A048 _ Validation Report.pdf
PDF 136 KB Posted
- Solicitation number
- W56HZV_19_R_0118
About this file
This document contains a Contract Data Requirements List (CDRL) and details regarding validation reporting requirements for a Type I Family of All Terrain Crane contract opportunity. The CDRL outlines requirements for a Validation Report to be submitted with draft equipment publications and technical manuals. The report must certify validation was completed, detail validation efforts, and show technical manual quality assurance was applied. It must include authorized contractor representative signature and be submitted for government review and approval within 30 days of receiving comments. The related federal contract opportunity posting provides a draft scope of work, attachments, and CDRLs for industry review and comment on the Family of All Terrain Cranes contract by December 11, 2020. Comments will be considered for the final RFP to be issued on Beta.SAM.
View the file
Other files
Show 40 more
Latest 50 of 133 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
Form Approved CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. Contract Line Item No.
TBD
B. Exhibit
A C. Category
TDP __ TM __ OTHER _X_
D. System/Item.
Type I FOATC
E. Contract/PR NO.
W56HZV-19-R-0118
F. Contractor
TBD
1. Data Item No.
A048
2. Title of Data Item
Validation Report
3. Subtitle:
Validation Report
4. Authority (Data Acquisition Document No.)
DI-CMAN-80792A
5. Contract Reference C.4.4.3
6. Requiring Office
AMTA-LCC-JC
7. DD 250
Req
DD
9. Dist Statement Required
A
10. Frequency
AS REQ
12. Date of First Submission
SEE BLOCK 16
14. Distribution
8. APP Code A
11. As of Date
SEE BLOCK 16
13. Date of Subsequent
Submission
SEE BLOCK 16
a. Addressee b. Copies
Draf t
Final
Re g
Repr o
16. REMARKS
The Validation Report shall be submitted concurrent with each of the Logistics Demonstration - Draft
Equipment Publication/Preliminary Technical Manual (DEP/PTM) submissions IAW CDRLs A0XX, A0XX, A0XX, A0XX, A0XX and A0XX.
The Validation Report shall certify that validation has been completed, shall list in detail the effort undertaken during validation and shall show the TM deliverable has had Technical Manual Quality Assurance (TMQA) applied with use of the Equipment Publications Defects List located in the DE Syle Guide Attachment 0017 and TMQA Plan. The Validation Report shall include a signature of an individual authorized to represent the contractor.
The Government will review and determine acceptability within 30 calendar days of receipt. The contractor shall incorporate any Government comments and re-submit for approval within 30 calendar days of receipt of
Government comments. The report shall be considered a draft until accepted by the Government.
Electronic copy shall be delivered via e-mail.
*Please see Attachment 0008 – Type I FOATC POC List.
Repro = electronic copy delivery to email:
AMTA-LCC-
JC*
LOG* 1
15. TOTAL 2
G. PREPARED BY
Meredith Mydlo, Publications Manager
H. DATE
12/16/19
I. APPROVED BY
Pamela Tinsley, Chief, Force Projection Publications (CE, MHE and Tactical Bridging Systems)
J. DATE
12/16/19
File details come from the government source that posted it. Updated .