ;E as em en ts
;F lo od pl ai n;
Li gh tin g;
Z- U til ity
;P ro fil es
-U til iti es
PL
O
TT
ED
/2 /2
3:
P M
F
IL
EN
AM
E:
P
:\2
5\
2-
4\ C
AD
D
\C on st ru ct io n\ Pl ot \Z
-C D
-U til ity .d w g
N O
D
AT
E R
EV
IS
IO
N
O
PE
R
AT
IO
N
S
FA
C
IL
IT
Y
EX
PA
N
SI
O N
PI
TN
EY
R
O
AD
C O
N
ST
R U
C
TI
O N
P
LA
N
C
IT
Y O
F
LA
N C
AS
TE
R
LA
N C
AS
TE
R C
O U
N
TY
, P A
U
TI
LI
TY
P
LA
N
C
IT
Y O
F
LA
N C
AS
TE
R D
EP
AR
TM
EN
T O
F
PU
BL
IC
W O
R
KS
N O
R
TH
D U
KE
S
TR
EE
T P.
O . B
O X
LA
N
C
AS
TE
R
, P A
(7
) 2
-4
SC
AL
E:
0' 0'
SEPTEMBER 8, 2026
2025992-044
BENJAMIN MORTON, RLA
CD-16 54
/0 6/
AD
D
EN
D
U M
/1 4/
AD
D
EN
D
U M
/2 3/
AD
D
EN
D
U M
/2 9/
AD
D
EN
D
U M
/2 /2
AD
D
EN
D
U M
MULTICORELINK:Z-CD-Utility-CD-17 UTILITY PLAN MULTICORELINK:Z-CD-Utility-CD-17 UTILITY PLAN MULTICORELINK:Z-CD-Utility-CD-17 UTILITY PLAN MULTICORELINK:Z-CD-Utility-CD-17 UTILITY PLAN MULTICORELINK:Z-CD-Utility-CD-18 UTILITY PLAN
| Sheets and Views |
| CD-16 UTILITY PLAN |
File details come from the government source that posted it. Updated .