A044 _ Equipment Publications Development Status Reports.pdf
PDF 208 KB Posted
- Solicitation number
- W56HZV_19_R_0118
About this file
This document contains a Contract Data Requirements List (CDRL) for a federal contract to develop equipment publications. The contractor will submit monthly Equipment Publications Development Status Reports detailing the work packages and status for each manual being developed. The first report is due 60 days after contract award, and subsequent reports will be delivered every 30 days until the contractor submits the Verification - DEP/PTM. The reports will be reviewed by the government within seven days of receipt. The contractor will provide electronic copies to the points of contact listed in an attachment. This CDRL requires the contractor to regularly update the government on the status of developing technical manuals for equipment under the Type I Family of All Terrain Crane contract between the Army Materiel Command TACOM Life Cycle Management Command and the contractor.
View the file
Other files
Show 40 more
Latest 50 of 133 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
Form Approved
CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. Contract Line Item No.
TBD
B. Exhibit A
C. Category
TDP __ TM __ OTHER _X_
D. System/Item.
Type I FOATC
E. Contract/PR NO.
W56HZV-19-R-0118
F. Contractor
TBD
1. Data Item No.
A044
2. Title of Data Item
Equipment Publications Development Status Reports
3. Subtitle:
4. Authority (Data Acquisition Document No.)
DI-MGMT-80368A
5. Contract Reference
C.4.2.8
6. Requiring Office
AMTA-LCC-JC
7. DD 250
Req
DD
9. Dist Statement Required
A
10. Frequency
AS REQ
12. Date of First Submission
SEE BLOCK 16
14. Distribution
8. APP Code A
11. As of Date
SEE BLOCK 16
13. Date of Subsequent
Submission
SEE BLOCK 16
a.
Addressee
b. Copies
Draft Final
Reg Repro
16. REMARKS
The contractor shall submit monthly Equipment Publications Development Status Reports. These reports will contain a detailed list of work packages and their status for each manual being developed.
The first Equipment Publications Development Status report will be delivered 60 calendar days after Contract
Award. The contractor will continue to provide the report every 30 calendar days until the contractor delivers the Verification - DEP/PTM.
The Government will review and determine acceptability within seven calendar days of receipt.
BLOCK 14 - *Email delivery per email addresses on Attachment 0008 - Type I FOATC POC List
Repro = electronic copy
ILSM* 1
PI* 1
APM* 1
AMTA-
LCC-JC
15.
TOTAL
G. PREPARED BY
Meredith Mydlo, Publications Manager
H. DATE
12/16/19
I. APPROVED BY
Pamela Tinsley, Chief, Force Projection Publications (CE, MHE and Tactical Bridging Systems)
J. DATE
12/16/19
File details come from the government source that posted it. Updated .