46-CD-16 UTILITY PLAN.pdf

PDF 929 KB Posted

Attached to
Oakbrook Center for Early Education
Solicitation number
US.252787
Issued by
Berks County, Reese CDP, Pennsylvania

About this file

This is a utility plan document for the Operations Facility Expansion project located at 150 Pitney Road for the City of Lancaster, Lancaster County, Pennsylvania. The plan details the installation and coordination of water, sewer, gas, electrical, and stormwater utilities required for the facility expansion. Key utility infrastructure includes an 8-inch DICL water main previously installed by the City of Lancaster, a terminal hydrant, frost-free hydrants (Woodward Y2 or approved equal), roof leaders for stormwater management (ranging from 6 to 8 inches), and electrical service components including primary and secondary duct banks. The General Contractor is responsible for all subgrade preparation, earthwork, and trenching coordination, while specialized contractors (electrical, plumbing, gas) coordinate their respective installations. The plan was finalized on September 8, 2026, with the project number 2025992-044, and has undergone five addendum revisions through November 2, 2026.

The utility plan establishes minimum vertical clearances between utilities to ensure safe installation and operation: stormwater, sanitary, and water lines require 18-inch separation from each other; gas lines require 12-inch separation from all other utilities; and AV/IT lines require 12-inch separation from all other utilities, with electrical installations following PPL requirements. The General Contractor must coordinate with utility providers including the City of Lancaster Water Bureau, UGI Utilities for gas service, and PPL for electrical service. UGI Utilities will install the service connection from the gas main to the meter, while the General Contractor must prepare the concrete pad for the gas meter and provide stone dust and trench spoils per UGI specifications. Electrical service installation will be performed by the electrical contractor with cable pulling and transformer/metering installation by PPL. The contractor must confirm the acceptability of all materials, such as the frost-free hydrant basis of design, with the City of Lancaster Water Bureau prior to ordering.

View the file

Other files

File Type Posted
34-25061 - Addendum 3 Arch-struct-MEP summary.pdf PDF
3-C05 - Site Civil Specifications Combined.pdf PDF
15-2026-10-06 - ES Addendum 1.pdf PDF
35-25061 - Addendum 3 Arch-struct-MEP summary.pdf PDF
10-C08 - Construction Plan.pdf PDF
Demolition.dwg DWG drawing
17-323113 - CHAIN LINK FENCES AND GATES.pdf PDF
321723 - PAVEMENT MARKINGS.pdf PDF
6-C10 - Geotechnical Report.pdf PDF
42-312000 - EARTH MOVING.pdf PDF
PG.dwg DWG drawing
EG.dwg DWG drawing
49-B861-26-01 BidTabulationReport.xlsx XLSX spreadsheet
24-2026-10-14 - CD Addendum 2.pdf PDF
25-061_Pitney Rd Warehouse_Arch-Structural-MEP Drawings_Addendum 3.pdf PDF
28-312000 - EARTH MOVING.pdf PDF
12-25061 - Addendum 1.pdf PDF
48-CD-18 UTILITY PLAN.pdf PDF
9-C06 - Pitney Rd Warehouse Arch-Structural-MEP Bid Set.pdf PDF
32-25-061 Pitney Rd Warehouse Arch-Structural-MEP Drawings Addendum 3.pdf PDF
37-133418-USER-Post Frame Building Systems-10-23-2026.pdf PDF
22-B861-26-01 ADDENDUM 2 - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
25-2026-10-14 - ES Addendum 2.pdf PDF
18-329113 - SOIL PREPARATION.pdf PDF
41-2026-10-29 - ES Addendum 4.pdf PDF
ES.dwg DWG drawing
29-321723 - PAVEMENT MARKINGS.pdf PDF
25061 - Addendum 3_ Arch-struct-MEP summary.pdf PDF
44-B861-26-01 ADDENDUM 4 - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
30-2026-10-23 - ES Addendum 3.pdf PDF
Easements.dwg DWG drawing
Landscape.dwg DWG drawing
16-25-061 Pitney Rd Warehouse Arch-Structural-MEP Addendum 1.pdf PDF
20-City of Lancaster 150 Pitney Road Phase 1 ESA Sept2026.pdf PDF
33-Addendum 03 Arch Front End Specs.pdf PDF
13-133419-RIB- Pre-Engineered Metal Building Systems-09-17-2026.pdf PDF
11-B861-26-01 FINAL - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
26-Pre-Bid Attendees Ops Center Expansion 10072026.pdf PDF
40-2026-10-29 - CD Addendum 4.pdf PDF
38-25061 - Addendum 4 Arch-struct-MEP summary.pdf PDF
2026-10-23 - ES Addendum 3.pdf PDF
Addendum 03_Arch & Front End Specs.pdf PDF
39-25-061 Pitney Rd Warehouse Arch-Structural-MEP Drawings Addendum 4.pdf PDF
45-FINAL QA Report.pdf PDF
2026-10-23 - CD Addendum 3.pdf PDF
47-CD-17 UTILITY PLAN.pdf PDF
7-C09 - Fill Assessment Summary.pdf PDF
31-2026-10-23 - CD Addendum 3.pdf PDF
5-C03 - Operations Facilities Expansion - Bid Specs - Vol I.pdf PDF
312000 - EARTH MOVING.pdf PDF
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SALT STORAGE

