A046 _ Technical Manual Crosswalk Report.pdf
PDF 137 KB Posted
- Solicitation number
- W56HZV_19_R_0118
About this file
This document package includes a Contract Data Requirements List and related federal contract opportunity notice for the Type I Family of All Terrain Crane technical manual development effort. The CDRL outlines requirements for the contractor to conduct technical manual crosswalks and deliver crosswalk reports using a government-provided form with each technical manual submission. Reports are due within 30 days of government comments and must meet formatting and content requirements. The related opportunity notice provides a draft statement of work, attachments, and CDRLs for the Type I FOATC technical manual contract for industry review, with comments due by December 11, 2020. The Army Contracting Command will consider comments in finalizing the request for proposal to be posted on SAM.gov for the technical manual development effort.
View the file
Other files
Show 40 more
Latest 50 of 133 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
Form Approved CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. Contract Line Item No.
TBD
B. Exhibit
A C. Category
TDP _ TM __ OTHER _ X _
D. System/Item.
Type I FOATC
E. Contract/PR NO.
W56HZV-19-R-0118
F. Contractor
TBD
1. Data Item No.
A046
2. Title of Data Item
Technical Manual Crosswalk Report
3. Subtitle:
N/A
4. Authority (Data Acquisition Document No.)
DI-MGMT-80368A
5. Contract Reference
C.4.3.4
6. Requiring Office
AMTA-LCC-JC
7. DD 250 Req
LT
9. Dist Statement Required
A
10. Frequency
SEE BLOCK 16
12. Date of First Submission
SEE BLOCK 16
14. Distribution
8. APP Code
A
11. As of Date
SEE BLOCK 16
13. Date of Subsequent Submission
SEE BLOCK 16
a. Addressee b. Copies
Draft Final
Reg Repro
16. REMARKS
TECHNICAL MANUAL CROSSWALK REPORT. Contractor shall conduct a TM crosswalk IAW MIL-
STD-40051-2C, and as clarified by Attachment 0017 (Deployment Equipment Publications Style Guide).
The contractor shall use the Government provided TM Crosswalk Form (Attachment 0021) to document findings for all applicable manuals. The TM Crosswalk Form(s) shall be submitted with each TM deliverable (CDRLs A0XX, A0XX, A0XX, A0XX, A0XX and A0XX). The contractor shall deliver one electronic copy of the TM Crosswalk Form to each of the addressee’s listed in BLOCK 14. Deliverable will be reviewed for technical content and format.
Note - Paragraphs 2 and 3 of DI-MGMT-80368A are satisfied by utilizing TM Crosswalk Form (Attachment
0021).
The Government will review and determine acceptability or provide comments.
Government receipt of documentation does not constitute acceptance. The contractor shall incorporate any
Government comments and re-submit for approval within 30 calendar days of receipt of comments. The report shall be considered a draft until accepted by the Government.
BLOCK 14 - Email delivery per email addresses on Attachment 0008 - Type 1 FOATC POC List.
Repro = electronic copy delivery to email:
AMTA-LCC-JC 1
LOG 1
15. TOTAL 2
G. PREPARED BY
Meredith Mydlo, Publications Manager
H. DATE
4/16/2019
I. APPROVED BY
Pamela Tinsley, Chief, Force Projection Publications (CE, MHE and Tactical Bridging Systems)
J. DATE
4/16/2019
File details come from the government source that posted it. Updated .