About this file

This is a Specification Section document for pavement markings work prepared for the City of Lancaster Department of Public Works Operations Center Expansion project (RGS 2025992-044). The specification outlines requirements for applying painted markings to asphalt pavement and includes detailed procedures for surface preparation, paint application, and post-installation protection. The work requires compliance with PENNDOT and City of Lancaster requirements, and paint must be applied only to clean, dry surfaces at minimum ambient temperatures of 40 degrees Fahrenheit for alkyd materials and 55 degrees Fahrenheit for water-based materials, not exceeding 95 degrees Fahrenheit. A preinstallation conference must be conducted at the project site to review marking procedures, pavement aging requirements, and traffic restrictions during installation. Paving must age a minimum of 30 days before marking application begins, and all layout, colors, and placement must be verified with the Landscape Architect/Engineer prior to paint application.

The specification permits pavement-marking paint from 22 approved manufacturers including Sherwin-Williams, PPG Industries, Benjamin Moore, and others, with three paint type options available: alkyd-resin type complying with AASHTO M 248 Type N, MPI #32 alkyd traffic-marking paint, or MPI #97 latex traffic-marking paint. All paint must be lead and chromate free and available in white, yellow, and blue colors complying with FS TT-P-1952 color standards. Paint must be applied with mechanical equipment at manufacturer-recommended rates to achieve a minimum wet film thickness of 15 mils, with graphic symbols and lettering applied using paint-resistant die-cut stencils. Product data including technical data and tested physical and performance properties must be submitted for each paint product type selected. Pavement markings must be protected from damage and wear throughout the remainder of the construction period.

View the file

Other files

File Type Posted
34-25061 - Addendum 3 Arch-struct-MEP summary.pdf PDF
3-C05 - Site Civil Specifications Combined.pdf PDF
15-2026-10-06 - ES Addendum 1.pdf PDF
35-25061 - Addendum 3 Arch-struct-MEP summary.pdf PDF
10-C08 - Construction Plan.pdf PDF
Demolition.dwg DWG drawing
17-323113 - CHAIN LINK FENCES AND GATES.pdf PDF
321723 - PAVEMENT MARKINGS.pdf PDF
6-C10 - Geotechnical Report.pdf PDF
42-312000 - EARTH MOVING.pdf PDF
PG.dwg DWG drawing
EG.dwg DWG drawing
49-B861-26-01 BidTabulationReport.xlsx XLSX spreadsheet
24-2026-10-14 - CD Addendum 2.pdf PDF
25-061_Pitney Rd Warehouse_Arch-Structural-MEP Drawings_Addendum 3.pdf PDF
28-312000 - EARTH MOVING.pdf PDF
12-25061 - Addendum 1.pdf PDF
48-CD-18 UTILITY PLAN.pdf PDF
9-C06 - Pitney Rd Warehouse Arch-Structural-MEP Bid Set.pdf PDF
32-25-061 Pitney Rd Warehouse Arch-Structural-MEP Drawings Addendum 3.pdf PDF
37-133418-USER-Post Frame Building Systems-10-23-2026.pdf PDF
22-B861-26-01 ADDENDUM 2 - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
25-2026-10-14 - ES Addendum 2.pdf PDF
18-329113 - SOIL PREPARATION.pdf PDF
41-2026-10-29 - ES Addendum 4.pdf PDF
ES.dwg DWG drawing
25061 - Addendum 3_ Arch-struct-MEP summary.pdf PDF
44-B861-26-01 ADDENDUM 4 - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
30-2026-10-23 - ES Addendum 3.pdf PDF
Easements.dwg DWG drawing
Landscape.dwg DWG drawing
16-25-061 Pitney Rd Warehouse Arch-Structural-MEP Addendum 1.pdf PDF
20-City of Lancaster 150 Pitney Road Phase 1 ESA Sept2026.pdf PDF
33-Addendum 03 Arch Front End Specs.pdf PDF
13-133419-RIB- Pre-Engineered Metal Building Systems-09-17-2026.pdf PDF
11-B861-26-01 FINAL - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
26-Pre-Bid Attendees Ops Center Expansion 10072026.pdf PDF
40-2026-10-29 - CD Addendum 4.pdf PDF
38-25061 - Addendum 4 Arch-struct-MEP summary.pdf PDF
2026-10-23 - ES Addendum 3.pdf PDF
Addendum 03_Arch & Front End Specs.pdf PDF
39-25-061 Pitney Rd Warehouse Arch-Structural-MEP Drawings Addendum 4.pdf PDF
45-FINAL QA Report.pdf PDF
2026-10-23 - CD Addendum 3.pdf PDF
47-CD-17 UTILITY PLAN.pdf PDF
7-C09 - Fill Assessment Summary.pdf PDF
31-2026-10-23 - CD Addendum 3.pdf PDF
5-C03 - Operations Facilities Expansion - Bid Specs - Vol I.pdf PDF
312000 - EARTH MOVING.pdf PDF
46-CD-16 UTILITY PLAN.pdf PDF
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Operations Center Expansion RGS 2025992-044

