26-Pre-Bid Attendees Ops Center Expansion 10072026.pdf

PDF 433 KB Posted

Attached to
Oakbrook Center for Early Education
Solicitation number
US.252787
Issued by
Berks County, Reese CDP, Pennsylvania

About this file

This document is a Pre-Bid Conference Attendee List for the B861-26-01 Multiprime - New Construction Operations Facility Expansion Project conducted by the City of Lancaster Department of Public Works (DPW) on October 7, 2026, at 9:00 AM. The project involves new construction for an operations facility expansion. The pre-bid conference was attended by six representatives from the City of Lancaster DPW, including the Deputy Director of Construction & Operations, managers of parks and public property, water distribution, and wastewater collections, along with construction unit and project management personnel. Additionally, two project design professionals from Beers & Hoffman Architects and RGS Associates attended the conference. The attendee list includes 24 representatives from various construction and trade contractors, including general construction firms, mechanical and plumbing contractors, electrical contractors, excavation services, and security system providers. The names, companies, phone numbers, and email addresses are documented for all attendees.

The document serves as a record of bidder participation and engagement for the multiprime sealed bid solicitation. No specific pricing terms, set-asides, or contract award information is contained within this attendee list. The comprehensive participation by multiple construction trade contractors suggests a complex, multi-phase project requiring coordinated work across general construction, plumbing, and electrical disciplines. This document indicates active market interest in the project prior to the formal bid submission phase.

View the file

Other files

File Type Posted
34-25061 - Addendum 3 Arch-struct-MEP summary.pdf PDF
3-C05 - Site Civil Specifications Combined.pdf PDF
15-2026-10-06 - ES Addendum 1.pdf PDF
35-25061 - Addendum 3 Arch-struct-MEP summary.pdf PDF
10-C08 - Construction Plan.pdf PDF
Demolition.dwg DWG drawing
17-323113 - CHAIN LINK FENCES AND GATES.pdf PDF
321723 - PAVEMENT MARKINGS.pdf PDF
6-C10 - Geotechnical Report.pdf PDF
42-312000 - EARTH MOVING.pdf PDF
PG.dwg DWG drawing
EG.dwg DWG drawing
49-B861-26-01 BidTabulationReport.xlsx XLSX spreadsheet
24-2026-10-14 - CD Addendum 2.pdf PDF
25-061_Pitney Rd Warehouse_Arch-Structural-MEP Drawings_Addendum 3.pdf PDF
28-312000 - EARTH MOVING.pdf PDF
12-25061 - Addendum 1.pdf PDF
48-CD-18 UTILITY PLAN.pdf PDF
9-C06 - Pitney Rd Warehouse Arch-Structural-MEP Bid Set.pdf PDF
32-25-061 Pitney Rd Warehouse Arch-Structural-MEP Drawings Addendum 3.pdf PDF
37-133418-USER-Post Frame Building Systems-10-23-2026.pdf PDF
22-B861-26-01 ADDENDUM 2 - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
25-2026-10-14 - ES Addendum 2.pdf PDF
18-329113 - SOIL PREPARATION.pdf PDF
41-2026-10-29 - ES Addendum 4.pdf PDF
ES.dwg DWG drawing
29-321723 - PAVEMENT MARKINGS.pdf PDF
25061 - Addendum 3_ Arch-struct-MEP summary.pdf PDF
44-B861-26-01 ADDENDUM 4 - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
30-2026-10-23 - ES Addendum 3.pdf PDF
Easements.dwg DWG drawing
Landscape.dwg DWG drawing
16-25-061 Pitney Rd Warehouse Arch-Structural-MEP Addendum 1.pdf PDF
20-City of Lancaster 150 Pitney Road Phase 1 ESA Sept2026.pdf PDF
33-Addendum 03 Arch Front End Specs.pdf PDF
13-133419-RIB- Pre-Engineered Metal Building Systems-09-17-2026.pdf PDF
11-B861-26-01 FINAL - MULTIPRIME Operations Facility Expansion Project.docx DOCX document
40-2026-10-29 - CD Addendum 4.pdf PDF
38-25061 - Addendum 4 Arch-struct-MEP summary.pdf PDF
2026-10-23 - ES Addendum 3.pdf PDF
Addendum 03_Arch & Front End Specs.pdf PDF
39-25-061 Pitney Rd Warehouse Arch-Structural-MEP Drawings Addendum 4.pdf PDF
45-FINAL QA Report.pdf PDF
2026-10-23 - CD Addendum 3.pdf PDF
47-CD-17 UTILITY PLAN.pdf PDF
7-C09 - Fill Assessment Summary.pdf PDF
31-2026-10-23 - CD Addendum 3.pdf PDF
5-C03 - Operations Facilities Expansion - Bid Specs - Vol I.pdf PDF
312000 - EARTH MOVING.pdf PDF
46-CD-16 UTILITY PLAN.pdf PDF
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B861-26-01 MULTIPRIME – NEW CONSTRUCTION

