A031 _ Hazardous Materials Management Program Report _ HMMR.pdf
PDF 714 KB Posted
- Solicitation number
- W56HZV_19_R_0118
About this file
This document contains a Contract Data Requirements List (CDRL) for hazardous materials management reporting on the Type I Family of All Terrain Crane contract. The CDRL requires the contractor to submit a Hazardous Materials Management Program Report within 120 business days of award and provide updates within 30 days of any material or process changes. The report shall include safety data sheets and be delivered electronically in Microsoft Office format to the addresses listed in an attachment. Distribution of the report is restricted to the Department of Defense and contractors for administrative and operational use only, as the data is export controlled.
View the file
Other files
Show 40 more
Latest 50 of 133 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if i t does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TBD B TDP TM OTHER X
D. SYSTEM/ITEM
Type I FOATC
E. CONTRACT/PR NO.
W56HZV-19-R-0118
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A031
2. TITLE OF DATA ITEM
Hazardous Materials Management Program Report (HMMR)
3. SUBTITLE
HMMR
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B(T) – SEE BLK 16
5. CONTRACT REFERENCE
C.2.4.4
6. REQUIRING OFFICE
FCDD-GVS-ES-MAT-ECC
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NO SEE BLK 16 SEE BLK 16
b. COPIES
8. APP CODE SEE BLK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft Final
A A
SEE BLK 16 SEE BLK 16 Reg Repro
SEE BLK 16
16. REMARKS
Block 4:
Delete “format and” from the second paragraph of the Use/Relationship section.
Delete Requirements Section 2 and Section 3b through 3d.
Block 8: Should the Government require the data item to be corrected after its delivery, the Government will provide comments within 25 business days after delivery of the data item, and the contractor shall resubmit an update within 25 business days after receipt of Government comments.
Block 9: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DOD contractors only (Administrative or Operational use; export controlled) (Date of Determination: 09 August 2017). Other requests for this document shall be referred to PM FP Security Manager at: Program Executive Office Combat Support and Combat Service Support (CS&CSS), ATTN: SFAE-CSS-P, 6501 East 11 Mile Road, Mail Stop XXX, Detroit Arsenal, MI 48397- 5000. WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
Block 10, 11, and 12: The HMMR shall be submitted no later than 120 business days after contract award.
Block 13: In the event material/process changes occur the contractor must provide an update to the initial report to capture the material/process changes within 30 days of the change.
Block 14: The HMMR shall be submitted emailed per email addresses on Attachment 0008 - Type I FOATC POC List. The submission shall be prepared and delivered in an editable and Microsoft Office 2007 software suite file format (MS Word, MS Excel, MS PowerPoint, MS Visio). Exception:
The SDSs may be provided in pdf format.
APM
Environmental
Engineer
COR
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1
File details come from the government source that posted it. Updated .