About this file

This document contains a Contract Data Requirements List (CDRL) and details regarding validation reporting requirements for a Type I Family of All Terrain Crane contract opportunity. The CDRL outlines requirements for a Validation Report to be submitted with draft equipment publications and technical manuals. The report must certify validation was completed, detail validation efforts, and show technical manual quality assurance was applied. It must include authorized contractor representative signature and be submitted for government review and approval within 30 days of receiving comments. The related federal contract opportunity posting provides a draft scope of work, attachments, and CDRLs for industry review and comment on the Family of All Terrain Cranes contract by December 11, 2020. Comments will be considered for the final RFP to be issued on Beta.SAM.

View the file

Other files

File Type Posted
A082 _ Tool Locator Guide.pdf PDF
A053 _ NMWR Data Summary.pdf PDF
A007 _ Integrated Product Support (IPS).pdf PDF
A071 _ Critical Task List-FOATC.pdf PDF
A056 _ Storage_ Exercise_ Care and Maintenance Plan.pdf PDF
Attachment 0014 _ Hazardous Materials Management Report _ HMMR.XLSX XLSX spreadsheet
A029 _ Safety Assessment Report _ SAR.pdf PDF
A005 _ Integrated Master Schedule (IMS).pdf PDF
Attachment 0027 _ LMI Summary Worksheet _ NMWR Data.pdf PDF
A074 _ New Equipment Training Classes.pdf PDF
Attachment 0009 _ Provisioning Requirements Statement.pdf PDF
A070 _ Training Material Format and Documentation.pdf PDF
Attachment 0025 _ EPCO Source File Requirements.pdf PDF
A017 _ Provisioning Pre-Procurement Screening.pdf PDF
A095 _ Test Support Package _ TSP.pdf PDF
A030 _ System Safety Program Plan _ SSPP.pdf PDF
A058 _ Provisioning Plan.pdf PDF
A036 _ Logistics Support Analysis (LSA).pdf PDF
Attachment 0037 _ Unique Item Identifier Raw Scan Report.xlsx XLSX spreadsheet
A055 _ Accountability Report.pdf PDF
Attachment 0001 - Type I FOATC PD - AT-PRF-0001 Type I FOATC PD 2020-10-08.pdf PDF
A028 _ Hazard Tracking System - HTS.pdf PDF
Attachment 0010 _ LMI Summary Worksheet _ Maintenance Analysis.pdf PDF
A038 _ Logistics Product Data Summary (LPDS).pdf PDF
A075 _ Training Course Completion Report-Student Training Administration.pdf PDF
A063 _ Logistics Product Data.PDF PDF
Attachment 0028 _ Attribute Selection Sheet.pdf PDF
Attachment 0007 _ Exhibit A CDRL DD Form 1423.pdf PDF
Attachment 0016 _ Level of Repair Analysis (LORA).pdf PDF
A089 _ Obsolescence Supportability Analysis Report.pdf PDF
A079 _ Sample IUID Data Plate Report.pdf PDF
A093 _ Analysis Requirement.pdf PDF
A001 _ Basic Issue Items (BII) List.pdf PDF
A062 _ Bill of Materials Report.pdf PDF
A052 _ NMWR Technical Manual.pdf PDF
Attachment 0006 _ Government Furnished Property (GFP) List.xlsx XLSX spreadsheet
Attachment 0012 _ Risk Management Scoring Criteria and Reporting Template.xlsx XLSX spreadsheet
A067 _ Field Level Maintenance New Equipment Training.pdf PDF
A020 _ Failure Mode _ Effects and Criticality Analysis (FMECA).pdf PDF
A065 _ Packaging Test Report.PDF PDF
A083 _ System Tracking and Shipping Report.pdf PDF
Attachment 0030 _ LMI Data Products Worksheet.pdf PDF
Attachment 0005 _ COTS Publications Requirements.pdf PDF
Attachment 0029 _ GEIA-STD-0007 Attribute Selection Worksheet.xlsx XLSX spreadsheet
Attachment 0038 _ TACOM IUID Data Plate Minimum Requirements.pdf PDF
A085 _ DMSMS Management Plan.pdf PDF
Attachment 0022 _ Copyright Release.pdf PDF
Attachment 0017 _ Deployment Equipment Publications Style Guide.pdf PDF
A027 _ Risk Tracking Report.pdf PDF
A037 _ Product Support Analysis (PSA) and Logistics Product Data (LPD) Objectives.pdf PDF
Show 40 more

Latest 50 of 133 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

Form Approved CMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

A. Contract Line Item No.

TBD

B. Exhibit

A C. Category

TDP __ TM __ OTHER _X_

D. System/Item.

Type I FOATC

E. Contract/PR NO.

W56HZV-19-R-0118

F. Contractor

TBD

1. Data Item No.

A048

2. Title of Data Item

Validation Report

3. Subtitle:

Validation Report

4. Authority (Data Acquisition Document No.)

DI-CMAN-80792A

5. Contract Reference C.4.4.3

6. Requiring Office

AMTA-LCC-JC

7. DD 250

Req

DD

9. Dist Statement Required

A

10. Frequency

AS REQ

12. Date of First Submission

SEE BLOCK 16

14. Distribution

8. APP Code A

11. As of Date

SEE BLOCK 16

13. Date of Subsequent

Submission

SEE BLOCK 16

a. Addressee b. Copies

Draf t

Final

Re g

Repr o

16. REMARKS

The Validation Report shall be submitted concurrent with each of the Logistics Demonstration - Draft

Equipment Publication/Preliminary Technical Manual (DEP/PTM) submissions IAW CDRLs A0XX, A0XX, A0XX, A0XX, A0XX and A0XX.

The Validation Report shall certify that validation has been completed, shall list in detail the effort undertaken during validation and shall show the TM deliverable has had Technical Manual Quality Assurance (TMQA) applied with use of the Equipment Publications Defects List located in the DE Syle Guide Attachment 0017 and TMQA Plan. The Validation Report shall include a signature of an individual authorized to represent the contractor.

The Government will review and determine acceptability within 30 calendar days of receipt. The contractor shall incorporate any Government comments and re-submit for approval within 30 calendar days of receipt of

Government comments. The report shall be considered a draft until accepted by the Government.

Electronic copy shall be delivered via e-mail.

*Please see Attachment 0008 – Type I FOATC POC List.

Repro = electronic copy delivery to email:

AMTA-LCC-

JC*

LOG* 1

15. TOTAL 2

G. PREPARED BY

Meredith Mydlo, Publications Manager

H. DATE

12/16/19

I. APPROVED BY

Pamela Tinsley, Chief, Force Projection Publications (CE, MHE and Tactical Bridging Systems)

J. DATE

12/16/19

File details come from the government source that posted it. Updated .