A032 _ Corrosion Control Report.pdf
PDF 95 KB Posted
- Solicitation number
- W56HZV_19_R_0118
About this file
This document package includes a Contract Data Requirements List (CDRL) and details of a related federal contract opportunity. The CDRL outlines technical reporting requirements for a contractor providing corrosion control services. Key deliverables include a corrosion control plan and periodic updates. The contractor must submit an initial draft within 30 days of award, with the Government providing comments for incorporation within 15 days thereafter. The opportunity notice seeks industry feedback on draft documents for a contract to produce Type I Family of All Terrain Cranes. Comments on the Scope of Work, Attachments and CDRLs are due by December 11, 2020. The final RFP will be posted to SAM.gov.
View the file
Other files
Show 40 more
Latest 50 of 133 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
| 1_DATA_ITEM_NO: A032 |
| 2_TITLE_OF_DATA_ITEM: Corrosion Control Report |
| 3_SUBTITLE: |
| 4_AUTHORITY_Data_Acquisit: DI-MISC-80508 |
| 5_CONTRACT_REFERENCE: C.2.5.1 |
| 6_REQUIRING_OFFICE: SFAE-CSS-FP-H |
| 7_DID_250_REQ: N/A |
| 8_APP_CODE: |
| DIST_STATEMENT: C |
| 10_FREQUENCY: SEE BLK 16 |
| 11_AS_OF_DATE: N/A |
| 12_DATE_OF_FIRST_SUBMISSI: SEE BLK 16 |
| 13_DATE_OF_SUBSEQUENT_SUB: SEE BLK 16 |
| addressee1: SFAE-CSS-FP-H |
| draft1: 1 |
| reg1: |
| repro1: 1 |
| addressee2: RDTA-EN/ME |
| draft2: 1 |
| reg2: |
| repro2: 1 |
| addressee3: |
| draft3: |
| reg3: |
| repro3: |
| addressee4: |
| draft4: |
| reg4: |
| repro4: |
| addressee5: |
| draft5: |
| reg5: |
| repro5: |
| addressee6: |
| draft6: |
| reg6: |
| repro6: |
| addressee7: |
| draft7: |
| reg7: |
| repro7: |
| addressee8: |
| draft8: |
| reg8: |
| repro8: |
| addressee9: |
| draft9: |
| reg9: |
| repro9: |
| addressee10: |
| draft10: |
| reg10: |
| repro10: |
| addressee11: |
| draft11: |
| reg11: |
| repro11: |
| addressee12: |
| draft12: |
| reg12: |
| repro12: |
| addressee13: |
| draft13: |
| reg13: |
| repro13: |
| addressee14: |
| draft14: |
| reg14: |
| repro14: |
| addressee15: |
| draft15: |
| reg15: |
| repro15: |
| addressee16: |
| draft16: |
| reg16: |
| repro16: |
| addressee17: |
| draft17: |
| reg17: |
| repro17: |
| addressee18: |
| draft18: |
| reg18: |
| repro18: |
| addressee19: |
| draft19: |
| reg19: |
| repro19: |
| addressee20: |
| draft20: |
| reg20: |
| repro20: |
| addressee21: |
| draft21: |
| reg21: |
| repro21: |
| addressee22: |
| draft22: |
| reg22: |
| repro22: |
| addressee23: |
| draft23: |
| reg23: |
| repro23: |
| addressee24: |
| draft24: |
| reg24: |
| repro24: |
| addressee25: |
| draft25: |
| reg25: |
| repro25: |
| addressee26: |
| draft26: |
| reg26: |
| repro26: |
| addressee27: |
| draft27: |
| reg27: |
| repro27: |
| addressee28: |
| draft28: |
| reg28: |
| repro28: |
| addressee29: |
| draft29: |
| reg29: |
| repro29: |
| addressee30: |
| draft30: |
| reg30: |
| repro30: |
| addressee31: |
| draft31: |
| reg31: |
| repro31: |
| addressee32: |
| draft32: |
| reg32: |
| repro32: |
| addressee33: |
| draft33: |
| reg33: |
| repro33: |
| addressee34: |
| draft34: |
| reg34: |
| repro34: |
| addressee35: |
| draft35: |
| reg35: |
| repro35: |
| addressee36: |
| draft36: |
| reg36: |
| repro36: |
| addressee37: |
| draft37: |
| reg37: |
| repro37: |
| addressee38: |
| draft38: |
| reg38x: |
| repro38: |
| total_draft: 2 |
| total_repro: 2 |
| 16_REMARKS: The contractor shall provide a report relating to corrosion control using the DI-MISC-80508B with the following information: |
1. Identification of base materials and their finish selection with qualification specification to include type(s) of plating(s), pretreatment(s), primer(s), topcoat(s), etc. of the hull, deck components, engine and attachment hardware.
2. Identification of all locations of dissimilar metal joints, and the detailed strategy to prevent corrosion (such as. galvanic, crevice, etc) between the hull, engine and any other instances of dissimilar metal joints.
BLOCK 10, 12 and 13: The draft Corrosion Control Report shall be submitted 30 days of contract award. The Government shall have 15 days to review and provide comments to the contractor. The contractor is required to address and/or incorporate all Government comments and provide a final report for approval within 15 days after receipt of Government contracts.
In the event that a material, process or finish changes occur following final report approval, the contractor must provide an update to capture the changes.
BLOCK 14: E-mail delivery per e-mail addresses on Attachment 0008 - Type I FOATC POC POC List.
Repro = electronic copy
| 17_PRICE_GROUP: |
| ESTIMATED_TOTAL_PRICE: |
| G_PREPARED_BY: Karl Tebeau |
| H_DATE: 23 Oct 2020 |
| 1_APPROVED_BY: |
| J_DATE: |
| Page: 1 |
| reg38t: 0 |
| A_CONTRACT_LINE_ITEM_NO: TBD |
| B_EXHIBIT: A |
| TDP: |
| TM: |
| OTHER: X |
| DSYSTEMITEM: Type I FOATC |
| E_CONTRACTPR_NO: W56HZV-19-R-0118 |
| FCONTRACTOR: TBD |
| of_pages: 1 |
| Reset: |
File details come from the government source that posted it. Updated .