About this file

This document contains a Contract Data Requirements List (CDRL) for the Type I Family of All Terrain Crane contract opportunity. The CDRL requires the submission of quarterly Warranty Performance Reports detailing warranty activations and repairs. Reports are due 40 business days after the first system warranty activation and quarterly thereafter on the 10th day of each quarter. Distribution includes the Logistics Manager, Product Officer, Research Development and Engineering Command, and Product Manager. The related federal contract opportunity posting is for draft Section C, attachments, and CDRLs for the Family of All Terrain Cranes contract with solicitation number W56HZV-19-R-0118 from the Department of the Army Materiel Command. Comments on the draft documents are due by December 11, 2020 to inform the final RFP.

View the file

Other files

File Type Posted
A082 _ Tool Locator Guide.pdf PDF
A053 _ NMWR Data Summary.pdf PDF
A007 _ Integrated Product Support (IPS).pdf PDF
A071 _ Critical Task List-FOATC.pdf PDF
A056 _ Storage_ Exercise_ Care and Maintenance Plan.pdf PDF
Attachment 0014 _ Hazardous Materials Management Report _ HMMR.XLSX XLSX spreadsheet
A029 _ Safety Assessment Report _ SAR.pdf PDF
A005 _ Integrated Master Schedule (IMS).pdf PDF
Attachment 0027 _ LMI Summary Worksheet _ NMWR Data.pdf PDF
A074 _ New Equipment Training Classes.pdf PDF
Attachment 0009 _ Provisioning Requirements Statement.pdf PDF
A070 _ Training Material Format and Documentation.pdf PDF
Attachment 0025 _ EPCO Source File Requirements.pdf PDF
A017 _ Provisioning Pre-Procurement Screening.pdf PDF
A095 _ Test Support Package _ TSP.pdf PDF
A030 _ System Safety Program Plan _ SSPP.pdf PDF
A058 _ Provisioning Plan.pdf PDF
A036 _ Logistics Support Analysis (LSA).pdf PDF
Attachment 0037 _ Unique Item Identifier Raw Scan Report.xlsx XLSX spreadsheet
A055 _ Accountability Report.pdf PDF
Attachment 0001 - Type I FOATC PD - AT-PRF-0001 Type I FOATC PD 2020-10-08.pdf PDF
A028 _ Hazard Tracking System - HTS.pdf PDF
Attachment 0010 _ LMI Summary Worksheet _ Maintenance Analysis.pdf PDF
A038 _ Logistics Product Data Summary (LPDS).pdf PDF
A075 _ Training Course Completion Report-Student Training Administration.pdf PDF
A063 _ Logistics Product Data.PDF PDF
Attachment 0028 _ Attribute Selection Sheet.pdf PDF
Attachment 0007 _ Exhibit A CDRL DD Form 1423.pdf PDF
Attachment 0016 _ Level of Repair Analysis (LORA).pdf PDF
A089 _ Obsolescence Supportability Analysis Report.pdf PDF
A079 _ Sample IUID Data Plate Report.pdf PDF
A093 _ Analysis Requirement.pdf PDF
A001 _ Basic Issue Items (BII) List.pdf PDF
A062 _ Bill of Materials Report.pdf PDF
A052 _ NMWR Technical Manual.pdf PDF
Attachment 0006 _ Government Furnished Property (GFP) List.xlsx XLSX spreadsheet
Attachment 0012 _ Risk Management Scoring Criteria and Reporting Template.xlsx XLSX spreadsheet
A067 _ Field Level Maintenance New Equipment Training.pdf PDF
A020 _ Failure Mode _ Effects and Criticality Analysis (FMECA).pdf PDF
A065 _ Packaging Test Report.PDF PDF
A083 _ System Tracking and Shipping Report.pdf PDF
Attachment 0030 _ LMI Data Products Worksheet.pdf PDF
Attachment 0005 _ COTS Publications Requirements.pdf PDF
Attachment 0029 _ GEIA-STD-0007 Attribute Selection Worksheet.xlsx XLSX spreadsheet
Attachment 0038 _ TACOM IUID Data Plate Minimum Requirements.pdf PDF
A085 _ DMSMS Management Plan.pdf PDF
Attachment 0022 _ Copyright Release.pdf PDF
Attachment 0017 _ Deployment Equipment Publications Style Guide.pdf PDF
A027 _ Risk Tracking Report.pdf PDF
A037 _ Product Support Analysis (PSA) and Logistics Product Data (LPD) Objectives.pdf PDF
Show 40 more

Latest 50 of 133 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS

LIST

(1 Data Item)

Form Approved OMB No. 0704-

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER X

D. SYSTEM/ITEM

Type I FOATC

E. CONTRACT/PR NO.

W56HZV-19-R-0118

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A054

2. TITLE OF DATA ITEM

Technical Report-Study/Services

3. SUBTITLE

Warranty Performance Report

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80508(T)

5. CONTRACT REFERENCE

C.5.2

6. REQUIRING OFFICE

SFAE-CSS-FP-C

7. DD 250 REQ

DD

9. DIST

STATEMENT

A

10. FREQUENCY

QRTLY

12. DATE OF 1STSUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION SEE BLK 16 Draft

Final

Reg Repro

16. REMARKS

TAILORING: Para 1(a) – Delete 'and shall be duplicated using non-fading ink.' Para 1(b)

- Delete entirely. Para 1(c) – Delete and folded to conform to the size of paper used in the report.'

BLK 9 – The following information shall be included on the deliverable:

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

BLK12 – The contractor shall submit Warranty Performance Report within 40 business days of the first system warranty activation. The Government will review and provide comments within 10 business days.

BLK 13 – The contractor shall re-submit the Warranty Performance Report within ten business days of Government comments. Updated reports shall be submitted quarterly.

Report shall be submitted electronically once a quarter commencing with initial production delivery. The first report is due on the 10th day of the quarter following the First Unit Equipped (FUE).

Subsequent reports are due quarterly thereafter on the 10th day of each quarter.

BLK 14 – See Attachment 0008 – Type I FOATC Point of Contact (POC) List for distribution names and contact information.

Repro = Electronic Delivery

APM 1 1

Logistics Manager 1 1

PO 1 1

RDTA-DP 1 1

15. TOTAL --------- 4

G. PREPARED BY

Integrated Product Support Manager (IPSM)

H. DATE

11/5/2019

I. APPROVED BY

Assistant Product Manager (APM)

J. DATE

11/6/2019

File details come from the government source that posted it. Updated .