BUILDING

STORAGE YARD

TRASH AREA

846 SF.

COVERED STORAGE

FROST FREE HYDRANT (TYP.),

WOODWARD Y2 OR APPROVED

EQUAL

INSTALLED FORD METER BOX

COMPANY - BASIS OF DESIGN

PSBH-488-20-60-NL-FP:

CONTRACTOR TO CONFIRM

ACCEPTABILITY WITH CITY OF

LANCASTER WATER BUREAU

PRIOR TO ORDERING

SCM-002

SCM-001

"D O

N O

T

EX

PL

O

D E"

M A

TC

H

LI

N

E

LD

-1

LD

-1

LD-18

SHEET KEY MAP

LD-17

LD-16

8" DICL WATER MAIN PREVIOUSLY

INSTALLED BY CITY OF LANCASTER

"DO NOT EXPLODE"MATCHLINE

LD-17

LD-18

TERMINAL HYDRANT PREVIOUSLY

INSTALLED BY CITY OF LANCASTER

MATERIAL STORAGE

PROPOSED TREE

PROTECTION FENCE (TYP.)

EXTENTS OF EXISTING

VEGETATION TO REMAIN (TYP.)

EX. ELECTRIC / COMMUNICATIONS

UTILITY, IF ADJUSTMENT/REBURIAL

REQUIRED TO PROVIDE REQUIRED

COVER, UTILITY AND OWNER SHALL

RELOCATE AT OWNER'S EXPENSE.

GC IS REQUIRED TO COORDINATE

ACCESS AND INCORPORATE WORK

INTO SCHEDULE

EX. ELECTRIC TO BE REBURIED

PER UTILITY PROVIDER

SPECIFICATIONS, IF

INSUFFICIENT COVER WILL

RESULT FROM ROADWAY

GRADING, CONTRACTOR TO

TEST PIT AND CONFIRM

PROPOSED LIGHT

POST (TYP.)

6" ROOF LEADER

TIE-IN (TYP.)

8" ROOF LEADER

6" ROOF LEADER

TIE-IN (TYP.)

6" ROOF LEADER

TIE-IN (TYP.)

6" ROOF LEADER

TIE-IN (TYP.)

6" ROOF LEADER

APPROXIMATE LOCATION OF EX. 6" WATER LINE

PER EDEN MANOR INTERCEPTOR REPLACEMENT &

CONESTOGA PINES TRAIL IMPROVEMENT PLAN,

LAST REVISED 10/11/2022.

"D O

N O

T

EX

PL

O

D E"

M A

TC

H

LI

N

E C

D -1

C D

-1

CD-18

SHEET KEY MAP

CD-17

CD-16

"DO NOT EXPLODE"MATCHLINE

CD-17

CD-18

M -A

M-A5

M -A

M-A3

M-A2

EW-A1

I-A7

I-A10

M-A12

SW-A27

OS-1

M-A29

O S-

M-A28

M-A30

FE

S-

A3

FE

S-

A3

M-A26

OS-3

M-A11 I-A8

G G

S S

S S

S S

S S

S

S S

S S

S S

S

S S

S

C O

-8

C O

-6

C O

-7

C O

-5 C O

-4

CO-9

W W

WW

W

WWWWWW

W

(NOT IN SCOPE)

GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL SUBGRADE

PREPARATION AND EARTHWORK. OTHER PRIME CONTRACTORS

TO COORDINATE WORK WITH GENERAL CONTRACTOR.

(NOT IN SCOPE)

FROST FREE HYDRANT (TYP.),

WOODWARD Y2 OR APPROVED

EQUAL

INSTALLED FORD METER BOX

COMPANY - BASIS OF DESIGN

PSBH-488-20-60-NL-FP:

CONTRACTOR TO CONFIRM

ACCEPTABILITY WITH CITY OF

LANCASTER WATER BUREAU

PRIOR TO ORDERING

UTILITY NOTES:

1.GENERAL UTILITY NOTES:

a.WATER, SEWER, AND GAS UTILITY LINES ON THE PLANS

REPRESENT THE CENTER OF THE UTILITY LINE OR

TRENCH.

b.CONTRACTOR SHALL CONFIRM THAT MINIMUM VERTICAL

CLEARANCES ARE PROVIDED AT ALL UTILITY CROSSINGS.

