A081 _ Special Tool Technical Data Package for Field and Sustainment Level.pdf
PDF 181 KB Posted
- Solicitation number
- W56HZV_19_R_0118
About this file
This document contains a Contract Data Requirements List (CDRL) and details of a draft solicitation for the Type I Family of All Terrain Crane program. The CDRL requires the delivery of technical data packages including field and sustainment level special tool drawings and documentation. The initial technical data package must be delivered no later than 30 days prior to government verification, with final data due 30 to 60 days after verification. Distribution will include maintenance, logistics and program managers. The draft solicitation provides an opportunity for industry to review and comment on draft Section C, attachments, and CDRLs related to the Type I Family of All Terrain Cranes program. Comments on the draft documents are due by December 11, 2020 to inform the final solicitation. The Army Materiel Command Life Cycle Management Command is the issuing agency.
View the file
Other files
Show 40 more
Latest 50 of 133 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY:
TDP _X _ TM _ _ OTHER
D. SYSTEM/ITEM
Type I FOATC
E. CONTRACT/PR NO.
W56HZV-19-R-0118
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A081
2. TITLE OF DATA ITEM
Technical Data Package (TDP)
3. SUBTITLE
Field and Sustainment Level Special Tool Drawings
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80776B
5. CONTRACT REFERENCE
C.13.6, C.13.10
6. REQUIRING OFFICE
SFAE-CSS-FP-C
7. DD 250 REQ
NO
9. DIST
STATEMENT
A
10. FREQUENCY
AS REQ
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS:
The contractor shall develop and deliver tool and tool kit level one (conceptual), two (developmental), and three (production) drawings to support development of Field-Level and Sustainment-Level Special Tool Kit, which shall include a Tool Locator Guide identifying and including containerized tools, a placard or booklet, and integrated digital pictures of drawers, trays or cases indicating tool locations.
Block 12/13: The initial TDP shall be delivered no later than 30 prior to government verification of the special tool kit(s).
Final TDP shall be delivered 30 to 60 days following Government Verification.
Government comments will be provided at initial delivery and during Verification, for incorporation.
A DD Form 2554-1 TDP Option Selection Worksheet is included as an attachment for this CDRL and SOW.
*See Attachment 0008 – Type I FOATC POC List for distribution names and contact information.
APM*
1 1
Maintenance System Manager*
1 1
Logistics Manager* 1 1
15. TOTAL 3 - 3
G. PREPARED BY
Matthew Hinton
H. DATE
16 Jun 20
I. APPROVED BY
Assistant Product Manager (APM)
J. DATE
File details come from the government source that posted it. Updated .