A080 _ Contractor Logistics Support (CLS) Performance Report and Field Service Representative (FSR) Reports.pdf
PDF 424 KB Posted
- Solicitation number
- W56HZV_19_R_0118
About this file
This document contains a draft Contract Data Requirements List (CDRL) and attachments for solicitation number W56HZV-19-R-0118, which seeks contractor logistics support (CLS) and field service representative (FSR) reports for the Type I Family of All Terrain Crane (FOATC). The CDRL requires initial and updated CLS performance reports within two and ten business days of a contractor's arrival and completion of CLS actions at Government sites. Reports must include estimates and details of maintenance actions, labor hours, material and equipment costs, and other direct costs. FSRs must submit field reports upon completing duties or at intervals agreed by the Government and contractor. Distribution of reports includes program management and logistics personnel at the Government customer. Industry may submit comments on the draft Section C, attachments, and CDRLs to Army contacts by December 11, 2020, which will be considered for the final RFP.
View the file
Other files
Show 40 more
Latest 50 of 133 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS
LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER_ X _
D. SYSTEM/ITEM
Type I FOATC
E. CONTRACT/PR NO.
W56HZV-19-R-0118
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A080
2. TITLE OF DATA ITEM
Technical Report-Study/Service
3. SUBTITLE
Contractor Logistics Support (CLS) Performance Report and Field Service Representative (FSR) Reports
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
C.12.1.4
6. REQUIRING OFFICE
SFAE-CSS-FP-C
7. DD 250 REQ
No
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
See Blk 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Blk 16
Draft
Final
Reg Repro
16. REMARKS
BLK 9 - The following information shall be included on the deliverable:
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
BLK 12 - The contractor shall submit an initial Contractor Logistics Support (CLS) Performance Report 2 business days upon arrival to the Government site for Government approval. The initial report shall include an estimate of all anticipated service and maintenance actions, man days of labor, material/parts costs, any equipment/tools or lift assets that the contractor anticipates that are not already authorized for use at the system site identified by the unit, and Other Direct cost (ODC) to bring the system to Fully Mission Capable (FMC) status.
BLK 13 - The contractor shall update the CLS Performance Report within ten business days upon completion of CLS actions for Government approval. The updated report shall include all service and maintenance actions, man days of labor, material/parts costs, any equipment/tools or lift assets that the contractor required that are not already authorized for use at the system site identified by the unit, and ODC to bring the system to FMC status.
The contractor shall keep a log of the events by time starting once a request for support is received through the time the support condition is resolved. The log shall include the time of all servicing and maintenance actions performed and the time material/parts ordered and received.
The contractor-appointed Field Service Representatives (FSRs) shall provide field service reports upon completion of duties or in intervals outlined upon Government and contractor mutual decision. All FSR reports will be viewed by the Government as part of CLS Performance.
BLK 14 – See Attachment 0008 – Type I FOATC Point of Contact (POC) List for
Distribution Names and contact information.
Repro = Electronic Delivery
PCO 1 1
COR 1 1
APM 1 1
Logistics Manager 1 1
WSM 1 1
MSM 1 1
15. TOTAL 6 0 6
G. PREPARED BY
Integrated Product Support Manager
H. DATE
5/27/2020
I. APPROVED BY
Assistant Product Manager (APM)
J. DATE
File details come from the government source that posted it. Updated .