This is a legal advertisement order confirmation from the Kingman Miner newspaper for the City of Kingman, Arizona, regarding Invitation for Bids (IFB) 2026-IFB-003 for construction of public roadway and drainage improvements for Flying Fortress Parkway Phase II. The advertisement was scheduled to run twice in the newspaper on March 4 and March 11, 2026. The solicitation seeks sealed bids from qualified contractors capable of performing comprehensive civil infrastructure work including pavement installation with both Portland Cement Concrete Pavement and Asphalt Concrete options, concrete box culverts, drainage channels, retention basins, riprap and gabion construction, utility conduit installation, traffic control, pavement markings, signage, sidewalk and curb construction, and site preparation. The project requires completion within a mandatory 150-calendar-day construction period with pre-cast box culvert deliveries scheduled from March 2026 through June 2026. A non-mandatory pre-bid meeting is scheduled for March 12, 2026, at 10:00 a.m. Arizona time with an online Zoom option. Written questions must be submitted through the OpenGov procurement portal by 10:00 a.m. Arizona time on Monday, March 16, 2026, and sealed bids are due electronically by 10:00 a.m. Arizona time on Tuesday, March 24, 2026, submitted exclusively through the City of Kingman's procurement portal.

Selection criteria prioritize overall cost inclusive of taxes and the contractor's demonstrated ability to meet the 150-day construction schedule. Bidders must demonstrate previous acceptable experience in similar concrete roadway construction, submit contractor qualification statements and references, obtain an Arizona Registrar of Contractors license for public roadway work, secure a City of Kingman business license where applicable, and furnish a statutory bid bond. Contractors must perform at least 51 percent of the work with their own forces unless written approval for greater subcontracting is obtained. Bidders are responsible for factoring Transaction Privilege Tax into their overall pricing, as the City is not exempt from applicable Arizona taxes. No specific project budget range or award value is identified; the contract will be awarded to the lowest responsible, responsive bidder. The project is subject to Arizona Pollutant Discharge Elimination System requirements, making contractors responsible for environmental mitigation including invasive species prevention and stormwater pollution prevention planning. Failure to complete work within the 150-day contract period will result in liquidated damages per Maricopa Association of Governments Section 108 standards. Sabrina Hilton serves as the Project Manager and primary point of contact.

View the file

Other files

File Type Posted
Flying_Fortress_Parkway_Phase_II_(Addendum_#2_Revision).pdf PDF
Pre-Bid_Attendees.pdf PDF
Airway_Avenue_Geotech_Eval_Rpt_3-22-19.pdf PDF
Rinker's_Precast_Box_Culvert_Shop_Drawing.pdf PDF
FFP-Airway_100%_Sealed_Specs_02-24-2026.pdf PDF
ENG25-0079_Sheet22of32_Dibble.pdf PDF
Proctor_for_Earthwork_(stockpile).pdf PDF
Proctor_for_Earthwork_(stockpile).pdf PDF
RSFP_TI_Final_Geotech_Roadway_Report.pdf PDF
FFP-Airway_100%_Sealed_Specs_02-24-2026.pdf PDF
Airway_Avenue_Geotech_Eval_Rpt_3-22-19.pdf PDF
Student_calendar_for_the_2025-26_school_year___Kingman_Unified_School_District_#20.pdf PDF
Student_calendar_for_the_2026-27_school_year_Kingman_Unified_School_District_#20.pdf PDF
Student_calendar_for_the_2025-26_school_year___Kingman_Unified_School_District_#20.pdf PDF
RSFP_TI_Final_Geotech_Roadway_Report.pdf PDF
Cross_Sections_from_AECOM.pdf PDF
Flying_Fortress_Parkway_Phase_II_(Addendum_#1_Revision).pdf PDF
Flying_Fortress_Parkway_Phase_II.pdf PDF
AD91304_jnl.pdf PDF
Proctor_for_Earthwork_(stockpile).pdf PDF
RSFP_TI_Final_Geotech_Roadway_Report.pdf PDF
Airway_Avenue_Geotech_Eval_Rpt_3-22-19.pdf PDF
FFP-Airway_100%_Sealed_Plans_02-20-2026.pdf PDF
FFP-Airway_100%_Sealed_Specs_02-24-2026.pdf PDF
Student_calendar_for_the_2025-26_school_year___Kingman_Unified_School_District_#20.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KINGMAN MINER

