A090 _ Manufacturing Plan.pdf
PDF 131 KB Posted
- Solicitation number
- W56HZV_19_R_0118
About this file
This document contains a draft Contract Data Requirements List (CDRL) and related details for a Type I Family of All Terrain Crane procurement. The CDRL requires the contractor to submit a Manufacturing Plan detailing processes for producing the cranes. Deliverables include a draft plan due 15 days before the start of work meeting and a final plan due 20 days prior to Critical Design Review. The contractor must incorporate lessons learned and process improvements into revisions submitted 20 days before Production Readiness Review. Distribution of deliverables requires a statement and occurs via email to an Army IPT distribution list. Comments on the draft CDRL are due to the Army contracting office by December 11, 2020.
View the file
Other files
Show 40 more
Latest 50 of 133 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
| 1_DATA_ITEM_NO: A090 |
| 2_TITLE_OF_DATA_ITEM: Manufacturing Plan |
| 3_SUBTITLE: Manufacturing Plan |
| 4_AUTHORITY_Data_Acquisit: DI-MGMT-81889 |
| 5_CONTRACT_REFERENCE: E.1.2 |
| 6_REQUIRING_OFFICE: SFAE-CSS-FP |
| 7_DID_250_REQ: LT |
| 8_APP_CODE: A |
| DIST_STATEMENT: B |
| 10_FREQUENCY: AS REQ |
| 11_AS_OF_DATE: N/A |
| 12_DATE_OF_FIRST_SUBMISSI: SEE BLK 16 |
| 13_DATE_OF_SUBSEQUENT_SUB: SEE BLK 16 |
| addressee1: ACO |
| draft1: 1 |
| reg1: |
| repro1: 1 |
| addressee2: COR |
| draft2: 1 |
| reg2: |
| repro2: 1 |
| addressee3: SYS Engineer |
| draft3: 1 |
| reg3: |
| repro3: 1 |
| addressee4: Q/A |
| draft4: 1 |
| reg4: |
| repro4: 1 |
| addressee5: |
| draft5: |
| reg5: |
| repro5: |
| addressee6: |
| draft6: |
| reg6: |
| repro6: |
| addressee7: |
| draft7: |
| reg7: |
| repro7: |
| addressee8: |
| draft8: |
| reg8: |
| repro8: |
| addressee9: |
| draft9: |
| reg9: |
| repro9: |
| addressee10: |
| draft10: |
| reg10: |
| repro10: |
| addressee11: |
| draft11: |
| reg11: |
| repro11: |
| addressee12: |
| draft12: |
| reg12: |
| repro12: |
| addressee13: |
| draft13: |
| reg13: |
| repro13: |
| addressee14: |
| draft14: |
| reg14: |
| repro14: |
| addressee15: |
| draft15: |
| reg15: |
| repro15: |
| addressee16: |
| draft16: |
| reg16: |
| repro16: |
| addressee17: |
| draft17: |
| reg17: |
| repro17: |
| addressee18: |
| draft18: |
| reg18: |
| repro18: |
| addressee19: |
| draft19: |
| reg19: |
| repro19: |
| addressee20: |
| draft20: |
| reg20: |
| repro20: |
| addressee21: |
| draft21: |
| reg21: |
| repro21: |
| addressee22: |
| draft22: |
| reg22: |
| repro22: |
| addressee23: |
| draft23: |
| reg23: |
| repro23: |
| addressee24: |
| draft24: |
| reg24: |
| repro24: |
| addressee25: |
| draft25: |
| reg25: |
| repro25: |
| addressee26: |
| draft26: |
| reg26: |
| repro26: |
| addressee27: |
| draft27: |
| reg27: |
| repro27: |
| addressee28: |
| draft28: |
| reg28: |
| repro28: |
| addressee29: |
| draft29: |
| reg29: |
| repro29: |
| addressee30: |
| draft30: |
| reg30: |
| repro30: |
| addressee31: |
| draft31: |
| reg31: |
| repro31: |
| addressee32: |
| draft32: |
| reg32: |
| repro32: |
| addressee33: |
| draft33: |
| reg33: |
| repro33: |
| addressee34: |
| draft34: |
| reg34: |
| repro34: |
| addressee35: |
| draft35: |
| reg35: |
| repro35: |
| addressee36: |
| draft36: |
| reg36: |
| repro36: |
| addressee37: |
| draft37: |
| reg37: |
| repro37: |
| addressee38: |
| draft38: |
| reg38x: |
| repro38: |
| total_draft: 4 |
| total_repro: 4 |
| 16_REMARKS: BLOCK 4: Contractor's format is acceptable. |
BLOCK 8: Contractor shall submit updates within 15 days of any changes. Government has 10 days to review and provide comments or approval. Contractor has10 days to respond to comments. The Government has 10 days for approval.
BLOCK 9: Government requires a distribution statement on all deliverables. The Contractor shall request the distribution statement from the Government 15 days before the delivery of the data.
BLOCK 10, 12, 13 – The contractor shall submit a Draft Manufacturing Plan 15 days prior to the Start of Work Meeting.
Final Manufacturing Plan shall be submitted 20 days prior to CDR.
Any changes and/or updates resulting from lessons learned or implemented process improvements must be incorporated and submitted to the Government in a revision to the Final Manufacturing Plan 20 days prior to PRR.
BLOCK 14 – Email delivery per email addresses on Type I FOATC IPT List - Attachment 0008.
Repro = electronic copy
| 17_PRICE_GROUP: |
| ESTIMATED_TOTAL_PRICE: |
| G_PREPARED_BY: Brian C. McGrail |
| H_DATE: 02 Dec 2020 |
| 1_APPROVED_BY: |
| J_DATE: |
| Page: 1 |
| reg38t: 0 |
| A_CONTRACT_LINE_ITEM_NO: XXXX |
| B_EXHIBIT: C |
| TDP: |
| TM: |
| OTHER: x |
| DSYSTEMITEM: TYPE I FOATC |
| E_CONTRACTPR_NO: W56HZV-19-R-0118 |
| FCONTRACTOR: TBD |
| of_pages: 1 |
| Reset: |
File details come from the government source that posted it. Updated .