Operations Facility Expansion Project

Pre-Bid Conference Meeting, 10/7/2026 at 9:00 AM

Print Name Representing Phone Email Matt Metzler, Deputy Director, Construction & Operations

City of Lancaster DPW 717.291.4777 mmetzler@cityoflancasterpa.gov Ryan Hunter, Mgr. of Parks & Public Property

City of Lancaster DPW 717.291.4842 rhunter@cityoflancasterpa.gov

Mike Belfino, Water Distribution Manager

City of Lancaster DPW 717.989.3695 mbelfino@cityoflancasterpa.gov

Jason Gore, Construction Unit Superintendent

City of Lancaster DPW 717.740.0820 jgore@cityoflancasterpa.gov

Brandon Nye, Wastewater Collections Manager

City of Lancaster DPW 717.844.4105 bnye@cityoflancasterpa.gov

Travis Good, Construction Project Manager

City of Lancaster DPW 717.342.7942 tgood@cityoflancasterpa.gov

Jordan Zimmerman, Project Architect Beers & Hoffman Architects

717.625.0400 x313 jzimmerman@beershoffman.com

Benjamin Morton, RLA, Associate RGS Associates 717.715.1396 x214 bmorton@rgsassociates.com

George Glodwin C.S. Davidson, Inc. 717.481.2991 Delbert Martin Greencoast Site Prep 717.445.4667 dmartin@greencoastsite.com Scott Wallick W.C. Eshenaur & Son, Inc. 717.236.5031 swallick@eshenaurs.com Mike Frey W.C. Eshenaur & Son, Inc. 717.236.5031 mfrey@eshenaurs.com Ryan Graybill Garden Spot Electric 717.662.6000 rgraybill@gardenspotelectric.com Steve Mussoline Skepton Construction 508.641.5267 estimating@skeptonconstruction.com Steve Taylor Uhrig Construction 610.373.1612 staylor@uhrig.com Wyatt Ballou Balton Construction, Inc. 484.707.2347 estimating@baltonconstruction.com Scott Torrens Electronic Security Corp. of

America

610.633.4621 storrens@electronicsecuritycorp.com

Alex Sakal SSM Industries, Inc. 718.938.1622 asakal@ssmi.biz John Struble Caldwell, Heckles & Egan

Inc.

717.468.7933 jstruble@cheinc.com

Mel Bishop Storage Construction 717.578.1402 mbishop@storageconstruction.com

B861-26-01 MULTIPRIME – NEW CONSTRUCTION

Operations Facility Expansion Project

Pre-Bid Conference Meeting, 10/7/2026 at 9:00 AM

Jim Hair Lobar, Inc. 717.432.9728 james.hair@lobar.com Ian O’Connell Dustin Nagy Excavating, LLC

717.604.1957

Dan Foresman Matchline Mechanical LLC 717.721.3160 Shannon Breneman Keystruct Construction Inc. 717.393.9781 Colin Keefer eciConstruction 717.638.3000 Devin Cook D.H. Funk & Sons LLC 717.684.0708 Tim Fling Winter Engine 717.848.3777

File details come from the government source that posted it. Updated .