701 STOCKTON HILL RD. STE. P

KINGMAN, AZ 86401

(928)753−6397

ORDER CONFIRMATION

Salesperson: LEGAL ADS Printed at 02/26/26 13:49 by jduha−rc Acct #: 35392 Ad #: 91304 Status: New WHOLD

*CITY OF KINGMAN CLERK’S OFFICE Start: 03/04/2026 Stop: 03/11/2026 310 N 4TH ST Times Ord: 2 Times Run: *** KINGMAN AZ 86401 LEG 1.00 X 8.53 Words: 349

Total LEG 8.53 Class: 400 LEGALS/MISC Rate: LEOP First Date: 80.61

Contact: Ad Descrpt: (91304) INVITATION FOR BI Phone: (928)753−5561 Given by: * Fax#: P.O. #: 2026−IFB−003 Email: ameredith@cityofkingman.gov; Created: jduha 02/26/26 13:42 Agency: Last Changed: jduha 02/26/26 13:49

PUB ZONE EDT TP RUN DATES

KDM A 6 S 03/04,11

AUTHORIZATION

Under this agreement rates are subject to change with 30 days notice. In the event of a cancellation before schedule completion, I understand that the rate charged will be based upon the rate for the number of insertions used.

Name (print or type) Name (signature)

(CONTINUED ON NEXT PAGE)

KINGMAN MINER

701 STOCKTON HILL RD. STE. P

KINGMAN, AZ 86401

(928)753−6397

ORDER CONFIRMATION (CONTINUED)

Salesperson: LEGAL ADS Printed at 02/26/26 13:49 by jduha−rc Acct #: 35392 Ad #: 91304 Status: New WHOLD WHOLD

� ����
��!�����" ��
�������"! ����
��!����#
�
��� � �� � ��������
������ � ���� � ���������� �
� � ���� ��
��������
������������������
� �������
� ���������� �
��� �������������
�������������
�����������
���������!��" ���!����
����������� �������������
�����������������$�������������������
�������������������%&'������
����(
��������#
���� �����������������������������
���� � ����������
����� � �� ������)**����������#���(

�./0�1'02 � %$ � 0'%1.22$/ � 2-&3'4- 2-$� 5$6�37�5&3,'&$1$62�53&2(8"

� �������� ���������
�������������
����������������
����������������������%')''���+�,��(
-�� � ����+ �� � .����+ � .���� � %/+

0'0/# �./0�(&$�/'$�%)�������(1!��&.936( 2.1$!�36��'$0/()!��(&,-�*�!�*�*+"

��� ����� ���� � ��1��� ����� ��� � �� � ��
���������� ��������
���������� � ��������� � ��� � �������(
���������������������#�������������
�� � �� ��1��� � ���� ���
������������������������������������(
��������������������(
�����������
����
����2���3�
���������) ������)**����������#���(
�#��*��
���� #��������������
�����������������+�����������(
��������� ���������

����2���( 3 � � � �������� �� � �� � ����"��

�����)**����������#���
�#��*��(
���4������5���# � �� � ��(
���������������������������

���6� � ������ � ��)

�*
�(
�������*��������(��������*����(

�(.8$/!�:(;$/!�-(6/ /$8.7$&$/!�(6/ $ 1(.8$/�5&3530(80�<.88�632�%$�(, ,$52$/" � �(.8$/ � 5&3530(80 � <.88 � %$ /.0530$/ � 3:! � '635$6$/! � (6/ � <.88 632�%$�&$2'&6$/�23�2-$��&3530$&"

������������������������������
����1��������������������������������(
�+��� �����������
�����������������(
����+ ����� �� ��1��� � ���������

�-$��.2)�&$0$&7$0�2-$�&.4-2�23� &$=$,2�(6)�(6/�(88�%./0"

!��#�'7*'8+�'7*%%*0'0/ 2�����9 #�:%7'8

File details come from the government source that posted it. Updated .