A031 _ Hazardous Materials Management Program Report _ HMMR.pdf

PDF 714 KB Posted

Attached to
Type I Family of All Terrain Crane Draft Section C (Scope of Work); Draft Attachments, and Draft Contract Data Requirement Lists (CDRLs)
Solicitation number
W56HZV_19_R_0118
Issued by

About this file

This document contains a Contract Data Requirements List (CDRL) for hazardous materials management reporting on the Type I Family of All Terrain Crane contract. The CDRL requires the contractor to submit a Hazardous Materials Management Program Report within 120 business days of award and provide updates within 30 days of any material or process changes. The report shall include safety data sheets and be delivered electronically in Microsoft Office format to the addresses listed in an attachment. Distribution of the report is restricted to the Department of Defense and contractors for administrative and operational use only, as the data is export controlled.

View the file

Other files

File Type Posted
A082 _ Tool Locator Guide.pdf PDF
A053 _ NMWR Data Summary.pdf PDF
A007 _ Integrated Product Support (IPS).pdf PDF
A071 _ Critical Task List-FOATC.pdf PDF
A056 _ Storage_ Exercise_ Care and Maintenance Plan.pdf PDF
Attachment 0014 _ Hazardous Materials Management Report _ HMMR.XLSX XLSX spreadsheet
A029 _ Safety Assessment Report _ SAR.pdf PDF
A005 _ Integrated Master Schedule (IMS).pdf PDF
Attachment 0027 _ LMI Summary Worksheet _ NMWR Data.pdf PDF
A074 _ New Equipment Training Classes.pdf PDF
Attachment 0009 _ Provisioning Requirements Statement.pdf PDF
A070 _ Training Material Format and Documentation.pdf PDF
Attachment 0025 _ EPCO Source File Requirements.pdf PDF
A017 _ Provisioning Pre-Procurement Screening.pdf PDF
A095 _ Test Support Package _ TSP.pdf PDF
A030 _ System Safety Program Plan _ SSPP.pdf PDF
A058 _ Provisioning Plan.pdf PDF
A036 _ Logistics Support Analysis (LSA).pdf PDF
Attachment 0037 _ Unique Item Identifier Raw Scan Report.xlsx XLSX spreadsheet
A055 _ Accountability Report.pdf PDF
Attachment 0001 - Type I FOATC PD - AT-PRF-0001 Type I FOATC PD 2020-10-08.pdf PDF
A028 _ Hazard Tracking System - HTS.pdf PDF
Attachment 0010 _ LMI Summary Worksheet _ Maintenance Analysis.pdf PDF
A038 _ Logistics Product Data Summary (LPDS).pdf PDF
A075 _ Training Course Completion Report-Student Training Administration.pdf PDF
A063 _ Logistics Product Data.PDF PDF
Attachment 0028 _ Attribute Selection Sheet.pdf PDF
Attachment 0007 _ Exhibit A CDRL DD Form 1423.pdf PDF
Attachment 0016 _ Level of Repair Analysis (LORA).pdf PDF
A089 _ Obsolescence Supportability Analysis Report.pdf PDF
A079 _ Sample IUID Data Plate Report.pdf PDF
A093 _ Analysis Requirement.pdf PDF
A001 _ Basic Issue Items (BII) List.pdf PDF
A062 _ Bill of Materials Report.pdf PDF
A052 _ NMWR Technical Manual.pdf PDF
Attachment 0006 _ Government Furnished Property (GFP) List.xlsx XLSX spreadsheet
Attachment 0012 _ Risk Management Scoring Criteria and Reporting Template.xlsx XLSX spreadsheet
A067 _ Field Level Maintenance New Equipment Training.pdf PDF
A020 _ Failure Mode _ Effects and Criticality Analysis (FMECA).pdf PDF
A065 _ Packaging Test Report.PDF PDF
A083 _ System Tracking and Shipping Report.pdf PDF
Attachment 0030 _ LMI Data Products Worksheet.pdf PDF
Attachment 0005 _ COTS Publications Requirements.pdf PDF
Attachment 0029 _ GEIA-STD-0007 Attribute Selection Worksheet.xlsx XLSX spreadsheet
Attachment 0038 _ TACOM IUID Data Plate Minimum Requirements.pdf PDF
A085 _ DMSMS Management Plan.pdf PDF
Attachment 0022 _ Copyright Release.pdf PDF
Attachment 0017 _ Deployment Equipment Publications Style Guide.pdf PDF
A027 _ Risk Tracking Report.pdf PDF
A037 _ Product Support Analysis (PSA) and Logistics Product Data (LPD) Objectives.pdf PDF
Show 40 more

Latest 50 of 133 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if i t does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TBD B TDP TM OTHER X

D. SYSTEM/ITEM

Type I FOATC

E. CONTRACT/PR NO.

W56HZV-19-R-0118

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A031

2. TITLE OF DATA ITEM

Hazardous Materials Management Program Report (HMMR)

3. SUBTITLE

HMMR

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80508B(T) – SEE BLK 16

5. CONTRACT REFERENCE

C.2.4.4

6. REQUIRING OFFICE

FCDD-GVS-ES-MAT-ECC

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO SEE BLK 16 SEE BLK 16

b. COPIES

8. APP CODE SEE BLK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft Final

A A

SEE BLK 16 SEE BLK 16 Reg Repro

SEE BLK 16

16. REMARKS

Block 4:

Delete “format and” from the second paragraph of the Use/Relationship section.

Delete Requirements Section 2 and Section 3b through 3d.

Block 8: Should the Government require the data item to be corrected after its delivery, the Government will provide comments within 25 business days after delivery of the data item, and the contractor shall resubmit an update within 25 business days after receipt of Government comments.

Block 9: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DOD contractors only (Administrative or Operational use; export controlled) (Date of Determination: 09 August 2017). Other requests for this document shall be referred to PM FP Security Manager at: Program Executive Office Combat Support and Combat Service Support (CS&CSS), ATTN: SFAE-CSS-P, 6501 East 11 Mile Road, Mail Stop XXX, Detroit Arsenal, MI 48397- 5000. WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

Block 10, 11, and 12: The HMMR shall be submitted no later than 120 business days after contract award.

Block 13: In the event material/process changes occur the contractor must provide an update to the initial report to capture the material/process changes within 30 days of the change.

Block 14: The HMMR shall be submitted emailed per email addresses on Attachment 0008 - Type I FOATC POC List. The submission shall be prepared and delivered in an editable and Microsoft Office 2007 software suite file format (MS Word, MS Excel, MS PowerPoint, MS Visio). Exception:

The SDSs may be provided in pdf format.

APM

Environmental

Engineer

COR

15. TOTAL

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1

File details come from the government source that posted it. Updated .