City of Lancaster - Department of Public Works

PAVEMENT MARKINGS 321723

SECTION 321723 - PAVEMENT MARKINGS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes painted markings applied to asphalt pavement.

1.3 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site.

1. Review methods and procedures related to marking pavement including, but not limited to, the following:

a. Pavement aging period before application of pavement markings.

b. Review requirements for protecting pavement markings, including restriction of traffic during installation period.

1.4 ACTION SUBMITTALS

A. Product Data: For each type of product.

1. Include technical data and tested physical and performance properties.

1.5 QUALITY ASSURANCE

A. Regulatory Requirements: Comply with materials, workmanship, and other applicable requirements of PENNDOT and the City of Lancaster for pavement-marking work.

1. Measurement and payment provisions and safety program submittals included in standard specifications do not apply to this Section.

1.6 FIELD CONDITIONS

A. Environmental Limitations: Proceed with pavement marking only on clean, dry surfaces and at a minimum ambient or surface temperature of 40 deg F (4.4 deg C) for alkyd materials and 55 deg F

(12.8 deg C) for water-based materials, and not exceeding 95 deg F (35 deg C).

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Basis-of-Design Product: Subject to compliance with City of Lancaster requirements and

PENNDOT specifications, provide pavement marking products by one of the following:

1. Aexcel Inc.

2. Benjamin Moore & Co.

3. Color Wheel Paints & Coatings.

4. Columbia Paint & Coatings.

5. Conco Paints.

6. Coronado Paint; Division of INSL-X Products Corporation.

7. Diamond Vogel Paints.

8. Dunn-Edwards Corporation.

9. Ennis Traffic Safety Solutions, Inc.

10. Frazee Paint.

11. General Paint.

12. Kwal Paint.

13. M.A.B. Paints.

14. McCormick Paints.

15. Miller Paint.

16. Parker Paint Mfg. Co. Inc.

17. PPG Industries.

18. Pratt & Lambert.

19. Rodda Paint Co.

20. Rohm and Haas Company; a subsidiary of The Dow Chemical Company.

21. Scott Paint Company.

22. Sherwin-Williams Company (The).

2.2 PAVEMENT-MARKING PAINT

A. Pavement-Marking Paint: Alkyd-resin type, lead and chromate free, ready mixed, complying with

AASHTO M 248, Type N; colors complying with FS TT-P-1952.

1. Color: White, Yellow and Blue

B. Pavement-Marking Paint: MPI #32, alkyd traffic-marking paint.

1. Color: White, Yellow and Blue http://www.specagent.com/LookUp/?ulid=6888&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836435&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836436&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836438&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836439&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836440&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836441&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836442&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836444&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836445&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836446&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836447&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836448&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836449&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836450&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836451&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836452&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836453&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836454&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836455&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836456&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836457&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836458&mf=04&src=wd

C. Pavement-Marking Paint: MPI #97, latex traffic-marking paint.

1. Color: White, Yellow and Blue

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that pavement is dry and in suitable condition to begin pavement marking according to manufacturer's written instructions.

B. Proceed with pavement marking only after unsatisfactory conditions have been corrected.

3.2 PAVEMENT MARKING

A. Do not apply pavement-marking paint until layout, colors, and placement have been verified with

Landscape Architect/Engineer.