c. VERTICAL CLEARANCES SHALL BE PROVIDED AS FOLLOWS:

i. STORMWATER - MIN. 18" SEPARATION FROM

SANITARY/STORM/WATER

ii. SANITARY - MIN. 18" FROM SANITARY/STORM/WATER

iii. WATER - MIN. 18" FROM SANITARY/STORM/WATER

iv. GAS - MIN. 12" FROM ALL OTHER UTILITIES v.AV/IT - MIN. 12" FROM ALL OTHER UTILITIES

vi. ELECTRIC - PER PPL REQUIREMENTS

2.ELECTRIC NOTES:

a.INSTALLATION OF PRIMARY AND SECONDARY DUCT

BANKS SHALL BE PERFORMED BY THE ELECTRICAL

CONTRACTOR. ALL TRENCHING TO BE PROVIDED BY THE

GENERAL CONTRACTOR. SEE MEP PLANS FOR PRIMARY

AND SECONDARY ELECTRICAL SERVICE DETAILS.

b.PPL SHALL PULL THE CABLES AND INSTALL THE XFMR AND

METERING.

c.ELECTRICAL CONTRACTOR TO COORDINATE AND INSTALL

ALL ONSITE ELECTRICAL CONDUIT FOR

GENERATOR/BACK-UP POWER AND LIGHTING. SEE MEP

PLANS.

3.GAS NOTES:

a. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR

COORDINATION WITH UGI REGARDING GAS SERVICE

INSTALLATION SCHEDULE.

b. THE GENERAL CONTRACTOR SHALL PROVIDE TRENCHING

FROM THE EXISTING GAS LINE TO THE RISER/METER

LOCATION(S).

c. THE GENERAL CONTRACTOR SHALL PROVIDE STONE DUST

PER UGI SPECIFICATIONS AND HAVE THIS MATERIAL

AVAILABLE FOR UGI'S USE AT THE TIME OF SERVICE LINE

INSTALLATION. TRENCH SPOILS SHALL ALSO BE LOCATED

ADJACENT TO THE TRENCH FOR UGI'S USE WHEN

BACKFILLING.

d.THE SERVICE CONNECTION FROM THE GAS MAIN UP TO

AND INCLUDING THE GAS METER SHALL BE INSTALLED BY

UGI UTILITIES.

THE GENERAL CONTRACTOR SHALL INSTALL THE CONCRETE PAD

FOR THE GAS METER PER UGI REQUIREMENTS, THIS SHALL BE

INSTALLED PRIOR TO THE INSTALLATION OF THE GAS METER.

SCRIPT:

SE

AL

SE

AL

MANAGER:

DATE:

PROJECT NO.:

OF

SHEET NO.:

C or po ra te O ffi ce

W es t J am es S tre et

Su ite

, L an ca st er , P

A

Ph on e:

(7

) 7

-1 w w w .rg sa ss oc ia te s.

co m

R eg io na l O ffi ce s:

Yo rk

, H ar ris bu rg , a nd P ao li

La nd

P la nn in g La nd sc ap e

Ar ch ite ct ur e

C iv il En gi ne er in g

XR

EF

S:

E xi st in g;

Ex is tin g-

G

IS

-S ur ve y;

La yo ut ;E as em en ts

;F lo od pl ai n;

Li gh tin g;

Z- U til ity

;P ro fil es

-U til iti es

PL

O

TT

ED

/2 /2

3:

P M

F

IL

EN

AM

E:

P

:\2

5\

2-

4\ C

AD

D

\C on st ru ct io n\ Pl ot \Z

-C D

-U til ity .d w g

N O

D

AT

E R

EV

IS

IO

N

O

PE

R

AT

IO

N

S

FA

C

IL

IT

Y

EX

PA

N

SI

O N

PI

TN

EY

R

O

AD

C O

N

ST

R U

C

TI

O N

P

LA

N

C

IT

Y O

F

LA

N C

AS

TE

R

LA

N C

AS

TE

R C

O U

N

TY

, P A

U

TI

LI

TY

P

LA

N

C

IT

Y O

F

LA

N C

AS

TE

R D

EP

AR

TM

EN

T O

F

PU

BL

IC

W O

R

KS

N O

R

TH

D U

KE

S

TR

EE

T P.

O . B

O X

LA

N

C

AS

TE

R

, P A

(7

) 2

-4

SC

AL

E:

0' 0'

SEPTEMBER 8, 2026

2025992-044

BENJAMIN MORTON, RLA

CD-16 54

/0 6/

AD

D

EN

D

U M

/1 4/

AD

D

EN

D

U M

/2 3/

AD

D

EN

D

U M

/2 9/

AD

D

EN

D

U M

/2 /2

AD

D

EN

D

U M

MULTICORELINK:Z-CD-Utility-CD-17 UTILITY PLAN MULTICORELINK:Z-CD-Utility-CD-17 UTILITY PLAN MULTICORELINK:Z-CD-Utility-CD-17 UTILITY PLAN MULTICORELINK:Z-CD-Utility-CD-17 UTILITY PLAN MULTICORELINK:Z-CD-Utility-CD-18 UTILITY PLAN

Sheets and Views
CD-16 UTILITY PLAN

File details come from the government source that posted it. Updated .