B. Allow paving to age for a minimum of 30 days before starting pavement marking.

C. Sweep and clean surface to eliminate loose material and dust.

D. Apply paint with mechanical equipment to produce pavement markings, of dimensions indicated, with uniform, straight edges. Apply at manufacturer's recommended rates to provide a minimum wet film thickness of 15 mils (0.4 mm).

1. Apply graphic symbols and lettering with paint-resistant, die-cut stencils, firmly secured to pavement. Mask an extended area beyond edges of each stencil to prevent paint application beyond the stencil. Apply paint so that it cannot run beneath the stencil.

3.3 PROTECTING AND CLEANING

A. Protect pavement markings from damage and wear during remainder of construction period.

B. Clean spillage and soiling from adjacent construction using cleaning agents and procedures recommended by manufacturer of affected construction.

END OF SECTION 321723

PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes painted markings applied to asphalt pavement.
1.3 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1. Review methods and procedures related to marking pavement including, but not limited to, the following:
a. Pavement aging period before application of pavement markings.
b. Review requirements for protecting pavement markings, including restriction of traffic during installation period.
1.4 ACTION SUBMITTALS
A. Product Data: For each type of product.
1. Include technical data and tested physical and performance properties.
1.5 QUALITY ASSURANCE
A. Regulatory Requirements: Comply with materials, workmanship, and other applicable requirements of PENNDOT and the City of Lancaster for pavement-marking work.
1. Measurement and payment provisions and safety program submittals included in standard specifications do not apply to this Section.
1.6 FIELD CONDITIONS
A. Environmental Limitations: Proceed with pavement marking only on clean, dry surfaces and at a minimum ambient or surface temperature of 40 deg F (4.4 deg C) for alkyd materials and 55 deg F (12.8 deg C) for water-based materials, and not exceeding ...
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Basis-of-Design Product: Subject to compliance with City of Lancaster requirements and PENNDOT specifications, provide pavement marking products by one of the following:
1. Aexcel Inc.
2. Benjamin Moore & Co.
3. Color Wheel Paints & Coatings.
4. Columbia Paint & Coatings.
5. Conco Paints.
6. Coronado Paint; Division of INSL-X Products Corporation.
7. Diamond Vogel Paints.
8. Dunn-Edwards Corporation.
9. Ennis Traffic Safety Solutions, Inc.
10. Frazee Paint.
11. General Paint.
12. Kwal Paint.
13. M.A.B. Paints.
14. McCormick Paints.
15. Miller Paint.
16. Parker Paint Mfg. Co. Inc.
17. PPG Industries.
18. Pratt & Lambert.
19. Rodda Paint Co.
20. Rohm and Haas Company; a subsidiary of The Dow Chemical Company.
21. Scott Paint Company.
22. Sherwin-Williams Company (The).
2.2 PAVEMENT-MARKING PAINT
A. Pavement-Marking Paint: Alkyd-resin type, lead and chromate free, ready mixed, complying with AASHTO M 248, Type N; colors complying with FS TT-P-1952.
1. Color: White, Yellow and Blue
B. Pavement-Marking Paint: MPI #32, alkyd traffic-marking paint.
1. Color: White, Yellow and Blue
C. Pavement-Marking Paint: MPI #97, latex traffic-marking paint.
1. Color: White, Yellow and Blue
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that pavement is dry and in suitable condition to begin pavement marking according to manufacturer's written instructions.
B. Proceed with pavement marking only after unsatisfactory conditions have been corrected.
3.2 PAVEMENT MARKING
A. Do not apply pavement-marking paint until layout, colors, and placement have been verified with Landscape Architect/Engineer.
B. Allow paving to age for a minimum of 30 days before starting pavement marking.
C. Sweep and clean surface to eliminate loose material and dust.
D. Apply paint with mechanical equipment to produce pavement markings, of dimensions indicated, with uniform, straight edges. Apply at manufacturer's recommended rates to provide a minimum wet film thickness of 15 mils (0.4 mm).
1. Apply graphic symbols and lettering with paint-resistant, die-cut stencils, firmly secured to pavement. Mask an extended area beyond edges of each stencil to prevent paint application beyond the stencil. Apply paint so that it cannot run beneath th...
3.3 PROTECTING AND CLEANING
A. Protect pavement markings from damage and wear during remainder of construction period.
B. Clean spillage and soiling from adjacent construction using cleaning agents and procedures recommended by manufacturer of affected construction.